CII Benchmarking & Metrics (Project Questionnaire Version 11) Glossary of Terms
|
|
|
- Suzanna Hampton
- 10 years ago
- Views:
Transcription
1 Actual Project Cost: This is the total actual cost of a project. For contractors, the cost includes all work performed by the company, including costs attributable to work added or deducted by change orders. For owners, it excludes the cost of land, and any site preparation cost. Addition: A new addition that ties in to an existing facility, often intended to expand capacity. Synonym: Expansion, Add-on. Alignment: The condition where appropriate project participants are working within acceptable tolerances to develop and meet a uniformly defined and understood set of project objectives. Baseline Schedule: is the original planned schedule approved at time of Project Sanction for owners and contract award for contractors. It should be updated to include any changes since change data are collected in a later section. For benchmarking purposes the Baseline Schedule does NOT change during project execution. Benchmarking and Metrics: the systematic process of measuring an organization s performance against recognized leaders for the purpose of determining best practices that lead to superior performance when adapted and utilized. Best Practices: A Best Practice is a process or method that, when executed effectively, leads to enhanced project performance. CII Best Practices have been proven through extensive industry use and/or validation. Brownfield: The expansion, redevelopment, or reuse of property or facility which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant. Common examples are abandoned gas stations and dry cleaners, railroad properties, factories and closed military bases. Synonym: co-locate. Building: Includes Communications Center, Courthouse, Dormitory, Hotel, Large apartment complex, Embassy, Office building, Hospital, Laboratory, Maintenance Facilities, Movie Theatre, Parking Garage, Physical Fitness Center, Prison, Restaurant, Nightclub, Retail Building, School, and Warehouse. Business Driver: refers to the rationale behind of the capital investment, e.g. increase production capacity, or mandated by regulation. Change: A change is any event that results in a modification of the project work, schedule or cost. Owners and designers frequently initiate changes during design development to reflect changes in project scope or preferences for equipment and materials other than those originally specified. Contractors often initiate changes when interferences are encountered, when designs are found to be not constructable, or other design errors are found. Change Management: Change Management is the process of incorporating a balanced change culture of recognition, planning and evaluation of project changes in an organization to effectively manage project changes. CM at Risk: A delivery method which entails the construction manager to act as consultant to the owner in the development and design phases, but as the equivalent of a general contractor during the construction phase. (Last update: May 08, 2012) Page 1
2 Constructability: The optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives. Contingency: All costs in contingency accounts including but not limited to normal contingency, allowances, reserves, indirect costs for schedule contingency, escalation, etc. Cost Escalation: The provision in a cost estimate for increases in the cost of equipment, material, labor, etc., due to continuing price changes over time. Cost of Land: The cost of land includes the purchase price of the land obtained for project use. It does not include the cost of preparing the land for use, such as soil remediation, demolition of existing structures, site preparation, etc. Cost Reimbursable: The owner and contractor agree as to the price that will be charged per unit for the project. It is also called unit price. Its derivatives include cost plus fee, time and materials, and guaranteedmaximum price. Days Away (DA) Case: An incident which results in days away from work. Days Away (DA) Incidence Rate: The days away from work incidence rate (DA) is the number of DA cases occurring annually among 100 full-time workers (2,000 hours per worker per year). Days Away Restricted or Transferred (DART) Case: An incident which results in days away from work, restricted work activity, or job transfer. Days Away Restricted or Transferred (DART) Incidence Rate: The days away, restricted, or job transfer case incidence rate (DART) is the number of DART cases occurring annually among 100 full-time workers (2,000 hours per worker per year). Design-Build: An integrated delivery process which combines architectural and engineering design services with construction performance under one contract agreement. Direct Costs : Direct costs are those which are readily or directly attributable to, or become an identifiable part of, the final project (e.g., piping labor and material) [Source: AACEi]. Direct Cost of Field Rework: The sum of those costs associated with actual performance of tasks involved in rework. Examples include: Labor Materials Equipment Supervisory personnel Associated overhead cost Direct Work Hours: For the convenience of data collection, direct work hours include work hours of engineers/technician who produce engineering deliverables, include site investigators, meetings, planning, constructability, RFI, etc, and rework. Or work hours of workers who physically install material or physically assisting in installation. See account table for more details. (Last update: May 08, 2012) Page 2
