1 TPB PG-NO. 12C (Revised May 2014) TOWN PLNNING BORD GUIDELINES FOR PPLICTION FOR DEVELOPMENTS WITHIN DEEP BY RE UNDER SECTION 16 OF THE TOWN PLNNING ORDINNCE (Important Note :- The Guidelines are intended for general reference only. The decision to approve or reject an application rests entirely with the Town Planning Board (the Board) and will be based on individual merits and other specific considerations of each case. ny enquiry on this pamphlet should be directed to the Secretariat of the Town Planning Board (15th Floor, North Point Government Offices (NPGO), 333 Java Road, North Point, Hong Kong Tel. No or ) or the Planning Enquiry Counters of the Planning Department (Hotline : ) (17th Floor, NPGO and 14th Floor, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin). The Guidelines are liable to revision without prior notice. the Guidelines current at the date on which it considers an application.) The Board will only make reference to INTRODUCTION 1. The Deep Bay, Mai Po Marshes and its adjacent area, including Hoo Hok Wai (collectively known as the Deep Bay rea) is recognised as a wetland of international importance. It is a habitat for a variety of species of waterbirds such as herons and egrets, and a stopover point for thousands of migratory birds. The Deep Bay rea comprises natural and man-made wetlands (rivers, freshwater marshes, fish ponds, gei wais, mangroves and inter-tidal mudflats) which provide a wide range of habitats to support a high diversity of biota (insects, reptiles, amphibian, birds and mammals). Five sites in the Deep Bay rea are designated as Sites of Special Scientific Interest (SSSI), respectively at Mai Po Village, Mai Po Marshes (including Lut Chau), Tsim Bei Tsui, Tsim Bei Tsui Egretry and Inner Deep Bay. The Mai Po Marshes, the Inner Deep Bay and the surrounding fish ponds have been listed as a Wetland of International Importance (the Ramsar Site ) under the Convention on Wetlands of International Importance especially as Waterfowl Habitat (the Ramsar Convention) since Such designation recognises the ecological importance of the Deep Bay rea as a wetland habitat and refueling station for thousands of migratory birds. Under the Ramsar Convention, if a party subsequently deletes or restricts a Wetland of International Importance, it should as far as possible compensate for the loss of
2 - 2 - wetland resources and recreate additional nature reserves for the purpose. 2. In recent years, there has been an increasing number of development proposals in the Deep Bay rea involving filling of fish ponds or works which may adversely affect the Deep Bay rea wetland ecosystem. To avoid the irreversible adverse impacts on the fish ponds and other wetland habitats in the Deep Bay rea, the Board provides development guidance for the Deep Bay rea through statutory plans. To facilitate applications for different uses and developments, a set of planning guidelines was also published. PRECUTIONRY PPROCH TO CONSERVE THE ECOLOGICL VLUE OF FISH PONDS 3. The ecological value of a habitat is defined as its contribution in sustaining the wildlife communities and essential ecological processes of a wider ecosystem. The Study on the Ecological Value of Fish Ponds in the Deep Bay rea (the Study) completed in 1997 has confirmed the unique international and regional importance of the fish pond system in the Deep Bay rea particularly for ardeids (i.e. herons and egrets). It has established that fish ponds in the area have intrinsic value as they function ecologically as a substantial source of food supply for the birds and as an important habitat for roosting and foraging of waterbirds. The fish pond system is fundamentally linked with the Mai Po Marshes and is part of the Deep Bay rea wetland ecosystem. The Ecological Field Survey of Hoo Hok Wai completed in June 2013 has further confirmed that the fish ponds and freshwater marshes occupying majority of the Hoo Hok Wai area have high ecological value due to their importance to waterbirds, including ardeids and spoonbills and other wetland-dependent species, including Eurasian Otter, and their strong ecological linkages with other wetlands within the Deep Bay rea, including the Mai Po Inner Deep Bay Ramsar Site. Different ponds are used preferentially by birds in different seasons, and it would be difficult to justify removal of certain individual fish ponds. Higher bird usage was observed to correlate with ponds which are contiguous to each other and with a greater and continuous area as against fragmented and isolated ponds. Developments resulting in the loss of fish ponds would reduce the food source to birds and certain developments adjoining or in the vicinity of fish ponds with disturbance impact, in particular open storage uses, industrial uses, dispersed village type development and roads, would lead to a reduction in bird usage.
