- 10 years ago
- Views:
Transcription
1
2 This page intentionally left blank Page 2 of 28
3 . TABLE OF CONTENTS 1.0 Forward Introduction Mission Statement Quality Management Systems General Requirements Documentation Requirements General Control of Documents Control of Records Management Responsibility Management Commitment Customer Focus Quality Policy Planning Quality Objectives Quality Management System Planning Responsibility, Authority and Communication Responsibility and Authority Management Representative Internal Communication Management Review General Review Input Review Output Resource Management Provision of Resources Human Resources General Competence, Training and Awareness Infrastructure Work Environment Product (Service) Realization Planning of Product Realization Project Management Risk Management Configuration Management Page 3 of 28
4 7.1.4 Control of Work Transfers Customer-Related Processes Determination of Requirements Related to the Product Review of Requirements Related to the Product Customer Communication Design and Development Purchasing Purchasing Process Purchasing Information Verification of Purchased Product Product and Service Provision Control of Production and Service Provision Validation of Processes for Production and Service Provision Identification and Traceability Customer Property Preservation of Product Control of Monitoring and Measuring Equipment Measurement, Analysis and Improvement General Monitoring and Measurement Customer Satisfaction Internal Audit Monitoring and Measurement of Processes Monitoring and Measurement of Product Evidence of Conformity Control of Nonconforming Product Analysis of Data Improvement Continual Improvement Corrective Actions Preventive Action Appendix A: Process Map Appendix B: Organizational Chart Appendix C: Revision History Page 4 of 28
5 1.0 Forward This manual is issued to describe the Quality Management System of Mouser Electronics (hereafter referenced as Mouser). The manual numbering is structured to match the standard. The is issued and controlled by Mouser's Quality Department. Mouser's Quality Management System serves to improve customer satisfaction, fulfill quality objectives, and facilitate continual improvement. It is the responsibility of the President and the Director of Quality to ensure that this manual is maintained as a current reflection of the Mouser Quality Management System. 2.0 Introduction Mouser Electronics believes in providing design engineers and buyers of semiconductors and electronic components the best possible service, regardless of the size of the customer or the size of the order. Mouser Electronics' product lines include Semiconductors, Passives, Interconnects, Electromechanical, Power Sources, and Specialty Products. In January 2000, Mouser Electronics, Inc. became a subsidiary of TTI, Inc. The Chairman of Mouser Electronics, Inc. is Paul Andrews; President and CEO, Glenn Smith; Senior Vice President of Products, Barry McConnell. On March 5th, 2002, we celebrated the Grand Opening of our new warehouse and office facility. The new facility allowed Mouser to consolidate operations in Mansfield, Texas, allowing for efficiency as well as growth. To better serve our customers, in early 2007, Mouser completed an extensive expansion of its corporate headquarters more than doubling the space for offices, call and data centers, as well as its state-of-the-art warehouse. The new data center features a pre-action fire suppression system, connections to multiple power sources, and a dedicated fiber communications ring to ensure uninterrupted internet operations a core component of Mouser s global sales operations. The warehouse greatly expanded to include a new ESD (Electro Static Discharge) area for safe storage of active components. Also in 2007, the success of Mouser and TTI caught the attention of Warren Buffett and his investment company Berkshire Hathaway, Inc., which acquired both companies in March Mouser and TTI were granted the freedom to continue their successful business ways, plus gained the financial strength of Berkshire Hathaway. Today, the combined resources of Mouser Electronics and TTI, with the financial strength of Berkshire Hathaway, Inc., offer a complete solution for both customers and suppliers. Products can be "prototyped in" at the R & D level through Mouser, and then transitioned to global production quantities at TTI. This complete solution is unique in the electronics distribution industry. Page 5 of 28
6 3.0 Mission Statement Be the source most preferred by design engineers and small production buyers for the products to design, prototype, test, and manufacture electronics. 4.0 Quality Management Systems 4.1 General Requirements Mouser has established, documented, and implemented a Quality Management System which is continuously maintained for effectiveness and process improvements in accordance with the requirements of SAE AS9100C/ISO 9001:2008. a. The processes needed to operate the Quality Management System have been determined and documented. b. The sequence and interactions of these processes has been determined. c. The criteria and methods needed to ensure the operation and control of these processes is documented and effective. Criterion is defined in the procedures and is in line with the Quality Policy and Quality Objectives. Methods include Internal Audit and Quality Reports. d. Information and resources to support the operation and monitoring of these processes is available. Management is committed to properly resource the Quality System and Information Systems of the company. e. Mouser monitors, measures where applicable, and analyzes these processes. f. Based on these measurements and controls Mouser will implement actions necessary to achieve planned results and continual improvement of these processes These processes will be managed by Mouser in accordance with SAE AS9100C/ISO 9001: Outsourced processes will be identified and controlled when outsourcing is required. See procedure QS-PR-017 Outsourced Processes The quality management system will address customer and applicable statutory and regulatory quality management system requirements. 4.2 Documentation Requirements General Mouser's Quality Management System includes the following documentation. a. Mouser has defined and documented a Quality Policy and Quality Objectives. See section 5.3 and b. Mouser has prepared a quality manual. See Section c. Mouser has documented the procedures and records required by SAE AS9100C/ISO 9001:2008 and procedures and records needed for the effective planning, operation, and control of processes. Page 6 of 28
7 d. Mouser keeps records required by SAE AS9100C/ISO 9001:2008. See procedure QS-PR-008 Record Control. e. Mouser employees have access to, and are aware of, relevant quality management system documentation and changes Mouser has established and maintains this. The is approved by the President of Mouser and the Director of Quality. This manual includes a scope and exclusions as defined in Section and In addition to this manual there are procedures required to operate this Quality Management System. In this manual there will be reference to them as appropriate. A full listing of the procedures is available upon request. A description of the interaction between the core processes of the Quality Management System is given in Appendix A. revision history is maintained in Appendix C of this document Scope The scope of the Quality Management System is as follows. Authorized Distributor of Semiconductors, Electronic Components, Supplies and Equipment. And includes the facilities located at the following location. Mouser Electronics, Inc. Corporate Headquarters 1000 North Main Street Mansfield, Texas Exclusions a. 7.3 Design and Development Mouser does not design any of the products it sells Control of Documents Mouser controls the documents required by the Quality Management System. This is performed through a documented Document Control process. See procedure QS-PR-004 Document Control Process for details on controlling documents Documents of External Origin These documents are addressed in procedure QS-PR-009 External Document Control. Page 7 of 28
8 4.2.4 Control of Records Records have been established and are maintained which specifically provide evidence of meeting requirements and the effectiveness of the Quality Management System. This will include records of product origin, conformity and shipment in accordance with customer, statutory and regulatory requirements, where appropriate. These records will remain legible and will be readily identifiable and retrievable. See procedure QS-PR-008 Record Control for a summary of records and the controls needed for identification, storage, protection, retrieval, back-up, retention, and disposition. Procedure QS-PR-008 Record Control defines the method for controlling records that are created by and/or retained by suppliers Electronic Records Records stored in electronic form have defined back-up procedures. They are secured to prevent unauthorized alteration or change and will not be corrupted due to software system changes. 5.0 Management Responsibility 5.1 Management Commitment Senior Management is committed to resourcing, operating, and maintaining an effective Quality Management System. The Quality Policy, Quality Objectives, and Management Review serve as evidence of this commitment. Through company meetings, employees learn the importance of meeting customer requirements and having an effective Quality Management System. Senior Management has established a Quality Council. Members of the Quality Council are as follows: President & CEO Director of Quality (Management Representative) Business Operations Department Head America Sales Department Head Products Department Head Internet Business Department Head Technical Marketing Department Head 5.2 Customer Focus Senior Management employs a number of ways to ensure that customer requirements are identified and properly fulfilled and that customer satisfaction is measured. Product conformity and on-time performance is measured. Appropriate action is taken if planned results are not, or will not be, achieved. Page 8 of 28
9 5.3 Quality Policy Mouser's quality policy was developed by the Quality Council to communicate Mouser's commitment to quality and meeting customer requirements. It is considered appropriate by Senior Management. The Quality Policy is revalidated at each Management Review meeting. Quality Policy Mouser Electronics is committed to gratifying and astonishing customers with our customer service excellence, order accuracy and on-time delivery. This is accomplished through our commitment to continual improvement of our processes, services, products and our people. 5.4 Planning Quality Objectives Executive management has set strategic top-tier quality objectives for the company, see below. They are consistent with the Quality Policy. Sub-tier quality objectives are established on processes where it is warranted to establish effectiveness of the process. Quality objectives will be measureable. Total Customer Satisfaction Customer Service Excellence On-Time Delivery Order Accuracy Continual Process Improvement Quality Management System Planning The President and Director of Quality have planned the establishment of the Quality Management System. This planning will show up in Management Review or Corrective or Preventive Action Plans. Changes to the Quality System are planned. Each manager initiating a change will do so only after careful analysis and planning. Major changes will be planned, controlled and documented. 5.5 Responsibility, Authority and Communication Responsibility and Authority Responsibilities and authorizations are documented in this manual, procedures, work instructions and Job Descriptions Management Representative The President has appointed the Director of Quality as Management Representative for Mouser. The Management Representative has the authority and responsibility for: a. Ensuring processes needed for the Quality Management System are established, implemented, and maintained. Page 9 of 28
10 B. Reporting on the performance of the Quality Management System to management and any need for improvement. See procedure QS-PR-006 Quality Measurements for more detail. c. Promoting awareness of customer requirements throughout the organization. d. And has the organizational freedom and unrestricted access to top management to resolve quality management issues Internal Communication The Quality Council has established the following communication channels to ensure the performance and effectiveness of the Quality Management System are communicated to the employees of Mouser: Management Meetings Department Meetings Performance Metrics posted on bulletin boards Performance Metrics posted to the Intranet 5.6 Management Review General The Quality Council will meet at planned intervals, not to exceed 12 months, to perform Management Review per procedure QS-PR-001 Management Review Process. Management Review records are maintained Review Input The following are reviewed as part of Management Review to assess the ongoing suitability of Mouser's Quality System: a. results of audits, b. customer feedback, c. process performance and product conformity, d. status of preventive and corrective actions, e. follow-up actions from previous management reviews, f. changes that could affect the quality management system, and g. recommendations for improvement Review Output Management review meeting notes include any decisions/actions related to the following: a. improvement of the effectiveness of the quality management system and its processes, b. improvement of product related to customer requirements, and c. resource needs. Page 10 of 28
11 6.0 Resource Management 6.1 Provision of Resources Mouser's management is responsible for identifying and procuring the resources needed to fulfill the requirements of Mouser's Quality Management System, provide for its continual improvement and effectiveness, and the enhancement of Customer Satisfaction. 6.2 Human Resources General Mouser's management at all levels is responsible for ensuring personnel under their supervision performing work affecting conformity to product requirements are competent on the basis of education, training, skills, and experience Competence, Training and Awareness a. a. Managers and Human Resources determine the required competence for each position. Competence is defined as having the appropriate education, training, skills, and experience for a position. Education, skills and experience for each position is documented in the corresponding Job Description. Training requirements are defined for each position in departmental training procedures. b. Mouser identifies training requirements during initial hiring and employee performance reviews using education, training, skills, and experience listed in the Job Description and departmental training procedures. c. Training is evaluated for effectiveness through departmental training procedures, employee performance reviews and Corrective/Preventive Action follow-up. d. Mouser maintains Training Records on each employee. These records will contain objective evidence of an individual's education and training. See procedure QS-PR-020 Training Program. e. Mouser employees are made aware of the relevance and importance of their work performance and how this supports Mousers' Quality Objectives. Employee bonuses are tied to Quality Metrics. 6.3 Infrastructure Mouser management determines, provides, and maintains the infrastructure needed to meet product requirements. Infrastructure needs are evaluated and planned during process improvements. Infrastructure needs are also identified in Corrective and Preventive Actions. 6.4 Work Environment Mouser management determines, provides, and maintains the work environment needed to meet product requirements and employee safety. Managers are responsible for the work environment within their managed work area. Page 11 of 28
12 7.0 Product (Service) Realization 7.1 Planning of Product Realization Product realization at Mouser is defined as purchasing electronic components and supplies, warehousing it, and then creating and delivering a Customer Order which meets the customer's requirements. Product realization is a planned process at Mouser. Product realization records are maintained in the Mouser Business System and Warehouse Control System. When further planning is needed, such as a corrective or preventive action, or process improvements, managers will follow the requirements of QS-PR-014 Process Control Procedure. The planning will include: a. The need for Quality objectives for the process to ensure effectiveness of the process. Quality Objectives will be measureable. b. The need for requirements for the product. This includes the individual components and the customer order. c. The need for a process. Processes will be developed to support product realization where necessary. These processes will be documented as needed to ensure consistent product realization. d. The need for resources specific to the product. This includes the order and parts. e. The need for Inspection specific to the product. This includes the order and parts. f. The need for Records. Such as records of order processing and inspection. g. Documentation of the analysis, plan and implementation. h. The need for Risk Management Project Management When required Mouser will plan and manage product realization in a structured and controlled manner to meet requirements at acceptable risk, within resource and schedule constraints Risk Management Mouser has established, implemented and maintains processes for managing risk to the achievement of applicable requirements that includes as appropriate to the organization and the product. a. assignment of responsibilities for risk management, b. definition of risk criteria, c. identification, assessment and communication of risks throughout product realization, d. identification, implementation and management of actions to mitigate risks that exceed the defined risk acceptance criteria, and e. acceptance of risks remaining after implementation of mitigating actions. See procedure QS-PR-028 Risk Management for more information Risk Management and the use of FMEA (Failure Mode and Effects Analysis). Page 12 of 28
13 7.1.3 Configuration Management Configuration management consists mostly of unique Part Numbers assigned to product by both the manufacturer and Mouser. If a part materially changes the manufacturer will sell the product to Mouser with another unique part number assigned by the manufacturer. Customer assigned part numbers are verified and assigned at time of the order for recording on documents to the customer. Customer part numbers are not part of Configuration Management. The assembly of component kits are subject to Configuration Management. See procedure QS- PR-027 Configuration Management. Life-Cycle of products is also part of configuration management. See procedure PTOP-PR-037 Part Number Entry & Update - Standard Process for part number entry. See procedure PTPD- PR-034 Lifecycle for Lifecycle Control of Work Transfers Mouser performs limited work transfers through sub-contracted suppliers. See procedure QS-PR-022 Control of Work Transfers for more information. 7.2 Customer-Related Processes Determination of Requirements Related to the Product Basic customer requirements, specific manufacturer and part number, quantity, and delivery service are selected by the customer at the time the order is requested. Post-delivery activity consists of product returns and customer-initiated Corrective Actions. Product specific requirements such as ESD, Packaging, etc. are met through process control even when not stated by the customer. All applicable statutory and regulatory requirements, such as hazardous material, will be met. Mouser has an Export Management and Compliance Program modeled after the EMCP Guidelines published by the United States Commerce Department's Bureau of Industry and Security (BIS). See procedure QS-PR-010 Export Management System and Compliance Program. Any additional requirements considered necessary will be addressed at the time the order is placed by the customer. Customer requirements arising after order placement will be handled on a case-by-case basis Review of Requirements Related to the Product Mouser receives request from customers to purchase product via two distinct processes. These are through our website and through our sales offices. a. Website Orders - The review of customer requirements through the website is limited to customer selections on the website. Detailed information is provided through the website for the customer to make decisions on meeting their requirements and assessing their risk. If the customer has more specific requirements they will need to contact a sales office directly and make their requirements available to the sales office for review and acceptance. Page 13 of 28
14 b. Sales Office Orders When customers make their requirements available to Mouser though our Sales Office, Mouser will review those requirements for acceptance and risks. Members of Sales will review the requirements to ensure they are defined and understood. If a requirement needs clarification or a risk is identified the customer will be contacted for guidance on processing the customer s order. If customer has no documented requirement the member of Sales will review the requirement as the order is placed in the system and make the customer aware of any requirements which cannot be accepted by Mouser. If the customer changes the requirements this will be reviewed against the previous requirement and any document amended. These amended requirements will be communicated to relevant Mouser employees. The record of the acceptance of an order or quote with requirements is recorded by placing the quote or order on the system and executing the quote or order. d) Special requirements of the product are normally pre-determined by Product Management and the Warehouse. The special requirements are either coded into systems or documented in work instructions. See Sales and Quote procedures for more detail on these processes. Risk may include obsolesce, end of life, shelf life, transportation issues and others If the customer calls back to change the order, provisions are provided to update the Mouser Business System and if the order is in the warehouse, notify the warehouse of the change. See procedure SASV-PR-071 Order Updates and Cancellations Customer Communication a. Mouser maintains a comprehensive website. Product specifications in electronic files are available on the website. b. Mouser produces print catalogs. c. Mouser's Business System s customers when an order has shipped and when a new order does not ship on time. d. Customers can contact us via phone, , chat, fax, and mail. e. Customers are encouraged to provide feedback to Mouser. Mouser publishes the e- mail addresses of its Managers on Mouser's website. Customer complaints are handled through the Sales Department. See procedure SASV-PR-002 Customer Correspondence. f. Surveys are used to measure customer satisfaction. 7.3 Design and Development As a distributor, Mouser does not design any of the products it sells. (See exclusions listed in section ) Page 14 of 28
15 7.4 Purchasing Purchasing Process Mouser is an authorized distributor for the products distributed. Mouser purchases semiconductors, electronic components, supplies, and equipment for resale from manufacturers or their authorized distributors. Mouser does not manufacturer. Mouser is responsible for the conformance of the products we sell. This includes product from sources defined by the customer, as applicable. Asset Management is responsible for the management of the purchasing process. a. Mouser maintains a register of suppliers which includes their approval status. For suppliers that provide new products Mouser resells, the scope of approval will be for product selection and distribution according to contract with the supplier. Scope of approval for other suppliers that affect quality requirements of the QMS will be defined in QS-PR-017 Outsourced Processes. b. Supplier performance is reviewed periodically. The results of these reviews will be used to determine the implantation of controls such as corrective action. See procedure PTOP-PR-040 Supplier Re-evaluation detail on this process for suppliers that provide new products Mouser resells. For other suppliers that affect quality requirements of the QMS see QS-PR-017 Outsourced Processes. c. Mouser has defined the actions to be taken when a supplier fails to meet requirements. See procedure PTOP-PR-040 Supplier Re-evaluation detail on this process for suppliers that provide new products Mouser resells. For other suppliers that affect quality requirements of the QMS see QS-PR-017 Outsourced Processes. d. Mouser will ensure where required that Mouser and all applicable suppliers use customer-approved special process sources. e. Mouser has defined the process, responsibilities and authority for the approval of suppliers and any subsequent changes in their approval status. Control of the use of these suppliers is accomplished by their approval status controlling a systems based purchasing process. See procedures PTOP-PR-046 New Supplier Approval and PTOP- PR-040 Supplier Re-evaluation. For details on processes that regulate suppliers providing product for resells. For other suppliers that affect quality requirements of the QMS see procedure QS-PR-017 Outsourced Processes. f. Risk with a supplier is determined and managed through above referenced procedures in section e. g. Mouser has implemented controls to prevent the purchase of counterfeit and suspected unapproved parts in accordance with aerospace standard AS5553 Counterfeit Electronic Parts; Avoidance, Detection, Mitigation and Disposition. See procedure QS-PR-024 Counterfeit Electronic Parts Plan for more details Purchasing Information Purchasing information describes the product to be purchased. For products Mouser resells this requires only an accurate manufacturer or supplier part number. The following requirements are flowed down to suppliers at Mouser: Page 15 of 28
16 a. requirements regarding the need for the supplier to notify Mouser of nonconforming product, obtain Mouser approval for nonconforming product disposition, notify Mouser of changes in product and/or process definition, changes of suppliers, change of manufacturing facility location and, where required, obtain Mouser approval, and flow down to the supply chain the applicable requirements including customer requirements, b. records retention requirements, c. right of access by Mouser, the customer and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records, and d. requirements for a certificate of conformity. The following requirements will be addressed as needed. e. Requirements for Mouser approval of the product or service, procedures, processes and equipment. f. Requirements for qualification of personnel. g. Requirements for Quality Management System. h. Requirements for the identification and revision status of specifications, drawings, process requirements, inspection/verification instructions and other relevant technical data. i. Requirements for design, test, inspection, verification, use of statistical techniques for product acceptance and related instructions for acceptance by the organization. j. Requirements for test reports and/or airworthiness certificate Purchasing requirements are reviewed prior to being communicated to the supplier. See procedure PTOP-PR-059 Product Purchasing Purchasing information on other supplies and services that affect quality requirements of the QMS will describe the supplies or services in terms familiar to the supplier. Employees purchasing these supplies and services will, as needed, document and communicate any Mouser or Customer requirements. See procedure QS-PR-017 Outsourced Processes Verification of Purchased Product Mouser performs incoming inspection on product purchased for resale. Inspection consists of verification of count, kind, documentation and condition against packing list, Mouser's Purchase Order and if needed, work instructions. Mouser is a dock-to-stock distributor. Except for Lead Acid batteries, Mouser performs no testing or measurement on products for resale. Mouser has no intentions of verifying product at the supplier's premises. See WHRV (Receiving) procedures for more details Product and services purchased from sub-contracted suppliers will be verified by the process owner per their local procedures. See procedure QS-PR-017 Outsourced Processes for details on these processes. Page 16 of 28
17 7.5 Product and Service Provision Control of Production and Service Provision Production of individual orders is planned by the entering of customer requirements into the computer system. This system along with procedures and approved equipment will control production. See Sales and Operations procedures for more detail on these processes. Additionally controlled conditions will include the following, as applicable: a. the availability of information that describes the characteristics of the product, b. the availability of procedures and work instructions, as necessary, c. the use of suitable equipment, d. the availability and use of monitoring and measuring equipment, e. the implementation of monitoring and measurement, f. the implementation of product release and delivery, g. accountability for all product (e.g., parts quantities, split orders, nonconforming product), h. evidence that all operations have been completed as planned, or as otherwise documented and authorized, i. provision for the prevention, detection and removal of foreign objects, j. monitoring and control of utilities and supplies (e.g., water, compressed air, electricity, chemical products) to the extent they affect conformity to product requirements, and k. criteria for workmanship, specified in the clearest practical way (e.g., written standards, representative samples, illustrations) Production Process Verification Mouser only produces Engineering Components Kits that are subject to First Article Inspection. Each time a kit is developed the process and the first Kit will be verified through inspection Control of Production Process Controls Employees in management positions authorized to change production processes are identified in QS-PR-014 Process Control Control of Production Equipment, Tools and Software Programs Mouser uses many kinds of equipment, tools and software systems to produce an order that conforms to the customer s requirement. The warehouse maintains the infrastructure of conveyer systems, lift vehicles and other equipment through warehouse and preventive maintenance processes. Enterprise software is maintained and controlled though IS processes Post-Delivery Support Service Mouser will gladly support any request by a customer for Failure Analysis. We will work with the customer and manufacturer to get the customer an answer. Mouser also will perform 8D- Corrective Actions at the request of the customer Validation of Processes for Production and Service Provision Mouser has two processes which require validation at Mouser. They are Electro-Static Discharge (ESD) Product Handling and Moisture Sensitive Level (MSL) Product Handling. Page 17 of 28
18 Validation of these processes is in accordance with QS-PR-015 ESD Control Program and WHOD-PR-040 MSL Supper Dry Cabinet Validation Process. Neither can be verified before use by the customer Identification and Traceability Mouser identifies the product throughout the product realization process. There are no requirements for monitoring and measurement. Identification - Customer orders are identified in the system by assigning a sales order number. Parts to be included on the order have unique part numbers as described in Configuration Management. This identification of configuration is maintained throughout the processing of the customer s order and in the case part number configuration management throughout the life of any record kept. Traceability a. Customer orders are traceable in Mouser s Business System for retention period defined in QS-PR-008 Record Control. b. Product at the part number level is traceable to the manufacturer and normally Lot and/or Date Code level also. Customers can require Lot and/or Date information which will be collected, stored and printed on pack list and product labels when available. Product identification and traceability is maintained using bar-code labels from Receiving to the warehouse shelf. From the shelf to the customer the identification and traceability is controlled and recorded on product labels. Acceptance authority is controlled by user ID and password on Mouser Business System. Assigned stamps are used in Receiving for acceptance of incoming products. Both are controlled by IT and Receiving procedures Customer Property Customer Property at Mouser is limited to Customer Personal Data under PCI Compliance Preservation of Product Mouser preserves the conformity of products during internal processing and final delivery. This preservation includes identification, handling, packaging, storage, and protection. a. Identification - All products Mouser distributes are identified with Mouser s part number, the manufacturer's part number, or other identifying codes. This identification is recorded at a minimum on the packaging containing the product. When product is repackaged, the package is labeled with the part number. b. Handling - Product is handled in a manner to prevent physical and electrical damage. Electro-Static Discharge (ESD) and Moisture Sensitive Level (MSL) are taken into consideration as required. Only authorized Warehouse, Products, Tech Sales and Quality employees handle product. Hazardous products are managed and handled per specific warehouse procedures. c. Packaging - Packaging is performed in accordance with written procedures. Whenever possible, material is kept in the manufacturer s original packaging. Standard packaging methods minimize shipping damage to the product while in transit to the Page 18 of 28
19 customer facility. ESD parts are packaged in ESD protective material and labeled as such. MSL parts are packaged with MSL protection and precautions when required by customers. Packaging requirements will mitigate risk of Foreign Object Damage (FOD). d. Storage - Material is stored in individual bin locations. The storage areas are clean, neat, and temperature-controlled to the extent necessary to minimize lead contamination and ESD. The condition of products is assessed during the cycle count process. Receipt and withdrawal of inventory is controlled and maintained to assure effective storage of the inventory. All materials with a specified shelf life are controlled to assure their use within the specified period or disposal outside the specified period. e. Protection - Where necessary product is protected from ESD and with MSL precautions. f. Cleaning Mouser sells new products that do not require cleaning. g. Foreign Object Damage (FOD) Warehouse employees are trained to detect and remove foreign objects. h. Sensitive Devices ESD is considered sensitive see above. When identified by the supplier additional sensitive products will be controlled as specified by the supplier. i. Safety warnings Markings and labels to this effect are applied by the supplier and Mouser will take precautions to preserve these markings and/or labels. j. Shelf-Life Mouser tracks shelf-life and controls available life on in-stock products. k. Stock Rotation Mouser actively participates in supplier allowed stock rotation. l. Hazardous materials Mouser has processes in place to handle hazardous materials and products. 7.6 Control of Monitoring and Measuring Equipment Monitoring and Measuring Equipment is defined as Test Measurement and Diagnostic Equipment (TMDE), a device used to measure a parameter critical to a decision affecting the meeting of customer requirements. Mouser has determined when and where TMDE is needed based upon the necessary measurements to be made and the amount of accuracy required. The Director of Quality is responsible for administrating the TMDE program. See procedure QS-PR-012 TMDE Program for more details Procedures describe and control the use of TMDE. Employees using TMDE will be trained to use it properly, if necessary Mouser maintains a register of TMDE TMDE is calibrated and re-calibrated at specified intervals. Calibration is performed by external calibration organizations. Calibrations will be traceable to nationally recognized measurement standards. Intervals for re-calibration will be set to ensure intolerance performance for the duration of the interval. The Director of Quality will select the calibration organization TMDE will have a calibration label. The label will identify the equipment, the date calibrated and the date due calibration. The TMDE will have a calibration certificate which will be kept on file as part of the equipment's calibration record. Page 19 of 28
20 7.6.5 TMDE is sealed using void if broken seals to safeguard it from adjustment which invalidate the results of the measurement TMDE is stored and used in controlled environments. Preventive maintenance other than re-calibration is performed as needed per OEM procedures Personally owned TMDE is not allowed at Mouser When TMDE is discovered to be out of tolerance the Logistics Manager will evaluate the validity of previous measurements and take appropriate actions TMDE at Mouser is not controlled by separate software Mouser maintains a TMDE Recall process. See procedure QS-PR-012 TMDE Program for more details. 8.0 Measurement, Analysis and Improvement 8.1 General Mouser plans and implements the monitoring, measurement, analysis, and improvement processes needed to demonstrate meeting product requirements. See section Mouser plans and implements the monitoring, measurement, analysis, and improvement processes needed to ensure the Quality Management System meets requirements. See section Mouser plans and implements the monitoring, measurement, analysis, and improvement processes needed to continually improve the effectiveness of the Quality Management System. See section Quality System measurements are described procedure QS-PR-006 Quality Measurements. 8.2 Monitoring and Measurement Customer Satisfaction Mouser utilizes survey results to monitor customer perceptions as to whether Mouser has met customer requirements; and survey and reports to measure customer satisfaction. The evaluation of customer satisfaction will include order accuracy, defective product rates, on-time delivery performance, customer complaints and corrective action requests. Results are reviewed in Management Review. See QS-PR-006 Quality Measurements for more detail Internal Audit Mouser has implemented and maintains an Internal Audit Program. The responsibilities and requirements for planning and conducting audits and for reporting results and maintaining records are defined in procedure QS-PR-005 Audit Procedure. Page 20 of 28
21 The objective of the Internal Audit program is to ensure the Quality Management System: conforms to the planned arrangements described in procedures and plans conforms to SAE AS9100C/ISO 9001:2008 conforms to the Quality Management System requirements set by Mouser - See section 4.0 is implemented and effective is maintained Internal audits are conducted at planned intervals according to the Internal Audit Schedule or according to customer contractual requirements. Audits are planned based on the status and importance of the process and area to be audited, as well as previous audit results. The audit criteria, scope, frequency, and methods will be defined Internal auditors are trained and qualified. Internal auditors will be selected by the Director of Quality. The selection of auditors and conducting of audits will ensure objectivity and impartiality of the audit process. Auditors will not audit their own work Findings found during Internal Audits will have an 8-D Corrective Action opened When processes require self-audits the process owner will plan and conduct these audits according to their process procedures. Records of these audits will be kept Monitoring and Measurement of Processes Mouser monitors and measures key processes which indicate the effectiveness of the Quality Management System. Key processes are the processes identified in the process map see appendix A. Key Processes will have Process owners. Key Processes will have turtle diagrams and FMEA for Risk. Process owners are responsible for analysis of the effectiveness of their processes and will document this analysis and retain as a Quality Record. Appropriate corrective or preventive action will be taken when planned results are not achieved. In the event of process nonconformity, Mouser will: a. take appropriate action to correct the nonconforming process, b. evaluate whether the process nonconformity has resulted in product nonconformity, c. determine if the process nonconformity is limited to a specific case or whether it could have affected other processes or products, and d. identify and control any nonconforming product Monitoring and Measurement of Product Mouser is an authorized distributor, products as parts are purchased through an authorized supply chain and therefore Mouser does not need to make actual specification specific measurements on the products. These products are monitored for count, kind and condition throughout the product realization processes. Page 21 of 28
22 8.2.5 Evidence of Conformity Mouser is a manufacturer authorized distributor. Evidence of conformity is kept on file and available to the customer when requested. Mouser s pack list also contains a certification affirming this conformity which should meet customer requirements when purchasing from an authorized distributor. When orders are split, such as backorder, each shipment is considered a separate invoiced order with separate pack list. Backordered products are indicated on the pack list. 8.3 Control of Nonconforming Product Mouser will ensure that product which does not conform to product requirements is identified and controlled to prevent its unintended use or delivery. Non-conforming product at Mouser is defined as one of the following: Components, Parts, Equipment or Supplies intended for resale or distribution which have been identified by a customer or supplier as being defective in any way. Suspected or confirmed Counterfeit or Unapproved Components, Parts, Equipment or Supplies as defined in AS5553. Components, Parts, Equipment or Supplies returned from the customer. Components, Parts, Equipment or Supplies which have lost traceability to Mouser s computer systems. Components, Parts, Equipment or Supplies which have been scheduled for scrap as part of a stock rotation action Procedure QS-PR-007 Nonconforming Product Control defines the controls and related responsibilities and authorities for dealing with nonconforming product, the responsibility and authority for the review and disposition of nonconforming product, and the process for approving personnel making these decisions. The nonconformity procedure will also address reverification and containment, if necessary Disposition of Nonconforming Products at Mouser are limited to: Scrap Rejection for return to the supplier Rejection for revalidation by the manufacturer Submittal to customer for USE AS IS disposition Mouser acknowledges it has no authority to rework or repair product When product is recalled by the supplier or nonconforming product which has already shipped to the customer is identified as nonconforming, the Product Recall process will be initiated per procedure by Products. Customers will be notified in a timely manner. See procedure PTOP-PR-011 Product Recall for details Nonconformity records will be maintained in accordance with the nonconformity procedure and procedure QS-PR-008 Record Control. Page 22 of 28
23 8.3.5 Product dispositioned for scrap is positively controlled until it can be sent to a recycler and rendered unusable. See Scrap Control Process 8.4 Analysis of Data Mouser determines, collects, and analyzes data to demonstrate the continuing suitability and effectiveness of Mouser's Quality Management System. Analysis is performed on measurements previously discussed in this and developed within the Quality Management System. A comprehensive list of these measurements is maintained by the Management Representative. These measurements are also reviewed in Management Review. See procedure QS-PR-006 Quality Measurement for details. 8.5 Improvement Continual Improvement Mouser continually improves the effectiveness of the Quality Management System by using the Quality Policy, Quality Objectives, Audit Results, Management Review, Corrective and Preventive Actions, and any other appropriate analysis of data. Mouser will seek out improvement opportunities. See procedure QS-PR-014 Process Improvement and Control Procedure for details Corrective Actions Mouser maintains a comprehensive Corrective Action Program for the Quality Management System. See QS-PR-002 Corrective Action Program for details of the Corrective Action Program Preventive Action The Preventive Action program is designed to detect, analyze, and eliminate causes of potential nonconformities. All steps of the Preventative Action will be recorded and all Preventative Action plans will have their effectiveness evaluated in accordance with procedure QS-PR-003 Preventive Action Program. Page 23 of 28
24 Appendix A: Process Map Process Map of the processes of the QMS with their sequence and interaction. Page 24 of 28
25 This page intentionally left blank Page 25 of 28
26 Appendix B: Organizational Chart Page 26 of 28
27 Appendix C: Revision History Date Rev Description Approved by: 3/15/04 - Original Glenn Smith Chuck Amsden 5/30/04 A Changes to 1.0 para 2. Added Appendix A. Added when required to 4.1.2, Added procedure ref d. Added resourcing to 5.1. Revised Quality Objective to High, 5.4.1, changed frequency of management review, Total revision of 7.1. Included Mail and to Define responsibility, Added Revised Added on Quality Measurement procedure. Expanded Added audit criteria, scope, freq. and methods to Revised Added goals to Added 2 nd sentence to Added procedure ref. to Glenn Smith Revised Appendix B to be Product Realization flow Chuck Amsden 7/12/04 B Deleted exclusion for Revised Appendix A and B for accuracy. Revised to WCS, deleted pick list. Glenn Smith Chuck Amsden 8/10/04 C Deleted ref. to appendix A in 4.1 a and b. Removed general from last sentence of section Changed Ref on Appendix. Corrected number error, section Revised Quality Policy, section 5.3. Added records to 7.1. Revised 8.3 to reference single procedure. Added reference to Product Recall process, section Deleted appendix B. Revised appendix A. Glenn Smith Chuck Amsden 8/18/04 D Revised Appendix A to Process Map. Glenn Smith Chuck Amsden 9/14/04 E Revised 7.4.1b to remove approved supplier list. Glenn Smith Chuck Amsden 10/15/04 F Added detail on out sourcing, section Added procedure references throughout manual. Removed all ref. to work instructions. Added Org Chart, Updated Scope of Quality System, Added Mkt&Bis Devlp Dept Head to Quality Council and updated title on two, 5.1. Added and on Calibration. Revised to clarify. 11/15/05 G Revised section to better align with standard. Revised Org Chart, appendix B, to add Tim Sanghera as Vice President of Marketing Sales. Glenn Smith President Chuck Amsden Quality Manager Glenn Smith President Chuck Amsden Quality Manager Page 27 of 28
28 Appendix C: Revision History (continued) Date Rev Description Approved by: 3/21/07 H Updated Introduction, section 2.0. Revised Mission Glenn Smith Statement, section 3.0. Designated Warehouse President Manager to review out of tolerance TMDE, Section Changed Quality Assurance to Returns in Chuck Amsden Receiving on the Process Map, Appendix A. Added IT Quality Manager Department Head to Organizational Chart Appendix B. 9/14/07 J Updated page numbers for Appendix B and Appendix C in Table of Contents. Changed Position Qualifications to Job Qualifications, section Changed Warehouse Manager to Logistics Manager, section Changed Quality Manager to Director of Quality throughout. 8/25/08 K Updated titles on Quality Council, 5.1. Updated title of Export system, Updated a for U.S. catalog x4/yr. Updated e to include managers on website. Deleted procedure reference (last sentence) d. Updated Appendix B: Organizational Chart. 9/25/09 L Revised to ISO 9001:2008 throughout. Revised Quality Policy and Objectives. Removed exclusion for Customer Property. Updated c and.d to include MSL. Changed Void If Broken to void if broken, section Changed potential causes of nonconformities to causes of potential non-conformities. Glenn Smith President Chuck Amsden Director of Quality Glenn Smith President Chuck Amsden Director of Quality Glenn Smith President Chuck Amsden Director of Quality 1/26/11 M Revised to AS9120A Glenn Smith President & CEO Chuck Amsden Director of Quality 7/3/13 N Revised to AS9100C Glenn Smith President & CEO 4/1/14 O Minor changes to Process Map and numbering error at Chuck Amsden Director of Quality Glenn Smith President & CEO Chuck Amsden Director of Quality Page 28 of 28
MOUSER ELECTRONICS QUALITYMANUAL
MOUSER ELECTRONICS QUALITYMANUAL QS-QM-001 REV L9/25/09 This page intentionally left blank. Page 2 of 27 TABLE OF CONTENTS 1.0 Forward...5 2.0 Introduction...5 3.0 Mission Statement...5 4.0 Quality Management
Quality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
Turbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
Cartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents
Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality
ALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.
QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 1/19/15 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled
AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised
Quality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval
Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
ISO 9001:2008 Audit Checklist
g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation
CENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
ISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
Micro Plastics, Inc. Quality Manual
ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company
Quality Management System Manual QM-QUA-001
Quality Management System Manual QM-QUA-001 Nelson-Miller Inc. 2800 Casitas Avenue Los Angeles, Ca 90039 P a g e 2 Revision Date Description of the Change N/C 10/10/79 Initial release of documented inspection
Quality Management Systems Manual
Washington Division Quality Management Systems Manual ISO 13485:2003 DOCUMENT NUMBER 01-QM-MED REVISION LEVEL 01 PAGE 1 of 40 This manual describes the quality management systems structure at GM Nameplate
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended
QUALITY MANAGEMENT SYSTEM Corporate
Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality
Camar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
QUALITY MANUAL ISO 9001. Quality Management System
Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval
Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368
Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies
The Prophotonix (UK) Ltd Quality manual
The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: [email protected] Page
Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626
AS 9100 Rev C Quality Management System Manual B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 Doc. No. AS9100C Rev E Effective Date: 01 JAN 2013 Page 2 of 45 CONTROLLED
Uncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
ISO 9001:2008 QUALITY MANUAL. Revision B
ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,
Row Manufacturing Inc. Quality Manual ISO 9001:2008
Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of
FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A
FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171
Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
Quality Management System Manual
Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
QUALITY MANAGEMENT SYSTEMS
QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 7 Page: 1 of 57 This document contains proprietary information and is not lo be distributed to or copted for a third party without the express written permission
ISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22
ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality
ED FAGAN INC. QUALITY SYSTEM MANUAL
ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY
Eagle Machining, Inc. Quality Management System
Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014
Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents
Contents. Management Policy Manual SEM USA Page 2 of 12
SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Quality Systems Manual
Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management
ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
The President of Inductors Inc. is the senior executive responsible for operations.
Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom
Quality Management System Manual
Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years
Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents
FMC Technologies Measurement Solutions Inc.
Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...
Quality Management System Quality Manual
1788 Northpointe Rd. Columbia, TN 38401 & 5456 E. McDowell Rd. Suite 109 Mesa, AZ 85215 & 647 Westport Pkwy Grapevine, TX 76051 USA 1-800-635-5342 www.wiremasters.net Quality Management System TABLE OF
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
Quality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL
PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS
Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1
Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This
QUALITY MANAGEMENT SYSTEM
2507 WEST GENEVA DRIVE TEMPE, ARIZONA 85282 TEL: 602.231.8616 FAX: 602.273.9135 QUALITY MANAGEMENT SYSTEM TABLE OF CONTENTS TABLE OF CONTENTS... 2 Phoenix Logistics Vision Statement... 3 1.0 SCOPE... 4
QUALITY MANUAL ISO 9001:2015
Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
ISO-9001:2000 Quality Management Systems
ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT
ISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
0. 0 TABLE OF CONTENTS
QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2
QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O
IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 Introduction Value Plastics, Inc., dba Nordson MEDICAL created a Quality Management System (QMS) to document the company s best business
Quality Assurance System Manual
The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street
ISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION
INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page
Quality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02
Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page
Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have
ISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control
Sensing and Control ISO/TS 16949:2009 Quality Management System CORPORATE HEADQUARTERS: OPTEK Technology 1645 Wallace Drive Carrollton, TX 75006 MANUFACTURING: Optron de Mexico Avenue Rio Bravo #1551 Parque
Quality Management System Policy Manual
Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
Quality Management System and Procedures
Commercial HVAC/R Coils & Protective Coatings Quality Management System and Procedures Rahn Industries, Inc. Quality Assurance Manual Version 3.0 www.rahnindustries.com 1-800-421-7070 Commitment to Quality
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context
QUALITY MANAGEMENT SYSTEMS MANUAL
QUALITY MANAGEMENT SYSTEMS MANUAL AS 9100 Rev C / ISO 9001-2008 UNCONTROLLED COPY_ ISSUE DATE APPROVED BY: BRAD SMITH REVISION DATE:30 APRIL 2010 PRESIDENT & GM APPROVED BY: DAVID R BENNETT QA MANAGER
Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum
Release 4.0 4.2.3 4.2.3.C.1 Control of Customer- Supplied Documents and Data The organization shall establish and maintain a documented procedure(s) to control all customer-supplied documents and data
Technical Manufacturing Corporation (TMC) Quality Manual
Technical Manufacturing Corporation (TMC) Quality Manual 15 Centennial Drive Peabody MA 01960 Revision: 19 Pages: 2 of 15 Date Issued: 03/13/2013 1. Table of Contents 1. TABLE OF CONTENTS... 2 2. ABOUT
UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013
UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd
SNAP-ON INCORPORATED QUALITY FORWARD SYSTEM MANUAL OF PRACTICE
QUALITY FORWARD SYSTEM MANUAL OF PRACTICE Approval: Date: 05/01/05 QFSSystem.doc QUALITY MANAGEMENT SYSTEM TABLE OF CONTENTS Section Page No. Quality Policy...For display purposes 0.0 Introduction and
QUALITY MANAGEMENT SYSTEM MANUAL
The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual
Disclosure to Promote the Right To Information
इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information
Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.
ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,
ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL
Page 1 of 25 ABC COMPANY INC QUALITY MANUAL Page 2 of 25 DOCUMENT INTRODUCTION PURPOSE OF THIS MANUAL This describes the quality management system at ABC Company Ltd, Buffalo, USA described as the Organization,
Quality Manual ISO9001:2008
Quality Manual ISO9001:2008 Connor Winfield Corp. Date: 4/26/10 Revision: 3 Quality Manual Quality Manual Connor Winfield GENERAL Section 0.1 Section Rev.: 2 Rev. Date: 4/26/10 Section Page 1 Index and
Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.
This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA
Quality System Manual
Quality System Manual Document: QM Issue: 3 Revision: 1 Date: July 24, 2014 General Introduction ISS: 3 REV: 1 Page: 2 of 56 Section 1.2 Document Revision Page REV REV DETAILS LEVEL DATE Page Para. DESCRIPTION