3 Disputes Prevention & Resolution: Techniques that include the use of a Disputes Review Board as an alternate dispute resolution process for addressing disputes in their early stages before affecting the progress of the work, creating adversarial positions, and leading to litigation. Expansion: A new addition that ties in to an existing facility, often intended to expand capacity. Synonym: Addition. Fatality Rate: The fatality rate is the number of fatalities occurring annually among 100,000 full-time workers (2,000 hours per worker per year). Front End Planning (FPP): The essential process of developing sufficient strategic information with which owners can address risk and make decisions to commit resources in order to maximize the potential for a successful project. FEP is often perceived as synonymous with front-end engineering design (FEED), frontend loading (FEL), pre-project planning (PPP), feasibility analysis, programming and conceptual planning. Full-Time Equivalent (FTE): Represents the number of participants and the percent of time each is allocated to the project. For example, if one team member responsible for procurement works ½ time on the project, then the procurement contribution to the FTE measure is 0.5. Likewise, if two project controls specialists work on the team full time, they contribute 2.0 FTE. Grass Roots: A new facility from the foundations and up. A project requiring demolition of an existing facility before new construction begins is also classified as grass roots. Synonym: Greenfield. Heavy Industry: Includes Chemical Manufacturing, Electrical (Generating), Gas Distribution, Environmental, Metals Refining/Processing, Mining, Natural Gas Processing, Oil Exploration/Production, Oil Refining, Oil Sands Mining/Extraction, Oil Sands SAGD, Oil Sands Upgrading, Cogeneration, Pulp and Paper, Others. Indirect Costs: Indirect costs are all costs that cannot be attributed readily to a part of the final product (e.g., cost of managing the project) [Source: AACEi]. Infrastructure: Includes Airport, Electrical Distribution, Flood Control, Highway, Marine Facilities, Navigation, Pipeline, Rail, Tunneling, Water/Wastewater, Telecom, and Wide Area Network. ISBL: Inside Battery Limits (ISBL) is defined as all equipment and associated components (piping, etc.) that act upon the primary feed stream of a process. ISBL is functional-based and refers to equipment and other components that are solely dedicated to a single process whether or not the equipment is physically located within the geographical boundaries of the unit. Issue for Construction (IFC) Quantity: The work is required in the project s plans and specifications which are issued for construction, and does not include any quantity of work that is used due to rework. Lessons Learned: A critical element in the management of institutional knowledge, an effective lessons learned program will facilitate the continuous improvement of processes and procedures and provide a direct advantage in an increasingly competitive industry. Light Industry: Includes Automotive Manufacturing, Consumer Products Manufacturing, Foods, Microelectronics Manufacturing, Office Products Manufacturing, Pharmaceutical Manufacturing, Pharmaceutical Labs, and Clean Room. (Last update: May 08, 2012) Page 3
4 Lump Sum: The contractor agrees to provide a specified amount of work for a specific sum. It is also called single fixed price. Major Equipment: Commonly used interchangeably with Engineered Equipment. It is generally defined as tagged/numbered process or mechanical equipment including drivers. See Major Material Reference Table for details of cost elements. Materials Management: An integrated process for planning and controlling all necessary efforts to make certain that the quality and quantity of materials and equipment are appropriately specified in a timely manner, are obtained at a reasonable cost, and are available when needed. Mechanical Completion: The point in time when a plant is capable of being operated although some trim, insulation, and painting may still be needed. This occurs after completion of precommissioning. In some industries, mechanical completion may have the same general meaning as beneficial occupancy. Modernization: A facility for which a substantial amount of the equipment, structure, or other components is replaced or modified, and which may expand capacity and/or improve the process or facility. Synonyms: Renovation, Upgrade. Modularization: Modularization refers to the use of offsite construction (including a segregated area onsite). For the purposes of the benchmarking data, modularization includes all work that represents substantial offsite construction and assembly of components and areas of the finished project. Examples that would fall within this categorization include: Skid assemblies of equipment and instrumentation that naturally ship to the site in one piece, and require minimal on-site reassembly. Super-skids of assemblies of components that typically represent substantial portions of the plant, intended to be installed in a building. Prefabricated modules comprising both industrial plant components and architecturally finished enclosures. Modularization does not include offsite fabrication of components. Examples of work that would be excluded from the definition of modularization include: Fabrication of the component pieces of a structural framework Fabrication of piping spool-pieces NDE/NDT: Non-Destructive Examination/Evaluation (NDE) and Non-Destructive Testing (NDT) are techniques of testing that do not destroy the test object. Offshore Engineering: The practice of hiring an external organization or use foreign subsidiary to perform engineering functions in a developing country to gain a cost and/or schedule advantage. OSBL: Outside Battery Limits (OSBL) is defined as utilities, common facilities, and other equipment and components not included in the ISBL definition. OSBL refers to systems (equipment pieces and associated components) that support several units. Typical OSBL equipment includes cooling towers, water treatment facilities, feed tanks, etc. Overtime: any hours above 40 work hours a week. For example, if working 55 hours a work, so the overtime is 15 hours and the percentage of overtime hours is calculated as 15 hours overtime / 55 hours worked = 27.3% overtime. (Last update: May 08, 2012) Page 4
5 Partnering: A long-term commitment between two or more organizations as in an alliance or it may be applied to a shorter period of time such as the duration of a project. The purpose of partnering is to achieve specific business objectives by maximizing the effectiveness of each participant s resources. Planning for Startup: Startup is defined as the transitional phase between plant construction completion and commercial operations, that encompasses all activities that bridge these two phases, including systems turnover, check-out of systems, commissioning of systems, introduction of feedstocks, and performance testing. Process Industry Practices (PIP): A consortium of process industry owners and engineering construction contractors, who publishes Practices reflecting common standards for many engineering disciplines across the companies. Product: Refers to a grouping of goods or services produced by a facility. Project Budget: This is the estimated cost of the project at authorization to proceed (i.e., sanction, or final investment decision). For contracts, it only includes their scope of work. If a project had cost changes before authorization to proceed, then these changes should be included in the project budget. Do not include estimated costs for change orders received during project execution.. Project Definition Rating Index (PDRI): A tool used to measure the level of scope definition. It helps project teams to communicate and identify risks related to project scope definition. Project Delivery Method: an approach used to organize a project team so as to manage the delivery of a project. Project Delivery and Contract Strategy (PDCS): A structured process of evaluating and prioritizing owner s objectives, reviewing and evaluating delivery methods and contract types, and then determining what is the appropriate delivery method and contract type for a project. Project Development Changes: Changes required to execute the original scope of work or obtain original process basis. Examples include: Unforeseen site conditions that require a change in design / construction methods Changes required due to design errors and omissions Schedule acceleration / Deceleration Change in owner preferences Additional equipment or processes required to obtain original planned throughput Operability or maintainability changes Project Priority: Priority given to cost or schedule when making decisions during the execution of a project. Assuming Safety is given for all projects. Project Risk Assessment: The process to identify, assess and manage risk. Generally, the project team evaluates risk exposure for potential project impact to provide focus for mitigation strategies. P&IDs (Piping and Instrumentation Diagrams): Schematic diagrams which show the layout and relationship of piping and instrumentation. QA/QC: Quality Assurance (QA) and Quality Control (QC); Planned and systematic actions necessary to provide appropriate confidence that a product or service will satisfy the quality requirements. (Last update: May 08, 2012) Page 5
6 Quality Management: Quality Management incorporates all activities conducted to improve the efficiency, contract compliance and cost effectiveness of design, engineering, procurement, QA/QC, construction, and start-up elements of construction projects. Recordable Incident: A recordable incident is a work-related illness and any injury which results in loss of consciousness, restriction of work or motion, transfer to another job, or requires medical treatment beyond first aid. Total Recordable Incidence Rate (TRIR): The total recordable incidence rate (TRIR) is the number of recordable injuries occurring annually among 100 full-time workers (2,000 hours per worker per year). Lost Workday Case Incidence Rate (LWCIR): The lost workday case incidence rate (LWCIR) was replaced by the DART rate effective January 1, By definition, it was the equivalent to the DART rate. Request for Information (RFI): A process used to confirm the interpretation of a detail, specification or note on construction drawings or to secure a documented directive or clarification from the architect, engineer or owner that is needed to continue work. Renovation: A facility for which a substantial amount of the equipment, structure, or other components is replaced or modified, and which may expand capacity and/or improve the process or facility. Synonyms: Modernization, Upgrade. Scope Changes: Changes in the base scope of work or process basis. Examples include: Feedstock change Changed site location Changed throughput Addition of unrelated scope Team Building: A project-focused process that builds and develops shared goals, interdependence, trust and commitment, and accountability among team members and that seeks to improve team members problemsolving skills. Technology Use and Integration: The Technology Use and Integration practice addresses the level of automation and integration internally and externally for predefined tasks/work functions common to most projects. Turnaround: The period during which a boiler, generating unit, transmission line, or other facility is shutdown and unable to perform its normal operations. The shutdown of a facility including for maintenance, inspection, testing, regulatory changes, or, in some cases, for refuelling is known as a planned shutdown. Turnaround is interchangeable with shutdown or outage depending on industry groups. Zero Accidents Techniques: Zero accident techniques include the site specific safety programs and implementation, auditing and incentive efforts to create a project environment and a level of training that embraces the mind set that all accidents are preventable and that zero accidents is an obtainable goal. (Last update: May 08, 2012) Page 6
7 (Project Questionnaire Version 12.0) Project Phase Definition Table Project Phase Start/Stop Typical Activities & Products Typical Cost Elements Front End Planning Owner Personnel Planning Consultants Constructability Consultant Alliance / Partner Detail Engineering Owner Personnel Design Contractor Constructability Expert Alliance / Partner Procurement Owner Personnel Design Contractor Alliance / Partner Start: Defined Business Need that requires facilities Stop: Total Project Budget Authorized Start: Design Basis Stop: Release of all approved drawings and specs for construction (or last package for fast-track) Start: Procurement Plan for Engineered Equipment Stop: All engineered equipment has been delivered to site Options Analysis Life-cycle Cost Analysis Project Execution Plan Appropriation Submittal Pkg P&IDs and Site Layout Project Scoping Procurement Plan Arch. Rendering Drawing & Spec Preparation Bill of Material Preparation Procurement Status Sequence of Operations Technical Review Definitive Cost Estimate Supplier Qualification Supplier Inquiries Bid Analysis Purchasing Engineered Equipment Transportation Supplier QA/QC Owner Planning Team Personnel Expenses Consultant Fees & Expenses Environmental Permitting Costs Project Manager / Construction Manager Fees Licensor Costs Owner Project Management Personnel Designer Fees Project Manager / Construction Manager Fees Owner Project Management Personnel Project/Construction Manager Fees Procurement & Expediting Personnel Engineered Equipment Transportation Shop QA/QC (Last update: May 08, 2011) Page 7
8 (Project Questionnaire Version 12.0) Project Phase Definition Table (Cont.) Project Phase Start/Stop Typical Activities & Products Typical Cost Elements Construction Owner Personnel Design Contractor (Inspection) Construction Contractor and its Subcontractors Start-up / Commissioning Note: Not usually applicable to infrastructure or building projects Owner personnel Design Contractor Construction Contractor Training Consultant Equipment Suppliers Start: Commencement of foundations or driving piles Stop: Mechanical Completion Start: Mechanical Completion Stop: Custody transfer to user/operator (steady state operation) Set Up Trailers Procurement of Bulks Issue Subcontracts Construction Plan for Methods/Sequencing Build Facility & Install Engineered Equipment Complete Punchlist Demobilize Construction Equipment Testing Systems Training Operators Documenting Results Introduce Feedstocks and Obtain First Product Hand-off to User/Operator Operating System Functional Facility Warranty Work Owner Project Management Personnel Project Manager / Construction Manager Fees Building Permits Inspection QA/QC Construction Labor, Equipment & Supplies Bulk Materials Construction Equipment Contractor Management Personnel Warranties Owner Project Management Personnel Project Manager / Construction Manager Fees Consultant Fees & Expenses Operator Training Expenses Wasted Feedstocks Supplier Fees (Last update: May 08, 2011) Page 8
Experience and Qualifications of PROCESS PLANTS CORPORATION
Experience and Qualifications of PROCESS PLANTS CORPORATION Table of Contents Section 1. Project Services pg 3-20 Engineering Services Project management Design engineering Design management Construction
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT Characteristic of Construction Industry One of the biggest sector as * total turnover is more than $3,9 trillion annually * 7 million employee (USA) Affects vast and different industries:
Stanford University Guest Lecturer, Professor s Assistant, 1999-2004 Advanced Construction Issues and Claims, Civil Engineering Department
Current Position PKR CONSULTING, INC. Founder and Chief Executive Officer, 2004 Present Provides construction consulting, dispute resolution and expert witness services to owners, contractors, subcontractors,
NAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
Construction Contracts
STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.
International Accounting Standard 11 Construction Contracts
International Accounting Standard 11 Construction Contracts Objective The objective of this Standard is to prescribe the accounting treatment of revenue and costs associated with construction contracts.
Document Comparison. AIA Documents A134 2009 and A131CMc 2003
Document Comparison AIA Documents A134 2009 and A131CMc 2003 AIA Document A134 2009 is in the right-hand column. Corresponding sections of AIA Document A131 CMc 2003 are in the left-hand column. Sections
International Financial Reporting. Construction Contracts IAS 11
Construction Contracts IAS 11 2 Construction contract definition Construction Contract is a contract specifically negotiated for the construction of an asset (a building, a bridge) or a combination of
5. Firm is Corporation Partnership Sole Proprietorship Joint Venture Other
THIS IS AN APPLICATION FOR A CLAIMS MADE AND REPORTED POLICY This Application for Architects and Engineers Professional Liability Insurance is intended to be used for the preliminary evaluation of a submission.
SMARTPLANT ENTERPRISE
INDUSTRY SMARTPLANT ENTERPRISE For the Metals and Mining Industry INDUSTRY CHALLENGES Metals and mining facilities are increasingly complex and large in scope, with mega-projects becoming the norm. There
Professional Liability Division, Indianapolis, IN 317-575-9999 Holly Casey or Mike Gray Architects / Engineers
Professional Liability Division, Indianapolis, IN 317-575-9999 Holly Casey or Mike Gray Architects / Engineers Firm name: 1. Your firm's practice is best described as an architectural, engineering or environmental
Sri Lanka Accounting Standard -LKAS 11. Construction Contracts
Sri Lanka Accounting Standard -LKAS 11 Construction Contracts -405- Sri Lanka Accounting Standard -LKAS 11 Construction Contracts Sri Lanka Accounting Standard LKAS 11 Construction Contracts is set out
How To Manage A Project
Project Management - Maintenance Management p. 105 to 112 Project Management - Maintenance Management PGP / OCP-E PGP / OCP Project Management Major Grassroots Projects 5 Days Level: Foundation To provide
EST.07. If You Build It, They Will Come Making Project Historical Data Useful
EST.07 If You Build It, They Will Come Making Project Historical Data Useful Mr. John G. Musgrove, PE A t the 2007 AACE International Annual Meeting, Transaction Paper EST-02 presented the reasons and
Project Delivery Methods & Contract Types CSTM 102 Spring 2013
Project Delivery Methods & Contract Types CSTM 102 Spring 2013 Schedule February 16- Building Information Modeling February 21- Midterm Review February 23- Midterm In the industry the term Pre-Construction
Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.
Company Overview Finding simple solutions to complex problems. ON M9B 6H7 AB T2H 1Z9 339941 From our offices in,, and, we serve our national and international clients by providing cost-effective solutions
NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS
NAS 13 NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS CONTENTS Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT
1.040 Project Management
MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fred Moavenzadeh Spring 2009
APPLICATION FOR ARCHITECTS & ENGINEERS AND DESIGN/BUILD PROFESSIONAL LIABILITY INSURANCE
APPLICATION FOR ARCHITECTS & ENGINEERS AND DESIGN/BUILD PROFESSIONAL LIABILITY INSURANCE This is an Application for a claims made and reported policy. Please read the entire Application carefully before
The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors
108 Accounting Standard (AS) 7 (revised 2002) Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT
Front End Engineering Design Capabilities
Front End Engineering Design Capabilities Why EMERSON? Aligning your project and business objectives while creating a solid, detailed project foundation begins with a Front End Engineering Design (FEED)
Guardian Telecom Systems. Telephone. www.guardiantelecom.com
Guardian Telecom Systems Telephone www.guardiantelecom.com Telephone Systems Implementation of small to large Guardian Telecom Industrial PABX Telephone Systems allows internal and external communication
CII Best Practices Guide: Improving Project Performance
Construction Industry Institute CII Best Practices Guide: Improving Project Performance T F A R D Implementation Resource 166-3 Version 4.0 CII Best Practices Guide: Improving Project Performance Prepared
REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
Occupational Disease Fatalities Accepted by the Workers Compensation Board
Occupational Disease Fatalities Accepted by the Workers Compensation Board Year to date, numbers as of 30, Occupational disease fatalities are usually gradual in onset and result from exposure to work-related
Architects and Engineers Professional Liability Proposal Form
Notice:Statement pursuant to Section 25(5) of the Insurance Act (Cap 142) or any amendments thereof; You are to disclose in this application, fully and faithfully, all the facts which you know or ought
CALIFORNIA DEPARTMENT OF HUMAN RESOURCES SECTION I
PAY LETTER: 14-17 ISSUE DATE: August 20, 2014 CALIFORNIA DEPARTMENT OF HUMAN RESOURCES SECTION I SUMMARY OF REVISIONS TO THE CALIFORNIA STATE CIVIL SERVICE PAY SCALES LOCATED ON CALIFORNIA DEPARTMENT OF
ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE
THIS IS AN APPLICATION FOR A CLAIMS MADE AND REPORTED POLICY This Application for Architects and Engineers Professional Liability Insurance is intended to be used for the preliminary evaluation of a submission.
Schedule Acceleration Techniques Using a CM
College of Engineering Schedule Acceleration Techniques Using a CM By PI: Dr. Jesús M. de la Garza, Vecellio Professor Graduate Student: Ms. Daniela Escobar Hidrobo Final Report September 1, 2006 Invent
Advancements in Modularization
Advancements in Modularization Standardization, Modular Unit Operations and Global Deployment Interphex 2013 New York, NY Pär Almhem President ModWave & ModularPartners Outline Introduction to Modularization
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
Contracting Practices in Mega Projects
CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference
ENVIRONMENTAL QUESTIONNAIRE - REAL ESTATE SECURED LOANS
ENVIRONMENTAL QUESTIONNAIRE - REAL ESTATE SECURED LOANS Borrower: Property Known As: Property Address: City State NC Zip Code INSTRUCTIONS: For all loans, complete pages 1-3, answering all questions. If
Construction Contracts
65 Accounting Standard (AS) 7 Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT COSTS 15-20
Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive
Jacobs Contract performance Tracking spreadsheet = Excellent 2 = Meets performance standards 1 = Improvement needed 0= Unsatisfactory Report for the time period: Annual report 210 Total average score 2.86
School Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
How To Account For Construction Contracts In Hong Kong Kongsong Accounting Standard 11
HKAS 11 Issued October 2004Revised March 2010 Hong Kong Accounting Standard 11 Construction Contracts COPYRIGHT Copyright 2011 Hong Kong Institute of Certified Public Accountants This Hong Kong Financial
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG [email protected]
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG [email protected] CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
CMMS/EAM. Maintenance Solutions
CMMS/EAM Maintenance Solutions Superior Functionality. Fully Integrated Solution. Maximum System Support. Maximize Critical Assets Maintenance Software Solutions For nearly 40 years, CHAMPS has remained
Program Management for School Construction
Program Management for School Construction Presented to: Pasadena Unified School District Board of Education January 13, 2009 Project Delivery Options Design Bid Build Design/Build Construction Management
ORDINANCE NO.------- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
ORDINANCE NO.------- An ordinance authorizing the award of one design-build contract for the decommissioning, disablement, demolition and removal of Scattergood Generating Station Unit 3 pursuant to a
Engineering g Procurement. 02-Feb-2015
Engineering g Procurement Construction & Operation Capability Presentation About Pyramid E&C Est. 1995, professionally managed Company Over 500 projects executed till date Employs over 600 Engineers and
Motor Vehicle Fatalities Accepted by the Workers Compensation Board
Motor Vehicle Fatalities Accepted by the Workers Compensation Board Year to date, numbers as of January 1, 2008 to December 31, 2008 The fatalities listed represent motor vehicle fatalities that have been
Project Systems Management Providing Value-Added Solutions
Project Systems Management Providing Value-Added Solutions UPSTREAM MIDSTREAM AUTOMATION PROCESS & INDUSTRIAL PIPELINE PROCESS PLANTS Adding Value to Your Project Mustang couples global engineering, design,
Guidance on Process Safety Performance Indicators
Guidance on Process Safety Performance Indicators Table of contents 01 INTRODUCTION 02 OBJECTIVE 02 SCOPE 03 CRITERIA 06 DATA REPORTING 08 PROCESS SAFETY PERFORMANCE 08 CONCLUSIONS 09 DEFINITIONS 09 REFERENCES
Powerful information management services and software for the oil, gas, and chemical industries
Powerful information management services and software for the oil, gas, and chemical industries RELIEF SYSTEM SERVICES Provenance Consulting has relief system design experience in all aspects of the petrochemical
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
Occupational Disease Fatalities Accepted by the Workers Compensation Board
Occupational Disease Fatalities Accepted by the Workers Compensation Board Year to date, numbers as of Occupational disease fatalities are usually gradual in onset and result from exposure to work-related
Construction Management & Engineering CIEG 467-013
Construction Management & Engineering Construction Managers must be both oriented business and technically Construction Education Engineering (civil or architectural) Specialization/area of concentration
Project Execution Planning: The Key to Successful Pharmaceutical Project Delivery
Reprinted from PHARMACEUTICAL ENGINEERING THE OFFICIAL TECHNICAL MAGAZINE OF ISPE MARCH/APRIL 2014, VOL 34, NO 2 Copyright ISPE 2014 www.pharmaceuticalengineering.org facilities and equipment : The Key
Assured Joint Integrity
Assured Joint Integrity All leaks cost Loss of containment can have catastrophic results and negatively impact brand image, facilities, employees, and the environment. Unplanned shutdowns at hydrocarbon
On-Site Risk Management Audit Checklist for Program Level 3 Process
On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:
Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel
Page 1 of 6 ALM Properties, Inc. Page printed from: New York Law Journal Back to Article Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel James E. Hughes New York
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University. This was one of four innovative practices was described by
Committed to Environment, Health, & Safety
Committed to Environment, Health, & Safety Environment, Health, and Safety Management System and Policy of W.R. Grace & Co. January 1, 2015 The Grace Environment, Health, and Safety Management System,
Construction Contracts
Compiled Accounting Standard AASB 111 Construction Contracts This compiled Standard applies to annual reporting periods beginning on or after 1 January 2009 that end on or after 30 June 2009. Early application
Design Build Institute of America (DBIA)
Design Build Institute of America (DBIA) 1 D E S I G N B U I L D L E S S O N S L E A R N E D J O S É D. N U Ñ E Z, L E E D A P V I C E C H A N C E L L O R F A C I L I T I E S P L A N N I N G, M A I N T
Schedule 12 - Insurances
RFP Version There are two parts to this Schedule 12: Part A Insurances applicable to the D&C Phase; and Part B Insurances during the O&M Phase. [State Note: The State in its discretion may procure any
AXIS PRO Application for Design Professional Liability Insurance
IMPORTANT NOTICE AXIS PRO Application for Design Professional Liability Insurance This is an application for a policy, which if issued, will be on a claims made and reported basis and covers only claims
CLASSIFICATION SYSTEM BY FIELD AND SUB-FIELD OF EXPERTISE SUPPLIERS REGISTRY OF GOODS AND SERVICES ENAP GROUP OF COMPANIES I. Suppliers are classified in three groups: Classification Equipments, materials
GOVERNMENT OF MALAYSIA
GOVERNMENT OF MALAYSIA Malaysian Public Sector Accounting Standards MPSAS 11 Construction Contracts March 2015 MPSAS 11 Construction Contracts Acknowledgment The Malaysian Public Sector Accounting Standard
CSC-DIVISION 1-MASTER SECTIONS Description
CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant
ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY APPLICATION
James River Insurance Company and its Subsidiaries 6641 West Broad Street, Suite 300 Richmond, VA 23230 Application for Architects and Engineers Professional Liability PROFESSIONAL LIABILITY Division Email
Occupational Disease Fatalities Accepted by the Workers Compensation Board
Occupational Disease Fatalities Accepted by the Workers Compensation Board Year to date, numbers as of January 1, 2008 to December 31, 2008 Occupational disease fatalities are usually gradual in onset
ENVIRONMENTAL CONTRACTORS & CONSULTANTS
ace westchester specialty group NAME OF APPLICANT: ENVIRONMENTAL CONTRACTORS & CONSULTANTS SECTION I: APPLICANT APPLICATION DATE: MAILING ADDRESS: CITY: STATE: ZIP CODE: TELEPHONE: WEB ADDRESS: Company
Module 1: INTRODUCTION. Submodule 1: What is Construction Quality Management (CQM)? "PROACTIVE PREVENTION vs. REACTIVE INSPECTION"
Module 1: INTRODUCTION Submodule 1: What is Construction Quality Management (CQM)? "PROACTIVE PREVENTION vs. REACTIVE INSPECTION" Objectives: After completing this submodule, you will be able to: State
Architects and Engineers Professional Liability Application
Architects and Engineers Professional Liability Application WESTERN WORLD INSURANCE COMPANY TUDOR INSURANCE COMPANY STRATFORD INSURANCE COMPANY NOTICE: This application is for a CLAIMS MADE AND REPORTED
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
PROCUREMENT, FABRICATION & CONSTRUCTION
SmartPlant Enterprise PROCUREMENT, FABRICATION & CONSTRUCTION 2 Balancing Act PROCUREMENT, FABRICATION, AND CONSTRUCTION represent a complex balancing act between profit-making and risk-taking that requires
Owner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
EXPERT WITNESS AND DISPUTE SUPPORT Property Damage and Business Interruption Insurance Claims
Baker & O'Brien consultants are frequently retained as consulting or testifying experts and have been qualified to offer evidence in many insurance-related matters involving the energy industry. Services
7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster
Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com
How to get value for money from service providers on major projects
How to get value for money from service providers on major projects Session Focus Contracting as a relationship Identifying win/win arrangements Procurement & Planning on major projects Understanding the
PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Project Risk Assessment Examples
PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and Documentation - Project Risk Assessment Examples Example 54 10.0 PROJECT RISK This section outlines a methodology which will be used to
Construction Safety Forecast For ITER
INL/CON-06-11427 PREPRINT Construction Safety Forecast For ITER 17th ANS Topical Meeting on the Technology of Fusion Energy L. C. Cadwallader November 2006 This is a preprint of a paper intended for publication
Professionals in oil, gas and power projects LEADING IN OIL, GAS AND POWER PROJECTS
Professionals in oil, gas and power projects LEADING IN OIL, GAS AND POWER PROJECTS More successful with STAR, the expert in Oil, Gas and Power Projects Projects in Oil, Gas and Power generating industries
CHAPTER 4 TYPES OF COST ESTIMATES
CHAPTER 4 TYPES OF COST ESTIMATES 1. INTRODUCTION All projects, both construction and environmental restoration, require cost estimates to plan and budget the project efficiently. Numerous estimates are
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS. By Frank Westfall and Robert Winterburn
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS By Frank Westfall and Robert Winterburn DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS Frank Westfall and Robert Winterburn April 2015 Whether it
Contract Works and What you need to Know
ACN 002 566 743 Brookvale Insurance Brokers Pty Ltd Contract Works and What you need to Know 1. The Need for Contract Works Insurance The growth of large-scale construction projects has been accompanied
BUILDING PROFESSIONAL CONSTRUCTION INDEMNITY INSURANCE GUIDELINES. Australian Procurement and Construction Council Inc
Australian Procurement and Construction Council Inc PROFESSIONAL INDEMNITY INSURANCE GUIDELINES IN THE BUILDING AND CONSTRUCTION INDUSTRY BUILDING CONSTRUCTION Australian Procurement and Construction Council
Exhibit to Data Center Services Service Component Provider Master Services Agreement
Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information
Architects, Engineers and Construction Managers Errors and Omissions Insurance Application
If coverage is issued, it will be on a claims-made basis. Notice: this insurance coverage provides that the limit of liability available to pay judgements or settlements shall be reduced by amounts incurred
Project Cost Management
PDHonline Course P104 (8 PDH) Project Cost Management Instructor: William J. Scott, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
Procedure. Work Health and Safety Contractor Management. Document number: PRO-00808. Rev no. Description Process Owner Approved for issue
Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority
Procurement Strategy and Contract Selection
GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works
Classification Appeal Decision Under Section 5112 of Title 5, United States Code
U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Atlanta Oversight Division 75 Spring Street, SW., Suite 972 Atlanta, GA