3 precautionary approach has been adopted by the Board in view of the known intrinsic value of fish ponds in ecological terms and the complex response of birds to future landuse changes and carrying capacity which has not been fully understood. The intention is to protect and conserve the existing ecological functions of fish ponds in order to maintain the ecological integrity of the Deep Bay wetland ecosystem as a whole. This precautionary approach is formulated with the support of scientific surveys and analysis as provided in the Study. THE PRINCIPLE OF NO-NET-LOSS IN WETLND 5. In considering development proposals in the Deep Bay rea, the Board adopts the Study s recommended principle of no-net-loss in wetland which provides for the conservation of continuous and adjoining fish ponds. The no-net-loss can refer to both loss in area and function. No decline in wetland or ecological functions served by the existing fish ponds, especially as a source to provide abundant and accessible food and roosting grounds to ardeids and other species, should occur. s the fish ponds form an integral part of the Deep Bay rea wetland ecosystem, alternative uses could be considered suitable only if it could be demonstrated that they would not result in the loss of ecological function of the original ponds and if they complement the ecological functions of the wetlands and fish ponds in and/or around the Deep Bay rea. It is important that the alternative wetland habitat to replace the fish ponds can provide food supplies in a sustainable manner so that birds, particularly, the egret and heron population, are not put at risk. LND USE CONCEPT ND DEVELOPMENT GUIDELINES 6. The fundamental landuse planning concept for the Deep Bay rea should be the avoidance of loss of fish ponds and habitat fragmentation as well as mitigation of negative impact from undesirable landuses and human disturbance. two-pronged approach to landuse planning control is adopted through the designation of Wetland Conservation rea (WC) for all existing continuous and adjoining active/abandoned fish ponds and the designation of Wetland Buffer rea (WB) to protect the ecological integrity of the WC. This buffer generally comprises the strip of land of about 500m wide along the landward side of the WC (Figure ).
4 - 4 - Wetland Conservation rea (WC) 6.1 The planning intention of the WC is to conserve the ecological value of the fish ponds which form an integral part of the wetland ecosystem in the Deep Bay rea. It comprises the existing and contiguous, active or abandoned fish ponds in the Deep Bay rea, which should all be conserved. New development within the WC would not be allowed unless it is required to support the conservation of the ecological value of the area or the development is an essential infrastructural project with overriding public interest. ny such development should be supported by an ecological impact assessment to demonstrate that the development would not result in a net loss in wetland function and negative disturbance impact. For any redevelopment which requires planning permission from the Board, an ecological impact assessment would also be required. Wetland compensation is required for any development involving pond filling and mitigation measures against disturbance would be necessary. They would be imposed as part of the planning approval conditions. 6.2 Subject to submission of ecological impact assessments, the types of activities which may be considered within the WC must be related to one of the following uses: Conservation Land uses in WC should be devoted to conservation management of the wetland areas such that the integrity of the habitat should be maintained to avoid disturbance and/or fragmentation. lternative ecologically beneficial uses to existing fish ponds which would perform ecological functions similar to or better than the existing fish ponds to be replaced and be compatible with the conservation objectives of the wetland in Deep Bay rea, such as recreated nature reserve, wetland wildlife reserve for bird watching or sports fishery and aquaculture, would be considered. The proposed use should be appropriate to the rural and wetland setting and be able to enhance the visual and landscape quality of the area. It should not add to the pollution loading of the Deep Bay rea.
5 - 5 - Environmental Education Research and educational uses which will facilitate the public understanding of the ecology and nature conservation of the area would be encouraged. Educationally based facilities, such as nature trails, ecology study centre and field study centre, with controlled access would be considered. The proposed use should be appropriate to the rural and wetland setting and be able to enhance the visual and landscape quality of the area. It should not add to the pollution loading of the Deep Bay rea. Essential Infrastructure Projects Essential infrastructure projects needed for public purpose, such as rail, emergency vehicular access and footpath, road, drainage and flood protection project and public utility project, for which no suitable alternative locations outside the WC could be identified, would also be considered by the Board. However, any such proposed project should include a practical wetland compensation scheme for the consideration of the Board. It should not add to the pollution loading of the Deep Bay rea. Private-Public Partnership pproach 6.3 While the primary planning intention of the WC is to conserve the ecological value of fish ponds, if there are strong planning justifications and positive measures to enhance the ecological functions of the existing fish ponds, the Board may consider development with conservation objectives within the WC under a private-public partnership approach. Having regard to the precautionary principle and the no-net-loss in wetland concept, the approach would allow consideration of limited low-density private residential/recreational development at the landward fringe of the WC in exchange for committed long-term conservation and management of the remaining ponds within the development site. Development of this nature should require minimum pond filling and be located as far away from the Deep Bay and/or adjoining to existing development site. dherence to the no-net-loss principle would be important to ensure no decline in the wetland functions of the fish ponds within the development site and surrounding ponds. ny such development proposal
6 - 6 - should be accompanied by an ecological impact assessment with an acceptable and feasible wetland enhancement and management scheme to demonstrate that the development would not result in, or be able to fully compensate for, any loss of the total ecological function of the original ponds on the site and that the development impact can be mitigated. The proposal should also include a mechanism to ensure that the long-term management of the wetland could be practically implemented and monitored. development proposal of this kind would be carefully scrutinized either through the objection consideration process or by way of a request to rezone the site to Other Specified Uses (Comprehensive Development and Wetland Enhancement rea). Wetland Buffer rea (WB) 6.4 The intention of the WB is to protect the ecological integrity of the fish ponds and wetland within the WC and prevent development that would have a negative off-site disturbance impact on the ecological value of fish ponds. buffer area of about 500m along the landward boundary of the WC is thus designated as a WB. s a substantial amount of the fish ponds within the WB have already been lost over time through filling and certain areas have been degraded by the presence of open storage use, these degraded areas may be considered as target areas to allow an appropriate level of residential/recreational development so as to provide an incentive to remove the open storage use and/or to restore some of the fish ponds lost. 6.5 Within the WB, for development or redevelopment which requires planning permission from the Board, an ecological impact assessment would also need to be submitted. Development/redevelopment which may have negative impacts on the ecological value of the WC would not be supported by the Board, unless the ecological impact assessment can demonstrate that the negative impacts could be mitigated through positive measures. The assessment study should also demonstrate that the development will not cause net increase in pollution load to Deep Bay. Some local and minor uses are however exempted from the requirement of ecological impact assessment. They are listed in ppendix and include temporary uses. 6.6 pplications for new open storage or container back-up uses including workshops within the WB, whether temporary or permanent, would normally not be allowed in view of the adverse disturbances of such activities on birds, in
7 - 7 - particular for such uses involving filling of contiguous ponds. However, open storage or container back-up uses located close to the Lok Ma Chau crossing and without involving pond filling might be sympathetically considered by the Board in view of the genuine need to facilitate cross-boundary movements of goods in the area. 6.7 Proposals for residential/recreational developments on degraded sites to remove/replace existing open storage or container back-up uses and/or to restore lost wetlands may be given sympathetic consideration by the Board subject to satisfactory ecological and other impact assessments. For those disturbed areas directly abutting the WC, the development should provide a wetland and visual buffer to separate the development from the WC to minimise its impact on the wetland and to restore some of the lost fish ponds to an appropriate form of wetland adjoining the WC. Within these degraded areas targetted for upgrading, the following types of activities may be considered: Wetland Restoration Development proposals to restore lost fish ponds or to replace existing undesirable uses by wetland habitats are encouraged. Recreation ppropriate recreational use may be considered. Consideration should be given to the compatibility of such use with any adjoining fish pond area and to other planning and environmental implications of the development. Residential Residential development projects which include replacement of existing open storage and port back-up uses and/or proposals of detailed wetland restoration may be given special consideration subject to satisfactory ecological and other impact assessments. These developments should be compatible with the surrounding land uses and the rural setting of the area.
