724 Act LAWS OF PENNSYLVANIA. No A SUPPLEMENT
|
|
|
- Preston Haynes
- 10 years ago
- Views:
Transcription
1 724 Act LAWS OF PENNSYLVANIA No SB 874 A SUPPLEMENT To the act of December 8, 1982 (P.L.848, No.235), entitled An act providing for the adoption of capital projects related to the repair, rehabilitation or replacement of highway bridges to be financed from current revenue or by the incurring of debt and capital projects related to highway and safety improvement projects to be financed from current revenue of the Motor License Fund, itemizing additional local and State bridge projects. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: Section 1. Short title. This act shall be known and may be cited as the HighwayRailroad and Highway Bridge Capital Budget Supplemental Act for Section 2. Definitions. The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise: Account. The Highway Bridge Improvement Restricted Account within the Motor License Fund. Capital project. A capital project as defined in section 302 of the act of February 9, 1999 (P.L.l, No.1), known as the Capital Facilities Debt Enabling Act, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in this act. Department. The Department of Transportation of the Commonwealth. Secretary. The Secretary of Transportation.ofthe Commonwealth. Section 3. Total authorization for bridge projects. (a) Total projects. The total authorization for the costs of the projects itemized pursuant to this act and to be financed from current revenue or by the incurring of debt shall be $2,103,688,000. (b) State projects. The authorization for capital projects in the category of highway bridge projects and forestry and State park bridge projects to be constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt or from the account itemized in this act under the category of State bridges shall be $1,612,945,000. (c) NonState projects. The authorization for nonstate highway bridge projects to be constructed by municipalities and to be financed in part with grants not exceeding 80% of the nonfederal share of the costs made to the local government municipalities by the department from revenues deposited in the account itemized in this act under the category of local bridges shall be $490,743,000.
2 SESSION OF 2006 Act Section 4. Itemization of bridge projects. The individual capital projects in the category of highway projects to be constructed by the Department of Transportation, its successors or assigns and to be financed from current revenue or by the incurring of debt are hereby itemized, together with their estimated financial costs, in the following sections. Section 5. Adams County. (a) Local Bridges (1) Hamilton and Paradise Townships, T55l over Beaver Creek, 290,000 (2) Hamilton and Paradise Townships, T552A over Beaver Creek, 270,000 (3) Hamilton and Paradise Townships, 1554 over Beaver Creek, 295,000 (b) State Bridges (1) SR 0034, Carlisle Road over Quaker Run, Menallen 205,000 (Base Construction Allocation $100,000) (Land Allocation $15,000) (Design and Contingencies $90,000) (2) SR 2006, Coleman Road over CSX Railroad, Straban 225,000 (Base Construction Allocation $120,000) (Land Allocation $15,000) (Design and Contingencies $90,000) (3) SR 4010, Shippensburg Road over Conewago Creek, Franklin and Menallen Townships, Bridge 205,000 (Base Construction Allocation $100,000) (Land Allocation $15,000) (Design and Contingencies $90,000) (4) SR 1007 over Mud Run, Reading Township, 215,000 (Base Construction Allocation $135,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (5) SR 1015 over Conewago Creek, Straban 250,000 (Base Construction Allocation $156,000) (Land Allocation $47,000) (Design and Contingencies $47,000) (6) SR 1017 over Conewago Creek, Straban 459,000 (Base Construction Allocation $287,000) (Land Allocation $86,000)
3 726 Act LAWS OF PENNSYLVANIA (Design and Contingencies $86,000) (7) SR 2006 over Plum Creek, Conewago Township, 144,000 (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (8) SR 2014 over Piney Creek, Germany Township, 106,000 (Base Construction Allocation $66,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (9) SR 3005 over Willoughby Run, Cumberland 157,000 (Base Construction Allocation $99,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (10) SR 3006 over Tributary of Marsh Creek, Cumberland 49,000 (Base Construction Allocation $31,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (11) SR 3018 over Little Marsh Creek, Hamiltonban 38,000 (Base Construction Allocation $24,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (12) SR 3030 over Conewago Creek, Franklin 141,000 (Base Construction Allocation $87,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (13) SR 4013 over Conewago Creek, Butler 121,000 (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) Section 6. Allegheny County. (a) Local Bridges (1) South Park Township, Wallace Road Bridge over Catfish Run near Brownsville Road, Bridge 120,000 (Base Construction Allocation $120,000) (2) Findlay Township, SteubenvilleEnlow Road over Montour Run, 819,000 (Base Construction Allocation $819,000)
4 SESSION OF 2006 Act (3) South Park Township, Wood Street over Piney Fork Creek, 298,000 (Base Construction Allocation $298,000) (4) Moon Township, Spring Run Road over Boggs Run, 390,000 (Base Construction Allocation $390,000) (5) South Park Township, B. Corrigan Drive at Horse Barn in Park over Catfish Run, Bridge 250,000 (Base Construction Allocation $250,000) (6) South Fayette Township, Parks Run Road over Millers Run, 480,000 (Base Construction Allocation $480,000) (7) South Fayette Township, 2000 Feet North of SR 3001 over Miller Run Road/Fishing Run Road, 650,000 (Base Construction Allocation $650,000) (8) Collier Township, Scotts Run Road over Scotts Run, 350,000 (Base Construction Allocation $350,000) (9) Collier Township, Thoms Run Road over Woods Run, 650,000 (Base Construction Allocation $650,000) (10) Edgeworth Borough, Woodland Road Extension over CSX Railroad, Bridge 4,664,000 (Base Construction Allocation $4,664,000) (11) Edgeworth Borough, Woodland Road Extension over Little Sewickley Creek, Bridge 424,000 (Base Construction Allocation $424,000) (12) Bethel Park Borough, Bethel Park N&W Railroad over Railroad, 3,982,000 (Base Construction Allocation $3,982,000) (13) Sewickley Hills Borough, Glenfield Road over Tributary of Kilbuck Run, 519,000 (Base Construction Allocation $519,000) (14) South Park Township, Brownsville Road over Lick Run, 310,000 (Base Construction Allocation $310,000) (15) Findlay Township, ClintonEnlow Road over North Branch of Montour Run, Bridge 204,000 (Base Construction Allocation $204,000)
5 728 Act LAWS OF PENNSYLVANIA (16) Sewickley Hills Borough, Pony Hollow Road over Tributary of Little Sewickley Creek, Bridge 519,000 (Base Construction Allocation $519,000) (17) Sewickley Heights Borough, Pony Hollow Road over Tributary of Little Sewickley Creek, 410,000 (Base Construction Allocation $410,000) (18) Osborne Borough, Beaver Street over Davis Run, 350,000 (Base Construction Allocation $350,000) (19) North Fayette Township, Main Street over Robinson Run, 859,000 (Base Construction Allocation $859,000) (20) Jefferson Hills, Cochran Mills Road over N&W Railroad, 4,979,000 (Base Construction Allocation $4,979,000) (21) Kilbuck Township, Camp Home Road over Tributary oflowries Run, 281,000 (Base Construction Allocation $281,000) (22) North Fayette Township, Hans Road over North Branch of Robinson Run, 327,000 (Base Construction Allocation $327,000) (23) South Fayette Township, 100 Feet West of SR 3026 over Miller Run Road/Dolphin Road, Bridge 186,000 (Base Construction Allocation $186,000) (24) Ross Township, Hillcrest Drive over Hillcrest Drive, Bridge Rehabilitation 36,000 (Base Construction Allocation $30,000) (Land Allocation $6,000) (25) South Park Township, McElheny Road over Lick Run, 30,000 (Base Construction Allocation $30,000) (26) South Park Township, Wallace Road over Lick Run, 30,000 (Base Construction Allocation $30,000) (27) South Park Township, Brandis Avenue at Stewart Road over Tributary of Piney Fork Creek, 25,000 (Base Construction Allocation $25,000) (28) Bethel Park Borough, Brookside Boulevard over Graesers Run, 120,000 (Base Construction Allocation $120,000)
6 SESSION OF 2006 Act (29) South Park Township, McElheny Road near Cochran Mill Road over Lick Run, Bridge 30,000 (Base Construction Allocation $30,000) (30) South Fayette Township, Millers Run Road over Small Stream, 26,000 (Base Construction Allocation $26,000) (31) South Park Township, Wilson Road over Lick Run, 10,000 (Base Construction Allocation $10,000) (32) Pleasant Hills Borough, Pleasant Hills Boulevard Pedestrian Bridge over Old Lebanon Church Road, Bridge Rehabilitation 7,000 (Base Construction Allocation $7,000) (33) Neville Township, Fleming Park Bridge over Ohio River Back Channel and Railroad, Bridge 3,123,000 (Base Construction Allocation $3,066,000) (Design and Contingencies $57,000) (34) Moon Township, T300, North Flaugherty Run Road over Tributary of Flaugherty Run Creek, 150,000 (Base Construction Allocation $125,000) (Design and Contingencies $25,000) (35) Moon Township, T1 14, Becks Run Road over Tributary of Flaugherty Run Creek, Bridge 150,000 (Base Construction Allocation $125,000) (Design and Contingencies $25,000) (36) Hampton Township, T760 over West Bardonner Road, 265,000 (Base Construction Allocation $240,000) (Design and Contingencies $25,000) (37) Bethel Park Borough, Sarah Street over Tributary No.1 of Piney Fork Creek, Streambed, 50,000 (Base Construction Allocation $50,000) (38) Nelson Township, Nelson Run Road over Nelson Run, 75,000 (Base Construction Allocation $60,000) (Land Allocation $5,000) (Design and Contingencies $10,000) (39) Upper St. Clair Township, Bower Hill Road over Painters Run, 290,000 (Base Construction Allocation $290,000)
7 730 Act LAWS OF PENNSYLVANIA (40) Ben Avon Borough, 0.25 Mile Southeast of SR 4021 over Ohio River Boulevard, Spruce Run Creek, Spruce Street, 91,000 (Base Construction Allocation $91,000) (41) Ben Avon Borough, Forest Avenue over Ohio River, 396,000 (Base Construction Allocation $396,000) (42) South Park Township, Wallace Road near Brownville Road over Piney Fork Creek, Bridge 350,000 (Base Construction Allocation $350,000) (b) State Bridges (1) SR 4043, Red Mud Hollow Road over 179, Sewickley Hills Borough, 10,548,000 (Base Construction Allocation $10,548,000) (2) 179 South over SR 0050, South Fayette 24,575,000 (Base Construction Allocation $24,575,000) (3) 179 North over SR 0050, South Fayette 24,575,000 (Base Construction Allocation $24,575,000) (4) Brownsville, Curry Road over Lick Run, South Park 310,000 (Base Construction Allocation $310,000) (5) Piney Fork Road, Bridge No.1 over Piney Fork Creek, South Park 60,000 (Base Construction Allocation $60,000) (6) 179 Northbound and Southbound over Presley Road, Collier 38,766,000 (Base Construction Allocation $38,766,000) (7) Thorns Run Road over Woods Run, Collier 650,000 (Base Construction Allocation $650,000) (8) SR 3070, Boggs Road over Branch of South Fork of Montour Run, Findlay Township, Bridge 650,000 (Base Construction Allocation $650,000) (9) SR 3088, Hookstown Grade Road over RQute 60 Business, Findlay 1,830,000 (Base Construction Allocation $1,830,000) (10) SR 3070, McClaren Road and Main Street over Montour Run Stream, Findlay Township, Bridge Restoration 220,000 (Base Construction Allocation $200,000) (Design and Contingencies $20,000)
8 SESSION OF 2006 Act (11) Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge 650,000 (Base Construction Allocation $650,000) (12) SR 3071, Potato Garden Road over Potato Garden Run Bridge No.1, Findlay Township, 570,000 (Base Construction Allocation $570,000) (13) SR 3071, Potato Garden Road over Potato Garden Run Bridge No.2, Findlay Township, 382,000 (Base Construction Allocation $382,000) (14) SR 3071, Culvert between Burgettstown and Boggs Road over Potato Garden Run, Findlay 165,000 (Base Construction Allocation $150,000) (Design and Contingencies $15,000) (15) SR 0065, Red Gate over Hay s Run, Haysville Borough, 650,000 (Base Construction Allocation $650,000) (16) SR 0837, Snowden Road over Lobbs Run, Jefferson Hills Borough, 450,000 (Base Construction Allocation $450,000) (17) Camp Home Road over Tributary of Lowries Run, Kilbuck 281,000 (Base Construction Allocation $281,000) (18) SR 0065, Ohio River Boulevard over Toms Run, Kilbuck Township, Bridge Rehabilitation 650,000 (Base Construction Allocation $650,000) (19) SR 3077, Broadhead Road over Flaugherty Run Creek, Moon 2,015,000 (Base Construction Allocation $1,650,000) (Land Allocation $200,000) (Design and Contingencies $165,000) (20) Ewing Road over Meek Run, Moon Township, 650,000 (Base Construction Allocation $650,000) (21) North Flaugherty Run Road over Boggs Run, Moon 341,000 (Base Construction Allocation $341,000) (22) Spring Run Road Extension over Boggs Run, Moon 390,000 (Base Construction Allocation $390,000) (23) Mt. Nebo Interchange over 179, Ohio Town
9 732 Act LAWS OF PENNSYLVANIA ship, 4;1 82,000 (Base Construction Allocation $4,182,000) (24) Woodland Road Extension over CSX Railroad, Edgeworth Borough, 4,664,000 (Base Construction Allocation $4,664,000) (25) Gregg Station Road over Robinson Run, Collier 997,000 (Base Construction Allocation $997,000) (26) SR 3048 over Robinson Run, Collier Township, Bridge Rehabilitation 6,401,000 (Base Construction Allocation $6,045,000) (Land Allocation $20,000) (Design and Contingencies $336,000) (27) Hans Road over North Branch of Robinson Run, North Fayette Township, Bridge 328,000 (Base Construction Allocation $328,000) (28) Pony Hollow Road over Tributary of Little Sewickley Creek, Sewickley Heights Borough, 410,000 (Base Construction Allocation $410,000) (29) SR 0051, Saw Mill Run Boulevard over Weyman Run, Whitehall Borough, Bridge 650,000 (Base Construction Allocation $650,000) (30) SR 2005 over Kelly Run Bridge No.2, Forward 520,000 (Base Construction Allocation $500,000) (Design and Contingencies $20,000) (31) SR 3004 over McLaughlin Run, Upper St. Clair Township, Bridge Rehabilitation 700,000 (Base Construction Allocation $700,000) (32) SR 0022 and SR 0980 Intersection, Steubenville Pike over Abandoned Montour Railroad, North Fayette 1,800,000 (Base Construction Allocation $1,800,000) (33) SR 0065, Ohio River Boulevard over Birmingham Avenue, Avalon Borough, Bridge 440,000 (Base Construction Allocation $440,000) (34) SR 4023, New Brighton Road over Spruce Run, Avalon Borough, 650,000 (Base Construction Allocation $650,000) (35) Turkey Foot Road over Big Sewickley Creek
10 SESSION OF 2006 Act Road, Bell Acres Borough, 650,000 (Base Construction Allocation $650,000) (36) SR 4021 over Ohio River Boulevard, Ben Avon Borough, 91,000 (Base Construction Allocation $91,000) (37) Bethel Park Municipality over Graesers Run, Bethel Park Borough, 120,000 (Base Construction Allocation $120,000) (38) SR 3008, Morrow Road over McLaughlin Run, Upper St. Clair Township, Bridge Rehabilitation 300,000 (Base Construction Allocation $300,000) (39) SR 3048, Noblestown Road over Scotts Run, Collier 350,000 (Base Construction Allocation $350,000) (40) SR 3048, Noblestown Road over North Branch of Robinson Run, North Fayette Township, Bridge 650,000 (Base Construction Allocation $650,000) (41) SR 3008, Morrow Road over McLaughlin Run, Upper St. Clair 360,000 (Base Construction Allocation $360,000) (42) SR 3034, Lesnett Road over McLaughlin Run, Upper St. Clair 500,000 (Base Construction Allocation $500,000) (43) SR 3108, North Branch Road over North Branch of Robinson Run, North Fayette 650,000 (Base Construction Allocation $650,000) (44) SR 3051 over North Branch of Robinson Run, North Fayette 370,000 (Base Construction Allocation: $370,000) (45) SR 3051, North Branch Road over Robinson Run, North Fayette Township, Bridge 6,500,000 (Base Construction Allocation $6,500,000) (46) SR 3063 over Robinson Run, North Fayette 18,000,000 (Base Construction Allocation $18,000,000) (47) SR 3005, Mayview Road over Chartiers Creek, South Fayette 400,000 (Base Construction Allocation $400,000) (48) SR 0051, Clairton Boulevard over Lewis Run, Pleasant Hills Borough, 550,000 (Base Construction Allocation $550,000)
11 734 Act LAWS OF PENNSYLVANIA (49) SR 3014, Piney Fork Road Bridge No.2 over Piney Fork Creek, South Park Township, Bridge 5,535,000 (Base Construction Allocation $5,535,000) (50) SR 3013, Brownsville Road over Piney Fork, South Park 1,040,000 (Base Construction Allocation $1,040,000) (51) SR 3051, Weyman Road over Saw Mill Run, Whitehall Borough, 570,000 (Base Construction Allocation $570,000) (52) SR 3026, SyganGlyther Road over Millers Road, South Fayette Township, Bridge 2,715,000 (Base Construction Allocation $2,715,000) (53) SR 3051 over SR 0022, North Fayette 1,250,000 (Base Construction Allocation $1,250,000) (53.1) SR 3089 and Stoops Ferry Road over Flaugherty Run, Moon Township, Bridge 1,096,000 (Base Construction Allocation $1,096,000) (54) SR 3048, Grant Street over Robinson Run, Collier 901,000 (Base Construction Allocation $901,000) (55) SR 3048, Noblestown Road over Robinson Run, Collier 400,000 (Base Construction Allocation $400,000) (56) 179 over PittInd Railroad and Robinson Run, Collier 11,293,000 (Base Construction Allocation $11,293,000) (57) Ramp D Road overohio Creek, Robinson Run, Collier 9,173,000 (Base Construction Allocation $9,173,000) (58) SR 3117, Noblestown Road over Ohio Creek, Collier 3,450,000 (Base Construction Allocation $3,450,000) (59) SR 3117, Dorrington Road over Robinson Run, Collier 11,995,000 (Base Construction Allocation $11,995,000) (60) 179 over Collier Road, Collier Township, 5,261,000 (Base Construction Allocation $5,261,000) (61) 179 over Chartiers Creek, Collier Township, 2,210,000 (Base Construction Allocation $2,210,000)
12 SESSION OF 2006 Act (62) SR 3004, McLaughlin Run Road over McLaughlin Run, Bridgeville Borough, Bridge 227,000 (Base Construction Allocation $227,000) (63) SR 0088, Library Road Bridge No.1 over Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation 161,000 (Base Construction Allocation $128,000) (Land Allocation $20,000) (Design and Contingencies $13,000) (64) SR 3034, McMillan Road over McLaughlin Run, Upper St. Clair Township, Bridge 570,000 (Base Construction Allocation $570,000) (65) SR 1016 over 179 and Chartiers Creek, Collier 2,079,000 (Base Construction Allocation $2,079,000) (66) SR 3071, Potato Garden Road over Tributary of Potato Garden Run, Findlay Township, Bridge 650,000 (Base Construction Allocation $650,000) (67) SR 0065, Ohio River Boulevard, Herron Avenue over Lowries Run, Emsworth Borough, 560,000 (Base Construction Allocation $560,000) (68) SR 0065, Ohio River Boulevard over Norfolk Southern Railroad, Leetsdale Borough, Bridge 14,615,000 (Base Construction Allocation $14,615,000) (69) SR 3089, Flaugherty Run Road over Flaugherty Run, Moon 1,067,000 (Base Construction Allocation $1,067,000) (70) SR 3007, Walton Road over Lobbs Run, Jefferson Hills, 560,000 (Base Construction Allocation $560,000) (71) SR 1050 over Lobbs Run, Jefferson Hills, 450,000 (Base Construction Allocation $450,000) (72) SR 0088, Library Road Bridge No.2 over Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation 161,000 (Base Construction Allocation $128,000) (Land Allocation $20,000) (Design and Contingencies $13,000)
13 736 Act LAWS OF PENNSYLVANIA (73) SR 0834 over Hay s Run, Haysville Borough, 650,000 (Base Construction Allocation $650,000) (74) SR 0060, Ramp AP14 Road over Ramp EPE, Ramp P4, Findlay Township, Bridge 2,293,000 (Base Construction Allocation $2,293,000) (75) SR 0060, Ramp APlO Road over Ramp EPE, Ramp CM,. Findlay Township, Bridge 2,293,000 (Base Construction Allocation $2,293,000) (76) SR 3078, Burgettstown Road over Potato Garden Run, Findlay Township, Bridge Rehabilitation. 176,000 (Base Construction Allocation $148,000) (Land Allocation $10,000) (Design and Contingencies $18,000) (77) SR 0065, Ohio River Boulevard, Gibson Street over Lowries Run, Emsworth Borough, Bridge 416,000 (Base Construction Allocation $416,000) (78) SR 3018, Scheinbach Road over Lobbs Run, Jefferson Hills, 450,000 (Base Construction Allocation $450,000) (79) SR 0837, Homestead Bridge Ramps, City of Pittsburgh, West Homestead Borough, Bridge Rehabilitation 2,185,000 (Base Construction Allocation $1,780,000) (Land Allocation $69,000) (Design and Contingencies $336,000) (80) SR 4011, Rochester Road Bridge over SR , 1279, Franklin Park Borough, Bridge. 511,000 (Base Construction Allocation $421,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (81) SR 0028, SH over Yutes Run, Springdale Township, Bridge Preservation 176,000 (Base Construction Allocation $86,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (82) SR 0279, Raymond P. Shafer Highway over I 279 Southbound, Franklin Park Borough, Bridge Rehabilitation 280,000 (Base Construction Allocation $235,000)
14 SESSION OF 2006 Act (Land Allocation $20,000) (Design and Contingencies $25,000) (83) SR 0885, Muffin Road Bridge over Branch of Streets Run, City of Pittsburgh, Bridge 149,000 (Base Construction Allocation $59,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (84) SR 0885, Lebanon Road Bridge over Branch of Streets Run, City of Pittsburgh and West Mifflin Borough, 127,000 (Base Construction Allocation $37,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (85) SR 1010, Harts Run Road over Little Pine Creek, Indiana 102,000 (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (86) SR 2010, Lovedale Road Bridge over Branch of Wylie Run, Lincoln Borough, Bridge 107,000 (Base Construction Allocation $17,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (87) SR 2010, Lovedale Road Bridge over Wylie Run Seg.0040, Elizabeth Township and Lincoln Borough,.. 114,000 (Base Construction Allocation $24,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (88) SR 2046, Streets Run Road Bridge, Seg.0030/0580, Baldwin Borough, Bridge Rehabilitation 236,000 (Base Construction Allocation $146,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (89) SR 2046, Streets Run Road Bridge, Seg.0040/1678, Baldwin Borough, Bridge Rehabilitation 112,000 (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
15 738 Act LAWS OF PENNSYLVANIA (90) SR 2046, Streets Run Road Bridge, Seg.0060/0897, West Mifflin and Baldwin Boroughs, 125,000 (Base Construction Allocation $35,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (91) SR 2046, Streets Run Road Bridge, Seg.0080/l088, West Mifflin and Baldwin Boroughs, 110,000 (Base Construction Allocation $20,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (92) SR 3037, Castle Shannon Boulevard over Saw Mill Run, Castle Shannon Borough, Bridge 173,000 (Base Construction Allocation $83,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (93) SR 3048, Noblestown Road over Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (94) SR 4017, Pine Creek Road over Little Pine Creek, Shaler 174,000 (Base Construction Allocation $84,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (95) SR 3048, Noblestown Road over Branch of Chartiers Creek, Collier Township, Bridge Rehabilitation 96,000 (Base Construction Allocation $6,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (96) SR 0022, SH over Potato Garden Road, North Fayette Township, Bridge Rehabilitation 523,000 (Base Construction Allocation $433,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (97) SR 0279, Penn Lincoln Parkway over Poplar Avenue, Green Tree Borough, Bridge 413,000 (Base Construction Allocation $368,000) (Land Allocation $20,000)
16 SESSION OF 2006 Act (Design and Contingencies $25,000) (98) SR 0079, Raymond P. Shafer Highway over SR 4051 Mingo Road, Marshall Township, Bridge Rehabilitation 179,000 (Base Construction Allocation $134,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (99) SR 0079, Raymond P. Shafer Highway over Mingo Road, Marshall Township, Bridge Rehabilitation.. 167,000 (Base Construction Allocation $122,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (100) SR 0079, Raymond P. Shafer Highway over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation 327,000 (Base Construction Allocation $282,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (101) SR 0079, Raymond P. Shafer Highway over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation 285,000 (Base Construction Allocation $240,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (102) SR 0079, Raymond P. Shafer Highway over I 76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation 184,000 (Base Construction Allocation $139,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (103) SR 0376, Parkway East Highway over Old William Penn Highway, Monroeville Borough, 942,000 (Base Construction Allocation $897,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (104) SR 0376, Parkway East over LR 187, US 22 Business, Monroeville Borough, Bridge Rehabilitation 206,000 (Base Construction Allocation $161,000) (Land Allocation $20,000) (Design and Contingencies $25,000)
17 740 Act LAWS OF PENNSYLVANIA (105) SR 0030, Lincoln Highway over LR 639, Electric Avenue, Chalfant Borough, Bridge 1,003,000 (Base Construction Allocation $913,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (106) SR 4049, Nicholson Road over 179 Northbound and Southbound, Franldin Park Borough, Bridge Rehabilitation 499,000 (Base Construction Allocation $409,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (107) SR 2103, Bigelow Boulevard over 7th Avenue, Rosslyn Farms Borough, Bridge Rehabilitation 209,000 (Base Construction Allocation $119,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (108) SR 3027, Georgetown Road over Branch of Mill Creek, Springdale Township, Bridge Rehabilitation. 103,000 (Base Construction Allocation $13,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (109) SR 3027, Georgetown Road over Mill Creek, Fawn 193,000 (Base Construction Allocation $103,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (110) SR 0028, SH over LR 02169, Yutes Run Road, Collier. 216,000 (Base Construction Allocation $126,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (111) SR 1034, Bull Creek Road over Branch of Bull Creek, Scott 114,000 (Base Construction Allocation $24,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (112) SR 3028, Grant Street over Robinson Run, Findlay 218,000 (Base Construction Allocation $128,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
18 SESSION OF 2006 Act (113) SR 3052, Greentree Road over Chartiers Creek, Scott 1,222,000 (Base Construction Allocation $1,132,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (114) SR 3071, Potato Garden Road over Potato Garden Run, Findlay Township, Bridge Rehabilitation 110,000 (Base Construction Allocation $20,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (115) SR 4011, Rochester Road over LR 1021 and I 79, 1279 Franklin Park Borough, Bridge Rehabilitation 512,000 (Base Construction Allocation $422,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (116) SR 0008, William Flynn Highway over Small Stream, Hampton 128,000 (Base Construction Allocation $38,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (117) SR 0008, William Flynn Highway over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation 134,000 (Base Construction Allocation $44,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (118) SR 0022, SR 0022 SH over SR 3041 and McMichael Road, Robinson Township, Bridge Rehabilitation 353,000 (Base Construction Allocation $263,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (119) SR 0028, SR 0028 SH over LR and Guys Run Road, Harmar Township, Bridge Rehabilitation 252,000 (Base Construction Allocation $162,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (120) SR 0028, SR 0028 SH over LR and Guys Run Road, Harmar Township, Bridge Rehabilitation 252,000 (Base Construction Allocation $162,000) (Land Allocation $40,000)
19 742 Act LAWS OF PENNSYLVANIA (Design and Contingencies $50,000) (121) SR 0028, SR 0028 SH over Deer Creek, Harmar Township, Bridge Rehabilitation 321,000 (Base Construction Allocation $231,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (122) SR 0028, SR 0028 SH over Deer Creek, Harmar Township, Bridge Rehabilitation 288,000 (Base Construction Allocation $198,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (123) SR 0028, SR 0028 SH over LR 679 and TR 910, Harrnar Township, Bridge Rehabilitation 304,000 (Base Construction Allocation $214,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (124) SR 0048, Scenery Drive over Douglas Run, Forward Township, Bridge Rehabilitation 102,000 (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (125) SR 0048, Boston Hollow Road over Wylie Run, Elizabeth Township, Bridge Rehabilitation 98,000 (Base Construction Allocation $8,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (126) SR 0048, Boston Hollow Road over Wylie Run, Elizabeth Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (127) SR 0051, Island Avenue over Filledin Spandrel Arch, Stowe Township, Bridge 207,000 (Base Construction Allocation $117,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (128) SR 0051, Coraopolis Boulevard over TR 142 and Montour Run, Robinson Township, Bridge 1,240,000 (Base Construction Allocation $1,150,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (129) SR 0051, 4th Street over McMabe Run,
20 SESSION OF 2006 Act Coraopolis Borough, Bridge Rehabilitation 106,000 (Base Construction Allocation $16,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (130) SR 0051, Stoops Ferry Road over Flaugherty Run, Moon 315,000 (Base Construction Allocation $225,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (131) SR 0060, Steubenville Pike over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation 141,000 (Base Construction Allocation $51,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (132) SR 0060, Steubenville Pike over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (133) SR 0065, Ohio River Boulevard over Toms Run, Kilbuck 204,000 (Base Construction Allocation $114,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (134) SR 0130, Allegheny River Boulevard over Abandoned Railroad, Penn Hills Township, 336,000 (Base Construction Allocation $246,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (135) SR 0130, Allegheny River Boulevard over Abandoned Railroad, City of Pittsburgh, Bridge 358,000 (Base Construction Allocation $268,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (136) SR 0130, Beulah Road over Chalfont Run, Penn Hills 126,000 (Base Construction Allocation $36,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
21 744 Act LAWS OF PENNSYLVANIA (137) SR 0130, Broadway Boulevard over Branch of Turtle Creek, Mt. Oliver Borough, Bridge Rehabilitation 103,000 (Base Construction Allocation $13,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (138) SR 0136, Monongahela Road over Beckets Run, Forward Township, Bridge Rehabilitation 111,000 (Base Construction Allocation $21,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (139) SR 0279, Penn Lincoln Parkway over Whiskey Run and Bell Road, Scott Township, Bridge Rehabilitation 639,000 (Base Construction Allocation $594,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (140) SR 0279, Parkway West over Branch of Whiskey Run, Green Tree Borough, Bridge 91,000 (Base Construction Allocation $46,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (141) SR 0279, 1279 Southbound over SR 4003, SR 4009 and Ramp J, City of Pittsburgh, Bridge Rehabilitation 553,000 (Base Construction Allocation $508,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (142) SR 0376, Parkway East over LR 763 Ramp B, City ofpittsburgh, Bridge Rehabilitation 242,000 (Base Construction Allocation $197,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (143) SR 0376, Parkway East over LR 187, Ramp A, Westbound, Churchill Borough, Bridge Rehabilitation. 135,000 (Base Construction Allocation $90,000) (Land Allocation $20,000) (Design and Contingencies $25,000) (144) SR 0400, Saltsburgh Road over Plum Creek, Plum Borough, Bridge Rehabilitation 112,000 (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
22 SESSION OF 2006 Act (145) SR 0791, Rodi Road over Branch of Chalfant Run, Penn Hills Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (146) SR 0791, Rodi Road over Branch of Chalfont Run, Penn Hills Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (147) SR 0837,, Eighth Avenue over Homestead Run, Munhall Borough, Bridge Rehabilitation 114,000 (Base Construction Allocation $24,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (148) SR 0910, Bayne Wexford Run, Pine Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (149) SR 0910, Salem Hollow Road over North Fork Pine Creek, Pine 162,000 (Base Construction Allocation $72,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (150) SR 0910, Gibsonia Road over Branch of Deer Creek, West Deer Township, Bridge Rehabilitation. 108,000 (Base Construction Allocation $18,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (151) SR 0978, Miller s Run Road over Fishing Run, South Fayette Township, Bridge 130,000 (Base Construction Allocation $40,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (152) SR 0978, Battle Ridge Road over Dolphin Run, McDonald Borough, Bridge Rehabilitation 113,000 (Base Construction Allocation $23,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (153) SR 1001, Freeport Road over Squaw Run, O Hara Township, Bridge Rehabilitation 128,000 (Base Construction Allocation $38,000)
23 746 Act LAWS OF PENNSYLVANIA (Land Allocation $40,000) (Design and Contingencies $50,000) (154) SR 1001, Freeport Road over Barge Basin, Harmar (Base Construction Allocation $339,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (155) SR 1001, Freeport Road over Riddle Run, Springdale Township, Bridge Rehabilitation (Base Construction Allocation $10,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (156) SR 1002, SR 0028 SH over Tributary of Allegheny River, O Hara Township, Bridge (Base Construction Allocation $20,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (157) SR 1006, Saxonburg Boulevard over Branch of Little Pine Creek, Indiana Township, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (158) SR 1011, Guys Run Road over Guys Run, Harmar (Base Construction Allocation $81,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (159) SR 1011, Guys Run Road over Guys Run, Harmar (Base Construction Allocation $41,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (160) SR 1013, Saxonburg Boulevard over Little Pine Creek, Shaler (Base Construction Allocation $85,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (161) SR 1013, Saxonburg Boulevard over Little Pine Creek, O Hara (Base Construction Allocation $65,000) (Land Allocation $40,000) (Design and Contingencies $50,000) 429, , ,000 S 106, ,000, 131, , ,000
24 SESSION OF 2006 Act (162) SR 1013, Saxonburg Boulevard over Branch of Little Pine Creek, O Hara Township, Bridge (Base Construction Allocation $30,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (163) SR 1014, Hite Road over Allegheny Valley Express, Harmar (Base Construction Allocation $1,659,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (164) SR 1016, Cove Run Road over Deer Creek, Indiana Township, Bridge Rehabilitation (Base Construction Allocation $129,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (165) SR 1018, Alpha Drive over SR 0028 SH, O Hara (Base Construction Allocation $1,060,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (166) SR 1019, Butler Logan Road over Allegheny Valley Expressway, Frazer Township, Bridge Rehabilitation (Base Construction Allocation $432,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (167) SR 1019, Days Run Road over Days Run, East Deer Township, Bridge Rehabilitation (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (168) SR 1022, Oak Road over Dawson Run, West Deer (Base Construction Allocation $72,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (169) SR 1028, Bakerstown Road over Branch of Deer Creek, Richland Township, Bridge (Base Construction Allocation $24,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (170) SR 1028, Bakerstown Road over Bull Creek, ,000 1,749, ,000 1,150, , , , ,000
25 748 LAWS OF PENNSYLVANIA Act Fawn (Base Construction Allocation $134,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (171) SR 1028, Bakerstown Road over Little Bull Creek, Fawn (Base Construction Allocation $18,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (172) SR 1031, Lardington Road over Bull Creek, Fawn Township, Bridge Rehabilitation (Base Construction Allocation $48,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (173) SR 1031, Lardington Road over Lardington Run, Fawn Township, Bridge Rehabilitation (Base Construction Allocation $25,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (174) SR 1034, Bull Creek Road over Branch of Bull Creek, Fawn (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (175) SR 1034, Bull Creek Road over Branch of Bull Creek, Fawn (Base Construction Allocation $204,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (176) SR 1037, Saxonburg Road over Branch of Little Bull Creek, Harrison Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (177) SR 2013, Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge (Base Construction Allocation $26,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (178) SR 2017, Buena Vista Road over Wildcat Run, Elizabeth (Base Construction Allocation $106,000) (Land Allocation $40,000) 224, ,000 S 138, , , ,000 99, , ,000
26 SESSION OF 2006 Act (Design and Contingencies $50,000) (179) SR 2018, West Smithfield Road over Unnamed Creek, Elizabeth Borough, Bridge Rehabilitation (Base Construction Allocation $15,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (180) SR 2031, Lincoln Way over Long Run, White Oak Borough, Bridge Rehabilitation (Base Construction Allocation $52,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (181) SR 2058, Verona Road over Branch of Sandy Creek, Penn Hills Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (182) SR 2058, Verona Road over Sandy Creek, Penn Hills (Base Construction Allocation $35,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (183) SR 2058, Hulton Road over Plum Creek, Penn Hills (Base Construction Allocation $155,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (184) SR 2058, Hulton Road over Branch of Plum Creek, Plum Borough, Bridge Rehabilitation (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and.contingencies $50,000) (185) SR 2059, Long Road over Chalfant Run, Penn Hills (Base Construction Allocation $29,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (186) SR 2064, Lime Hollow Road over Lime Hollow Run, Penn Hills Township, Bridge Rehabilitation (Base Construction Allocation $13,000) (Land Allocation $40,000) (Design and Contingencies $50,000) , ,000 99, , , , , ,000
27 750 Act LAWS OF PENNSYLVANIA (187) SR 2070, Indiana Drive over Small Stream, Penn Hills Township, Bridge Rehabilitation (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (188) SR 2075, New Texas Road over Branch of Little Plum Creek, Plum Borough, Bridge Rehabilitation (Base Construction Allocation $10,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (189) SR 2076, Old Leechburg Road over Little Plum Creek, Plum Borough, (Base Construction Allocation $44,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (190) SR 2112, Electric Avenue over Falls Run, East Pittsburgh Borough, (Base Construction Allocation $38,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (191) SR 3001, Miller s Run Road over Branch of Miller s Run, South Fayette Township, Bridge (Base Construction Allocation $23,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (192) SR 3002, Country Club Drive over SR 0019, Upper St. Clair Township, Bridge Rehabilitation (Base Construction Allocation $70,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (193) SR 3005, Mayview Road over Branch of Chartiers Creek, Upper St. Clair Township, Bridge Rehabilitation (Base Construction Allocation $8,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (194) SR 3021, Walton Road over Lobbs Run, Jefferson Hills Borough, (Base Construction Allocation $71,000) (Land Allocation $40,000) (Design and Contingencies $50,000) 97, , , , , ,000 98, ,000
28 SESSION OF 2006 Act (195) SR 3028, Preston Sygan Road over Thorns Run, South Fayette Township, Bridge Rehabilitation (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (196) SR 3031, Presley Road over Chartiers Creek, Collier Township, Bridge Rehabilitation (Base Construction Allocation $172,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (197) SR 3057, Donaldson Road over Fork Robinson Run, North Fayette Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (198) SR 3071, Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge Rehabilitation (Base Construction Allocation $8,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (199) SR 3072, Beaver Grade Road over Montour Trailway and Montour Railroad, Moon Township, Bridge Rehabilitation (Base Construction Allocation $164,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (200) SR 3077, Brodhead Road over Flaugherty Run, Moon Township, Bridge Rehabilitation (Base Construction Allocation $38,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (201) SR 3077, Brodhead Road over Boggs Run, Moon Township, Bridge Rehabilitation (Base Construction Allocation $27,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (202) SR 3082, Murdocksville Road over Branch of Raccoon Creek, Findlay Township, Bridge Rehabilitation (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and Contingencies $50,000) , ,000 S. 99,000 98, , , , ,000
29 752 LAWS OF PENNSYLVANIA Act (203) SR 3084, Spring Run Road over LR 1023 and TR 60, Findlay Township, Bridge Rehabilitation (Base Construction Allocation $308,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (204) SR 3108, North Branch Road over Branch of North Branch Robinson Run, North Fayette (Base Construction Allocation $37,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (205) SR 3111, Sugar Grove Road over Shouse Run, Crescent Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (206) SR 3144, Robinson Township, C Boulevard over Airport Parkway, North Fayette Township, Bridge Rehabilitation (Base Construction Allocation $345,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (207) SR 4003, McKnight Road over Pine Creek, McCandless Township, Bridge Rehabilitation (Base Construction Allocation $115,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (208) SR 4009, Evergreen Road over Girtys Run, Millvale Borough, Bridge Rehabilitation (Base Construction Allocation $48,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (209) SR 4028, Red Gate over Hays Run, Haysville Borough, (Base Construction Allocation $14,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (210) SR 4032, Fern Hollow Road over Branch of Little Sewickley Creek, Sewickley Heights Borough, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) 398, ,000 S 99, , , , ,000 99,000
30 Act SESSION OF 2006 (211) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Bell Acres Borough, (Base Construction Allocation $50,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (212) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Braddock Hills Borough, (Base Construction Allocation $31,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (213) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Bell Acres Borough, Bridge Rehabilitation (Base Construction Allocation $15,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (214) SR 4036, Big Sewickley Creek Road over Big Sewickley Creek, Braddock Hills Borough, (Base Construction Allocation $138,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (215) SR 4036, Big Sewickley Creek over Branch of Big Sewickley Creek, Braddock Hills Borough, (Base Construction Allocation $46,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (216) SR 4039, Lower Sewickley Creek Road over Little Sewickley Creek, Sewickley Hills Borough, (Base Construction Allocation $31,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (217) SR 4043, Camp Meeting Road over Branch of Rippling Run, Franklin Park Borough, Bridge (Base Construction Allocation $47,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (218) SR 4043, Camp Meeting Road over Rippling Run, Franklin Park Borough, (Base Construction Allocation $36,000) , , , , , , , ,000
31 754 Act LAWS OF PENNSYLVANIA (Land Allocation $40,000) (Design and Contingencies $50,000) (219) SR 4050, Shenot Road over Branch of Brush Creek, Marshall Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (220) SR 4053, Wexford Run Road over Branch of Brush Creek, Marshall Township, Bridge Rehabilitation (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (221) SR 4059, SH over Branch of Breakneck Creek, Pine Township, Bridge Rehabilitation (Base Construction Allocation $13,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (222) SR 4064, Peebles Road over Little Pine Creek, McCandless (Base Construction Allocation $65,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (223) SR 4070, Wildwood Road over CSX Railroad, Unnamed Creek, Private Road, Hampton Township, Bridge Rehabilitation (Base Construction Allocation $481,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (224) SR 4153, Township Road over Little Pine Creek, Shaler Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (225) SR 6579, LR 1026, HOV Station over CSX Railroad, City of Pittsburgh, Bridge Rehabilitation (Base Construction Allocation $1,544,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (226) SR 8057, Ramp A Road over 736 Extension Southbound TR 837, City of Duquesne, Bridge Rehabilitation (Base Construction Allocation $348,000) (Land Allocation $40,000) 99,000 97, , , , ,000 1,634, ,000
32 SESSION OF 2006 Act (Design and Contingencies $50,000) (227) SR 8080, Mall Entrance and Exit over LR 187 and US 22 Business, Monroeville Borough, Bridge Rehabilitation (Base Construction Allocation $156,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (228) SR 8086, Ramp H Road over Local Street, City of McKeesport, Bridge Rehabilitation (Base Construction Allocation $50,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (229) SR 8094, Ramp BU Road over Mon Wharf~ City of Pittsburgh, Bridge Rehabilitation (Base Construction Allocation $203,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (230) SR 8095, Ramp F Road over C&D, Ft. Pitt Boulevard, City of Pittsburgh, Bridge Rehabilitation (Base Construction Allocation $405,000) (Land Allocation $40,000) (Design and Contingencies $50,000). (231) SR 0279 and 179, Various Townships, Bridge Rehabilitation and Paint (Base Construction Allocation $1,600,000) (232) SR 2048, Bridge over Thompson to SR 0048 (0050/1252 to 0110/0000), Elizabeth Township, Bridge Restoration (Base Construction Allocation $800,000) (233) SR 7219, Corrigan Catfish CTO3, South Park Township, Bridge Restoration (Base Construction Allocation $150,000) (234) SR 0400, Baum Boulevard over CSX Railroad, City of Pittsburgh, Bridge Rehabilitation (Base Construction Allocation $150,000) (Design and Contingencies $15,000) (235) SR 0030, Westinghouse Bridge over Turtle Creek, N&S Railroad, Bridge Preservation (Base Construction Allocation $240,000) (Design and Contingencies $36,000) (236) SR 0376, Pedestrian Bridge Paint, Parkway East near Bates Street, Interstate Maintenance (Base Construction Allocation $40,000) (Design and Contingencies $2,000) , , , ,000 1,600, , , , ,000 42,000
33 756 Act LAWS OFPENNSYLVANIA (237) Various SRs, Bridge Expansion, Dam s, Bridge Rehabilitation (Base Construction Allocation $200,000) (Design and Contingencies $1,000) (238) Bridge No.6 Expansion and, Interstate Maintenance (Base Construction Allocation $200,000) (239) SR 0050 over Pittsburgh & Ohio Railway, Scottsville, (Base Construction Allocation $262,000) (Land Allocation $78,000) (Design and Contingencies $78,000) (240) SR 0910 over Deer Creek, Seg.0300, West Deer (Base Construction Allocation $69,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (241) SR 0910 over Deer Creek, Seg.0280, West Deer (Base Construction Allocation $46,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (242) SR 0910 over Deer Creek, Seg.0270, West Deer (Base Construction Allocation $49,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (243) SR 1013 over Little Pine Creek, Seg.0030, O Hara (Base Construction Allocation $33,000) (Design and Contingencies $10,000) (244) SR 1013 over Little Pine Creek, Seg.0020, Shaler (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (245) SR 1019 over Days Run, Seg.0220, Offset 2389, East Deer (Base Construction Allocation $31,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (246) SR 1019 over Days Run, Seg.0220, Offset 1167, East Deer (Base Construction Allocation $34,000) 201, , , ,000 74,000 78,000 52,000 68,000 49,000 54,000
34 SESSION OF 2006 Act (Design and Contingencies $10,000) (247) SR 1019 over Days Run, Seg.0220, Offset 0000, East Deer (Base Construction Allocation $33,000) (Design and Contingencies $10,000) (248) SR 1020 over Cunningham Run, West Deer (Base Construction Allocation $36,000) (Design and Contingencies $10,000) (249) SR 1027 over Little Bull Creek, Harrison (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (250) SR 1031 over Lardington Run, Fawn (Base Construction Allocation $41,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (251) SR 2031 over Branch of Long Run, White Oak Borough, (Base Construction Allocation $126,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (252) SR 2046 over Streets Run, Seg.0080, Baldwin, (Base Construction Allocation $77,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (253) SR 2046 over Streets Run, Seg.0040, Baldwin, (Base Construction Allocation $35,000) (Design and Contingencies $10,000) (254) SR 3004 over McLaughlin Run, Bridgeville Borough, (Base Construction Allocation $69,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (255) SR 3015 over Peters Creek, Jefferson Hills Borough, (Base Construction Allocation $79,000) ,000 56,000 96,000 65, , ,000 55, , ,000
35 758 Act LAWS OF PENNSYLVANIA (Land Allocation $24,000) (Design and Contingencies $24,000) (256) SR 3070 over Montour Run, Seg.0070, Findlay (Base Construction Allocation $29,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (257) SR 3070 over Montour Run, Seg.0064, North Fayette (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (258) SR 4070 over Montour Run, Hampton (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (259) SR 0019 over Pine Creek, (Base Construction Allocation $2,700,000) (Design and Contingencies $450,000) Section 7. Armstrong County. (a) Local Bridges (1) Washington Township, T840, Simpson Bridge over Hulings Road, (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (2) Burrell Township, TR 510 over Tributary of Crooked Creek Lake, (Base Construction Allocation $900,000) (3) South Buffalo Township, T397, Foreman Road over Branch of Pine Run, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (4) South Buffalo Township, T352, Pine Ridge Road over Branch of Buffalo Creek, Bridge Restoration (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (5) South Buffalo Township, TR 810, Furnace Run, Ballfield over Pine Run, Bridge Replace 45,000 80, ,000 S 3,200, , , , ,000
36 SESSION OF 2006 Act ment (Base Construction Allocation $100,000) (6) South Buffalo Township, T393, East Spangler over Nicholson Run, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (7) South Buffalo Township, T302, Corn Planter Road over Corn Planter Run, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (8) Washington Township, T484, St. Mark s Road over Branch of Limestone Run, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (9) Washington Township, T577, Helm Road over Branch of Limestone Run, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (10) West Franklin Township, SR 4010 over Buffalo Creek, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (11) Washington Township, T840, Beagle Club Road over Huling Run, Bridge Rehabilitation (Base Construction Allocation $100,000) (12) Perry Township, T346 over Bear Creek, Bridge Rehabilitation (Base Construction Allocation $250,000) (Land Allocation $5,000) (Design and Contingencies $45,000) (13) Washington Township, Camp Road over Creek, Bridge Rehabilitation (Base Construction Allocation $100,000) (14) Burrell Township, Polka Hollow Bridge, Bridge (Base Construction Allocation $140,000) (Land Allocation $14,000) (Design and Contingencies $28,000) , , , , , , , , , ,000
37 760 Act LAWS OF PENNSYLVANIA (b) State Bridges (1) SR 4035 at Yellow Dog, West Franklin Township, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (2) SR 3009 over Branch of Buffalo Creek, West Franklin Township, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (3) TR 841 over Buffalo Creek, West Franklin Township, Bridge Rehabilitation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (4) SR 2023 and TR 880, Dutch Run Road at Crooked Creek, Plumcreek Township, Bridge Rehabilitation (Base Construction Allocation $819,000) (5) SR 0056, Sugar Hollow Run Culvert, Apollo Borough, (Base Construction Allocation $100,000) (Design and Contingencies $20,000) (6) SR 0066, Taylor Run Bridge, Bethel Township, (Base Construction Allocation $138,000) (Land Allocation $14,000) (Design and Contingencies $28,000) (7) SR 2011, Garretts Run Bridge No.7, Manor (Base Construction Allocation $214,000) (Land Allocation $21,000) (Design and Contingencies $43,000) (8) SR 4002, Queenstown Road Bridge, Perry (Base Construction Allocation $62,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (9) SR 2025, Crooked Creek Bridge, Burrell (Base Construction Allocation $1,250,000) (Land Allocation $125,000) (Design and Contingencies $250,000) 600, , , , , , ,000 81,000 1,625,000
38 SESSION OF 2006 Act (10) SR 2047, Roaring Run Bridge, Kiskiminetas (Base Construction Allocation $90,000) (Land Allocation $9,000) (Design and Contingencies $18,000) (11) SR 1039, South Bryan Bridge, Cowanshannock (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (12) SR 1039, Bryan Bridge, Cowanshannock (Base Construction Allocation $105,000) (Land Allocation $11,000) (Design and Contingencies $21,000) (13) SR 1028, Echo Church Bridge, Wayne (Base Construction Allocation $70,000) (Land Allocation $7,000) (Design and Contingencies $14,000) (14) SR 3009, Booher Road Bridge, East Franklin (Base Construction Allocation $114,000) (Land Allocation $11,000) (Design and Contingencies $23,000) (15) SR 3005, Pony Farm Road Bridge, North Buffalo (Base Construction Allocation $152,000) (Land Allocation $15,000) (Design and Contingencies $30,000) (16) SR 1016, Calhoun School Road Bridge, Wayne (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (17) SR 2014, Bowers Cross Roads Bridge No.1, Kittanning (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (18) SR 3027, Dock Run Bridge, South Buffalo (Base Construction Allocation $108,000) (Land Allocation $11,000) (Design and Contingencies $22,000) ,000 78, ,000 91, , ,000 78,000 78, ,000
39 762 Act LAWS OF PENNSYLVANIA (19) SR 0268, Allison Run Box No.1, West Kittanning Borough, (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (20) SR 1038, Allison Run Box No.2, West Kittanning Borough, (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (21) SR 0028, Baum Bridge, Boggs Township, (Base Construction Allocation $162,000) (Land Allocation $16,000) (Design and Contingencies $32,000) (22) SR 0068, Harts Run Bridge, Bradys Bend Township, Bridge Restoration (Base Construction Allocation $30,000) (Land Allocation $3,000) (Design and Contingencies $6,000) (23) SR 0068, Whiskey Run Bridge, Bradys Bend Township, Bridge Restoration (Base Construction Allocation $30,000) (Land Allocation $3,000) (Design and Contingencies $6,000) (24) SR 0068, Sugar Creek Bridge No.2, Bradys Bend Township, Bridge Restoration (Base Construction Allocation $30,000) (Land Allocation $3,000) (Design and Contingencies $6,000) (25) SR 0356, Freeport Bridge, Freeport Borough, Bridge Restoration (Base Construction Allocation $200,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (26) SR 0068, Branch of Sugar Creek, Bradys Bend Township, Bridge Restoration (Base Construction Allocation $20,000)(Land Allocation $2,000) (Design and Contingencies $4,000) (27) SR 0068, Sugar Creek Bridge No.3, Bradys Bend Township, Bridge Restoration (Base Construction Allocation $20,000) (Land Allocation $2,000) (Design and Contingencies $4,000) 78,000 78, , ,000 39,000 39,000 S 5 260, ,000 26,000
40 SESSION OF 2006 Act (28) SR 4042, Bayne Wexford Road over 179, Mahoning Township Bridge Rehabilitation (Base Construction Allocation $467,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (29) SR 2014, Bowser Crossroad Bridge, BMS , Kittanning Township, Bridge (Base Construction Allocation $150,000) (Land Allocation $15,000) (Design and Contingencies $50,000) (30) SR 0056 over Crooked Creek, Southbend (Base Construction Allocation $229,000) (Land Allocation $69,000) (Design and Contingencies $69,000) (31) SR 0422 over Plum Creek, Plumcreek : (Base Construction Allocation $281,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (32) SR 2003 over Cessna Run, Plumcreek (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (33) SR 2057 over Guffy Run, Parks Township, (Base Construction Allocation $36,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (34) SR 2063 over Brady Run, Gilpin Township, (Base Construction Allocation $41,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (35) SR 3023 over Pine Run, South Buffalo (Base Construction Allocation $72,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (36) SR 3025 over Tributary of Nicholson Run, South Buffalo (Base Construction Allocation $142,000) (Land Allocation $42,000) , , , , , ,000 5 S S 65, , ,000
41 764 Act LAWS OF PENNSYLVANIA (Design and Contingencies $42,000) (37) SR 4003 over Sugar Creek, Bradys Bend (Base Construction Allocation $75,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (38) SR 4006 over Glade Run, East Franklin (Base Construction Allocation $119,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (39) SR 4009 over Hart Run, Bradys Bend (Base Construction Allocation $32,000) (Design and Contingencies $10,000) (40) SR 0068, Bradys Bend No.7, Bradys Bend (Base Construction Allocation $181,000) (Land Allocation $54,000) (Design and Contingencies $54,000) (41) SR 0068, Bradys Bend No.9, Bradys Bend (Base Construction Allocation $327,000) (Land Allocation $98,000) (Design and Contingencies $98,000) (42) SR 0068, Bradys Bend No.9, Bradys Bend (Base Construction Allocation $181,000) (Land Allocation $54,000) (Design and Contingencies $54,000) (43) SR 0068, Bradys Bend No.10, Bradys Bend (Base Construction Allocation $227,000) (Land Allocation $68,000) (Design and Contingencies $68,000) (44) SR 0068, Bradys Bend No.11, Bradys Bend (Base Construction Allocation $163,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (45) SR 3023, Iron Bridge No.1, South Buffalo (Base Construction Allocation $561,000) (Land Allocation $168,000) 119, , , ,000 S S 523, , , , ,000
42 SESSION OF 2006 Act (Design and Contingencies $168,000) (46) SR 0356, Laneville Bridge over Buffalo Creek and Conrail Railroad, Freeport Borough, Bridge (Base Construction Allocation $1,756,000) (Land Allocation $527,000) (Design and Contingencies $527,000) (47) SR 0356, All Bridges, Freeport Borough, Buffalo Township and Harrison Township, Bridge Rehabilitation (Base Construction Allocation $50,000,000) (Land Allocation $100,000) (Design and Contingencies $4,000,000) Section 8. Beaver County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0051, 51/Bridge over Franklin Avenue 2, City of Aliquippa, Bridge Rehabilitation (Base Construction Allocation $350,000) (Design and Contingencies $10,000) (2) SR 0018, Frankfort Road over Traverse Creek, Hanover Township, Bridge Rehabilitation (Base Construction Allocation $42,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (3) SR 0018, Frankfort Road over Little Traverse Creek, Hanover Township, Bridge Rehabilitation (Base Construction Allocation $15,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (4) SR 0051, Constitution Boulevard over Creek, City ofaliquippa, (Base Construction Allocation $63,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (5) SR 0051, Constitution Boulevard over Elkhom Run, Center Township, Bridge Rehabilitation (Base Construction Allocation $31,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (6) SR 0051, Pennsylvania Avenue over Branch of Small Run, Darlington Township, Bridge Rehabilitation (Base Construction Allocation $12,000) (Land Allocation $40,000) 765 2,810,000 54,100, , , , , , ,000
43 766 Act LAWS OF PENNSYLVANIA (Design and Contingencies $50,000) SR 0065, Mercer Road over Branch of Connoquenessing, North Sewickley Township, Bridge Rehabilitation (Base Construction Allocation $6,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (8) SR 0151, Bocktown Road over Branch of Raredon Run, Independence Township, Bridge Rehabilitation (Base Construction Allocation $21,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (9) SR 0168, Fairview Road over Branch of Upper Dry Run, Ohioville Borough, Bridge Rehabilitation (Base Construction Allocation $8,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (10) SR 0251, Blackhawk Road over Brush Run, South Beaver Township, Bridge Rehabilitation (Base Construction Allocation $51,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (11) SR 0351, Fairlane Boulevard over Branch of Stockman Run, Big Beaver Borough, Bridge Rehabilitation (Base Construction Allocation $6,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (12) SR 0588, Bennett Run Road over Bennett Run, North Sewickley Township, Bridge Rehabilitation (Base Construction Allocation $31,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (13) SR 1005, Chapel Drive over Branch of Connoquenessing Creek, North Sewickley Township, Bridge Rehabilitation (Base Construction Allocation $13,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (14) SR 1005, Chapel Drive over Brush Creek, North Sewickley Township, Bridge Rehabili (7) 96, ,000 98, ,000 96, , ,000
44 SESSION OF 2006 Act tation (Base Construction Allocation $170,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (15) SR 1024, Deer Lane Extension over Small Creek, Rochester Borough, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (16) SR 3016, Kennedy Boulevard over Logtown Run, City of Aliquippa, (Base Construction Allocation $130,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (17) SR 3019, Raccoon Creek Road over Fish Pot Run, Potter Township, Bridge Rehabilitation (Base Construction Allocation $21,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (18) SR 3027, Georgetown Road over Mill Creek, Greene Township, Bridge Rehabilitation (Base Construction Allocation $32,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (19) SR 3032, Kendall Harshav Road over Little Service Run, Hanover Township, Bridge Rehabilitation (Base Construction Allocation $20,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (20) SR 3036, Gringo Independence Road over Beaver Valley Expressway, Hopewell Township, (Base Construction Allocation $1,020,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (21) SR 4002, Anderson Road over Small Run, Darlington Township, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (22) SR 4004, Cannelton Road over Coalbank Run, Darlington Township, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $40,000) , , , , , ,000 1,110, , ,000
45 768 Act LAWS OF PENNSYLVANIA (Design and Contingencies $50,000) (23) SR 4004, Cannelton Road over Dilworth Run, Darlington Borough Bridge Rehabilitation (Base Construction Allocation $25,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (24) SR 4005, New Gallilee Road over North Fork of Little Beaver Creek, Darlington Township, Bridge Rehabilitation (Base Construction Allocation $173,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (25) SR 4011, Elmbrook Road over Branch of Small Run, South Beaver Township, Bridge Rehabilitation (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (26) SR 4012, Bradys Run Road over Bradys Run, Brighton (Base Construction Allocation $176,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (27) SR 4017, Shenango Road over Wallace Run, Chippewa (Base Construction Allocation $25,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (28) SR 4033, Wildwood Road over Branch of. Brady Run, Brighton Township, Bridge Rehabilitation (Base Construction Allocation $5,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (29) SR 4034, Westwood Road over Upper Dry Run, Ohioville Borough, (Base Construction Allocation $25,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (30) SR 4034, Wolf Run Road over Wolf Run, Industry Borough, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $40,000) (Design and Contingencies $50,000) 115, ,000 99, , ,000 95, , ,000
46 SESSION OF 2006 Act (31) SR 4034, Wolf Run Road over Wolf Run, Industry Borough, Bridge Rehabilitation (Base Construction Allocation $34,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (32) SR 4040, Middle Road over Branch of Wallace Run, Chippewa Township, Bridge Rehabilitation (Base Construction Allocation $6,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (33) SR 4049, Riverside Drive over Tributary to Beaver River, Bridgewater Borough, Bridge Rehabilitation (Base Construction Allocation $11,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (34) SR 8031, Ramp A Road over Parkway West, Chippewa Township, Bridge Rehabilitation (Base Construction Allocation $170,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (35) SR 0224, Youngstown Pola Road over Swamp, South Beaver Township, Bridge Rehabilitation (Base Construction Allocation $17,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (36) SR 0060, Beaver Valley Expressway over SR 4008, Independence Township, Bridge Rehabilitation (Base Construction Allocation $140,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (37) SR 0168, Tuscarawas Road over Brush Run, Ohioville Borough, Bridge Rehabilitation (Base Construction Allocation $27,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (38) SR 0151, Bocktown Road over Raredon Run, Greene Township, Bridge Rehabilitation (Base Construction Allocation $46,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (39) SR 0168, Fairview Road over Upper Dry Run, Greene Township, Bridge Rehabilitation (Base Construction Allocation $33,000) ,000 96, , , , , , , ,000
47 770 LAWS OF PENNSYLVANIA Act (Land Allocation $40,000) (Design and Contingencies $50,000) (40) SR 0168 over Jordan Run, New Galilee Borough, (Base Construction Allocation $26,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (41) SR 1009 over Camp Run, Franklin Township, (Base Construction Allocation $76,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (42) SR 3019 over Fish Pot Run, Potter Township, (Base Construction Allocation $33,000) (Design and Contingencies $10,000) (43) SR 4005 over North Fork of Little Beaver Creek, Darlington (Base Construction Allocation $272,000) (Land Allocation $82,000) (Design and Contingencies $82,000) (44) SR 4022 over South Branch of Bradys Run, Ohioville Borough, (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) Section 9. Bedford County. (a) Local Bridges (1) South Woodbury Township, T704, Bridge No.3 over Three Springs Run, (Base Construction Allocation $790,000) (2) East St. Clair Township, T570, Pine Knob Road over Bobs Creek, (Base Construction Allocation $750,000) (Design and Contingencies $250,000) (3) East St. Clair Township, T545, Oppenheimer Road over Oppenheimer Run,. Bridge (Base Construction Allocation $750,000) (Design and Contingencies $250,000) (4) South Woodbury Township, T704 over Three 40, ,000 53, ,000 85, ,000. 1,010,000. 1,010,000
48 SESSION OF 2006 Act Springs Run, (Base Construction Allocation $560,000) (5) East Providence Township, T446, Butler Road over French Creek, (Base Construction Allocation $450,000) (Design and Contingencies $250,000) (6) Mann Township, T324, Piney Creek, Bridge (Base Construction Allocation $820,000) (Land Allocation $20,000) (Design and Contingencies $275,000) (7) Everett Borough, First Street over Bloody Run, (Base Construction Allocation $550,000) (Design and Contingencies $150,000) (8) Cumberland Valley Township, 1337 over Beavers Run, (Base Construction Allocation $525,000) (Land Allocation $5,000) (Design and Contingencies $140,000) (9) Cumberland Valley Township, T337 over Evitts Creek, (Base Construction Allocation $575,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (10) Woodbury Township, T678 over Hickory Bottom Creek, Smith Road Bridge, Bridge (Base Construction Allocation $500,000) (Design and Contingencies $200,000) (b) State Bridges (1) SR 0869 over Scrubgrass Creek, King Township, (Base Construction Allocation $785,000) (Land Allocation $25,000) (Design and Contingencies $175,000) (2) SR 0326 over Sweet Root Creek, Southampton (Base Construction Allocation $460,000) (Land Allocation $25,000) (Design and Contingencies $130,000) , ,000 1,115, , , , , , ,000
49 772 Act LAWS OF PENNSYLVANIA (3) SR 0096 over Tributary of Wills Creek, Hyndman Borough, (Base Construction Allocation $1,075,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (4) SR 0026 over Tributary of Yellow Creek, Hopewell (Base Construction Allocation $245,000) (Land Allocation $25,000) (Design and Contingencies $110,000) (5) SR 0026 over Tributary of Yellow Creek, Hopewell (Base Construction Allocation $345,000) (Land Allocation $25,000) (Design and Contingencies $110,000) (6) SR 0096 over Sulphur Springs Creek, Harrison (Base Construction Allocation $385,000) (Design and Contingencies $115,000) (7) SR 0056 over Sloans Hollow Run, East St. Clair (Base Construction Allocation $390,000) (Land Allocation $75,000) (Design and Contingencies $115,000) (8) SR 0220 over Tributary of Evitts Creek, Cumberland Valley Township, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $400,000) (9) SR 0915 over Sandy Run, Broad Top Township, (Base Construction Allocation $640,000) (Land Allocation $25,000) (Design and Contingencies $155,000) (10) SR 0026, Seg.0500/l424 over Bloody Run, Everett Borough, (Base Construction Allocation $258,000) (Design and Contingencies $68,000) (11) SR 0026, Seg.0660/0257 over Tributary of Yellow Creek, Hopewell Township, Bridge (Base Construction Allocation $500,000) 1,375, , , , , , , , ,000
50 SESSION OF 2006 Act (Land Allocation $25,000) (Design and Contingencies $175,000) (12) SR 0026, Seg.0660/0826 over Tributary of Yellow Creek, Hopewell Township, Bridge (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $175,000) (13) SR 0030, Seg.0640/1480 over Tributary of Raystown Branch of Juniata River, East Providence Township, Bridge Rehabilitation (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $55,000) (14) SR 0056, Seg.0280/3409 over Tributary of Dunning Creek, East St. Clair Township, Bridge (Base Construction Allocation $270,000) (Land Allocation $25,000) (Design and Contingencies $125,000) (15) SR 0056, Seg.0330/0000 over Brush Run, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $30,000) (Land Allocation $1,000) (Design and Contingencies $13,000) (16) SR 0096, Seg.0350/0000 over Tributary of Buffalo Run, Harrison Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (17) SR 0326, Seg.0180/0000 over Sweet Root Creek, Southampton Township, Bridge Rehabilitation (Base Construction Allocation $38,000) (Land Allocation $1,000) (Design and Contingencies $17,000) (18) SR 0867, Seg.0210/0000 over Tributary of Halter Creek, Bloomfield Township, Bridge (Base Construction Allocation $210,000) (Land Allocation $25,000) (Design and Contingencies $105,000) (19) SR 0869, Seg.0260/2417 over Trout Run, King , , ,000 44, ,000 56,000 S 340,000
51 774 Act LAWS OF PENNSYLVANIA (Base Construction Allocation $170,000) (Land Allocation $25,000) (Design and Contingencies $85,000) (20) SR 1001, Seg.0050/2 170 over Crawfords Run, Bedford (Base Construction Allocation $106,000) (Land Allocation $5,000) (Design and Contingencies $37,000) (21) SR 1001, Seg.0l70/2845 over Tributary of Dunnings Creek, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $12,000) (Land Allocation $1,000) (Design and Contingencies $5,000) (22) SR 1005, Seg.0220/0000 over Tributary of Yellow Creek, South Woodbury Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (23) SR 1010, Seg.0080/0000 over Tributary of Tub Mill Run, East Providence Township, Bridge Rehabilitation (Base Construction Allocation $50,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (24) SR 1015, Seg.0060/08l0 over Tributary of Three Springs Run, South Woodbuiy Township, (Base Construction Allocation $70,000) (Land Allocation $5,000) (Design and Contingencies $33,000) (25) SR 1016, Seg.0010/0000 over Tributary of Dunnings Creek, Bedford Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (26) SR 1020, Seg.0020/0000 over Tributary of Pipers Run, Hopewell Township, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $1,000) (Design and Contingencies $7,000) 280, ,000 18,000 60,000 80, , ,000 24,000
52 SESSION OF 2006 Act (27) SR 1021, Seg.0090/0000 over Tributary of Shoups Run, Broad Top Township, Bridge (Base Construction Allocation $270,000) (Land Allocation $25,000) (Design and Contingencies $125,000) (28) SR 1023, Seg.0020/0000 over Dudley Run, Broad Top Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (29) SR 2001, Seg.Ol 10/0000 over Johnson Branch, Mann Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (30) SR 2007, Seg.0080/0000 over Coffee Run, Mann Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (31) SR 2017, Seg.0l70/0000 over Tributary of Cove Creek, Snake Spring Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (32) SR 2018, Seg.0050/0000 over Greys Run, West Providence (Base Construction Allocation $70,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (33) SR 3011, Seg.0030/0000 over Tributary of Evitts Creek, Cumberland Valley Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (34) SR 4001, Seg.0060/3374 over Bentz Run, Napier Township, Bridge Rehabilitation (Base Construction Allocation $50,000) (Land Allocation $1,000) (Design and Contingencies $21,000) ,000 60,000 60, , , , ,000 72,000
53 776 LAWS OF PENNSYLVANIA Act (35) SR 4009, Seg.0020/0000 over Cumberland Valley Run, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (36) SR 4009, Seg.0220/l974 over Tributary of Dunnings Creek, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $55,000) (37) SR 4009, Seg.0280/0000 over Dunnings Creek, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $1,000) (Design and Contingencies $67,000) (38) SR 4010, Seg.0060/0528 over Cumberland Valley Run, Bedford Borough, Bridge (Base Construction Allocation $248,000) (Design and Contingencies $86,000) (39) SR 4010, Seg.0080/l535 over Shobers Run, Bedford Township, Bridge Rehabilitation (Base Construction Allocation $145,000) (Land Allocation $2,000) (Design and Contingencies $49,000) (40) SR 4019, Seg.0090/2738 over Bobs Creek, East St. Clair Township, Bridge Rehabilitation (Base Construction Allocation $118,000) (Land Allocation $2,000) (Design and Contingencies $40,000) (41) SR 4020, Seg.0030/1005 over Dunnings Creek, New Paris Borough, Bridge Rehabilitation (Base Construction Allocation $74,000) (Land Allocation $1,000) (Design and Contingencies $25,000) (42) SR 4031, Seg.0070/0000 over Tributary of Scrubgrass Creek, Pavia Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) 120, , , , , , ,000 60,000
54 SESSION OF 2006 Act (43) SR 4031, Seg.0l60/l407 over Beaverdam Creek, Kimmel Township, Bridge Rehabilitation (Base Construction Allocation $52,000) (Land Allocation $1,000) (Design and Contingencies $23,000) (44) SR 4032, Seg.0030/0000 over Sinking Run, East St. Clair (Base Construction Allocation $505,000) (Land Allocation $20,000) (Design and Contingencies $131,000) (45) SR 8007, Seg.0500/0000 over 199/US 220, Bedford (Base Construction Allocation $1,000,000) (Land Allocation $25,000) (Design and Contingencies $105,000) (46) SR 0031 over Todd Run, Seg.0300, Napier (Base Construction Allocation $39,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (47) SR 0031 over Cove Run, Seg.0250, Harrison (Base Construction Allocation $42,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (48) SR 0096 over Barefoot Run, Seg.0690, Pleasantville Borough, (Base Construction Allocation $61,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (49) SR 0096, TR Dunnings Creek, Seg.0630, Napier (Base Construction Allocation $89,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (50) SR 0096 over Bethel Hollow Run, Seg.0580, Napier (Base Construction Allocation $166,000) (Design and Contingencies $50,000) (51) SR 0326 over Sweet Root Creek, Southampton (Base Construction Allocation $76,000) (Land Allocation $23,000) (Design and Contingencies $23,000) , ,000 1,130,000 63,000 68,000 97, , , ,000
55 778 Act LAWS OF PENNSYLVANIA (52) SR 0915 over Sandy Run, Seg.0l20, Offset 1561, Broad Top (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (53) SR 0915 over Sandy Run, Seg.0 120, Offset 0580, Broad Top (Base Construction Allocation $109,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (54) SR 1014 over Dunnings Creek, Bedford (Base Construction Allocation $156,000) (Land Allocation $47,000) (Design and Contingencies $47,000) (55) SR 1032 over Potter Creek, Bloomfield. (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (56) SR 1036 over Six Mile Run, Coaldale Borough, (Base Construction Allocation $67,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (57) SR 2002 over Elk Lick Creek, Southampton (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (58) SR 2007 over Brush Creek, Monroe Township, (Base Construction Allocation $121,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (59) SR 2015 over Clear Creek, Monroe Township, (Base Construction Allocation $49,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (60) SR 2023 over Cove Creek, Colerain Township, (Base Construction Allocation $1 1.3,000) (Land Allocation $34,000) (Design and Contingencies $34,000) 144, ,000 S 250,000 S S 100, , ,000 5 S S. S 193,000 S 79, ,000
56 SESSION OF 2006 Act (61) SR 2025 over Clear Creek, West Providence (Base Construction Allocation $81,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (62) SR 2029 over Shaffers Creek, Monroe (Base Construction Allocation $99,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (63) SR 3004 over Wills Creek, Londonderry (Base Construction Allocation $186,000) (Land Allocation $56,000) (Design and Contingencies $56,000) (64) SR 3017 over Milligan Run, Harrison (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (65) SR 4001 over Bums Creek, Juniata Township, (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (66) SR 4010 over Cumberland Valley Run, Bedford, (Base Construction Allocation $95,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (67) SR 4017 over Dunnings Creek, Seg.0020, Various Municipalities, (Base Construction Allocation $290,000) (Land Allocation $87,000) (Design and Contingencies $87,000) (68) SR 4017 over Adams Run, Seg.0010, Various Municipalities, (Base Construction Allocation $76,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (69) SR 4020 over Dunnings Creek, New Paris Borough, (Base Construction Allocation $83,000) (Land Allocation $25,000) (Design and Contingencies $25,000) , , , ,000 64, , , , ,000
57 780 Act LAWS OF PENNSYLVANIA (70) SR 4027 over Scrubgrass Creek, Kimmel (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) Section 10. Berks County. (a) Local Bridges (1) Bern Township, 1921, Old Pedestrian Covered Bridge over Tulpehocken Creek, Bridge Rehabilitation (Base Construction Allocation $903,000) (2) Bethel Township, T419, Gravel Pit Road, Lower Swatara Creek, Bridge Rehabilitation (Base Construction Allocation $675,000) (3) Bethel Township, T628, Salem Road, Lower Swatara Creek, (Base Construction Allocation $1,259,000) (4) Marion Township, T92 1, over Tulpehocken Creek, (Base Construction Allocation $5,565,000) (5) Ontelaunee Township, T749, Bowers Road, over Maiden Creek, (Base Construction Allocation $4,646,000) (6) Spring Township, T597, Old Lancaster Pike, over Little Muddy Creek, Bridge Rehabilitation (Base Construction Allocation $60,000) (7) Spring Township, 1668, Wernersville Road, over Cacoosing Creek, Bridge Rehabilitation (Base Construction Allocation $5,000) (8) Spring Township, 1495, Pendergast Road, over Millrace Creek, Bridge Rehabilitation (Base Construction Allocation $30,000) (9) Exeter Township, Ritters Road over Owatin Creek, (Base Construction Allocation $1,000,000) (10) Washington Township, T651 over West Branch of Perkiomen Creek, (Base Construction Allocation $1,924,000) (11) Richmond Township, T607 over Moselem Creek, (Base Construction Allocation $1,170,000) (12) Greenwich Township, T745 over Maiden Creek, (Base Construction Allocation $223,000) 84, , ,000 1,259,000 5,565,000 4,646,000 60,000 5,000 30,000 1,000,000 1,924,000 1,170, ,000
58 SESSION OF 2006 Act (13) Greenwich Township, T505 over Sacony Creek, (Base Construction Allocation $2,813,000) (14) Maxatawny Township, 1832 over Sacony Creek, (Base Construction Allocation $920,000) (15) Bethel Township, T4 19 over Lower Swatara Creek, (Base Construction Allocation $675,000) (16) Bethel Township, 1628 over Lower Swatara Creek, (Base Construction Allocation $1,259,000) (17) Marion Township, T493 over Tulpehocken Creek, (Base Construction Allocation $5,565,000) (18) Douglass Township, T482 over Ironstone Creek, (Base Construction Allocation $1,306,000) (19) Oley Township, 1503 over Furnace Creek, (Base Construction Allocation $606,000) (20) Bern and Spring Townships, T921 over Tulpehocken Creek, Bridge Rehabilitation (Base Construction Allocation $903,000) (21) Oley Township, 1589 over Tributary of Manatawny Creek, (Base Construction Allocation $950,000) (22) Ontelaunee Township, T749 over Maiden Creek, (Base Construction Allocation $4,646,000) (23) Cumru Township, Poplar Neck Road over Schuylkill River, (24) Exeter Township, Butter Lane over Antietam Creek, (Base Construction Allocation $600,000) (Design and Contingencies $60,000) (25) Cumru Township, Werner Street over Wyomissing Creek, (Base Construction Allocation $1,200,000) (26) Curnru Township, High Boulevard over Angelica Creek, (Base Construction Allocation $1,200,000) (27) Cumru Township, Poplar. Neck Road over Norfolk Southern Railroad, Bridge Replace 781 2,813, , ,000. 1,259,000 5,565,000 1,306, , , ,000 4,646,000 10,000, ,000 1,200,000 1,200,000
59 782 Act LAWS OF PENNSYLVANIA ment (Base Construction Allocation $1,200,000) (28) Robeson Township, Evergreen Road, Bridge (Base Construction Allocation $350,000) (29) Caernarvon Township, Thousand Oaks Boulevard over Conestoga Creek, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $25,000) (b) State Bridges (1) SR 4026 over Plum Creek, Centerport Borough, (Base Construction Allocation $1,540,000) (2) SR 4022 over Plum Creek, Centerport Borough, (Base Construction Allocation $1,500,000) (3) SR 4028 over Schuylkill River, Hamburg Borough, (Base Construction Allocation $5,600,000) (4) SR 4028 over Mill Creek, Hamburg Borough, (Base Construction Allocation $4,620,000) (5) SR 1004 over Willow Creek, Ontelaunee Township, Bridge Rehabilitation (Base Construction Allocation $1,620,000) (6) SR 0422, West Shore Bridge, Phase I, City of Reading and Cumru Township, Bridge Preservation (Base Construction Allocation $200,000) (Land Allocation $60,000) (Design and Contingencies $100,000) (7) SR 0422, West Shore Bridge, Phase II, Womelsdorf, Robesonia, Wernersville and Sinking Spring Boroughs, Bridge Preservation (Base Construction Allocation $600,000) (Land Allocation $60,000) (Design and Contingencies $100,000) (8) SR 0078 over 1477 (Hausman Road), Greenwich (Base Construction Allocation $120,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (9) Various Srs, Local Bridge Review Assistance 1,200, , ,000 1,540,000 1,500, ,600,000 4,620,000 1,620, , , ,000
60 SESSION OF 2006 Act Planning PartnerWide Project Delivery Initiative (Design and Contingencies $400,000) (10) SR 0143 over Moselem Creek, Richmond (Base Construction Allocation $99,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (11) SR 0645 over Tributary of Crosskill Creek, Bethel (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (12) SR 0724 over Angelica Creek, Kenhorst Borough, (Base Construction Allocation $57,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (13) SR 0724 over Hay Creek, Birdsboro Borough, (Base Construction Allocation $114,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (14) SR 1004 over Laurel Creek, Muhlenberg (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (15) SR 1006 over Sacony Creek, Greenwich (Base Construction Allocation $170,000) (Land Allocation $51,000) (Design and Contingencies $51,000) (16) SR 1026 over Pine Creek, Oley Township, (Base Construction Allocation $113,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (17) SR 2017 over Schuylkill River, Robeson (Base Construction Allocation $1,024,000) (Land Allocation $307,000) (Design and Contingencies $307,000) (18) SR 2044 over West Branch of Swamp Creek, Washington (Base Construction Allocation $83,000) , ,000 69,000 91, ,000 84, , ,000 1,638, ,000
61 784 Act LAWS OF PENNSYLVANIA (Land Allocation $25,000) (Design and Contingencies $25,000) (19) SR 2049 over Manatawny Creek, Amity (Base Construction Allocation $212,000) (Land Allocation $64,000) (Design and Contingencies $64,000) (20) SR 3008 over Spring Creek, North Heidelberg (Base Construction Allocation $89,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (21) SR 3009 over Wyomissing Creek, Mohnton Borough, (Base Construction Allocation $112,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (22) SR 4022 over Plum Creek, Centerport Borough, (Base Construction Allocation $396,000) (Land Allocation $119,000) (Design and Contingencies $119,000) (23) SR 4026 over Centerport Creek, Centerport Borough, (Base Construction Allocation $51,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (24) SR 4026 over Unnamed Stream, Centerport Borough, (Base Construction Allocation $1,000,000) (25) SR 0143 over Maiden Creek, Perry and Richmond Townships, (Base Construction Allocation $10,000,000) (26) SR 0222 and Bypass Bridges, Kutztown Borough, Richmond and Maxatawny Townships, Bridge Rehabilitation (Base Construction Allocation $7,600,000) (27) SR 1026 over Pine Creek, Pike Township, (Base Construction Allocation $1,700,000) (28) SR 2083 over Six Penny Creek, Union (Base Construction Allocation $530,000) (29) SR 1022 over Perkiomen Creek, Hereford 340, , , ,000 81,000 1,000,000 10,000,000 S 7,600,000 1,700, ,000
62 SESSION OF 2006 Act (Base Construction Allocation $1,080,000) (30) SR 3020 over Tributary of Wyomissing Creek, Mohnton Borough, (Base Construction Allocation $320,000) (31) SR 1018 over Stony Creek, Albany Township, (Base Construction Allocation $740,000) (32) SR 0073 over Tributary of Manatawny Creek, Oley (Base Construction Allocation $2,600,000) (33) SR 0737 over Mill Creek, Greenwich (Base Construction Allocation $1,500,000) (34) SR 4026 over Plum Creek, Centre Township and Centerport Borough, (Base Construction Allocation $1,540,000) (35) SR 1003 over Schuylkill River, Leesport Borough, (Base Construction Allocation $7,400,000) (36) SR 0662 over Furnace Creek, Ruscombmanor (Base Construction Allocation $740,000) (37) SR 0078 over Maiden Creek, Greenwich (Base Construction Allocation $7,200,000) (38) SR 1004 over Willow Creek, Ontelaunee (Base Construction Allocation $1,620,000) (39) SR 1030 over West Branch of Perkiomen Creek, Washington Township, Bridge (Base Construction Allocation $800,000) (Land Allocation $100,000) (Design and Contingencies $400,000) (40) SR 1047 over Tributary of West Branch of Perkiomen Creek, Washington Township, Bridge (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (41) SR 2032 over Tributary of Swamp Creek, Washington (Base Construction Allocation $500,000) (Land Allocation $100,000) 785 1,080, , ,000 2,600,000 1,500,000 1,540,000 7,400, ,000 7,200,000 1,620,000 1,300,000 1,000, ,000
63 786 LAWS OF PENNSYLVANIA Act (Design and Contingencies $300,000) (42) SR 2069 over Tributary of West Branch of Perkiomen Creek, Washington Township, Bridge (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (43) SR 2069 over Branch of Perkiomen Creek, Washington. (Base Construction Allocation $1,000,000) (Land Allocation $200,000) (Design and Contingencies $500,000) (44) SR 2069 over Esbach Creek, Washington (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (45) SR 3009, West Wyomissing Avenue over Wyomissing Creek, Cuniru Township, Bridge (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (46) SR 3022 over Angelica Creek, Cumru (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (47) PA 625, New Holland Road over AngelicaCreek, Cumru (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (48) PA 625, BMS over Angelica Creek, Cumru Township, Bridge (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (49) SR 3003 over Angelica Creek, Curnru (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) 400,000 1,700,000 S 600,000 1,000, ,000 1,000,000. 1,000, ,000
64 SESSION OF 2006 Act (50) SR 2039 over SR 0422, Exeter Township, (Base Construction Allocation $4,800,000) (Land Allocation $600,000) (Design and Contingencies $2,400,000) (51) SR 3009 over Wyomissing Creek, Cumru (Base Construction Allocation $400,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (52) SR 0010, Reading Road, New Morgan Borough, (Base Construction Allocation $1,700,000) (Design and Contingencies $300,000) (53) PA 10 over Hay Creek, Robeson Township, (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (54) PA 10 over Allegheny Creek, Robeson (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (55) PA 82 over Tributary of Hay Creek, Robeson (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (56) 176 over Norfolk Southern Railroad, Cumru (Base Construction Allocation $10,100,000) (Land Allocation $1,300,000) (Design and Contingencies $5,100,000) (57) SR 0568 over Allegheny Creek, Robeson (Base Construction Allocation $1,100,000) (Land Allocation $200,000) (Design and Contingencies $600,000) (58) SR 0568 over Allegheny Creek, Robeson (Base Construction Allocation $800,000) (Land Allocation $100,000) (Design and Contingencies $400,000) 787 7,800, ,000 2,000, ,000 1,000, ,000 16,500,000 1,900,000 S 1,300,000
65 788 Act LAWS OF PENNSYLVANIA (59) PA 625, New Holland and Ledger Rock Roads over Angelica Creek, (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (60) PA 625, Two miles south of Kenhorst over Angelica Creek, Cumru Township, Bridge (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (61) PA 625, Nolde Forest State Park Bridge over Angelica Creek, Cumru Township, Bridge (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $300,000) Section 11. Blair County. (a) Local Bridges (1) Antis Township, T502, North 2nd Street over Tributary of Little Juniata River, Bridge (Base Construction Allocation $332,000) (2) City of Altoona, 9th Street over Brush Run, (Base Construction Allocation $370,000) (3) City of Altoona, 15th Street over Brush Run, (Base Construction Allocation $370,000) (4) Hollidaysburg Borough, Porter Alley over Tributary of Beaverdam Branch of Juniata River, (Base Construction Allocation $200,000) (5) Hollidaysburg Borough, Bedford Street over Tributary of Beaverdam Branch of Juniata River, (Base Construction Allocation $470,000) (6) Hollidaysburg Borough, River Street over Tributary of Beaverdam Branch of Juniata River, (Base Construction Allocation $400,000) (7) Hollidaysburg Borough, McDonald Alley over Tributary of Beaverdam Branch of Juniata River, (Base Construction Allocation $280,000) 900, ,000 1,000, , , , , , , ,000
66 SESSION OF 2006 Act (8) Antis Township, T509, Danbeck Road over Tributary of Little Juniata River, Bridge (Base Construction Allocation $3,320,000) (9) Roaring Spring Borough, South Main Street to Cabbage Creek Alley over Cabbage Creek, Bridge (Base Construction Allocation $100,000) (10) Taylor Township, T343 over Plum Creek, (Base Construction Allocation $916,000) (Land Allocation $25,000) (Design and Contingencies $291,000) (11) Woodbury Township, T397 over Clover Creek, (Base Construction Allocation $1,088,000) (Land Allocation $25,000) (Design and Contingencies $212,000) (12) Frankstown Township, 1378 over Old Town Run, (Base Construction Allocation $1,240,000) (Land Allocation $20,000) (Design and Contingencies $381,000) (13) Allegheny Township, T414 over Gillians Run, (Base Construction Allocation $650,000) (Land Allocation $25,000) (Design and Contingencies $207,000) (14) Tyrone Borough, 12th Street over Bald Eagle Creek, (Base Construction Allocation 1,108,000) (Land Allocation $25,000) (Design and Contingencies $353,000) (15) Allegheny Township, T406 over Blair Gap Run, (Base Construction Allocation $719,000) (Land Allocation $25,000) (Design and Contingencies $229,000) (16) Logan Township, T456 over Mill Run, Bridge (Base Construction Allocation $634,000) (Land Allocation $25,000) (Design and Contingencies $210,000) (17) Allegheny Township, T414 over Gillans Run, 789 3,320, ,000 1,232,000 1,325,000 1,641, ,000 1,486, , ,000
67 790 Act LAWS OF PENNSYLVANIA (Base Construction Allocation $275,000) (Design and Contingencies $160,000) (18) Allegheny Township, T304 over Gillans Run, (Base Construction Allocation $230,000) (Design and Contingencies $160,000) (b) State Bridges (1) SR 0036 over Union Avenue Bridge under Railroad, City of Altoona, Bridge Rehabilitation (Base Construction Allocation $1,250,000) (2) SR 0453, Seg.Ol 10/0440 over Sinking Run, Tyrone Borough, (Base Construction Allocation $100,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (3) SR 0453, Seg.OllO/1379 over Sinking Run, Tyrone Borough, Bridge Rehabilitation (Base Construction Allocation $105,000) (Land Allocation $5,000) (Design and Contingencies $50,000) (4) SR 1008, Seg.0070/0000 over Elk Run, Tyrone Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (5) SR 1013, Seg.0040/0000 over Kettle Run, Logan (Base Construction Allocation $380,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (6) SR 1013, Seg.0250/0868 over Sinking Run, Tyrone Township, Bridge Rehabilitation (Base Construction Allocation $58,000) (Land Allocation $1,000) (Design and Contingencies $25,000) (7) SR 1015, Seg.0140/0000 over Elk Run, Tyrone Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (8) SR 2015, Seg.OllO/l868 over Yellow Spring 445, ,000 1,250, , ,000 60, ,000 84, ,000
68 SESSION OF 2006 Act Run, Catharine (Base Construction Allocation $215,000) (Land Allocation $25,000) (Design and Contingencies $100,000) (9) SR 2017, Seg.0l60/0000 over Fox Run, Catharine Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (10) SR 2017, Seg.0l60/0875 over Fox Run, Catharine Township, Bridge Rehabilitation (Base Construction Allocation $24,000) (Land Allocation $1,000) (Design and Contingencies $11,000) (11) SR 4002, Seg.Ol 10/0000 over Sugar Run, Allegheny (Base Construction Allocation $152,000) (Land Allocation $20,000) (Design and Contingencies $44,000) (12) SR 4003, Seg.0020/0490 over Tributary of Mill Run, City ofaltoona, (Base Construction Allocation $107,000) (Design and Contingencies $39,000) (13) SR 4013, Seg.0080/0000 over Homer Gap Run, Logan (Base Construction Allocation $156,000) (Land Allocation $20,000) (Design and Contingencies $44,000) (14) SR 4027, Seg.0010/0827 over McFarlands Run, Antis Township, Bridge Rehabilitation (Base Construction Allocation $152,000) (Land Allocation $20,000) (Design and Contingencies $44,000) (15) SR 8003, Seg.0270/0772 over Little Juniata River, Antis (Base Construction Allocation $160,000) (Land Allocation $25,000) (Design and Contingencies $105,000) (16) SR 1001 over Brush Run, City of Altoona, (Base Construction Allocation $69,000) (Land Allocation $20,000) (Design and Contingencies $20,000) Section 12. Bradford County , ,000 36, , , , , , ,000
69 792 Act LAWS OF PENNSYLVANIA (a) Local Bridges (1) Leroy Township, 1330 over Towanda Creek, (Base Construction Allocation $950,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (b) State Bridges (1) SR 0549 over Beckwith Creek, Village of Mosherville, Wells Township, Bridge (Base Construction Allocation $162,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (2) SR 1022 over Bullard Creek, Rome Township, (Base Construction Allocation $211,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (3) SR 3002 over Ladds Creek, New Albany Borough, (Base Construction Allocation $44,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (4) SR 4031 over Beckwith Creek, Wells Township, (Base Construction Allocation $36,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (5) SR 1029, Bridge over Bullard Creek, Sheshequin (Base Construction Allocation $120,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (6) SR 1022, Bridge over Bullard Creek, Rome (Base Construction Allocation $140,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (7) SR 2010, Bridge over Towanda Creek, Albany (Base Construction Allocation $140,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (8) SR 4013, Bridge over Bentley Creek, Ridgebury 1,070, , , ,000 S 72, , , ,000
70 SESSION OF 2006 Act (Base Construction Allocation $200,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (9) SR 4013, Bridge over Tomjack Creek, West Burlington (Base Construction Allocation $100,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (10) SR 1022, Bullard Creek Deck, Rome Township, Bridge Rehabilitation (Base Construction Allocation $.l 60,000) (Design and Contingencies $20,000) (11) SR 0006 over Morgan Creek, Sylvania Borough, (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (12) SR 0187 over Bullard Creek, Rome Township, (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (13) SR 0187 over Dry Run Creek, Wysox (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (14) SR 0187 over Tributary of Wappasening Creek, Windham (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (15) SR 0549 over Beckwith Creek, Wells (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (16) SR 1029 over Bullard Creek, Rome Township, (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (17) SR 1043 over Spauldings Creek, Sheshequin , , , , ,000 84,000 89, , ,000
71 794 Act LAWS OF PENNSYLVANIA (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (18) SR 1049 over Prince Hollow Run, Windham (Base Construction Allocation $95,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (19) SR 1055 over Parks Creek, Seg.0080, Rome (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (20) SR 1055 over Parks Creek, Seg.0030, Rome (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (21) SR 2007 over Sugar Run, Teny Township, (Base Construction Allocation $70,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (22) SR 2009 over Panther Lick Run, Wilmot (Base Construction Allocation $85,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (23) SR 2010 over Tributary Of Sugar Run, Albany (Base Construction Allocation $40,000) (Land Allocation $12;000) (Design and Contingencies $12,000) (24) SR 2016 over King Creek; Standing Stone Township,. (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (25) SR 2032 over Laning Creek, Wysox Township, (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) 73, ,000 64,000 S 128, , ,000 64,000 57,000 S 73,000
72 SESSION OF 2006 Act (26) SR 3001 over Towanda Creek, Franklin (Base Construction Allocation $175,000) (Land Allocation $53,000) (Design and Contingencies $53,000) (27) SR 3009 over Sugar Creek, Burlington. (Base Construction Allocation $115,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (28) SR 3015 over Branch of Preacher Brook, Franklin (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (29) SR 3036 over South Fork of Sugar Creek, Troy (Base Construction Allocation $44,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (30) SR 4016 over South Creek, Columbia (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (31) SR 4017 over Leonards Creek, Springfield (Base Construction Allocation $67,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (32) SR 4019 over Sugar Creek, Sylvania Borough, (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (33) SR 4022 over Stone Lick Creek, Athens (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (34) SR 4024 over Bentley Creek, Ridgebury (Base Construction Allocation $240,000) (Land Allocation $72,000) (Design and Contingencies $72,000) ,000. S 185, ,000 70, , ,000 89, , ,000
73 796 Act LAWS OF PENNSYLVANIA (35) SR 4027 over Bentley Creek, Ridgebury (Base Construction Allocation $145,000) (Land Allocation $44,000) (Design and Contingencies $44,000) (36) SR 4028 over Justice Run, Ridgebury (Base Construction Allocation $155,000) (Land Allocation $47,000) (Design and Contingencies $47,000) (37) SR 0467 over Wysox Creek, Rome Township, (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (38) SR 3012 over Tributary of Towanda Creek, Canton (Base Construction Allocation $51,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (39) SR 1026 over Wyalusing Creek, Pike (Base Construction Allocation $1,000,000) (Land Allocation $30,000) (Design and Contingencies $80,000) (40) SR 0414 over Towanda Creek, Franklin (Base Construction Allocation $1,240,000) (Land Allocation $30,000) (Design and Contingencies $20,000) (41) SR 1058 over Sackett Run, Litchfield (Base Construction Allocation $449,000) (Land Allocation $30,000) (Design and Contingencies $20,000) (42) SR 2010 over Towanda Creek, Albany (Base Construction Allocation $1,100,000) (Land Allocation $30,000) (Design and Contingencies $20,000) Section 13. Bucks County. (a) Local Bridges (1) Solesbury Township, Reeder Road, Bridge Rehabilitation (Base Construction Allocation $175,000) 233, , ,000 81,000 1,110,000 1,290, ,000 1,150, ,000
74 SESSION OF 2006 Act Solesbury Township, Covered Bridge Road, Bridge Rehabilitation (Base Construction Allocation $95,000) (3) Solesbury Township, Cuttalossa Road, Bridge (Base Construction Allocation $200,000) (4) Solesbury Township, Sugan Road, Bridge (Base Construction Allocation $300,000) (5) Solesbury Township, Lower Mountain Road, Bridge Rehabilitation (Base Construction Allocation $95,000) (b) State Bridges (1) SR 2038 over Southampton Creek, Upper Southampton (Base Construction Allocation $92,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (2) SR 2053 over Queen Anne Creek, Falls. (Base Construction Allocation $82,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (3) SR 2063 over Mill Creek, Lower Southampton (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (4) SR 2089 over Little Neshaminy Creek, Warwick (Base Construction Allocation $250,000) (Land Allocation $75,000) (Design and Contingencies $75,000) (5) SR 4025 over Deep Run, Bedminster Township, (Base Construction Allocation $63,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (6) SR 8071 over Rock Run, Falls Township, Bridge (Base Construction Allocation $46,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (7) SR 0013 over Branch of Martins Creek, Falls 797 (2) 95,000 S 200, , , , , , , ,000 S 72,000
75 798 Act LAWS OF PENNSYLVANIA (Base Construction Allocation $155,000) (Land Allocation $46,000) (Design and Contingencies $46,000) (8) SR 1014 over Branch of Swamp Creek, Tinicum (Base Construction Allocation $47,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (9) SR 2006 over Branch of Martins Creek, Falls (Base Construction Allocation $81,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (10) SR 2018 over Branch of Queen Anne Creek, Seg.0060, Middletown Township, Bridge (Base Construction Allocation $83,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (11) SR 2018 over Mill Creek, Seg.0030, Middletown (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (12) SR 2025 over Ironworks Creek, Northampton (Base Construction Allocation $72,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (13) SR 2033 over Queen Anne Creek, Middletown (Base Construction Allocation $283,000) (Land Allocation $85,000) (Design and Contingencies $85,000) (14) SR 2043 over Neshimany Creek, Lower Southampton (Base Construction Allocation $325,000) (Land Allocation $98,000) (Design and Contingencies $98,000) (15) SR 0263, Warwick Township, Bridge Rehabilitation (Base Construction Allocation $100,000) Section 14. Butler County. (a) Local Bridges 247,000 76, , ,000 S 138, , , , ,000
76 SESSION OF 2006 Act (1) Clearfield Township, TR 630 at Buffalo Run, (Base Co~nstructionAllocation $800,000) (2) Clearfield Township, TR 843 at Little Buffalo Run, (Base Construction Allocation $800,000) (3) Cherry Valley Borough, TR 528 at Scrubgrass Creek, (Base Construction Allocation $800,000) (4) Clearfield Township, TR 630 over Branch of Buffalo Run, (Base Construction Allocation $800,000) (5) Clearfield Township, TR 691 at Little Buffalo Run, (Base Construction Allocation $800,000) (6) Clearfield Township, TR 578 at Little Buffalo Run, (Base Construction Allocation $800,000) (7) Concord Township, TR 621 at Robinson Run, (Base Construction Allocation $800,000) (8) Fairview Township, TR 676 at Hays Run, Bridge (Base Construction Allocation $800,000) (9) Fairview Township, TR 625 at Bear Creek, (Base Construction Allocation $800,000) (10) Fairview Township, TR 636 at Bear Creek, (Base Construction Allocation $800,000) (11) Jefferson Township, TR 840 at Davis Run, (Base Construction Allocation $800,000) (12) Oakland Township, TR 603 at Bonnie Brook, (Base Construction Allocation $800,000) (13) Parker Township, TR 723 at Bear Creek, Bridge (Base Construction Allocation $800,000) (14) Parker Township, TR 632 at Bear Creek, Bridge (Base Construction Allocation $800,000) (15) Parker Township, TR 638 at Silver Creek, (Base Construction Allocation $800,000) , , , , , , , , , , , , , , ,000
77 800 Act LAWS OF PENNSYLVANIA (16) Summit Township, TR 584 at Bonnie Brook, (Base Construction Allocation $800,000) (17) Venango Township, TR 649 at Murrin Run, (Base Construction Allocation $800,000) (18) Washington Township, TR 506 at North Branch of Slippery Rock Creek, (Base Construction Allocation $800,000) (19) Washington Township, TR 452 at North Branch of Slippery Rock Creek, (Base Construction Allocation $800,000) (20) Washington Township, TR 504 at Christy Run, (Base Construction Allocation $800,000) (21) Winfield Township, TR 626 at Rough Run, (Base Construction Allocation $800,000) (22) Winfield Township, TR 846 at Rough Run, Bridge Rehabilitation (Base Construction Allocation $120,000) (23) Winfield Township, TR 846 at Tributary of Rough Run, Bridge Rehabilitation (Base Construction Allocation $80,000) (24) Jefferson Township, T840, Golden City Road over Davis Run, (Base Construction Allocation $500,000) (25) Jefferson Township, Golden City Road over Davis Run, (Base Construction Allocation $1,000,000) (26) Jefferson Township, T844 over Thorn Creek, (Base Construction Allocation $800,000) (27) Marion Township, T476 over Branch of Slippery Rock Creek, (Base Construction Allocation $800,000) (28) Marion Township, T434 over Slippery Rock Creek, (Base Construction Allocation $800,000) (29) Mercer Township, 1434 over McMurray Run, (Base Construction Allocation $800,000) (30) Muddycreek Township, T318 over Muddycreek, (Base Construction Allocation $800,000) 800, , , , , , ,000 80, ,000 1,000, , ,000 S 800, , ,000
78 SESSION OF 2006 Act (31) Brady Township, 1414 over Haliston Run, Frank Hall, 500,000 (Base Construction Allocation $500,000) (32) Allegheny Township, T538 over Loweiy Run, 500,000 (Base Construction Allocation $500,000) (33) Cherry Township, T560 over Slippery Rock Creek, 800,000 (Base Construction Allocation $800,000) (34) Brady Township, T369 over Big Run, Bridge 800,000 (Base Construction Allocation $800,000) (35) Cherry Township, T537 over South Branch of Slippery Rock Creek, 800,000 (Base Construction Allocation $800,000) (36) Brady Township, T455 over Glade Run, 800,000 (Base Construction Allocation $800,000) (37) Cherry Township, T535 over Findley Run, 800,000 (Base Construction Allocation $800,000) (38) Cherry Township, 1416 over Findley Run, 800,000 (Base Construction Allocation $800,000) (39) Clay Township, T53l over Claytonia Run, 800,000 (Base Construction Allocation $800,000) (40) Clay Township, 1461 over Muddycreek, 800,000 (Base Construction Allocation $800,000) (41) Brady Township, T368 over Big Run, Bridge 800,000 (Base Construction Allocation $800,000) (42) Donegal Township, 1830 over Buffalo Creek, 800,000 (Base Construction Allocation $800,000) (43) Clay Township, T4 14 over Muddycreek, 800,000 (Base Construction Allocation $800,000) (44) Concord Township, T508 over Connoquenessing Creek, 800,000 (Base Construction Allocation $800,000) (45) City of Butler, South Monroe Street Bridge over B&P Railroad, 676,000 (Base Construction Allocation $520,000)
79 802 Act2006l03 LAWS OF PENNSYLVANIA (Land Allocation $52,000) (Design and Contingencies $104,000) (46) Clearfield Township, T 570 over Little Buffalo Creek, 1,250,000 (Base Construction Allocation $1,250,000) (47) Wmfield Township, Center Avenue, Bridge Rehabilitation 15,000 (Base Construction Allocation $12,000) (Design and Contingencies $3,000) (48) City of Butler, West Brady Street, Bridge 520,000 (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $80,000) (49) City of Butler, Mercer Street, Bridge 1,140,000 (Base Construction Allocation $900,000) (Land Allocation $60,000) (Design and Contingencies $180,000) (50) City of Butler, West Penn Street over Sullivan Run, 520,000 (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $80,000) (51) City of Butler, North Sixth Avenue over Sullivan Run, 520,000 (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $80,000) (52) City of Butler, Monroe Street over Connoquenessing Creek, Bridge Rehabilitation 395,000 (Base Construction Allocation $310,000) (Land Allocation $10,000) (Design and Contingencies $75,000) (53) City of Butler, West New Castle Street, Bridge 520,000 (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $80,000) (b) State Bridges (1) SR 1004, Bridge over Silver Creek, Bridge 800,000 (Base Construction Allocation $650,000) (Land Allocation $10,000) (Design and Contingencies $140,000)
80 SESSION OF 2006 Act (2) SR 2015 over Little Buffalo Creek, Buffalo 1,100,000 (Base Construction Allocation $1,100,000) (3) SR 3020, Freedom Road Bridge over Pennsylvania Turnpike, Cranberry Township, 936,000 (Base Construction Allocation $720,000) (Land Allocation $72,000) (Design and Contingencies $144,000) (4) SR 3027, Harmony Junction Bridge over Connoquenessing Creek, Jackson Township, Bridge Restoration 3,874,000 (Base Construction Allocation $2,980,000) (Land Allocation $298,000) (Design and Contingencies $596,000) (5) SR 0268, Petrolia Bridge No.1 over South Branch of Bear Creek, Petrolia Borough, Bridge 286,000 (Base Construction Allocation $220,000) (Land Allocation $22,000) (Design and Contingencies $44,000) (6) SR 0038, Sedwicks Mills Bridge over South Fork of Lower Scrubgrass Creek, Allegheny 546,000 (Base Construction Allocation $420,000) (Land Allocation $42,000) (Design and Contingencies $84,000) (7) SR 0019 over US 422, Muddycreek Township, 1,248,000 (Base Construction Allocation $960,000) (Land Allocation $96,000) (Design and Contingencies $192,000) (8) SR 0258, Christleys Mills Bridge No.2, Slippery Rock 863,000 (Base Construction Allocation $664,000) (Land Allocation $66,000) (Design and Contingencies $133,000) (9) SR 0138, Harbor Acres Bridge, Concord 276,000 (Base Construction Allocation $212,000) (Land Allocation $21,000) (Design and Contingencies $42,000) (10) SR 4002, Lake Oneida Bridge, Oakland Township, Bridge Restoration 208,000 (Base Construction Allocation $160,000)
81 804 Act LAWS OF PENNSYLVANIA (Land Allocation $16,000) (Design and Contingencies $32,000) (11) SR 4007, West Park Road No.!, Muddycreek Township, Bridge Restoration 312,000 (Base Construction Allocation $240,000) (Land Allocation $24,000) (Design and Contingencies $48,000) (12) SR 4012, Atwell Crossings Bridge, Marion Township, Bridge Restoration 130,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (13) SR 3013, Ribold Bridge, Forward Township, Bridge Restoration 117,000 (Base Construction Allocation $90,000) (Land Allocation $9,000) (Design and Contingencies $18,000) (14) SR 1010, Hooker Road Bridge No.2, Concord 57,000 (Base Construction Allocation $44,000) (Land Allocation $4,000) (Design and Contingencies $9,000) (15) SR 1002, Cherry Valley Bridge No.4, Cherry Valley Borough, 52,000 (Base Construction Allocation $40,000) (Land Allocation $4,000) (Design and Contingencies $8,000) (16) SR 1027, Cherry Valley Bridge No.5, Cherry Valley Borough, 52,000 (Base Construction Allocation $40,000) (Land Allocation $4,000) (Design and Contingencies $8,000) (17) SR 1004, Bruin Bridge No.6, Parker Township, 57,000 (Base Construction Allocation $44,000) (Land Allocation $4,000) (Design and Contingencies $9,000) (18) SR 4007, West Park Road Bridge No.4, Muddycreek Township, Bridge Restoration 185,000 (Base Construction Allocation $120,000) (Land Allocation $15,000) (Design and Contingencies $50,000) (19) SR 0038 over South Fork of Scrubgrass Creek, Cherry Valley Borough, 55,000 (Base Construction Allocation $35,000)
82 SESSION OF 2006 Act (Land Allocation $10,000) (Design and Contingencies $10,000) (20) SR 0058 over McMurray Run, Seg.0050, Mercer 154,000 (Base Construction Allocation $96,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (21) SR 0058 over McMurray Run, Seg.0040, Mercer 208,000 (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (22) SR 0308 over South Branch of Slippery Rock Creek, Cherry 159,000 (Base Construction Allocation $99,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (23) SR 2007 over Rocky Run, Seg.0030, Clinton 63,000 (Base Construction Allocation $39,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (24) SR 2007 over Bull Creek, Seg.OOlO, Clinton 63,000 (Base Construction Allocation $39,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (25) SR 2018 over Little Buffalo Creek, Buffalo 70,000 (Base Construction Allocation $44,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (26) SR 3013 over Connoquenessing Creek, Forward 346,000 (Base Construction Allocation $216,000) (Land Allocation $65,000) (Design and Contingencies $65,000) (27) SR 3028 over Connoquenessing Creek, Forward 517,000 (Base Construction Allocation $323,000) (Land Allocation $97,000) (Design and Contingencies $97,000) (28) SR 3032 over Little Connoquenessing Creek, Connoquenessing 135,000 (Base Construction Allocation $85,000)
83 806 Act LAWS OF PENNSYLVANIA (Land Allocation $25,000) (Design and Contingencies $25,000) (29) SR 0228 South of Mars over CSX Railroad, Adams 1,455,000 (Base Construction Allocation $909,000) (Land Allocation $273,000) (Design and Contingencies $273,000) (30) SR 1010, Glade Run Bridge, Adams Township, 432,000 (Base Construction Allocation $270,000) (Land Allocation $81,000) (Design and Contingencies $81,000) (31) SR 2002, Coal Run Bridge, Butler Township, 566,000 (Base Construction Allocation $354,000) (Land Allocation $106,000) (Design and Contingencies $106,000) (32) SR 2010, Little Buffalo Creek Bridge, Cabot, Winfield 193,000 (Base Construction Allocation $121,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (33) SR 2023, Sandy Lick Bridge over Little Buffalo Creek, Buffalo 545,000 (Base Construction Allocation $341,000) (Land Allocation $102,000) (Design and Contingencies $102,000) (34) SR 3002, Sawmill Run Bridge, Butler 155,000 (Base Construction Allocation $97,000) (Land Allocation $29,000) (Design and Contingencies $29,000) Section 15. Cambria County. (a) Local Bridges (1) Barr Township, T509 over North Branch of Blacklick Creek, Bridge No.5, Bridge 780,000 (Base Construction Allocation $780,000) (2) Lilly Borough, Pine Street Bridge over Little Conemaugh River, 60,000 (Base Construction Allocation $54,000) (Land Allocation $3,000) (Design and Contingencies $3,000) (3) East Taylor and Middle Taylor Townships, Hunt
84 SESSION OF 2006 Act Road over Hinckston Run, 60,000 (Base Construction Allocation $54,000) (Land Allocation $3,000) (Design and Contingencies $3,000) (b) State Bridges (1) SR 0036, Seg.0230/0785 over Chest Creek, Patton Borough, 528,000 (Base Construction Allocation $402,000) (Land Allocation $20,000) (Design and Contingencies $106,000) (2) SR 0053, Seg.0230/2476 over Burgoon Run, Lilly Borough, 148,000 (Base Construction Allocation $101,000) (Land Allocation $10,000) (Design and Contingencies $37,000) (3) SR 0053, Seg.0540/0928 over Tributary of Clearfield Creek, Dean Township; Bridge 420,000 (Base Construction Allocation $245,000) (Land Allocation $50,000) (Design and Contingencies $125,000) (4) SR 0053, Seg.0620/0000 over Laurel Run, Reade Township, Bridge Rehabilitation 200,000 (Base Construction Allocation $135,000) (Land Allocation $5,000) (Design and Contingencies $60,000) (5) SR 0219, Seg.0700/0000 over Fox Run, West Carroll Township, Bridge Rehabilitation 140,000 (Base Construction Allocation $95,000) (Land Allocation $5,000) (Design and Contingencies $40,000) (6) SR 0219, Seg.0880/1261 over Tributary of West Branch of Susquehanna River, Susquehanna 420,000 (Base Construction Allocation $245,000) (Land Allocation $50,000) (Design and Contingencies $125,000) (7) SR 0271, Seg.0090/l084 over Little Mill Creek, Upper Yoder 620,000 (Base Construction Allocation $415,000) (Land Allocation $50,000) (Design and Contingencies $155,000) (8) SR 1007, Seg.0050/0756 over Tributary of Chest Creek, Allegheny 320,000 (Base Construction Allocation $180,000)
85 808 Act LAWS OF PENNSYLVANIA (Land Allocation $50,000) (Design and Contingencies $90,000) (9) SR 1011, Seg.0050/0000 over Tributary of Beaver Dam Run, Allegheny Township, Bridge 152,000 (Base Construction Allocation $104,000) (Land Allocation $10,000) (Design and Contingencies $38,000) (10) SR 2001, Seg.0010/0635 over Branch of Paint Creek, Adams Township, Bridge Rehabilitation 60,000 (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (11) SR 2005, Seg.0030/0679 over Tributary of Otto Run, Adams Township, Bridge Rehabilitation 120,000 (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (12) SR 2014, Seg.OOlO/0000 over US 22, Cambria Township, Bridge Rehabilitation 296,000 (Base Construction Allocation $235,000) (Land Allocation $2,000) (Design and Contingencies $59,000) (13) SR 3024, Seg.0130/0000 over Clapboard Run, Richland Township, Bridge Rehabilitation 100,000 (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (14) SR 3041, Seg.0020/0000 over Wildcat Run, West Taylor 620,000 (Base Construction Allocation $415,000) (Land Allocation $50,000) (Design and Contingencies $155,000) (15) SR 3047, Seg.0050/2875 over South Branch of Blacklick Creek, Blacklick Township, Bridge Rehabilitation 116,000 (Base Construction Allocation $86,000) (Land Allocation $1,000) (Design and Contingencies $29,000) (16) SR 4001, Seg.0040/0292 over Findley Run, Blacklick Township, Bridge Rehabilitation 20,000 (Base Construction Allocation $13,000) (Land Allocation $1,000) (Design and Contingencies $6,000)
86 SESSION OF 2006 Act (17) SR 4002, Seg.0l20/0000 over Tributary of California Run, Cambria Township, Bridge Rehabilitation 32,000 (Base Construction Allocation $22,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (18) SR 4002, Seg.0140/282l over Branch of Blacklick Creek, Cambria Township,. Bridge Rehabilitation 32,000 (Base Construction Allocation $22,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (19) SR 0219 over Palestine Road, T316, Adams 224,000 (Base Construction Allocation $140,000) (Land Allocation $42,000) (Design and Contingencies $42,000) (20) SR 0160 over South Fork Branch of Little Conemaugh River, Seg.0 190, Adams Township, 214,000 (Base Construction Allocation $134,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (21) SR 0160 over Branch of Little Conemaugh River, Seg.0180, Adams Township, Bridge 123,000 (Base Construction Allocation $77,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (22) SR 1021 over Beaver Dam Run, Seg.0180, White 324,000 (Base Construction Allocation $202,000) (Land Allocation $61,000) (Design and Contingencies $61,000) (23) SR 1021 over Killbuck Run, Seg.0090, Chest 80,000 (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (24) SR 2001 over Little Paint Creek, Adams. 76,000 (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000)
87 810 Act LAWS OF PENNSYLVANIA (25) SR 2015 over Little Conemaugh River, Cassandra Borough, 164,000 (Base Construction Allocation $102,000) (Land Allocation $31,000) (Design and Contingencies $31,000) (26) SR 3035 over Little Conemaugh River, East Taylor. 410,000 (Base Construction Allocation $256,000) (Land Allocation $77,000) (Design and Contingencies $77,000) (27) SR 4002 over Branch of Elk Creek, Blacklick.. 48,000 (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) Section 16. Cameron County. (a) Local Bridges (1) Lumber Township, T302 over Sterling Run, 616,000 (Base Construction Allocation $425,000) (Land Allocation $6,000) (Design and Contingencies $185,000) (2) Lumber Township, T308 over Sterling Run,. 560,000 (Base Construction Allocation $370,000) (Land Allocation $5,000) (Design and Contingencies $185,000) (3) Shippen Township, Jenks Run Road over Clear Creek,.. 570,000 (Base Construction Allocation $425,000) (Land Allocation $15,000) (Design and Contingencies $130,000) (4) Shippen Township, Township Road over Clear Creek, 301,000 (Base Construction Allocation $237,000) (Land Allocation $4,000) (Design and Contingencies $60,000) (5) Portage Township, Bridge over Cowley Run,. 229,000 (Base Construction Allocation $164,000) (Land Allocation $3,000) (Design and Contingencies $62,000) (b) State Bridges (1) SR 0120 over West Creek, Shippen Township,
88 SESSION OF 2006 Act ,000 (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (2) SR 0120 over West Creek, Shippen Township, Box Culvert 280,000 (Base Construction Allocation $200,000) (Land Allocation $10,000) (Design and Contingencies $70,000) (3) SR 0120, Johnson Run Bridge, Gibson 615,000 (Base Construction Allocation $400,000) (Land Allocation $15,000) (Design and Contingencies $200,000) Section 17. Carbon County. (a) Local Bridges (1) Penn Forest Township, T5l3 over Mud Run, 163,000 (Base Construction Allocation $103,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (b) State Bridges (1) SR 2007 over Pohopoco Creek, Franklin 360,000 (Base Construction Allocation $224,000) (Land Allocation $68,000) (Design and Contingencies $68,000) (2) SR 1001 over Wild Creek, Towamensing 113,000 (Base Construction Allocation $71,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (3) SR 1001 over Wild Creek, Penn Forest 54,000 (Base Construction Allocation $34,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (4) SR 2007 over Pohopoco Creek, Franklin 364,000 (Base Construction Allocation $227,000) (Land Allocation $68,000) (Design and Contingencies $68,000) (5) SR 2015 over Saw Mill Creek, Franklin 152,000 (Base Construction Allocation $95,000)
89 812 Act LAWS OF PENNSYLVANIA (Land Allocation $29,000) (Design and Contingencies $29,000) Section 18. Centre County. (a) Local Bridges (1) Gregg Township, T468 over Penns Creek, 750,000 (Base Construction Allocation $750,000) (2) Philipsburg Borough, Presque Isle Street Bridge over Moshannon Creek, 750,000 (Base Construction Allocation $750,000) (3) College Township, T333 over Spring Creek, 750,000 (Base Construction Allocation $750,000) (4) College Township, T334 over Spring Creek and Cedar Creek, 750,000 (Base Construction Allocation $750,000) (5) Bellefonte Borough, Linn Street, Box Culvert 125,000 (Base Construction Allocation $120,000) (Design and Contingencies $5,000) (6) Worth Township, T348 over Ardeiy Run, 1,500,000 (Base Construction Allocation $1,000,000) (Design and Contingencies $500,000) (b) State Bridges (1) SR 1001 over Marsh Creek, Curtin Township, Bridge Rehabilitation 750,000 (Base Construction Allocation $750,000) (2) SR 2014 over Branch of Laurel Run, Gregg Township, Bridge Rehabilitation 750,000 (Base Construction Allocation $750,000) (3) SR 0026, Railroad to Whiterock Quarry, Spring Township, Bridge Construction 3,209,000 (Base Construction Allocation $3,209,000) (4) SR 2014 over Laurel Run, Gregg Township, Box Culvert 43,000 (Base Construction Allocation $38,000) (Design and Contingencies $5,000) (5) SR 4007 over Moose Run, Boggs Township, Box Culvert 260,000 (Base Construction Allocation $200,000) (Land Allocation $10,000) (Design and Contingencies $50,000) (6) SR 3032 over Laurel Run, Huston Township,
90 SESSION OF 2006 Act ,000 (Base Construction Allocation $120,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (7) SR 2009, Penns Creek Bridge, Penn Township, 220,000 (Base Construction Allocation $150,000) (Land Allocation $10,000) (Design and Contingencies $60,000) (8) SR 3006, Mill Race Bridge, Bellefonte Borough, 220,000 (Base Construction Allocation $150,000) (Land Allocation $10,000) (Design andcontingencies $60,000) (9) SR 0504 over Dewitt Run, Union Township, 44,000 (Base Construction Allocation $28,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (10) SR 0026 over Tributary of Slab Cabin Run, College 196,000 (Base Construction Allocation $122,000) (Land Allocation $37,000) (Design and Contingencies $37,000) (11) SR 0064 over Little Fishing Creek, Seg.0240, Walker 168,000 (Base Construction Allocation $104,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (12) SR 0064 over Little Fishing Creek, Seg.0200, Walker 162,000 (Base Construction Allocation $102,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (13) SR 0064 over Roaring Run, Walker Township, 86,000 (Base Construction Allocation $54,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (14) SR 0064 over Little Fishing Creek, Seg.0260, Walker 176,000 (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000)
91 814 Act LAWS OF PENNSYLVANIA (15) SR 3010 over Spring Creek, College Township, 192,000 (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (16) SR 3011 over Slab Cabin Run, College 132,000 (Base Construction Allocation $82,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (17) SR 3027 over Moshannon Creek, Rush 256,000 (Base Construction Allocation $160,000) (Land Allocation $48,000) (Design and Contingencies $48,000) (18) SR 3011 over Spring Creek, College Township, 256,000 (Base Construction Allocation $160,000) (Land Allocation $48,000) (Design and Contingencies $48,000) Section 19. Chester County. (a) Local Bridges (1) Downingtown Borough, Chestnut Street over Tributary of Brandywine Creek, Bridge 180,000 (Base Construction Allocation $150,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (2) Penn Township, T326, Sunnyside Road over Octoraro Railway, 850,000 (Base Construction Allocation $700,000) (Land Allocation $50,000) (Design and Contingencies $100,000) (3) Sadsbury Township, T42 1, Compass Road over Buck Run, 207,000 (Base Construction Allocation $181,000) (Land Allocation $3,000) (Design and Contingencies $23,000) (4) Sadsbury Township, T364, Newport Avenue over Amtrak 260,000 (Land Allocation $200,000) (Design and Contingencies $60,000) (5) Tredyifrin Township, T400, LeBoutillier Road over Valley Creek, 655,000 (Base Construction Allocation $500,000)
92 SESSION OF 2006 Act (Land Allocation $15,000) (Design and Contingencies $140,000) (6) Tredyffrin Township, T500, Church Road over North Branch of Cedar Hollow Run, Bridge (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (7) Tredyifrin Township, Church Road over Valley Creek, (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (8) Upper Oxford Township, T366, Forest Manor Road over Branch of Big Elk Creek, Bridge (Base Construction Allocation $800,000) (Land Allocation $60,000) (Design and Contingencies $350,000) (9) North Coventry Township, South Keim Street over Schuylkill River, (Base Construction Allocation $7,000,000) (Land Allocation $500,000) (Design and Contingencies $1,000,000) (10) West Brandywine Township, Germany Hollow Road over Indian Run, (Base Construction Allocation $60,000) (Land Allocation $80,000) (Design and Contingencies $350,000) (11) West Brandywine Township, Lafayette Road over West Brandywine Creek, Bridge (Base Construction Allocation $900,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (12) West Brandywine and West Cain Townships, Reid Road over West Brandywine Creek, Bridge (Base Construction Allocation $900,000) (Land Allocation $60,000) (Design and Contingencies $450,000) (13) West Vincent Township, Horseshoe Trail over Birch Run, (Base Construction Allocation $900,000) (Land Allocation $75,000) 600,000 1,575,000 1,210,000 8,500, ,000 1,475,000 1,410,000 1,375,000
93 816 Act LAWS OF PENNSYLVANIA (Design and Contingencies $400,000) (14) West Vincent Township, Flowing Springs Road over Birch Run, Bridge Rehabilitation 120,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (15) East Vincent Township, Pushtown Road over French Creek to West Vincent, Bridge Rehabilitation 1,000,000 (Base Construction Allocation $1,000,000) (16) West Pikeland Township, Art School Road over Pine Creek, 600,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (17) Tredyffrmn Township, T6 18, Glen Hardie Road over Trout Creek, 525,000 (Base Construction Allocation $475,000) (Design and Contingencies $50,000) (18) Caln Township, North Bailey Road over Tributary of Beaver Run, 670,000 (Base Construction Allocation $600,000) (Land Allocation $20,000) (Design and Contingencies $50,000) (19) CaIn Township, Fisherville Road over Beaver Run, 470,000 (Base Construction Allocation $400,000) (Land Allocation $30,000) (Design and Contingencies $40,000) (20) East Vincent and West Vincent Townships, County Bridge No.191, French Creek Road over French Creek, 1,600,000 (Base Construction Allocation $1,000,000) (Land Allocation $100,000) (Design and Contingencies $500,000) (21) New London Township, T356 over School Road and Middle Branch of White Clay Creek, 600,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (22) Tredyffrmn Township, T564 over Chester County Trail, formerly Chester Valley Railroad, 725,000 (Base Construction Allocation $600,000)
94 SESSION OF 2006 Act (Design and Contingencies $125,000) (23) Caln Township, Carlson Boulevard over Beaver Run, New Bridge 2,400,000 (Base Construction Allocation $2,000,000) (Land Allocation $200,000) (Design and Contingencies $200,000) (24) Caln Township, Fisherville Road over Tributary of Beaver Run, 150,000 (Base Construction Allocation $120,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (25) East Brandywine Township, Reeds Road over East Brandywine Creek, 1,775,000 (Base Construction Allocation $1,200,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (26) Elk Township, T309, Reislers Road over Jordon Run, 1,375,000 (Base Construction Allocation $900,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (27) Highland and Londonderry Townships, T3 10 to T344, St. Malachi Road over Doe Run, Bridge Rehabilitation 690,000 (Base Construction Allocation $500,000) (Land Allocation $10,000) (Design and Contingencies $180,000) (28) Kennett Township, T337, Hillendale Road over West Branch of Red Clay Creek, Bridge 1,440,000 (Base Construction Allocation $900,000) (Land Allocation $40,000) (Design and Contingencies $500,000) (29) London Britain Township, T3l3, Watson Mill Road over Broad Run, 1,475,000 (Base Construction Allocation $900,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (30) London Britain Township, T314, Sharpless Road over White Clay Creek, 1,410,000 (Base Construction Allocation $850,000) (Land Allocation $60,000) (Design and Contingencies $500,000)
95 818 Act LAWS OF PENNSYLVANIA (31) Lower Oxford and Penn Townships, T308, Elkview Road over Big Elk Creek, Bridge Rehabilitation 230,000 (Base Construction Allocation $200,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (32) London Grove Township, T549, Lake Road over Indian Run, 460,000 (Base Construction Allocation $400,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (33) Lower Oxford Township, Fairview Road over Tweeds Run, 1,140,000 (Base Construction Allocation $700,000) (Land Allocation $40,000) (Design and Contingencies $400,000) (34) Franklin Township, T354, Mount Olivet Road over Mackeys Run, 990,000 (Base Construction Allocation $600,000) (Land Allocation $40,000) (Design and Contingencies $350,000) (35) East Vincent Township, Pughtown Road over French Creek to West Vincent, Bridge Rehabilitation 1,000,000 (Base Construction Allocation $1,000,000) (36) West Pikeland Township, Art School Road over Pine Creek, 600,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (37) East Bradford Township, Harmony Hill Road over Little Valley,. 1,575,000 (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (38) Newlin Township, Oakbourne Road over Chester Creek, 2,400,000 (Base Construction Allocation $1,750,000) (Land Allocation $50,000) (Design and Contingencies $600,000) (39) Lower Oxford Township, Elk View Road over Big Elk Creek, 1,140,000 (Base Construction Allocation $700,000) (Land Allocation $40,000) (Design and Contingencies $400,000)
96 SESSION OF 2006 Act (40) Atglen Township, Old Newport Pike over Valley Creek, 1,020,000 (Base Construction Allocation $800,000) (Land Allocation $20,000) (Design and Contingencies $200,000) (41) Westtown, Oakbourne Road over Chester Creek,. 650,000 (Base Construction Allocation $600,000) (Land Allocation $50,000) (42) West Fallowfield Township, Steelville Road over Knight Run, 130,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (43) Valley Township, Kirby Street over Sucker Run, 350,000 (Base Construction Allocation $300,000) (Land Allocation $20,000) (Design and Contingencies $30,000) (44) West Vincent Township, Buttonwood Lane over Birch Run, 225,000 (Base Construction Allocation $200,000) (Land Allocation $5,000) (Design and Contingencies $20,000) (45) West Vincent Township, Art School Road over Pickering, 225,000 (Base Construction Allocation $200,000) (Land Allocation $5,000) (Design and Contingencies $20,000) (46) West Fallowfield Township, Biyson Road over Knight Run, 120,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (47) East Vincent Township and West Vincent Township, T497, Sheeder Mill Road over French Creek, 1,410,000 (Base Construction Allocation $900,000) (Land Allocation $60,000) (Design and Contingencies $450,000) (48) East Coventry Township, T506, Baptist Church Road over Pigeon Creek, Bridge 1,475,000 (Base Construction Allocation $900,000) (Land Allocation $75,000)
97 820 Act LAWS OF PENNSYLVANIA (Design and Contingencies $500,000) (49) Warwick Township, T452, County Park Road over French Creek, 1,175,000 (Base Construction Allocation $800,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (50) South Coventry Township, T492, Porter smill Road over Pigeon Creek, 1,475,000 (Base Construction Allocation $900,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (51) North Coventry Township, T501, Keim Street over Small Run, 950,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $400,000) (52) Valley Township, T206, Kirby Street over Sucker Run, 350,000 (Base Construction Allocation $300,000) (Land Allocation $20,000) (Design and Contingencies $30,000) (53) East Nantmeal Township, Fairview Road over Beaver Run, 800,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $250,000) (54) Honey Brook Township, Suplee Road over Brandywine Creek, 655,000 (Base Construction Allocation $575,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (55) Warwick Township, Harmoneyville Road over French Creek, 1,114,000 (Base Construction Allocation $700,000) (Land Allocation $40,000) (Design and Contingencies $374,000) (56) Wallace Township, Springton Road over Indian Run,. 550,000 (Base Construction Allocation $450,000) (Land Allocation $60,000) (Design and Contingencies $40,000) (57) West Caln Township and West Brandywine Township, Hibemia Road over Brandywine Creek, 700,000 (Base Construction Allocation $500,000)
98 SESSION OF 2006 Act (Land Allocation $100,000) (Design and Contingencies $100,000) (58) East Nantmeal Township, Fairview Road over Beaver Run, 710,000 (Base Construction Allocation $400,000) (Land Allocation $50,000) (Design and Contingencies $260,000) (59) Warwick Township, Pine Swamp Road over Pine Creek, 2,275,000 (Base Construction Allocation $1,750,000) (Land Allocation $100,000) (Design and Contingencies $425,000) (60) Wallace Township, Springton Road over Indian Run, 750,000 (Base Construction Allocation $400,000) (Land Allocation $50,000) (Design and Contingencies $300,000) (61) Wallace Township, Indian Run Road over Indian Run, 360,000 (Base Construction Allocation $250,000) (Land Allocation $30,000) (Design and Contingencies $80,000) (62) Valley Township, T442 over Sucker Run, 500,000 (Base Construction Allocation $400,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (63) Valley Township, T400 over Sucker Run, 500,000 (Base Construction Allocation $400,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (b) State Bridges (1) SR 0345 over Pine Creek, Warwick Township, Bridge Rehabilitation 2,100,000 (Base Construction Allocation $1,750,000) (Land Allocation $100,000) (Design and Contingencies $250,000) (2) SR 4021 over Indian Run, Wallace Township, 710,000 (Base Construction Allocation $400,000) (Land Allocation $10,000) (Design and Contingencies $300,000) (3) SR 4021 over Creek, Wallace Township, Bridge
99 822 Act LAWS OF PENNSYLVANIA Rehabilitation 340,000 (Base Construction Allocation $300,000) (Land Allocation $10,000) (Design and Contingencies $30,000) (4) SR 3030 over Street Road and Octoraro Creek, Upper Oxford 600,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (5) SR 4008 over Creek, Wallace Township, Bridge Rehabilitation 360,000 (Base Construction Allocation $250,000) (Land Allocation $30,000) (Design and Contingencies $80,000) (6) SR 4018 over French Creek, Warwick Township, Bridge Rehabilitation 1,320,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $400,000) (7) SR 1026, Clover Mill Road over Pickering Creek, West Pikeland Township, Bridge 1,750,000 (Base Construction Allocation $1,200,000) (Land Allocation $50,000) (Design and Contingencies $500,000) (8) SR 1030, Birch Run Road over Birch Run, West Vincent Township, Bridge Rehabilitation 230,000 (Base Construction Allocation $200,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (9) SR 3044, Ewing Road over East Branch of Big Elk Creek, Upper Oxford Township, Bridge 600,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (10) SR 4031 over Beaver Run Road, East Nantmeal 900,000 (Base Construction Allocation $600,000) (Land Allocation $50,000) (Design and Contingencies $250,000) (11) SR 3014, Lee s Bridge Road over Black Run, West Nottingham 570,000 (Base Construction Allocation $300,000) (Land Allocation $20,000)
100 SESSION OF 2006 Act (Design and Contingencies $250,000) (12) SR 4031 over Road, East Nantmeal Township, Bridge Rehabilitation 660,000 (Base Construction Allocation $400,000) (Land Allocation $10,000) (Design and Contingencies $250,000) (13) SR 0041 over White Clay Creek, Avondale Borough, Bridge Rehabilitation 340,000 (Base Construction Allocation $300,000) (Land Allocation $10,000) (Design and Contingencies $30,000) (14) SR 0030 over Road, Cain Township, Bridge 2,480,000 (Base Construction Allocation $2,000,000) (Land Allocation $80,000) (Design and Contingencies $400,000) (15) SR 3003, Oxford Barren Road over Little Elk Creek, East Nottingham Township, Bridge 350,000 (Base Construction Allocation $250,000) (Land Allocation $30,000) (Design and Contingencies $70,000) (16) US 322 over Brandywine Creek, Downingtown Borough, 2,050,000 (Base Construction Allocation $1,000,000) (Land Allocation $50,000) (Design and Contingencies $1,000,000) (17) SR 3022, Pennock s Bridge Road over West Branch of White Clay Creek, Penn Township, 600,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $50,000) (18) SR 3105 over South Walnut Street over Red Clay Creek, Kennett Square Borough, Bridge 750,000 (Base Construction Allocation $550,000) (Land Allocation $50,000) (Design and Contingencies $150,000) (19) SR 3103, North Creek Road over West Branch of White Clay Creek, London Britain Township, 900,000 (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000)
101 824 LAWS OF PENNSYLVANIA Act (20) SR 2006, Pine Grove Covered Bridge over Octoraro Creek, Lower Oxford Township, Bridge Rehabilitation (Base Construction Allocation $600,000) (Land Allocation $33,000) (Design and Contingencies $200,000) (21) SR 3016 over Street Road and Leach Run, Lower Oxford Township, Bridge Rehabilitation (Base Construction Allocation $100,000) (Design and Contingencies $5,000) (22) SR 3004 over Middle Branch of White Clay Creek, New London Township, Bridge (Base Construction Allocation $550,000) (Design and Contingencies $120,000) (23) SR 0422 over Road, North Coventry Township, (Base Construction Allocation $920,000) (Design and Contingencies $70,000) (24) SR 3073 over Railway, City of Coatesville, Bridge Rehabilitation (Base Construction Allocation $283,000) (Land Allocation $100,000) (Design and Contingencies $37,000) (25) SR 3100, Pottstown Pike over US 322, West Goshen Township, Removal of One Damaged Steel Fascia Beam and Several Secondary Steel Diaphragm Members (Base Construction Allocation $600,000) (26) New Bridge connecting SR 2020, Boot Road to SR 3053, Viaduct Avenue over the Brandywine Creek, Downingtown Borough, New Bridge Construction (Base Construction Allocation $2,000,000) (Design and Contingencies $500,000) (27) SR 0082, over Unnamed Tributary, Elverson Borough, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (28) SR 0041 over Knights Run, West Fallowfield (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000) 833, , ,000 1,000, , ,000 2,500,000 1,000,000 76,000
102 SESSION OF 2006 Act (29) SR 0322 over West Branch of Brandywine Creek, Honeybrook Township, Bridge (Base Construction Allocation $82,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (30) SR 1023 over Pickering Creek, East Pikeland (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (31) SR 3062 over Broad Run, West Bradford (Base Construction Allocation $61,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (32) SR 3100 over Plum Creek, Birmingham (Base Construction Allocation $36,000) (Design and Contingencies $10,000) (33) SR 4100 over Rock Run, City of Coatesville, (Base Construction Allocation $41,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (34) Upper Uwchian Township, PA Turnpike over PA 100, (Base Construction Allocation $5,000,000) (Land Allocation $200,000) (Design and Contingencies $500,000) (35) Atglen Township, PA 372 over Officers Run, (Base Construction Allocation $1,000,000) (Land Allocation $20,000) (Design and Contingencies $180,000) (36) Downingtown, US 322 over Amtrak, Bridge (Base Construction Allocation $10,000,000) (Design and Contingencies $1,000,000) (37) Newlin Township, Green Valley Road over Brandywine, (Base Construction Allocation $345,000) (Land Allocation $40,000) , ,000 97,000 56,000 65,000 5,700,000 1,200,000 11,050, ,000
103 826 Act LAWS OF PENNSYLVANIA (Design and Contingencies $20,000) (38) East Brandywine Township, East Reeceville Road over Beaver Creek, (Base Construction Allocation $600,000) (Design and Contingencies $375,000) (39) West Fallowfield Township, PA 41 over Knight Run, (Base Construction Allocation $1,000,000) (Design and Contingencies $320,000) (40) West Whiteland Township, Lancaster Pike over Branch of Valley Creek, (Base Construction Allocation $1,000,000) (Land Allocation $500,000) (Design and Contingencies $100,000) (41) West Vincent Township, PA 401 at St. Matthews Road over Pine Creek, Bridge (Base Construction Allocation $600,000) (Land Allocation $100,000) (Design and Contingencies $70,000) (42) SR 926 over Brandywine River, Bridge (Base Construction Allocation $4,500,000) (Land Allocation $150,000) (Design and Contingencies $1,100,000) (43) SR 2005, (Base Construction Allocation $1,000,000) (Land Allocation $100,000) (Design and Contingencies $700,000) (44) SR 0052, (Base Construction Allocation $400,000) (45) SR 2020 over AMTRAK, Downingtown Borough, (Base Construction Allocation $272,000) (Land Allocation $82,000) (Design and Contingencies $82,000) Section 20. Clarion County. (a) Local Bridges (1) Farmington Township, T619, Moore Drive over Toby Creek, (Base Construction Allocation $460,000) (Design and Contingencies $115,000) 1,025,000 1,370,000 1,600, ,000 5,750,000 1,800, , , ,000
104 SESSION OF 2006 Act (2) Farmington Township, T619 over Toby Creek, (Base Construction Allocation $400,000) (Design and Contingencies $90,000) (3) Limestone Township, T444 over Little Piney Creek, (Base Construction Allocation $450,000) (Design and Contingencies $180,000) (4) Limestone Township, T685 over Piney Creek, (Base Construction Allocation $1,000,000) (5) Madison Township, T460, Montgomery Road Bridge over Turkey Run, (Base Construction Allocation $400,000) (Design and Contingencies $90,000) (6) Licking Township, T341 over Cherry Run, (Base Construction Allocation $750,000) (Land Allocation $20,000) (Design and Contingencies $190,000) (7) Highland and Clarion Townships, T572 over Clarion River, (Base Construction Allocation $4,080,000) (8) Salem Township, Beaver Creek Bridge, Bridge (Base Construction Allocation $120,000) (Land Allocation $12,000) (Design and Contingencies $24,000) (b) State Bridges (1) SR 1011, Stratteñ Run Bridge, Clarion (Base Construction Allocation $40,000) (Land Allocation $4,000) (Design and Contingencies $8,000) (2) SR 0861, South Leatherwood Bridge, Porter (Base Construction Allocation $140,000) (Land Allocation $14,000) (Design and Contingencies $28,000) (3) SR 0536, Mayport Bridge, Redbank Township, (Base Construction Allocation $872,000) , ,000 1,000, , ,000 4,080, ,000 52, ,000 1,134,000
105 828 Act LAWS OF PENNSYLVANIA (Land Allocation $87,000) (Design and Contingencies $174,000) (4) SR 2009, Lawsonham Bridge No.1, Madison (Base Constructioii Allocation $668,000) (Land Allocation $67,000) (Design and Contingencies $134,000) (5) SR 4001, Groce Hill Bridge, Beaver Township, Bridge Restoration (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (6) SR 0080, Potter Road Bridge, Beaver Township, Bridge Restoration (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (7) SR 0028, Hawthorn Bridge No.4, Redbank (Base Construction Allocation $180,000) (Land Allocation $15,000) (Design and Contingencies $40,000) (8) T424, Bryner s Mill Bridge, Clarion, Bridge (Base Construction Allocation $186,000) (Land Allocation $3,000) (Design and Contingencies $56,000) (9) T619, Moore Drive Bridge, Farmington (Base Construction Allocation $186,000) (Land Allocation $8,000) (Design and Contingencies $45,000) (10) SR 0208 over Beaver Creek, Salem Township, (Base Construction Allocation $59,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (1!) SR 1001 over Mill Creek, Clarion Township, (Base Construction Allocation $125,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (12) SR 2001 over Little Piney Creek, Limestone (Base Construction Allocation $107,000) 869,000 78,000 78, , , ,000 95, , ,000
106 SESSION OF 2006 Act (Land Allocation $32,000) (Design and Contingencies $32,000) (13) SR 2007 over South Branch of Licking Creek, Clarion (Base Construction Allocation $125,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (14) SR 0066, Piney Creek Bridge, Limestone (Base Construction Allocation $379,000) (Land Allocation $114,000) (Design and Contingencies $114,000) (15) SR 0066, McGregor Road Bridge over Lower Piney, Limestone (Base Construction Allocation $273,000) (Land Allocation $82,000) (Design and Contingencies $82,000) (16) SR 0068, Reidsburg No.2 Bridge over Aban Railroad, Monroe (Base Construction Allocation $164,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (17) SR 2007, Piney No.3 over Deer Creek, Beaver (Base Construction Allocation $658,000) (Land Allocation $197,000) (Design and Contingencies $197,000) (18) SR 2007, Locker Road Bridge over South Branch of Licking Creek, Porter Township, (Base Construction Allocation $66,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (19) SR 3016, Piney Dam Road Bridge, Piney (Base Construction Allocation $332,000) (Land Allocation $100,000) (Design and Contingencies $100,000) Section 21. Clearfield County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0879 over Bilger Run, Pike Township, Box Culvert (Base Construction Allocation $500,000) (Land Allocation $100,000) , , , ,000 1,052, , , ,000
107 830 LAWS OF PENNSYLVANIA Act (Design and Contingencies $100,000) (2) SR 3011 over Bell Run, Penn Township, Box Culvert (Base Construction Allocation $800,000) (Land Allocation $100,000) (Design and Contingencies $675,000) (3) SR 4006 over East Branch Creek, Brady Township, Box Culvert (Base Construction Allocation $170,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (4) SR 0036, Bridge over Bear Run, Bell (Base Construction Allocation $1,250,000) (Land Allocation $90,000) (Design and Contingencies $675,000) (5) SR 0729 over Muddy Run, Beccaria Township, (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $90,000) (6) SR 0053 over Emigh Run, Morris Township, (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (7) SR 0053 over Laurel Run, Morris Township, (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (8) SR 0830 over Wolf Run, Sandy Townshiii, (Base Construction Allocation $160,000) (Land Allocation $48,000) (Design and Contingencies $48,000) (9) SR 0879 over Surveyor Run, Goshen Township, (Base Construction Allocation $250,000) (Land Allocation $75,000) (Design and Contingencies $75,000) (10) SR 0879 over Trout Run, Goshen Township, (Base Construction Allocation $320,000) (Land Allocation $96,000) 1,575, ,000 2,015, ,000 64, , , , ,000
108 SESSION OF 2006 Act (Design and Contingencies $96,000) (11) SR 2017 over Coal Run, Decatur Township, (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (12) SR 2035 over Tributary of Moshannon Creek, Morris (Base Construction Allocation $130,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (13) SR 2012 over Watts Run, Ferguson Township, (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (14) SR 2037 over Tributary of Sulphur Run, Cooper (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (15) SR 3001 over Chest Creek, Bell Township, (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $100,000) Section 22. Clinton County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 2019 over Laurel Run, City of Lock Haven, Bald Eagle (Base Construction Allocation $150,000) (Design and Contingencies $86,000) (2) SR 2022 over Bitner Run, Beech Creek Township, Box Culvert (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $50,000) (3) SR 2012 over Love Run, Wayne Township, Box Culvert (Base Construction Allocation $150,000) (Design and Contingencies $50,000) , ,000 64, , , , , ,000
109 832 Act LAWS OF PENNSYLVANIA (4) SR 0080, 180 Bridge Parapets, Greene, Lamar and Porter Townships, Bridge Rehabilitation (Base Construction Allocation $4,000,000) (Design and Contingencies $20,000) (5) SR 0120, Bridge over Tangascootac Creek, Colebrook (Base Construction Allocation $150,000) (Design and Contingencies $60,000) (6) SR 4002, Bridge over Sinnemahoning Creek, East Keating (Base Construction Allocation $150,000) (Design and Contingencies $60,000) (7) SR 0064 over Cedar Run, Lamar Township, (Base Construction Allocation $170,000) (Land Allocation $51,000) (Design and Contingencies $51,000) (8) SR 0880 over Fishing Creek, Logan Township, (Base Construction Allocation $200,000) (Land Allocation $60,000) (Design and Contingencies $60,000) (9) SR 1008 over Big Plum Run, Dunnstable (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (10) SR 2012 over McElhattan Creek, Wayne (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (11) SR 2012 over McElhattan Creek, Wayne (Base Construction Allocation $84,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (12) SR 4001 over Kettle Creek, Leidy Township, (Base Construction Allocation $250,000) (Land Allocation $75,000) (Design and Contingencies $75,000) 4,020, , , , ,000 80,000 96, , ,000
110 Act SESSION OF 2006 (13) SR 4002 over Smnnemahoning Creek, East Keating (Base Construction Allocation $500,000) (Land Allocation $150,000) (Design and Contingencies $150,000) (14) SR 0120 over Tangascootac Creek, Colebrook (Base Construction Allocation $202,000) (Land Allocation $61,000) (Design and Contingencies $61,000) (15) SR 4005 over Young Womans Creek, Chapman (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (16) SR 4005 over Young Womans Creek, Chapman (Base Construction Allocation $105,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (17) SR 2008, Lamar Township, Bridge (Base Construction Allocation $800,000) (Design and Contingencies $100,000) (18) SR 4001 over Kettle Creek, Noyes Township, (Base Construction Allocation $1,200,000) (Design and Contingencies $100,000) (19) SR 2019 over Laurel Run, Bald Eagle (Base Construction Allocation $950,000) (Land Allocation $30,000) (Design and Contingencies $580,000) (20) SR 0120 over Mill Run, East Keating (Base Construction Allocation $500,000) (Design and Contingencies $100,000) Section 23. Columbia County. (a) Local Bridges (Reserved) (b) State Bridges , , , , ,000 1,350,000 1,560, ,000
111 834 Act LAWS OF PENNSYLVANIA (1) SR 0239, 3.5 Miles Northwest of Benton over West Creek, Sugarloaf Township, Bridge (Base Construction Allocation $302,000) (Land Allocation $24,000) (Design and Contingencies $160,000) (2) SR 2020, 1 Mile West of Mifflinville over Ten Mile Run, Mifflin (Base Construction Allocation $128,000) (Land Allocation $24,000) (Design and Contingencies $120,000) (3) SR 3008, 0.5 Mile South of Fisherdale over Mugser Run, Cleveland Township, Bridge (Base Construction Allocation $265,000) (Land Allocation $24,000) (Design and Contingencies $120,000) (4) SR 4033, 1.5 Miles Northeast of Sereno over Little Fishing Creek, Greenwood and Pine Townships, (Base Construction Allocation $339,000) (Land Allocation $24,000) (Design and Contingencies $120,000) (5) SR 8006, Ramp West over SR 0011, South Centre (Base Construction Allocation $200,000) (Land Allocation $12,000) (Design and Contingencies $40,000) (6) SR 0080, Susquehanna River Bridge, Mifflinville, Mifflin and South Centre Townships, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) (7) SR 0011, Briar Creek Bridge, Briar Creek Borough, (Base Construction Allocation $180,000) (Land Allocation $12,000) (Design and Contingencies $60,000) (8) SR 1003 over Branch of Briar Creek, North Centre (Base Construction Allocation $68,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (9) SR 1008 over North Branch of Briar Creek, 486, , , , ,000 1,050, , ,000
112 Act SESSION OF 2006 North Centre (Base Construction Allocation $42,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (10) SR 2001 over Tributary of Roaring Creek, Locust (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (11) SR 4008 over Fishing Creek, Scott Township, (Base Construction Allocation $440,000) (Land Allocation $132,000) (Design and Contingencies $132,000) (12) SR 4015 over Fishing Creek, Mt. Pleasant (Base Construction Allocation $174,000) (Land Allocation $52,000) (Design and Contingencies $52,000) (13) SR 4031 over Branch of Little Fishing Creek, Jackson (Base Construction Allocation $24,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (14) SR 4031 over Little Fishing Creek, Jackson (Base Construction Allocation $32,000) (Design and Contingencies $10,000) (15) SR 0487 over Roaring Creek, Franklin (Base Construction Allocation $175,000) (Land Allocation $53,000) (Design and Contingencies $53,000) (16) SR 4049 over West Branch of Fishing Creek, Sugarloaf (Base Construction Allocation $420,000) (Land Allocation $126,000) (Design and Contingencies $126,000) Section 24. Crawford County. (a) Local Bridges (1) Athens Township, Hamilton Road over Federal Run, (Base Construction Allocation $800,000) (Land Allocation $5,000) , , , ,000 38,000 52, , , ,000
113 836 LAWS OF PENNSYLVANIA Act (Design and Contingencies $150,000) (2) City of Meadville, Grove Street over Mill Run, (Base Construction Allocation $405,000) (Land Allocation $35,000) (Design and Contingencies $60,000) (3) Union Township, T532, Mount Pleasant Road over Tributary of French Creek, Bridge (Base Construction Allocation $150,000) (Design and Contingencies $27,000) (4) Union Township, T369, Towpath Road over Tributary of Conneaut Outlet, Bridge (Base Construction Allocation $150,000) (Design and Contingencies $27,000) (5) Beaver Township, Spring Road, T368 over Stone Run, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (6) Sparta Township, T922, Hatchtown Road over Five Mile Creek, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (7) Wayne Township, T768, Sugar Lake Road over Lake Creek, (Base Construction Allocation $775,000) (Design and Contingencies $175,000) (8) Venango Township, T634, Drake Mill Road over Torry Run, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (9) Venango Township, T807, Kightlinger Road over Coulter Run, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (10) Union Township, T413, Hamil Road over Norfolk Southern Railway Company s Salamacca and Galion Main Line, (Base Construction Allocation $595,000) 500, , , , , , , , ,000
114 SESSION OF 2006 Act (Land Allocation $5,000) (Design and Contingencies $150,000) (11) Sparta Township, T878, Britton Run Road over Britton Run, (Base Construction Allocation $475,000) (Design and Contingencies $150,000) (12) Oil Creek Township, T928, Duncan Road over Pine Creek, (Base Construction Allocation $595,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (13) East Fairfield Township, T399, Stitzetville Road over Little Sugar Creek, Bridge (Base Construction Allocation $545,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (14) Conneaut Township, T605, West Road over Linesville Creek, (Base Construction Allocation $500,000) (Land Allocation $5,000) (Design and Contingencies $125,000) (15) Conneaut Township, T609, Wheeler Road over Linesville Creek, (Base Construction Allocation $500,000) (Land Allocation $5,000) (Design and Contingencies $125,000) (16) Conneaut Township, T346, Russell Road over Linesville Creek, (Base Construction Allocation $560,000) (Land Allocation $5,000) (Design and Contingencies $125,000) (17) Athens Township, T789, Athens Road over Federal Run, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (18) Conneaut Township, T360 over East Branch of Conneaut Creek, (Base Construction Allocation $570,000) (19) Beaver Township, T835, Parker Road over Conneaut Creek, (Base Construction Allocation $300,000) , , , , , , , ,000 2,350,000
115 838 Act LAWS OF PENNSYLVANIA (Design and Contingencies $2,000,000) (20) Beaver Township, T867, Philadelphia Road over Middle Branch of Conneaut Creek, Bridge (Base Construction Allocation $350,000) (Design and Contingencies $200,000) (21) Beaver Township, T883, Joiner Road over Middle Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $250,000) (22) Beaver Township, T883, Joiner Road over East Branch of Conneaut Creek, (Base Construction Allocation $350,000) (Design and Contingencies $200,000) (23) Beaver Township, T867, Philadelphia Road over East Branch of Conneaut Creek, Bridge (Base Construction Allocation $300,000) (Design and Contingencies $200,000) (24) Beaver Township, T300, Stone Run over Branch ofconneaut Creek, (Base Construction Allocation $500,000) (Design and Contingencies $200,000) (25) Beaver Township, T835, Parker Road over East Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $250,000) (26) Beaver Township, T799, Artrnan Road over East Branch of Conneaut Creek, Bridge (Base Construction Allocation $250,000) (Design and Contingencies $200,000) (27) Beaver Township, T799, Artman Road over Middle Branch of Conneaut Creek, Bridge (Base Construction Allocation $250,000) 600, , , , , , , ,000
116 SESSION OF 2006 Act (Design and Contingencies $200,000) (28) Beaver Township, T799, Artman Road over West Branch of Conneaut Creek, Bridge (Base Construction Allocation $250,000) (Design and Contingencies $200,000) (29) Beaver Township, T837, Lockwood Road over Middle Branch of Conneaut Creek, Bridge (Base Construction Allocation $250,000) (Design and Contingencies $200,000) (30) Beaver Township, T900, Nelson Driveway over East Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $200,000) (31) Athens Township, T709 over Muddy Creek, Bridge Rehabilitation (Base Construction Allocation $550,000) (Design and Contingencies $100,000) (32) Athens Township, T765 over Federal Run, Bridge Rehabilitation (Base Construction Allocation $90,000) (Land Allocation $5,000) (Design and Contingencies $20,000) (33) Athens Township, T765 over Federal Run, Bridge Rehabilitation (Base Construction Allocation $550,000) (Design and Contingencies $100,000) (34) Athens Township, T300 over Tributary of Muddy Creek, Bridge Rehabilitation (Base Construction Allocation $23,000) (35) Athens Township, T789 over Federal Run, Bridge Rehabilitation (Base Construction Allocation $79,000) (36) Athens Township, T794, Bridge Rehabilitation (Base Construction Allocation $58,000) (37) Athens Township, T828 over Muddy Creek, , , , , , ,000 23,000 79,000 58,000
117 840 Act LAWS OF PENNSYLVANIA Bridge Rehabilitation (Base Construction Allocation $52,000) (b) State Bridges (1) T488, Hollis Road over Watson Run, Vernon (Base Construction Allocation $665,000) (Design and Contingencies $150,000) (2) South Townline Road over Tributary of Shenango River, Pine Township, Bridge (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (3) T355, Rock Creek Road over Rock Creek, Greenwood (Base Construction Allocation $460,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (4) T3 15, Mattocks Road over Tributary of Sandy Creek, Greenwood Township, Bridge (Base Construction Allocation $600,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (5) T526, Middle Road over Tributary of Cussewago Creek, Cussewago Township, Bridge (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (6) T609, Agnew Road over Inlet Run, Summit (Base Construction Allocation $350,000) (Design and Contingencies $150,000) (7) T883, Joiner Road over East Branch Conneaut Creek, Beaver (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (8) North Main Street over Tributary of Conneaut Creek, Springboro Borough, (Base Construction Allocation $650,000) 52, , , , , , , , ,000
118 Act SESSION OF 2006 (Design and Contingencies $150,000) (9) Beaver Street over Conneaut Creek, Springboro Borough, (Base Construction Allocation $650,000) (Design and Contingencies $150,000) (10) Beaver Street over Crazy Run Creek, Springboro Borough, (Base Construction Allocation $400,000) (Land Allocation $5,000) (Design and Contingencies $150,000) (11) SR 1002 over Dry Run, Woodcock Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (12) SR 0198 over Babe Run, Hayfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (13) SR 4010 over Stone Run Branch, Beaver (Base Construction Allocation $70,000) (Design and Contingencies $30,000) (14) SR 4008 over East Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (15) SR 4010 over Crazy Run, Springboro Borough, (Base Construction Allocation $70,000) (Design and Contingencies $30,000) (16) SR 0027 over Tributary No.1 of Lake Creek, Randolph Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (17) SR 0027 over Tributary of Oil Creek, Oil Creek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) , , , , , , , , ,000
119 842 Act LAWS OF PENNSYLVANIA (Design and Contingencies $30,000) (18) SR 1024 over Tributary of Oil Creek, Bloomfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (19) SR 3019 over Little Sandy Creek, Greenwood Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (20) SR 0006 over Bennehoof Creek, West Mead Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (21) SR 1016 over Little Federal Run, Bloomfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (22) SR 0089 over Church Run, City of Titusville, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (23) SR 2007 over Mud Run, East Fairfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (24) SR 0006 over Van Home Creek, Vernon Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (25) SR 0285 over Adsit Run, Sadsbury Township, Bridge Rehabilitation (Base Construction Allocation $100,000) (Design and Contingencies $30,000) (26) SR 2012 over Hunter Run, East Mead Township, Bridge Rehabilitation (Base Construction Allocation $100,000) 120, , , , , , , , ,000
120 SESSION OF 2006 Act (Design and Contingencies $30,000) (27) SR 1019 over Coulter Run, Venango Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $30,000) (28) SR 1019 over Boles Run, Venango Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $40,000) (29) SR 3023, Watson Run Bridge No.2, Vernon Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $30,000) (30) SR 2005 over Conneaut Creek, Union Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Design and Contingencies $10,000) (31) SR 0079 over SR 0198 Southbound, Hayfield Township, Bridge Rehabilitation (Base Construction Allocation $240,000) (Design and Contingencies $10,000) (32) SR 4004 over Summit Run, Conneaut Township, Bridge Rehabilitation (Base Construction Allocation $60,000) (Design and Contingencies $30,000) (33) SR 0408 over Branch of French Creek, Rockdale Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (34) SR 3015 over Tributary of Conneaut Creek, East Fallowfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (35) SR 0006 over Van Home Creek, Vernon (Base Construction Allocation $400,000) , , , , , , , , ,000
121 844 Act LAWS OF PENNSYLVANIA (Design and Contingencies $150,000) (36) SR 0006 over Mill Creek, Meadville, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (37) SR 0006 over Bennehoof Creek, West Mead (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (38) SR 0006 over Tributary No.2 of French Creek, Cambridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (39) SR 0006 over Tributary No.4 of French Creek, Cambridge Springs Borough, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (40) SR 0006 over Tributary No.5 of French Creek, Cambridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (41) SR 0018 over Tributary No.! of Crooked Creek, West Fallowfield Township, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (42) SR 0018 over Tributary No.2 of Crooked Creek, West Fallowfield Township, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (43) SR 0018 over Inlet Creek, Summit Township, (Base Construction Allocation $500,000) (Design and Contingencies $110,000) (44) SR 0027 over Tributary No. I of Lake Creek, 600, , , , , , , ,000
122 SESSION OF 2006 Act Randolph (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (45) SR 0027 over Oil Creek Tributary, Oil Creek (Base Construction Allocation $400,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (46) SR 0079 Northbound over SR 0198, Hayfield (Base Construction Allocation $1,200,000) (Design and Contingencies $50,000) (47) SR 0079 Southbound over SR 0198, Hayfield (Base Construction Allocation $1,300,000) (Design and Contingencies $50,000) (48) SR 0079 Northbound over Center Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) (49) SR 0079 Southbound over Center Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) (50) SR 0079 Northbound over Hecker Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $150,000) (51) SR 0079 Southbound over Hecker Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $150,000) (52) SR 0079 Northbound over Irish Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) , ,000 1,300,000 1,400,000 1,100,000 1,100,000 1,200,000 1,200,000. 1,100,000
123 846 LAWS OF PENNSYLVANIA Act (53) SR 0079 Southbound over Irish Road, Cussewago (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) (54) SR 0089 over Church Run, Titusville, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (55) Foster Road Bridge, Summerhill Township, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (56) SR 0198 over Babe Run, Hayfield Township, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (57) SR 0198 over Kerns Run, Hayfield, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (58) SR 0285 over Adsit Run, Sadsbury Township, (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (59) SR 0322 over Tributary of Crooked Creek, West Fallowfield (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (60) SR 0408 over Branch of French Creek, Rockdale (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (61) SR 0408 over Tributary of Dead Creek, Rockdale (Base Construction Allocation $400,000) (Design and Contingencies $150,000) 1,100, , , , , , , , ,000
124 SESSION OF 2006 Act (62) SR 0408 over Tributary No.! of Dead Creek, Rockdale, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (63) SR 0408 over Tributary No.2 of Dead Creek, Richmond (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (64) SR 1002 over Dry Run, Woodcock Township, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (65) SR 1002 over Tributary of Pmnney Run, Richmond, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (66) SR 1013 over Thompson Run, Oil Creek (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (67) SR 1016 over Little Federal Run, Bloomfield (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (68) SR 1019 over Coulter Run, Venango Township, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (69) SR 1019 over Boles Run, Venango Township, (Base Construction Allocation $450,000) (Design and Contingencies $150,000) (70) SR 1022 over East Branch Oil Creek, Centerville Borough, (Base Construction Allocation $1,200,000) (Land Allocation $100,000) (Design and Contingencies $1,000) , , , , , , , ,000 1,301,000
125 848 LAWS OF PENNSYLVANIA Act (71) SR 1024 over Tributary of Oil Creek, Bloomfield (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (72) SR 1041 over East Branch Oil Creek, Rome (Base Construction Allocation $550,000) (Design and Contingencies $50,000) (73) SR 2005 over Conneaut Creek, Union (Base Construction Allocation $1,000,000) (Design and Contingencies $50,000) (74) SR 2007 over Mud Run, East Fairfield (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (75) SR 2007 over Thurston Run, West Mead (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (76) SR 2012 over Hunter Run, East Mead Township, (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (77) SR 2034 over SR 0079, Hayfield Township, (Base Construction Allocation $3,300,000) (Land Allocation $100,000) (Design and Contingencies $900,000) (78) SR 3005 over Bennetts Run Tributary, North Shenango (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (79) SR 3015 over Tributary of Conneaut Creek, East Fallowfield (Base Construction Allocation $400,000) (Design and Contingencies $150,000) 600, ,000 1,100, , , ,000 4,300, , ,000
126 SESSION OF 2006 Act (80) SR 3019 over Unnamed Creek, Greenwood (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (81) SR 4003 over Chestnut Creek, Conneaut (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (82) SR 4003 over Foster Run, Summerhill (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (83) SR 4004 over Summit Run, Conneaut Townshi~, (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (84) SR 4008 over East Branch Conneaut Creek, Beaver (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (85) SR 4010 over Stone Run, Beaver, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (86) SR 4010 over Tributary of Stone Run, Beaver, (Base Construction Allocation $350,000) (Design and Contingencies $150,000) (87) SR 4010 over Crazy Run, Springboro Borough, (Base Construction Allocation $350,000) (Design and Contingencies $150,000) (88) SR 0006 over Western New York and Pennsylvania Railroad, Woodcock Township, (Base Construction Allocation $150,000) (Land Allocation $45,000) , , , , , , , , ,000
127 850 Act LAWS OF PENNSYLVANIA (Design and Contingencies $45,000) (89) SR 0018 over Tributary of Conneaut Creek, Summerhill (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (90) SR 0077 over Tributary of Muddy Creek, Athens (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (9!) SR 0089 over Church Run, Oil Creek (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (92) SR 1020 over Clarks Run, Townville Borough, (Base Construction Allocation $70,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (93) SR 2005 over Conneaut Creek, Union (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (94) SR 2031 over Thompson Run, Oil Creek (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (95) SR 4008 over Conneaut Creek, Spring (Base Construction Allocation $160,000) (Land Allocation $48,000) (Design and Contingencies $48,000) (96) SR 4010 over Conneaut Creek, Springboro Borough, (Base Construction Allocation $140,000) (Land Allocation $42,000) (Design and Contingencies $42,000) Section 25. Cumberland County. (a) Local Bridges (1) Hopewell Township, SR 0641 over Conodo 128, ,000 64, , , , , ,000
128 SESSION OF 2006 Act guinet Creek, (Base Construction Allocation $2,060,000) (Land Allocation $100,000) (Design and Contingencies $500,000) (2) Middlesex Township, Wolf Bridge Road, Bridge (Base Construction Allocation $1,998,000) (Design and Contingencies $353,000) (3) North Newton Township and West Pennsboro Township, Nealy Road, (Base Construction Allocation $133,000) (Design and Contingencies $50,000) (b) State Bridges (1) TR641, Hopewell Township, Bridge over Conodoguinet Creek, (Base Construction Allocation $2,060,000) (Land Allocation $100,000) (Design and Contingencies $500,000) (2) SR 3007 over Big Spring Run, West Pennsboro (Base Construction Allocation $460,000) (Design and Contingencies $500,000) (3) SR 0174 over Exit 29 of 181, Southampton Township, Bridge Rehabilitation (Base Construction Allocation $10,000,000) (Design and Contingencies $1,000,000) (4) SR 0233, Pine Grove Road over Mountain Creek, Cooke (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (5) SR 0011, Ritner Highway over Alexander Spring Creek, Dickinson and West Pennsboro Townships, (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (6) SR 0174, Walnut Bottom Road over Yellow Breeches Creek, Penn and North Newton Townships, (Base Construction Allocation $100,000) (Design and Contingencies $130,000) 851 2,660,000 2,351, ,000 2,660, ,000 11,000, , , ,000
129 852 Act LAWS OF PENNSYLVANIA (7) SR 2004, Market Street over Yellow Breeches Creek, Upper Allen Township, Bridge Rehabilitation (Base Construction Allocation $140,000) (Design and Contingencies $90,000) (8) SR 4007, Mountain Road over Conodoguinet Creek, North Newton and Upper Mifflin Townships, (Base Construction Allocation $260,000) (Design and Contingencies $90,000) (9) SR 0997, Roxbury Road over Doubling Gap Creek, Lower Mifflin Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (10) SR 3019, Montsera Road over Yellow Breeches Creek, Dickinson (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (11) SR 3017, Lebo Road over Yellow Breeches Creek, Penn (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (12) SR 064!, Green Springs Road over Bulls Head Creek, North Newton Township, Bridge (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (13) SR 064!, Green Springs Road over Green Springs Creek, North Newton Township, Bridge (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (14) SR 3006, Pine Road over Beetem Hollow Road, Penn (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) 230, , , , , , , ,000
130 SESSION OF 2006 Act (15) SR 0233, Centerville Road over Beetem Hollow Run, Penn (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (16) SR 0233, Pine Grove Road over Mountain Creek, Cooke (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (17) US 11, Ritner Highway over Alexander Spring Creek, Dickinson and West Pennsboro Townships, (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (18) SR 0174, Walnut Bottom Road over Yellow Breeches Creek, Penn and North Newton Townships, (Base Construction Allocation $100,000) (Design and Contingencies $130,000) (19) SR 2004, Market Street over Yellow Breeches Creek, Upper Allen Township, Bridge Rehabilitation (Base Construction Allocation $140,000) (Design and Contingencies $90,000) (20) SR 4007, Mountain Road over Conodoguinet Creek, North Newton and Upper Mifflin Townships, (Base Construction Allocation $260,000) (Design and Contingencies $90,000) (21) SR 0997, Roxbury Road over Doubling Gap Creek, Lower Mifflin Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (22) SR 3019, Montsera Road over Yellow Breeches Creek, Dickinson (Base Construction Allocation $100,000) (Design and Contingencies $90,000) , , , , , , , ,000
131 854 LAWS OF PENNSYLVANIA Act (23) SR 3017, Lebo Road over Yellow Breeches Creek, Penn (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (24) SR 0641, Green Springs Road over Bulls Head Creek, North Newton Township, Bridge (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (25) SR 3006, Pine Road over Beetem Hollow Run, Penn (Base Construction Allocation $100,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (26) SR 0944 over Locust Creek, Lower Frankford (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (27) SR 0997 over Tributary of Three Square Hollow Run, Upper Mifflin Township, Bridge (Base Construction Allocation $24,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (28) SR 2008 over Tributary of Yellow Breeches Creek, Monroe (Base Construction Allocation $34,000) (Design and Contingencies $10,000) (29) SR 2019 over Yellow Breeches Creek, Lower Allen (Base Construction Allocation $199,000) (Land Allocation $60,000) (Design and Contingencies $60,000) (30) SR 2031 over Cedar Creek, Lower Allen (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (3!) SR 3006 over Spruce Run, Dickinson (Base Construction Allocation $52,000) 240, , ,000 80,000 38,000 54, ,000 85,000 84,000
132 SESSION OF 2006 Act (Land Allocation $16,000) (Design and Contingencies $16,000) Section 26. Dauphin County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 2017, Manada Bottom Road over Manada Creek, East Hanover Township, Bridge (Base Construction Allocation $150,000) (Design and Contingencies $90,000) (2) SR 3018, Herr Street over Paxton Street, City of Harrisburg, (Base Construction Allocation $150,000) (Land Allocation $15,000) (Design and Contingencies $130,000) (3) SR 2017, Manada Bottom Road over Manada Creek, East Hanover Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (4) SR 2011, Bachmanville Road over Branch of Spring Creek, Derry Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (5) SR 0230, Harrisburg Pike over Swatara Creek, Londonderry Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $20,000) (Design and contingencies $80,000) (6) SR 3009, Paxton Street over Norfolk Southern Railroad, City of Harrisburg, (Base Construction Allocation $880,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (7) SR 3022, McClay Street over Norfolk Southern Railroad, City of Harrisburg, (Base Construction Allocation $1,800,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (8) SR 4013, Powells Valley Road over Rattling , , , , ,000 1,050,000 1,970,000
133 856 LAWS OF PENNSYLVANIA Act Creek, Jackson (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (9) SR 0944, Clarks Valley Road over Clark s Creek, Middle Paxton Township, Bridge (Base Construction Allocation $160,000) (Design and Contingencies $90,000) (10) SR 2017, Manada Bottom Road over Manada Creek, East Hanover Township, Bridge (Base Construction Allocation $150,000) (Design and Contingencies $90,000) (11) SR 3018, Herr Street over Paxton Creek, City ofharrisburg, (Base Construction Allocation $150,000) (Land Allocation $15,000) (Design and Contingencies $130,000) (12) SR 0230, Harrisburg Pike over Swatara Creek, Londonderry Township and Middletown Borough, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (13) SR 3009, Paxton Street over Norfolk Southern Railroad, City of Harrisburg, (Base Construction Allocation $880,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (14) SR 3022, McClay Street over Norfolk Southern Railroad, City of Harrisburg, (Base Construction Allocation $1,800,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (15) SR 4013, Powells Valley Road over Rattling Creek, Jackson (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (16) SR 0944, Clarks Valley Road over Clark s Creek, Middle Paxton Township, Bridge 200, , , , ,000 1,050,000 1,970, ,000
134 SESSION OF 2006 Act (Base Construction Allocation $160,000) (Design and Contingencies $90,000) (17) SR 3012, Mulberry Street Bridge, City of Harrisburg, Bridge Rehabilitation (Base Construction Allocation $180,000) (Land Allocation $25,000) (Design and Contingencies $250,000) (18) SR 2029, 181 Bridge PM Group, East Hanover, West Hanover and Lower Paxton Townships, Bridge Rehabilitation (Base Construction Allocation $852,000) (Design and Contingencies $80,000) (19) SR 0209 over Wiconisco Creek, Lykens Borough, (Base Construction Allocation $196,000) (Land Allocation $59,000) (Design and Contingencies $59,000) (20) SR 0230 over Spring Creek, City of Harrisburg, (Base Construction Allocation $84,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (21) SR 1007 over Wiconisco Creek, Washington (Base Construction Allocation $312,000) (Land Allocation $93,000) (Design and Contingencies $93,000) (22) SR 1013 over Pine Creek, Lykens Township, (Base Construction Allocation $196,000) (Land Allocation $59,000) (Design and Contingencies $59,000) (23) SR 2019 over Beaver Creek, South Hanover (Base Construction Allocation $125,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (24) SR 4001 over Armstrong Creek, Jackson (Base Construction Allocation $72,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (25) SR 4004 over Tributary of Armstrong Creek, , , , , , , , , ,000
135 858 Act LAWS OF PENNSYLVANIA Jackson (Base Construction Allocation $194,000) (Land Allocation $58,000) (Design and Contingencies $58,000) (26) SR 4009 over Little Wiconisco Creek, Upper Paxton (Base Construction Allocation $129,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (27) SR 4009 over Wiconisco Creek, Upper Paxton (Base Construction Allocation $246,000) (Land Allocation $73,000) (Design and Contingencies $73,000) (28) SR 4013 over Rattling Creek, Seg.0036, Lykens Borough, (Base Construction Allocation $131,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (29) SR 4013 over Rattling Creek, Seg.0034, Lykens Borough, (Base Construction Allocation $142,000) (Land Allocation $43,000) (Design and Contingencies $43,000) (30) SR 4013 over Rattling Creek, Jack~on (Base Construction Allocation $77,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (3!) SR 3024 over Tributary of Beaver Creek, Lower Paxton (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) Section 27. Delaware County. (a) Local Bridges (1) Glenolden Borough, Ashland Avenue over Amtrak, Bridge Rehabilitation (Base Construction Allocation $3,500,000) (Land Allocation $130,000) (Design and Contingencies $350,000) (2) Ridley Township, South Swarthmore Avenue over Stoney Creek, (Base Construction Allocation $167,000) (Design and Contingencies $15,000) 310, , , , , ,000 73,000 3,980, ,000
136 SESSION OF 2006 Act Glenolden Borough, Glenolden Avenue over Muckinipattis Creek, (Base Construction Allocation $415,000) (Land Allocation $25,000) (Design and Contingencies $41,000) (4) Media Borough, 3rd Street over Broomall Lake and Tributary of Ridley Creek, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (Design and Contingencies $200,000) (5) Middletown Township, Darlington Road over Rocky Run, Bridge Rehabilitation (Base Construction Allocation $84,000) (Design and Contingencies $60,000) (6) Middletown Township, Tl70, Wawa Station Road, Bridge No.24 over Chester Creek, Bridge Rehabilitation (Base Construction Allocation $700,000) (Design and Contingencies $450,000) (7) Media Borough, Third Street Bridge over Broomall Lake Dam, Bridge Rehabilitation (Base Construction Allocation $800,000) (Design and Contingencies $160,000) (8) Aston Township, Mount Alverno Road, Bridge No.9 over Chester Creek, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (Land Allocation $30,000) (Design and Contingencies $600,000) (9) Middletown Township, Indian Lane over SEPTA R 3 Line, (Base Construction Allocation $220,000) (Design and Contingencies $30,000) (10) Newtown Township, Gradyville Road, PA 252, Bishop Hollow Road, Culvert (Base Construction Allocation $240,000) (b) State Bridges (1) SR 0420 over Stoney Creek, Ridley Township, (Base Construction Allocation $3,300,000) (Land Allocation $100,000) (Design and Contingencies $400,000) (2) SR 1032 over Ithan Creek, Radnor Township, (Base Construction Allocation $50,000) 859 (3) 481,000 1,200, ,000 1,160, ,000 1,630, , ,000 3,800,000 80,000
137 860 LAWS OF PENNSYLVANIA Act (Land Allocation $15,000) (Design and Contingencies $15,000) (3) SR 4021 over West Branch of Chester Creek, Thornbuiy (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (4) SR 8031 over Relocated Crum Creek, Ridley (Base Construction Allocation $76,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (5) SR 3101 over Brandywine River, Bridge (Base Construction Allocation $6,000,000) (Land Allocation $250,000) (Design and Contingencies $650,000) (6) SR 0001, Baltimore Pike, (Base Construction Allocation $1,000,000) (Design and Contingencies $700,000) (7) SR 0001, Baltimore Pike over Sunny Brook Creek, (Base Construction Allocation $6,000,000) Section 28. Elk County. (a) Local Bridges (1) Horton Township, T52l, TParolari Road Bridge, (Base Construction Allocation $500,000) (Land Allocation $15,000). (Design and Contingencies $180,000) (2) Horton Township, T33 I, Boggy Run Bridge, (Base Construction Allocation $575,000) (Land Allocation $20,000) (Design and Contingencies $210,000) (3) Washington Township, T349, Conneauttee Road over Little Conneauttee Creek, Bridge (Base Construction Allocation $350,000) (Design and Contingencies $40,000) (4) Conneaut Township, T330, Porkey Road over West Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) 85, ,000 6,900,000 1,700,000 6,000, , , , ,000
138 SESSION OF 2006 Act (Design and Contingencies $60,000) (5) Horton Township, T33 1 over Little Horton Creek, (Base Construction Allocation $805,000) (6) Horton Township, T521 over Little Toby Creek, (Base Construction Allocation $695,000) (7) City of St. Marys, Ebrel Street over Iron Run, (Base Construction Allocation $350,000) (Design and Contingencies $365,000) (b) State Bridges (1) SR 3002 over Crow Run, Spring Creek Township, Box Culvert (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $70,000) Section 29. Erie County. (a) Local Bridges (1) North East Township, T743, West Law Road over Twelve Mile Creek, (Base Construction Allocation $450,000) (2) North East Township, Bort Road over Railroad, (Base Construction Allocation $1,000,000) (3) McKean Township, T661 over Tributary of Elk Creek, Reichart Road No.2, (Base Construction Allocation $515,000) (4) McKean Township, T450, Rick Road over Elk Creek, (Base Construction Allocation $1,650,000) (5) Springfield Township, T338, McKee Road over Cormeaut Creek, (Base Construction Allocation $600,000) (6) McKean Township, Old Route 99 over Lamson Run, (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (7) Washington Township, T349, Conneaut Road over Little Conneaut Creek, (Base Construction Allocation $350,000) , , , , ,000 1,000, ,000 1,650, , , ,000
139 862 LAWS OF PENNSYLVANIA Act (Design and Contingencies $40,000) (8) McKean Township, Old Route 99 over Lamson Run, (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (9) Harborcreek Township, T628, Depot Street over Seven Mile Creek, (Base Construction Allocation $560,000) (10) McKean Township, T480, Old Route 99 over Lamson Run, (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (11) Summit Township, T619, Jackson Station Road over Le Boeuf Creek, (Base Construction Allocation $500,000) (12) Union City Borough, Pleasant Street over Tributary of French Creek, (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $75,000) (13) Washington Township, T349, Conneaut Road over Little Conneaut Creek, (Base Construction Allocation $500,000) (Design and Contingencies $45,000) (14) Washington Township, T508, Perry Lane over Conneaut Creek, (Base Construction Allocation $450,000) (15) Waterford Borough, South Hazel Street over Le Boeuf Creek, (Base Construction Allocation $570,000) (16) Waterford Borough, South Hazel Street over Le Boeuf Creek, (Base Construction Allocation $25,000) (Land Allocation $8,000) (Design and Contingencies $10,000) (17) Waterford Borough, South Hazel Street over Le Boeuf Creek, (Base Construction Allocation $500,000) (Design and Contingencies $30,000) (18) Waterford Borough, T596, Flatts Road over Le Boeuf Creek, (Base Construction Allocation $650,000) 600, , , , , , , ,000 43, , ,000
140 SESSION OF 2006 Act (19) Wayne Township, T826, Mill Road over Brokenstraw Creek, (Base Construction Allocation $750,000) (20) Harborcreek Township, T640, Bartlett Road over Elliotts Run, (Base Construction Allocation $560,000) (21) Mill Village Borough, Depot Street over Tributary offrench Creek, (Base Construction Allocation $200,000) (Design and Contingencies $40,000) (22) Washington Township, T518, Beason Road over Conneaut Creek, (Base Construction Allocation $400,000) (Land Allocation $5,000) (Design and Contingencies $40,000) (23) City of Erie, T7302, West 38th Street over Mill Creek, (Base Construction Allocation $700,000) (24) North East Township, T780, Bort Road over Tributary of Lake Erie, (Base Construction Allocation $500,000) (25) Greenfield Township, T994, Ashton Road over West Branch of French Creek, Bridge (Base Construction Allocation $500,000) (26) City of Erie, Norman Way over Mill Creek, (Base Construction Allocation $800,000) (Design and Contingencies $300,000) (27) City of Erie, State Street over Railroad, Bridge (Base Construction Allocation $800,000) (Land Allocation $2,000) (Design and Contingencies $100,000) (28) Concord Township, T387, Mitchell Road over Lilley Run, (Base Construction Allocation $400,000) (Land Allocation $5,000) (Design and Contingencies $45,000) (29) Coimeaut Township, T883, Akerley Road over Ashtabula Creek, (Base Construction Allocation $400,000) (Land Allocation $5,000) , , , , , , ,000 1,110, , , ,000
141 864 Act LAWS OF PENNSYLVANIA (Design and Contingencies $45,000) (30) Conneaut Township, T30 1, Boyce Road over Stone Run, (Base Construction Allocation $600,000) (Design and Contingencies $60,000) (31) Conneaut Township, T330, Porkey Road over West Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $60,000) (32) Conneaut Township, T300, State Line Road over Ashtabula Creek, (Base Construction Allocation $400,000) (Design and Contingencies $60,000) (33) Conneaut Township, T883, Akerley Road over Ashtabula Creek, Bridge, (Base Construction Allocation $470,000) (34) Conneaut Township, T30l, Boyce Road over Stone Run, (Base Construction Allocation $600,000) (Design and Contingencies $60,000) (35) Conneaut Township, T330, Porkey Road over West Branch of Conneaut Creek, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $60,000) (36) Greene Township, T664, Jones Road over Six Mile Creek, (Base Construction Allocation $350,000) (37) Franklin Township, T424, Falls Road over Falk Run, (Base Construction Allocation $450,000) (38) Greenfield Township, T7l1, Wilson Road over Darrow Brook, (Base Construction Allocation $400,000) (39) Greenfield Township, T974, Old Route 89 over Tributary of West Branch of French Creek, (Base Construction Allocation $400,000) 670, , , , , , , , , ,000
142 SESSION OF 2006 Act (40) Greene Township, T609, Kane Hill Road over Four Mile Creek, (Base Construction Allocation $500,000) (41) Greene Township, T646, Bliley Road over Branch of Le Boeuf Creek, (Base Construction Allocation $350,000) (42) City of Cony, Shady Avenue over Hare Creek, (Base Construction Allocation $50,000) (Land Allocation $16,000) (Design and Contingencies $50,000) (43) Girard Township, T400, Gudgeonville Road over Elk Creek, (Base Construction Allocation $100,000) (44) Girard Township, T544, Elk Park Road over Elk Creek, (Base Construction Allocation $995,000) (45) Greenfield Township, T974, Old Route 89 over Tributary of French Creek, Bridge (Base Construction Allocation $350,000) (Design and Contingencies $40,000) (46) Conneaut Township, Ore Docks Road over Ashtabula Creek, (Base Construction Allocation $500,000) (Design and Contingencies $75,000) (47) Franklin Township, Carbury Road over Cussewago Creek, (Base Construction Allocation $500,000) (Design and Contingencies $75,000) (48) North East Township, Brickyard Road over Twelve Mile Creek, (Base Construction Allocation $500,000) (Design and Contingencies $75,000) (49) Venango Township, Hardscrabble Road over French Creek, (Base Construction Allocation $500,000) (Design and Contingencies $75,000) (50) North East Township, Brickyard Road over , , , , , , , , , ,000
143 866 Act LAWS OF PENNSYLVANIA Twelve Mile Creek, (Base Construction Allocation $500,000) (Design and Contingencies $75,000) (51) City of Erie, State Street over Canal Basin, (Base Construction Allocation $1,075,000) (Design and Contingencies $250,000) (52) City of Erie, East Avenue over Railroad, Bridge (Base Construction Allocation $500,000) (Design and Contingencies $20,000) (53) City of Erie, Norman Way over Mill Creek, (Base Construction Allocation $800,000) (Design and Contingencies $300,000) (54) City of Erie, Baternan Avenue over Conneaut Creek, Bridge Rehabilitation (Base Construction Allocation $20,000) (Design and Contingencies $5,000) (55) Springfield Township, McKee Road over Conneaut Creek, (Base Construction Allocation $500,000) (Design and Contingencies $250,000) (56) McKean Township, T480, approximately.2 Miles West of Route 99 south of South Hill Road over Lamson Run, (Base Construction Allocation $400,000) (Design and Contingencies $120,000) (57) McKean Township, T480, Old Route 99 just North of East and West Stancliff Roads over Lamson Run, (Base Construction Allocation $480,000) (Design and Contingencies $140,000) (58) McKean Township, T480, approximately.3 Miles West of Route 99 North of East Stancliff Road over Lamson Run, (Base Construction Allocation $480,000) (Design and Contingencies $140,000) (b) State Bridges 585,000 1,335, ,000 1,110,000 25, , , , ,000
144 SESSION OF 2006 Act and 190 over Elk Creek, McKean Township, Bridge Rehabilitation (Base Construction Allocation $156,000) (2) Various Bridges over 190, Girard Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $5,000) (Design and Contingencies $50,000) (3) SR 0018, Platea Railroad Bridge, Platea Borough, Bridge Rehabilitation (Base Construction Allocation $140,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (4) SR 0090 over PA 97 Eastbound, Summit Township, Bridge Rehabilitation (Base Construction Allocation $340,000) (Design and Contingencies $50,000) (5) SR 8009, Ramp B over 179, City of Erie, Bridge Rehabilitation (Base Construction Allocation $820,000) (Land Allocation $20,000) (Design and Contingencies $120,000) (6) SR 0090 over Tributary No.5 of Walnut Creek, Summit Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $30,000) (7) SR 0018 over Conneaut Creek Bridge, Conneaut Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (8) SR 0090 over Tributary No.1 of Turkey Creek, Springfield Township, Bridge Rehabilitation (Base Construction Allocation $120,000) (Design and Contingencies $30,000) (9) SR 0008 over Mill Creek, Millcreek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (10) SR 0020 over Branch of Turkey Creek, Spring 867 (1) 156, , , , , , , , ,000
145 868 LAWS OF PENNSYLVANIA Act field Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (11) SR 0020 over Cascade Creek, Millcreek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (12) SR 0020 over Crooked Creek Bridge, Girard Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $30,000) (13) SR 3013 over Conneaut Creek Bridge, Conneaut Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (14) SR 3025, Cummings Creek Bridge, Washington (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (15) SR 0505 over Branch of Mill Creek, Millcreek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (16) SR 3025 over Little Conneaut Creek, Washington Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $30,000) (17) SR 0006, Mill Village Railroad Underpass, SR 0006 at Seg in Mill Village Borough, Removal and (Base Construction Allocation $200,000) (Design and Contingencies $80,000) (18) SR 1005 over Le Boeuf Creek, Greene (Base Construction Allocation $70,000) (Land Allocation $21,000) (Design and Contingencies $21,000) 120, , , , , , , , ,000
146 SESSION OF 2006 Act (19) SR 2022 over Beaver Creek, Wayne Township, (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (20) SR 2024 over Hubbel Run, Amity Township, (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (21) SR 4024 over Walnut Creek, Summit (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) Section.30. Fayette County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0381, Stony Run, Wharton Township, Bridge (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (2) SR 0381, Indian Creek Reservoir, Springfield (Base Construction Allocation $1,000,000) (Land Allocation $150,000) (Design and Contingencies $680,000) (3) SR 0819, Youghiogheny River/Bike Trail, Dunbar (Base Construction Allocation $417,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (4) SR 1001, Mill Run, Springfield Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (5) SR 1003, Laurel Run, Springfield Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (6) SR 1023, Whites Run, Connellsville and Bull ,000 84,000 80, ,000 1,830, , , ,000
147 870 Act LAWS OF PENNSYLVANIA skin Townships, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (7) SR 1031, Branch of Galley Run, Upper Tyrone (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (8) SR 1039, Branch of Dickerson Run, Dunbar (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (9) SR 1050, Mounts Creek, Bullskin Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (10) SR 1051, Breakneck Run, Bullskin Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (11) SR 1053, Opossum Run, Dunbar Township, (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (12) SR 2002, Mill Run, Wharton Township, Bridge (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (13) SR 2011, Feik Run, Wharton Township, Bridge (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (14) SR 2015, Meadow Run, Wharton Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) 195, , , , , , , , ,000
148 SESSION OF 2006 Act (15) SR 3005, Grassy Run, Springhill Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (16) SR 3008, Jacobs Creek, Nicholson Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (17) SR 3009, George Creek, Springhill Township, (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (18) SR 3011, Cats Creek, Nicholson and German Townships, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (19) SR 3013, Middle Run, German Township, (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (20) SR 3023, Saltlick Run, Menallen Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (21) SR 4040, Lamb Lick Run, Washington (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (22) SR 4038, Youghiogheny River/Bike Trail, Layton Bridge, Bridge Deck (Base Construction Allocation $4,000,000) (Land Allocation $200,000) (Design and Contingencies $400,000) (23) SR 0166 over Dunlap Creek, Redstone and Lu.zerne Townships, (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) , , , , , , ,000 4,600, ,000
149 872 LAWS OF PENNSYLVANIA Act (24) SR 0711, Crawford Avenue Bridge, City of Connellsville, Bridge Rehabilitation (Base Construction Allocation $1,200,000) (Design and Contingencies $200,000) (25) SR 4006 over Branch of Dunlap Creek, Menallen (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (26) SR 2040 over Redstone Creek, City of Uniontown, (Base Construction Allocation $200,000) (Design and Contingencies $100,000) (27) SR 0819 over Jacobs Creek, Upper Tyrone (Base Construction Allocation $300,000) (Land Allocation $5,000) (Design and Contingencies $120,000) (28) SR 4040 over Lamb Lick Run, Fayette City Borough, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (29) SR 4003, Cast Iron Bridge, Brownsville Borough, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $5,000) (Design and Contingencies $120,000) (30) SR 4020 over Fourmile Run, Redstone (Base Construction Allocation $700,000) (Land Allocation $30,000) (Design and Contingencies $350,000) (31) SR 1031 over Galley Run, Upper Tyrone (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (32) SR 1031 over Branch of Galley Run, Upper Tyrone and Connellsville Townships, Bridge (Base Construction Allocation $120,000) (Land Allocation $5,000) 1,410, , , , , ,000 1,080, , ,000
150 Act SESSION OF 2006 (Design and Contingencies $70,000) (33) SR 0051, Allen Run, Franklin Township, (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (34) SR 0819, Dawson Bridge, Dawson Borough Deck (Base Construction Allocation $2,000,000) (35) SR 0040 over Beaver Run, Henry Clay (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (36) SR 0166 over Bateman Creek, Springhill (Base Construction Allocation $450,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (37) SR 0166 over Cat s Run, Nicholson Township, Bridge Rehabilitation (Base Construction Allocation $150,000) (Land Allocation $70,000) (Design and Contingencies $120,000) (38) SR 0166 over Browns Run, German Township, (Base Construction Allocation $300,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (39) SR 0166 over Middle Run, German Township, (Base Construction Allocation $100,000) (Land Allocation $70,000) (Design and Contingencies $80,000) (40) SR 0166 over Dunlap Creek, Luzerne and Redstone Townships, (Base Construction Allocation $220,000) (Land Allocation $90,000) (Design and Contingencies $120,000) (41) SR 0166 over Dunlap Creek, Luzerne and Redstone Townships, Bridge Rehabilitation (Base Construction Allocation $960,000) (Land Allocation $150,000) (Design and Contingencies $120,000) ,000 2,000, , , , , , ,000 1,230,000
151 874 Act LAWS OF PENNSYLVANIA (42) SR 0201 over Virgin Run, Franklin Township, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (43) SR 0201 over SR 0051, Perry Township, Bridge Rehabilitation (Base Construction Allocation $300,000) (Land Allocation $220,000) (Design and Contingencies $160,000) (44) SR 0201 over Tributary of Mon River, Jefferson (Base Construction Allocation $350,000) (Land Allocation $70,000) (Design and Contingencies $300,000) (45) SR 0201 over Tributary of Mon River No.2, Jefferson (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $300,000) (46) SR 0201 over Tributary of Mon River No.3, Washington (Base Construction Allocation $350,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (47) SR 0201 over Branch of Little Redstone Creek, Washington Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $70,000) (Design and Contingencies $40,000) (48) SR 0381 over Branch of Meadow Run, Wharton Township, Bridge Rehabilitation (Base Construction Allocation $400,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (49) SR 0381 over Laurel Run, Stewart and Springfield Townships, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $300,000) (50) SR 0381 over Stoney Run, Springfield Township, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $300,000) 770, , , , , , , , ,000
152 SESSION OF 2006 Act (51) SR 0819 over Branch of Jacobs Run, Lower Tyrone (Base Construction Allocation $350,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (52) SR 0982 over Mounts Creek, Bullskin (Base Construction Allocation $130,000) (Land Allocation $70,000) (Design and Contingencies $60,000) (53) SR 0982 over Latta Run, Bullskin Township, (Base Construction Allocation $80,000) (Land Allocation $70,000) (Design and Contingencies $40,000) (54) SR 1031 over Branch of Galley Run, Connellsville and Upper Tyrone Townships, (Base Construction Allocation $130,000) (Land Allocation $70,000) (Design and Contingencies $60,000) (55) SR 1037 over Trump Run, City of Connellsville, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $70,000) (Design and Contingencies $200,000) (56) SR 1037 over Connell Run, City of Connellsville, Bridge Rehabilitation (Base Construction Allocation $300,000) (Land Allocation $230,000) (Design and Contingencies $140,000) (57) SR 1043 over Redstone Creek, North Union and Franidin Townships, (Base Construction Allocation $300,000) (Land Allocation $125,000) (Design and Contingencies $140,000) (58) SR 1054 over Indian Creek, Saltlick Township, (Base Construction Allocation $500,000) (Land Allocation $225,000) (Design and Contingencies $240,000) (59) SR 3006 over York Run, Nicholson Township, (Base Construction Allocation $300,000) (Land Allocation $125,000) , , , , , , , , ,000
153 876 Act LAWS OF PENNSYLVANIA (Design and Contingencies $200,000) (60) SR 3013 over Middle Run, German Township, (Base Construction Allocation $260,000) (Land Allocation $125,000) (Design and Contingencies $160,000) (61) SR 4001 over Rush Run, Luzerne Township, (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (62) SR 4016 over Redstone Creek, Redstone (Base Construction Allocation $400,000) (Land Allocation $225,000) (Design and Contingencies $200,000) (63) SR 4040 over Lamb Lick Run, Washington (Base Construction Allocation $70,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (64) Township Drive Bridge No.182, South Union (Base Construction Allocation $520,000) (Land Allocation $20,000) (Design and Contingencies $180,000) (65) Moyer Road Bridge No.115, Bullskin (Base Construction Allocation $560,000) (Land Allocation $24,000) (Design and Contingencies $180,000) (66) Mountain Creek Bridge No.15, Georges (Base Construction Allocation $480,000) (Land Allocation $24,000) (Design and Contingencies $188,000) (67) Moyer Road Bridge No.72, Bullskin Township, (Base Construction Allocation $560,000) (Land Allocation $24,000) (Design and Contingencies $188,000) (68) Old Furnace Road Bridge, South Union (Base Construction Allocation $560,000) (Land Allocation $32,000) 545, , , , , , , , ,000
154 SESSION OF 2006 Act (Design and Contingencies $180,000) (69) SR 0381 over Meadow Run, Wharton (Base Construction Allocation $68,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (70) SR 0857 over Mountain Creek, Georges (Base Construction Allocation $74,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (71) SR 2010 over Deer Lake, Wharton Township, (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (72) SR 3007 over Mountain Creek, Georges (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (73) SR 3023 over North Branch of Dunlap Creek, German (Base Construction Allocation $44,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (74) SR 3029 over George Creek, Georges (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (75) SR 3029 over George Creek, Georges (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (76) SR 4008 over Dunlap Creek, Seg.0050, Redstone (Base Construction Allocation $128,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (77) SR 4008 over Branch of Dunlap Creek, Seg. 0040, German (Base Construction Allocation $128,000) (Land Allocation $38,000) , , , ,000 70, , , , ,000
155 878 Act LAWS OF PENNSYLVANIA (Design and Contingencies $38,000) Section 31. Forest County. (a) Local Bridges (1) Hickory Township, T328 over East Hickory Creek, (Base Construction Allocation $675,000) (Design and Contingencies $150,000) (2) Hickory Township, T328 over East Hickory Creek, (Base Construction Allocation $700,000) (Design and Contingencies $150,000) (3) Tionesta Borough, Elm Street over Tionesta Creek, (Base Construction Allocation $1,700,000) (Land Allocation $20,000) (Design and Contingencies $300,000) (4) Hickory Township, T328, Queens Road over East Hickory Creek, (Base Construction Allocation $865,000) (Land Allocation $5,000) (Design and Contingencies $200,000) (5) Hickory Township, T328, Queens Road over East Hickory Creek, (Base Construction Allocation $980,000) (Land Allocation $5,000) (Design and Contingencies $200,000) (6) Jenks Township, T356, Salmon Creek over Salmon Creek, (Base Construction Allocation $690,000) (Design and Contingencies $190,000) (7) Kingsley Township, T396, Jug Handle Road over Ross Run, (Base Construction Allocation $575,000) (Land Allocation $5,000) (Design and Contingencies $175,000) (8) Kingsley Township, T338, Ross Run Road over Ross Run, (Base Construction Allocation $575,000) (Land Allocation $5,000) (Design and Contingencies $175,000) (9) Tionesta Borough, Old Elm Street over Tionesta 835, ,000 2,020,000 1,070,000 1,185, , , ,000
156 SESSION OF 2006 Act Creek, Bridge Rehabilitation (Base Construction Allocation $575,000) (Land Allocation $5,000) (Design and Contingencies $60,000) (b) State Bridges (1) SR 0062 over Tubbs Run, Tionesta Borough, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (2) SR 0666 over Beaver Run, Hickory Township, Bridge Rehabilitation (Base Construction Allocation $100,000) (Design and Contingencies $30,000) (3) SR 3004 over Coon Creek, Green Township, Bridge Rehabilitation (Base Construction Allocation $110,000) (Design and Contingencies $10,000) (4) SR 0036 over Tionesta Creek, Tionesta Borough, Bridge Rehabilitation (Base Construction Allocation $600,000) (Land Allocation $20,000) (Design and Contingencies $420,000) (5) SR 0062 Tionesta River Bridge, Tionesta Borough, Bridge Rehabilitation (Base Construction Allocation $1,600,000) (Land Allocation $40,000) (Design and Contingencies $420,000) (6) SR 0066 over Upper Sheriff Run, Howe (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (7) SR 3001 over Little Tionesta Creek, Tionesta (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (8) SR 4002 over Dawsoñ Run, Harmony Township, (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) , , , ,000 1,040,000 2,060,000 64,000 73,000 48,000
157 880 LAWS OF PENNSYLVANIA Act Section 32. Franklin County. (a) Local Bridges (1) Washington Township, SR 2007/SR 2012 over Antietam Creek, (b) State Bridges (1) SR 0016, Buchanan Trail over West Branch of Conococheague Creek, Montgomery Township, (Base Construction Allocation $120,000) (Design and Contingencies $80,000) (2) US 30, Lincoln Highway over Back Creek, Hamilton and St. Thomas Townships, Bridge (Base Construction Allocation $280,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (3) SR 0433, Tan Yard Hill Road over Conodoguinet Creek, Lurgan and Southampton Townships, (Base Construction Allocation $280,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (4) SR 0456, Little Cove Road over Little Cove Creek, Warren (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (5) SR 0641, Newburg Road over Paxtons Run, Lurgan (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (6) SR 0641, Newburg Road over Clippinger Run, Lurgan (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (7) SR 4004, Horse Valley Road over Conodoguinet Creek, Letterkenny Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $80,000) 1,000, , , , , , , ,000
158 SESSION OF 2006 Act (8) SR 0914 over 181, Guilford Township, Bridge (Base Construction Allocation $280,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (9) SR 2042, T513, McKinley Street over 181, Guilford (Base Construction Allocation $280,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (10) SR 0075 over Bucks Run, Seg.0260, Peters (Base Construction Allocation $26,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (11) SR 0075 over Bucks Run; Seg.0210, Peters (Base Construction Allocation $62,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (12) SR 0456 over Licking Creek, Warren (Base Construction Allocation $170,000) (Land Allocation $51,000) (Design and Contingencies $51,000) (13) SR 0641 over Trout Run, Lurgan Township, (Base Construction Allocation $56,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (14) SR 0696 over Shirley Run, Southampton (Base Construction Allocation $32,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (15) SR 1001 over Cold Spring Run, Greene (Base Construction Allocation $29,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (16) SR 3007 over West Branch of Conococheague Creek, Peters (Base Construction Allocation $262,000) (Land Allocation $78,000) (Design and Contingencies $78,000) , ,000 40,000 98, ,000 88,000 50,000 45, ,000
159 882 LAWS OF PENNSYLVANIA Act (17) SR 3009 over West Branch of Conococheague, Seg.0140, Peters (Base Construction Allocation $258,000) (Land Allocation $78,000) (Design and Contingencies $78,000) (18) SR 3009 over Licking Creek, Seg.0020, Montgomery (Base Construction Allocation $102,000) (Land Allocation $31,000) (Design and Contingencies $31,000) (19) SR 4008 over Rocky Spring Creek, Seg.0230, Hamilton (Base Construction Allocation $92,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (20) SR 4008 over Dennis Run, Seg.0190, Hamilton (Base Construction Allocation $72,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (21) SR 2007 over Antietam Creek, Washington Township, Bridge Construction (Base Construction Allocation $1,000,000) Section 33. Fulton County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0070, Seg.1522/1846 over T390, Lodge Road, Brush Creek Township, Bridge Rehabilitation (Base Construction Allocation $158,000) (Land Allocation $2,000) (Design and Contingencies $40,000) (2) SR 0070, Seg.1686/0894 over Tributary of Little Tonoloway Creek, Brush Creek Township, Bridge (Base Construction Allocation $475,000) (Design and Contingencies $95,000) (3) SR 0928, Seg.0120/0080 over Licking Creek, Thompson Township, Bridge Rehabilitation (Base Construction Allocation $164,000) (Land Allocation $2,000) (Design and Contingencies $42,000) (4) SR 0928, Seg.0220/0000 over Esther Run, Ayr 414, , , ,000 1,000, , , ,000
160 SESSION OF 2006 Act Township, Bridge Rehabilitation (Base Construction Allocation $24,000) (Land Allocation $1,000) (Design and Contingencies $11,000) (5) SR 1002, Seg.0020/0000 over Tributary of Spring Run, Ayr Township, Bridge Rehabilitation (Base Construction Allocation $21,000) (Land Allocation $1,000) (Design and Contingencies $10,000) (6) SR 1005, Seg.0080/0000 over South Branch of Little Augwick Creek, Todd Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (7) SR 1005, Seg.0l90/0000 over South Branch of Little Augwick Creek, Todd Township, Bridge (Base Construction Allocation $150,000) (Design and Contingencies $40,000) (8) SR 1007, Seg.00l0/1254 over Licking Creek, Licking Creek Township, Bridge Rehabilitation (Base Construction Allocation $161,000) (Land Allocation $2,000) (Design and Contingencies $41,000) (9) SR 3002, Seg.0050/0000 over Tributary of Bear Creek, Union Township, Bridge Rehabilitation (Base Construction Allocation $19,000) (Land Allocation $1,000) (Design and Contingencies $8,000) (10) SR 3006, Seg.0020/1216 over 170, Bethel Township, Bridge Rehabilitation (Base Construction Allocation $232,000) (Land Allocation $2,000) (Design and Contingencies $58,000) (11) SR 3009, Seg.OOlO/1429 over White Oak Run, Bethel (Base Construction Allocation $63,000) (Land Allocation $5,000) (Design and Contingencies $28,000) (12) SR 3011, Seg.OOlO/0154 over Little Tonoloway Creek, Bethel Township, Bridge Rehabilitation (Base Construction Allocation $125,000) (Land Allocation $1,000) ,000 32,000 60, , ,000 28, ,000 96, ,000
161 884 Act LAWS OF PENNSYLVANIA (Design and Contingencies $42,000) (13) SR 4007, Seg.0010/0183 over Sindeldecker Run, Licking Creek Township, Bridge Rehabilitation (Base Construction Allocation $16,000) (Land Allocation $1,000) (Design and Contingencies $7,000) (14) SR 0928 over Licking Creek, Thompson (Base Construction Allocation $204,000) (Land Allocation $61,000) (Design and Contingencies $61,000) (15) SR 1003 over Cove Creek, Ayr Township, (Base Construction Allocation $68,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (16) SR 1007 over Licking Creek, Licking Creek (Base Construction Allocation $198,000) (Land Allocation $59,000) (Design and Contingencies $59,000) (17) SR 2004 over Tonoloway Creek, Thompson (Base Construction Allocation $116,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (18) SR 3006 over Little Tonoloway Creek, Bethel (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (19) SR 4004 over Wooden Bridge Creek, Taylor (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (20) SR 8014 over South Brush Creek, Brush Creek (Base Construction Allocation $115,000) (Land Allocation $34,000) (Design and Contingencies $34,000) Section 34. Greene County. (a) Local Bridges 24, , , , , ,000 80, ,000
162 SESSION OF 2006 Act (1) Morgan Township, T586 County Bridge, Bridge (Base Construction Allocation $400,000) (Land Allocation $160,000) (Design and Contingencies $160,000) (2) Center Township, T454 County Bridge, Bridge (Base Construction Allocation $400,000) (Land Allocation $160,000) (Design and Contingencies $160,000) (b) State Bridges (1) SR 0018, Branch of Browns Creek, Morris (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (2) SR 0079, SR 2009, Perry Township, Bridge (Base Construction Allocation $1,400,000) (Design and Contingencies $140,000) (3) SR 0079, TR 513, Whiteley Township, Bridge (Base Construction Allocation $800,000) (Design and Contingencies $100,000) (4) SR 0079, SR 0188, South Fork of Ten Mile Creek, Railroad, Franklin Township, Bridge (Base Construction Allocation $3,000,000) (Design and Contingencies $300,000) (5) SR 0088, Pumpkin Run, Jefferson Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (6) SR 0218, Branch of Smith Creek, Franldin (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (7) SR 1003, Ruff Creek, Morgan Township, Bridge (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) , , ,000 1,540, ,000 3,300, , , ,000
163 886 Act LAWS OF PENNSYLVANIA (8) SR 1011, Ten Mile Creek, Clarksville Borough, (Base Construction Allocation $600,000) (Design and Contingencies $100,000) (9) SR 1014, Castile Run, Morgan Township, Bridge (Base Construction Allocation $200,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (10) SR 2013, Muddy Creek, Cumberland and Jefferson Townships, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (11) SR 3006, Clawson Run, Gilmore Township, (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (12) SR 3009, Branch of Toms Run, Jackson (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (13) SR 3011, Hargus Creek, Center Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (14) SR 3011, Hargus Creek, Center Township, (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (15) SR 4017, Scott Run, Center Township, Bridge (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (16) SR 4029 over Fonner Run, Morris Township, (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) 710, , , , , , , , ,000
164 SESSION OF 2006 Act (17) SR 0218, Roberts Run, Wayne Township, (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (18) SR 0079 over TR 513, Whiteley Township, (Base Construction Allocation $800,000) (Design and Contingencies $100,000) (19) SR 0018, Eastview Bridge, Franklin Township, (Base Construction Allocation $300,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (20) SR 0018 over Garners Run, Washington (Base Construction Allocation $80,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (21) SR 0018 over Branch of Browns Creek, Morris (Base Construction Allocation $300,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (22) SR 0018, Bridge No.2 over Branch of Browns Creek, Morris (Base Construction Allocation $100,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (23) SR 0018, Bridge No.3 over Branch of Browns Creek, Morris (Base Construction Allocation $350,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (24) SR 0018, Bridge No.4 over Branch of Browns Creek, Morris (Base Construction Allocation $300,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (25) SR 0019 over Dunkard Creek, Perry Township, (Base Construction Allocation $200,000) (Land Allocation $75,000) (Design and Contingencies $120,000) , , , , , , , , ,000
165 888 Act LAWS OF PENNSYLVANIA (26) SR 0019, Bridge No.2 over Dunkard Creek, Perry (Base Construction Allocation $400,000) (Land Allocation $40,000) (Design and Contingencies $200,000) (27) SR 0019 over Dunkard Creek, Perry Township, (Base Construction Allocation $640,000) (Land Allocation $60,000) (Design and Contingencies $120,000) (28) SR 0019 over Calvin Run, Perry Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $150,000) (Design and Contingencies $120,000) (29) SR 0019 over Laurel Run, Franklin Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (30) SR 0019 over Purman Run, Waynesburg Borough, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $600,000) (31) SR 0021 over Toll Gate Run, Waynesburg Borough, (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (32) SR 0021 over Branch of Ten Mile Creek, Franklin (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (33) SR 0079, 179 over SR 0188, South Fork of Ten Mile Creek, Franklin Township, Bridge (Base Construction Allocation $2,000,000) (Land Allocation $150,000) (Design and Contingencies $200,000) (34) SR 0088 over Muddy Creek, Cumberland (Base Construction Allocation $100,000) (Land Allocation $70,000) 640, , ,000 1,225,000 1,675,000 1,325,000 1,575,000 2,350, ,000
166 SESSION OF 2006 Act (Design and Contingencies $200,000) (35) SR 0088 over Branch of Coal Run, Cumberland (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (36) SR 0188 over Branch of South Fork of Ten Mile Creek, Jefferson Township, Bridge (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (37) SR 1009 over Bacon Run, Morgan Township, (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (38) SR 1016 over Little Whiteley Creek, Cumberland (Base Construction Allocation $150,000) (Design and Contingencies $100,000) (39) SR 3005 over North Fork of Wheeling Creek, Seg.0 160, Richhill Township, Bridge (Base Construction Allocation $101,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (40) SR 3005 over Long Run, Seg.0140, Richhill (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) Section 35. Huntingdon County. (a) Local Bridges (1) Saltillo Borough, T328 over North Spring Creek, (Base Construction Allocation $750,000) (b) State Bridges (1) SR 0022, Seg.0230/0000 over PA 26, Smithfield Township, Bridge Rehabilitation (Base Construction Allocation $130,000) (Land Allocation $2,000) (Design and Contingencies $44,000) , ,000 1,325, , ,000 85, , ,000
167 890 LAWS OF PENNSYLVANIA Act (2) SR 0035, Seg.0190/1800 over Trough Spring Branch of Tuscarora Creek, Tell Township, Bridge Rehabilitation (Base Construction Allocation $44,000) (Land Allocation $1,000) (Design and Contingencies $19,000) (3) SR 0305, Seg.0020/0919 over Deny Run, Alexandria Borough, Bridge Rehabilitation (Base Construction Allocation $50,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (4) SR 0305, Seg.0260/1192 over Tributary of Garner Run, West Township, Bridge Rehabilitation (Base Construction Allocation $50,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (5) SR 0305, Seg.0270/0000 over Branch of Garner Run, West Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (6) SR 1013, Seg.0120/l794 over Henrys Run, Barree Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (7) SR 1019, Seg.0060/0000 over East Branch of Standing Stone Creek, Jackson Township, Bridge Rehabilitation (Base Construction Allocation $52,000) (Land Allocation $1,000) (Design and Contingencies $23,000) (8) SR 1029, Seg.0030/0000 over Phranton Run, West (Base Construction Allocation $82,000) (Land Allocation $5,000) (Design and Contingencies $29,000) (9) SR 2009, Seg.0410/0000 over Tributary of Tuscarora Creek, Tell Township, Bridge (Base Construction Allocation $270,000) (Land Allocation $25,000) (Design and Contingencies $125,000) 64,000 80,000 80, , ,000 76, , ,000
168 Act SESSION OF 2006 (10) SR 2017, Seg.0220/0000 over Spruce Run, Shirley Township, Bridge Rehabilitation (Base Construction Allocation $32,000) (Land Allocation $1,000) (Design and Contingencies $15,000) (11) SR 3013, Seg.0010/2349 over Tributary of Shoups Run, Coalmont Borough, Bridge (Base Construction Allocation $70,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (12) SR 3029, Seg.0260/0000 over Hares Valley Creek, Mapleton Borough, Bridge Rehabilitation (Base Construction Allocation $47,000) (Land Allocation $1,000) (Design and Contingencies $20,000) (13) SR 3039, Seg.0080/0354 over Branch of Crooked Creek, Porter Township, Bridge (Base Construction Allocation $315,000) (Land Allocation $25,000) (Design and Contingencies $140,000) (14) SR 3045, Seg.0020/0000 over Tributary of Juniata River, Smithfield Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (15) SR.3053, Seg.0010/0000 over Tributary of Robinson Run, Porter Township, Bridge (Base Construction Allocation $85,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (16) SR 4009, Seg.0070/1169 over Tributary of Shavers Creek, West Township, Bridge Rehabilitation (Base Construction Allocation $25,000) (Land Allocation $5,000) (Design and Contingencies $10,000) (17) SR 0035 over Tr. Trough Sp. Branch of Tuscarora Creek Seg.0l90, Offset 2142, Tell (Base Construction Allocation $35,000) (Land Allocation $11,000) , ,000 68, , , ,000 40,000 57,000
169 892 Act LAWS OF PENNSYLVANIA (Design and Contingencies $11,000) (18) SR 0475 over Little Aughwick Creek, Tell (Base Construction Allocation $51,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (19) SR 2004 over Aughwick Creek, Springfield (Base Construction Allocation $215,000) (Land Allocation $65,000) (Design and Contingencies $65,000) (20) SR 2005 over Sideling Hill Creek, Springfield (Base Construction Allocation $173,000) (Land Allocation $51,000) (Design and Contingencies $51,000) (21) SR 2006 over Shade Creek, Dublin Township, (Base Construction Allocation $88,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (22) SR 2016 over Black Log Creek Seg.0060, Cromwell (Base Construction Allocation $205,000) (Land Allocation $61,000) (Design and Contingencies $61,000) (23) SR 2016 over Old Womans Run, Seg.0030, Cromwell (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (24) SR 2024 over Sideling Hill Creek, Clay (Base Construction Allocation $155,000) (Land Allocation $47,000) (Design and Contingencies $47,000) (25) SR 3006 over Great Trough Creek, Wood (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (26) SR 3008 over Little Trough Creek, Cass (Base Construction Allocation $172,000) (Land Allocation $51,000) 81, , , , ,000 84, ,000 85, ,000
170 SESSION OF 2006 Act (Design and Contingencies $51,000) (27) SR 3037 over Crooked Creek, Walker (Base Construction Allocation $98,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (28) SR 4015 over Warriors Mark Run, Franklin (Base Construction Allocation $122,000) (Land Allocation $36,000) (Design and Contingencies $36,000) Section 36. Indiana County. (a) Local Bridges (1) Black Lick Township, TR 574, Muddy Run Bridge No.36 over Branch of Black Lick Creek, (Base Construction Allocation $250,000) (2) Black Lick Township, TR 840, Smith Bridge over Stewart Run, (Base Construction Allocation $100,000) (3) Black Lick Township, TR 470, Nehrig Bridge over Unnamed Creek, (Base Construction Allocation $100,000) (4) Canoe Township, TR 818 over Small Body of Water, (Base Construction Allocation $30,000) (5) Canoe Township, TR 604 over Small Creek, (Base Construction Allocation $65,000) (6) East Wheatfield Township, TR 719 over Culvert, (Base Construction Allocation $15,000) (7) East Wheatfield Township, TR 718, Bridge No.2 over Tributary of Conemaugh River, Bridge (Base Construction Allocation $1 30,00) (Land Allocation $5,000) (Design and Contingencies $20,000) (8) East Wheatfield Township, TR 718, Bridge No.! over Tributary of Conemaugh River, Bridge (Base Construction Allocation $96,000) (Land Allocation $4,000) (Design and Contingencies $20,000) , , , , ,000 30,000 65,000 15, , ,000
171 894 Act LAWS OF PENNSYLVANIA (9) Indiana Borough, Maple Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (10) Indiana Borough, Locust Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (11) Indiana Borough, Washington Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (12) Indiana Borough, Fifth Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (13) Indiana Borough, Sixth Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (14) Indiana Borough, Willow Avenue over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $40,000) (15) Indiana Borough, Seventh Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (16) Indiana Borough, School Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (17) Indiana Borough, Fourth Street over Marsh Run, Bridge Rehabilitation (Base Construction Allocation $15,000) (18) Rayne Township, TR 561 over Rayne Run, Bridge Rehabilitation (Base Construction Allocation $100,000) (19) Rayne Township, TR 611 over Small Creek, Bridge Rehabilitation (Base Construction Allocation $270,000) (20) Washington Township, TR 840 to Redding Run, Bridge Rehabilitation (Base Construction Allocation $10,000) (21) Washington Township, Adamson Road over Redding Run, Bridge Rehabilitation (Base Construction Allocation $20,000) (22) Washington Township, Spence Road over Dark Hollow Road, Bridge Rehabilitation (Base Construction Allocation $20,000) (23) West Wheatfield Township, TR 605 over East Branch of Richardson s River, Bridge Rehabil 15,000 15,000 15,000 15,000 15,000 40,000 15,000 15,000 15, , ,000 10,000 20,000 20,000
172 SESSION OF 2006 Act itation (Base Construction Allocation $490,000) (Design and Contingencies $100,000) (24) Young Township, TR 456 over Small Creek, Bridge Rehabilitation (Base Construction Allocation $12,000) (25) Young Township, TR 357 over Small Stream, Bridge Rehabilitation (Base Construction Allocation $19,000) (26) East Wheatfield Township, T734 over Township Bridge No.46, (Base Construction Allocation $7,200,000) (b) State Bridges (1) SR 0403, Heilwood Bridge over Little Yellow Creek, Pine (Base Construction Allocation $400,000) (Design and Contingencies $90,000) (2) SR 0056, East Brush Valley Bridge, Brush Valley (Base Construction Allocation $173,000) (Land Allocation $17,000) (Design and Contingencies $35,000) (3) SR 0286, Hillsdale Bridge, Montgomery (Base Construction Allocation $73,000) (Land Allocation $7,000) (Design and Contingencies $14,000) (4) SR 0286, Hooverhurst Bridge, Montgomery (Base Construction Allocation $56,000) (Land Allocation $6,000) (Design and Contingencies $11,000) (5) SR 0110, Muller Road Bridge, White Township, (Base Construction Allocation $80,000) (Land Allocation $8,000) (Design and Contingencies $16,000) (6) SR 3035, South Two Lick Bridge, Center (Base Construction Allocation $992,000) (Land Allocation $99,000) (Design and Contingencies $198,000) ,000 12,000 19,000 7,200, , ,000 94,000 73, ,000 1,290,000
173 896 LAWS OF PENNSYLVANIA Act (7) SR 4001, Five Points Road Bridge, Center (Base Construction Allocation $318,000) (Land Allocation $32,000) (Design and Contingencies $64,000) (8) SR 0954, Smicksburg Bridge, West Mahoning (Base Construction Allocation $654,000) (Land Allocation $65,000) (Design and Contingencies $131,000) (9) SR 4008, Hawk Road Bridge, Rayne Township, (Base Construction Allocation $40,000) (Land Allocation $4,000) (Design and Contingencies $8,000) (10) SR 3003, Tunnelton Bridge, Conemaugh (Base Construction Allocation $1,200,000) (Land Allocation $120,000) (Design and Contingencies $240,000) (11) SR 1056, Gypsy Bridge, Montgomery (Base Construction Allocation $110,000) (Land Allocation $11,000) (Design and Contingencies $22,000) (12) SR 0580, Cherry Tree Bridge, Cherry Tree Borough, Bridge Restoration (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (13) SR 2013, Wehrum Bridge, Buffington Township, Bridge Restoration (Base Construction Allocation $70,000) (Land Allocation $7,000) (Design and Contingencies $14,000) (14) SR 0286, Hamill Bridge No.1, White (Base Construction Allocation $80,000) (Land Allocation $8,000) (Design and Contingencies $16,000) (15) SR 0286, Rowley Cemetery Bridge, Montgomery Township, Bridge Restoration (Base Construction Allocation $20,000) (Land Allocation $2,000) (Design and Contingencies $4,000) 413, ,000 52,000 1,560, ,000 78,000 91, ,000 26,000
174 SESSION OF 2006 Act (16) SR 0422 over SR 8016, Cherry Hill Township, Bridge Restoration (Base Construction Allocation $80,000) (Land Allocation $8,000) (Design and Contingencies $16,000) (17) SR 0286, Stonebreaker Hill West 3R Bridge, White and Rayne Townships, Bridge Rehabilitation (Base Construction Allocation $80,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (18) SR 0286, East Clarksburg Bridge, Young (Base Construction Allocation $124,000) (Land Allocation $15,000) (Design and Contingencies $40,000) (19) SR 0056, South Brush Valley Bridge, Brush Valley (Base Construction Allocation $160,000) (Land Allocation $15,000) (Design and Contingencies $40,000) (20) SR 0286, West Onberg Bridge, Rayne (Base Construction Allocation $104,000) (Land Allocation $15,000) (Design and Contingencies $40,000) (21) SR 1041 over Little Mahoning Creek, Canoe and Grant Townships, (Base Construction Allocation $1,060,000) (Land Allocation $15,000) (Design and Contingencies $200,000) (22) SR 0085 over South Branch of Plum Creek, Seg.0 120, Washington Township, Bridge (Base Construction Allocation $109,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (23) SR 0085 over Tributary of South Branch of Plum Creek, Seg.OllO, South Mahoning (Base Construction Allocation $55,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (24) SR 0217 over Stewarts Run, Black Lick , , , , ,000 1,275, ,000 87,000
175 898 LAWS OF PENNSYLVANIA Act (Base Construction Allocation $88,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (25) SR 0259 over Laurel Run, Seg.0360, Cherryhill (Base Construction Allocation $39,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (26) SR 0259 over Little Yellow Creek, Seg.0330, Brush Valley (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (27) SR 0286 over Cherry Run, Seg.0380, Center (Base Construction Allocation $138,000) (Land Allocation $41,000) (Design and Contingencies $41,000) (28) SR 0286 over West Branch of Cush Creek, Seg.03 80, Montgomery Township, Bridge (Base Construction Allocation $77,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (29) SR 0422 over Yellow Creek, Cherryhill (Base Construction Allocation $125,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (30) SR 0580 over West Branch of Susquehanna River, Cherry Tree Borough, (Base Construction Allocation $206,000) (Land Allocation $62,000) (Design and Contingencies $62,000) (31) SR 1041 over Little Mahoning Creek, Canoe (Base Construction Allocation $177,000) (Land Allocation $53,000) (Design and Contingencies $53,000) (32) SR 1053 over South Branch of Bear Run, Banks (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) 142,000 63, , , , , , ,000 48,000
176 SESSION OF 2006 Act (33) SR 2011 over East Branch of Richards Run, West Wheatfield (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (34) SR 2013 over Blacklick Creek, Buffington (Base Construction Allocation $301,000) (Land Allocation $90,000) (Design and Contingencies $90,000) (35) SR 2027 over Little Yellow Creek, Brush Valley (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (36) SR 3010 over Blacklegs Creek, Young (Base Construction Allocation $36,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (37) SR 3017 over Cherry Run, Center Township, (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (38) SR 4006 over South Branch of Plum Creek, Washington (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (39) SR 4010 over Crooked Creek, Rayne (Base Construction Allocation $162,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (40) SR 4026 over Mahoning Creek, West Mahoning (Base Construction Allocation $318,000) (Land Allocation $96,000) (Design and Contingencies $96,000) (41) SR 4030 over Marsh Run, Indiana Borough, (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) , ,000 69,000 58,000 80, , , , ,000
177 900 Act LAWS OF PENNSYLVANIA (42) SR 4033 and Sugarcamp Run, Washington (Base Construction Allocation $107,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (43) SR 2009, Huff Bridge over Conemaugh River, West Wheatfield (Base Construction Allocation $2,790,000) (Land Allocation $837,000) (Design and Contingencies $837,000) (44) SR 3056, Homer Cheny Railroad Bridge, Center (Base Construction Allocation $224,000) (Land Allocation $67,000) (Design and Contingencies $67,000) Section 37. Jefferson County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0119, Sykesville Bridge No.2, Sykesville Borough, (Base Construction Allocation $184,000) (Land Allocation $18,000) (Design and Contingencies $37,000) (2) SR 0028, Mill Creek Bridge No.4, Snyder (Base Construction Allocation $62,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (3) SR 0028, Warsaw Bridge, Warsaw Township, (Base Construction Allocation $80,000) (Land Allocation $8,000) (Design and Contingencies $16,000) (4) SR 2015, Graffius Avenue Bridge, Punxsutawney Borough, (Base Construction Allocation $222,000) (Land Allocation $22,000) (Design and Contingencies $44,000) (5) SR 2023, Cortez Bridge, McCalmont Township, (Base Construction Allocation $64,000) (Land Allocation $6,000) (Design and Contingencies $13,000) (6) SR 3008, No.8 Road Bridge, Young Township, 171,000 4,464, , ,000 81, , ,000 83,000
178 SESSION OF 2006 Act ,000 (Base Construction Allocation $56,000) (Land Allocation $6,000) (Design and Contingencies $11,000) (7) SR 3039, South Colon Bridge, Knox Township, 75,000 (Base Construction Allocation $58,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (8) SR 2007, Paradise Church Bridge, Henderson 75,000 (Base Construction Allocation $58,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (9) SR 3003, Langville Bridge, Ringgold Township, 465,000 (Base Construction Allocation $358,000) (Land Allocation $36,000) (Design and Contingencies $72,000) (10) SR 0310, Harmony Bridge No.2, McCalmont Township, Bridge Restoration 130,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $20,000) (11) SR 0310, Harmony Bridge No.2, Young Township, Bridge Restoration 104,000 (Base Construction Allocation $80,000) (Land Allocation $8,000) (Design and Contingencies $16,000) (12) SR 0310, Bradford Street Bridge, Reynoldsville Borough, Bridge Restoration 195,000 (Base Construction Allocation $150,000) (Land Allocation $15,000) (Design and Contingencies $30,000) (13) SR 0310, Trout Run Bridge, Winslow Township, Bridge Restoration 195,000 (Base Construction Allocation $150,000) (Land Allocation $15,000) (Design and Contingencies $30,000) (14) SR 2023, Sandy Lick Point Bridge, Pine Creek Township, Bridge Restoration 260,000 (Base Construction Allocation $200,000) (Land Allocation $20,000) (Design and Contingencies $40,000)
179 902 Act LAWS OF PENNSYLVANIA (15) SR 3004, East Dora Bridge No.!, Ringgold Township, Bridge Restoration 99,000 (Base Construction Allocation $76,000) (Land Allocation $8,000) (Design and Contingencies $15,000) (16) SR 0119, Indiana Hill Bridge Removal, Young 78,000 (Base Construction Allocation $60,000) (Land Allocation $6,000) (Design and Contingencies $12,000) (17) SR 0436, Margiotti Bridge, Punxsutawney Borough, Bridge Restoration 91,000 (Base Construction Allocation $70,000) (Land Allocation $7,000) (Design and Contingencies $14,000) (18) SR 0028, Freemer Hill 3R Bridge, Snyder Township, Bridge Rehabilitation 355,000 (Base Construction Allocation $80,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (19) SR 0899, Clarington Bridge Deck, Barnett Township, Bridge Rehabilitation 380,000 (Base Construction Allocation $180,000) (Land Allocation $50,000) (Design and Contingencies $150,000) (20) SR 0119, Big Run Arch, Big Run Borough, 355,000 (Base Construction Allocation $260,000) (Land Allocation $15,000) (Design and Contingencies $80,000) (21) SR 0310, Group Super s, Jefferson County, Bridge Rehabilitation 262,000 (Base Construction Allocation $192,000) (Land Allocation $20,000) (Design and Contingencies $50,000) (22) SR 1011 over Mill Creek, Washington 73,000 (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (23) SR 1830 over Mill Creek, Washington 133,000 (Base Construction Allocation $83,000) (Land Allocation $25,000) (Design and Contingencies $25,000)
180 SESSION OF 2006 Act (24) SR 2010 over Trout Run, Winslow Township, 100,000 (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (25) SR 2033 over Soldier Run, Winslow Township, 74,000 (Base Construction Allocation $46,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (26) SR 2035 over Soldier Run, Reynoldsville Borough, 202,000 (Base Construction Allocation $126,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (27) SR 3007 over Beaver Run, Beaver Township, 124,000 (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (28) SR 3011 over Little Sandy Creek, Seg.0230, Oliver 144,000 (Base Construction Allocation $90,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (29) SR 3011 over Little Mahoning Creek, Seg.0030, Perry 521,000 (Base Construction Allocation $325,000) (Land Allocation $98,000) (Design and Contingencies $98,000) (30) SR 3031 over Lick Run, Oliver Township, 49,000 (Base Construction Allocation $31,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (31) SR 3015, Fordham Bridge over Mahoning Creek, Perry 1,179,000 (Base Construction Allocation $737,000) (Land Allocation $221,000) (Design and Contingencies $221,000) Section 38. Juniata County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0850 over Reeds Gap Run, Tuscarora
181 904 Act LAWS OF PENNSYLVANIA Township, Bridge Rehabilitation 750,000 (Base Construction Allocation $750,000) (2) SR 2023, Bridge over Tributary of Mahantango Creek, Susquehanna Township, Box Culvert 235,000 (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (3) SR 0333, Bridge over Tributary of Hunters Creek, Turbett Township, Box Culvert 235,000 (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (4) SR 3014 over Willow Run, Tuscarora Township, 672,000 (Base Construction Allocation $396,000) (Land Allocation $51,000) (Design and Contingencies $225,000) (5) SR 4Q03 over Licking Creek, Milford Township, 220,000 (Base Construction Allocation $150,000) (Land Allocation $10,000) (Design and Contingencies $60,000) (6) SR 0074 over Hunters Creek, Turbett Township, 80,000 (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (7) SR 0850 over Little Laurel Run, Tuscarora 112,000 (Base Construction Allocation $70,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (8) SR 1003 over Lost Creek, Fayette Township, 64,000 (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (9) SR 2017 over Stony Run, Greenwood Township, 132,000 (Base Construction Allocation $82,000) (Land Allocation $25,000) (Design and Contingencies $25,000)
182 SESSION OF 2006 Act (10) SR 2017 over Cocolamus Creek, Greenwood 240,000 (Base Construction Allocation $150,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (11) SR 2028 over Dutchmans Run, Greenwood 52,000 (Base Construction Allocation $32,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (12) SR 3010 over Licking Creek, Milford 160,000 (Base Construction Allocation $100,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (13) SR 3021 over Tuscarora Creek, Tuscarora 432,000 (Base Construction Allocation $270,000) (Land Allocation $81,000) (Design and Contingencies $81,000) (14) SR 4003 over Licking Creek, Milford 281,000 (Base Construction Allocation $175,000) (Land Allocation $53,000) (Design and Contingencies $53,000) Section 39. Lackawanna County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0435, Wayne County Line over the Lehigh River, Clifton 680,000 (Base Construction Allocation $550,000) (Land Allocation $20,000) (Design and Contingencies $110,000) (2) SR 0011, 0.1 Mile South of Keyser Avenue over Leach Creek, City of Scranton, Bridge 860,000 (Base Construction Allocation $700,000) (Land Allocation $20,000) (Design and Contingencies $140,000) (3) SR 3016, 200 Feet East of SR 3013 over the Lackawanna River, Taylor Borough, Bridge 2,960,000 (Base Construction Allocation $2,464,000) (Land Allocation $4,000) (Design and Contingencies $492,000)
183 906 Act LAWS OF PENNSYLVANIA (4) SR 0084, 0.3 Mile South of TR 435 over Roaring Brook, Roaring Brook Township, Bridge 4,804,000 (Base Construction Allocation $4,000,000) (Land Allocation $4,000) (Design and Contingencies $800,000) (5) SR 0081 over TR 502, Moosic Borough, Bridge 1,548,000 (Base Construction Allocation $1,286,000) (Land Allocation $4,000) (Design and Contingencies $258,000) (6) SR 0081 over TR 442, South Abington 2,620,000 (Base Construction Allocation $2,170,000) (Land Allocation $20,000) (Design and Contingencies $430,000) (7) SR 0081 over TR 442, South Abington 2,620,000 (Base Construction Allocation $2,170,000) (Land Allocation $20,000) (Design and Contingencies $430,000) (8) SR 0081 over SR 4028, Fairview Road, South Abington 2,550,000 (Base Construction Allocation $2,110,000) (Land Allocation $20,000) (Design and Contingencies $420,000) (9) SR 0081 over SR 4028, Fairview Road, South Abington 2,550,000 (Base Construction Allocation $2,110,000) (Land Allocation $20,000) (Design and Contingencies $420,000) (10) SR 0081, 0.1 Mile South of Exit 194 over Hall Creek, South Abington Township, Bridge 1,100,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $180,000) (11) SR 0081, 185 Feet West of 181 over a Tributary of Lackawanna River, City of Scranton, 610,000 (Base Construction Allocation $490,000) (Land Allocation $20,000) (Design and Contingencies $100,000)
184 SESSION OF 2006 Act (12) SR 0081, 0.2 Mile South of TR 502 over Springbrook Creek, Moosic Borough, Bridge Rehabilitation 550,000 (Base Construction Allocation $500,000) (Design and Contingencies $50,000) (13) SR 0006, 0.2 Mile East of SR 4011 over Canadian Pacific Railroad, Clarks Summit Borough, Bridge Rehabilitation 154,000 (Base Construction Allocation $140,000) (Design and Contingencies $14,000) (14) SR 4026, 0.5 Mile South of TR 6 over Canadian Pacific Railroad, Clarks Summit Borough, Bridge Rehabilitation 385,000 (Base Construction Allocation $350,000) (Design and Contingencies $35,000) (15) SR 8041 over TR 11, South Abington Township, Bridge Rehabilitation 220,000 (Base Construction Allocation $200,000) (Design and Contingencies $20,000) (16) SR 1031 over 181 Southbound and Northbound, Scott 821,000 (Base Construction Allocation $681,000) (Land Allocation $4,000) (Design and Contingencies $136,000) (17) SR 0081 over TR 107, Scott Township, Bridge 2,590,000 (Base Construction Allocation $2,140,000) (Land Allocation $20,000) (Design and Contingencies $430,000) (18) SR 0081, 400 Feet South of TR 107 over South Branch of Tunkhannock Creek, Scott Township, 1,960,000 (Base Construction Allocation $1,620,000) (Land Allocation $20,000) (Design and Contingencies $320,000) (19) SR 0081 over TR 107, Scott Township, Bridge 2,590,000 (Base Construction Allocation $2,140,000) (Land Allocation $20,000) (Design and Contingencies $430,000) (20) SR 0081, 1,500 Feet South of Exit 199 over Kennedy Creek, Scott Township, Bridge 2,230,000 (Base Construction Allocation $1,840,000) (Land Allocation $20,000)
185 908 Act LAWS OF PENNSYLVANIA (Design and Contingencies $370,000) (21) SR 0690, Junction of SR 2019 over Unknown Stream, Spring Brook Township, Bridge 550,000 (Base Construction Allocation $440,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (22) SR 0438, 0.3 Mile West of TR 247 over South Branch of Tunkhannock Creek, Scott Township, 680,000 (Base Construction Allocation $550,000) (Land Allocation $20,000) (Design and Contingencies $110,000) (23) SR 0502, 0.3 Mile East of TR 11 over Spring Brook, Moosic Borough, 3,620,000 (Base Construction Allocation $3,000,000) (Land Allocation $20,000) (Design and Contingencies $600,000) (24) SR 0690, 1.1 Miles West of TR 307 over Roadway Drainage, Spring Brook Township, 550,000 (Base Construction Allocation $440,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (25) SR 0107, 0.1 Mile West of SR 1017 over Heart Lake Creek, Scott 360,000 (Base Construction Allocation $280,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (26) SR 0438, 0.2 Mile East of TR over a Branch of Tunkhannock, Benton Township, Bridge 480,000 (Base Construction Allocation $380,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (27) SR 4010, 0.2 Mile West of TR 407 over a Branch of Ackerly Creek, Abington Township, 250,000 (Base Construction Allocation $190,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (28) SR 0084, 1.2 Miles East of TR 247 over a Recreational Trail, Jefferson Township, Bridge 1,093,000 (Base Construction Allocation $894,000)
186 SESSION OF 2006 Act (Land Allocation $20,000) (Design and Contingencies $179,000) (29) SR 0081, 181 Northbound over SR 3031, Moosic Borough, 588,000 (Base Construction Allocation $525,000) (Design and Contingencies $63,000) (30) SR 0081, 181 Southbound over SR 3031, Moosic Borough, 553,000 (Base Construction Allocation $494,000) (Design and Contingencies $59,000) (31) SR 0081, 181 Northbound over SR 6006, City of Scranton, 1,199,000 (Base Construction Allocation $1,071,000) (Design and Contingencies $128,000) (32) SR 3021, 1 Mile West of SR 0307, City of Scranton, 49,000 (Base Construction Allocation $44,000) (Design and Contingencies $5,000) (33) SR 0084, 184 East over Roaring Brook and Erie Railroad, 1,920,000 (Base Construction Allocation $1,500,000) (Land Allocation $10,000) (Design and Contingencies $410,000) (34) SR 0084, 184 West over Roaring Brook and Erie Railroad, 1,920,000 (Base Construction Allocation $1,500,000) (Land Allocation $10,000) (Design and Contingencies $410,000) (35) SR 0081, Lackawanna and Luzerne Counties, Bridge Preventative Maintenance and/or Rehabilitation 4,100,000 (Base Construction Allocation $4,000,000) (Design and Contingencies $100,000) (36) SR 2005 over Roaring Brook, Moscow Borough, 206,000 (Base Construction Allocation $128,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (37) SR 2013 over Meadowbrook, Clifton 104,000 (Base Construction Allocation $64,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (38) SR 2013 over Choke Creek, Lehigh Township,
187 910 Act LAWS OF PENNSYLVANIA 89,000 (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (39) SR 0502 over Spring Brook, Moosic Borough, 440,000 (Base Construction Allocation $274,000) (Land Allocation $83,000) (Design and Contingencies $83,000) Section 40. LancasterCounty. (a) Local Bridges (1) Rapho Township, 1364 over Big Chickies Creek, 1,370,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $450,000) (2) West Hempfield and Rapho Townships, T359 over Big ChickiesCreek, 1,380,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $460,000) (3) West Hempfield and Rapho Townships, 1359, Garfield Road over Big Chickies Creek, Bridge 1,380,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $460,000) (4) Rapho Township, 1364 over Big Chickies Creek, 1,370,000 (Base Construction Allocation $900,000) (Land Allocation $20,000) (Design and Contingencies $450,000) (5) East Earl Township, 1848 over Conestoga River, 1,416,000 (Base Construction Allocation $750,000) (Land Allocation $22,000) (Design and Contingencies $644,000) (6) East Donegal Township, 13 34, Long Lane, 460,000 (Base Construction Allocation $400,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (7) Rapho Township, Hamaker Road over Chiques Creek, 903,000 (Base Construction Allocation $750,000)
188 SESSION OF 2006 Act (Land Allocation $25,000) (Design and Contingencies $128,000) (8) East Cocalico Township, T90l over Stony Run, 1,500,000 (Base Construction Allocation $1,000,000) (Land Allocation $100,000) (Design and Contingencies $400,000) (9) Denver Borough, Walnut Street over Penn Eastern Railroad, Bridge Rehabilitation 177,000 (Base Construction Allocation $112,000) (Design and Contingencies $65,000) (10) Denver Borough, Weaver Road over Cocalico Creek, 3,600,000 (Base Construction Allocation $3,000,000) (Land Allocation $200,000) (Design and Contingencies $400,000) (11) West Cocalico Township, Sportsmans Road over Cocalico Creek, 800,000 (Base Construction Allocation $600,000) (Design and Contingencies $200,000) (12) Ephrata Township, T668, Mohler Church Road over Cocalico Creek, 2,000,000 (Base Construction Allocation $1,750,000) (Land Allocation $50,000) (Design and Contingencies $200,000) (b) State Bridges (1) PA 472 over Octoraro Creek, Colerain Township, Bridge Rehabilitation 1,870,000 (Base Construction Allocation $1,337,000) (Land Allocation $133,000) (Design and Contingencies $400,000) (2) SR 0462 over Amtrak, Mountville Borough, 1,755,000 (Base Construction Allocation $1,200,000) (Land Allocation $55,000) (Design and Contingencies $500,000) (3) PA 324 over Pequea Creek, Pequea and Providence Townships, Bridge Rehabilitation 1,270,000 (Base Construction Allocation $860,000) (Land Allocation $10,000) (Design and Contingencies $400,000) (4) SR 3016 over Abandoned Railroad, Providence 1,150,000 (Base Construction Allocation $860,000) (Land Allocation $15,000)
189 912 Act LAWS OF PENNSYLVANIA (Design and Contingencies $275,000) (5) SR 2019 over Beaver Creek, Strasburg and Providence Townships, 1,505,000 (Base Construction Allocation $975,000) (Land Allocation $30,000) (Design and Contingencies $500,000) (6) US 222 over PA 272, West Earl Township, Bridge Rehabilitation 940,000 (Base Construction Allocation $800,000) (Design and Contingencies $140,000) (7) SR 0462 over Stickler Run, West Hempfield 590,000 (Base Construction Allocation $420,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (8) PA 462 over Norfolk Southern Railroad Tracks, Mountville Borough, 1,755,000 (Base Construction Allocation $1,200,000) (Land Allocation $55,000) (Design and Contingencies $500,000) (9) SR 2039 over Mill Creek, West Lampeter 1,020,000 (Base Construction Allocation $500,000) (Land Allocation $20,000) (Design and Contingencies $500,000) (10) US 222 over Stone Quarry Road, West Earl Township, Bridge Rehabilitation 405,000 (Base Construction Allocation $345,000) (Design and Contingencies $60,000) (11) US 222 over US 322, Ephrata and West Earl Townships, Bridge Rehabilitation 1,000,000 (Base Construction Allocation $1,000,000) (12) PA 272 over Cocalico Creek, East Earl 1,325,000 (Base Construction Allocation $790,000) (Land Allocation $35,000) (Design and Contingencies $500,000) (13) PA 772 over Amtrak, Mount Joy Borough, 1,440,000 (Base Construction Allocation $500,000) (Land Allocation $140,000) (Design and Contingencies $800,000) (14) PA 897 over Muddy Creek, Brecknock and East Earl Townships, 1,530,000 (Base Construction Allocation $900,000)
190 SESSION OF 2006 Act (Land Allocation $30,000) (Design and Contingencies $600,000) (15) PA 472 over West Branch Octoraro Creek, Colerain Township, Bridge Rehabilitation 1,060,000 (Base Construction Allocation $860,000) (Design and Contingencies $200,000) (16) US 222 over US 322, Ephrata and West Earl Townships, Bridge Rehabilitation 940,000 (Base Construction Allocation $800,000) (Design and Contingencies $140,000) (17) SR 2006 over Octoraro Creek, Little Britain Township, Bridge Rehabilitation 1,268,000 (Base Construction Allocation $926,000) (Land Allocation $10,000) (Design and Contingencies $332,000) (18) PA 324 over Pequea Creek, Martic and Conestoga Townships, 2,444,000 (Base Construction Allocation $1,768,000) (Land Allocation $70,000) (Design and Contingencies $606,000) (19) PA 372 over Susquehanna River, Martic Township, Bridge Rehabilitation 465,000 (Base Construction Allocation $400,000) (Design and Contingencies $65,000) (20) PA 772 over Amtrak, Mount Joy Borough, 4,988,000 (Base Construction Allocation $4,048,000) (Land Allocation $140,000) (Design and Contingencies $800,000) (21) PA 230 over Little Chickies Creek, Mount Joy Borough, 1,100,000 (Base Construction Allocation $500,000) (Land Allocation $50,000) (Design and Contingencies $550,000) (22) SR 2013 over Octoraro Creek, Colerain 890,000 (Base Construction Allocation $670,000) (Land Allocation $30,000) (Design and Contingencies $190,000) (23) SR 4010, Mt. Pleasant Road over Little Chickies Creek, Mount Joy Township, Bridge 1,000,000 (Base Construction Allocation $1,000,000)
191 914 Act LAWS OF PENNSYLVANIA (24) SR 4010, Mt. Pleasant Road over Little Chickies Creek, Mount Joy Township, Bridge 2,000,000 (Base Construction Allocation $2,000,000) (25) SR 0741, Strasburg Road over Tributary of Londonland Run, Paradise Township, Bridge 210,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (26) SR 1024, Springville Road over Indian Run, Ephrata 210,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (27) SR 1035, Clay Road over Middle Creek, Clay 210,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (28) SR 2033, Cheny Hill Road over Pequea Creek, Leacock and Paradise Townships, Bridge 330,000 (Base Construction Allocation $220,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (29) SR 4011, Fruitville Pike over Bachman Run, Man~heim 210,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (30) SR 4033, Meadow View Road over Little Chickies Creek, Mt. Joy and Rapho Townships, 210,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (31) SR 0324, Pequea and Providence Townships, Bridge Rehabilitation 206,000 (Base Construction Allocation $139,000) (Land Allocation $4,000) (Design and Contingencies $63,000) (32) SR 0897, Dry Tavern Road Bridge, Brecknock and East Earl Townships, 506,000 (Base Construction Allocation $369,000)
192 SESSION OF 2006 Act (Land Allocation $8,000) (Design and Contingencies $129,000) (33) SR 0010 over Conestoga River, Caernarvon (Base Construction Allocation $132,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (34) SR 0023 over Conestoga River, Seg.0630, Caernarvon (Base Construction Allocation $122,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (35) SR 0023 over Donegal Creek, Seg.0020, East Donegal (Base Construction Allocation $98,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (36) SR 0072 over Chickies Creek, Penn Township, (Base Construction Allocation $126,000) (Land Allocation $37,000) (Design and Contingencies $37,000) (37) SR 0222 over Conestoga River, West Lampeter (Base Construction Allocation $629,000) (Land Allocation $188,000) (Design and Contingencies $188,000) (38) SR 0441 over Chickies Creek, East Donegal (Base Construction Allocation $280,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (39) SR 0772 over Lititz Run, Seg.0450, Warwick (Base Construction Allocation $46,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (40) SR 0772 over Pequea Creek, Seg.0870, Leacock (Base Construction Allocation $195,000) (Land Allocation $58,000) (Design and Contingencies $58,000) (41) SR 1020 over Middle Creek, Ephrata (Base Construction Allocation $99,000) 210, , , ,000 1,005, ,000 74, , ,000
193 916 Act LAWS OF PENNSYLVANIA (Land Allocation $30,000) (Design and Contingencies $30,000) (42) SR 1024 over Hammer Creek, Clay Township, 194,000 (Base Construction Allocation $122,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (43) SR 1030 over Cocalico Creek, East Cocalico 242,000 (Base Construction Allocation $152,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (44) SR 1044 over Little Muddy Creek, Brecknock 129,000 (Base Construction Allocation $81,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (45) SR 1046 over Tributary of Muddy Creek, Brecknock 84,000 (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (46) SR 1053 over Hamish Run, West Cocalico 198,000 (Base Construction Allocation $124,000) (Land Allocation $37,000) (Design and Contingencies $37,000) (47) SR 1901 over Conestoga River, Earl Township, 410,000 (Base Construction Allocation $256,000) (Land Allocation $77,000) (Design and Contingencies $77,000) (48) SR 2008 over Coopers Run, Colerain 59,000 (Base Construction Allocation $37,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (49) SR 2009 over West Branch of Octoraro Creek, Colerain 150,000 (Base Construction Allocation $94,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (50) SR 2011 over Tributary of West Branch of Octoraro Creek, Little Britain Township, Bridge
194 SESSION OF 2006 Act (Base Construction Allocation $35,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (51) SR 3009 over Pequea Creek, Providence (Base Construction Allocation $226,000) (Land Allocation $68,000) (Design and Contingencies $68,000) (52) SR 3028 over AMTRAK, East Lampeter (Base Construction Allocation $138,000) (Land Allocation $41,000) (Design and Contingencies $41,000) (53) SR 3040 over Beaver Creek, Strasburg (Base Construction Allocation $79,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (54) SR 4003 over Chickies Creek, West Hempfield (Base Construction Allocation $203,000) (Land Allocation $61,000) (Design and Contingencies $61,000) (55) SR 4004 over Convoy Creek, Conoy Township, (Base Construction Allocation $112,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (56) SR 4033 over Brubaker Run, Warwick (Base Construction Allocation $26,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (57) SR 4037 over Conewago Creek, Mt. Joy (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (58) SR 0462, Veterans Memorial Bridge over Susquehanna River, Columbia Borough, West Hempfield Township and Wrightsville Borough, (Base Construction Allocation $2,000,000) 55, , , , , ,000 42,000 80,000 2,000,000
195 918 Act LAWS OF PENNSYLVANIA (59) SR 1031, Warwick Township, Bridge Rehabilitation 150,000 (Base Construction Allocation $125,000) (Design and Contingencies $25,000) (60) SR 1019 over Tributary of Conestoga River, Caernarvon 800,000 (Base Construction Allocation $800,000) (61) SR 1028, Elizabeth Township, Culvert 700,000 (Base Construction Allocation $600,000) (Design and Contingencies $100,000) (62) SR 1028, Elizabeth Township, Culvert 700,000 (Base Construction Allocation $600,000) (Design and Contingencies $100,000) Section 41. Lawrence County. (a) Local Bridges (I) City of New Castle, North Street over Neshannock Creek, 2,020,000 (Base Construction Allocation $1,500,000) (Land Allocation $20,000) (Design and Contingencies $500,000) (2) North Beaver Township, 1370, Reed Road over Tributary ofhickory Run, 800,000 (Base Construction Allocation $450,000) (Land Allocation $10,000) (Design and Contingencies $340,000) (3) Shenango Township, T741, Old Butler Road over Big Run, 490,000 (Base Construction Allocation $420,000) (Land Allocation $10,000) (Design and Contingencies $60,000) (4) Perry Township, T35l, Camp Run Road over Camp Run, 700,000 (Base Construction Allocation $350,000) (Land Allocation $10,000) (Design and Contingencies $340,000) (5) Perry Township, 1516, North Camp Run Road over Camp Run, 700,000 (Base Construction Allocation $350,000) (Land Allocation $10,000) (Design and Contingencies $340,000) (6) New Wilmington Borough, Oak Street over McClures Run, 700,000 (Base Construction Allocation $350,000)
196 SESSION OF 2006 Act (Land Allocation $10,000) (Design and Contingencies $340,000) (7) City of New Castle, Boyles Avenue over Rural Avenue, 543,000 (Base Construction Allocation $468,000) (Land Allocation $10,000) (Design and Contingencies $65,000) (8) City of New Castle, Columbus Innerbelt over Neshannock Creek, Bridge Rehabilitation 1,000,000 (Base Construction Allocation $750,000) (Design and Contingencies $250,000) (9) City of New Castle, Jefferson Street over Big Run, 1,300,000 (Base Construction Allocation $750,000) (Land Allocation $50,000) (Design and Contingencies $500,000) (10) Neshannock Township, T462 over Tributary of Neshannock Creek, 700,000 (Base Construction Allocation $350,000) (Land Allocation $10,000) (Design and Contingencies $340,000) (11) Slippery Rock Township, T394, Big Run Road, 820,000 (Base Construction Allocation $450,000) (Land Allocation $10,000) (Design and Contingencies $360,000) (b) State Bridges (1) SR 0108, Mt. Jackson Road over Hickory Run, North Beaver 192,000 (Base Construction Allocation $102,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (2) SR 0168, Eastbrook Road over Branch of Neshannock Creek, Hickory Township, Bridge Rehabilitation 100,000 (Base Construction Allocation $10,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (3) SR 0168, Eastbrook Road over Hottenbaugh Run, Hickory Township, Bridge Rehabilitation 117,000 (Base Construction Allocation $27,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (4) SR 0168, Eastbrook Road over Small Stream,
197 920 Act LAWS OF PENNSYLVANIA Hickory Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (5) SR 0168, Eastbrook Road over Branch of Neshannock Creek, Hickory Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (6) SR 0168, Eastbrook Road over Neshannock Creek, Wilmington Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (7) SR 0208, Pulaski Road over Branch of Deer Creek, Pulaski 120,000 (Base Construction Allocation $30,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (8) SR 0224, Youngstown Pola Road over Branch of Mahoning River, Mahoning Township, Bridge Rehabilitation 102,000 (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (9) SR 0422, Ben Franklin Highway over PA 60 Northbound Toll and Ramp, Northbound and Southbound, Union Township, Bridge Rehabilitation 415,000 (Base Construction Allocation $325,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (10) SR 0422, Ben Franklin Highway over TR 18 and Cedar Street, City of New Castle, Bridge 1,555,000 (Base Construction Allocation $1,465,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (11) SR 0422, Ben Franklin Highway over Route 18 and Cedar Street, City of New Castle, Bridge 1,562,000 (Base Construction Allocation $1,472,000) (Land Allocation $40,000)
198 SESSION OF 2006 Act (Design and Contingencies $50,000) (12) SR 0488, Portersville Road over Morrison Run, Perry Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (13) SR 0551, Main Street over Sugar Creek, North Beaver 118,000 (Base Construction Allocation $28,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (14) SR 0551, Main Street over Small Stream, North Beaver Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (15) SR 0551, SH over Branch of Shenango River, Pulaski Township, Bridge Rehabilitation 97,000 (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (16) SR 0956, Neshannock Falls Road over Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation 102,000 (Base Construction Allocation $12,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (17) SR 0956, Neshannock Falls Road over Neshannock Creek, Wilmington Township, Bridge Rehabilitation 220,000 (Base Construction Allocation $130,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (18) SR 0956, Neshannock Falls Road over Branch of Little Neshannock Falls Creek, Wilmington Township, Bridge Rehabilitation 96,000 (Base Construction Allocation $6,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (19) SR 0956, Neshannock Falls Road over Branch of Little Neshannock Creek, Wilmington 111,000 (Base Construction Allocation $21,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
199 922 Act LAWS OF PENNSYLVANIA (20) SR 1002, Maitland Lane over Branch of Neshannock Creek, Neshannock Township, 116,000 (Base Construction Allocation $26,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (21) SR 1009, Neshannock Falls Road over Branch of Little Neshaimock Creek, Hickory Township, Bridge Rehabilitation 95,000 (Base Construction Allocation $5,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (22) SR 1009, Neshannock Falls Road over Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation 121,000 (Base Construction Allocation $31,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (23) SR 1016, North Liberty Drive over 179, Plain Grove Township, Bridge Rehabilitation 298,000 (Base Construction Allocation $208,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (24) SR 2001, McKee Run over Savannah Road, Shenango Township, Bridge Rehabilitation 94,000 (Base Construction Allocation $4,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (25) SR 3004, Wallace Road over Branch of Honey Creek, North Beaver Township, Bridge 112,000 (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (26) SR 3008, Darlington Road over Wampum Run, New Beaver Borough, Bridge Rehabilitation 95,000 (Base Construction Allocation $5,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (27) SR 3010, Covert Road over US 422 Eastbound and Westbound, Union Township, Bridge Rehabilitation 437,000 (Base Construction Allocation $347,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
200 SESSION OF 2006 Act (28) SR 3011, Thompson Road over North Fork of Little Beaver Creek, Little Beaver Township, Bridge Rehabilitation 197,000 (Base Construction Allocation $107,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (29) SR 3016, GarbonMicco Road over Tributary of Mahoning River, Mahoning Township, Bridge Rehabilitation 99,000 (Base Construction Allocation $9,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (30) SR 4001, Evergreen Road over Coffee Run, Pulaski Township, Bridge Rehabilitation 101,000 (Base Construction Allocation $11,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (31) SR 4001, Pulaski Road over Branch of Deer Creek, Pulaski Township, Bridge Rehabilitation 101,000 (Base Construction Allocation $11,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (32) SR 4001, SharonBedford Road over Small Stream, Pulaski Township, Bridge Rehabilitation 94,000 (Base Construction Allocation $4,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (33) SR 4005, Pulaski Road over Camp Run, Neshannock Township, Bridge Rehabilitation 106,000 (Base Construction Allocation $16,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (34) SR 4005, Pulaski Road over Branch of Shenango River, Pulaski Township, Bridge 115,000 (Base Construction Allocation $25,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (35) SR 4006, Sky Hill Road over Branch of Mahoning River, Mahoning Township, Bridge 141,000 (Base Construction Allocation $51,000) (Land Allocation $40,000) (Design and Contingencies $50,000)
201 924 LAWS OF PENNSYLVANIA Act (36) SR 4008, High Hill Road over Deer Creek, Pulaski Township, Bridge Rehabilitation (Base Construction Allocation $11,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (37) SR 4008, High Hill Road over Branch of Deer Creek, Pulaski (Base Construction Allocation $22,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (38) SR 4008, High Hill Road over Branch of Deer Creek, Pulaski Township, Bridge Rehabilitation (Base Construction Allocation $7,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (39) SR 4014, BypassFalls Street over Shenango R, P and LE, City of New Castle, Bridge Rehabilitation (Base Construction Allocation $941,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (40) SR 4015, TR 324 over Traffic Route 224, Mahoning Township, Bridge Rehabilitation (Base Construction Allocation $34,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (41) SR 4004, Pulaski Road over Fisher Run, Neshannock Township, Bridge Rehabilitation (Base Construction Allocation $10,000) (Land Allocation $40,000) (Design and Contingencies $50,000) (42) SR 4004, Pulaski Road over Fisher Run, Neshannock Township, Culvert (Base Construction Allocation $160,000) (Design and Contingencies $14,000) (43) SR 0060 Southbound over Township Road 605, Bridge Preservation (Base Construction Allocation $25,000) (Design and Contingencies $1,000) (44) SR 0422 over Big Run Preservation, Shenango Township, Deck Repairs, Substructure Repairs, Dams (Base Construction Allocation $240,000) (Design and Contingencies $24,000) 101, ,000 97,000 1,031, , , ,000 26, ,000
202 SESSION OF 2006 Act (45) SR 0060 over Shenango River, Neshannock Township, Deck Repairs, Paint, Hone Retrofits (Base Construction Allocation $400,000) (Design and Contingencies $4,000) (46) SR 0018 over Abandoned Plant Access Road South, Beaver (Base Construction Allocation $144,000) (Land Allocation $43,000) (Design and Contingencies $43,000) (47) SR 0168 over Hottenbaugh Run, Hickory (Base Construction Allocation $93,000) (Land Allocation $28,000) (Design and Contingencies $28,000) Section 42. Lebanon County. (a) Local Bridges (1) Annville Township, T398 over Quittapahilla Creek, (Base Construction Allocation $950,000) (2) Annville Township, Spruce Street over Quittapahilla Creek, (Base Construction Allocation $280,000) (Land Allocation $28,000) (Design and Contingencies $50,000)(3) North Annville Township, T376 over Quittapahilla Creek, (Base Construction Allocation $980,000) (4) Jackson Township, West of Myerstown, Creamery Street Bridge over Tulpehocken Creek, (Base Construction Allocation $160,000) (Land Allocation $4,000) (Design and Contingencies $28,000) (5) East Hanover Township, T336 over Raccoon Creek, (Base Construction Allocation $675,000) (6) North Cornwall Township, T427, Chestnut Street over Quittapahilla Creek, Bridge (Base Construction Allocation $1,200,000) (b) State Bridges (1) SR 4013 over 181, East Hanover and Union Townships, Bridge Rehabilitation (Base Construction Allocation $2,083,000) (Design and Contingencies $500,000) , , , , , , , ,000 1,200,000 2,583,000
203 926 Act LAWS OF PENNSYLVANIA (2) SR 0072 over 178, Bethel, Swatara and Union Townships, Bridge Rehabilitation (Base Construction Allocation $2,690,000) (Design and Contingencies $500,000) (3) Lebanon City, North Lincoln Avenue over Quittapahilla Creek, (Base Construction Allocation $975,000) (4) SR 0934, White Oak Street over Norfolk Southern Railroad, Annville and North Annville Townships, (Base Construction Allocation $240,000) (Land Allocation $20,000) (Design and Contingencies $110,000) (5) SR 1020, Lickdale Road over Oil Run, Swatara (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (6) SR 2014, Fort Zellers Road over Mill Creek, Millcreek (Base Construction Allocation $104,000) (Design and Contingencies $90,000) (7) SR 4013, Jonestown Road over Tributary of Raccoon Creek, East Hanover Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (8) SR 4013, 181 Overhead Bridge Group, East Hanover and Union Townships, Bridge Preservation (Base Construction Allocation $429,000) (Design and Contingencies $190,000) (9) SR 0072, 178 Overhead Bridges, Bethel, Swatara and Union Townships, Bridge Preservation (Base Construction Allocation $419,000) (Design and Contingencies $40,000) (10) SR 0072 over Snitz Creek, Cornwall Borough, (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) 3,190, , , , , , , ,000 64,000
204 SESSION OF 2006 Act (11) SR 0117 over Conewago Creek, South Londonderry (Base Construction Allocation $71,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (12) SR 1009 over Little Swatara Creek, Bethel (Base Construction Allocation $197,000) (Land Allocation $59,000) (Design and Contingencies $59,000) (13) SR 1013 over Tulpehocken Creek, North Lebanon (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (14) SR 1014 over Earlakill Run, Bethel Township, (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (15) SR 3009 over Little Conewago Creek, Seg.0050, South Londonderry Township, Bridge (Base Construction Allocation $42,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (16) SR 3009 over Tributary of Conewago Creek, Seg.0030, South Londonderry Township, Bridge (Base Construction Allocation $56,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (17) SR 4007 over Swatara Creek, East Hanover (Base Construction Allocation $297,000) (Land Allocation $89,000) (Design and Contingencies $89,000) (18) SR 4008 over Quittapahilla Creek, North Annville (Base Construction Allocation $146,000) (Land Allocation $44,000) (Design and Contingencies $44,000) (19) SR 4013 over Tributary of Raccoon Creek, East Hanover (Base Construction Allocation $32,000) , , ,000 73,000 66,000 90, , ,000 50,000
205 928 Act LAWS OF PENNSYLVANIA (Land Allocation $9,000) (Design and Contingencies $9,000) Section 43. Lehigh County. (a) Local Bridges (1) City of Allentown, Linden Street over Jordan Creek, (Base Construction Allocation $1,600,000) (Design and Contingencies $80,000) (2) City of Allentown, Lehigh Parkway over Little Lehigh Creek, (Base Construction Allocation $1,800,000) (Land Allocation $110,000) (Design and Contingencies $400,000) (3) Whitehall Township, Lehigh Street over Lehigh River, (Base Construction Allocation $8,500,000) (Design and Contingencies $250,000) (4) Whitehall Township, Chestnut Street over Lehigh River, Bridge Rehabilitation (Base Construction Allocation $1,600,000) (Land Allocation $215,000) (Design and Contingencies $335,000) (5) Heidelberg Township, T778, Hunters Hill Road over Jordan Creek, (Base Construction Allocation $217,500) (Design and Contingencies $32,500) (6) Upper Milford Township, T4 16, (Base Construction Allocation $250,000) (Land Allocation $25,000) (Design and Contingencies $125,000) (7) Upper Milford Township, T837 over Indian Creek, (Base Construction Allocation $305,000) (Land Allocation $25,000) (Design and Contingencies $80,000) (8) Upper Milford Township, T4 16 over Perkiomen Creek, (Base Construction Allocation $200,000) (Land Allocation $25,000) (Design and Contingencies $80,000) (9) Lower Milford Township, T409, Scout Road, (Base Construction Allocation $385,000) (Land Allocation $70,000) (Design and Contingencies $77,000) 1,680,000 2,310,000 8,750,000 2,150, , , , , ,000
206 SESSION OF 2006 Act (10) Upper Saucon Township, T440, Kozy Korner Lane, Bridge Rehabilitation (Base Construction Allocation $25,000) (Land Allocation $2,000) (11) Upper Saucon Township, T844, Bridge Rehabilitation (Base Construction Allocation $2,000) (Design and Contingencies $1,000) (b) State Bridges (1) SR 2025 over Indian Creek, Upper Milford (Base Construction Allocation $342,000) (2) SR 0100 over Little Lehigh Creek, Seg.0100, Lower Macungie (Base Construction Allocation $95,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (3) SR 0100 over Tributary of Swope Creek, Seg.0040, Lower Macungie Township, Bridge (Base Construction Allocation $69,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (4) SR 0309 over Jordan Creek, Seg.0460, Heidelberg (Base Construction Allocation $79,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (5) SR 0309 over Tributary of Mill Creek, Seg.0400, North Whitehall (Base Construction Allocation $63,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (6) SR 1019 over Little Cedar Creek, Seg.0050, City ofallentown, (Base Construction Allocation $672,000) (Land Allocation $202,000) (Design and Contingencies $202,000) (7) SR 1019 over Cedar Creek, Seg.0050, City of Allentown, (Base Construction Allocation $122,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (8) SR 2009 over Cedar Creek, South Whitehall ,000 3, , , , , ,000 1,076, ,000
207 930 LAWS OF PENNSYLVANIA Act (Base Construction Allocation $105,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (9) SR 2045 over Saucon Creek, Coopersburg Borough, (Base Construction Allocation $47,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (10) SR 3007 over Schaefer Run, Upper Macungie (Base Construction Allocation $66,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (11) SR 4008 over Coplay Creek, North Whitehall (Base Construction Allocation $65,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (12) SR 6100 over Spring Creek, Lower Macungie (Base Construction Allocation $133,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (13) SR 0022 over SR 0309, South Whitehall (Base Construction Allocation $12,300,000) (Land Allocation $1,600,000) (Design and Contingencies $6,200,000) (14) SR 2018 over Tributary of Swope Creek, Lower Macungie (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (15) SR 2018 over Branch of Swope Creek, Macungie Borough, (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (16) SR 2018 over Indian Creek, Upper Milford (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) 169,000 75, , , ,000 20,100, , , ,000
208 SESSION OF 2006 Act (17) SR 2023 over Branch of Leiberts Run, Upper Milford (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (18) SR 2021 over Tributary of Swope Creek, Lower Macungie (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (19) SR 3007 over Breinig Run, Upper Macungie (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (20) SR 3003 over Little Lehigh Creek, Lower Macungie (Base Construction Allocation $3,300,000) (Land Allocation $500,000) (Design and Contingencies $1,700,000) (21) SR 3001 over Little Lehigh Creek, Lower Macungie (Base Construction Allocation $1,300,000) (Land Allocation $200,000) (Design and Contingencies $700,000) (22) SR 2023 over Branch of Leiberts Run, Upper Milford (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) Section 44. Luzerne County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 2047 over Wapwallopen Creek, Wright Township, Bridge Rehabilitation (Base Construction Allocation $115,000) (2) SR 2045 over Wapwallopen Creek, Wright (Base Construction Allocation $256,000) (3) SR 0315, 1.0 Mile East of TR 309 over Laurel Run Creek, Plains (Base Construction Allocation $80,000) (Land Allocation $4,000) (Design and Contingencies $16,000) , , ,000 5,500,000 2,200, , , , ,000
209 932 Act LAWS OF PENNSYLVANIA (4) SR 0309 over SR 2022, City of WilkesBarre, Bridge Rehabilitation (Base Construction Allocation $1,300,000) (Design and Contingencies $130,000) (5) SR 4024, 0.3 Mile North of SR 4005 over Water Runoff, Ross (Base Construction Allocation $201,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (6) SR 4024, 0.3 Mile East of LR 4005, Fairmount (Base Construction Allocation $374,000) (Land Allocation $20,000) (Design and Contingencies $75,000) (7) SR 4024, 144 Feet East of SR 4015 over Huntington Creek, Fairmount Township, Bridge (Base Construction Allocation $374,000) (Land Allocation $20,000) (Design and Contingencies $75,000) (8) SR 2042, 175 Feet East of SR 3007 over Little Wapwallopen Creek, Dorrance Township, Bridge (Base Construction Allocation $350,000) (Land Allocation $20,000) (Design and Contingencies $70,000) (9) SR 0011, Junction of TR 239 over Shickshinny Creek, Shickshinny Borough, (Base Construction Allocation $1,108,000) (Land Allocation $20,000) (Design and Contingencies $222,000) (10) SR 2004, 0.4 Mile South of SR 0309, Plains (Base Construction Allocation $200,000) (Design and Contingencies $30,000) (11) SR 0315, 600 Feet North of SR 2035 over Mill Creek, Dupont Borough, (Base Construction Allocation $45,000) (Land Allocation $4,000) (Design and Contingencies $7,000) (12) SR 0081 over SR 0315, Dupont Borough, (Base Construction Allocation $450,000) (Land Allocation $4,000) (Design and Contingencies $68,000) 1,430, , , , ,000 1,350, ,000 56, ,000
210 SESSION OF 2006 Act (13) SR 0081 over SR 2103, Dupont Borough, (Base Construction Allocation $319,000) (Land Allocation $4,000) (Design and Contingencies $48,000) (14) SR 0029, Junction to SR 0011, Hanover (Base Construction Allocation $6,600,000) (15) SR 2042, 175 Feet East of SR 3007, Dorrance (Base Construction Allocation $600,000) (Land Allocation $40,000) (Design and Contingencies $330,000) (16) SR 0081, Bridge Preventative Maintenance and/or Rehabilitation (Base Construction Allocation $200,000) (Design and Contingencies $100,000) (17) SR 0011 over Shickshinny Creek, Shickshinny Borough, (Base Construction Allocation $102,000) (Land Allocation $31,000) (Design and Contingencies $31,000) (18) SR 2010 over Sugar Notch Run Creek, Hanover (Base Construction Allocation $49,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (19) SR 2041 over Bear Creek, Bear Creek (Base Construction Allocation $98,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (20) SR 3019 over Big Black Creek, Hazle (Base Construction Allocation $79,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (21) SR 3019 over Hazle Creek, Hazle Township, (Base Construction Allocation $68,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (22) SR 4013 over Branch of Kitchen Creek, Fairmount (Base Construction Allocation $49,000) ,000 6,600, , , ,000 79, , , ,000 79,000
211 934 Act LAWS OF PENNSYLVANIA (Land Allocation $15,000) (Design and Contingencies $15,000) (23) SR 4014 over Pine Creek, New Columbus Borough, (Base Construction Allocation $117,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (24) SR 2001 over Solomon Creek, Ashley Borough, (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (25) SR 3042 over Nescopeck Creek, Nescopeck (Base Construction Allocation $194,000) (Land Allocation $58,000) (Design and Contingencies $58,000) (26) SR 4014 over Branch of Huntington Creek, New Columbus Borough, (Base Construction Allocation $1,500,000) (Design and Contingencies $500,000) Section 45. Lycoming County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0015, Village of Trout Run, Northbound Lane over SR 0014, Cogan House and Lewis Townships, (Base Construction Allocation $554,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (2) SR 0015, Village of Trout Run, Southbound Lane over SR 0014, Cogan House and Lewis Townships, (Base Construction Allocation $502,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (3) SR 0220, 1.75 Miles West of Linden over Pine Run, Woodward (Base Construction Allocation $112,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (4) SR 1003, 2 Miles Southeast of Culvert over Wallis Run, Gamble Township, Bridge Replace 187,000 96, ,000 2,050, , , ,000
212 SESSION OF 2006 Act ment (Base Construction Allocation $100,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (5) SR 1006, 2 Miles West of Proctor over Wallis Run, Cascade (Base Construction Allocation $49,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (6) SR 1006, Village of Proctor over Ingle Mill Run, Plunketts Creek (Base Construction Allocation $36,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (7) SR 2014, 3 Miles South of Montoursville over Twin Run, Muncy (Base Construction Allocation $73,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (8) SR 2019, 7 Miles East of Clarkstown over German Run, Franklin Township, Bridge (Base Construction Allocation $43,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (9) SR 2050, 2.5 Miles East oflairdsville over Little Muncy Creek, Franklin and Jordan Townships, (Base Construction Allocation $55,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (10) SR 0118 over Muncy Creek, Wolf Township, (Base Construction Allocation $340,000) (Land Allocation $102,000) (Design and Contingencies $102,000) (11) SR 0220 over Muncy Creek, Wolf Township, (Base Construction Allocation $168,000) (Design and Contingencies $50,000) (12) SR 1005 over Big Bear Creek, Plunketts Creek (Base Construction Allocation $78,000) (Land Allocation $23,000) ,000 85,000 72, ,000 79,000 91, , , ,000
213 936 Act LAWS OF PENNSYLVANIA (Design and Contingencies $23,000) (13) SR 1017 over Trout Run, Lewis Township, (Base Construction Allocation $54,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (14) SR 2024 over Millers Run, Loyalsock (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (15) SR 2044 over Glade Run, Muncy, Bridge (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (16) SR 2048 over Little Muncy Creek, Muncy Creek (Base Construction Allocation $135,000) (Land Allocation $41,000) (Design and Contingencies $41,000) (17) SR 3011 over Pine Run, Woodward Township, (Base Construction Allocation $32,000) (Design and Contingencies $10,000) (18) SR 4007 over Blockhouse Creek, Jackson (Base Construction Allocation $86,000) (Land Allocation $26,00Q) (Design and Contingencies $26,000) (19) SR 2001 over Spring Creek, Washington (Base Construction Allocation $146,000) (Land Allocation $44,000) (Design and Contingencies $44,000) (20) SR 4001 over Little Pine Creek, Pine Township, (Base Construction Allocation $350,000) (Land Allocation $105,000) (Design and Contingencies $105,000) (21) SR 0087 over Mill Creek, Fairfield Township, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $30,000) 86,000 64, , ,000 52, , , , ,000
214 SESSIONOF 2006 Act (Design and Contingencies $40,000) Section 46. McKean County. (a) Local Bridges (1) Ceres Township, Bridge over Kings Run, Bridge (Base Construction Allocation $105,000) (Land Allocation $8,000) (Design and Contingencies $56,000) (2) Liberty Township, T41 5 over Allegheny River, (Base Construction Allocation $1,130,000) (b) State Bridges (1) SR 0346 over Knapp Creek, Prentisvale, Otto (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (2) SR 0046 over Branch of Kendall Creek, Foster Township, Box Culvert (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (3) SR 0046 over Pratt Hollow, Foster Township, Box Culvert (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (4) SR 0006 over Warner Brook, Hamlin Township, (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (5) SR 0006 over Marvin Creek, Hamlm Township, (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (6) SR 0046 over Cole Creek, Keating Township, (Base Construction Allocation $126,000) (Land Allocation $38,000) (Design and Contingencies $38,000) (7) SR 0346 over Knapp Creek, Otto Township, (Base Construction Allocation $45,000) ,000 1,130, , , , ,000 96, ,000 73,000
215 938 Act LAWS OF PENNSYLVANIA (Land Allocation $14,000) (Design and Contingencies $14,000) (8) SR 0446 over McCrea Run, Eldred, Bridge (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (9) SR 1019 over Lillibridge Creek, Port Allegheny, (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (10) SR 2002 over East Branch of Potato Creek, Norwich (Base Construction Allocation $135,000) (Land Allocation $41,000) (Design and Contingencies $41,000) (11) SR 2002 over West Branch of Potato Creek, Norwich (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (12) SR 4005 over Foster Brook, Foster Township, (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (13) SR 0346 over Tunungwant Creek, Bradford, (Base Construction Allocation $100,000) (Land Allocation $30,000) (Design and Contingencies $30,000) Section 47. Mercer County. (a) Local Bridges (1) French Creek Township, T895 Bridge No.0650 over French Creek, (Base Construction Allocation $198,000) (Land Allocation $18,000) (Design and Contingencies $36,000) (2) City ofhermitage, Sample Road Bridge No.2326 over Hogback Run, (Base Construction Allocation $157,000) (Land Allocation $14,000) (Design and Contingencies $29,000) 64, , , , , , , ,000
216 SESSION OF 2006 Act (3) Lake Township, Parker Road Bridge No.2116 over Fox Run, (Base Construction Allocation $222,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (4) Mercer Borough, McKinley Avenue Bridge No.2650 over Munnell Run, (Base Construction Allocation $307,000) (Land Allocation $4,000) (Design and Contingencies $7,000) (5) Pine Township, Daugherty Road Bridge No.3121 over Wolf Creek, (Base Construction Allocation $906,000) (Land Allocation $82,000) (Design and Contingencies $165,000) (6) South Pymatuning Township, Orangeville Road Bridge No over Towel Works Run, Bridge (Base Construction Allocation $265,000) (Land Allocation $24,000) (Design and Contingencies $48,000) (7) Sugar Grove Township, Calvin Road Bridge No.0250 over Bluff Run, (Base Construction Allocation $318,000) (Land Allocation $29,000) (Design and Contingencies $58,000) (b) State Bridges (1) SR 0158 over Beaver Run, East Lackawannock Township, Bridge Rehabilitation (Base Construction Allocation $70,000) (Design and Contingencies $30,000) (2) SR 4019 over Tributary of Shenango River, Hempfield Township, Bridge Rehabilitation (Base Construction Allocation $70,000) (Design and Contingencies $30,000) (3) SR 0079 over Tributary of Black Run, Springfield Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $30,000) (4) SR 2014 over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation (Base Construction Allocation $70,000) , ,000 1,153, , , , , , ,000
217 940 Act LAWS OF PENNSYLVANIA (Design and Contingencies $30,000) (5) SR 2011 over Beaver Creek, East Lackawannock (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (6) SR 0079 over Black Run, Deer Creek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (7) SR 1001 over Tributary of Little Shenango River, Perry Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (8) SR 0258 over Nelson Run, Springfield (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (9) SR 2022 over Branch of Wolf Creek, Worth Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (10) SR 3011 over Hogback Run, City of Hermitage, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (11) SR 4003 over Tributary of Big Run, West Salem Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (12) SR 4024, Baker Hill Road over Sugar Run, Delaware Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (13) SR 0080 over Harthegig Run No.2, Lackawannock Township, Bridge Rehabilitation (Base Construction Allocation $160,000) 120, , , , , , , , ,000
218 Act SESSION OF 2006 (Design and Contingencies $30,000) (14) SR 0080 over Harthegig Run No.!, Lackawannock Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $30,000) (15) SR 3043 over Tributary of Shenango Reservoir, South Pymatuning Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (16) SR 4001 over Tributary No.1 of Sugar Run, Greene Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (17) SR 3039 over Lackawannock Creek, Jefferson Township, Bridge Rehabilitation (Base Construction Allocation $100,000) (Design and Contingencies $30,000) (18) SR 0019, Perry Highway over Black Run,Sandy Creek Township, Bridge Rehabilitation (Base Construction Allocation $120,000) (Design and Contingencies $40,000) (19) SR 0358 over Big Run, West Salem Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $30,000) (20) SR 0058 over Branch of Swamp Run, Pine Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $40,000) (21) SR 0358 over Little Shenango River, Perry Township, Bridge Rehabilitation (Base Construction Allocation $90,000) (Design and Contingencies $30,000) (22) SR 2014 over Wolf Creek, Wolf Creek Town , , , , , , , ,000
219 942 Act LAWS OF PENNSYLVANIA ship, Bridge Rehabilitation (Base Construction Allocation $100,000) (Design and Contingencies $30,000) (23) SR 4016, Kennard Road Bridge, Sugar Grove Township, Bridge Rehabilitation (Base Construction Allocation $120,000) (Design and Contingencies $40,000) (24) SR 0018 over Hogback Run, Shenango Township, Bridge Rehabilitation (Base Construction Allocation $150,000) (Design and Contingencies $40,000) (25) SR 0080 Eastbound over SR 3007, East Lackawannock Township, Bridge Rehabilitation (Base Construction Allocation $240,000) (Design and Contingencies $10,000) (26) SR 0080 Westbound over SR 3007, East Lackawannock Township, Bridge Rehabilitation (Base Construction Allocation $280,000) (Design and Contingencies $10,000) (27) SR 0258 over Magaree Run, Clark Borough, Bridge Rehabilitation (Base Construction Allocation $240,000) (Design and Contingencies $10,000) (28) SR 4012 over Shenango River, Pymatuning Township, Bridge Rehabilitation (Base Construction Allocation $320,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (29) SR 3012 over Shenango River, City of Sharon, Bridge Rehabilitation (Base Construction Allocation $420,000) (Land Allocation $20,000) (Design and Contingencies $160,000) (30) SR 2101, Hartwick Road over SR 0080, Findley Township, Bridge Rehabilitation (Base Construction Allocation $400,000) (Design and Contingencies $80,000) 140, , , , , , , , ,000
220 SESSION OF 2006 Act (31) SR 0079 Westbound over 180, Findley Township, Bridge Rehabilitation (Base Construction Allocation $700,000) (Design and Contingencies $120,000) (32) SR 0018 over Hogback Run, Shenango (Base Construction Allocation $750,000) (Design and Contingencies $20,000) (33) Perry Highway over Black Run, Sandy Creek (Base Construction Allocation $600,000) (Design and Contingencies $200,000) (34) SR 0058 over Shenango River Tributary No. 3, Jamestown Borough, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (35) SR 0058 over Swamp Run Branch, Pine (Base Construction Allocation $450,000) (Design and Contingencies $200,000) (36) SR0062 over Tributary of Sandy Creek, Stoneboro Borough, (Base Construction Allocation $400,000) (Design and Contingencies $200,000) (37) SR 0079 Eastbound over SR 0080, Findley (Base Construction Allocation $2,400,000) (Design and Contingencies $500,000) (38) SR 0079 Westbound over SR 0080, Findley (Base Construction Allocation $3,500,000) (Design and Contingencies $600,000) (39) SR 0079 over SR 1009, New Vernon Township, (Base Construction Allocation $1,200,000) (Design and Contingencies $50,000) , , , , , ,000 2,950,000 4,150,000 1,300,000
221 944 Act LAWS OF PENNSYLVANIA (40) SR 0079 over Tributary No. 1 of Sandy Creek, New Vernon (Base Construction Allocation $7,700,000) (Land Allocation $100,000) (Design and Contingencies $1,600,000) (41) SR 0079 over Black Run, Deer Creek (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (42) SR 0080 over Harthegig Run No. 1, Lackawannock (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (43) SR 0080 over Harthegig Run No. 2, Lackawannock (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (44) SR 0080 Westbound over SR 3007, East Lackawannock (Base Construction Allocation $1,400,000) (Design and Contingencies $50,000) (45) SR 0080 Eastbound over SR 3007, East Lackawannock (Base Construction Allocation $1,200,000) (Design and Contingencies $50,000) (46) SR 0158 over Beaver Run, East Lackawannock (Base Construction Allocation $350,000) (Design and Contingencies $150,000) (47) SR 0258 over Nelson Run, Springfield (Base Construction Allocation $400,000) (Design and Contingencies $200,000) (48) SR 0258 over Magaree Run, Clark Borough, (Base Construction Allocation $1,200,000) (Design and Contingencies $150,000) 9,400, , , ,000 1,500,000 1,300, , ,000 1,400,000
222 SESSION OF 2006 Act (49) SR 0358 over Big Run, West Salem Township, (Base Construction Allocation $450,000) (Design and Contingencies $150,000) (50) SR 0358 over Little Shenango River, Perry (Base Construction Allocation $450,000) (Design and Contingencies $150,000) (51) SR 1001 over Tributary of Little Shenango River, Perry (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (52) SR 1024 over SR 0079, Deer Creek Township, (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (53) SR 2004 over Milburn Road, Springfield (Base Construction Allocation $450,000) (Design and Contingencies $150,000) (54) SR 2011 over Beaver Creek, East Lackawannock (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (55) SR 2014 over Branch ofwolf Creek, Wolf Creek (Base Construction Allocation $300,000) (Design and Contingencies $150,000) (56) SR 2014 over Wolf Creek, Wolf Creek (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (57) SR 2019 over SR 0079, Lake Township, Bridge (Base Construction Allocation $3,100,000) (Land Allocation $100,000) (Design and Contingencies $800,000) , , , , , , , ,000 4,000,000
223 946 Act LAWS OF PENNSYLVANIA (58) SR 2022 over Branch of Wolf Creek, Worth (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (59) SR 2028 over Wolf Creek, Liberty Township, (Base Construction Allocation $700,000) (Design and Contingencies $100,000) (60) Hartwick Road over SR 0080, Findley (Base Construction Allocation $2,000,000) (Design and Contingencies $400,000) (61) Foxmine Road over SR 0079, Jackson Township, (Base Construction Allocation $2,000,000) (Design and Contingencies $400,000) (62) SR 3004 over Tributary of Shenango River, Hermitage, (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (63) SR 3011 over Hogback Run, Hermitage, Bridge (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (64) SR 3012 over Shenango River, Sharon, Bridge (Base Construction Allocation $2,100,000) (Land Allocation $100,000) (Design and Contingencies $800,000) (65) SR 3039 over Lackawannock Creek, Jefferson (Base Construction Allocation $500,000) (Design and Contingencies $150,000) (66) SR 3043 over Tributary of Shenango Creek, South Pymatuning (Base Construction Allocation $400,000) (Design and Contingencies $150,000) 600, ,000 2,450,000 2,450, , ,000 3,000, , ,000
224 SESSION OF 2006 Act (67) SR 4001 over Tributary No.1 of Sugar Run, Greene (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (68) SR 4003 over Tributary of Big Run, West Salem (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (69) SR 4004 over Branch of Big Run, West Salem (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (70) SR 4012 over Shenango River, Pymatuning (Base Construction Allocation $1,600,000) (Land Allocation $100,000) (Design and Contingencies $450,000) (71) Kennard Road Bridge, Sugar Grove Township, (Base Construction Allocation $600,000) (Design and Contingencies $200,000) (72) SR 4019 over Tributary of Shenango River, Hempfield, (Base Construction Allocation $350,000) (Design and Contingencies $150,000) (73) SR 4021 over Hollow Run, Sugar Grove (Base Construction Allocation $400,000) (Design and Contingencies $150,000) (74) Baker Hill Road over Sugar Run, Delaware (Base Construction Allocation $400,000) (Design and Contingencies $200,000) (75) SR 2004 over Mill Run, Springfield Township, (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) , , ,000 2,150, , , , ,000 57,000
225 948 Act LAWS OF PENNSYLVANIA (76) SR 3039 over Little Neshannock, East Lackawamiock (Base Construction Allocation $84,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (77) SR 4016 over Crooked Creek, Sugar Grove (Base Construction Allocation $100,000) (Land Allocation $30,000) (Design andcontingencies $30,000) Section 48. Muffin County. (a) Local Bridges (1) Lewistown Borough, T403 over Kish Creek, Bridge Rehabilitation (Base Construction Allocation $1,000,000) (Land Allocation $ 10,000) (Design and Contingencies $200,000) (2) Deny Township, US 22 over Township Road 480, (Base Construction Allocation $250,000) (Land Allocation $75,000) (Design and Contingencies $75,000) (b) State Bridges (1) SR 1001 over Branch of Honey Creek, Armagh Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (2) SR 3017 over Beaver Dam Run, Wayne Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (3) SR 4013 over Mussers Run, Oliver Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (4) SR 0522 over Jacks Creek, Deny Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (5) SR 2008 over Wolf Run, Decatur Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (6) SR 2002 over Belltown Run, Decatur Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (7) SR 1002 over Tributary of Honey Creek, Armagh Township, Bridge Rehabilitation (Base Construction Allocation $750,000) 136, ,000 1,210, , , , , , , , ,000
226 SESSION OF 2006 Act (8) SR 2008 over Jacks Creek, Decatur Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (9) SR 0655 over Little Kish Extension nearbelleville, Union (Base Construction Allocation $575,000) (Design and Contingencies $400,000) (10) SR 2007 over Kishacoquillas Creek, Lewistown Borough, (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (11) SR 1003 over Havice Creek, Armagh (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (12) SR 3015 over Musser Run, Oliver Township, Bridge Replacemetit (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (13) SR 3017 over Beaver Dam Run, Wayne (Base Construction Allocation $65,000) (Land Allocation $20,000) (Design and Contingencies $20,000) Section 49. Monroe County. (a) Local Bridges (1) Barrett Township, T6l0, Old Canadensis Hill Bridge, (Base Construction Allocation $5,000,000) (2) Middle Smithfield Township, T523 over Bushkill Creek, (Base Construction Allocation $800,000) (Design and Contingencies $140,000) (b) State Bridges (1) SR 0715 over McMichaels Creek, Chestnuthill Township, Bridge Rehabilitation (Base Construction Allocation $260,000) (2) SR 2022 over Brodhead Creek, Stroud (Base Construction Allocation $1,150,000) ,000 1,025, , ,000 89, ,000 5,000, , ,000 1,150,000
227 950 Act LAWS OF PENNSYLVANIA (3) SR 2009 over Pocono Creek, Stroud Township, (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (4) SR 0390 over Leavitts Bridge, Seg.0 150, Barrett (Base Construction Allocation $65,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (5) SR 0191 over Cherry Creek, Seg.0050, Stroud (Base Construction Allocation $93,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (6) SR 0191 over Paradise Creek, Seg.0280, Paradise (Base Construc~tionAllocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (7) SR 0314 over Swiftwater Creek, Paradise (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (8) SR 0390 over Mill Creek, Seg.0030, Barrett (Base Construction Allocation $85,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (9) SR 0447 over Spruce Cabin Run, Seg.0270, Barrett (Base Construction Allocation $92,000) (Land Allocation $27,000) (Design and Contingencies $27,000) (10) SR 0447 over Brodhead Creek, Seg.0340, Barrett (Base Construc~tionAllocation $72,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (11) SR 0611 over Pocono Creek, Seg.0240, Pocono (Base Construction Allocation $139,000) (Land Allocation $42,000) (Design and Contingencies $42,000) 121, , , , , , , , ,000
228 SESSION OF 2006 Act (12) SR 0611 over Pocono Creek, Seg.0220, Pocono (Base Construction Allocation $278,000) (Land Allocation $83,000) (Design and Contingencies $83,000) (13) SR 0715 over Pocono Creek, Pocono (Base Construction Allocation $116,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (14) SR 0940 over Beaver Creek, Seg.0170, Tobyhanna (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (15) SR 0940 over Wagners Run, Seg.0120, Tobyhanna (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (16) SR 1002 over Tributary of Analomink Creek, Pocono (Base Construction Allocation $29,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (17) SR 1004 over Paradise Creek, Seg.0030, Paradise (Base Construction Allocation $79,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (18) SR 1004 over Swiftwater Creek, Seg.0030, Paradise (Base Construction Allocation $53,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (19) SR 1011 over Forest Hills Run, Paradise (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (20) SR 2005 over Pocono Creek, Stroud Township, (Base Construction Allocation $73,000) (Land Allocation $22,000) (Design and Contingencies $22,000) , ,000 69,000 85,000 47, ,000 85,000 69, ,000
229 952 Act LAWS OF PENNSYLVANIA (21) SR 2009 over Pocono Creek, Stroud Township, (Base Construction Allocation $162,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (22) SR 2010 over McMichaels Creek, Hamilton (Base Construction Allocation $113,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (23) SR 2012 over Pocono Creek, Borough of Stroudsburg, (Base Construction Allocation $406,000) (Land Allocation $121,000) (Design and Contingencies $121,000) (24) SR 3015 over Aquashicola Creek, Ross (Base Construction Allocation $86,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (25) SR 3020 over Appenzell Creek, Hamilton (Base Construction Allocation $79,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (26) SR 3023 over Pocono Creek, Hamilton (Base Construction Allocation $239,000) (Land Allocation $72,000) (Design and Contingencies $72,000) (27) SR 4006 over Pocono Creek, Pocono (Base Construction Allocation $96,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (28) SR 4012 over Pocono Creek, Pocono (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (29) SR 2012, Stroudsburg and East Stroudsburg Boroughs, Bridge Rehabilitation (Base Construction Allocation $2,000,000) (30) SR 0715 over Pocono Road, Pocono Township, 260, , , , , , , ,000 2,000,000
230 SESSION OF 2006 Act (Base Construction Allocation $1,800,000) (Land Allocation $300,000) (Design and Contingencies $900,000) (31) SR 0715 over Pocono Road, Pocono Township, (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (32) SR 0715 over Tributary of Analomink Creek, Pocono (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (33) SR 0940 over Paradise Creek, Paradise (Base Construction Allocation $1,400,000) (Land Allocation $200,000) (Design and Contingencies $700,000) (34) SR 1002 over Brodhead Creek, Stroud (Base Construction Allocation $1,600,000) (Land Allocation $200,000) (Design and Contingencies $800,000) (35) SR 1003 over Brodhead Creek, Stroud (Base Construction Allocation $2,300,000) (Land Allocation $300,000) (Design and Contingencies $1,200,000) (36) SR 1003 over Tributary of Brodhead Creek, Stroud (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (37) SR 1003 over Tributary of Cranberry Creek, Pocono (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (38) SR 1006 over Forest Hill Run, Paradise (Base Construction Allocation $400,000) (Land Allocation $100,000) (Design and Contingencies $200,000) 953 3,000, , ,000 2,300,000 2,600,000 3,800, , , ,000
231 954 Act LAWS OF PENNSYLVANIA (39) SR 1006 over Paradise Creek, Paradise (Base Construction Allocation $1,500,000) (Land Allocation $200,000) (Design and Contingencies $800,000) (40) SR 1013 over Forest Hills Run, Paradise (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (41) SR 3021 over Appenzell Creek, Jackson (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (42) SR 3024 over Tributary of Appenzell Creek, Jackson (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (43) SR 3026 over Akiba Creek, Jackson Township, (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (44) SR 3026 over Appenzell creek, Jackson (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (45) SR 3028 over Appenzell Creek, Jackson (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (46) SR 4010 over Tributary of Appenzell Creek ( ), Jackson Township, Bridge (Base Construction Allocation $200,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (47) SR 4010 over Tributary of Appenzell Creek ( ), Jackson Township, Bridge (Base Construction Allocation $200,000) 2,500, , , , , , , , ,000
232 SESSION OF 2006 Act (Land Allocation $100,000) (Design and Contingencies $100,000) (48) SR 2012 over Brodhead Creek, East Stroudsburg Borough, (Base Construction Allocation $16,300,000) (Land Allocation $2,100,000) (Design and Contingencies $8,200,000) (49) SR 0080, Exit No.305, Stroudsburg Borough, (Base Construction Allocation $12,000,000) (Land Allocation $1,500,000) (Design and Contingencies $6,000,000) (50) SR 0196, Coolbaugh Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (51) SR 0314, one mile west of Swiftwater over Swiftwater Creek, Pocono Township, Bridge (Base Construction Allocation $500,000) (Land Allocation $100,000) (Design and Contingencies $300,000) (52) SR 0314, 109 feet north of LR 168 over Swiftwater Creek, Pocono Township, Bridge (Base Construction Allocation $1,300,000) (Land Allocation $200,000) (Design and Contingencies $700,000) (53) SR 0435 over 13 80, Coolbaugh Township, (Base Construction Allocation $3,700,000) (Land Allocation $500,000) (Design and Contingencies $1,900,000) (54) SR 0611 over Tobyhanna Creek, Coolbaugh (Base Construction Allocation $3,100,000) (Land Allocation $400,000) (Design and Contingencies $1,600,000) (55) SR 0715, Reeders Road over Tributary of Appenzell Creek, Jackson Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) ,600,000 19,500, , ,000 2,200,000 6,100,000 5,100, ,000
233 956 Act LAWS OF PENNSYLVANIA (56) SR 0715 over Reeder Road, Jackson Township, (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) (57) SR 0715 over Reeder Road, Jackson Township, (Base Construction Allocation $300,000) (Land Allocation $100,000) (Design and Contingencies $200,000) Section 50. Montgomery County. (a) Local Bridges (1) Unknown Township, Valley Green Road over Wissahickon Creek, (Base Construction Allocation $2,570,000) (2) Norristown Borough, Main Street over Stony Creek, Bridge Rehabilitation (Base Construction Allocation $79,000) (3) Norristown Borough, Markley Street over Stony Creek, Bridge Rehabilitation (Base Construction Allocation $13,000) (4) Upper Dublin Township, Butler Pike, over Wissahickon Creek, (Base Construction Allocation $7,000,000) (Land Allocation $500,000) (Design and Contingencies $1,000,000) (5) Ambler Borough, North Ridge Avenue, Bridge (Base Construction Allocation $1,600,000) (Design and Contingencies $200,000) (6) Plymouth Township, Brook Road over Plymouth Creek, (Base Construction Allocation $1,500,000) (Design and Contingencies $200,000) (7) Abington Township, Johnston Avenue over Sandy Run, (Base Construction Allocation $700,000) (Design and Contingencies $150,000) (8) Abington Township, Meadowbrook Road over Meadow Brook, (Base Construction Allocation $700,000) (Design and Contingencies $150,000) 600, ,000 2,570,000 79,000 13,000 8,500,000 1,850,000 1,700, , ,000
234 SESSION OF 2006 Act (b) State Bridges (1) SR 4031 over Perkiomen Creek, Collegeville Borough, (Base Construction Allocation $10,000,000) (Design and Contingencies $2,000,000) (2) SR 0663 over Manatawny Creek, Pottstown Borough, (Base Construction Allocation $358,000) (Land Allocation $107,000) (Design and Contingencies $107,000) (3) SR 1026 over Perkiomen Creek, Lower Frederick (Base Construction Allocation $177,000) (Land Allocation $53,000) (Design and Contingencies $53,000) (4) SR 3001 over Zacharias Creek, Skippack (Base Construction Allocation $46,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (5) SR 3014 over Wissahickon Creek, Upper Dublin (Base Construction Allocation $132,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (6) SR 3051 over Bike Path, West Norriton (Base Construction Allocation $154,000) (Land Allocation $46,000) (Design and Contingencies $46,000) (7) SR 4013 over Mingo Run, Upper Providence (Base Construction Allocation $61,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (8) SR 4030 over Minister Creek, New Hanover (Base Construction Allocation $75,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (9) SR 1021 over Perkiomen Creek, East Branch, Franconia (Base Construction Allocation $1,400,000) (Land Allocation $150,000) (Design and Contingencies $205,000) ,000, , ,000 74, , ,000 97, ,000 1,755,000
235 958 Act LAWS OF PENNSYLVANIA Section 51. Montour County. (a) Local Bridges (1) West Hemlock Township, T414 over Kase Run, (Base Construction Allocation $17,000) (Land Allocation $5,000) (Design and Contingencies $23,000) (b) State Bridges (1) SR 1006, 7 Miles Northeast of Washingtonville over Branch of Chillisquaque Creek, Anthony (Base Construction Allocation $65,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (2) SR 0080, Bridges over SR 0054 and Indian Creek, Valley Township, Bridge Rehabilitation (Base Construction Allocation $140,000) (Design and Contingencies $10,000) (3) SR 1003 over West Branch of Chillisquaque Creek, Anthony Township (Base Construction Allocation $61,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (4) SR 4008 over Chillisquaque Creek, Limestone (Base Construction Allocation $62,000) (Land Allocation $18,000) (Design and Contingencies $18,000) Section 52. Northampton County. (a) Local Bridges (1) Williams Township, Northampton Street over Silver Creek, Bridge Rehabilitation (Base Construction Allocation $260,000) (2) Williams Township, T410 over Freys Run, Bridge Rehabilitation (Base Construction Allocation $260,000) (3) Upper Mt. Bethel Township, T701 over Jacoby Creek, (Base Construction Allocation $850,000) (b) State Bridges (1) SR 2007 over Lehigh River, Bethlehem (Base Construction Allocation $525,000) (2) SR 2018, Freemansburg Avenue over SR 0033, 45, , ,000 97,000 98, , , , ,000
236 SESSION OF 2006 Act Bethlehem Township, Bridge Rehabilitation (Base Construction Allocation $8,500,000) (Design and Contingencies $1,500,000) (3) SR 1008 over Bushkill Creek, Bushkill (Base Construction Allocation $1,934,000) (4) SR 1037 over Tributary of Delaware River, Lower Mt. Bethel (Base Construction Allocation $1,100,000) (5) SR 2012 over Bull Run, Lower Saucon (Base Construction Allocation $1,575,000) (6) SR 2014 over Saucon Creek, Lower Saucon Township, Bridge Rehabilitation (Base Construction Allocation $1,015,000) (7) SR 2006 over Freys Run, Williams Township, (Base Construction Allocation $860,000) (8) SR 2011, Stockertown, Palmer Township, Tatamy Borough, Structure Removal and Streamlining (Base Construction Allocation $200,000) (Land Allocation $30,000) (Design and Contingencies $100,000) (9) SR 0191 over Monocacy Creek, Seg.0030, Bethlehem (Base Construction Allocation $302,000) (Land Allocation $91,000) (Design and Contingencies $91,000) (10) SR 0191 over Conrail, Abandoned, Seg.0110, Nazareth Borough, (Base Construction Allocation $92,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (11) SR 0191 over Monocacy Creek, Seg.0030, Lower Nazareth (Base Construction Allocation $195,000) (Land Allocation $59,000) (Design and Contingencies $59,000) (12) SR 3003 over Black Creek, Lower Saucon (Base Construction Allocation $55,000) (Land Allocation $16,000) (Design and Contingencies $16,000) ,000,000 1,934,000 1,100,000 1,575,000 1,015, , , , , ,000 87,000
237 960 Act LAWS OF PENNSYLVANIA (13) SR 3007 over Nancy Run, Bethlehem (Base Construction Allocation $121,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (14) SR 4005 over Hokendauqua Creek, Moore (Base Construction Allocation $76,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (15) SR 4007 over Hokendauqua Creek, Moore (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) Section 53. Northumberland County. (a) Local Bridges (1) Lewis Township, T361 over Tributary of Beaver Run, (Base Construction Allocation $154,000) (Land Allocation $24,000) (Design and Contingencies $120,000) (2) Jackson Township, T353, (Base Construction Allocation $540,000) (Land Allocation $5,000) (Design and Contingencies $140,000) (3) Washington Township, T454, Bridge (Base Construction Allocation $540,000) (Land Allocation $5,000) (Design and Contingencies $140,000) (4) Lower Augusta Township, T394, Cressinger Hill Road, (Base Construction Allocation $540,000) (Land Allocation $5,000) (Design and Contingencies $140,000) (5) Jackson Township and Herndon Borough, T353, Sucker Street, (Base Construction Allocation $540,000) (Land Allocation $5,000) (Design and Contingencies $140,000) (6) Lewis Township, T63 1, Old State Road, Bridge (b) State Bridges 193, , , , , , , , ,000
238 SESSION OF 2006 Act SR 1039, 0.5 Mile West of Turbotville over Muddy Run, Lewis Township, Bridge (Base Construction Allocation $34,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (2) SR 0044 over Delaware Run, Delaware (Base Construction Allocation $92,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (3) SR 0125 over Tributary of Mahantango Creek, Upper Mahanoy (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (4) SR 2007 over Shamokin Creek, Shamokin (Base Construction Allocation $275,000) (Land Allocation $83,000) (Design and Contingencies $83,000) (5) SR 2013 over Shamokin Creek, Shamokin (Base Construction Allocation $122,000) (Land Allocation $37,000) (Design and Contingencies $37,000) (6) SR 3018 over Mahantango Creek, Jordan (Base Construction Allocation $370,000) (Land Allocation $111,000) (Design and Contingencies $111,000) (7) SR 0225 over Mahantango Creek, Lower Manhanoy (Base Construction Allocation $500,000) (Land Allocation $150,000) (Design and Contingencies $150,000) (8) SR 1007 over Tributary of Warrior Run, Delaware (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (9) SR 4002 over Wilson Run, Riverside Borough, (Base Construction Allocation $49,000) (Land Allocation $15,000) 961 (1) 70, , , , , , ,000 57,000 79,000
239 962 Act LAWS OF PENNSYLVANIA (Design and Contingencies $15,000) (10) Routes 11 and 15, Central Susquehanna Valley Thruway Bridge, Bridge Construction (Base Construction Allocation $100,000,000) (11) SR 4004, Mile Post Road, Upper Augusta (Base Construction Allocation $600,000) (Design and Contingencies $150,000) (12) SR 4020, Hallowing Run Road, Lower Augusta Township, Bridge Rehabilitation (Base Construction Allocation $250,000) (Design and Contingencies $100,000) Section 54. Perry County. (a) Local Bridges (1) Centre Township, TR 422 over Little Juniata Creek, (Base Construction Allocation $600,000) (Design and Contingencies $245,000) (2) Wheatfield Township, T506 over Little Juniata Creek, (Base Construction Allocation $510,000) (Land Allocation $20,000) (Design and Contingencies $365,000) (3) Southwest Madison Township, T405 over Laurel Run, (Base Construction Allocation $565,000) (Land Allocation $5,000) (Design and Contingencies $280,000) (4) Southwest Madison Township, T405 over Laurel Run, (Base Construction Allocation $415,000) (Land Allocation $5,000) (Design and Contingencies $230,000) (5) Marysville Borough, South Main Street over Fishing Creek, Bridge Rehabilitation (Base Construction Allocation $250,000) (6) Tyrone Township, T330 over McCabe Run, (Base Construction Allocation $450,000) (Land Allocation $5,000) (Design and Contingencies $255,000) 100,000, , , , , , , , ,000
240 SESSION OF 2006 Act (7) Penn Township, T347 over Little Juniata Creek, (Base Construction Allocation $370,000) (Land Allocation $9,000) (Design and Contingencies $365,000) (8) Toboyne Township, T300 over Shaeffer Run, (Base Construction Allocation $450,000) (Land Allocation $5,000) (Design and Contingencies $230,000) (9) Rye Township, Pine Hill Road over Fishing Run, (Base Construction Allocation $550,000) (Design and Contingencies $200,000) (10) Wheatfield Township, Roseglen Road over Dark Run, (Base Construction Allocation $90,000) (Design and Contingencies $5,000) (11) Southwest Madison Township, T405 over Laurel Run, (Base Construction Allocation $415,000) (Land Allocation $5,000) (Design and Contingencies $230,000) (12) Miller and Wheatfield Townships, Lower Bailey Road over Losh Run, (Base Construction Allocation $50,000) (13) Bloomfield Borough, Bamett Road, of Two Bridges, Bridge (Base Construction Allocation $6,500,000) (b) State Bridges (1) SR 2007, Market Street over Little Juniata Creek, Duncarmon Borough, (Base Construction AllocatiQn $140,000) (Land Allocation $20,000) (Design and Contingencies $130,000) (2) SR 0074, PA 74 over Branch of Panther Creek, Saville (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (3) SR 3009 over Shermans Creek, Southwest Madison (Base Construction Allocation $240,000) (Land Allocation $20,000) , , ,000 95, ,000 50,000 6,500, , , ,000
241 964 Act LAWS OF PENNSYLVANIA (Design and Contingencies $110,000) (4) SR 1010, Front Street over Wildcat Creek, Liverpool Borough, (Base Construction Allocation $80,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (5) SR 1024 over Buffalo Creek, Oliver Township, (6) SR 1015 over Cocolamus Creek, Greenwood (7) SR 3010 over Shermans Creek, Tyrone (8) SR 3004 over Shultz s Creek, Toboyne (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (9) SR 3011 over Shermans Creek, Tyrone (Base Construction Allocation $220,000) (Land Allocation $66,000) (Design and Contingencies $66,000) (10) SR 3017 over Tributary of Shermans Creek, Spring (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (11) SR 4006 over Buckwheat Run, Tuscarora (Base Construction Allocation $25,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (12) SR 4007 over Raccoon Creek, Tuscarora (Base Construction Allocation $51,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (13) SR 0017 over Tributary of Susquehanna River, Seg.0760, Liverpool, (Base Construction Allocation $41,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (14) SR 0017 over Panther Creek, Seg.0270, Saville (Base Construction Allocation $36,000) 200,000 1,200,000 1,400,000 1,900, , ,000 48,000 41,000 81,000 65,000 56,000
242 SESSION OF 2006 Act (Design and Contingencies $10,000) (15) SR 0034 over Tributary of Little Juniata Creek, Bloomfield Borough, (Base Construction Allocation $34,000) (Design and Contingencies $10,000) (16) SR 0850 over Fishing Run, Seg.0500, Rye (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (17) SR 0850 over Fishing Run, Seg.0480, Carroll (Base Construction Allocation $58,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (18) SR 0850 over Tributary of Fishing Creek, Seg.0480, Carroll (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (19) SR 1014 over Wildcat Run, Greenwood (Base Construction Allocation $68,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (20) SR 2005 over Little Juniata Creek, Wheatfield (Base Construction Allocation $95,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (21) SR 3001 over Shermans Creek, Toboyne (Base Construction Allocation $77,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (22) SR 3004 over Shultz s Creek, Toboyne (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (23) SR 3011 over Shermans Creek, Tyrone (Base Construction Allocation $216,000) ,000 76,000 92,000 84, , , , , ,000
243 966 LAWS OF PENNSYLVANIA Act (Land Allocation $65,000) (Design and Contingencies $65,000) Section 55. City ofphiladelphia. (a) Local Bridges (Reserved) (b) State Bridges (1) 195, Girard Point Bridge, City of Philadelphia, Bridge Preservation (Base Construction Allocation $6,000,000) (2) SR 1016, Pennypack Circle over Roosevelt Boulevard, Seg.0003, City of Philadelphia, Bridge (Base Construction Allocation $220,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (3) SR 1016, Pennypack Circle over Roosevelt Boulevard, Seg.0002, City of Philadelphia, Bridge (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (4) SR 2153, 18th Street over 1676, Vine Street Expressway, City of Philadelphia, Bridge (Base Construction Allocation $300,000) (Land Allocation $90,000) (Design and Contingencies $90,000) (5) SR 3007, Ben Franklin Parkway over Vine Street Expressway, City of Philadelphia, Bridge (Base Construction Allocation $400,000) (Land Allocation $120,000) (Design and Contingencies $120,000) (6) SR 3037, JFK Boulevard over 23rd Street, City of Philadelphia, (Base Construction Allocation $200,000) (Land Allocation $60,000) (Design and Contingencies $60,000) (7) SR 3037, JFK Boulevard over 22nd Street, City of Philadelphia, (Base Constiuction Allocation $160,000) (Land Allocation $60,000) (Design and Contingencies $60,000) (8) SR 3037, JFK Boulevard over 21st Street, City of Philadelphia, (Base Construction Allocation $200,000) 6,000, , , , , , , ,000
244 SESSION OF 2006 Act (Land Allocation $60,000) (Design and Contingencies $60,000) (9) SR 0001 over Fernhill Park Bike Path, City of Philadelphia, (Base Construction Allocation $143,000) (Land Allocation $43,000) (Design and Contingencies $43,000) (10) SR 0030 over CSX, City of Philadelphia, (Base Construction Allocation $116,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (11) SR 4003 over CSX Trenton Line, City of Philadelphia, (Base Construction Allocation $169,000) (Design and Contingencies $50,000) Section 56. Pike County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 0447 over Wallenpaupack Creek, Greene (Base Construction Allocation $96,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (2) SR 0507 over East Bridge over Wallenpaupack Creek, Greene (Base Construction Allocation $118,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (3) SR 0590 over West Falls Creek, Lackawaxen (Base Construction Allocation $47,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (4) SR 1007 over Twin Lakes Creek, Shohola (Base Construction Allocation $45,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (5) SR 2003 over Little Bushkill Creek, Lehman (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) , , , , ,000 75,000 73, ,000
245 968 Act LAWS OF PENNSYLVANIA (6) SR 2009 over Raymondskill Creek, Dingman (Base Construction Allocation $42,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (7) SR 3012 over Wallenpaupack Creek, Greene (Base Construction Allocation $92,000) (Land Allocation $27,000) (Design and Contingencies $27,000) Section 57. Potter County. (a) Local Bridges (Reserved) (b) State Bridges (I) SR 0244 over Branch of Genesee River, Genesee Feasibility Study (Base Construction Allocation $60,000) (Land Allocation $2,000) (Design and Contingencies $20,000) (2) SR 4013 over Drainage Area, Sweden Township, Box Culvert (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (3) SR 1004 over Genesee Branch, Hector (Base Construction Allocation $180,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (4) SR 1005 over Laurel Run, Hector Township, (Base Construction Allocation $50,000) (Land Allocation $6,000) (Design and Contingencies $20,000) (5) SR 4021, Honeoye Creek Bridge, Sharon (Base Construction Allocation $150,000) (Design and Contingencies $60,000) (6) SR 0006 over Lyman Creek, Sweden Township, (Base Construction Allocation $75,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (7) SR 1022 over Pine Creek, Galeton Borough, 66, ,000 82, , ,000 76, , ,000
246 SESSION OF 2006 Act (Base Construction Allocation $210,000) (Land Allocation $63,000) (Design and Contingencies $63,000) (8) SR 1022 over South Branch of Pine Creek, Galeton Borough, (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (9) SR 3001 over Birch Run, Wharton Township, (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (10) SR 3004 over Card Creek, Roulette Township, (Base Construction Allocation $59,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (11) SR 4003 over Allegheny River, Roulette (Base Construction Allocation $155,000) (Land Allocation $47,000) (Design and Contingencies $47,000) (12) SR 4019 over Horse Run, Sharon Township, (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (13) SR 4003 over Bradley Run, Clara Township, (Base Construction Allocation $135,000) (Land Allocation $41,000) (Design and Contingencies $41,000) Section 58. Schuylkill County. (a) Local Bridges (1) Ryan Township, T499, Ridge Road over Locust Creek, (Base Construction Allocation $298,340) (Design and Contingencies $59,660) (2) Tremont Borough, Union Street Bridge over Good Springs Creek, Bridge Reconstruction (Base Construction Allocation $400,000) (3) Tremont Borough, Washington Street over , ,000 57,000 93, ,000 80, , , ,000
247 970 LAWS OF PENNSYLVANIA Act Unknown Creek, Bridge Reconstruction (Base Construction Allocation $400,000) (4) Branch Township, Strossertown Bridge, Bridge (Base Construction Allocation $113,000) (Land Allocation $23,000) (Design and Contingencies $60,000) (5) City of Pottsville and Borough of Palo Alto, Collins Street over Schuylkill River and Railroad, Bridge Rehabilitation (Base Construction Allocation $1,500,000) (Design and Contingencies $300,000) (6) City of Pottsville and Borough of Palo Alto, Collins Street over Schuylkill River and Railroad, (Base Construction Allocation $3,250,000) (Design and Contingencies $500,000) (b) State Bridges (I) SR 1001 over Mill Creek, East Norwegian (Base Construction Allocation $163,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (2) SR 1006 over Tributary of Schuylkill River, East Norwegian (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (3) SR 3002 over Swatara Creek, Washington (Base Construction Allocation $93,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (4) SR 4030 over Mahanoy Creek, Butler Township, (Base Construction Allocation $156,000) (Land Allocation $47,000) (Design and Contingencies $47,000) Section 59. Snyder County. (a) Local Bridges (1) Shamokin Dam Borough, Center Street, Bridge (Base Construction Allocation $45,000) 400, ,000 1,850,000 3,800, , , , ,000 45,000
248 SESSION OF 2006 Act (b) State Bridges (1) SR 0035, 2 Miles West of Selinsgrove over Tributary of Middle Creek, Freeburg Borough, Penn and Washington Townships, Bridge (Base Construction Allocation $194,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (2) SR 3009 over Middle Creek, Franklin Township, (Base Construction Allocation $300,000) (Land Allocation $80,000) (Design and Contingencies $60,000) (3) SR 2009 over Middle Creek, Penn and Union Townships, (Base Construction Allocation $300,000) (Land Allocation $80,000) (Design and Contingencies $60,000) (4) SR 4006 over South Branch of Middle Creek, Spring (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (5) SR 0035 over Tributary of Middle Creek, Washington (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000) (6) SR 4003 over Branch of Middle Creek, McClure Borough, (Base Construction Allocation $63,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (7) SR 1016, Kratzerville Road, Monroe Township, Section 60. Somerset County. (a) Local Bridges (1) Allegheny Township, T469 over Hillegas Run, (Base Construction Allocation $790,000) (2) Jefferson Township, T858, Mt. Zion Road over Kooser Run, (Base Construction Allocation $250,000) (Land Allocation $2,000) (Design and Contingencies $75,000) , , , , , ,000 1,200, , ,000
249 972 Act LAWS OF PENNSYLVANIA (b) State Bridges (1) SR 0030, Seg.0320/0696 over Tributary of Stony Creek, Quemahoning Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (2) SR 0219, Seg.0270/1651 over Tributary of Buffalo Creek, Brothers Valley Township, Bridge (Base Construction Allocation $270,000) (Land Allocation $25,000) (Design and Contingencies $125,000) (3) SR 0403, Seg.0l00/2165 over Dixie Run Hooversville Borough, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (4) SR 0403, Seg.0120/0901 over Wilbur Coal Company Mine Railroad, Quemahoning (Base Construction Allocation $298,000) (Design and Contingencies $76,000) (5) SR 0523, Seg.0080/l065 over Tributary of Whites Creek, Addison Township, Bridge (Base Construction Allocation $215,000) (Land Allocation $25,000) (Design and Contingencies $100,000) (6) SR 1003, Seg.0l50/0000 over Buck Run, Stony Creek Township, Bridge Rehabilitation (Base Construction Allocation $13,000) (Land Allocation $1,000) (Design and Contingencies $6,000) (7) SR 1004, Seg.0060/0000 over Ben s Run, Stony Creek (Base Construction Allocation $300,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (8) SR 1007, Seg.0120/0000 over Tributary of Stony Creek, Stony Creek Township, Bridge (Base Construction Allocation $185,000) (Land Allocation $25,000) 100, ,000 28, , ,000 20, , ,000
250 SESSION OF 2006 Act (Design and Contingencies $90,000) (9) SR 1010, Seg.0080/0000 over Oven Run, Shade Township, Bridge Rehabilitation (Base Construction Allocation $55,000) (Land Allocation $5,000) (Design and Contingencies $20,000) (10) SR 1011, Seg.0050/0583 over Tributary of Wells Creek, (Base Construction Allocation $97,000) (Land Allocation $5,000) (Design and Contingencies $34,000) (11) SR 1021, Seg.0130/0000 over Miller Run, Shade Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (12) SR 1033, Seg.0050/0000 over Sandy Run, Paint Township, Bridge Rehabilitation (Base Construction Allocation $27,000) (Land Allocation $1,000) (Design and Contingencies $12,000) (13) SR 2004, Seg.0440/0000 over Casselman River, Meyersdale Borough, Bridge Rehabilitation (Base Construction Allocation $164,000) (Land Allocation $2,000) (Design and Contingencies $42,000) (14) SR 2005, Seg.0030/0000 over Elk Lick Creek, Summit Township, Bridge Rehabilitation (Base Construction Allocation $27,000) (Land Allocation $1,000) (Design and Contingencies $12,000) (15) SR 2010, Seg.0130/0000 over Little Piney Run, Greenville Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (16) SR 2013, Seg.0090/0000 over Gladdens Run, Southampton (Base Construction Allocation $100,000) (Land Allocation $5,000) (Design and Contingencies $35,000) (17) SR 2015, Seg.0120/0000 over Tributary of Wills Creek, Northampton Township, Bridge Rehabilitation (Base Construction Allocation $80,000) , , ,000 40, ,000 40,000 28, , ,000
251 974 Act LAWS OF PENNSYLVANIA (Land Allocation $5,000) (Design and Contingencies $35,000) (18) SR 2016, Seg.0050/0000 over Rhodes Creek, Black Township, Bridge Rehabilitation (Base Construction Allocation $24,000) (Land Allocation $1,000) (Design and Contingencies $11,000) (19) SR 2016, Seg.0060/0000 over Tributary of Rhodes Creek, Black Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (20) SR 2017, Seg.0l30/1325 over Bear Run, Northampton Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (21) SR 2020, Seg.0140/0000 over Poorbaugh Run, Northampton Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (22) SR 2021, Seg.0034/0000 over Shaffers Run, Fairhope Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) (23) SR 3001, Seg.0010/0471 over Tributary of Whites Creek, Addison Borough, Bridge Rehabilitation (Base Construction Allocation $40,000) (Land Allocation $5,000) (Design and Contingencies $15,000) (24) SR 3001, Seg.0050/0000 over Cucumber Run, Addison (Base Construction Allocation $109,000) (Land Allocation $5,000) (Design and Contingencies $38,000) (25) SR 3001, Seg.0080/0000 over Tributary of Casselman River, Addison Township, Bridge Rehabilitation (Base Construction Allocation $65,000) (Land Allocation $5,000) (Design and Contingencies $30,000) 36, ,000 28,000 28, ,000 60, , ,000
252 SESSION OF 2006 Act (26) SR 3001, Seg.0140/000 over Tributary of Casselman River, Upper Turkeyfoot Township, (Base Construction Allocation $215,000) (Land Allocation $25,000) (Design and Contingencies $100,000) (27) SR 3007, Seg.0060/0000 over Smith Run, Lower Turkeyfoot Township, Bridge Rehabilitation (Base Construction Allocation $24,000) (Land Allocation $1,000) (Design and Contingencies $11,000) (28) SR 3010, Seg.0280/0000 over Tub Run, Brothersvalley Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (29) SR 3014, Seg.0060/0000 over Lost Run, Middlecreek Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (30) SR 3019, Seg.0080/1529 over Wilson Creek, Black Township, Bridge Rehabilitation (Base Construction Allocation $18,000) (Land Allocation $1,000) (Design and Contingencies $9,000) (31) SR 4001, Seg.0200/0000 over Branch of Quemahoning Creek, Lincoln Township, Bridge (Base Construction Allocation $82,000) (Land Allocation $5,000) (Design and Contingencies $29,000) (32) SR 4004, Seg.0036/0000 over Tributary of Quemahoning Creek, Lincoln Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $25,000) (Design and Contingencies $135,000) (33) SR 4013, Seg.0030/2196 over Branch of Quemahoning Creek, Lincoln Township, Bridge Rehabilitation (Base Construction Allocation $55,000) (Land Allocation $5,000) (Design and Contingencies $20,000) ,000 36,000 28,000 28,000 28, , ,000 80,000
253 976 LAWS OF PENNSYLVANIA Act (34) SR 4014, Seg.0020/0000 over Tributary of Roaring Run, Jenner Township, Bridge (Base Construction Allocation $185,000) (Land Allocation $25,000) (Design and Contingencies $90,000) (35) SR 4022, Seg.0050/0000 over US 219, Conemaugh Township, Bridge Rehabilitation (Base Construction Allocation $232,000) (Land Allocation $2,000) (Design and Contingencies $58,000) (36) SR 4027, Seg.0120/2813 over South Fork of Ben s Creek, Jenner Township, Bridge (Base Construction Allocation $70,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (37) SR 4029, Seg.0120/0000 over North Fork of Ben s Creek, Conemaugh Township, Bridge (Base Construction Allocation $172,000) (Design and Contingencies $46,000) (38) SR 4041, Seg.0l00/0119 over Kaufman Run, Conemaugh (Base Construction Allocation $106,000) (Land Allocation $5,000) (Design and Contingencies $37,000) (39) SR 4027, Seg.0120/2813 over South Fork of Ben s Creek, Jenner Township, Bridge (Base Construction Allocation $70,000) (Land Allocation $5,000) (Design and Contingencies $25,000) (40) SR 4029, Seg.0120/0000 over North Fork of Ben s Creek, Conemaugh Township Bridge (Base Construction Allocation $172,000) (Design and Contingencies $46,000) (41) SR 4041, Seg.0100/0119 over Kaufman Run, Conemaugh (Base Construction Allocation $106,000) (Land Allocation $5,000) (Design and Contingencies $37,000) 300, , , , , , , ,000
254 SESSION OF 2006 Act (42) SR 0281, Seg.0590/252l over Wells Creek, Somerset (Base Construction Allocation $15,000) (Land Allocation $1,000) (Design and Contingencies $8,000) (43) SR 1001, Seg.0140/0000 over Tributary of Schrock Run, Stonycreek Township, Bridge (Base Construction Allocation $110,000) (Land Allocation $5,000) (Design and Contingencies $39,000) (44) SR 0160 over Clear Shade Creek, Shade (Base Construction Allocation $112,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (45) SR 1002 over Buck Run, Stonycreek Township, (Base Construction Allocation $42,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (46) SR 1015 over Ray Branch of Juniata River, Allegheny (Base Construction Allocation $69,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (47) SR 1031 over Shade Creek, Paint Township, (Base Construction Allocation $106,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (48) SR 1033 over Roaring Fork Creek, Paint (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (49) SR 2019 over Wills Creek, Fairhope Township, (Base Construction Allocation $203,000) (Land Allocation $60,000) (Design and Contingencies $60,000) (50) SR 2021 over Shaffers Run, Fairhope (Base Construction Allocation $27,000) (Land Allocation $8,000) , , ,000 68, , ,000 76, ,000 43,000
255 978 Act LAWS OF PENNSYLVANIA (Design and Contingencies $8,000) (51) SR 3001 over McClintock Run, Addison (Base Construction Allocation $55,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (52) SR 3004 over Whites Creek, Addison (Base Construction Allocation $99,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (53) SR 3009 over Laurel Hill Creek, Upper Turkeyfoot (Base Construction Allocation $152,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (54) SR 3014 over Laurel Hill Creek, Middlecreek (Base Construction Allocation $226,000) (Land Allocation $68,000) (Design and Contingencies $68,000) Section 61. Sullivan County. (a) Local Bridges (1) Elkland Township, T420 over Elk Creek, Bridge (Base Construction Allocation $250,000) (Land Allocation $13,000) (Design and Contingencies $38,000) (2) Elkland Township, T4 19 over Elk Creek, Bridge (Base Construction Allocation $238,000) (Land Allocation $12,000) (Design and Contingencies $36,000) (3) Elkland Township, T346 over Kings Creek, (Base Construction Allocation $538,000) (Land Allocation $27,000) (Design and Contingencies $81,000) (4) Elkland Township, T424 over Tributary of Elk Creek, (Base Construction Allocation $200,000) (Design and Contingencies $30,000) (5) Elkland Township, T424 over Branch of Elk 87, , , , , , , ,000
256 SESSION OF 2006 Act Creek, (Base Construction Allocation $200,000) (Design and Contingencies $30,000) (b) State Bridges (1) SR 0087 over Kettle Creek, Hillsgrove (Base Construction Allocation $72,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (2) SR 3005 over Kettle Creek, Hillsgrove (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (3) SR 4018 over Marsh Run, Dushore Borough, (Base Construction Allocation $70,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (4) SR 0087 over Lick Run, Forks Township, Bridge (Base Construction Allocation $508,000) (Land Allocation $32,000) (Design and Contingencies $95,000) Section 62. Susquehanna County. (a) Local Bridges (1) Liberty Township, T723 over Rhiney Creek, (Base Construction Allocation $300,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (2) Liberty Township, T723 over Rhiney Creek, (Base Construction Allocation $420,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (3) New Milford Borough, Church Street over Salt Lick Creek, (Base Construction Allocation $286,000) (Land Allocation $18,000) (Design and Contingencies $54,000) (4) Liberty Township, T723 over Snake Creek, (Base Construction Allocation $1,300,000) , ,000 69, , , , , ,000 1,570,000
257 980 Act LAWS OF PENNSYLVANIA (Land Allocation $20,000) (Design and Contingencies $250,000) (b) State Bridges (1) SR 0858 over Tributary of North Branch Wyalusing Creek, Middletown Township, Bridge (Base Construction Allocation $307,000) (Land Allocation $20,000) (Design and Contingencies $61,000) (2) SR 0081 over SR 1014, New Milford Borough, (Base Construction Allocation $707,000) (Land Allocation $20,000) (Design and Contingencies $141,000) (3) SR 0029 over Tributary of Snake Creek, Liberty (Base Construction Allocation $296,000) (Land Allocation $20,000) (Design and Contingencies $59,000) (4) SR 3023 over Elk Lake Stream, Dimock (Base Construction Allocation $468,000) (Land Allocation $20,000) (Design and Contingencies $94,000) (5) SR 4018 over Dewing Creek, Little Meadows Borough, (Base Construction Allocation $400,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (6) SR 4018 over Dewing Creek, Little Meadows Borough, (Base Construction Allocation $267,000) (Land Allocation $20,000) (Design and Contingencies $53,000) (7) SR 1022 over Tributary of Snake Creek, Liberty (Base Construction Allocation $381,000) (Land Allocation $20,000) (Design and Contingencies $76,000) (8) SR 1022 over Tributary of Dubois Creek, Liberty (Base Construction Allocation $305,000) (Land Allocation $20,000) (Design and Contingencies $61,000) 388, , , , , , , ,000
258 SESSION OF 2006 Act SR 0081 over Salt Lick Creek, New Milford (Base Construction Allocation $1,982,000) (Land Allocation $20,000) (Design and Contingencies $396,000) (10) SR 1022 over Tributary of Snake Creek, Liberty (Base Construction Allocation $409,000) (Land Allocation $20,000) (Design and Contingencies $82,000) (11) SR 1018 over Delaware & Hudson Railroad, New Milford (Base Construction Allocation $667,000) (Land Allocation $20,000) (Design and Contingencies $134,000) (12) SR 2061 over Offset 2064, New Milford (Base Construction Allocation $380,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (13) SR 2061 over Unknown Stream, New Milford (Base Construction Allocation $370,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (14) SR 0848 over 181, New Milford Township, (Base Construction Allocation $3,639,000) (Land Allocation $20,000) (Design and Contingencies $728,000) (15) SR 0081 over 1492, New Milford Township, (Base Construction Allocation $2,821,000) (Land Allocation $20,000) (Design and Contingencies $564,000) (16) SR 2061 over Tributary of Gillespie Pond, New Milford (Base Construction Allocation $214,000) (Land Allocation $20,000) (Design and Contingencies $43,000) (17) SR 0011 over Tributary of Salt Lake Creek, New Milford (Base Construction Allocation $666,000) (Land Allocation $20,000) (Design and Contingencies $133,000) 981 (9) 2,398, , , , ,000 4,387,000 3,405, , ,000
259 982 Act LAWS OF PENNSYLVANIA (18) SR 0492 over Tributary of Stump Pond, New Milford (Base Construction Allocation $254,000) (Land Allocation $20,000) (Design and Contingencies $51,000) (19) SR 0267 over Branch of Deer Lick Creek, Rush (Base Construction Allocation $234,000) (Land Allocation $20,000) (Design and Contingencies $27,000) (20) SR 0706 over Branch of Wyalusing Creek, Rush (Base Construction Allocation $174,000) (Land Allocation $20,000) (Design and Contingencies $35,000) (21) SR 0267 over Middle Branch of Wyalusing Creek, Rush (Base Construction Allocation $721,000) (Land Allocation $20,000) (Design and Contingencies $144,000) (22) SR 4004 over Laurel Lake, Silver Lake (Base Construction Allocation $412,000) (Land Allocation $20,000) (Design and Contingencies $82,000) (23) SR 4002 over Rhiney Creek, Silver Lake (Base Construction Allocation $427,000) (Land Allocation $20,000) (Design and Contingencies $85,000) (24) SR 2063 over Branch of Nine Partners Creek, New Milford (Base Construction Allocation $254,000) (Land Allocation $20,000) (Design and Contingencies $51,000) (25) SR 4014 over Branch of Apolacon Creek, Apolacon (Base Construction Allocation $634,000) (Land Allocation $20,000) (Design and Contingencies $127,000) (26) SR 0858 over Branch of Apolacon Creek, Apolacon (Base Construction Allocation $254,000) (Land Allocation $20,000) (Design and Contingencies $51,000) 325, , , , , , , , ,000
260 SESSION OF 2006 Act (27) SR 2026 over Meshoppen Creek, Dimock (Base Construction Allocation $510,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (28) SR 0858 over Branch of Apolacon Creek, Apolacon (Base Construction Allocation $227,000) (Land Allocation $20,000) (Design and Contingencies $45,000) (29) SR 0706 over East Branch of Wyalusing Creek, Jessup (Base Construction Allocation $1,761,000) (Land Allocation $20,000) (Design and Contingencies $352,000) (30) SR 4044 over Branch of Apolacon Creek, Apolacon (Base Construction Allocation $360,000) (Land Allocation $20,000) (Design and Contingencies $72,000) (31) SR 4013 over Cork Hill Creek, Apolacon (Base Construction Allocation $427,000) (Land Allocation $20,000) (Design and Contingencies $85,000) (32) SR 3001 over Carter Creek, Auburn Township, (Base Construction Allocation $187,000) (Land Allocation $20,000) (Design and Contingencies $37,000) (33) SR 3004 over Riley Creek, Auburn Township, (Base Construction Allocation $340,000) (Land Allocation $20,000) (Design and Contingencies $68,000) (34) SR 3004 over Tributary of Riley Creek, Auburn (Base Construction Allocation $174,000) (Land Allocation $20,000) (Design and Contingencies $35,000) (35) SR 0706 over East Branch of Wyalusing Creek, Bridgewater (Base Construction Allocation $212,000) (Land Allocation $20,000) (Design and Contingencies $42,000) , ,000 2,133, , , , , , ,000
261 984 LAWS OF PENNSYLVANIA Act (36) SR 2055 over Hop Bottom Creek, Bridgewater (Base Construction Allocation $241,000) (Land Allocation $20,000) (Design and Contingencies $48,000) (37) SR 2015 over Hop Bottom Creek, Bridgewater (Base Construction Allocation $340,000) (Land Allocation $20,000) (Design and Contingencies $68,000) (38) SR 0167 over Branch of Hop Bottom Creek, Brooklyn (Base Construction Allocation $374,000) (Land Allocation $20,000) (Design and Contingencies $75,000) (39) SR 2032 over Delaware & Hudson Railroad, Brooklyn (Base Construction Allocation $1,000,000) (Land Allocation $20,000) (Design and Contingencies $200,000) (40) SR 0011 over Norfolk Southern Railroad, Great Bend Borough, (Base Construction Allocation $1,672,000) (Land Allocation $20,000) (Design and Contingencies $334,000) (41) SR 4002 over Tributary of Choconut Creek, Choconut (Base Construction Allocation $347,000) (Land Allocation $20,000) (Design and Contingencies $69,000) (42) SR 1010 over Tributary of Susquehanna River, Great Bend (Base Construction Allocation $241,000) (Land Allocation $20,000) (Design and Contingencies $43,000) (43) SR 0011 over Tributary of Salt Lick Creek, Great Bend (Base Construction Allocation $354,000) (Land Allocation $20,000) (Design and Contingencies $71,000) (44) SR 1010 over Salt Lick Creek, Great Bend (Base Construction Allocation $645,000) (Land Allocation $20,000) (Design and Contingencies $131,000) 309, , ,000 1,220,000 2,026, , , , ,000
262 SESSION OF 2006 Act (45) SR 0029 over Silver Lake Creek, Franklin (Base Construction Allocation $849,000) (Land Allocation $20,000) (Design and Contingencies $170,000) (46) SR 4008 over Silver Creek, Franklin Township, (Base Construction Allocation $334,000) (Land Allocation $20,000) (Design and Contingencies $67,000) (47) SR 0267 over Middle Branch of Wyalusing Creek, Forest Lake Township, Bridge (Base Construction Allocation $254,000) (Land Allocation $20,000) (Design and Contingencies $51,000) (48) SR 3029 over Branch of Forest Lake Creek, Forest Lake (Base Construction Allocation $214,000) (Land Allocation $20,000) (Design and Contingencies $43,000) (49) SR 3010 over White Creek, Dimock Township, (Base Construction Allocation $453,000) (Land Allocation $20,000) (Design and Contingencies $91,000) (50) SR 2053 over Johnson Pond Creek, Dimock (Base Construction Allocation $307,000) (Land Allocation $20,000) (Design and Contingencies $61,000) (51) SR 0267 over Tributary of Choconut Creek, Choconut (Base Construction Allocation $179,000) (Land Allocation $20,000) (Design and Contingencies $36,000) (52) SR 4016 over Choconut Creek, Choconut (Base Construction Allocation $984,000) (Land Allocation $20,000) (Design and Contingencies $197,000) (53) SR 1037 over Tributary of Dubois Creek, Great Bend (Base Construction Allocation $307,000) (Land Allocation $20,000) 985 1,039, , , , , , ,000 1,201, ,000
263 986 LAWS OF PENNSYLVANIA Act (Design and Contingencies $61,000) (54) SR 1003, 0.1 Mile South of SR 1001 over Branch of Starrucca Creek, Thompson Township, (Base Construction Allocation $51,000) (Land Allocation $4,000) (Design and Contingencies $10,000) (55) SR 3004, 0.1 Mile West of TR 29 over Branch of Pond Brook, Springville Township, Bridge (Base Construction Allocation $179,000) (Land Allocation $20,000) (Design and Contingencies $36,000) (56) SR 0171, 200 Feet North of SR 2010 over Lackawanna River, Clifford Township, Bridge (Base Construction Allocation $894,000) (Land Allocation $20,000) (Design and Contingencies $179,000) (57) SR 0547, 0.5 Mile West of TR 848 over Branch of Butler Creek, Gibson Township, Bridge (Base Construction Allocation $360,000) (Land Allocation $20,000) (Design and Contingencies $72,000) (58) SR 2008, 150 Feet West of TR 247 over Dundaff Creek, Clifford Township, Bridge (Base Construction Allocation $340,000) (Land Allocation $20,000) (Design and Contingencies $68,000) (59) SR 2012, 200 Feet West of SR 2014 over Tributary of East Branch of Tunkhannock Creek, Clifford (Base Construction Allocation $340,000) (Land Allocation $20,000) (Design and Contingencies $68,000) (60) SR 2043, 0.5 Mile South of SR 2020 over Tower Creek, Lenox Township, Bridge (Base Construction Allocation $388,000) (Land Allocation $20,000) (Design and Contingencies $78,000) (61) SR 0106 over an Unknown Stream, Harford 65, ,000 1,093, , , , ,000
264 SESSION OF 2006 Act (Base Construction Allocation $440,000) (Land Allocation $20,000) (Design and Contingencies $90,000) (62) SR 2013, 0.1 Mile South of SR 0706, Rush (Base Construction Allocation $600,000) (Land Allocation $40,000) (Design and Contingencies $330,000) (63) SR 0081, Interstate Bridge, Preventative Maintenance (Base Construction Allocation $400,000) (64) SR 0081, Interstate Bridge, Preventative Maintenance (Base Construction Allocation $400,000) (65) SR 0247 over D&H Railroad, Abandoned, Forest City Borough, (Base Construction Allocation $64,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (66) SR 1009 over Starrucca Creek, Harmony (Base Construction Allocation $97,000) (Land Allocation $29,000) (Design and Contingencies $29,000) (67) SR 3023 over Hortons Creek, Lathrop (Base Construction Allocation $65,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (68) SR 4024 over Gaylord Creek, Middletown (Base Construction Allocation $56,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (69) SR 2027 over East Branch of Tunkhannock Creek, Clifford (Base Construction Allocation $32,000) (Land Allocation $9,000) (Design and Contingencies $9,000) Section 63. Tioga County. (a) Local Bridges (1) Delmar Township, T483 over Marsh Creek, (Base Construction Allocation $800,000) , , , , , , ,000 90,000 50,000 1,050,000
265 988 LAWS OF PENNSYLVANIA Act (Land Allocation $5,000) (Design and Contingencies $23,000) (2) Morris Township, Village of Hoytville, T496 over Harrison Run, (Base Construction Allocation $20,000) (Land Allocation $5,000) (Design and Contingencies $23,000) (3) Deerfield Township, County Bridge No.4, Knox Bridge, T402 over Cowanesque River, Bridge (Base Construction Allocation $127,000) (Land Allocation $5,000) (Design and Contingencies $23,000) (4) Putnam Township, T750, Marvin Creek Bridge over Tioga River, (Base Construction Allocation $210,000) (Land Allocation $30,000) (Design and Contingencies $75,000) (b) State Bridges (1) SR 0015, 1 Mile South of Lawrenceville over Harts Run, Lawrence Township, Bridge (Base Construction Allocation $57,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (2) SR 0549, 4 Miles Northeast of Mansfield over Elk Run, Richmond, Rutland and Sullivan Townships, Roseville Borough, Bridge (Base Construction Allocation $125,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (3) SR 0549, 2 Miles Southwest of Roseville over Tributary of Mill Creek, Richmond, Rutland and Sullivan Townships, Roseville Borough, Bridge (Base Construction Allocation $47,000) (Land Allocation $6,000) (Design and Contingencies $40,000) (4) SR 0549, 1 Mile North of Jobs Corners over Seeley Creek, Jackson and Rutland Townships, (Base Construction Allocation $149,000) (Land Allocation $6,000) (Design and Contingencies $40,000) 48, , , , ,000 93, ,000
266 SESSION OF 2006 Act SR 4017, Osceola Bridge over Cowanesque River, Osceola Township, Bridge Rehabilitation (Base Construction Allocation $339,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (6) SR 0006 over Tributary of Charleston Creek, Charleston (Base Construction Allocation $100,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (7) SR 0414 over Zimmerman Creek, Liberty (Base Construction Allocation $100,000) (Land Allocation $12,000) (Design and Contingencies $20,000) (8) Central Avenue over Kelsey Creek, Wellsboro Borough, (Base Construction Allocation $60,000) (Land Allocation $9,000) (Design and Contingencies $38,000) (9) SR 0006 over Heise Run, Delmar Township, (Base Construction Allocation $42,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (10) SR 1003 over Mill Creek, Tioga Township, (Base Construction Allocation $176,000) (Land Allocation $53,000) (Design and Contingencies $53,000) (11) SR 1005 over Branch of Elk Run, Sullivan (Base Construction Allocation $59,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (12) SR 1008 over Elk Creek, Sullivan Township, (Base Construction Allocation $106,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (13) SR 1030 over Crooked Creek, Tioga Township, (Base Construction Allocation $306,000) (Land Allocation $92,000) (Design and Contingencies $92,000) 989 (5) 375, , , ,000 68, ,000 95, , ,000
267 990 Act LAWS OF PENNSYLVANIA (14) SR 2022 over Gaffers Creek, Sullivan (Base Construction Allocation $24,000) (Land Allocation $7,000) (Design and Contingencies $7,000) (15) SR 2024 over Tioga River, Blossburg Borough, (Base Construction Allocation $278,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (16) SR 3001 over Elk Run, Gaines Township, (Base Construction Allocation $81,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (17) SR 3001 over Cedar Run, Elk Township, (Base Construction Allocation $86,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (18) SR 4001 over Cowanesque River, Westfield (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (19) SR 4002 over Catlin Hollow Creek, Charleston (Base Construction Allocation $40,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (20) SR 4003 over Broughton Brook, Westfield (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (21) SR 4005 over North Fork, Brookfield (Base Construction Allocation $116,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (22) SR 4006 over Potter Brook, Westfield (Base Construction Allocation $57,000) (Land Allocation $17,000) (Design and Contingencies $17,000) 38, , , , ,000 64,000 48, ,000 91,000
268 SESSION OF 2006 Act (23) SR 4008 over Tributary of North Fork, Brookfield (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (24) SR 4012 over Hornby Hollow Creek, Chatham (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (25) SR 4039 over Hills Creek, Charleston (Base Construction Allocation $55,000) (Land Allocation $17,000) (Design and Contingencies $17,000) (26) SR 0549 over Seely Creek, Jackson Township, (Base Construction Allocation $100,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (27) SR 4024 over Elkhorn Creek, Farmington (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (28) SR 2017 over Mill Creek, Union Township, (Base Construction Allocation $270,000) (Land Allocation $30,000) (Design and Contingencies $20,000) (29) SR 0549, SR 0006 to Sweely Lane over Elk Run, Bridge Rehabilitation (Base Construction Allocation $1,100,000) (Design and Contingencies $5,000) Section 64. Union County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 2001, 1 Mile West of Buffalo Crossroads over Buffalo Creek, Buffalo Township, Bridge (Base Construction Allocation $333,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (2) SR 3002, Village of Laurelton over Laurel Run, ,000 69,000 89, ,000 84, ,000 1,105, ,000
269 992 Act LAWS OF PENNSYLVANIA Hartley (Base Construction Allocation $76,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (3) SR 4017, Replace Wing Walls over Black Run, Gregg Township, Bridge Rehabilitation (Base Construction Allocation $35,000) (Land Allocation $6,000) (Design and Contingencies $30,000) (4) SR 1003 over White Deer Creek, White Deer (Base Construction Allocation $108,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (5) SR 1011 over White Deer Creek, White Deer (Base Construction Allocation $158,000) (Land Allocation $48,000) (Design and Contingencies $48,000) Section 65. Venango County. (a) Local Bridges (1) Pinegrove Township, T628 over Sandy Creek, (Base Construction Allocation $450,000) (Land Allocation $25,000) (Design and Contingencies $125,000) (2) Cherrytree Township, Fairview Road over Branch of Prather Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (3) Cherrytree Township, Barker Road over Prather Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (4) Clinton Township, Phipps Road over Sugarcreek, (Base Construction Allocation $650,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (5) Cornplanter Township, T569 over Cherry Run, (Base Construction Allocation $600,000) (Land Allocation $15,000) 112,000 71, , , , , , , ,000
270 SESSION OF 2006 Act (Design and Contingencies $300,000) (6) Cornplanter Township, T674 over Cherry Run, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (7) Cornplanter Township, T564 over Cherrytree Run, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (8) Frenchcreek Township, Rainbow Road over Little Sandy Creek, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (9) Frenchcreek Township, Whippoorwill Road over Little Sandy Creek, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (10) Frenchcreek Township, Bombish Road over Little Sandy Creek, (Base Construction Allocation $750,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (11) Frenchcreek and Mineral Townships, Greenlee Road over Tributary of Little Sandy Creek, Bridge (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (12) Irwin Township, Old Beech Road over East Branch ofwolf Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (13) Jackson Township, T364 over Lake Creek, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (14) Jackson Township, White Road over Branch of Sugar Creek, (Base Construction Allocation $600,000) ,000 1,065,000 1,065,000 1,065,000 1,115, , ,000 1,065, ,000
271 994 Act LAWS OF PENNSYLVANIA (Land Allocation $15,000) (Design and Contingencies $300,000) (15) Jackson Township, Independent Road, over Beatty Run, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (16) Oakland Township, Cherrytree Road over Tributary of 2 Mile Run Lake, Bridge (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (17) Oilcreek Township, Coe Road over West Pithole Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (18) Pinegrove Township, T628 over East Sandy Creek, (Base Construction Allocation $800,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (19) Plum Township, Williams Road over Middle Branch of Sugar Creek, (Base Construction Allocation $900,000) (Land Allocation $15,000) (Design and Contingencies $400,000) (20) Plum Township, Acel Road over Little Sugar Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (21) Plum Township, Gifford Road over Prather Creek, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (22) Victory Township, Fisherman s Cove Road over Victory Run, (Base Construction Allocation $950,000) (Land Allocation $15,000) (Design and Contingencies $400,000) (23) Richland Township, Geiring Road over Mill 915, , ,000 1,165,000 1,315, ,000 1,065,000 1,365,000
272 SESSION OF 2006 Act Run, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (24) Sugarcreek Borough, Martin Hill Road over Two Mile Run, (Base Construction Allocation $700,000) (Land Allocation $15,000) (Design and Contingencies $350,000) (25) Mineral Township, Gadsby Road over South Sandy Creek, (Base Construction Allocation $600,000) (Land Allocation $15,000) (Design and Contingencies $300,000) (26) Jackson Township, Independent Road over Beatty Run, (Base Construction Allocation $450,000) (Design and Contingencies $200,000) (27) Jackson Township, T364 over Lake Creek, (Base Construction Allocation $550,000) (Design and Contingencies $200,000) (28) Jackson Township, T384 over Sugar Creek, (Base Construction Allocation $450,000) (Design and Contingencies $200,000) (b) State Bridges (1) SR 1009 over Benninghoff Run No.!, Cherrytree (Base Construction Allocation $60,000) (Design and Contingencies $30,000) (2) SR 4002 over Galloway Run, Sugarcreek Borough, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (3) SR 0008 over Complanter Run, City of Oil City, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) 995 1,065,000 1,065, , , , , , , ,000
273 996 LAWS OF PENNSYLVANIA Act (4) SR 3015 over Tributary of Sandy Creek, Mineral Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (5) SR 3024 over Doyle Run, Sandycreek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (6) SR 0008 over Morrison Run, Sandycreek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (7) SR 0080 over Little Scrubgrass Creek, Scrubgrass Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Design and Contingencies $30,000) (8) SR 0062 over Brannon Run, Sugar Creek Borough, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (9) SR 4011 over Prather Creek, Cherrytree Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (10) SR 4020 over Kane Run, Oakland Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (11) SR 0062 over Shaffer Run, Sugar Creek Borough, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (12) SR 0038 over Sugar Valley Run, Scrubgrass Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) 120, , , , , , , , ,000
274 SESSION OF 2006 Act (13) SR 0080 over SR 0038 Eastbound, Scrubgrass Township, Bridge Rehabilitation (Base Construction Allocation $360,000) (Design and Contingencies $50,000) (14) SR 0080 over SR 0038 Westbound, Scrubgrass Township, Bridge Rehabilitation (Base Construction Allocation $360,000) (Design and Contingencies $50,000) (15) SR 0008, McClintock Bridge over Oil Creek, Seg.0490, Complanter and Rouseville Townships, Bridge Rehabilitation (Base Construction Allocation $800,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (16) SR 0038 over Richey Run, Richland Township, (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (17) SR 2004 over Tarklin Run, Cranberry (Base Construction Allocation $38,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (18) SR 3017 over Little Sandy Creek, Frenchcreek (Base Construction Allocation $34,000) (Design and Contingencies $10,000) (19) SR 3025 over Lower Two Mile Run, Cranberry (Base Construction Allocation $80,000) (Land Allocation $24,000) (Design and Contingencies $24,000) Section 66. Warren County. (a) Local Bridges (1) Columbus Township, T515, Way Road over Damon Run, (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (2) Columbus Township, T639, Stewart Road over , , ,000 57,000 62,000 54, , ,000
275 998 Act LAWS OF PENNSYLVANIA Winton Run, (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (3) Conewango Township, T45 1, River Road over Morse Run, (Base Construction Allocation $510,000) (Design and Contingencies $140,000) (4) Eldred Township, T377, Eureka Road over Caldwell Creek, (Base Construction Allocation $510,000) (Design and Contingencies $140,000) (5) Elk Township, T621, Reynolds Run Road over Reynolds Run, (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (6) Farmington Township, T508, Ludwick Road over Kiantone Creek, (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (7) Pine Grove Township, T568, Egypt Hollow Road over Akeley Run, (Base Construction Allocation $790,000) (Design and Contingencies $210,000) (8) Pine Grove Township, T568, Egypt Hollow Road over Widdlefield Creek, Bridge (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (9) Pittsfield Township, T388, Miles Run Road over Miles Run Creek, (Base Construction Allocation $790,000) (Design and Contingencies $210,000) (10) Pittsfield Township, T441, Barton Run Road over Little Brokenstraw Creek, Bridge (Base Construction Allocation $1,580,000) 600, , , , ,000 1,050, ,000 1,050,000 2,050,000
276 SESSION OF 2006 Act (Design and Contingencies $420,000) (11) Pittsfield Township, T397, Shell Road and Garland Run, (Base Construction Allocation $510,000) (Design and Contingencies $140,000) (12) Pittsfield Township, T395, Marshianne Hill Road over Garland Run, (Base Construction Allocation $750,000) (Design and Contingencies $200,000) (13) Pittsfield Township, T378, Trailer Park Road over Garland Run, (Base Construction Allocation $675,000) (Design and Contingencies $150,000) (14) Sheffield Township, T526, Henry Mills Road over Tionesta Creek, Bridge, (Base Construction Allocation $1,300,000) (Design and Contingencies $350,000) (15) Sheffield Township, T546, Four Mile Run, (Base Construction Allocation $790,000) (Design and Contingencies $210,000) (16) Spring Creek Township, T429, Jackson Hill Road over Spring Creek, (Base Construction Allocation $830,000) (Design and Contingencies $220,000) (17) Spring Creek Township, T326, Jinks Road over Whitney Run, (Base Construction Allocation $450,000) (Design and Contingencies $100,000) (18) Triumph Township, T362, Youngsville Road over Tidioute Creek, (Base Construction Allocation $510,000) (Design and Contingencies $140,000) (19) Brokenstraw Township, T444, Irvine Run Road over Irvine Run, (Base Construction Allocation $510,000) (Land Allocation $140,000) ,000 1,000, ,000 1,700,000 1,050,000 1,100, , , ,000
277 1000 LAWS OF PENNSYLVANIA Act (Design and Contingencies $50,000) (b) State Bridges (1) SR 1009 over Johnny Run, Pine Grove Township, Bridge Rehabilitation (Base Construction Allocation $60,000) (Design and Contingencies $30,000) (2) SR 0006 over Scott Run, Conewango Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (3) SR 0958 over Branch of Brokenstraw Creek, Freehold Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (4) SR 1013 over Page Hollow Run, Glade Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (5) SR 1012 over Priest Hollow Run, Pine Grove Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (6) SR 3010 over Toms Run, Spring Creek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (7) SR 4009 over Page Hollow Run, Pittsfield Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $30,000) (8) SR 0426 over Brokenstraw Creek, Bridge No.1, Spring Creek Township, Bridge Rehabilitation (Base Construction Allocation $80,000) (Design and Contingencies $40,000) (9) SR 0069 over Jackson Run Branch No.2, Sugar Grove Township, Bridge Rehabilitation (Base Construction Allocation $80,000) 100, , , , , , , , ,000
278 SESSION OF 2006 Act (Land Allocation $10,000) (Design and Contingencies $30,000) (10) SR 3016 over Tributary of Brokenstraw Creek, Brokenstraw 130,000 (Base Construction Allocation $80,000) (Land Allocation $10,000) (Design and Contingencies $40,000) (11) SR 0426 over Brokenstraw Creek, Bridge No.3, Spring Creek Township, Bridge Rehabilitation 150,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $40,000) (12) SR 0027 over Willow Brook, Brokenstraw Township, Bridge Rehabilitation 120,000 (Base Construction Allocation $80,000) (Land Allocation $10,000) (Design and Contingencies $30,000) (13) SR 4007 over Prosser Creek, Columbus Township, Bridge Rehabilitation 120,000 (Base Construction Allocation $80,000) (Land Allocation $10,000) (Design and Contingencies $30,000) (14) SR 6006 over Mill Race Creek, City of Warren, Bridge Rehabilitation 130,000 (Base Construction Allocation $80,000) (Land Allocation $10,000) (Design and Contingencies $40,000) (15) SR 0062 over Valentine Creek, Conewango Township, Bridge Rehabilitation 140,000 (Base Construction Allocation $100,000) (Land Allocation $10,000) (Design and Contingencies $30,000) (16) SR 8004, Irvine Ramp B, Brokenstraw Township, Bridge Rehabilitation 140,000 (Base Construction Allocation $90,000) (Land Allocation $10,000) (Design and Contingencies $40,000) (17) SR 3001 over Spring Creek, Spring Creek Township, Bridge Rehabilitation 210,000 (Base Construction Allocation $160,000) (Land Allocation $10,000) (Design and Contingencies $40,000) (18) SR 3022 over SR 0006, Brokenstraw Township, 510,000 (Base Construction Allocation $440,000)
279 1002 Act LAWS OF PENNSYLVANIA (Land Allocation $10,000) (Design and Contingencies $60,000) (19) SR 0957 over Stiliwater Creek, Sheffield 80,000 (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (20) SR 1013 over Glade Run, Seg.0040, Glade 76,000 (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (21) SR 1013 over Glade Run, Seg.0020, Glade 82,000 (Base Construction Allocation $46,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (22) SR 3009 over Gilmore Run, Triumph 212,000 (Base Construction Allocation $132,000) (Land Allocation $40,000) (Design and Contingencies $40,000) (23) SR 3009 over Tidioute Creek, Seg.0080, Triumph 62,000 (Base Construction Allocation $38,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (24) SR 3009 over Tidioute Creek, Seg.0060, Deerfield 122,000 (Base Construction Allocation $76,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (25) SR 3009 over Tidioute Creek, Seg.0040, Triumph 83,000 (Base Construction Allocation $51,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (26) SR 3009 over Tidioute Creek, Seg.0030, Deerfield 88,000 (Base Construction Allocation $56,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (27) SR 3015 over Caldwell Creek, Eldred 52,000 (Base Construction Allocation $32,000)
280 SESSION OF 2006 Act (Land Allocation $10,000) (Design and Contingencies $10,000) (28) SR 4002 over Branch of Whitney Run, Spring Creek 100,000 (Base Construction Allocation $62,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (29) SR 4004 over Pine Valley Brook, Columbus 75,000 (Base Construction Allocation $47,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (30) SR 4011 over Hazeltine Hollow Run, Sugar Grove 70,000 (Base Construction Allocation $44,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (31) SR 4015 over Mill Brook, Freehold Township, 86,000 (Base Construction Allocation $54,000) (Land Allocation $16,000) (Design and Contingencies $16,000) Section 67. Washington County. (a) Local Bridges (1) Peters Township, Pelipets Drive over Brush Run Creek, 161,000 (Base Construction Allocation $150,000) (Design and Contingencies $11,000) (b) State Bridges (1) SR 0019, SR 0519, North Strabane Township, Bridge Rehabilitation 465,000 (Base Construction Allocation $360,000) (Land Allocation $5,000) (Design and Contingencies $100,00) (2) SR 0022, SR 4005, Hanover Township, Bridge Resurfacing 280,000 (Base Construction Allocation $200,000) (Design and Contingencies $80,000) (3) SR 0070, Branch of Chartiers Creek, North Franklin 2,200,000 (Base Construction Allocation $1,800,000) (Design and Contingencies $400,000) (4) SR 0070, Branch of Little Chartiers Creek, South Strabane 1,600,000 (Base Construction Allocation $1,200,000)
281 1004 Act LAWS OF PENNSYLVANTA (Design and Contingencies $400,000) (5) SR 0079, Montgomery Run, Amwell Township, 500,000 (Base Construction Allocation $400,000) (Design and Contingencies $100,000) (6) SR 0079, Branch of Ten Mile Creek, Amwell 1,600,000 (Base Construction Allocation $1,200,000) (Design and Contingencies $400,000) (7) SR 1014, SR 0070, South Strabane Township, 930,000 (Base Construction Allocation $800,000) (Land Allocation $10,000) (Design and Contingencies $120,000) (8) SR 1035, SR 0079, North Strabane Township, Bridge Rehabilitation. 765,000 (Base Construction Allocation $560,000) (Land Allocation $5,000) (Design and Contingencies $200,000) (9) SR 2021 Branch of Pigeon Creek, Somerset 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (10) SR 2022, Bans Run, West Bethlehem 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (11) SR 2022, Bans Run, West Bethlehem 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (12) SR 2026, Tributary of Monongahela River, Centerville Borough,. 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (13) SR 2034, Pike Run, West Pike Run Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000)
282 SESSION OF 2006 Act (14) SR 2034, Pike Run, West Pike Run Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (15) SR 2034, Branch of Pike Run, West Pike Run 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (16) SR 3009, Buffalo Creek, East Finley Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (17) SR 3021, Middle Wheeling Creek, West Finley 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (18) SR 4002, Raccoon Creek, Hanover Township, 485,000 (Base Construction Allocation $360,000) (Land Allocation $5,000) (Design and Contingencies $120,000) (19) SR 4003, Kings Creek, Hanover Township, Bridge Rehabilitation 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (20) SR 4005, Harmon Creek, Jefferson and Hanover Townships, 225,000 (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (21) SR 4006, Harmon Creek, Hanover and Smith Townships,. 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (22) SR 4017, Raccoon Creek, Smith Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000)
283 1006 Act LAWS OF PENNSYLVANIA (23) SR 4022, Branch of Buffalo Creek, Buffalo 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (24) SR 4026, SR 0022, Robinson Township, Bridge 600,000 (Base Construction Allocation $500,000) (Design and Contingencies $100,000) (25) SR 4029, North Fork Cross Creek, Cross Creek 345,000 (Base Construction Allocation $240,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (26) SR 0018 over Chartiers Creek, North Franklin 225,000 (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (27) SR 0040 over Dutch Fork of Buffalo Creek, Donegal Township, Bridge Rehabilitation 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (28) SR 0040 over 179, Amwell Township, Bridge 1,370,000 (Base Construction Allocation $1,200,000) (Land Allocation $10,000) (Design and Contingencies $160,000) (29) SR 0070 over South Branch of Maple Creek, Twilight Borough, 820,000 (Base Construction Allocation $700,000) (Design and Contingencies $120,000) (30) SR 0070, Belle Vernon Bridge Repair, Speers Borough, Bridge Rehabilitation 850,000 (Base Construction Allocation $600,000) (Design and Contingencies $250,000) (31) SR 0519 over Opossum Run, Somerset 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (32) SR 1001 over Millers Run, Cecil Township, 875,000 (Base Construction Allocation $500,000)
284 SESSION OF 2006 Act (Land Allocation $25,000) (Design and Contingencies $350,000) (33) SR 2030 over Gorby Run, California Borough, 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (34) SR 0231 over Branch of Brush Run, Independence 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (35) SR 7206, Millers Run Bridge No.3, Cecil 129,000 (Base Construction Allocation $90,000) (Land Allocation $11,000) (Design and Contingencies $28,000) (36) SR 7209, Buffalo Creek Bridge No.4, Donegal 796,000 (Base Construction Allocation $560,000) (Land Allocation $20,000) (Design and Contingencies $216,000) (37) SR 0022 over SR 4005, Hanover Township, Bridge Rehabilitation 1,075,000 (Base Construction Allocation $940,000) (Land Allocation $25,000) (Design and Contingencies $110,000) (38) SR 0022, Bridge No.2 over SR 4005, Hanover Township, Bridge Rehabilitation 1,100,000 (Base Construction Allocation $970,000) (Land Allocation $20,000) (Design and Contingencies $110,000) (39) SR 0040 over Dutch Fork, Donegal Township, Bridge Rehabilitation 621,000 (Base Construction Allocation $500,000) (Land Allocation $11,000) (Design and Contingencies $110,000) (40) SR 1091 over 170, Somerset Township, Bridge 220,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (41) SR 1093 over 170, Somerset Township, Bridge 220,000 (Base Construction Allocation $100,000)
285 1008 Act LAWS OF PENNSYLVANIA (Land Allocation $20,000) (Design and Contingencies $100,000) (42) SR 2002 over 179, South Strabane Township, 320,000 (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (43) SR 2027 over 170, Speers Borough, Bridge 320,000 (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (44) SR 2037 over 170, Fallowfield Township, 320,000 (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (45) SR 2018 over Bull Run, Whiteley Township, 875,000 (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (46) SR 0018 over Raccoon Creek, Smith Township, 875,000 (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (47) SR 0018 over SR 0022, Hanover Township, 1,905,000 (Base Construction Allocation $1,400,000) (Land Allocation $205,000) (Design and Contingencies $300,000) (48) SR 0019 over Ten Mile Creek, Amwell. 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (49) SR 0019, Bridge No.2 over Branch of Little Ten Mile Creek, Amwell Township, Bridge 775,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (50) SR 0040 over Branch of Buffalo Creek, Buffalo
286 SESSION OF 2006 Act ,000 (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (51) SR 0040, Bridge No~2over Branch of Buffalo Creek, Buffalo Township, Bridge Rehabilitation 235,000 (Base Construction Allocation $100,000) (Land Allocation $75,000) (Design and Contingencies $60,000) (52) SR 0050 over Cross Creek, Independence 470,000 (Base Construction Allocation $200,000) (Land Allocation $150,000) (Design and Contingencies $120,000) (53) SR 0050 over South Fork of Cross Creek, Cross Creek 625,000 (Base Construction Allocation $350,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (54) SR 0050, Bridge No.2 over South Fork of Cross Creek, Cross Creek Township, Bridge Rehabilitation 235,000 (Base Construction Allocation $100,000) (Land Allocation $75,000) (Design and Contingencies $60,000) (55) SR 0088 over Tributary of Mon River, Speers Borough, Bridge Rehabilitation 1,125,000 (Base Construction Allocation $650,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (56) SR 0088 over Mingo Creek, Carroll Township, Bridge Rehabilitation 465,000 (Base Construction Allocation $300,000) (Land Allocation $45,000) (Design and Contingencies $120,000) (57) SR 0088 over Froman Run, Union Township,.. 378,000 (Base Construction Allocation $200,000) (Land Allocation $78,000).. (Design and Contingencies $100,000) (58) SR 0136 over Little Chartiers Creek, South Strabane Township, Bridge Rehabilitation 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000)
287 1010 Act LAWS OF PENNSYLVANIA (59) SR 0136 over Branch of Little Chartiers Creek, North Strabane and South Strabane Townships, 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (60) SR 0136, Bridge No.2 over Branch of Little Chartiers Creek, North Strabane and South Strabane Townships, Bridge Rehabilitation 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (61) SR 0136 over Little Chartiers Creek, Somerset Township, Bridge Rehabilitation 2,025,000 (Base Construction Allocation $1,300,000) (Land Allocation $125,000) (Design and Contingencies $600,000) (62) SR 0136 over North Branch of Pigeon Creek, Somerset 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (63) SR 0221 over Buffalo Creek, Blame Township, 750,000 (Base Construction Allocation $400,000) (Land Allocation $150,000) (Design and Contingencies $200,000) (64) SR 0221, Bridge No.2 over Buffalo Creek, Blame 450,000 (Base Construction Allocation $200,000) (Land Allocation $150,000) (Design and Contingencies $100,000) (65) SR 0331 over Buffalo Creek, Independence 945,000 (Base Construction Allocation $600,000) (Land Allocation $45,000) (Design and Contingencies $300,000) (66) SR 0481 over Branch of Pike Run, Centerville Borough, Bridge Rehabilitation 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (67) SR 0481 over Pike Run, West Pike Run 305,000 (Base Construction Allocation $150,000)
288 SESSION OF 2006 Act (Land Allocation $75,000) (Design and Contingencies $80,000) (68) SR 0519 over Branch of Chartiers Run, Chartiers 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (69) SR 0519 over Westland Run, Mount Pleasant Township, Bridge Rehabilitation 775,000 (Base Construction Allocation. $500,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (70) SR 0917 over Branch of Pigeon Creek, Somerset 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (71) SR 1009 over McPherson Creek, Cecil 255,000 (Base Construction Allocation $120,000) (Land Allocation $75,000) (Design and Contingencies $60,000) (72) SR 1023 over Branch of Chartiers Creek, North Strabane 395,000 (Base Construction Allocation $240,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (73) SR 1039 over Chartiers Creek, North Strabane and Chartiers Townships, 355,000 (Base Construction Allocation $200,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (74) SR 1053 over Branch of Little Chartiers Creek, North Strabane 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (75) SR 1053, Bridge No.2 over Branch of Little Chartiers Creek, Peters and North Strabane Townships, 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (76) SR 1059 over Branch of Mingo Creek, Notting
289 1012 Act LAWS OF PENNSYLVANIA ham 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (77) SR 2008, Daniels Run Bridge, North Bethlehem 195,000 (Base Construction Allocation $80,000) (Land Allocation $75,000) (Design and Contingencies $40,000) (78) SR 2011 over Little Ten Mile Creek, Amwell 375,000 (Base Construction Allocation $200,000) (Land Allocation $75,000) (Design and Contingencies $100,000) (79) SR 4003 over SR 0022, Smith Township, Bridge Rehabilitation 3,570,000 (Base Construction Allocation $3,200,000) (Land Allocation $110,000) (Design and Contingencies $260,000) (80) SR 4012 over Robinson Run, Mount Pleasant 215,000 (Base Construction Allocation $100,000) (Land Allocation $75,000) (Design and Contingencies $40,000) (81) SR 4018 over Cross Creek, Independence and Cross Creek Townships, 355,000 (Base Construction Allocation $200,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (82) SR 4030 over 170, Canton Township, Bridge Rehabilitation 840,000 (Base Construction Allocation $600,000) (Land Allocation $80,000) (Design and Contingencies $160,000) (83) SR 4039 over Millers Run, Mount Pleasant 305,000 (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (84) SR 4049 over Branch of Chartiers Creek, Chartiers 675,000 (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000)
290 SESSION OF 2006 Act2006l (85) SR 1014, Lakeview Drive over 170, South Strabane 1,780,000 (Base Construction Allocation $980,000) (Design and Contingencies $800,000) (86) SR 1091 over 170, Somerset Township, Bridge 220,000 (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (87) SR 4029, North Fork of Cross Creek Bridge, Cross Creek 570,000 (Base Construction Allocation $300,000) (Land Allocation $150,000) (Design and Contingencies $120,000) (88) SR 0219, SR 0070 over Zediker Station Road, South Strabane 192,000 (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (89) SR 1093, T818 over 170, Somerset Township, 192,000 (Base Construction Allocation $120,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (90) SR 0088 over Private Road, East Bethlehem. 84,000 (Base Construction Allocation $52,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (91) SR 0018 over Branch of Ten Mile Creek, Seg.0l30, Morris 186,000 (Base Construction Allocation $116,000) (Land Allocation $35,000) (Design and Contingencies $35,000) (92) SR 0018 over Ten Mile Creek, Seg.0110, Morris 98,000 (Base Construction Allocation $62,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (93) SR 0018 over Branch of Short Creek, Seg.0070, Morris 208,000 (Base Construction Allocation $130,000) (Land Allocation $39,000) (Design and Contingencies $39,000)
291 1014 Act LAWS OF PENNSYLVANIA (94) SR 0040 over Buffalo Creek, Buffalo 82,000 (Base Construction Allocation $52,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (95) SR 0088 over Branch of Peters Creek, Union 53,000 (Base Construction Allocation $33,000) (Land Allocation $10,000) (Design and Contingencies $10,000) (96) SR 0221 over Buffalo Creek, Blame Township, 181,000 (Base Construction Allocation $113,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (97) SR 1049 over Branch of Little Chartiers Creek, South Strabane 44,000 (Base Construction Allocation $28,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (98) SR 1057 over Mingo Creek, South Strabane. 44,000 (Base Construction Allocation $28,000) (Land Allocation $8,000) (Design and Contingencies $8,000) (99) SR 1059 over Mingo Creek, Nottingham 124,000 (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (100) SR 1059 over Mingo Creek, Nottingham 124,000 (Base Construction Allocation $78,000) (Land Allocation $23,000) (Design and Contingencies $23,000) (101) SR 2011 over Little Ten Mile Creek, West Bethlehem 164,000 (Base Construction Allocation $102,000) (Land Allocation $31,000) (Design and Contingencies $31,000) (102) SR 2023 over Pigeon Creek, Carroll 207,000 (Base Construction Allocation $129,000) (Land Allocation $39,000) (Design and Contingencies $39,000)
292 S~SSIONOF 2006 Act (103) SR 2027 over South Branch of Maple Creek, Twilight Borough, 111,000 (Base Construction Allocation $69,000) (Land Allocation $21,000) (Design and Contingencies $21,000) (104) SR 3004 over Dutch Fork of Buffalo Creek, Donegal 137,000 (Base Construction Allocation $85,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (105) SR 3009 over Branch of Buffalo Creek, Buffalo 106,000 (Base Construction Allocation $66,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (106) SR 3026 over Enslow Fork of Wheeling Creek, West Finley Township, Bridge 134,000 (Base Construction Allocation $84,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (107) SR 3035 over Ten Mile Creek, Morris 95,000 (Base Construction Allocation $59,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (108) SR 4018 over North Fork of Cross Creek, Cross Creek 153,000 (Base Construction Allocation $95,000) (Land Allocation $29,000) (Design and Contingencies $29,000) Section 68. Wayne County. (a) Local Bridges (Reserved) (b) State Bridges (1) SR 4033 over Unknown Stream, Buckingham 480,000 (Base Construction Allocation $380,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (2) SR 0370, 0.1 Mile East of the County Line over East Branch of Lackawanna River, Preston 126,000 (Base Construction Allocation $36,000) (Land Allocation $20,000) (Design and Contingencies $70,000)
293 1016 Act LAWS OF PENNSYLVANIA (3) SR 0370, 0.3 Mile East of the County Line over East Branch of Lackawanna River, Preston 392,000 (Base Construction Allocation $310,000) (Land Allocation $20,000) (Design and Contingencies $62,000) (4) SR 4014, 0.4 Mile East of SR 4037 over Tarbox Brook, Scott 261,000 (Base Construction Allocation $201,000) (Land Allocation $20,000) (Design and Contingencies $40,000) (5) SR 4024, 0.1 Mile West of SR 4007 over Branch of Equinunk Creek, Buckingham Township,. 757,000 (Base Construction Allocation $614,000) (Land Allocation $20,000) (Design and Contingencies $123,000) (6) SR 4020, 171 Feet East of SR 4012 over Branch of Starlight Creek, Scott Township, Bridge 428,000 (Base Construction Allocation $340,000) (Land Allocation $20,000) (Design and Contingencies $68,000) (7) SR 0196 over Unknown Stream, Dreher 469,000 (Base Construction Allocation $374,000) (Land Allocation $20,000) (Design and Contingencies $75,000) (8) SR 0196 over Unknown Stream, Dreher. 630,000 (Base Construction Allocation $510,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (9) SR 3007, 0.1 Mile North of SR 3009 over Stevens Creek, Sterling Township, Bridge 403,000 (Base Construction Allocation $319,000) (Land Allocation $20,000) (Design and Contingencies $64,000) (10) SR 3040 over Unknown Stream, Lake 480,000 (Base Construction Allocation $380,000) (Land Allocation $20,000) (Design and Contingencies $80,000)
294 SESSION OF 2006 Act (11) SR 0084, 0.5 Mile East ofthe County Line over Wilcox Creek and TR 325, Sterling Township, 5,821,000 (Base Construction Allocation $4,834,000) (Land Allocation $20,000) (Design and Contingencies $967,000) (12) SR 0590, 113 Feet East of SR 3015 over Inlet to Finn Swamp, Paupack Township, Bridge 511,000 (Base Construction Allocation $409,000) (Land Allocation $20,000) (Design and Contingencies $82,000) (13) SR 0191, 0.1 Mile South of SR 3024 over Middle Creek, Cherry Ridge Township, Bridge Rehabilitation 580,000 (Base Construction Allocation $530,000) (Design and Contingencies $50,000) (14) SR 3041, 300 Feet South of SR 3032 over Lackawaxen River, Texas Township, Bridge Rehabilitation 260,000 (Base Construction Allocation $240,000) (Design and Contingencies $20,000) (15) SR 3039,0.2 Mile South of SR 3028 over Collins Brook, Cherry Ridge Township, Bridge 310,000 (Base Construction Allocation $240,000) (Land Allocation $20,000) (Design and Contingencies $50,000) (16) SR 0006 over Middle Creek, Hawley Borough, 242,000 (Base Construction Allocation $152,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (17) SR 0191 over Wallenpaupack Creek, Sterling. 149,000 (Base Construction Allocation $93,000) (Land Allocation $28,000) (Design and Contingencies $28,000) (18) SR 0447 over Branch of Wallenpaupack Creek, Dreher 83,000 (Base Construction Allocation $53,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (19) SR 1005, Outlet of Bunnells Pond, Honesdale
295 1018 Act LAWS OF PENNSYLVANIA Borough, 69,000 (Base Construction Allocation $43,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (20) SR 1016 over Little Equinunk Creek, Damascus 79,000 (Base Construction Allocation $49,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (21) SR 3011 over West Branch of Wallenpaupack Creek, Sterling 176,000 (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (22) SR 3034 over Middle Creek, South Canaan 76,000 (Base Construction Allocation $48,000) (Land Allocation $14,000) (Design and Contingencies $14,000) (23) SR 4007 over Equinunk Creek, Buckingham 195,000 (Base Construction Allocation $123,000) (Land Allocation $36,000) (Design and Contingencies $36,000) (24) SR 4041 over Riley Creek, Preston Township, 88,000 (Base Construction Allocation $56,000) (Land Allocation $16,000) (Design and Contingencies $16,000) (25) SR 1023 over Equinunk Creek, Manchester 172,000 (Base Construction Allocation $108,000) (Land Allocation $32,000) (Design and Contingencies $32,000) (26) SR 4043 over Sherman Creek, Scott Township, 108,000 (Base Construction Allocation $68,000) (Land Allocation $20,000) (Design and Contingencies $20,000) Section 69. Westmoreland County. (a) Local Bridges (1) Fairfield Township, T482, Hirsch Road over Tubmill Creek, 325,000 (Base Construction Allocation $325,000)
296 SESSION OF 2006 Act (2) Fairfield Township, T466, Cove Hollow Road over Small Creek, 100,000 (Base Construction Allocation $100,000) (3) Fairfield Township, T735, Turkey Inn Road over Small Creek, 150,000 (Base Construction Allocation $150,000) (4) Fairfield Township, T990, Patterson Road over Small Creek, 175,000 (Base Construction Allocation $175,000) (5) Fairfield Township, T740, Berkeys Road over Small Creek, 75,000 (Base Construction Allocation $75,000) (6) Loyalhanna Township, T939, Tunnelton Road over Conemaugh River, 800,000 (Base Construction Allocation $680,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (7) Loyalhanna Township, T852, Maple Lodge Road over Small Creek, 600,000 (Base Construction Allocation $490,000) (Land Allocation $10,000) (Design and Contingencies $100,000) (8) Murrysville Borough, Hills Church Road over Small Tributary of Haymaker Run, Bridge 200,000 (Base Construction Allocation $200,000) (9) Murrysville Borough, Manont Road over Tributary of Haymaker Run, 200,000 (Base Construction Allocation $200,000) (10) Murrysville Borough, Haymaker Farm Road over Steels Run, 600,000 (Base Construction Allocation $600,000) (11) Salem Township, T921, Pump Station Road over Beaver Run, Bridge Rehabilitation 159,000 (Base Construction Allocation $125,000) (Land Allocation $2,000) (Design and Contingencies $32,000) (12) Salem Township, T616, Maplewood Drive over Beaver Run, Bridge Rehabilitation 101,000 (Base Construction Allocation $79,000) (Land Allocation $2,000) (Design and Contingencies $20,000) (13) Salem Township, T612, Rock Springs Road over Beaver Run, Bridge Rehabilitation 65,000 (Base Construction Allocation $50,000)
297 1020 Act LAWS OF PENNSYLVANIA (Land Allocation $2,000) (Design and Contingencies $13,000) (14) Salem Township, T728, Hoffman Heights Road over Porter Run, Bridge Rehabilitation 78,000 (Base Construction Allocation $61,000) (Land Allocation $2,000) (Design and Contingencies $15,000) (15) St. Clair Township, T994 over Small Creek, 600,000 (Base Construction Allocation $490,000) (Land Allocation $10,000) (Design and Contingencies $100,000) (16) T654, Finnin Road Bridge, Allegheny 612,000 (Base Construction Allocation $400,000) (Land Allocation $52,000) (Design and Contingencies $160,000) (b) State Bridges (1) SR 4028, Kemerer Hollow Road over Steel s Run, Murrysville Borough, 400,000 (Base Construction Allocation $400,000) (2) SR 4041, School Road over Turtle Creek, Murrysville, 600,000 (Base Construction Allocation $600,000) (3) SR 1050, T910, Loyalhanna Dam Road over Loyalhanna Creek, Loyalhanna Township, Bridge Rehabilitation 1,000,000 (Base Construction Allocation $850,000) (Land Allocation $20,000) (Design and Contingencies $130,000) (4) SR 1006, Creekroad Bridge No.3 over Small Creek, Fairfield 1,000,000 (Base Construction Allocation $1,000,000) (5) SR 1006, Creekroad Bridge No.1 over Small Creek, Fairfield 1,000,000 (Base Construction Allocation $1,000,000) (6) SR 0156 Bridge over Kiskiminetas River, Avonmore Borough, Bridge Rehabilitation 600,000 (Base Construction Allocation $490,000) (Land Allocation $10,000) (Design and Contingencies $100,000) (7) SR 1006 over Tubmill Creek, Fairfield 1,670,000 (Base Construction Allocation $1,400,000) (Land Allocation $20,000)
298 SESSION OF 2006 Act (Design and Contingencies $250,000) (8) SR 1006, Creekroad No.2 over Unnamed Creek, Fairfield 100,000 (Base Construction Allocation $100,000) (9) SR 0366, Little Pucketa Creek, City of New Kensington, 530,000 (Base Construction Allocation $400,000) (Land Allocation $10,000) (Design and Contingencies $120,000) (10) SR 0906, Webster Hollow Run, Rostraver 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (11) SR 0982, Loyalhanna Creek, Derry Township, 1,315,000 (Base Construction Allocation $900,000) (Land Allocation $35,000) (Design and Contingencies $380,000) (12) SR 1017, Branch of Harmas Run, Ligonier 175,000 (Base Construction Allocation $100,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (13) SR 1018, Branch of Loyalhanna Creek, Derry 00,000,000 (Base Construction Allocation $) (Land Allocation $) (Design and Contingencies $) (14) SR 1021, Coalpit Run, Ligonier Township,. 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (15) SR 1023, Furnace Run, Ligonier Township, 155,000 (Base Construction Allocation $80,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (16) SR 1055, Branch of Whitethom Creek, Salem 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000)
299 1022 Act LAWS OF PENNSYLVANIA (17) SR 2009, Township Line Run, Salem 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (18) SR 0217, Deny Borough Bridge, Derry 2,220,000 (Base Construction Allocation $2,000,000) (Land Allocation $20,000) (Design and Contingencies $200,000) (19) SR 2043, Two Mile Run, Ligonier Township, 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (20) SR 2045, Two Mile Run, Ligonier Township, 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (21) SR 3012, Sewickley Creek, Sewickley and South Huntingdon Townships, Bridge 2,520,000 (Base Construction Allocation $2,000,000) (Land Allocation $50,000) (Design and Contingencies $470,000) (22) SR 3021, Tributary of Monongahela River, Rostraver 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (23) SR 3023, Pollock Run, Rostraver Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (24) SR 3023, Pollock Run, Rostraver Township, 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (25) SR 3035, Barren Run, South Huntingdon 155,000 (Base Construction Allocation $80,000) (Land Allocation $5,000)
300 SESSION OF 2006 Act (Design and Contingencies $70,000) (26) SR 3047, Possum Hollow Run, North Huntington 215,000 (Base Construction Allocation $130,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (27) SR 4003, Branch of Brush Creek, Hempfield 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (28) SR 4022, Brush Run, Penn Township, Bridge 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (29) SR 4053, Turtle Creek, Municipality of Muriysville, 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (30) SR 4055, Haymakers Run, Municipality of Murrysville, 230,000 (Base Construction Allocation $140,000) (Land Allocation $10,000) (Design and Contingencies $80,000) (31) SR 4089, Branch of Chartiers Run, Allegheny 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (32) SR 0031 over Buffalo Run, East Huntingdon 875,000 (Base Construction Allocation $500,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (33) SR 0366, Pucketa Creek, Municipality of Murrysville, 195,000 (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (34) SR 0366, Pucketa Creek, Municipality of Murrysville, Bridge Rehabilitation 465,000 (Base Construction Allocation $340,000) (Land Allocation $5,000)
301 1024 Act LAWS OF PENNSYLVANIA (Design and Contingencies $120,000) (35) SR 0366 over Pucketa Creek, Washington Township, Bridge Rehabilitation (Base Construction Allocation $160,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (36) SR 0400 over Beaver Run; Washington and Bell Townships, Bridge Rehabilitation (Base Construction Allocation $260,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (37) SR 0136, Pollock Run Bridge, Rostraver (Base Construction Allocation $120,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (38) SR 4055, Haymakers Run Bridge, Municipality ofmunysville, (Base Construction Allocation $650,000) (Land Allocation $25,000) (Design and Contingencies $350,000) (39) SR 0993, Larimer Bridge, North Huntingdon (Base Construction Allocation $280,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (40) SR 4018 over Turtle Creek, Trafford Borough, (Base Construction Allocation $240,000) (Land Allocation $5,000) (Design and Contingencies $100,000) (41) SR 0982, Welty Run Bridge, Mount Pleasant (Base Construction Allocation $100,000) (Land Allocation $5,000) (Design and Contingencies $70,000) (42) SR 3071, Little Sewickley Creek, Arona Borough, (Base Construction Allocation $150,000) (Land Allocation $5,000) (Design and Contingencies $90,000) (43) SR 3093 over 170, New Stanton Borough, (Base Construction Allocation $600,000) (Land Allocation $40,000) 245, , ,000 1,025, , , , , ,000
302 SESSION OF 2006 Act (Design and Contingencies $140,000) (44) SR 3101 over Jacks Run, South Greensburg Borough and Hempfield Township, Bridge Rehabilitation (Base Construction Allocation $140,000) (Land Allocation $5,000) (Design and Contingencies $80,000) (45) SR 1014 over McGee Run, Deny Township, Bridge Rehabilitation (Base Construction Allocation $340,000) (Land Allocation $5,000) (Design and Contingencies $120,000) (46) SR 3011 over 170, Rostraver Township, Bridge (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (47) SR 3017 over 170, Rostraver Township, Bridge (Base Construction Allocation $100,000) (Land Allocation $20,000) (Design and Contingencies $100,000) (48) SR 3007 over 170, North Belle Vernon Borough, (Base Construction Allocation $150,000) (Land Allocation $20,000) (Design and Contingencies $150,000) (49) SR 0366 over Pucketa Creek, Murrysville, Bridge Rehabilitation (Base Construction Allocation $244,000) (Land Allocation $26,000) (Design and Contingencies $165,000) (50) SR 0366, Bridge No.2, Washington Township, Bridge Rehabilitation (Base Construction Allocation $520,000) (Land Allocation $11,000) (Design and Contingencies $100,000) (51) SR 0400 over Beaver Run, Bell Township, Bridge Rehabilitation (Base Construction Allocation $630,000) (Land Allocation $14,000) (Design and Contingencies $120,000) (52) SR 0993, Larimer Bridge, North Huntingdon Township, Bridge Rehabilitation (Base Construction Allocation $508,000) , , , , , , , , ,000
303 1026 Act LAWS OF PENNSYLVANIA (Design and Contingencies $250,000) (53) SR 1014 over McGee Run, Deny Township, Bridge Rehabilitation (Base Construction Allocation $358,000) (Land Allocation $45,000) (Design and Contingencies $125,000) (54) SR 3101 over Jacks Run, South Greensburg Township, Bridge Rehabilitation (Base Construction Allocation $153,000) (Land Allocation $17,000) (Design and Contingencies $110,000) (55) SR 0030 over Monastery Run, Unity Township, (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $500,000) (56) SR 0030 over Branch of Loyalhanna Creek, Unity (Base Construction Allocation $500,000) (Design and Contingencies $200,000) (57) SR 1022 over Crabtree Creek, Unity Township, (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (58) SR 3009 over Mon River, Rostraver Township, (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (59) SR 3103, Zellers Run Bridge, Hempfield Township and Southwest Greensburg Borough, Bridge Rehabilitation (Base Construction Allocation $700,000) (Land Allocation $110,000) (Design and Contingencies $74,000) (60) SR 4022 over Brush Run, Penn Borough, (Base Construction Allocation $160,000) (Land Allocation $105,000) (Design and Contingencies $100,000) (61) SR 4041, Turtle Creek Bridge, Murrysville 528, ,000 1,575, , ,000 ~ 975, , ,000
304 SESSION OF 2006 Act Borough, (Base Construction Allocation $300,000) (Land Allocation $125,000) (Design and Contingencies $80,000) (62) SR 3101 over Jacks Run, South Greensburg Borough and Hempfield Township, Bridge (Base Construction Allocation $300,000) (Land Allocation $125,000) (Design and Contingencies $230,000) (63) SR 0031, Buffalo Run Bridge, East Huntingdon (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (64) SR 0031 over Sherrick Run, East Huntingdon (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (65) SR 0031 over Sherrick Run 2, East Huntingdon (Base Construction Allocation $1,000,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (66) SR 0031 over Brush Run, Mount Pleasant (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (67) SR 0031 over Jacobs Creek, Mount Pleasant (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (68) SR 0031, Bridge No.2 over Jacobs Run, Mount Pleasant (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (69) SR 0051 over 170, Rostraver Township, Bridge (Base Construction Allocation $1,200,000) (Land Allocation $90,000) (Design and Contingencies $300,000) , , ,000. 1,475,000. 1,475, , , ,000 1,590,000
305 1028 Act LAWS OF PENNSYLVANIA (70) SR 0056 over Little Pucketa Creek, City of New Kensington, (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $80,000) (71) SR 0056, Bridge No.2 over Little Pucketa Creek, City of New Kensington, Bridge (Base Construction Allocation $600,000) (Design and Contingencies $200,000) (72) SR 0056 over Small Stream, Allegheny (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (73) SR 0070 over Branch of Cedar Creek, South Huntingdon (Base Construction Allocation $2,000,000) (Land Allocation $150,000) (Design and Contingencies $500,000) (74) SR 0119 over Jacks Run, Hempfield Township, (Base Construction Allocation $300,000) (Land Allocation $45,000) (Design and Contingencies $120,000) (75) SR 0119 over Zellers Run, Southwest Greensburg Borough, Bridge Rehabilitation (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $400,000) (76) SR 0119 over Branch of Jacks Run, Hempfield (Base Construction Allocation $600,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (77) SR 0119 over Crabtree Creek No.2, Hempfield Township, Bridge Rehabilitation (Base Construction Allocation $750,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (78) SR 0130 over Brush Creek, City of Jeannette, (Base Construction Allocation $360,000) (Land Allocation $150,000) 305, ,000 1,225,000 2,650, ,000 1,225, ,000 1,125, ,000
306 SESSION OF 2006 Act (Design and Contingencies $400,000) (79) SR 0130 over SR 0030, Hempfield Township, Bridge Rehabilitation (Base Construction Allocation $500,000) (Land Allocation $90,000) (Design and Contingencies $100,000) (80) SR 0130 over Slate Creek, Hempfield (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (81) SR 0201 over Pollock Run, Rostraver (Base Construction Allocation $150,000) (Land Allocation $75,000) (Design and Contingencies $300,000) (82) SR 0217 over Loyalhanna Creek, Deny Township, Bridge Rehabilitation (Base Construction Allocation $800,000) (Land Allocation $100,000) (Design and Contingencies $100,000) (83) SR 0259, Freeman Run Bridge No.2, Fairfield (Base Construction Allocation $400,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (84) SR 0259, Freeman Run Bridge, Bolivar Borough, Bridge Rehabilitation (Base Construction Allocation $300,000) (Land Allocation $60,000) (Design and Contingencies $80,000) (85) SR 0271, Mill Creek Bridge, Ligonier (Base Construction Allocation $300,000) (Land Allocation $125,000) (Design and Contingencies $80,000) (86) SR 0356 over Kiski River, Allegheny (Base Construction Allocation $1,000,000) (Land Allocation $105,000) (Design and Contingencies $300,000) (87) SR 0366 over Pucketa Creek, City of Lower Bunell, (Base Construction Allocation $650,000) (Land Allocation $75,000) , , ,000 1,000, , , ,000 1,405,000 1,025,000
307 1030 Act LAWS OF PENNSYLVANIA (Design and Contingencies $300,000) (88) SR 0381, Powdermill Run Bridge, Cook Township, Bridge Rehabilitation (Base Construction Allocation $100,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (89) SR 0711, Mill Creek Bridge No.2, Ligonier Township, Bridge Rehabilitation (Base Construction Allocation $300,000) (Design and Contingencies $70,000) (90) SR 0711, Mill Creek Bridge, Ligonier Township, Bridge Rehabilitation (Base Construction Allocation $200,000) (Land Allocation $150,000) (Design and Contingencies $200,000) (91) SR 0711, Tubmill Creek Bridge, Fairfield (Base Construction Allocation $450,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (92) SR 0819 over Jacks Run, Hempfield Township, (Base Construction Allocation $450,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (93) SR 0819, Porters Run Bridge, Salem Township, (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (94) SR 0981, Barron Run Bridge, South Huntingdon (Base Construction Allocation $100,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (95) SR 0982, Nine Mile Run Bridge, Unity (Base Construction Allocation $500,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (96) SR 0982, Bridge over Stony Run, Deny (Base Construction Allocation $500,000) (Land Allocation $75,000) 375, , , , , , , , ,000
308 Act SESSION OF 2006 (Design and Contingencies $300,000) (97) SR 0993, Brush Creek, North Huntingdon (Base Construction Allocation $450,000) (Land Allocation $75,000) (Design and Contingencies $200,000) (98) SR 1020, Saxman Run Bridge, Deny (Base Construction Allocation $750,000) (Land Allocation $80,000) (Design and Contingencies $400,000) (99) SR 0056 over Little Pucketa Creek, City of New Kensington, (Base Construction Allocation $151,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (100) SR 0259 over Freeman Run, Bolivar Borough, (Base Construction Allocation $166,000) (Land Allocation $49,000) (Design and Contingencies $49,000) (101) SR 0381 over Indian Creek, Donegal (Base Construction Allocation $113,000) (Land Allocation $34,000) (Design and Contingencies $34,000) (102) SR 2006 over Jacobs Creek, Mount Pleasant (Base Construction Allocation $82,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (103) SR 2043 over Four Mile Run, Ligonier (Base Construction Allocation $99,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (104) SR 3045 over Branch of Little Sewickley Creek, Sewickley (Base Construction Allocation $34,000) (Design and Contingencies $10,000) (105) SR 4028 over Branch of Steels Run, Murrysville Borough, (Base Construction Allocation $76,000) (Land Allocation $23,000) ,000 1,230, , , , , ,000 54, ,000
309 1032 Act LAWS OF PENNSYLVANIA (Design and Contingencies $23,000) Section 70. Wyoming County. (a) Local Bridges (1) Nicholson Township, Highway over Delaware & Hudson Railroad, (Base Construction Allocation $1,275,000) (Land Allocation $75,000) (Design and Contingencies $150,000) (2) Noxen Township, T327 over Beaver Run Creek, (Base Construction Allocation $154,000) (Design and Contingencies $29,000) (3) Monroe Township, T337 over Leonards Creek, (Base Construction Allocation $377,000) (Land Allocation $24,000) (Design and Contingencies $71,000) (4) North Branch Township, T423 over North Branch of Mehoopany Creek, (Base Construction Allocation $302,000) (Land Allocation $19,000) (Design and Contingencies $57,000) (5) Noxen Township, T337 over Beaver Creek, (Base Construction Allocation $182,000) (Land Allocation $18,000) (Design and Contingencies $43,000) (b) State Bridges (1) SR 4002, 1 Mile West of TR 87 over Little Mehoopany Creek, Mehoopany Township, Bridge (Base Construction Allocation $280,000) (Land Allocation $20,000) (Design and Contingencies $60,000) (2) SR 4025, 0.1 Mile West of TR 6 over Branch of Susquehanna River, Meshoppen Township, (Base Construction Allocation $374,000) (Land Allocation $20,000) (Design and Contingencies $75,000) (3) SR 2019, 42 Feet East of TR 307 over Branch of Beaver Creek, Falls Township, Bridge (Base Construction Allocation $374,000) 1,500, , , , , , , ,000
310 SESSION OF 2006 Act (Land Allocation $20,000) (Design and Contingencies $75,000) (4) SR 0006 over Unknown Stream, Meshoppen (Base Construction Allocation $630,000) (Land Allocation $20,000) (Design and Contingencies $130,000) (5) SR 2001, 0.5 Mile South of TR 29 over South Run Creek, Monroe Township, Bridge (Base Construction Allocation $390,000) (Land Allocation $20,000) (Design and Contingencies $80,000) (6) SR 3002, 2.2 Miles West of TR 29 over Stone Run, Noxen (Base Construction Allocation $60,000) (Land Allocation $4,000) (Design and Contingencies $12,000) (7) SR 2002, 0.4 Mile West of SR 0292, Exeter (Base Construction Allocation $500,000) (Design and Contingencies $250,000) (8) SR 0092 over Tributary of Tunkharwock Creek, Nicholson (Base Construction Allocation $49,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (9) SR 2002 over Branch of Marsh Creek, Northmoreland (Base Construction Allocation $66,000) (Land Allocation $20,000) (Design and Contingencies $20,000) (10) SR 3001 over Mehoopany Creek, Forkston (Base Construction Allocation $151,000) (Land Allocation $45,000) (Design and Contingencies $45,000) (11) SR 4019 over Meshoppen Creek, Washington (Base Construction Allocation $115,000) (Land Allocation $34,000) (Design and Contingencies $34,000) , ,000 76, ,000 79, , , ,000
311 1034 LAWS OF PENNSYLVANIA Act (12) SR 4027 over West Branch of Meshoppen Creek, Meshoppen Township, Bridge (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) Section 71. York County. (a) Local Bridges (1) East Hopewell Township, T570, Trout School Road over Tributary of Rambo Run, Bridge (Base Construction Allocation $140,000) (Design and Contingencies $40,000) (2) East Hopewell Township, T557, Church Road over Tributary of Rambo Run, Bridge (Base Construction Allocation $375,000) (Land Allocation $25,000) (Design and Contingencies $50,000) (3) Franklin Township, T863, Ridge Road over North Bermudian Creek, (Base Construction Allocation $447,000) (Land Allocation $17,000) (Design and Contingencies $119,000) (4) Paradise Township in York County and Hamilton Township in Adams County, T55 1, Beaver Creek, (5) Paradise Township in York County and Hamilton Township in Adams County, T552A, Beaver Creek, (6) Paradise Township in York County and Hamilton Township in Adams County, T554, Beaver Creek, (7) Spring Grove Borough, Main Street, Bridge (Base Construction Allocation $2,831,000) (b) State Bridges (1) SR 2076, Stewartstown Road over 183, Shrewsbury (Base Construction Allocation $500,000) (Design and Contingencies $505,000) (2) SR 0214, Main Street over South Branch of Codorus Creek, Seven Valleys Borough, Bridge (Base Construction Allocation $990,000). 57, , , , , , ,000 2,831,000 1,005,000 1,540,000
312 SESSION OF 2006 Act (Land Allocation $25,000) (Design and Contingencies $525,000) (3) SR 3073, Westminster Road over Indian Run, Penn (Base Construction Allocation $400,000) (Design and Contingencies $510,000) (4) SR 4032, Ridge Road over Branch of Bermudian Creek, Washington (Base Construction Allocation $740,000) (Design and Contingencies $205,000) (5) SR 2070, Ridgeview Road over 183, Springfield (Base Construction Allocation $500,000) (Design and Contingencies $505,000) (6) SR 2074, Plank Road over 183, Shrewsbury Township and Shrewsbury Borough, Bridge (Base Construction Allocation $500,000) (Design and Contingencies $505,000) (7) SR 2078, Windy Hill Road over 183, Shrewsbury (Base Construction Allocation $750,000) (Design and Contingencies $505,000) (8) SR 1021 over Tributary of Little Conewago Creek, Conewago (Base Construction Allocation $285,000) (Design and Contingencies $505,000) (9) SR 4033, Meadow View Road over North Branch of Bermudian Creek, Franldin Township, (Base Construction Allocation $400,000) (Design and Contingencies $510,000) (10) SR 0425, Woodbine Road over Bald Eagle Creek, Fawn (Base Construction Allocation $345,000) (Design and Contingencies $505,000) (11) SR 2093, Ham Road over 183, Shrewsbury (Base Construction Allocation $500,000) (Design and Contingencies $505,000) , ,000 1,005,000 1,005,000 1,255, , , ,000 1,005,000
313 1036 Act LAWS OF PENNSYLVANIA (12) SR 2033, Snyder Corner Road Bridge, Lower Windsor (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (13) SR 2002, Springwood Road Bridge, York (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (14) SR 0116, York Road Bridge, North Codorus Township and Spring Grove Borough, Bridge (Base Construction Allocation $416,000) (Design and Contingencies $110,000) (15) SR 4003, South Salem Church Bridge, Dover Township, Replace Bridge Deck and Superstructure (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (16) SR 1003, Bridge Street Bridge, New Cumberland Borough and Fairview Township, Bridge Rehabilitation (Base Construction Allocation $150,000) (Design and Contingencies $90,000) (17) SR 0234, East Berlin Road over Paradise Creek, Jackson (Base Construction Allocation $150,000) (Design and Contingencies $90,000) (18) SR 3015, Fissels Church Road Bridge, Codorus and Shrewsbury Townships, (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (19) SR 0181, North George Street Bridge, Manchester (Base Construction Allocation $140,000) (Design and Contingencies $100,000) (20) SR 3066, Furman s Mill Road Bridge, West Manheim (Base Construction Allocation $100,000) 240, , , , , , , , ,000
314 SESSION OF 2006 Act (Design and Contingencies $90,000) (21) SR 2020, Gum Tree Road Bridge, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (22) SR 1003, Bridge Street Bridge, New Cumberland Borough and Fairview Township, Bridge Rehabilitation (Base Construction Allocation $610,000) (Land Allocation $15,000) (Design and Contingencies $101,000) (23) SR 0234, East Berlin Road over Paradise Creek, Jackson (Base Construction Allocation $332,000) (Design and Contingencies $84,000) (24) SR 3015, Fissels Church Road Bridge, Codorus and Shrewsbury Townships, (Base Construction Allocation $206,000) (Land Allocation $15,000) (Design and Contingencies $92,000) (25) SR 0181, North George Street Bridge, Manchester (Base Construction Allocation $171,000) (Land Allocation $15,000) (Design and Contingencies $117,000) (26) SR 3066, Furman s Mill Road Bridge, West Manheim (Base Construction Allocation $165,000) (Design and Contingencies $94,000) (27) SR 2020, Gum Tree Road Bridge, Chanceford (Base Construction Allocation $157,000) (Design and Contingencies $83,000) (28) SR 0194, Baltimore Pike over Bermudian Creek, Washington Township, Bridge (Base Construction Allocation $360,000) (Design and Contingencies $90,000) (29) SR 2035, Richmond Road over Fishing Creek, , , , , , , , ,000
315 1038 Act LAWS OF PENNSYLVANIA Chanceford (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (30) SR 2087, Iron Stone Hill Road over Inners Run, York (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (31) SR 3050, Woodbeny Road over Railroad, West Manchester (Base Construction Allocation $300,000) (Design and Contingencies $115,000) (32) SR 3074, Smoketown Road over Tributary of Codorus Creek, Manheim Township, Bridge (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (33) SR 4001, Bull Road over Fox Run, Conewago and Dover Townships, (Base Construction Allocation $240,000) (Design and Contingencies $90,000) (34) SR 4009, York Road over Bennett Run, Newbeny (Base Construction Allocation $100,000) (Design and Contingencies $90,000) (35) SR 4003, South Salem Church Bridge, Dover (Base Construction Allocation $283,000) (Land Allocation $20,000) (Design and Contingencies $110,000) (36) Ridge Road Bridge, C236, Franklin Township, (Base Construction Allocation $81,000) (Land Allocation $15,000) (Design and Contingencies $30,000) (37) Gettysburg Pike Bridge, Carroll Township, Bridge Rehabilitation (Base Construction Allocation $340,000) (Land Allocation $40,000) (Design and Contingencies $110,000) 240, , , , , , , , ,000
316 Act SESSION OF 2006 (38) 183, 183 and SR 0030 Bridge, Parapet, Manchester Township, Bridge Rehabilitation (Base Construction Allocation $40,000) (Design and Contingencies $30,000) (39) SR 0116 over Tributary of Codorus Creek, North Codorus (Base Construction Allocation $85,000) (Land Allocation $26,000) (Design and Contingencies $26,000) (40) SR 0177 over Beaver Creek and Pinchot Lake, Warrington (Base Construction Allocation $82,000) (Land Allocation $25,000) (Design and Contingencies $25,000) (41) SR 0462 over Mill Creek, Springettsbury (Base Construction Allocation $280,000) (Land Allocation $84,000) (Design and Contingencies $84,000) (42) SR 0616 over Tributary of South Branch of Codorus Creek, Shrewsbury Township, Bridge (Base Construction Allocation $44,000) (Land Allocation $13,000) (Design and Contingencies $13,000) (43) SR 0851 over Swans Creek, Shrewsbury (Base Construction Allocation $180,000) (Land Allocation $54,000) (Design and Contingencies $54,000) (44) SR 0921 over Tributary of Little Conewago Creek, Conewago (Base Construction Allocation $33,000) (Design and Contingencies $10,000) (45) SR 1004 over Little Conewago Creek, Conewago (Base Construction Allocation $146,000) (Land Allocation $44,000) (Design and Contingencies $44,000) (46) SR 1012 over Tributary of Codorus Creek, Manchester (Base Construction Allocation $47,000) (Land Allocation $14,000) (Design and Contingencies $14,000) , , , , , ,000 53, ,000 75,000
317 1040 Act LAWS OF PENNSYLVANIA (47) SR 1013 over Conewago Creek, Newbeny (Base Construction Allocation $440,000) (Land Allocation $132,000) (Design and Contingencies $132,000) (48) SR 1019 over Diversion Channel, East Manchester (Base Construction Allocation $290,000) (Land Allocation $87,000) (Design and Contingencies $87,000) (49) SR 2014 over Beaver Creek, Lower Windsor (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (50) SR 2028 over Scott s Run, Delta Borough, (Base Construction Allocation $60,000) (Land Allocation $18,000) (Design and Contingencies $18,000) (51) SR 2031 over Kreutz Creek, Windsor (Base Construction Allocation $50,000) (Land Allocation $15,000) (Design and Contingencies $15,000) (52) SR 2048 over Branch of Muddy Creek, Chanceford (Base Construction Allocation $30,000) (Land Allocation $9,000) (Design and Contingencies $9,000) (53) SR 2060 over Tributary of North Branch of Muddy Creek, North Hopewell Township, Bridge (Base Construction Allocation $41,000) (Land Allocation $12,000) (Design and Contingencies $12,000) (54) SR 3012 over Centerville Run, Codorus (Base Construction Allocation $73,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (55) SR 3016 over South Branch of Codorus Creek, Springfield (Base Construction Allocation $89,000) (Land Allocation $26,000) 704, ,000 80,000 96,000 80,000 48,000 65, , ,000
318 SESSION OF 2006 Act (Design and Contingencies $26,000) (56) SR 3065 over Willis Run, City of York, Bridge (Base Construction Allocation $100,000) (Land Allocation $30,000) (Design and Contingencies $30,000) (57) SR 3072 over Bunch Run, Jackson Township, (Base Construction Allocation $73,000) (Land Allocation $22,000) (Design and Contingencies $22,000). (58) SR 3072 over Oil Creek, Jackson Township, (Base Construction Allocation $82,000) (Land Allocation $24,000) (Design and Contingencies $24,000) (59) SR 3072 over Oil Creek, Heidelberg Township, (Base Construction Allocation $73,000) (Land Allocation $22,000) (Design and Contingencies $22,000) (60) SR 3092 over Tributary of Bunch Creek, Jackson (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) (61) SR 4002 over Tributary of Conewago Creek, Dover (Base Construction Allocation $110,000) (Land Allocation $33,000) (Design and Contingencies $33,000) (62) SR 4015 over Davidsburg Run, Dover (Base Construction Allocation $63,000) (Land Allocation $19,000) (Design and Contingencies $19,000) (63) SR 4018 over Laurel Run, Conewago (Base Construction Allocation $32,000) (Design and Contingencies $10,000) (64) SR 4019 over Beaver Creek, Warrington (Base Construction Allocation $107,000) (Land Allocation $32,000) , , , ,000 57, , ,000 52, ,000
319 1042 Act LAWS OF PENNSYLVANIA (Design and Contingencies $32,000) (65) SR 3074, Manheim Township, Bridge 950,000 (Base Construction Allocation $500,000) (Design and Contingencies $400,000) (66) SR 2035, Lower Windsor Township, Bridge 950,000 (Base Construction Allocation $500,000) (Design and Contingencies $400,000) (67) SR 4001, Dover Township, Bridge 1,650,000 (Base Construction Allocation $1,200,000) (Design and Contingencies $400,000) (68) SR 0194 over Bermudian Creek, Washington 2,300,000 (Base Construction Allocation $1,800,000) (Design and Contingencies $450,000) (69) SR 4009 over Bennetts Run, Newberry 950,000 (Base Construction Allocation $500,000) (Design and Contingencies $400,000) (70) SR 2087 over Inners Run, York Township, 950,000 (Base Construction Allocation $500,000) (Design and Contingencies $400,000) (71) SR 3050 over Dover Railroad, West Manchester 2,000,000 (Base Construction Allocation $1,500,000) (Design and Contingencies $450,000) (72) SR 3015 over Centerville Creek, Codorus 57,000 (Base Construction Allocation $35,000) (Land Allocation $11,000) (Design and Contingencies $11,000) Section 72. (Reserved). Section 73. Limitation on expenditure of funds. Any moneys derived from the incurring of debt shall be used solely for effecting the rehabilitation, replacement or removal of bridges located on
320 SESSION OF 2006 Act State highways. All other bridge rehabilitation, replacement or removal shall be financed from current revenue. Section 74. Debt authorization. The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,612,945,000 as may be found necessary to carry out the acquisition and construction of the State projects specifically itemized in this act. Section 75. Issue ofbonds. The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series a~the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed 30 years from the date of the bond first issued for each series. Section 76. Estimated useful life ofprojects. The General Assembly states the estimated useful life of the projects itemized in this act as 30 years. Section 77. Appropriation. The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the department in the maximum amount of $1,612,945,000 to be used by it exclusively to defray the financial costs of the State projects specifically itemized in this capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the department the moneys as required and certified by it to be legally due and payable. Section 78. Federal funds. In addition to those funds appropriated in section 77, all moneys received from the Federal Government for the public improvement projects specifically itemized in this act are also hereby appropriated for those projects. Section 79. Allocation of funds. (a) General rule. Whenever the department or the Department of Conservation and Natural Resources determines that the full estimated financial costs of the projects itemized in this act are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the department or the Department of Conservation and Natural Resources to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget. (b) Reimbursement of municipal expenditures. Moneys raised or expended by municipalities after the effective date of this act, in anticipation of receipt of funds authorized for projects itemized by this act, may be reimbursable to those municipalities.
321 1044 Act LAWS OF PENNSYLVANIA Section 80. Policy on jobs and materials. (a) Jobs. It is the declared policy of the Commonwealth that the construction projects authorized in this act be used, to the greatest extent possible, to provide for the creation of jobs and the rehiring of the unemployed in this Commonwealth. In order to reach this goal, firms with Commonwealthbased facilities shall be actively solicited to make bids on contracts to furnish products and materials, including, but not limited to, steel and steel products, to be used in these projects. (b) Materials. Every contract document entered into to undertake a project contained in this act shall provide that any steel or other products to be used or supplied in the performance of this contract shall be required to be manufactured by plants in the United States unless the secretary determines, on a contractbycontract basis, that certain required products are not produced in the United States in sufficient quantities to meet the requirements of the contract. Such a determination and the reasons therefor shall be published in the Pennsylvania Bulletin. Decisions made under this subsection shall not be inconsistent with the general provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act. (c) Minorities and women. It is also the declared policy of the Commonwealth to require and encourage substantial participation by minorities and women in the construction projects authorized bythisiact. Section 81. Payment of capital debt service. The repayment of any debt incurred pursuant to this act shall be made from the account, and such repayment shall have first claim on the revenues of the account. Section 82. Authorization and debt cumulation. The additional authorization and debt allowance provided for in this act shall be added to the total authorizations and debt incurred pursuant to the act of December 8, 1982 (P.L.848, No.235), known as the HighwayRailroad and Highway Bridge Capital Budget Act for , as amended and supplemented. Section 83. Editorial changes. In editing and preparing this act for printing following the fmal enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for thetotal authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects. Section 84. Repeal (Reserved). Section ~5. Effective date. This act shall take effect immediately. APPROVED The 7th day ofjuly, A.D EDWARD G. RENDELL
Realty Transfer Tax Rates
1 of 6 1/19/2015 1:19 PM Realty Transfer Tax Rates Common Level Ratio Factor (CLR) for Real Estate Valuation Allegheny County 1.10 PA Department of Revenue - All PA Counties Act 77 In 1986, the State Legislature
Client List & References
Client List & References 445 Fort Pitt Boulevard, Suite 503 Pittsburgh, PA 15219 412-391-9890 www.weisslawoffices.com Municipal and School Experience Current Solicitorships School Districts Steel Center
How To Fix A Bridge In Apa.Com
BASE Bridge Rehabilitation Walker Mill Road over Paxton Creek DAUPHIN Y Bridge Rehabilitation on Township Road 431 (Walker Mill Road) over Paxton Creek in Susquehanna Township 1 $ 865,000 1 0 0.1 BASE
SESSION OF 1988 Act 1988-102 629. No. 1988-102 AN ACT
SESSION OF 1988 629 HB 2035 No. 1988-102 AN ACT Itemizing water and sewer projects eligible for funding through the Pennsylvania Infrastructure Investment Authority for fiscal year 1987-1988 together with
Nonresident. Resident. Municipal PSD Code School District Name EIT
PSD Code School District Name ADAMS ABBOTTSTOWN BORO 010201 CONEWAGO VALLEY S D 1.00 1.50 York Adams Tax Bureau PO Box 15627 York PA 17405 (717) 845-1584 www.yatb.com ADAMS ARENDTSVILLE BORO 010601 UPPER
Cove Forge Behavioral System Pittsburgh. Gateway Rehabilitation Center Allegheny Valley. Gateway Rehabilitation Center Monroeville
Cove Forge Behavioral System Pittsburgh Allegheny Valley Monroeville Pleasant Hills Squirrel Hill South Hills Out-Patient Squirrel Hill Out-Patient Monroeville Out-Patient Robinson Out-Patient Wexford
YORK COUNTY. Warrington Township 1 $ 650,000 1 1 0
Bridge rehabilitation on State Route 4014 (Harmony Grove Road) over Doe Run in BASE Bridge Rehabilitation Harmony Grove Road Bridge over Doe Run Warrington Township 1 $ 650,000 1 1 0 Browntown Road Bridge
We would like to welcome you as a new customer of XFINITY Home!
XFINITY HOME Comcast 3220 Tillman Drive Bensalem, PA 19020 We would like to welcome you as a new customer of XFINITY Home! Certain municipalities in Pennsylvania require home security system users to obtain
APPLICATION INSTRUCTIONS
ALLEGHENY COUNTY VACANT PROPERTY RECOVERY PROGRAM APPLICATION INSTRUCTIONS 1. This application should be used to apply for properties located in participating municipalities in which less than 51 percent
Highway & Bridge. Municipality: Exempt Code: Widen narw. pave. or recon brdgs (No addtl lanes)
FFY 2013 TIP MPMS #: 87792 Title: Bridge Reserve Route: Section: A/Q Status: Exempt Improvement Type: Miscellaneous Geographic Limits: County RPO area Narrative: Federal and State bridge Reserve County
Pittsburgh Metro Area Includes Allegheny County
Participating Provider Directory for Pittsburgh Metro Area Includes Allegheny County Please Note: Depending on the benefits provided under your plan, the services of some providers listed in this directory
John Holland Boathouse. N Surrey Ave & Calvert Ave Ventnor City, NJ 08406
John Holland Boathouse N Surrey Ave & Calvert Ave Ventnor City, NJ 08406 Take Rt. 40 East, The Blackhorse Horse Pike, towards Atlantic City. After Atlantic City High School but before you cross the last
Nursing Opportunities by County. View the county of your choice below to see a list of nursing job classifications used by facilities in that county.
Nursing Opportunities by County View the county of your choice below to see a list of nursing job classifications used by facilities in that county. Please note that not all counties have nursing facilities.
Alliance Medical Services, Inc. Ensign I. Alliance Medical Services, Inc. Ensign II. Alliance Medical Services, Inc. Smallman.
Alliance Medical Services, Inc. Ensign I Alliance Medical Services, Inc. Ensign II Alliance Medical Services, Inc. Smallman Gateway Rehabilitation Center Squirrel Hill Progressive Medical Specialists,
REST HOME & ASSISTED LIVING CABARRUS COUNTY
REST HOME & ASSISTED LIVING CABARRUS COUNTY Updated 7/3/08 BIG ELM RETIREMENT CENTER 1310 Glenn Avenue Medicaid (704) 932-0000 (ask for Admissions Director) Directions: Depart NorthEast Medical Center
North Pittsburgh Area
North Pittsburgh Area Sunday 6:00PM, Gateway Rehab Cranberry, 1659 Route 228, Cranberry Township, PA, 16066, USA, At Franklin Road [OPEN DISC] Group: G00176626 Help Us Help You Group 6:30PM, McFadden Room,
LESAGE, WEST VIRGINIA
AVAILABLE SPACE HADCO BUSINESS PARK BUILDING V LOCATION Building Address - HADCO Business Park 8201 Frazier s Lane (Rte. 2) Lesage, WV 25537 Located in City Limits - No County - Cabell Located in Business/Industrial
Star Ratings From Medicare For Utah Nursing Homes 2014
Federal Provider Number Provider Name 6003 HERITAGE PARK CARE CENTER 6006 MT OLYMPUS REHABILITATION CENTER 6009 KINDRED NURSING & REHABILITATION - WASATCH CARE 6020 PIONEER CARE CENTER 609 SPRING CREEK
Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg.
Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh Pyramid Healthcare, Inc. - Wilkinsburg Sojourner House Summit School COUNTY: ALLEGHENY 331 Hickory Grade Road South Fayette
Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh. Pyramid Healthcare, Inc. - Wilkinsburg.
Gateway Rehabilitation Center South Fayette Township Gaudenzia, Inc. - Pittsburgh Pyramid Healthcare, Inc. - Wilkinsburg Sojourner House Summit School COUNTY: ALLEGHENY 331 Hickory Grade Road South Fayette
AVAILABLE SPACE COLLIERS STEEL BUILDING
AVAILABLE SPACE COLLIERS STEEL BUILDING LOCATION Building Address - RR 2 Box 450 Located in City Limits - Yes County - Brooke Located in Business/Industrial Park - No Can the Building be Multi-Tenant -
Crash data may not contain complete information, some elements may be unknown
Crash Data Introduction: Crash data are information that comes from a reportable crash. A reportable crash according to Title 75, Pennsylvania Consolidated Statutes, Section 3746(a) is: an incident that
Drop-In Centers by County
Drop-In Centers by County Allegheny, Armstrong, Beaver, Bedford, Berks, Bradford, Bucks, Butler, Cambria, Cameron/Elk/McKean, Carbon, Centre, Chester, Clarion, Clearfield Jefferson, Columbia, Crawford,
State Health Insurance Assistance Program (SHIP) Coordinators in Kentucky S H I P COORDINATOR
BARREN RIVER Allen Barren Butler Edmonson Hart Logan Metcalfe Monroe Simpson Warren Daniel Curry/ Linda Tate Kentucky Legal Aid 1700 Destiny Lane Bowling Green, KY 42104 (866) 452-9243 Phone: (270) 782-5740
OAK HILL, WEST VIRGINIA
AVAILABLE SPACE 298 INDUSTRIAL DRIVE BUILDING OAK HILL, WEST VIRGINIA LOCATION Building Address - 298 Industrial Drive Oak Hill, WV 25901 Located in City Limits - No Zoning - Industrial County - Fayette
IN THE COURT OF COMMON PLEAS OF ALLEGHENY COUNTY, PENNSYLVANIA CIVIL DIVISION
IN THE COURT OF COMMON PLEAS OF ALLEGHENY COUNTY, PENNSYLVANIA CIVIL DIVISION LAWRENCE W. DUNN and CAROL L. : DUNN, his wife, COIN FLIP ASSOCIATES, a Pennsylvania General Partnership, : MAYVIEW ROAD ASSOCIATES
Information 117 Baltimore Street Gettysburg, PA 17325 (717) 337-9834. Court Administrator Adams County Courthouse Gettysburg, PA 17325 717-337-9846
County ADAMS ALLEGHENY ARMSTRONG BEAVER BEDFORD BERKS BLAIR BRADFORD BUCKS BUTLER Office to List on Notice to Defend Office of the, Room 104, Adams County, Gettysburg, Pennsylvania 17325. Department of
Thomas P. Williams Pennsylvania State Director
Thomas P. Williams Pennsylvania State Director in fra struc ture [in-fruh-struhk-cher] noun The fundamental facilities and systems serving a country, city, or area, as transportation and broadband systems,
PENNSYLVANIA FUTURE BUSINESS LEADERS OF AMERICA 2006-2007 STATE EXECUTIVE COMMITTEE and BOARD OF DIRECTORS (as of May 7, 2006)
PENNSYLVANIA FUTURE BUSINESS LEADERS OF AMERICA 2006-2007 STATE EXECUTIVE COMMITTEE and BOARD OF DIRECTORS (as of May 7, 2006) Position/Adviser(s) Home Address School Address President Term Expires 2007
ACCESSING DRUG & ALCOHOL TREATMENT IN ALLEGHENY COUNTY D&A RESOURCE GUIDE
ACCESSING DRUG & ALCOHOL TREATMENT IN ALLEGHENY COUNTY D&A RESOURCE GUIDE The Allegheny County Bureau of Drug and Alcohol Services provides supports, through a variety of community-based agencies, and
Bus #16 Start at South Main Street and 50 East. turn left Turn right on 150 South (Heights Chapel Road), pick up, turn around Follow 150 South to 175 East, turn right Follow 175 East, cross railroad tracks.
COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center
Alle Kiski Medical Center Jefferson Regional Medical Center COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236 Valley Medical Facilities, Inc. COUNTY:
COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236. Alle Kiski Medical Center
BEHAVIORAL HEALTH PROVIDERS Alle Kiski Medical Center Jefferson Regional Medical Center COUNTY: ALLEGHENY 1301 Carlisle Street Natrona Heights, PA 15065 Coal Valley Road Pittsburgh, PA 15236 Valley Medical
DAVISVILLE, WEST VIRGINIA
AVAILABLE SPACE POLYMER TECHNOLOGY PARK SPEC BUILDING LOCATION Building Address - 245 Polymer Way Davisville, WV 26142 Located in City Limits - No Zoning - None County - Wood Located in Business/Industrial
ASSISTIVE TECHNOLOGY AND TITLE II AND TITLE III OF THE AMERICANS WITH DISABILITIES ACT (ADA)
ASSISTIVE TECHNOLOGY AND TITLE II AND TITLE III OF THE AMERICANS WITH DISABILITIES ACT (ADA) Figure 1: Door knob and key. Prepared by: Disability Rights Network of Pennsylvania www.drnpa.org 1414 N. Cameron
Campbell & Levine, LLC
Campbell & Levine, LLC Public Finance Department Transactions Closed January 1, 2009 November 1, 2015 $1,750,000 Property Sale Transaction among Summerset Land Development Associates, L.P., Urban Redevelopment
Division of Criminal Justice Academy in Sea Girt New Jersey National Guard Training Center, Sea Girt, New Jersey 732.282.6060
Division of Criminal Justice Academy in Sea Girt New Jersey National Guard Training Center, Sea Girt, New Jersey 732.282.6060 From the North Take the Garden State Parkway South to Exit 98 (Highway 34 South).
Transportation Network Analysis. A. Overview
Transportation Network Analysis A. Overview The goal of this analysis is to evaluate existing roadways and specific intersections within the County. The focus will be on areas identified as probable growth
BLUEFIELD, WEST VIRGINIA
AVAILABLE SPACE FRYE ROOFING INC BUILDING LOCATION Building Address - 2000 Princeton Avenue Bluefield, WV 24701 Located in City Limits - Yes Zoning - County - Mercer Located in Business/Industrial Park
How To Get A Job In A Steel Town
365 Main N/A Pittsburgh Allegheny Data Ctr ABARTA Shared Financial Services 23 Pittsburgh Allegheny Shared Svcs Access Data Corp 70 Pittsburgh Allegheny Shared Svcs Accredo Health 144 Robinson Twp Allegheny
Road and Bridge Closure Report
Page 1 of 7 New Closures Date Anticipated DIST COUNTY ROUTE NUM LOCALNAME Closed OpeningDate CO 005/00 ELKHURST ROAD comments Slip/Rock Fall WV 016/00 BETWEEN BIG OTTER AND IVYDALE CO 015/04 MAIN STREET
Project Team Resume. Ruthann L. Omer, P.E. President / Municipal Liaison / Project Manager. Years of Experience 37
Project Team Resume Ruthann L. Omer, P.E. President / Municipal Liaison / Project Manager Years of Experience 37 Education University of Pittsburgh, Pennsylvania B.S. in Civil Engineering, 1983 Pennsylvania
Tabulation for: Extermination Services for Various County Buildings Spec#6033 Sara Kurpakus
Group A - Various County Buildings Terminix Orkin Bug Eyed Pest 1 Courthouse, 436 Grant Street, Pittsburgh, PA 15219 County Office Building, 542 Forbes Avenue, Pittsburgh, PA 15219 Morgue, Ground Level,
FFY 2007 York TIP. Highway & Bridge. Draft. Current Date: 05/02/2006. York
FFY 2007 TIP 72921 Title: STU Reserve (Lancaster) Route: Section: Improvement Type: Miscellaneous Geographic Limits: County Narrative: Creation of a 2005/06 STU Reserve Line item on the TIP for Co. Partial
FY 2009 Economic Stimulus List
FY 2009 Economic Stimulus List The Projects in this List are "Ready to Advertise" within 30-90 days of a Bills Enactment Pavement Preservation Projects Region County PIN Project Location Concept Estimate
BEAVER LOCAL SCHOOLS MASTER ROUTE SCHEDULE 2015/2016 SCHOOL YEAR ELEMENTARY SCHOOL
BEAVER LOCAL SCHOOLS MASTER ROUTE SCHEDULE 2015/2016 SCHOOL YEAR ELEMENTARY SCHOOL BUS #3: KEVIN SHAFFER, DRIVER 7:50 A.M./3:50 P.M. - RIFFLE ROAD (AT SR7 TO MILL ROCK ROAD) 7:55 A.M./3:55 P.M. - MILLROCK
Maryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects
BUILDING A STRONGER PA PennDOT District 6 Highway/Bridge Projects (+ = Act 89 Funding) Cowpath Road/Godshall Road/Broad Street Intersection Improvement, Montgomery County - $3.9 Million (M) (In Construction)
Placement Testing for CHS Calculus
Placement Testing for CHS Calculus Information for Parents Overview College level mathematics courses can be a challenge even for well-prepared students. Students without the needed prerequisite skills
Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687
Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20
Health Care Facilities in Central Indiana
Boone County Health Care Facilities in Central Indiana Essex Nursing and Rehabilitation Center 301 W. Essex Street Lebanon IN 46052 (765) 482-1950 Hickory Creek at Lebanon 1585 Perry Worth Road Lebanon
Employment Services Bureau of Employment Programs (BEP) 558-2630 www.wvbep.org, www.wvwic.org 1-800-FREE411 (directory assistance)
Employment Services Bureau of Employment Programs (BEP) 558-2630 www.wvbep.org, www.wvwic.org 1-800-FREE411 (directory assistance) Region 1 Fayette County Workforce WV Satellite Office 211 North Court
Campbell & Levine, LLC
Campbell & Levine, LLC Public Finance Department Transactions Closed January 1, 2009 July 1, 2015 $150,000,000 Allegheny County Hospital Development Authority University of Pittsburgh Medical Center Revenue
Pennsylvania s Health Care Marketplace
Pennsylvania s Health Care Marketplace Rating Areas: Insurance plans and their cost vary across the state. Pennsylvania is divided into nine rating areas. Rating areas are the geographic component used
LICENSED CARE FACILITIES FOR ADULTS IN FORSYTH COUNTY JANUARY, 2012. Hines Family Care Home I FCL-034-024 727-1308 2224 Manchester St.
LICENSED CARE FACILITIES FOR ADULTS IN FORSYTH COUNTY JANUARY, 2012 Hines Family Care Home I FCL-034-024 727-1308 2224 Manchester St. Holly Haven (AIDS ONLY) FCL- 034-034 725-3555 127 South Popular St.
RED - LINE SOUTHBOUND
You must be at the Trolley Stop Sign to be picked up. Sometimes the stop is not at the Intersection. Times listed are approximate. The Trolley can be late, but will never be early RED - LINE SOUTHBOUND
UPMC Out-of-Network Facilities and Practices as of 01/01/2015
Hospital Magee Womens Hosp Community Campus 300 Halket Street Pittsburgh PA 15213 Allegheny Hospital Magee Womens Hospital 300 Halket Street Pittsburgh PA 15213 Allegheny Hospital Magee Womens Hospital
KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM
KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM TABLE OF CONTENTS Water...Page 2 Design Professional Services... Page 3 Construction... Page 8 Wastewater...Page 12 Design Professional
Please read this letter
Please read this letter December 21, 2009 Dear Family, We are writing this update about Pennsylvania s new Autism Insurance Law. (also known as Act 62). This law requires certain private health insurance
South Carolina Department of Transportation Design-Build Projects Section
July 10, 2016 DESIGN-BUILD ACTIVE PROPOSALS: I-85 REHAB AND WIDENING REHAB FROM MM 77 TO MM 80, PHASE 1 WIDENING FROM EXIT 80 (S- 57) TO EXIT 90 (SC 105) & PHASE 2 WIDENING FROM EXIT 90 (SC 105) TO EXIT
COUNTY: ADAMS 334 York Street Gettysburg, PA 17325. Pennsylvania Counseling Services, Inc.
Pennsylvania Counseling Services, Inc. COUNTY: ADAMS 334 York Street Gettysburg, PA 17325 Alliance Medical Services Inc. Allied Addiction Recovery, LLC Allied Addiction Recovery, LLC Cove Forge Behavioral
SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March 2016 - February 2017 Subject To Change Without Notice
SCDOT TENTATIVE LETTINGS Rehabilitation & Resurfacing March 2016 - February 2017 Subject To Change Without Notice 1 of 9 Date Generated: 01/25/2016 Projects Returned: 56 Let Date Contract ID Project ID
Lawyer Referral Services by County
s by County Adams ADAMS COUNTY ADAMS COUNTY COURTHOUSE GETTYSBURG 17325 717-337-9846 Allegheny ALLEGHENY COUNTY ALLEGHENY COUNTY BAR ASSOCIATION Koppers Bldg., Suite 400 436 Seventh Avenue Pittsburgh,
Straight Line Diagram. Lebanon 38. January 2016
Straight Line Diagram Lebanon 38 January 2016 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not
`RUTHERFORD COUNTY FACILITY LIST NURSING HOMES Updated April 2010
1 `RUTHERFORD COUNTY FACILITY LIST NURSING HOMES Updated April 2010 Autumn Care of Forest City 830 Bethany Church Road Alice Dixon (Adm.) 828/245-2852 Fax: 247-6077(Holly Franklin, Admissions) Fax: 245-7254
IN THE NINETEENTH JUDICIAL DISTRICT COURT
IN THE NINETEENTH JUDICIAL DISTRICT COURT OF COWLEY COUNTY, KANSAS BOARD OF COUNTY COMMISSIONERS OF COWLEY COUNTY, KANSAS Plaintiffs, vs. JOSHUA E. ADAMS, ET AL., et al. Defendants. Pursuant to Chapter
BEHAVIORAL HEALTH CARE RESOURCE LISTING
BEHAVIORAL HEALTH CARE RESOURCE LISTING Western Behavioral Health Member Services: 1-888-251-0083 TTY Line: 1-877-877-3580 Where to turn (on-line version): http://www.unitedwaypittsburgh.org Western Behavioral
HIGHLAND COUNTY OHIO WE RE OPEN FOR BUSINESS
HIGHLAND COUNTY OHIO WE RE OPEN FOR BUSINESS Overview: Highland County is a wonderful blend of both agriculture and industry. The historic influence of farming communities carries on today with area residents
PENNSYLVANIA DEPARTMENT OF REVENUE REALTY TRANSFER TAX COMMON LEVEL RATIO (CLR) REAL ESTATE VALUATION FACTORS FOR ADAMS COUNTY CLR FACTOR
COMMON LEVEL RATIO () REAL ESTATE VALUATION S ADAMS COUNTY 7-2-1986 6-30-1987 7.94 7-1-2006 6-30-2007 3.98 7-1-1987 6-30-1988 9.01 7-1-2007 6-30-2008 4.53 7-1-1988 6-30-1989 9.35 7-1-2008 6-30-2009 4.55
The Trust for Public Land CREATING PARKS FOR PEOPLE CONNECTING CLEVELAND THROUGH PARKS AND TRAILS
The Trust for Public Land CREATING PARKS FOR PEOPLE CONNECTING CLEVELAND THROUGH PARKS AND TRAILS Lake Link Trail Corridor Location/Context The Proposed Trail Corridor travels along vacated Road and Railroad
POLLING PLACE CHANGES FOR THE UPCOMING AUGUST 27, 2013 CITY OF BIRMINGHAM ELECTIONS
POLLING PLACE CHANGES FOR THE UPCOMING AUGUST 27, 2013 CITY OF BIRMINGHAM ELECTIONS There are changes to City of Birmingham polling locations for the August 27, 2013 regular municipal elections as a result
Now available on your iphone!
Now available on your iphone! 1 2 3 4 West 53rd Street Columbus Avenue West 64th Str West 77th Street West 76th Street West 75th Street West 74th Street West 73rd Street West 72nd Street West 71st
WESTCO Rail Development Plan
WESTCO Rail Development Plan Five Year Outlook T he West Central Ohio Port Authority has developed a plan to serve as a guide for the future of the WESTCO rail system over the next five years. The plan
Here are three ways you can be excused from paying a tax penalty this year and in the future:
Will I Have to Pay a Tax Penalty if I Don t Have Health Insurance? The Affordable Care Act (Obamacare) requires many people to prove that they had health insurance in 2014 or pay a penalty when they file
POLLING LOCATIONS FOR AUGUST 23, 2011 MAYORAL ELECTION ABSENTEE BOX 3RD FLOOR CITY HALL (CONFERENCE ROOM A)
POLLING LOCATIONS FOR AUGUST 23, 2011 MAYORAL ELECTION ABSENTEE BOX 3RD FLOOR CITY HALL (CONFERENCE ROOM A) PREC 4406 - HILLDALE BAPTIST CHURCH 533 SUN HILL RD PREC 4501/5416 - MCELWAIN BAPTIST CHURCH
The Commonwealth s Official Source for Population and Economic Statistics. March 9, 2011
Research Brief The Commonwealth s Official Source for Population and Economic Statistics March 9, 2011 Local Data Released for Pennsylvania: State Shows Continued Population Growth PENN STATE HARRISBURG
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
Applying For Medical Assistance for Your Loved One with Behavioral Health Needs Ages 0-21
Applying For Medical Assistance for Your Loved One with Behavioral Health Needs Ages 0-21 A Guide to Assist Families in the Application Process (Updated October 2012) If you do not see a resource or listing
2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST
2013-14 HIGHWAY INFRASTRUCTURE CAPITAL PROJECT LIST Trans-Canada Highway (PTH 1) Micro-surface seven kilometres in Headingley from Goal Road to the CPR Crossing Structure rehabilitation at Birch River
Rehabilitation Hospital/Unit Provider List
County Located: Baxter Baxter Regional Medical Center 624 Hospital Drive Mountain Home, AR 72653 Phone No.: 870-508-1000 Licensed Rehabilitation Unit Beds: 23 PPS Rehabilitation Certified Beds: 23 County
MONROE COUNTY'S POLLING PLACE LIST
BARRETT ONE BARRETT MUNICIPAL TOWNSHIP BUILDING 01-1 993 ROUTE 390 CRESCO, PA 18326 BARRETT TWO MOUNTAINHOME UNITED METHODIST CHURCH ANNEX 6680 ROUTE 191 MOUNTAINHOME, PA 18342 CHESTNUTHILL ONE WEST END
Table of Contents. Elementary Schools 4
PENNSYLVANIA S BEST S IN 2013 Table of Contents Elementary Schools 4 Performance Gains 5 Low-Income Student Performance 6 Black Student Performance 7 Latino Student Performance 8 Middle Schools 9 Performance
Fatherhood Programs (county by county list)
Fatherhood Programs (county by county list) Alachua County 2100 NW 53rd Ave Gainesville, FL 32652 (352) 377 5690 Family Preservation 1731 NW 6th Street. Ste 1 Gainesville, FL 32609 (352) 213 6561 Baker
Jordan Tax Service, Inc., does not warrant the accuracy of the information obtained from this presentation. This information is not offered as and
Jordan Tax Service, Inc., does not warrant the accuracy of the information obtained from this presentation. This information is not offered as and does not constitute legal advice and may not be legally
