1 Infrastructure Leakage Index (ILI) as a Regulatory and Provider Tool David Michael Delgado Advisor: Kevin Lansey. Department of Civil Engineering & Engineering Mechanics College of Engineering Acknowledgement: University of Arizona, Technology and Research Initiative Fund 2007/2008, Water Sustainability Graduate Student Fellowship Program

2 1 Project Relevance In many water distribution systems a significant percentage of water is lost as leakage while in transit from wells or treatment plants to consumers. Water losses can be categorized as apparent and real. Apparent losses are those that are not accounted for due to poor metering, pirating or use, such as for construction purposes. Real losses are leakage from pipes or connections. A Metropolitan Water study indicated that these losses total approximately 5% of their pumping (Hill and Davis, 2005). Leakage from pipe and connections can be represented as reported bursts, unreported bursts and background losses. Reported bursts correspond to pipe failures, that are typically large but of short duration. Most of these events can be identified relatively quickly due to pressure changes monitored by the utility, or by water on the ground surface. Unreported bursts have smaller leakage magnitudes and depend on active leakage control to be detected, as leaked water is not seen or cause a nuisance. Background leakage is characterized by small non visible leaks that are usually smaller then 1 gal / min. Background leaks occur mostly at joints and fittings and run continuously, but not generating sufficient noise to be detectable by existing equipment. Leakage from water distribution system infrastructure is in large part lost to the atmosphere as evaporation or transpiration. Real losses can be reduced through pressure reduction, leak detection field studies and pipe/connection replacements. A 30% reduction in real losses would amount to real decrease of total pumping of between 1-2%. This is equivalent to reducing 5 days of annual water use and the associated treatment and pumping costs. Few other water management issues so directly affect this large of a proportion of the supply and are as potentially controllable. To achieve these gains, we must quantify water distribution system losses. Arizona Dept of Water Resources (ADWR) requires reporting the percentage of lost and unaccounted for water and limits that amount to 10% of the total pumping. However, no water budget methodology has been explicitly defined so water utilities use a range of definitions for these terms. These inconsistencies can be avoided by applying the infrastructure leakage index (ILI). The ILI is defined as the current annual real losses (CARL) divided by the unavoidable annual real losses (UARL). The UARL represents the lowest technically achievable annual real losses for a well-maintained well-managed system and is the likely lower bound on water losses. As a performance indicator (PI), the ILI represents a measure of the combined performance of three infrastructure management methods for real losses - the speed and quality of 2

3 repairs, active leakage control and assets management under a certain average operating pressure (Figure 1). The ILI was introduced in 2000 (Alegre et al) and has been quickly adopted around the world. The ILI approach was tested several years by the IWA Water Losses Task Force; and it is already included in the IWA as a Best Practice Performance Indicator. The American Water Works Association is proceeding to include the ILI as a recommended water audit method (AWWA, 2006). California and Texas are analyzing the ILI as a possible change to their best management practices (Dickinson, 2005). The ILI provides information to regulators to better control leakage losses and to utilities on how to most efficiently apply resources to reduce leakage. The first step towards computing the ILI is to obtain a water balance. Figure 2 shows the IWA s best practice standard water balance. This water balance table allows reaching a meaningful assessment of volumes of annual real losses (or CARL). Besides the ILI, IWA s Manual of Best Practice has other recommended performance indicators. According to Liemberger and Farley (2004), Financial and Operational PIs can be can be categorized at different levels as follows: Level 1 (Basic): a first layer of indicators that provide a general management overview of the efficiency and effectiveness of the water undertaking. Level 2 (Intermediate): Additional indicators, which provide a better insight than the Level 1 indicators; for users who need to go further in depth. Level 3 (Detailed): indicators that provide the greatest amount of specific detail, but are still relevant at the top management level. The ILI is the IWA best practice level 3 (detailed) PI for Operational Management of Real Losses. Although percentage of volume indicators, like the Unaccounted for Water measure (UFW), have traditionally been accepted as PIs, they can be very misleading as they are strongly influenced by differences and changes in the volume of consumption. IWA s Manual of Best Practice still recommending percentage of volume measures, like the UFW, as a Basic (Level 1) Financial PI for Non-Revenue Water. Nevertheless it should definitely not be used for assessing any aspect of operational performance management of water losses (IWA Task Force, 2000). An important result from previous studies of the ILI is that the Real Losses as percentage of volume measure (RLPV) is not directly correlated with the ILI. For example, see the ILI values for the cities listed in Table 1. Observing Vienna and Lemesos, is possible to notice that Vienna has a lower RLPV and a larger ILI 3

4 when compared to Lemesos. Considering that the average supply in Vienna is much larger than in Lemesos and assuming that supposedly these cities have exactly the same supply system (same water losses): Vienna apparently has a smaller real loss according to RLPV, when actually Lemesos is the one who has a smaller real loss (ILI ~ 1). The problem resides on the fact that RLPV is strongly influenced by the system demands, while the ILI is a better indicator since it is based on the system physical configuration. In addition, considering Makkah in Saudi Arabia (Table 1), over 30% of water is lost to leakage. Losses from most utilities should be significantly less but, for perspective, an 8% leakage loss is equivalent to losing the one month of supply per year. Real losses through pressure reduction could correspond to about 30%, or a real decrease of between 1-2% of total pumping. This is comparable to reducing 5 days of annual water use and the associated treatment and pumping costs. The proposed project objective is to study the appropriateness of the ILI in Arizona. The primary task is to collect data to compute the ILI for several Arizona water purveyors. Thirteen utilities have agreed previously to participate on this research by providing data from 2000 to 2007 for entire system or by pressure metered zone (PMZ). To provide a mechanism for further applications, an ILI calculation computer program or spreadsheet will be developed. Comparison of ILI values for the water distribution systems and subsystems will be conducted for systems with varying ages and pipe construction materials. Several components in the ILI are utility estimates, but field studies can fine tune these values. Thus, detailed water loss analyses will be conducted to measure system leakage and evaluate losses during pipe breaks. The ILI provides a means to quantify leakage losses and identify major loss categories. The final task in this project is to identify techniques to reduce those losses. The approach will vary between systems so, based on literature publications and engineering analysis, guidelines for identifying appropriate leakage reduction measures will be developed. The starting point of this project will regard the collection of sufficient data to compute the ILI for several Arizona water purveyors serving more than 5000 connections (the lower bound of acceptable implementation of the ILI). In addition to basic historic use data, the utilities will be asked to identify any leak reduction measures implemented during that period and their timing. The ILI time series will be computed and analysis of the resulting indices will be performed including temporal trends in the ILI, impacts of leak reduction measures on the ILI and their cost efficiency, correlations between the ILI, percentage indicators and other indices, correlations between the ILI and system 4

5 size, age, and pipe materials, and others relationships that appear during the analysis. Several spreadsheets are available to calculate the ILI including Benchleak (McKenzie and Lambert, 2002) and Aqualibre (Liemberger and McKenzie, 2003). The AWWA has also developed a water audit spreadsheet that allows not only to obtain the system s water balance, but also to compute many PIs. The model that fits best with the project needs should be chosen or our own model will be developed. This task will be brief, but insure that we have an acceptable tool for Arizona utilities. The ILI is a global measure and requires several assumptions on the distribution of water losses. The next major task will attempt to reduce the uncertainties in those estimates through more detailed study. These analyses are time consuming and will be focused to a limited set of utilities. The IWA Real Losses Task Force recommends that an alternative calculation of real losses should be carried out to check the results derived from the water balance. To improve these estimates an independent analysis called Night Flow Analysis (NFA) will be performed. The NFA begins by examining system inflows during the lowest demand hours and estimating the proportion that is leakage. These losses are a function of the system pressure and can be represented in hydraulic models. A full day hydraulic analysis can be used to predict the total nightly and diurnal variation of leakage. The results from estimates from night flows will be compared with those computed previously using ILI. If discrepancies result, additional study or assessment is must be completed. As noted, the ILI can be used to assess the need for and results from a utility conservation plan, and to identify cost effective leak management schemes. The IWA recommends an ILI of 1 to 2 for regions that have limited supplies and few new water sources. For proper application of the index, the ADWR must determine the magnitude of ILI that requires alternative action levels. This study will begin to provide ADWR with guidance to suggest an acceptable value. 5

6 2 Methods To control distribution system losses, most state regulatory agencies, including Arizona, allow a percentage of water delivered or supplied to be unaccounted for or lost. In Arizona a maximum of 10% of the pumped water volume can be unaccounted for or lost. This performance index is not appropriate as it relates the losses to the volume pumped allowing larger users to have larger losses. In addition, unaccounted for water (UFW) is intended to represent leakage but may also include many non-metered uses including fire and construction demands. To overcome these discrepancies, the International Water Association (IWA) has developed an alternative infrastructure leakage index (ILI). The ILI is defined as the current annual real losses (CARL) divided by the unavoidable annual real losses (UARL). The UARL are the lowest technically achievable annual real losses for a well-maintained well-managed system and is the likely lower bound on water losses. CARL ILI = UARL Once obtained the performance indicators (PIs), including the ILI. Alternative calculation of real losses can be assessed by performing the Night Flow Analysis (NFA). 2.1 Water Audit The procedure to compute the ILI and other PIs start by obtaining the water balance (or water audit). The water balance recommended by IWA and adopted by AWWA is shown on Figure 2. There are four basic steps to build this table: Step 1) Determine system input volume Step 2) Determine the authorized consumption Step 3) Estimate apparent losses Step 4) Calculate the current annual real losses (CARL) The spreadsheet distributed to participants with the data sets necessary to build the water balance are shown on Figure 3. The first step is to obtain the total volume of water input to the system from own sources and its adjustment by considering estimates of over-registered or under-registered master meter errors. In addition, the bulk water purchased (water imported) and the bulk water sold and conveyed out of the WDS should be respectively accounted and discounted from the adjusted volume form own sources resulting in the water supplied. 6

7 To determine Authorized Consumption is necessary to obtain the volume of metered consumption (billed and unbilled) from registered customer meters, and also estimates of unmetered consumptions (billed and unbilled). Authorized Consumption should include items such as fire fighting, flushing of mains and sewers, street cleaning, etc and also consumption from institutions free of charge and from the water utility itself. Water losses consist of apparent losses and real losses and are estimated subtracting the Authorized Consumption from the Total system input. Apparent losses constitute the most difficult approximation because evolves the estimation of unauthorized consumption, customer meter inaccuracies, and also data handling errors from meter reading and billing system. The real losses correspond as the remainder from the apparent losses subtracted form the water losses and correspond to the Current Annual Real Losses (CARL) in the numerator of the ILI equation. From these water balance table is possible to compute not only ILI but also many other alternative PIs. 2.2 Alternative Performance Indicators The traditional performance indicator (PI), unaccounted for water (UFW), has been extensively computed by water utilities worldwide. However, any percentage of system input volume measure, including the UFW, is considered as being unsuitable for assessing any aspect of operational performance management of water losses. This conclusion has been sanctioned by many organizations throughout the world, including AWWA. This is because values as percentage of system input volume are strongly influenced by consumption, do not distinguish between apparent and real losses and also, are difficult to interpret in situations of intermittent supply. Nevertheless, Non Revenue Water (NRW) is IWA s new term for unaccounted for water and is recommended as a Level 1 (Basic) Financial PI: Losses UFW = Supply An operational PI commonly used by providers is the gallons per service connection per day. It is considered as a basic PI for IWA for systems with more than 32 service connections / mile of mains. It has some advantages if compared to gallons per mile of mains per day because distribution losses expressed in gal/ conn/ day are less influenced by density of connections than losses expressed in gal/ mile of mains / day (Lambert and McKenzie, 2002). This basic PI is considered the most robust of the traditional evaluators but has certain limitations, as it does not account for mains length, customer meter location (distance between curbstop and customer meter) or average operating 7

8 pressure of the system. The latter is an important factor considering that leakage rates vary approximately linearly with pressure for systems with mixed pipe materials. Trying to address these deficiencies, IWA developed a detailed operational PI for real losses referred to as the Infrastructure Leakage Index (ILI). The ILI measures how effectively a utility is managing real losses under the current operating pressure regime (IWA Task Force, 2000). It also provides more meaningful bases for benchmarking and target setting. Other PIs like real losses as percentage of total volume input, apparent losses as percentage of total volume input, gal per connection per day per pressure can also be computed. Table 2 shows a list of Financial and Operational PIs for Basic, Intermediate and Detailed levels according to Liemberger and Farley (2004). 2.3 Infrastructure Leakage Index (ILI) The ILI is the ultimate PI to assess the operational management of real losses and it is considered by IWA best practice as a Level 3 (detailed) Operational PI. As mentioned before, the ILI is defined as the current annual real losses (CARL) divided by the unavoidable annual real losses (UARL). The CARL is obtained from the IWA water balance standard. Methods to compute UARL will be addressed later on. According to Lambert and McKenzie (2002), the equation to calculate UARL was developed and tested by IWA water losses task force and it represents the summation of the real losses volumes from leakage on mains, leakage on service connections, pipe breakages and storage tank overflows. The typical volume lost from each event is the product of the average target duration and the typical flow rates for leaks on mains and service connections. These components were collected from several countries, assuming a well maintained infrastructure in good conditions. The user friendly version of the UARL equation is: Where: UARL = (5.41 x Lm x Nc x Lp) x P Lm = Length of mains Nc = Number of service connections Lp = Length of private pipe P = Average pressure 8

9 2.3.1 Interpreting ILI results Providers have traditionally been used percentage by volume PIs to assess many components of the water balance (e.g. UFW or NRW), however, it is an imprecise indicator, as it is strongly influenced by changes in the volume of consumption. ILI is a non-dimensional and an instance will be described in order to help clarifying the meaning of it. If a certain system has ILI equal to 2, that means that CARL is estimated as being 2 times as high as the minimum expected amount of leakage for a well managed and well maintained system, operated under a certain average pressure. To reduce CARL, and consequently ILI, providers should attempt to improve the speed and quality of repairs, introduce active leakage control and apply good asset management. Additional changes in real losses would result from changes in the pressure management regime. Nevertheless, ILI lower than 2 is already considered world class leakage management according to IWA standards, therefore a cost effective study should be performed before trying to lower these values. In addition, such low ILI values are only likely to be economically justified in regions where water is exceptionally expensive (e.g. desalinization) or water resources are scarce, or both Benchmarking The ILI has the capability of allowing benchmarking in different levels. Comparisons can be carried out by benchmarking different utilities. Also, benchmarking within utilities is possible by analyzing the ILI overtime or evaluating their pressure zones or sub systems ILI limitations Even though ILI has been computed in an increasing number of countries, its usefulness has not been tested for and cannot be recommended with confidence for systems with: - Less than 5000 connections - Less than 35 PSI pressure on average, throughout the system - Less than 32 conn / miles of mains 2.4 Pressure Management There is a physical relationship between leakage rate and pressure. This relationship can be assumed linear for large systems with mixed materials and 9

10 for WDS using plastic pipes leakage rates vary approximately with pressure to the power 1.5. All metal pipe systems are predominantly pipe breakage leakage and are subject to high leakage rates and power exponents close to 0.5. Therefore, pressure management plays an important role in controlling real losses. If pressure is reduced, the rate of increase in leakage will reduce. According to Liemberger and Farley (2004), some tasks should be assessed to evaluate the appropriateness of pressure management on a certain part of the system or pressure zone: - Identifying potential pressure zones, installation points and customer issues - Demand analysis to identify customer types and control limitations - Logged 24 hours flow and pressure measurements at inlet, average zone point and critical point - Perform a pump test - Asses Night Flow Analysis and Leakage Modeling - Identify correct check valves and PRVs - Cost benefit analysis It is important to note that this does not imply that the pressure management is optimal it is usually possible to reduce the volume of real losses (but not the ILI) by improved active pressure management. 2.5 Night Flow Analysis The ILI and other PIs are a global measure and requires several assumptions on the distribution of water losses. Errors in the measured or estimated components input to the calculation result in errors in the components of real losses. Night Flow Analysis (NFA) is an alternative calculation of real losses to check values derived from the water balance and will attempt to reduce the uncertainties in those estimates through a more detailed study. Night Flow Analysis (NFA) helps determining the level of leakage in a particular zone metered area. NFA starts by collecting hourly pressure data for zone, measuring pressure and flows at the zone inlet and also the logged pressures at the average and critical points. The next step is to estimate the minimum domestic and non-domestic hour usage. Domestic night use can be assessed by simply considering the population active at night (usually assumed as 6%) multiplied by their consumption, which is mostly flushing the toiled at night. 10

11 The small non-domestic night use is more difficult to evaluate and depends to a large extent on the type of businesses being run in the pressure metered zone. To facilitate this estimation, users are lumped into various categories and a typical night use is assumed for each group. For example, there may be several all-night convenient stores where the unit use is relatively small although when added together the total use may be significant. Large non-domestic users like airports, large hotels, breweries, swimming pools, etc should be metered individually. Considering the Pressure / distribution losses equation: P 1 L1 = L0 P 0 N1 Where: L 0 = initial leakage loss in gal/h L 1 = new leakage loss in gal/h P 0 = initial pressure (PSI) P 1 = new pressure (PSI) N1 = pressure exponent (non-dimensional) The N1 value used in the equation represents the power exponent for all distribution losses in the system which is influenced by pressure. According to SANFLOW (2001), the value for N1 used normally vary between 0.5 (default value for bursts) and 2.5 (highest value for background leakage) with an average or default value of 1.0. Systems with a high percentage of background leakage will tend to have N1 values in excess of 1.0 while systems where the leakage is predominantly burst leakage on iron or steel pipes will have N1 values of less than 1.0. If possible, the value of N1 for a system should be calculated directly using measured information obtained from a pressure step-test analysis (pump test) undertaken during the period of minimum night flow. The pressure step-test analysis may take between two and three hours during which the minimum night flow would normally remain relatively constant. Once the field data is collected, Night Flow Analysis and a 24 hour leakage modeling can be evaluated. The South African Night Flow Analysis Model (SANFLOW) described by Mackenzie and Bhagwan (2004), is an example of a model designed to provide an indication of the unexplained burst leakage in a zone from the analysis of the minimum night flow analysis. 11

12 3 Key Findings The study case included on this research focused on the evaluation of water losses in water distribution systems in the state of Arizona, using alternative performance indicators, mostly the Infrastructure Leakage Index or the ILI. The aim is to conduct ILI analyses for a number of Arizona water providers, performing multi-year analyses. Also, a comparison between the UFW measure currently in use by ADWR and ILI is performed. Moreover, a Night Flow Analysis (NFA) is assessed in a limited number of systems. In addition, uncertainty analysis is being performed on the components with larger uncertainty. Finally, the project should provide feedback to participants and ADWR on alternative PIs and ILI as potential provider tools. 13 AZ providers committed on participate on the project by providing spreadsheet data from 2000 to 2007 for entire system or by pressure zone. 3 AZ utilities had their PIs and ILI assessed. Night Flow Analysis will be performed in only 3 AZ providers. Utilities will be always referred as anonymous data sets. At the end on this project, participants will receive a report with a summary of the results. 3.1 ILI in Arizona Since the ILI corresponds to the most powerful indicator for assessing the efficiency of the operational management of real losses, benchmarking and target setting, therefore the focus on this project is on this PI. Figure 4 shows ILI values collected from 7 water utilities in North America and from the three AZ water utilities. Is possible to notice that providers AZ 1 and AZ 2 show not only a smaller ILI when compared to the other utilities, but also demonstrate that their ILI values are below 2. IWA recommends ILI 1-2 for regions that have limited supplies and few new water sources and Figure 5 correlates the ILI within this Technical Performance Category. According to this figure, ILI between 1-2 corresponds to Category A, which means that these two water utilities have good performance in respect to real losses. Nevertheless, provider AZ 3 has ILI above 8. According to the real loss target matrix, AZ 3 shows poor conditions in respect to real losses performance; therefore leakage management methods should be prioritized in order to improve conditions of this provider. 12

13 3.2 Benchmarking and Target Setting As mentioned on the previous chapter, ILI can be used for benchmarking in different levels. Comparisons can be assessed by benchmarking utilities, and within utilities, by benchmarking sub-systems or comparing the ILI overtime. Figure 6 is an instance of a benchmarking performed over time within the water utility AZ 2. This provider was evaluated between 2000 to 2006 and it presents average ILI lower than 2. A reduction can be noticed on this PI during the years of 2002 and 2004 because the speed and quality of repairs and the infrastructure management overall were improved during these years. This same figure also illustrates ILI decreased in 2005, this is due to the delivery of reclaimed water and, as a result, a less usage of the potable water supply and consequently, less real losses from the potable system. The Non-revenue Water as a percentage of water supplied (NRW by volume) from provider AZ 1 was assessed and the results are shown in Figure 7. This Basic Financial PI increased during 2004 and 2005 because the NRW increased on a larger step then the water supplied, however a drop from 2006 to 2007 can be noticed due to a significant reduction in the unbilled authorized consumption. Benchmarking of sub-systems within water utilities are demonstrated at Figures 8 and 9. Figure 8 presents the Annual Cost of Real Losses by each pressure zone of AZ 1 provider. The benchmarking of subsystems within the water utility can aid operators and practioners evaluating if it is worthwhile to invest money in real losses reduction actions, also indicating which parts of the system have needs urgent care. Figure 9 shows a Basic Operational PI for real losses - by gallons per service connections per day. It is considered the best of the basic PIs and can be used for target setting. Figure 10 presents the real loss target matrix. This figure allows matching average operating pressures and the correspondent leakage (real loss) at each pressure zone. Analyzing the results from Figure 9 together with the real loss target matrix (Figure 10) is possible to observe that Zones 1, 2 and 5 have good performance in respect to real losses, because they fall on the Technical Performance Category A. However, Zones 3 and 4 fit into Category B, and should consider pressure management or any infrastructure management practices in order to reduce the real losses. Zone 5 shows poor conditions in respect to real losses performance. Leakage management methods should be prioritized in order to improve conditions of the PMZ. 13

14 3.3 Sensitivity Analysis Any errors in the measured or estimated components input to the water balance table, especially at the unmetered consumptions and apparent losses estimations, end up as errors in the real loss estimation. Sensitivity analysis was then performed in order to reduce the uncertainty in some components of the water balance table. Uncertainties were considered on the average operating pressure and real losses terms. Figures 11 and 12 show the sensitivity of the UFW and ILI and a following comparison between them. The first sensitivity analysis assumed a variation between 100 to 200 % of real losses. Figure 11 shows that UARL was kept constant. This is because the system configuration and pressure was assumed constant. Therefore, changes in ILI increased from 1.88 to 3.76, while UFW varied from 6.1% to 11.6%. Again, these results demonstrate that ILI and UFW are not necessarily correlated, and also show that UFW is imprecise because it is demand driven. Figure 12 illustrates a variation between 80 to 120% in the average operating pressure of the anonymous water utility AZ 2. UARL varied this time because changes in the operating pressure resulted in changes in this component. ILI kept constant in 1.88, however UFW varied from 6.1 to 7.4%. These results shown the importance of considering the operating pressure in the PI and also shows that real losses analysis should be based on systems physical configuration and not demand driven (e.g. UFW). 3.4 Night Flow Analysis Night Flow Analysis can help not only evaluating the degree of leakage on a certain part of the system, but also can aid reducing the uncertainty in the real loss measures. After collecting field data and performing the so called pump test, a 24 hour leakage modeling can be assessed. The SANFLOW and PRESMAC programs (WRC, 2004) assisted obtaining the 24 hours leakage modeling results and generating plots. Field data was collect from a pressure metered zone (PMZ) at provider AZ 3. Logged pressures were collected at the inlet point, at the average zone point and at the critical point. The critical point corresponds to the highest topographic location of the system, or the farthest location from the source. The inflow at the inlet point was also recorded. Background leakage values were assumed from standards that depend on pipes materials and system age. Domestic consumption was obtained from the total population supplied by this sub-system. There was only one small non-domestic user and any large non-domestic user in the PMZ. 14

15 A pump test could not be performed; however, as can be noticed in Figure 13, the PMZ does not have any significant change on the pressure during the 24 hour analysis. The 24 hour leakage modeling is represented in Figure 13. The red line is the total inflow to the zone, which corresponds to the consumption and leakage (background leaks and unreported bursts). The green line represents the consumption while the pink line is the leakage. Note that consumption varies together with inflow ( pressure independent ). In the other hand, leakage varies with pressure ( pressure dependent ). The area below the pink line represents the extent of leakage in this sub-system. However, it is often convenient to express the leakage in terms of equivalent service pipe bursts. An equivalent service pipe burst is generally taken to be approximately 422 gal/ hour. The number of equivalent service pipe bursts on this zone corresponds to 18. These results demonstrate that the current PMZ needs imperative actions towards real losses reduction. The Night Flow Analysis provides a more detailed analysis of the real losses, and it also helps identifying if leak detection programs should be initiated. NFA also allows a more accurate estimation of ILI. 4 Conclusions The project demonstrated that ILI is an improved water balance measure to water providers and ADWR. This study also shown that UFW is an imprecise PI, as it is strongly influenced by differences and changes in the volume of consumption. In addition, UFW should not be used for assessing any aspect of operational performance management of water losses. ILI also proved to represent a more meaningful basis for performance comparisons, benchmarking, target setting and analysis. In addition, the ILI could be used to assess the need for and results from a utility conservation plan, and to identify cost effective leak management schemes. This research aimed to quantify water utilities system losses, demonstrating real losses breakdown by NFA and leakage modeling. Future research could include guidelines to specify which alternatives, including pipe and valve replacement, leakage detection programs, setting up pressure reducing valves and optimized pump operations, would represent the optimal real loss reduction for Arizona providers. Finally, case ILI is accepted by ADWR is necessary to define what would be the maximum allowable ILI for Arizona. 15

16 5 References AWWA. (2006). Alegre, H. Hirner, W., Bapista, J., and Parena, R. (2000). Performance indicators for water supply services IWA Manual of Best Practices, ISBN Dickinson, M. (2005). Redesigning water loss standards in California using the new IWA methodology, paper presented at Leakage 2005, Halifax, Canada (available at Hill C., and Davis, S. (2005). Economics of Domestic Residential Water Meter Replacement Based on Cumulative Volume, powerpoint presentation for Tucson Metro Water, Tucson, Jun. IWA Task Force, 2000, Best Practice Performance indicators: a practical approach. Lambert, A and McKenzie, R. (2002) Practical Experience in using the Infrastructure Leakage Index. Paper to IWA Conference Leakage Management A Practical Approach, Cyprus, November 2002, (download from Liemberger, R. and Farley, M. (2004). Developing a non-revenue water reduction strategy, powerpoint presentation from the IWA Congress, Marratech, Sept. Liemberger, R. and McKenzie, R. (2003). Aqualibre: a new innovative water balance software, presented at the IWA/AWWA conference on efficient management of urban water supply, Tenerife. Mackenzie, R., Bhagwan, J., Introduction to WRC Tools to Manage Non-Revenue Water, McKenzie, R. and Lambert, A. (2002). Benchleak User Guide, Water Research Commission Report, TT 159/01. WRC. (2004), 16

17 APPENDIX 17

18 Table 1 Comparing ILI and UFW (modified from Liemberger and Farley, 2004). City Real loss (as percentage of volume) Vienna 9 6 ILI Lemesos Cyprus 13 ~1 Bristol Philadelphia 26 ~14 Makkah, Saudi Arabia 32 >70 Table 2 Recommended Performance Indicators (modified from Liemberger and Farley, 2004). Function Level Performance Indicator Financial: 1 Volume of NRW NRW by Volume (Basic) [as % of System Input Volume] Operational: 1 [gal / conn. / day] Real Losses (Basic) or: [gal / miles of mains / day] (only if connection density is < 32 conn. / mi) Operational: 2 [gal / conn. / day / PSI] Real Losses (Intermed.) or: [gal / miles of mains / day / PSI] (only if connection density is < 32 conn. / mi) Financial: 3 Value of NRW NRW by Cost (Detailed) [as % of annual cost of running system] Operational: 3 Real Losses (Detailed) Infrastructure Leakage Index (ILI) 18

19 Figure 1 The four basic methods of managing real losses (from Lambert and McKenzie, 2002). Figure 2 Standard IWA Water Balance (from IWA Task Force, 2000). 19

20 Water Audit Legend ACC / ADWR Annual Reports Estimated data Missing data Water Supplied Volume from own sources MI gal/ yr 95, , , , , , ,526.0 Master meter error % Water imported MI gal/ yr Water exported MI gal/ yr 7, , , , , , ,210.2 Authorized Consumption Billed Metered MI gal/ yr 57, , , , , , ,535.2 Billed Unmetered MI gal/ yr Unbilled metered MI gal/ yr Unbilled Unmetered MI gal/ yr Apparent Losses Unauthorized consumption MI gal/ yr 1, , , , , , ,145.2 Customer metering inaccuracies MI gal/ yr Data Handling Errors MI gal/ yr 2, , , , , , ,751.2 System Data Length of Mains (Transmission + Distribution) miles 3, , , , , , ,160.0 Number of Service Connections - 548, , , , , , ,289.0 Average Length of Private Pipe ft Average operating pressure when system is pressurised PSI Population served by the system - 900, , , , , , ,000.0 Cost Data Unit Value of Real Losses (eg bulk purchase price) $/ MI gal Unit Value of Apparent Losses (eg selling price) $/ 1000 gal Total Annual Cost of operating water system $/ yr 167,604, ,604, ,604, ,604, ,604, ,604, ,604,000 Figure 3 UA Water Audit Spreadsheet. 16 Infrastructure Leakage Index (ILI) 14 Infrastructure Leakage Index AZ 1 AZ AZ 3 Figure 4 ILI values in America and Arizona (modified from Lambert and McKenzie, 2002). 20

21 ILI Technical Performance Category 1-2 A 2-4 B 4-8 C > 8 D Further loss reduction may be uneconomic unless there are shortages; careful analysis needed to identify cost effective improvement Potential for marked improvements; consider pressure management; better active leakage control practices, and better network maintenance Poor leakage record; tolerable only if water is plentiful and cheap; even then, analyze level and nature of leakage and intensify leakage reduction efforts Horrendously inefficient use of resources; leakage reduction programs imperative and high priority Figure 5 ILI target matrix and technical performance category (Modified from Dickinson, 2005). 3 Infrastructure Leakage Index (ILI) 2.5 Infrastructure Leakage Index Figure 6 ILI - over time benchmarking. 21

22 Non - Revenue Water (% of Volume) 8% 7% 6% NRW (% of Volume) 5% 4% 3% 2% 1% 0% Figure 7 NRW - over time benchmarking. Annual Cost of Real Losses Cost of Real losses ($) Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Figure 8 Annual cost of real losses Benchmarking by pressure zone. 22

23 Real Losses (gal / conn. / day) gal/conn./day Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Figure 9 Real losses (gal / conn / day) Benchmarking by pressure zone. Figure 10 Real loss target matrix and technical performance category (Modified from Liemberger, 2005). 23

24 ILI vs. Unaccounted for Water % % 11 ILI % 8% 6% 4% Unaccounted for Water 3 2 2% Real Losses (Mil gal/year) 0% ILI UFW Figure 11 Sensitivity analysis uncertainties in the real losses ILI vs. Unaccounted for Water 10 10% 9 9% 8 8% 7 7% ILI % 5% 4% Unaccounted for Water 3 3% 2 2% 1 1% 0 0% Pressure (PSI) ILI UFW Figure 12 Sensitivity analysis uncertainties in the average operating pressure 24

25 Leakage Modelling 6.0E E Flow rate (gal / hr) 4.0E E E E E+00 09:00 11:00 13:00 15:00 17:00 19:00 21:00 23:00 01:00 03:00 05:00 Pressure (PSI) 07: Time Inflow Leakage Consumption Inlet Pressure Figure 13 Night Flow Analysis Leakage Modeling 25

George Kunkel, P.E. Philadelphia Water Department David Sayers Delaware River Basin Commission AWWA Water Loss Control Committee

George Kunkel, P.E. Philadelphia Water Department David Sayers Delaware River Basin Commission AWWA Water Loss Control Committee DRBC Workshop Water System Audits and Water Loss Control Bordentown, NJ April 13, 2011 Module 2 Session 2 Overview of AWWA s Free Water Audit Software & Compiler George Kunkel, P.E. Philadelphia Water

More information

Acoustic Leak Detection. Gander Newfoundland 2006

Acoustic Leak Detection. Gander Newfoundland 2006 Acoustic Leak Detection Gander Newfoundland 2006 Overview Background on Leakage and leak Detection Water Loss Management Fundamentals of Correlation Leakage The unintentional escape or loss of water from

More information

Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E.

Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E. Water Loss Auditing and Water Leak Detection: How Much is Being Lost and Where Does it Go? PNWS-AWWA Annual Conference Michael W. Grimm, P.E. April 29, 2015 1 2 What Will Be Covered Determining the magnitude

More information

CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT

CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT CITY OF TORONTO WATER LOSS STUDY & PRESSURE MANAGEMENT PILOT Alain M. Lalonde, P.Eng. Principal, Veritec Consulting Inc.* Candice Au, P.Eng. Engineer, Toronto Water, City of Toronto Paul Fanner, C.Eng.

More information

Barbados Water Authority Leak Detection

Barbados Water Authority Leak Detection Barbados Water Authority Leak Detection By: Gary Fricke- Sales Manager Hetek Solutions Inc. Shelley Chase- Engineer, Waste Control/ Distribution, Barbados Water Authority Abstract Water suppliers are under

More information

LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL

LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL LAKE VICTORIA WATER & SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME WATER AUDIT MANUAL Prepared by: NWSC- External Services, Uganda July 2008 Preamble This manual is specifically meant to

More information

The Manager s Non-Revenue Water Handbook. A Guide to Understanding Water Losses

The Manager s Non-Revenue Water Handbook. A Guide to Understanding Water Losses The Manager s Non-Revenue Water Handbook A Guide to Understanding Water Losses The Manager s Non-Revenue Water Handbook A Guide to Understanding Water Losses Publication Team Authors: Malcolm Farley Gary

More information

Reduce Leaks Using water audits and leak detection surveys

Reduce Leaks Using water audits and leak detection surveys February 2008 DOH 331-388 Reduce Leaks Using water audits and leak detection surveys In 2000, public water suppliers in Washington produced a total of 1,020 million gallons of drinking water per day to

More information

Georgia Water System Audits and Water Loss Control Manual

Georgia Water System Audits and Water Loss Control Manual Georgia Water System Audits and Water Loss Control Manual Produced for: Georgia Department of Natural Resources Georgia Environmental Protection Division Georgia Watershed Protection Branch January 2015

More information

AWWA Free Water Audit Software v5.0 Overview. Brian Skeens

AWWA Free Water Audit Software v5.0 Overview. Brian Skeens AWWA Free Water Audit Software v5.0 Overview Brian Skeens Georgia Water Loss Manual v1.0 September 2011 v1.1 January 2014 Release Number of Version Date Worksheets v1 2005/6 5 v2 2006 5 v3 2007 7 v4-4.2

More information

Schneider Electric s Advanced Water Leakage Detection

Schneider Electric s Advanced Water Leakage Detection Schneider Electric s Advanced Water Leakage Detection February 2010 / White paper by Ivan Nazzaretto, Schneider Electric solutions manager - water utilities Make the most of your energy SM Summary Executive

More information

Performance Indicators Review the performance indicators to evaluate the results of the audit. Comments. Loss Control Planning.

Performance Indicators Review the performance indicators to evaluate the results of the audit. Comments. Loss Control Planning. 4 AWWA Free Water Audit Software v5. American Water Works Association Copyright 214, All Rights Reserved. This spreadsheet-based water audit tool is designed to help quantify and track water losses associated

More information

Water Network Monitoring: A New Approach to Managing and Sustaining Water Distribution Infrastructure

Water Network Monitoring: A New Approach to Managing and Sustaining Water Distribution Infrastructure Water Network Monitoring: A New Approach to Managing and Sustaining Water Distribution Infrastructure A TaKaDu White Paper Haggai Scolnicov, Chief Technology Officer Guy Horowitz, VP Marketing September

More information

Experience and results achieved in introducing District Metered Areas (DMA) and Pressure Management Areas (PMA) at Enia utility (Italy)

Experience and results achieved in introducing District Metered Areas (DMA) and Pressure Management Areas (PMA) at Enia utility (Italy) Experience and results achieved in introducing District Metered Areas (DMA) and Pressure Management Areas (PMA) at Enia utility (Italy) M. Fantozzi* F. Calza** A. Lambert*** * MIYA Via Forcella 29 2564

More information

DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY

DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY İzzet ÖZTÜRK Vedat UYAK Mehmet ÇAKMAKCI Lütfi AKÇA İstanbul Technical University, Faculty of Civil Engineering, Department

More information

Water Loss and Leak Detection. Gary Armentrout, Project Associate Environmental Finance Center Wichita State University

Water Loss and Leak Detection. Gary Armentrout, Project Associate Environmental Finance Center Wichita State University Water Loss and Leak Detection Gary Armentrout, Project Associate Environmental Finance Center Wichita State University Water Meters The Atlanta Journal-Constitution: Thousands of city of Atlanta water

More information

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS

360 CMR: MASSACHUSETTS WATER RESOURCES AUTHORITY 360 CMR 12.00: LEAK DETECTION REGULATIONS 360 CMR 12.00: LEAK DETECTION REGULATIONS Section 12.01: Preamble 12.02: Effective Date 12.03: Definitions 12.04: Applicability of Leak Detection and Repair Program 12.05: Minimum Frequency 12.06: Methods

More information

The challenge of reducing non-revenue water by implementing the change management index A first comparative assessment in four development countries

The challenge of reducing non-revenue water by implementing the change management index A first comparative assessment in four development countries The challenge of reducing non-revenue water by implementing the change management index A first comparative assessment in four development countries Monika Konatar*, Matthias Hitzel** * Human Resource

More information

Designing an Effective Leakage Reduction and Management Program

Designing an Effective Leakage Reduction and Management Program The Water and Sanitation Program is an international partnership for improving water and sanitation sector policies, practices, and capacities to serve poor people April 2008 Field Note Performance Improvement

More information

SWAN. The Value of Online Water Network Monitoring SUMMARY

SWAN. The Value of Online Water Network Monitoring SUMMARY SWAN S m a r t W a t e r N e t w o r k s F o r u m The Value of Online Water Network Monitoring SUMMARY Online water monitoring is the use of data transmitted from network elements, meters and sensors

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

LAKE VICTORIA WATER AND SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME LEAKAGE REDUCTION AND REPAIR GUIDELINES

LAKE VICTORIA WATER AND SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME LEAKAGE REDUCTION AND REPAIR GUIDELINES LAKE VICTORIA WATER AND SANITATION INITIATIVE FAST TRACK CAPACITY BUILDING PROGRAMME LEAKAGE REDUCTION AND REPAIR GUIDELINES Prepared for: Muleba Urban Water and Sewerage Authority (MLUWASA), Tanzania

More information

WATER LEAK DETECTION AND REPAIR PROGRAM

WATER LEAK DETECTION AND REPAIR PROGRAM WATER LEAK DETECTION AND REPAIR PROGRAM EPD Guidance Document August 2007 TABLE OF CONTENTS PART 1: ESSENTIALS OF LEAK DETECTION AND REPAIR 3 SUMMARY 3 Benefits of Leak Detection and Repair 3 Unaccounted-for

More information

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com This presentation premiered at WaterSmart Innovations watersmartinnovations.com Cutting Our Losses: The Los Angeles Water Loss Audit Experience WaterSmart Conference October 2, 2013 Penny Falcon, P.E.

More information

Leakage Management & Control

Leakage Management & Control Leakage Management & Control (An overview) Saroj Sharma April 2008 Delft, The Netherlands Contents Introduction Causes of leaks and benefits of leakage control Leakage management strategy Economic level

More information

Technical Losses in Natural Gas Transportation, Distribution, and Storage. Paul Metro Pennsylvania Public Utility Commission

Technical Losses in Natural Gas Transportation, Distribution, and Storage. Paul Metro Pennsylvania Public Utility Commission Technical Losses in Natural Gas Transportation, Distribution, and Storage Paul Metro Pennsylvania Public Utility Commission 1 Unaccounted for Gas (UFG or Technical Losses) Unaccounted for gas is the difference

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

WATER LEAKAGE AND DETECTION IN MUNICIPAL WATER DISTRIBUTION NETWORKS. N. Merzi (1) and T. Özkan (2)

WATER LEAKAGE AND DETECTION IN MUNICIPAL WATER DISTRIBUTION NETWORKS. N. Merzi (1) and T. Özkan (2) Water Supply and Drainage for Buildings, 29th Int. Symposium, Turkey WATER LEAKAGE AND DETECTION IN MUNICIPAL WATER DISTRIBUTION NETWORKS N. Merzi (1) and T. Özkan (2) (1)[email protected] (2)[email protected]

More information

monitoring water networks Identifying and Quantifying the Value of Water Network Monitoring

monitoring water networks Identifying and Quantifying the Value of Water Network Monitoring monitoring water networks Identifying and Quantifying the Value of Water Network Monitoring A T a K a D u W h i t e p a p e r 1. INTRODUCTION Water Network Monitoring is based on real-time analysis of

More information

AADC Water Network Management and Leakage Control Synopsis

AADC Water Network Management and Leakage Control Synopsis AADC Water Network Management and Leakage Control Synopsis 1 Al Ain Distribution Company. Formed (from the Water and Electricity Department) in 1999 as a wholly owned subsidiary of the Abu Dhabi Water

More information

Real Loss Component Analysis: A Tool for Economic Water Loss Control

Real Loss Component Analysis: A Tool for Economic Water Loss Control Real Loss Component Analysis: A Tool for Economic Water Loss Control Web Report #4372a Subject Area: Infrastructure Real Loss Component Analysis: A Tool for Economic Water Loss Control About the Water

More information

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH

LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,

More information

Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency

Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency SUMMARY Recent advances in real-time water sensing technology have enabled new opportunities for improved assessment and management

More information

LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION

LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION 4th DAAAM International Conference on Advanced Technologies for Developing Countries September 21-24, 2005 Slavonski Brod, Croatia LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION

More information

Experiences Using Water Network Analysis Modeling for Leak Localization

Experiences Using Water Network Analysis Modeling for Leak Localization Experiences Using Water Network Analysis Modeling for Leak Localization S. Sethaputra*, S. Limanond*, Z. Y. Wu**, P. Thungkanapak***, K. Areekul*** * Technology Service and Consulting 1656 Co., Ltd. Bangkok

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Best Practices in Model Development and Maintenance Adam Rose ([email protected]), Product Manager, XP Solutions

Best Practices in Model Development and Maintenance Adam Rose (adam.rose@xpsolutions.com), Product Manager, XP Solutions Best Practices in Model Development and Maintenance Adam Rose ([email protected]), Product Manager, XP Solutions adopted from Best practices for software development projects Mike Perks ([email protected]),

More information

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM EPD Guidance Document AUGUST 2007 TABLE OF CONTENTS Part 1: OVERVIEW OF WATER METERING 3 SUMMARY 3 NECESSITY OF METERS 3 TYPES OF WATER METERS 4

More information

Aspects of Energy Efficiency in Water Supply systems

Aspects of Energy Efficiency in Water Supply systems Aspects of Energy Efficiency in Water Supply systems Mordecai Feldman Miya, Tel Aviv, Israel, [email protected] Keywords: water supply, energy, operation, scheduling, Water loss Abstract

More information

Leak detection in virtual DMA combining machine learning network monitoring and model based analysis

Leak detection in virtual DMA combining machine learning network monitoring and model based analysis Leak detection in virtual DMA combining machine learning network monitoring and model based analysis Author Dr. Gangl Gerald*, Raúl Navas ** * Dr. Gerald Gangl, Kriegsbergstraße 31, 70327 Stuttgart, Germany,

More information

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects December 10, 2014 from 2:00-3:00 p.m. Presented by Wayne Cannon Ohio RCAP Rural Development Specialist, [email protected] Why Asset

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

Cooling Tower Sidestream Filtration A Green, Proven Cost Reduction Technology

Cooling Tower Sidestream Filtration A Green, Proven Cost Reduction Technology Cooling Tower Sidestream Filtration A Green, Proven Cost Reduction Technology TAB0411 Typical crossflow cooling tower installation Due to the large air-water interface needed to obtain good evaporative

More information

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)

Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability

More information

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT? Derek Vogelsang 1, Alana Duncker 1, Steve McMichael 2 1. MWH Global, Adelaide, SA 2. South Australia Water Corporation, Adelaide, SA ABSTRACT

More information

A methodology for monitoring and leakage reduction in water distribution systems

A methodology for monitoring and leakage reduction in water distribution systems Water Utility Journal 2: 23-33, 2011. 2011 E.W. Publications A methodology for monitoring and leakage reduction in water distribution systems M. Nicolini University of Udine Department of Chemistry, Physics

More information

Water Demand Forecast Approach

Water Demand Forecast Approach CHAPTER 6 2009 REGIONAL WATER SUPPLY OUTLOOK Water Demand Forecast Approach 6.1 Introduction Long-range water demand forecasting is a fundamental tool that water utilities use to assure that they can meet

More information

STATE OF ILLINOIS. Issued by. Department of Registration and Education. NOBLE J. PUFFER, Director. State Water Survey Division

STATE OF ILLINOIS. Issued by. Department of Registration and Education. NOBLE J. PUFFER, Director. State Water Survey Division Circular No. 33 1951 STATE OF ILLINOIS Issued by Department of Registration and Education NOBLE J. PUFFER, Director State Water Survey Division A. M. BUSWELL, Chief Urbana, Illinois REPRINTED FROM AND

More information

A 360 Approach To Optimise Network Efficiency

A 360 Approach To Optimise Network Efficiency A 360 Approach To Optimise Network Efficiency Network Efficiency and Non-Revenue Water, A Challenge For Water Authorities TODAY NON-REVENUE WATER represents: 35% 49 14.9 Billion m 3 /year Billion $AUD

More information

INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM

INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM Tony Urquhart Vice President MWH Business Solutions Suite 700, 380 Interlocken Crescent Broomfield, CO 80304 ABSTRACT In

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft

Eidelweiss Asset Management. Project Plan. Revision 0 - Draft Eidelweiss Asset Management Project Plan Revision 0 - Draft Written by Larry Leonard Eidelweiss Commissioner / Team Chairperson 5/29/2014 Table of Contents Section Description 1 Overview 2 Development

More information

Ithriam Leukes Water Business Development Manager / Agent South Africa

Ithriam Leukes Water Business Development Manager / Agent South Africa Ithriam Leukes Water Business Development Manager / Agent South Africa Holistic NRW Reduction Solution Losses Segmentation Apparent Losses represent 34% of overall losses REAL LOSSES Calculated by substraction,

More information

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey IV. PROPOSED PLAN FOR AMD ABATEMENT GOALS AND OBJECTIVES Although the major natural resource in the Wyoming Valley is anthracite coal*, its importance to the present and future economy of the area is limited

More information

GAS & ELECTRIC UTILITY APPLICATION SUPPLEMENT

GAS & ELECTRIC UTILITY APPLICATION SUPPLEMENT Chubb Group of Insurance Companies 15 Mountain View Road, Warren, New Jersey 07059 GAS & ELECTRIC UTILITY APPLICATION SUPPLEMENT GENERAL INFORMATION Applicant Name: A. Applicant is: Investor Owned Utility

More information

Innovative Solutions in the Water Industry: Leak Detection

Innovative Solutions in the Water Industry: Leak Detection Maureen Duffy 856-309-4546 [email protected] Innovative Solutions in the Water Industry: Leak Detection Introduction Meeting current water demand and supplying water for future generations is a

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

An Online Optimised Pump Scheduling System

An Online Optimised Pump Scheduling System An Online Optimised Pump Scheduling System Stephanie Pegg Systems Technology Beca Carter Hollings & Ferner Ltd Auckland, New Zealand [email protected] Abstract A common problem facing the suppliers of bulk

More information

1 WATERFLUX - Comparisonon COO 2010-08-17. Rectangular Magmeter in water applications

1 WATERFLUX - Comparisonon COO 2010-08-17. Rectangular Magmeter in water applications 1 WATERFLUX - Comparisonon COO 2010-08-17 Rectangular Magmeter in water applications Jef Neven KROHNE WATERMETERS $3000 EMF Price C&I (mechanical) water meters Residential water meters $30 Water Metering

More information

INTERNATIONAL. Technical journal for piping system integrity and efficiency

INTERNATIONAL. Technical journal for piping system integrity and efficiency INTERNATIONAL Technical journal for piping system integrity and efficiency Special 2/2011 ISSN 0340-3386 K 1252 E Vulkan-Verlag, Essen, Germany Special Issue: Water & gas distribution Sewer systems Rehabilitation

More information

Management Techniques and Technologies for Leak Detection and Control in the Water Industry. Final report

Management Techniques and Technologies for Leak Detection and Control in the Water Industry. Final report Management Techniques and Technologies for Leak Detection and Control in the Water Industry Final report WRc Ref: G10278.01 WRc is an Independent Centre of Excellence for Innovation and Growth. We bring

More information

STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH

STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH Ir. LAM Shing Tim Development(2) Division, Development Branch, Water Supplies Department. Abstract: Water demand

More information

Water Pressure Reducing Valves

Water Pressure Reducing Valves F-23QA 23 Questions and Answers about Water Pressure Reducing Valves $ HOW THEY Save WATER Save ENERGY Save WASTEWATER Save MAINTENANCE Save MONEY ENERGY WATER Conserve Both Automatically with Water Pressure

More information

Leak Detection and Abatement in the Water Utility of Iasi

Leak Detection and Abatement in the Water Utility of Iasi Leak Detection and Abatement in the Water Utility of Iasi Transferable Solution Project Summary Project Activities Project Benefits Lessons Learned Contact Information Project Title: Leak Detection and

More information

A Short review of steel demand forecasting methods

A Short review of steel demand forecasting methods A Short review of steel demand forecasting methods Fujio John M. Tanaka This paper undertakes the present and past review of steel demand forecasting to study what methods should be used in any future

More information

Design Criteria & Service Goals

Design Criteria & Service Goals 4.1 Design Life of Improvements The design life of a water system component is sometimes referred to as its useful life or service life. The selection of a design life is a matter of judgment based on

More information

Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities

Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities Columbus DPU Asset Management Program Business Case Evaluations Kevin V. Campanella, P.E. - Columbus Department of Public Utilities Link to the on-line presentation: http://prezi.com/jjmaeumpxtaj/?utm_campaign=share&utm_medium=copy&rc=ex0share

More information

Technical Advice Note: Retail Impact Assessments

Technical Advice Note: Retail Impact Assessments Technical Advice Note: Retail Impact Assessments 1 A GUIDE FOR RETAIL IMPACT ASSESSMENTS INTRODUCTION This Technical Advice Note (TAN) has been prepared to assist applicants seeking planning permission

More information

SLIM Estimate and Microsoft Project Best Practices

SLIM Estimate and Microsoft Project Best Practices SLIM Estimate and Microsoft Project Best Practices There are many activities to perform during the life of a software development project. No single tool provides all of the functionality or data that

More information

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE Arabian Sea Mumbai KARNATAKA Delhi Chennai Nepal Calcutta Bay of Bengal PRESENTATION Improving the performance of Public Water Utilities A case study of Bangalore By N.C. MUNIYAPPA, Chairman, BWSSB LOCATION

More information

Alternatives to regular inspection of heating and air-conditioning systems for the EPBD: evaluation and comparison. Bruce Young.

Alternatives to regular inspection of heating and air-conditioning systems for the EPBD: evaluation and comparison. Bruce Young. Bruce Young Alternatives to regular inspection of heating and air-conditioning systems for the EPBD: evaluation and comparison July 2014 www.epbd-ca.eu Alternatives to regular inspection of heating and

More information

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information

More information

Boiler & Pressure Vessel Inspection discrepancies and failures

Boiler & Pressure Vessel Inspection discrepancies and failures Boiler & Pressure Vessel Inspection discrepancies and failures Water Heaters / Pressure Vessels Pressure Vessels are inspected once every three years. This requires a test of A: safety relief devices B:

More information

Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice

Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice Augmenting Rainwater Harvesting to Offset Potable Water for Irrigation and Indoor Use within the Tampa Bay Region A Best Management Practice Tampa Bay Water May 23, 2011 1 Table of Contents Section 1:

More information

Leakage Detection Using PLUMBOAT

Leakage Detection Using PLUMBOAT International Journal of Scientific and Research Publications, Volume 4, Issue 10, October 2014 1 Leakage Detection Using PLUMBOAT Pratiksha Kulkarni Electronics & Telecommunication Department, R.A.I.T

More information

KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD

KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD By K.P. Jayaramu, Executive Engineer, Karnataka Water Board, Jn NURM City Division, Mysore

More information

Leak Detection Theory: Optimizing Performance with MLOG

Leak Detection Theory: Optimizing Performance with MLOG Itron White Paper Water Loss Management Leak Detection Theory: Optimizing Performance with MLOG Rich Christensen Vice President, Research & Development 2009, Itron Inc. All rights reserved. Introduction

More information

Many directors of public enterprises

Many directors of public enterprises Management & Careers The Finance Director s Role in Helping Public Enterprises Look their Best By Bryan A. Mantz Finance directors of public enterprises face special challenges; developing expertise in

More information

Cybernetics Approach to Sales Incentive Compensation Management

Cybernetics Approach to Sales Incentive Compensation Management Cybernetics Approach to Sales Incentive Compensation Management Sales Incentive Compensation Management (ICM) is increasingly becoming the key decisive and motivating factor in influencing sales force

More information

Standard terms and conditions

Standard terms and conditions Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled

More information

Part II Management Accounting Decision-Making Tools

Part II Management Accounting Decision-Making Tools Part II Management Accounting Decision-Making Tools Chapter 7 Chapter 8 Chapter 9 Cost-Volume-Profit Analysis Comprehensive Business Budgeting Incremental Analysis and Decision-making Costs Chapter 10

More information