8 - 8 - Ecological Field Investigation 6.8 For planning applications requiring ecological impact assessment within either the WC or the WB, field investigation normally covering a period of not less than 12 months should be included to provide baseline information of, and to study effects on, existing wildlife habitats, flora and fauna, and their seasonal changes. The exact requirements for the field investigation may depend on the proposed scale and nature of development, and whether any direct loss of fish ponds would be involved. Potential applicants should seek advice from the griculture, Fisheries and Conservation Department on the technical requirements for the ecological impact assessment. Other Planning Considerations 6.9 In addition to ecological consideration, other planning considerations including development intensity, compatibility with the surrounding land uses, environmental impact (e.g. noise, air and water qualities), traffic and drainage impacts, provision of infrastructure and visual impact are also important in the assessment of an application within the Deep Bay rea. TOWN PLNNING BORD MY 2014
9 _ N ƒg Sandy Ridge Cemetery F ˆ SHENZHEN SPECIL ECONOMIC ZONE o º Lo Wu Tak Yuet Lau j flb Ma Tso Lung San y r da Lok Ma Chau U W Lo Wu Correctional Institution B Ha Wan ˆ g n ou j TI LW HU a re d se lo C ˆ T r ie nt ro ififlb F Community Sports T _ SM PO SHUE 9»fl FNLING s HIGHWY 9 SN TIN t y Ser Res nd ar ƒ m O B ou MI PO Lin Barn re a Beas River Lodge D T se C lo LE r ie nt P ø e m ST Beas River Country Club Y Mai Po San s HW ƒhfi (RESTRICTED RE) North Distr Hospital KWU TUNG RESERVOIR C Mai Po Lo Wai Tam Kon Chau ƒhfiƒm@ z ro ƒhfi Pœæ MI PO NTURE RESERVE F RO K E d ˆ IN NT HIG S b F Sha Kiu Pak Hok Chau j } n«f TI LONG KEI Nam Sha Po M' x Barracks Wo Shang Wai yƒ Tsim Bei Tsui Royal Palms Palm Springs Golf x [ {ƒ [ {ƒ 9 X Cemetery ˇ æ Yau Mei San œ Mong Tseng Wai LEGEND x Fairview Park ««Mong Tseng Course Barracks Barracks ˇ LUT CHU ªaƒO«ß NGU TM MEI BOUNDRY OF WETLND CONSERVTION RE ªaƒw Lau Fau Shan D R I N E R R R SE E E V R Tin Fook Wai 9 ZƒfiW ªaƒO«DEEP BY L ł Yuen Long Kingswood Villas Industrial Estate WETLND CONSERVTION ND LM TSUEN COUNTRY PRK æ»^ Tin Shui Estate a Wing Kei VE E G ER S E IN Nam Sang Wai fiu Ser Res Fung Kong t Ser Res G n«d t BOUNDRY OF WETLND BUFFER RE Tai Sang Wai M ay Fung Lok Wai SPECIL RE Tin Highw HONG KONG WETLND PRK j San y B LU FU SHN y B» ªaƒ BUFFER RES BOUNDRIES Tin Shui Wai Park a Sw P s ' F Shan Pui Chung Hau ' Tin Yiu Estate s s WNG CHU Shan Pui LE PE F Yu Sheung Cheung Wai YUEN LONG Yuen Long Estate fi 9 YUEN LONG C «s C W H ST Tung Tau Industrial rea H TSUEN W p ««W KR OD Kingswood Villas KU HUI t Ser Res TOWN PLNNING BORD SECTION PLNNING DEPRTMENT K ß PT KONG LENG REFERENCE No. YOHO u Tau L ł M/TPB/2014/12 LM TSUEN COUNTRY PRK SCLE W CSTLE PEK ROD C«s ƒ HEUNG METRES Ø ` æ METRES Date: 29/1/2014 ˇ Figure
10 ppendix List of Uses Exempted from Ecological Impact ssessment Within the Wetland Buffer rea For planning applications involving uses/development within the Wetland Buffer rea, the following uses/development are exempted from the requirement of ecological impact assessment as part of the submission to the Board : - Temporary Uses - gricultural Use (except in SSSI Zone) - ncestral Hall - Bank# - Barbecue Spot - Barber Shop# - Beauty Parlour# - Burial Ground - Clinic/Polyclinic* - Electricity Substation of single storey - Government Refuse Collection Point^ - House (lteration, modification and/or redevelopment to the existing building bulk only) - New Territories Exempted Houses - Off-Course Betting centre# - On-farm Domestic Structure - Photographic Studio# - Playground/Playing Field in V and R(D) zones - Police Post/Police Reporting Centre - Post Office* - Private Club# - Public Convenience - Public Library* - Public Utility Installation (electricity mast, lamp pole, pipeline and telephone booth only)^ - Pumping Station of single storey - Refreshment Kiosk - Retail Shop# - School*
11 - Showroom excluding Motor-vehicle Showroom# - Shrine - Social Welfare Facility* - Tent Camping Site Note: # other than free-standing building * other than free-standing building exceeding 3 storeys ^ not applicable to the Other Specified Uses annotated Eco-lodge zone on the Ma Tso Lung and Hoo Hok Wai Outline Zoning Plan
Mai Po Inner Deep Bay Ramsar Site Waterbird Monitoring Programme 2013-14
Tender Ref.: AFCD/SQ/57/13 Mai Po Inner Deep Bay Ramsar Site Waterbird Monitoring Programme 2013-14 Egretry Counts in Hong Kong, with particular reference to the Mai Po Inner Deep Bay Ramsar Site Summer
Supported Employment Service (As at August 2014)
(As at August 2014) Region District Name / Address Tel Fax Capacity Note Hong Kong Central & Western Sheung Wan Rehabilitation Centre Yan Chai Hospital 5/F - 6/F, 28 Ko Sing Street, Sheung Wan, HK Eastern
Property Development
Property Development The Group will continue strengthening its reputation by enhancing the quality of its products and services and branding individual projects. High project marketability and improved
APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (CAP. 131) GUIDANCE NOTES
APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (CAP. 131) GUIDANCE NOTES INTRODUCTION 1 The following notes give information and guidance on how to apply for permission under
Planning for Office Land in Hong Kong
Seminar on Office Development in Hong Kong Planning for Office Land in Hong Kong Mr. Jimm my y C.F. Leung, Director of Planning 12 March 2011 1 1 Outline of Presentation Introduction Office Development
Water Supplies Department Active WSD Capital Works Contracts
No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South
Examples of major projects with environmental permits :
Examples of major projects with environmental permits : Cyberport Development at the Telegraph Bay KCRC East Rail Extension From Hung Hom to Tsimshatsui Hong Kong Disneyland West Rail Phase I 1800 MW Gas-fired
The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million
Review of Operations Business in Hong Kong Property Investment 2012 Highlights The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million Held a total attributable gross
List of Aided Special Schools (2015/2016)
List of Aided Special s (2015/2016) Revised as at September 2015 s for Children with Visual Impairment Name Address Tel Fax Web-site Ebenezer 131 Pokfulam Road, Pokfulam, Hong Kong 2817 6076 2817 4355
Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference
- BEAM CNSULTANCY SERVICES - Description Location Rating proposed development at 1 Austin Rd W, West Kowloon, Kowloon, Hong Kong Kowloon BEAM Plus Environmental Consultancy Services for the Proposed ffice
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Advisory Council on the Environment Nature Conservation Subcommittee. Conservation of Black-faced Spoonbill (Platalea minor) in Hong Kong
Advisory Council on the Environment Nature Conservation Subcommittee Committee Paper NCSC 10/06 Conservation of Black-faced Spoonbill (Platalea minor) in Hong Kong Purpose This paper briefs Member on the
Additional and Planned Places of Rehabilitation Services (From January to June 2015)
Additional and Planned Places of Rehabilitation Services (From January to June 2015) Annex III (Page 1) Nature of Service Operating Agency & Address cum for Severely Mentally Handicapped Persons Tung Wah
Heritage Place Code. Heritage Place Code
1 Application This Code will apply in assessing building work (including demolition), reconfiguring a lot or operational work where: on a premises that includes a heritage place within a heritage precinct
Legislative Council Panel on Security
LC Paper No. CB(2)2585/03-04(01) Legislative Council Panel on Security Progress Report on the Implementation of the Drug Dependent Persons Treatment and Rehabilitation s (Licensing) Ordinance (Cap. 566)
Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno
Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno Introduction Olango Island Wildlife Sanctuary (OIWS) was proclaimed as protected
Company Name Address Telephone No.
Name Address Telephone No. Dream Optical City Ltd Room 1503-6, 15/F, Soundwill Plaza, 38 Russell Street, Causeway Bay, 2388 2262 Eye - Channel Shop A1, G/F, Cheong Kee House, 21B Soy Street, Mong Kok,
Green Infrastructure Case Study Template
Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
List of Proposed ArchSD Projects 2016-17 for the Refurbishment of Government Buildings
Item No. 002/16 003/16 004/16 006/16 008/16 009/16 010/16 Project Description Happy Valley Recreation Ground - Refurbishment of Pitch No.11 including replacement of sport playing surface, irrigation system,
PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary
PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES Executive Summary 1. Cycling is one of the popular recreational activities in Hong Kong. Many cyclists ride bicycles on cycle tracks for recreational
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014
Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development
Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014
Section1 L.N. 117 of 2014 B2667 Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014 (Made by the Director of Health under section 3(1AB) of the Smoking (Public Health) Ordinance
Convention on Wetlands of International Importance especially as Waterfowl Habitat
Convention on Wetlands of International Importance especially as Waterfowl Habitat Ramsar, Iran, 2.2.1971 as amended by the Protocol of 3.12.1982 and the Amendments of 28.5.1987 Paris, 13 July 1994 Director,
Central and Western District
1 Tsui Chung Wan 2868 2708 Room 706, Melbourne Plaza, 2 Ho Kai Kit 2869 6161 Room 706, Melbourne Plaza, Cataract Surgeries Programme (CSP) Central and Western District 1. The Hong Kong Ophthalmic Associates,
HONG KONG HOUSING AUTHORITY
HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME PRIVATE SECTOR PARTICIPATION SCHEME TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON APPLICATION FOR TRANSFER OF OWNERSHIP Prepared by Housing Subsidies
Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui
LC Paper No. CB(2)2452/11-12(03) For discussion on 4 July 2012 Legislative Council Panel on Security Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui PURPOSE This paper consults the
Camp. plan template. elements. This section that need to. identify the. vegetation. of flying-fox. also
Camp management plan template Introduction The following templatee guides local government in compiling a Camp Management Plan that will facilitate licensing of camp management actions for a five-year
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD
Address G/F YU SUNG BOON BLDG, 107-111 DES VOEUX ROAD SHOP 1 & 2, LOWER G/F.,MELBOURNE PLAZA, 33 QUEEN'S ROAD CENTRAL SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL
Different Types of Marine Protected Area
A protected area is defined by the IUCN as a clearly defined geographical space, recognised, dedicated and managed, through legal or other effective means, to achieve the long-term conservation of nature
11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing
11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood
ROSTHERNE TO MANCHESTER PICCADILLY
ROSTHERNE TO MANCHESTER PICCADILLY In your area July 2013 High Speed Two (HS2) is the planned new high speed rail network connecting London with the West Midlands and running lines on to Manchester and
Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles
The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached
Minutes of 960th Meeting of the Town Planning Board held on 18.6.2010. Permanent Secretary for Development (Planning and Lands) Mr.
Minutes of 960th Meeting of the Town Planning Board held on 18.6.2010 Present Permanent Secretary for Development (Planning and Lands) Mr. Thomas Chow Mr. Stanley Y.F. Wong Chairman Vice-Chairman Mr. Walter
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects
Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:
The River Ribble is one of the longest rivers in the North West of England
River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
Dorset Green SANGs Report
Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset
Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note
Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ
San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline
San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
House Code. House Code
1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the
Outdoor Advertising. Policy and Guidelines. CITY OF DAREBIN 350 High Street, Preston 3072 Telephone 9230 4444. January 2001
Outdoor Advertising Policy and Guidelines January 2001 CITY OF DAREBIN 350 High Street, Preston 3072 Telephone 9230 4444 CONTENTS PREAMBLE... 1 PURPOSE AND OBJECTIVES OF THE POLICY AND GUIDELINES... 2
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks
Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks Raymond wai-man, Wong Professor chi-ming, Tam City University of Hong Kong The background Before 2007, HK s railway networks
Carmarthenshire LDP Site Assessment Proforma
Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
Delivering multiple benefits through effective river restoration UK & EU
Martin Janes Managing Director The River Restoration Centre Delivering multiple benefits through effective river restoration UK & EU CIEEM Annual Conference Southampton 2013 [email protected] 01234 752979
Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra
Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents
Basics of Sustainability. Environmental Impact Assessments (EIA)
Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6
Appendix A: Land Protection Plan
Appendix A: Land Protection Plan In this appendix A.1 Introduction and Purpose A.2 Project Description A.3 Refuge Purposes A.4 Land Acquisition Policy for Urban Refuges A.5 Status of Resources to be Protected
Summary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at 19.6.2015)
2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at 19.6.2015) Institution Caritas Bianchi College of Careers 1 Dec 2014 25 Sep 2015 $50
4 PLACE OF WORSHIP & INSTITUTIONAL DEVELOPMENTS
4 PLACE OF WORSHIP & INSTITUTIONAL DEVELOPMENTS OVERVIEW 1 Three main types of developments will be discussed in this section. They are: Place of Worship These include temples, churches and mosques. Civic
District Address Tele No. (+852) 25451851 G/F YU SUNG BOON BLDG CENTRAL 25443856 107-111 DES VOEUX ROAD 25444385 MELBOURNE PLAZA
Fortress Branches Hong Kong Region 25451851 G/F YU SUNG BOON BLDG CENTRAL 25443856 107-111 DES VOEUX ROAD 25444385 MELBOURNE ADMIRALTY NEW CITY WEST POINT PROVIDENT NEW ABERDEEN WAH MING HEALTHY GARDEN
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places
Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Memorandum TO: FROM: Michael Bergstrom and Robin Cole City of Bellevue Nancy Bird, AICP EDAW, Inc. DATE: July 23, 2008 RE: Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Planning for Bushfire Risk Mitigation General Code
Planning for Bushfire Risk Mitigation General Code March 2008 Contents 0H1. Introduction 14H1 1H1.1 Purpose... 2H1.2 Aim... 3H2. Principles 17H2 4H2.1 Shared Responsibility... 5H2.2 Prevention, Preparedness,
Flora and Fauna. Section 4.9: Flora and Fauna
Flora and Fauna Section 4.9: Flora and Fauna BACK OF TAB 81 4.9 Flora and Fauna Objectives Ensure protection of the significant natural environment in and around Sydney Airport Minimise the propagation
Development Control of Buildings in Hong Kong
BRE 336 PolyTechnic University of Hong Kong Development Control of Buildings in Hong Kong Ch. 2 Town Planning ecyy 2012-2013 Contents -Land Use Planning - legal framework -Change of land use application
Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations
For discussion On 8 May 2001 Legislative Council Panel on Environmental Affairs 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations Purpose This paper seeks Members
Ecological Restoration of a Brackish Marsh at Parcel 11, Estate Carolina, St. John
Ecological Restoration of a Brackish Marsh at Parcel 11, Estate Carolina, St. John Gary Ray, Ph.D. Virgin Forest Restorations For Coral Bay Community Council Aerial of Parcel 11 Brackish Marsh Ecological
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
Rezoning case no. RZ15-08: Adam Development Properties, LP
PLANNING AND ZONING COMMISSION STAFF REPORT June 4, 2015 Rezoning case no. RZ15-08: Adam Development Properties, LP CASE DESCRIPTION: LOCATION: a request to amend the development plan of a previously-approved
Data Analysis for Healthcare: A Case Study in Blood Donation Center Analysis
: A Case Study in Blood Donation Center Analysis Michael Chau School of Business The University of Hong Kong [email protected] Chi Wai Chan School of Business The University of Hong Kong [email protected]
Using Aerial Photography to Measure Habitat Changes. Method
Then and Now Using Aerial Photography to Measure Habitat Changes Method Subject Areas: environmental education, science, social studies Conceptual Framework Topic References: HIIIB, HIIIB1, HIIIB2, HIIIB3,
Appendix A. The Marine Life Protection Act (MLPA)
Appendix A. The Marine Life Protection Act (MLPA) THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS: SECTION 1. Chapter 10.5 (commencing with Section 2850) is added to Division 3 of the Fish and
Aiding the Hydro-scheme development process. Web-links to useful information sources
Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation
How To Write A New Bill On Flood Management In Scotland
Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally
Clearing Code and Branch Code
Clearing and Date : 1 August 2016 Version : 2016/050 All such rights as may subsist in the Clearing and are owned by HKICL. These clearing codes and branch codes are strictly for Members of the Clearing
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress
53km will be added to our Hong Kong network Deliver the New Era Network 4 New Railway Projects are in progress Island Line Extension opened in December 2014 Executive Management s Report Hong Kong Network
Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation
Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:
2012 Resource Allocation Exercise - Block Vote Project Proposals
Item Organisation Title 1 Architectural Services Migration of the Automated Communication, Technical Information and Operations Network from Mainframe to Midrange Platform 9.9 2013-14 1st Quarter 2014-15
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint
CONTENTS A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint B. Can you complain to other organisations C. How to lodge a complaint D. How will your complaint
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities
40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香 港 灣 仔 告 士 打 道 5 號 稅 務 大 樓 40 樓 ACE-EIA Paper 2/2009 For advice Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment
Block Vote Projects Approved by the OGCIO in 2013-14 (from 1.4.2013 to 31.3.2014)
1 Agriculture, Fisheries and Conservation Replacement of Endangered Species Licensing and Enforcement 7.7 2013-14 1st Quarter 2014-15 3rd Quarter 2 Architectural Services 3 Chief Secretary for Administration's
SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
Facilities Provided by Holders of Private Recreational Leases
Facilities Provided by Holders of Private Recreational Leases Name of PRL Holder 1 Aberdeen Boat Limited 20 Shum Wan Road, Aberdeen, Hong Dinghy & sailing centre, leisure pool, fitness centre, snooker,
CHAPTER 4 RADIATION MONITORING AND ASSESSMENT
CHAPTER 4 RADIATION MONITORING AND ASSESSMENT RADIATION MONITORING IN NORMAL TIMES 4.1 HKO has established an on-going Environmental Radiation Monitoring Programme (ERMP) to determine long-term changes
PLANNING SERVICES UNIT
SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is
Transit Oriented Development and Value Capture Hong Kong
UNESCAP Regional Expert Group Meeting on Sustainable and Inclusive Transport Development and 2 nd Asia BRTS Conference, 29 Sep 1 Oct 2014, Ahmedabad Transit Oriented Development and Value Capture Hong
Rural dwellings including bed and breakfast accommodation
MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including
Buildings Departmen t Lands Department Planning Department
Buildings Departmen t Lands Department Planning Department Joint Practice Note No. 3 Re-engineering of Approval Process for Land and Building Developments Introduction The processing of a building development
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN