Quarterly Report for the Quarter Ended 30 September 2015
|
|
|
- Amice Parker
- 10 years ago
- Views:
Transcription
1 ASX Market Announcements Office via electronic lodgment 29 October 2015 Quarterly Report for the Quarter Ended 30 September 2015 HIGHLIGHTS: Drilling at Prospect GC11 intersected 2,354ppm U 3O 8 from 135m downhole in drillhole NAR7537; and 1,065ppm U 3O 8 from 169m downhole in drillhole NAR7535. Alteration patterns in Kombolgie sandstone at GC11 are consistent with those mapped over classical Athabasca style unconformity hosted uranium deposits. Intense alteration and pathfinder element signature intersected at the Nabarlek Offset target are consistent with footwall alteration to the Nabarlek deposit. 1. EXPLORATION ACTIVITIES ALLIGATOR RIVERS, NORTHERN TERRITORY The Alligator Rivers Uranium Province (ARUP) in the Northern Territory is a worldclass uranium province, comparable to the Athabasca Uranium Province in Canada in terms of its uranium endowment and geological setting. The focus of Uranium Equities' (UEQ, the Company) exploration activities in the ARUP is on the discovery of highgrade Alligator Riversstyle, unconformity and structurally controlled uranium deposits. The Company has been actively exploring the ARUP region both exclusively and in joint venture with Cameco Australia since 2007, and believes that its consolidated ground position has exceptional potential for discovery. Overview During the quarter, the Company completed a combined reverse circulation (RC) and diamond drilling (DD) program on targets at the Nabarlek Project. A total of 12 drillholes for 3,452 metres were drilled with encouraging results. 1.1 Nabarlek Project The West Arnhem Joint Venture with Cameco Australia (Uranium Equities right to earn 100%) and the 100%owned Nabarlek Mineral Lease, located in the ARUP, represent a rare nearmine uranium exploration opportunity surrounding the historic Nabarlek Uranium Mine (previous production: 1.84% U 3O 8) the Nabarlek Project. The Nabarlek Project covers the historical Nabarlek Mining Lease where the Company is targeting structural and geological extensions and repetitions of the high grade Nabarlek orebody. Outside the Nabarlek ML, UEQ has identified a number of prospects where drilling has intersected high grade uranium. ASX: UEQ HEAD OFFICE Level 2, 1292 Hay Street West Perth, WA 6005 GPO Box 2890 Perth, WA 6001 T: F: E: [email protected] w w w. u e l. c o m. a u
2 During the quarter the Company completed a 12 hole, 3,452 metres combined RC and diamond drilling program on the Nabarlek Offset target and other highpriority targets associated with known mineralised systems or fertile structures identified through UEQ s research and development programs into the alteration signature of Nabarlek style Unconformity Type uranium deposits (Figure 1). Figure 1: Nabarlek Project, location of 2015 drilling and prospects Prospect GC11, WAJV A total of four RC drillholes were completed at GC11 to test for host rocks favourable to uranium mineralisation beneath historic shallow aircore drilling with multielement geochemical alteration and pathfinder signatures. GC11 is located within the Oenpelli Dolerite; some 1.5km south west along strike from uranium mineralisation previously intersected at the N147 Prospect, and has not been tested by deeper drilling. Significant uranium mineralisation was intersected at the northern end of the drill line (Figure 2), including intersections (using 200ppm U 3O 8 cutoff) of: NAR7535 NAR7537 1,065ppm U 3O 8 from 169m including 2,143 U 3O 8 from 172m 699ppm U 3O 8 from 177m 322ppm U 3O 8 from 182m 875ppm U 3O 8 from 130m
3 2,354ppm U 3O 8 from 135m 325ppm U 3O 8 from 141m 653ppm U 3O 8 from 147m 802ppm U 3O 8 from 154m 232ppm U3O8 from 157m Figure 2: GC11 prospect cross section. Note the Unconformity style alteration system identified in drill hole NAR7534 (for alteration legend see Figure 3).
4 Figure 3: Alteration zonation through an Unconformitystyle uranium deposit Uranium mineralisation at GC11 is associated with extensive chlorite and haematite altered dolerite, and shows strong lithium (Li) and vanadium (V) anomalism consistent with the original geochemical targeting criteria. The two drillholes (NAR7535 and NAR7537) show a relative 1520m vertical displacement of the Kombolgie sandstone unconformity which is also suggestive of a fault displacement across this area of drill testing. In addition to opening up over 2.5km of strike of potentially mineralised dolerite west of N147, the significant intersections confirm the combined geological and geochemical targeting approach, and the results of the research and development program. Hole NAR7534 intersected a distinctive alteration package hosted within the Kombolgie Sandstone, comprising (from the top), illitic clay alteration (replacing background kaolinite within the sandstone), silicification, and across a redox front into illitechlorite and finally sudoittic chlorite alteration on the unconformity. The alteration assemblages are consistent with those mapped over classical Athabasca style unconformity hosted uranium deposits (shown schematically in Figure 3), and suggests NAR7534 has drilled into the outer margin of a uranium related alteration halo.
5 The intersection of uranium mineralisation in strong alteration zones in favourable host rocks at GC11 is a significant outcome and ongoing exploration work will focus on locating other areas of potential mineralisation through an integrated geologygeochemistry and geophysical targeting approach. Nabarlek Offset Prospect, Mining Lease MLN962 (100% UEQ) On the Nabarlek ML six holes totalling 2,160m were drilled to test the interpreted offset extensions of the historic Nabarlek mine beneath the Oenpelli Dolerite which truncates the deposit at depth. Drilling was undertaken on two sections 150m apart with a nominal 75m hole spacing, commencing around 100m north of the historical open pit. Drilling intersected Oenpelli Dolerite from surface to depths of between 225m and 320m down hole overlying a sequence of highly altered metasediments and amphibolites (Cahill Formation equivalents), shown in Figure 4. Figure 4: Nabarlek Offset Prospect, showing alteration along the interpreted trace of the Nabarlek Shear No significant intercepts of uranium mineralisation were encountered; however alteration mineral assemblages similar to those observed below the Nabarlek open pit have been identified from geological logging. These
6 mineral assemblages include intense sericitesilicapyrite zones, with anomalous silver (Ag) and molybdenum (Mo) pathfinder signatures, located at the base of a broader zone of sericite chlorite alteration overprinting the regional metamorphic muscovitechlorite assemblages. The intense alteration and Mo anomalism are consistent with footwall alteration to the Nabarlek deposit, and suggest the Nabarlek structure extends at depth and north along strike below the Oenpelli Dolerite. The intersection of the Nabarlek shear below the Oenpelli dolerite has increased the likelihood that other zones of uranium mineralisation may be located along this prospective structure. The Nabarlek shear will be modelled and projected along strike to assist with the identification of high priority target areas that have not been drill tested either below or above the Oenpelli dolerite. N147 Prospect, WAJV Two RC drillholes were completed on one drill section (holes 100m apart) located 170m west of the N147 Prospect (Figure 1), aiming to test for extensions of the altered dolerite package hosting the N147 system. While chlorite altered dolerites were intersected, no significant U results were recorded. These results suggest that N147 and GC11 represent separate cells developed along the southern margin of the Oenpelli Dolerite. Further Work RC drilling at GC11 has intersected anomalous uranium mineralisation in the lower part of the Oenpelli Dolerite, in a similar position to mineralisation located historically at N147. The discovery of new uranium mineralisation has outlined the potential for further N147style mineralisation over some 2.5km of strike, where previous shallow drilling intersected anomalous Li, V and Mo pathfinder alteration signatures. Also at GC11, illitechloritealteration signatures in hole NAR7534, hosted in Kombolgie sandstone, could indicate proximity to a unconformityrelated uranium deposit. The new geological interpretation will be integrated with geophysical data to define targets for further exploration at this exciting prospect. Diamond drilling at Nabarlek offset has intersected a strong localised alteration zone in basement schists of Cahill Formation which suggest that the Nabarlek structural zone continues at depth and north along strike. The structure will be modelled to determine if there is potential to locate additional uranium mineralisation at depth or further north along strike 1.2 Other Projects Arnhem Minerals (NT) During the reporting period the Company met with Traditional Owners and the Northern Land Council to progress tenements to grant. Rudall River (WA) The Rudall River Project (Uranium Equities 100%) consists of three Exploration Licences covering a total area of 172km 2. The westernmost Exploration Licence adjoins the Cameco/Mitsubishi Kintyre Project (current published NI43101 compliant measured and indicated resource estimate of 0.58% U 3O 8). The Company continues to work on identifying potential partners to progress the Rudall River Project.
7 1.3 Project Summary This section is provided in compliance with Listing Rule 5.3. Expenditure Exploration and evaluation expenditure made by the Company during the quarter was $691,402 (YTD: $691,402). In addition, during the quarter the Company has spent $113,443 on administration costs (YTD: $113,443). Projects Name Target Granted Area (km 2 ) Applic. Beneficial Ownership West Arnhem JV NT UEQ 40% earning 100%: Cameco Australia 60% Nabarlek ML Arnhem Minerals, Woodside, NT Structurally controlled and unconformity style uranium 12 UEQ 100% Browse, Cadel NT 2,351 UEQ 100% North, Pluto & Aurari Bay Headwaters NT Coronation Hillstyle gold platinum palladium uranium 2,280 UEQ 100% (in moratorium) Rudall River WA Kintyre style uranium 172 UEQ 100% 632 4,680 A full list of tenements held by the Company is enclosed in Appendix 1. Changes in tenements held during the quarter Changes in farmin or farmout agreements during the quarter 2. CORPORATE In August 2015 the Company completed an underwritten 1for3 nonrenounceable rights issue to eligible shareholders at 0.8 cents for each new share to raise up to $1,214,369 before issue costs. During the quarter the Company advised that it has received a Certificate for Finding from Innovation Australia under Section 27J of the Industry Research and Development Act 1986 ( IR&D Act ) regarding its R&D tax incentive claim for the 2011/12, 2012/13 and 2013/14 income years. Innovation Australia ascertain that certain R&D tax incentive claims in relation to the West Arnhem, Frome and
8 Marla projects made by the Company in these years are noncompliant, and as such, require repayment to the extent of ~$439,000. The Company and its advisor strongly disagree with the findings and believe all tax incentives received pursuant to the IR&D Act meet the eligibility requirements. Uranium Equities intends to take all necessary steps to dispute these findings of which the first step has been the requisition that the Board of Innovation Australia reconsider the decision and commence a review under Division 5 of the IR&D Act (being an internal review of the finding). The Group s cash balance at the end of the quarter was $609,614 (refer Appendix 5B for further information). The Company also held 8,004,393 shares in ASX listed Enterprise Uranium Limited (ASX:ENU) and retained a 9.9% interest (3,455,371 shares) in unlisted PhosEnergy Limited ( Tim Goyder Chairman Competent Person Statement This information in relation to drilling results and the potential offset extension at the Nabarlek Project are extracted from ASX Announcements entitled RC and Diamond Drilling Results Nabarlek Project created on 7th October 2015 and UEQ Identifies Significant New exploration Target Beneath HighGrade Nabarlek Uranium Mine, NT created on 7th May Both are available to view at The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcement.
9 Appendix 1 Tenement Schedule State Project Tenement Status Current Equity NT Nabarlek EL10176 Granted 40% EL24371 Granted 40% EL23700 Granted 40% ELA24878 Application 40% MLN962 Granted 100% Arnhem Minerals ELA25384 Application 100% ELA25385 Application 100% ELA25386 Application 100% ELA25387 Application 100% ELA25389 Application 100% ELA25391 Application 100% ELA25393 Application 100% Headwaters ELA27153 Application 100% ELA27513 Application 100% ELA27514 Application 100% ELA27515 Application 100% Woodside ELA29947 Application 100% Browse ELA29945 Application 100% Cadel North ELA28316 Application 100% Aurari Bay ELA29897 Application 100% Pluto ELA30073 Application 100% WA Rudall River E45/3118 Granted 100% E45/3119 Granted 100% E45/3126 Granted 100%
10 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity Uranium Equities Limited ABN Quarter ended ( current quarter ) September 2015 Consolidated statement of cash flows Cash flows related to operating activities 1.1 Receipts from product sales and related debtors Current quarter Year to date (3 months) 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration (691,402) (113,443) (691,402) (113,443) 1.3 Dividends received 1.4 Interest and other items of a similar nature 25,643 25,643 received 1.5 Interest and other costs of finance paid 1.6 Income taxes (paid)/received 1.7 Other (management fees received) Net Operating Cash Flows (779,202) (779,202) Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (779,202) (779,202) (carried forward) + See chapter 19 for defined terms. 01/05/2010 Appendix 5B Page 1
11 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 1.13 Total operating and investing cash flows (brought forward) (779,202) (779,202) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1,107,419 1,107, Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (movement in restricted cash) (3,386) (3,386) Net financing cash flows 1,104,033 1,104,033 Net increase (decrease) in cash held 324, , Cash at beginning of quarter/year to date 284, , Exchange rate adjustments to item Cash at end of quarter 609, ,614 Notes: (1) Cash balance excludes $1.589 million held as security deposits or against bank guarantees for rehabilitation obligations on the Nabarlek Mineral Lease and West Arnhem Land tenements and an office lease, which is treated as Restricted Cash in the Company s financial statements. Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities Current quarter 1.23 Aggregate amount of payments to the parties included in item , Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Item 1.23 Current quarter consists of director s fees, employer superannuation contributions ($25,486) and service charges paid to Chalice Gold Mines Ltd (a director related entity) for the provision of corporate services, office rent and technical personnel ($11,000). All transactions are on commercial terms. Noncash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest + See chapter 19 for defined terms. Appendix 5B Page 2 01/05/2013
12 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used 3.1 Loan facilities 3.2 Credit standby arrangements Estimated cash outflows for next quarter 4.1 Exploration and evaluation 250, Development 4.3 Production 4.4 Administration 150,000 Total 400,000 Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter Previous quarter 5.1 Cash on hand and at bank 598, , Deposits at call 10,728 10, Bank overdraft 5.4 Other (provide details) Total: cash at end of quarter (item 1.22) 609, ,783 + See chapter 19 for defined terms. 01/05/2010 Appendix 5B Page 3
13 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Changes in interests in mining tenements and petroleum tenements 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements and petroleum tenements acquired or increased Tenement reference and location Nature of interest (note (2)) Interest at beginning of quarter Interest at end of quarter Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks, redemptions Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks Convertible debt securities (description) Total number Number quoted Issue price per security (see note 3) (cents) Amount paid up per security (see note 3) (cents) 607,184, ,184, ,796, ,796, See chapter 19 for defined terms. Appendix 5B Page 4 01/05/2013
14 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (unlisted share options) Unlisted Performance Rights 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter Options Exercise price Expiry date Performance Rights Debentures (totals only) 7.12 Unsecured notes (totals only) + See chapter 19 for defined terms. 01/05/2010 Appendix 5B Page 5
15 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5). 2 This statement does give a true and fair view of the matters disclosed. Sign here: Date: 29 October 2015 Company secretary Print name: Kym Verheyen Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == == + See chapter 19 for defined terms. Appendix 5B Page 6 01/05/2013
Quarterly Report for the Quarter Ended 31 December 2015
ASX Market Announcements Office via electronic lodgment 28 January 2016 Quarterly Report for the Quarter Ended 31 December 2015 HIGHLIGHTS: Modelling of Nabarlek Offset target indicates that the prospective
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Appendix 5B. Quarter ended ( current quarter ) 51 153 918 257 31 December 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HIGHFIELD RESOURCES LIMITED ABN Quarter ended ( current quarter ) 51 153 918 257
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
Appendix 5B. Mining exploration entity and oil and gas exploration
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 38 119 047 693 30 September 2011
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity COPPER RANGE LIMITED ABN Quarter ended ( current quarter ) 38 119 047 693 30 September
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 68 073 914 191 31 December 2015
Appendix 5B Rule 5.3 Name of entity AUSTRALIAN MINES LIMITED AUZ ABN Quarter ended (current quarter ) 68 073 914 191 31 December 2015 Consolidated statement of cash flows Cash flows related to operating
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 December 2015. Net Operating Cash Flows (568) (1,210)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN Quarter ended ( current ) 68 064 120 896
Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 March 2015. Net Operating Cash Flows (512) (2,380)
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN 68 064 120 896 31 March 2015 Quarter ended
Appendix 5B. Mining exploration entity quarterly report LACONIA RESOURCES LIMITED 29 137 984 297 31 DECEMBER 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity LACONIA RESOURCES LIMITED ABN Quarter ended ( current quarter ) 29 137
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 65 094 206 292 30 June 2013
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Rule
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 44 009 163 919 31 December 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED
Johnnycake (EPM 18986) - background
Forte Consolidated Limited QUARTERLY REPORT 1 October 2015 to 31 December 2015 ASX: FRC Forte Consolidated Limited ABN 37 148 168 825 Board of Directors Chairman Executive Director John Terpu Non-Executive
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 108 476 384 30 September 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Aurelia Metals
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
Appendix 5B Mining exploration entity quarterly report
Name of entity Appendix 5B SEGUE RESOURCES LTD Rule 5.3 ABN Quarter ended ("current quarter") 49 112 609 846 31 December 2015 Consolidated statement of cash flows Cash flows related to operating activities
Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10. Quarter ended ( current quarter )
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 46 168 910 978 31 December 2015
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity TIAN POH RESOURCES LIMITED ABN Quarter ended ( current ) 46 168 910 978
ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015
ASX ANNOUNCEMENT 31 JULY 2015 JUNE 2015 QUARTERLY REPORT The Directors of Odyssey Energy Limited ( Odyssey or Company ) are pleased to present the June 2015 ly report. Highlights during, and subsequent
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,
APPENDIX 5B Mining exploration entity quarterly report
1 of 5 APPENDIX 5B Mining exploration entity quarterly report TORO ENERGY LTD Quarter ended ABN. 48 117 127 590 June 2015 Consolidated statement of cash flows (Note 6.0) Cash flows related to operating
ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014
Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: [email protected]
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 003 257 556 30 September 2013
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity MILLENNIUM MINERALS LIMITED ABN Quarter ended ( current ) 85 003 257 556 30 September
Appendix 5B. Quarter ended ( current quarter )
Appendix 5B Rule 5.5 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity WPG Resources Ltd ABN Quarter ended ( current quarter ) 51
Appendix 5B. RNI NL and its controlled entities. Quarter ended ( current quarter ) 77 085 806 284 30 Jun 2016
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity RNI NL and its controlled entities ABN Quarter ended ( current quarter ) 77 085 806
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 70 121 539 375 31 DECEMBER 2015
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity
Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia
ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 126 379 646 31 December 2015
Appendix 5B.Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity AVANCO RESOURCES LIMITED ABN Quarter ended ( current ) 85 126 379 646 31 December 2015 Consolidated
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. 94 106 641 963 30 Sept 2015
Appendix 5B Mining exploration entity ly report Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Crusader Resources Limited ABN
JUNE 2015 QUARTERLY REPORT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter
Report for the Quarter Ended 31 December 2015
Report for the Quarter Ended 31 December 2015 ASX: KIS Market Capitalisation $13.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 7.5 cents Share Price Board of Directors Johann
Appendix 5B Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Name of entity YILGARN GOLD LIMITED ABN Quarter ended ("current quarter") 34 002 527 906 31 December 2004 Consolidated statement of cash flows Cash flows related to operating activities
QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED
21 st January 2016 QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED 31 st DECEMBER 2015 CONTACTS: Collin Vost Telephone: 08 6436 2350 ISSUED CAPITAL: 2,225,337,344 Ordinary Shares Directors: Collin
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 December 2013
The Waterberg Coal Company Limited (formerly Range River Gold Limited) (Incorporated in Australia) (Registration number ABN 64 065 480 453) ASX: WCC JSE: WCC ISIN: AU000000WCC9 ( WCC or the Company ) Appendix
DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS
29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 March 2014
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity THE WATERBERG COAL COMPANY LIMITED ABN Quarter ended ( current ) 64 065 480 453 31 March 2014
Appendix 5B. Mining exploration entity quarterly report
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian Bauxite Limited ABN Quarter ended ( current ) 14 139 494 885
Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. Quarter ended ( current quarter ) 94 106 641 963 31 Dec 2015
Mining exploration entity ly report Appendix 5B Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/05/2013 Name of entity Crusader Resources
QUARTERLY ACTIVITIES AND CASH FLOW REPORT. PERIOD ENDED 31 March 2015
30 April 2015 QUARTERLY ACTIVITIES AND CASH FLOW REPORT PERIOD ENDED 31 March 2015 Baraka Energy & Resources Limited Contacts: Collin Vost Issued Capital: 2,225,337,344 Ordinary Shares Telephone: 08 6436
QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015
ASX ANNOUNCEMENT MEDIA RELEASE 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS RC drilling identified wide mineralised gold zones north of original Namdini
Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing
ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned
FOR THE QUARTER ENDED 31 December 2015 Swala Energy Limited ACN 161 989 546 Level 4, 21 Kintail Road Applecross WA 6153 Australia TEL +61 (0) 8 6270 4700 FAX +61 (0) 8 6314 4675 EML [email protected]
Quarterly Activities Report - for the period ended 31 December 2015
ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M
HORSE WELL GOLD PROJECT W.A
December 2015 Quarterly Activities Report ABN 20 109 361 195 ASX Release 29 January 2016 Alloy Resources Ltd Suite 6, 7 The Esplanade Mount Pleasant WA 6153 Tel: +61 8 9316 9100 Fax: +61 8 9315 5475 Email:
Falcon Minerals Ltd ACN 009 256 535 Company Announcement
Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April
March 2015 Quarterly Activity Report and Appendix 5B
ABN 90 118 710 508 Ground Floor 1 Havelock Street West Perth WA 6000 t: +61 8 9488 5220 f: +61 8 324 2400 www.citation.net.au [email protected] 30 April 2015 ASX Announcement March 2015 Quarterly Activity
For personal use only
December 2015 Quarterly Activities Report Rumble Resources Ltd (ASX: RTR) ( Rumble or the Company ) is pleased to provide an update of the Company s activities during the December 2015. Rumble Resources
Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million
Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take
Quarterly Report. For the Quarter Ended 30 June 2004. Vulcan is maintaining its low cost exposure to West Australian gold exploration.
Quarterly Report For the Quarter Ended 30 June 2004 Vulcan is maintaining its low cost exposure to West Australian gold exploration. Yerilla Joint Venture (Sons of Gwalia earning 75%) Sons of Gwalia are
MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT
QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015
QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 KIHABE ZINC LEAD SILVER PROJECT BOTSWANA On 11 November 2015, the Company received an email from the Assistant Permanent Secretary, Ministry of Minerals
September 2010 Quarterly Report
September 2010 Quarterly Report 25th October 2010 Corporate Details ASX Code: RCO Issued Capital: 52,714,183 Shares 2,950,000 Options @ 40c, 31/3/2011 (Unlisted) 510,000 Options @ 42c, 31/3/2011 (Unlisted)
December 2015 Quarterly Report
December 2015 Quarterly Report 29 January 2016 The downward spiral in oil prices coupled with ongoing industrial action in Bass Strait continues to impact receipts from the Weeks Royalty interest. Income
QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015
FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending
September 2015 Quarterly Activities Report
ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production
The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:
Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights
Merlin Diamonds Limited
Merlin s Limited 29 January 2016 Manager Companies Australian Securities Exchange Level 6, 20 Bridge Street Sydney NSW 2000 By ELodgement REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Merlin s Limited
DECEMBER 2015 QUARTERLY ACTIVITIES REPORT
29 January 2016 DECEMBER 2015 QUARTERLY ACTIVITIES REPORT CORPORATE On the 14 December 2015, Namibian Copper NL (ASX Code: NCO) (Namibian Copper or the Company) announced that the Company had entered into
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target
ASX Announcement 29 January 2016 Quarterly Report For the period ending 31 December 2015 ASX Code GOR ABN 13 109 289 527 Highlights Solid progress on Gruyere Pre Feasibility Study Gruyere PFS remains on
September 2015 Quarterly Report
September 2015 Quarterly Report 30 October 2015 The effects of industrial action on the Weeks Royalty in Bass Strait diminished through the with petroleum production moving back to more normal levels.
For personal use only
For persal use ly Mining explorati entity and oil and gas explorati entity ly report Rule 5.5 Mining explorati entity and oil and gas explorati entity ly report Introduced 01/07/96 Origin Appendix 8 Amended
Mineralisation remains open in all directions with an untested downhole EM conductor at depth
Quarterly Report For the Period Ending 31 December 2015 Key Points Nanadie Well Project (CopperNickelPGE s) Latest drill results double strike extent of copper nickel PGE mineralised massive sulphides
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015
ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming
For personal use only
1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium
Quarterly Report For the 3 Months ended December 2015
Quarterly Report For the 3 Months ended December 2015 This Quarterly Report updates activities undertaken during the period 1 October 2015 to 31 December 2015. OVERVIEW During the period, NuCoal continued
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT
MAXIMUS RESOURCES LIMITED QUARTERLY REPORT PERIOD ENDING 31 December 2015 SUMMARY CORPORATE Private share placement to sophisticated Investors was completed with $200,000 received A Share Purchase Plan
Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter )
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity 1Page Limited ABN Quarter ended ( current
December 2015 Quarterly Report & Appendix 5B
December 2015 Quarterly Report & Appendix 5B 29 January 2016 Highlights: Completed the R1 workover program for all five Glenaras wells. Commenced testing of the R1 seam at Glenaras, with initial gas desorption
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012
QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate
Quarterly report for entities admitted on the basis of commitments
Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity Papyrus Australia Limited ABN Quarter ended
Quarterly Activities Report For the quarter to 31 December 2015
Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:
DECEMBER 2015 QUARTERLY REPORT
NEWS RELEASE 29 JANUARY 2016 DECEMBER 2015 QUARTERLY REPORT Prairie Mining Limited is pleased to present its quarterly report for the period ending 31 December 2015. Highlights during, and subsequent to,
Quarterly Report December 2015
Quarterly Report December 2015 Highlights Major Asset Acquisition In October TGN announced that it had agreed terms for the acquisition of the Australian tungsten exploration assets of Hazelwood Resources
Quarterly Cash Flow Appendix 4c
ASX Announcement 15 October 2015 Quarterly Cash Flow Appendix 4c Tempo Australia Limited (ASX: TPP) (Tempo, the Company) is pleased to provide the following update on its business activities for the three
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara
QUARTERLY ACTIVITIES AND CASHFLOW REPORT 30 SEPTEMBER 2015
30th October 2015 Centralised Company Announcements Platform Australian Securities Exchange 10 th floor, 20 Bond Street Sydney NSW 2000 QUARTERLY ACTIVITIES AND CASHFLOW REPORT 30 SEPTEMBER 2015 Please
ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015
ASX ANNOUNCEMENT 29 th January 2016 ASX: PML QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015 HIGHLIGHTS Parmelia Resources entered into conditional agreement to acquire Veriluma Pty Ltd. Parmelia and Veriluma
QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015
STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights
