In Situ Bioremediation at FracRock Sites Mary F. deflaun, PhD
|
|
|
- Eleanore Washington
- 10 years ago
- Views:
Transcription
1 In Situ Bioremediation at FracRock Sites Mary F. deflaun, PhD Slide 1
2 Overview Two case studies of bioaugmentation in fractured rock: 1. Naval Air Warfare Center in NJ fractured mudstones 2. Industrial facility near Nashville, TN karst Common Features: TCE at DNAPL concentrations treated using emulsified vegetable oil (EVO) as the electron donor and the anaerobic microbial consortia KB-1 (contains DHC bacteria) Co-author and instructor for the ITRC BioDNAPL Training Co-author for ITRC IDSS and Mass Flux guidance documents Guidance documents available at Slide 2
3 Naval Air Warfare Center, West Trenton, NJ Collaborators: Slide 3
4 Mercer County Airport Jet engine testing facility from 1950 s to 1990 s Est. 100,000 gals of TCE lost from storage tanks-10,000 gals est. to gw (~200 ppm max conc.) Areas of coincident jet fuel contamination Daughter products-cis-dce and VC present (16 & 1.2 ppm max) Triassic sedimentary rock fractured sand and mudstones 60 gpm pump & treat system since 1993 no decrease in TCE since 1998 Slide 4 GeoSyntec Consultants
5 Dipping Bedded Lockatong Mudstones Test area Black Fissile Mudstone Grey Laminated and Massive Mudstone Red Massive Mudstone 200 ft Slide 5 From Pierre Lacombe
6 Implementation Utilize 4 existing wells-areal extent 9,000 ft 2 up to 115 bgs 4 wells form a trapezoid 230 ft on the long side Estimate 220 lbs TCE in pilot area (up to 16 ppm) Inject EVO first to retain injected bacteria Slide 6
7 Pilot Test Injections Used the four wells as injection/extraction well pairs - extracted from one well of the pair while injecting into the other using flow proportional pump Pulled water from designated extraction well to make up 10% stock of EVO Injected the EVO stock with gw pulled from the extraction well to a final concentration of ~2%-until EVO visible in the extraction well Added 20 L KB-1 culture-dhc bacteria Injected the remainder of the EVO and flushed the well with at least 1 well volume of groundwater without amendments Slide 7
8 USGS Toxics Research Site core hole 68 BR drilled downgradient 41BR BR 3 38BR BRP1 5 47BR 100 ft 68BR GW Flow Direction Slide 8
9 Well 16BR CVOC Molar Concentrations: May 2005-March Injection Event May-05 8-Aug Aug Oct Dec-05 3-Apr-06 7-Jun Aug Nov Feb May-07 5-Mar-08 micromoles/liter cis-dce TCE VC ethene TCE= 288 ug/l Date Sampled Slide 9
10 Well 38BR CVOC Molar Concentrations: May 2005-March Injection Event 120 TCE = 15,800 ug/l 100 micromoles/liter cis-dce TCE VC ethene May-05 8-Aug Aug Oct Dec-05 3-Apr-06 7-Jun-06 Date Sampled 28-Aug Nov Feb May-07 5-Mar-08 Slide 10
11 Historical Concentrations at 38BR (μg/l) 1 0 0, B R 1 0, , T C E DCE 10 VC 1 In n o c u la t io n From Pierre Lacombe, USGS, Feb Slide 11
12 Well BRP1 CVOC Molar Concentrations: May 2005-March Injection Event May-05 8-Aug Aug Oct Dec-05 3-Apr-06 7-Jun Aug Nov Feb May-07 5-Mar-08 micromoles/liter TCE = 206 ug/l cis-dce TCE VC ethene Date Sampled Slide 12
13 Well 41BR CVOC Molar Concentrations: May 2005-March Injection Event TCE =674 ug/l May-05 8-Aug Aug Oct Dec-05 6-Mar-06 5-Jun Aug Nov Feb May-07 5-Mar-08 micromoles/liter cis-dce TCE VC ethene Date Sampled Slide 13
14 Second Donor Injection 3 yrs after initial injection July 2008 EVO added at MW-30BR by gravity injection (dghigh concentration and very tight) EVO added at BRP-1 using MW-41BR as the extraction well Slide 14
15 2 nd Injections and Downgradient Monitoring Slide 15
16 1.00E+03 Total Organic Carbon Concentrations Injection Round 1 Injection Round E+02 Concentration (mg/l) 1.00E E+00 BRP-1 16BR 30BR 38BR 41BR 74BR 1.00E-01 Slide 16
17 1.00E E+10 DHC Cells Injection Round 1 Injection Round E E+08 Concentration (cells/l) 1.00E E E E E+03 BRP-1 30BR 41BR 74BR 1.00E E E+00 Slide 17
18 1.00E+03 Sulfate Injection Round 1 Injection Round E+02 Concentration (mg/l) 1.00E E+00 BRP-1 16BR 30BR 38BR 41BR 74BR 1.00E-01 Slide 18
19 100,000 Methane Concentrations Injection Round 1 Injection Round 2 10,000 Concentration (µg/l) 1, BRP-1 16BR 30BR 38BR 41BR 74BR 1 Slide 19
20 40,000 Concentrations of CVOCs at 30BR 35,000 30,000 Concentration (µg/l) 25,000 20,000 15,000 TCE cis-dce VC Ethene 10,000 5,000 0 Slide 20
21 16000 Concentrations of CVOCs at 38BR Injection Round 1 Injection Round Concentration (µg/l) TCE cis-dce VC Ethene Slide 21
22 1.00E+02 Total Organic Carbon Concentrations at 68BR Injection Round 1 Injection Round 2 Concentration (mg/l) 1.00E E+00 68BR-B 68BR-C 68BR-D 68BR-F 1.00E-01 Slide 22
23 1.00E+03 Sulfate at 68BR Injection Round 1 Injection Round E+02 Concentration (mg/l) 1.00E+01 68BR-B 68BR-C 68BR-D 68BR-F 1.00E E-01 Slide 23
24 100,000 Methane Concentrations at 68BR Injection Round 1 Injection Round 2 10,000 Concentration (µg/l) 1, BR-A 68BR-B 68BR-C 68BR-D 68BR-F 10 1 Slide 24
25 Concentrations of CVOCs at 68BR-B Injection Round 1 Injection Round Concentration (µg/l) TCE cis-dce VC Ethene Slide 25
26 800 Concentrations of CVOCs at 16BR Injection Round 1 Injection Round Concentration (µg/l) TCE cis-dce VC Ethene Slide 26
27 700 Concentrations of CVOCs at 41BR Injection Round 1 Injection Round Concentration (µg/l) TCE cis-dce VC Ethene Slide 27
28 200 Concentrations of CVOCs at BRP Concentration (µg/l) TCE cis-dce VC Ethene Slide 28
29 Summary Fracture surface coating of EVO and bacteria an effective passive approach to bioaugmentation in fractured rock Bioaugment only once with donor replenishment yearly or less frequently Temporary recirculation using well pairs an effective distribution strategy for known connections Several wells in the pilot test area and dg are below GWQS for the first time in decades Slide 29
30 Site 2 Active Manufacturing Plant Slide 30
31 Background Site History Release of ~1500 pounds of TCE 5 to 10 ppm of TCE in clay overburden and bedrock at the source 3 ppm of TCE in DG bedrock Biodegradation daughter products and DHC bacteria present Slide 31
32 Challenges GEOLOGY!! TCE in clay overburden and fractured bedrock Expedited timeframe (3 months) for the initial source treatment Bedrock groundwater (and VOCs) discharge through seeps to an off-property stream; vinyl chloride discharge is unacceptable Slide 32
33 Approach Full Scale Injections at existing wells in source area Nov-05, Nov-06, Jul-08 EVO and KB-1 in Nov 05, EVO only thereafter to replenish electron donor Passive bioremediation as a biobarrier near the site boundary Jun-07 Addition of EVO and KB-1 at 7 locations using recirculation between groups of wells EEO KB-1 Overburden Bedrock Slide 33
34 Plume Treatment Pump between wells at least until EVO breakthrough Add KB-1 during oil injection Full-Scale Biobarrier Application (Down Gradient Plume) In one week, a 300 biobarrier was constructed using 290 gallons of EVO and 40 liters of KB-1 EEO KB-1 Overburden Bedrock Slide 34
35 Biobarrier Results biobarriers Slide 35
36 Average Results at MW-09 Series Wells (Source Area) 6000 VOC Concentration (ug/l) TCE cdce VC 0 6/1/04 6/1/05 Pump and Treat 6/1/06 Bioremediation 6/1/07 6/1/08 6/1/09 6/1/10 VC cdce TCE Slide 36
37 Average Results for MW-20 Series Wells (downgradient of biobarrier) VOC Concentration (ug/l) TCE cdce VC 6/1/04 6/1/05 Pump and Treat 6/1/06 Source Area Bioremediation 6/1/07 Biobarrier 6/1/08 6/1/09 6/1/10 VC cdce TCE Slide 37
38 Full-Scale Biobarrier Slide 38
39 Questions? Slide 39
How To Test For Water Flow In A Site Near Niagara Falls
TRACER TEST CHARACTERIZATION DURING IN SITU BIOREMEDIATION OF CHLORINATED VOLATILE ORGANIC COMPOUNDS IN OVERBURDEN AND HIGH VELOCITY FRACTURED BEDROCK James W. Schuetz, Parsons Mark Raybuck, Parsons William
Enhanced In Situ Biodegradation of Trichloroethene/1,1,1 Trichloroethane in Fractured Rock Groundwater
Enhanced In Situ Biodegradation of Trichloroethene/1,1,1 Trichloroethane in Fractured Rock Groundwater Michael S. Kozar, PG Introduction Michael Kozar, PG, LSRP Vice President, O Brien & Gere 22 years
Cost-Effective Bioremediation of Perchlorate in Soil & Groundwater
Cost-Effective Bioremediation of Perchlorate in Soil & Groundwater Evan Cox - GeoSyntec Consultants Elizabeth Edwards - University of Toronto Scott Neville & Michael Girard - Aerojet Outline Perchlorate
Green Remediation via an Enhanced In Situ Bioremediation Solar-Powered System
C-041, in K.A. Fields and G.B. Wickramanayake (Chairs), Remediation of Chlorinated and Recalcitrant Compounds 2010. Seventh International Conference on Remediation of Chlorinated and Recalcitrant Compounds
Advances in Biological In-Situ Remediation: Full Scale Applications in the Netherlands. Experts in environmental and sustainable biotechnology
Advances in Biological In-Situ Remediation: Full Scale Applications in the Netherlands NORDROCS, September 2-21, 26, Malmö First joint Nordic Meeting on Remediation of Contaminated Sites Maurice Henssen,
SiREM-Major Services/Products
Optimizing in situ Bioremediation of Chlorinated Ethenes in Ontario s Groundwater Phil Dennis, Peter Dollar, Jeff Roberts, Sandra Dworatzek Smart Remediation, Ottawa February 27, 2014 SiREM-Major Services/Products
Optimization of In-Situ Injection and Bioremediation Design at a Brownfield Site
Optimization of In-Situ Injection and Bioremediation Design at a Brownfield Site Howard F. Nichols III, P.E. ([email protected]), Brendan J. Lazar ([email protected]), Nidal M. Rabah, PhD,
In Situ and Ex Situ Bioremediation Technologies for Groundwater Contaminated with Chlorinated Solvents
In Situ and Ex Situ Bioremediation Technologies for Groundwater Contaminated with Chlorinated Solvents Michelle M. Lorah, U.S. Geological Survey Emily Majcher, Duane Graves, Geosyntec Consultants John
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
A GEOCHEMICAL EVALUATION OF ENHANCED IN-SITU BIOREMEDIATION OF CHLORINATED ETHENES IN GROUNDWATER. A Thesis. Presented to the.
A GEOCHEMICAL EVALUATION OF ENHANCED IN-SITU BIOREMEDIATION OF CHLORINATED ETHENES IN GROUNDWATER A Thesis Presented to the Faculty of San Diego State University In Partial Fulfillment of the Requirements
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Interim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test
Interim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test June 15, 2012 Environmental Restoration Department This work was performed under the auspices of the
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Accelerated Site Cleanup Using a Sulfate-Enhanced In Situ Remediation Strategy
Accelerated Site Cleanup Using a Sulfate-Enhanced In Situ Remediation Strategy By: Sheri Knox, Tim Parker, & Mei Yeh YOUR NATURAL SOLUTIONS Patented Methods for In Situ Bioremediation Slide 2 About EOS
Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion
Bioremediation of Petroleum Hydrocarbons and Chlorinated Volatile Organic Compounds with Oxygen and Propane Gas infusion Walter S. Mulica Global Technologies Fort Collins, CO Co-Authors Mike Lesakowski
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
166 Engineered Approaches for 111 Silll Bioremedialion ofchlorinaled Soll'eIll COlllamillmiOIl MW-S. (2JW.{HB) IW-I. '<---'N'7"U-'-lr-'-;em-D,~;;;J
165 ACCELERATED IN SITU BIOREMEDIATION OF CHLORINATED ETRE ES IN GROUNDWATER WITH HIGH SULFATE CONCENTRATIONS Cltristian D. Johnson. Rodney S. Skeen, and Mark G. Butcher (Battelle PNWD. Richland, Washington)
Water remediation: Passive Treatment Technologies
Presenter: Jacques Meyer Project design: Adrian Haagner, Piet Smit & Jacques Meyer Water remediation: Passive Treatment Technologies Using a sub-surface flow wetland on a rehabilitated decommissioned coal
How To Treat A Contaminant Plume
DOE/EM-0624 Enhanced In Situ Bioremediation Subsurface Contaminants Focus Area Prepared for U.S. Department of Energy Office of Environmental Management Office of Science and Technology March 2002 Enhanced
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http://www.mde.state.md.
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland 21230-1719 1-800-633-6101 http://www.mde.state.md.us Colonial Pipeline Dorsey Junction Facility 929 Hood s Mill Road,
TECHNICAL REPORT TR-2306-ENV
ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 TECHNICAL REPORT TR-2306-ENV COST AND PERFORMANCE REPORT FOR A PERSULFATE TREATABILITY STUDY AT NAVAL AIR STATION NORTH ISLAND Prepared by
Long-Term Monitoring Network Optimization Evaluation. for. Wash King Laundry Superfund Site Lake County, Michigan
Long-Term Monitoring Network Optimization Evaluation for Wash King Laundry Superfund Site Lake County, Michigan June 2006 Solid Waste and Emergency Response (5102P) EPA 542-R-06-004 December 2006 www.epa.gov
COST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
Bioremediation. Introduction
Bioremediation Introduction In the twentieth century, the ever increase in the global human population and industrialization led to the exploitation of natural resources. The increased usage of heavy metals
In Situ Bioremediation Operations and Maintenance Plan for Test Area North Final Groundwater Remediation, Operable Unit 1-07B
DO /ld-llolz Revision 0 January 2003 U.S. Department of Energy Idaho Operations Off ice In Situ Bioremediation Operations and Maintenance Plan for Test Area North Final Groundwater Remediation, Operable
New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting
New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting Fairview Township, York County, Pennsylvania April 23, 2013 N US Army Corps of Engineers Depot
Remediation Services & Technology
Remediation Services & Technology Miranda Cruttenden- Well Remediation Engineer Todd Studer- Business Development Manager September 2011 Agenda Near wellbore remediation Causes of formations damage Field
BIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr.
TECHNICAL GUIDANCE DOCUMENT INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT BIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly Governor Commissioner 100 N. Senate
CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER
CHAPTER 7: REMEDIATION TECHNOLOGIES FOR CONTAMINATED GROUNDWATER There are a number of technologies that are being use to remediate contaminated groundwater. The choice of a certain remediation technology
PROGRAM AT A GLANCE 12
PROGRAM AT A GLANCE 12 Sunday, May 22, 2016 8:00 a.m. 5:00 p.m. Short Courses 3:00 9:00 p.m. Registration Desk Open 6:00 9:00 p.m. Welcome Reception, Exhibits, Poster Group 1 Display Monday, May 23, 2016
In Situ Bioremediation of Trichloroethylene
In Situ Bioremediation of Trichloroethylene Becki Tlusty Introduction Volatile organic compounds (VOC) are present at over two-thirds of Superfund, Resource Conservation and Recovery Act of 1976 (RCRA),
Pierre VOC Ground Water Investigation and MTBE Remediation Pilot Study
Pierre VOC Ground Water Investigation and MTBE Remediation Pilot Study Joint Meeting of 2007 Eastern South Dakota Water Conference and the 52 nd Annual Midwest Ground Water Conference October 30, 2007
Bioremediation. Biodegradation
Bioremediation A technology that encourages growth and reproduction of indigenous microorganisms (bacteria and fungi) to enhance biodegradation of organic constituents in the saturated zone Can effectively
Adjusted Estimates of Texas Natural Gas Production
Adjusted Estimates of Texas Natural Gas Production Background The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account
Ashley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
Microbiological and Geochemical Dynamics of the Subsurface: chemical oxidation and bioremediation of organic contaminants. Nora Barbour Sutton
Microbiological and Geochemical Dynamics of the Subsurface: chemical oxidation and bioremediation of organic contaminants Nora Barbour Sutton Soil Contamination Sources of Contamination Gas Stations Dry
TCE. The Use & Remediation of TCE at NASA. Keep reading. is developing innovative. NASA s pollution prevention efforts significantly reduced TCE use
National Aeronautics and Space Administration Space flight and exploration begin with developing innovative technologies here on Earth. Our commitment to environmental stewardship is central to that effort.
SUCCESSFUL FIELD-SCALE IN SITU THERMAL NAPL REMEDIATION AT THE YOUNG-RAINEY STAR CENTER
Paper 2B-01, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds 2004. Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant
Water Pollution. A Presentation for Café Scientifique Cherie L. Geiger, Ph.D. Department of Chemistry, UCF
Water Pollution A Presentation for Café Scientifique Cherie L. Geiger, Ph.D. Department of Chemistry, UCF Overview What is Causing it? Problems with Groundwater Contamination Traditional Remediation Techniques
In-situ Bioremediation of Chlorinated Hydrocarbons An Assessment of Projects in California
OPPTD Document No. 1218 In-situ Bioremediation of Chlorinated Hydrocarbons An Assessment of Projects in California California Department of Toxic Substances Control Office of Pollution Prevention and Technology
Innovative LNAPL Recovery Techniques
Innovative LNAPL Recovery Techniques RTDF NON-AQUEOUS PHASE LIQUID (NAPL) CLEANUP ALLIANCE San Antonio, Texas February 7-8, 2006 Presented by: Patrick E. Haas P. E. Haas & Associates, LLC http://www.phaas.net
Enhanced Oil Recovery (EOR) in Tight Oil: Lessons Learned from Pilot Tests in the Bakken
Enhanced Oil Recovery (EOR) in Tight Oil: Lessons Learned from Pilot Tests in the Bakken Tight Oil Optimization Workshop Calgary, Alberta, Canada March 12, 215 James Sorensen John Hamling 215 University
CARBON THROUGH THE SEASONS
DESCRIPTION In this lesson plan, students learn about the carbon cycle and understand how concentrations of carbon dioxide (CO 2 ) in the Earth s atmosphere vary as the seasons change. Students also learn
4 th & Carey Groundwater. Remediation Project and Reverse Osmosis Water Treatment System
4 th & Carey Groundwater Remediation Project and Reverse Osmosis Water Treatment System Contaminated City Well Well #8 4 th and Carey Groundwater contamination from industry was discovered in the Southeast
Bioremediation of contaminated soil. Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University
Bioremediation of contaminated soil Dr. Piyapawn Somsamak Department of Environmental Science Kasetsart University Outline Process description In situ vs ex situ bioremediation Intrinsic biodegradation
Professional Report. US Solar Network Evanston residential DHW. 1 Gobi 410 001 Helio-Pak 2-4 persons. Map section. Location of the system
US Solar Network Evanston residential DHW 1 Gobi 410 001 Helio-Pak 2-4 persons Location of the system Map section Evanston, IL Longitude: -87.694 Latitude: 42.055 Elevation: 597 ft This report has been
Facing The Challenges In Houston s Water System: Past, Present, and Future
Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory
How Can Fleets Control Mounting Fuel Costs? Effective fuel management requires purchase controls and driver behavior modification.
How Can Fleets Control Mounting Fuel Costs? Effective fuel management requires purchase controls and driver behavior modification. How Can Fleets Control Mounting Fuel Costs? 2 Effective Fuel Management
FARM A SYST Farmstead Assessment System. Drinking Water Well Condition
G3536 1W FARM A SYST Farmstead Assessment System Worksheet #1 Assessing the Risk of Groundwater Contamination from Why should I be concerned? Drinking Water Well Condition About 95 percent of this country
The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.
The Role of Groundwater in Alberta s Tight Water Supply Environment Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol. The Role of Groundwater in Alberta s Tight Water Supply Environment Outline Importance
Bioremediation of Petroleum Contamination. Augustine Ifelebuegu GE413
Bioremediation of Petroleum Contamination Augustine Ifelebuegu GE413 Bioremediation Bioremediation is the use of living microorganisms to degrade environmental contaminants in the soil and groundwater
Well Records and Maintenance Guidelines
1 Well Records and Maintenance Guidelines If you have a home well, you alone are responsible for maintaining the safety of our drinking water supply. When your well system is suitably located, correctly
OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM MIDDLEBURY, VT. Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc.
OPTIMIZING BIOLOGICAL PHOSPHORUS REMOVAL FROM AN SBR SYSTEM ABSTRACT MIDDLEBURY, VT Paul Klebs, Senior Applications Engineer Aqua-Aerobic Systems, Inc. The Middlebury Wastwater Treatment Plant, located
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida
GWPC September 27, 2015 Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Miami-Dade Water and Sewer Department Ed Rectenwald, P.G. MWH
IN-SITU BIOREMEDIATION VIA HORIZONTAL WELLS (U)
WSRC-MS-93-362 IN-SITU BIOREMEDIATION VIA HORIZONTAL WELLS (U) by T. C. Hazen WestinghouseSavannah RiverCompany SavannahRiver Site Aiken,SouthCarolina29808 B. B. Looney M. Enzien M. M. Franck C. B. Fliermans
This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.
This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy. DISCLAIMER This report was prepared as an account of work sponsored
AQUIFER STORAGE RECOVERY
AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges
Where does my water come from? Harrisonburg 2013 Hardness Levels
Definitions AL (Action Level): The concentration of a contaminant which, if exceeded, triggers treatment or other requirements which a water system must follow. MCL (Maximum Contaminant Level): The highest
SEAR Wastewater Treatment: Contaminant Removal and Material Recovery
ESTCP SEAR Wastewater Treatment: Contaminant Removal and Material Recovery U.S. Environmental Protection Agency National Risk Management Research Laboratory Cincinnati, Ohio SEAR Workshop Outline Motivation
2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
GUIDANCE PROTOCOL Environmental Restoration Project ER-0518
GUIDANCE PROTOCOL Environmental Restoration Project ER-0518 Application of Nucleic Acid-Based Tools for Monitoring Monitored Natural Attenuation (MNA), Biostimulation, and Bioaugmentation at Chlorinated
Bay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
WORKPLAN FOR ENHANCED IN-SITU BIOREMEDIATION PILOT TEST. for. Former Intel Facility 365 East Middlefield Road Mountain View, California
WORKPLAN FOR ENHANCED IN-SITU BIOREMEDIATION PILOT TEST for Former Intel Facility 365 East Middlefield Road Mountain View, California prepared for Intel Corporation 2200 Mission College Boulevard Santa
Map section. 87,390 kbtu
Closed-loop Solar System Closed-loop Solar Preheat with Back-Up Heater Location of the system Map section Richmond Longitude: -77.52 Latitude: 37.582 Elevation: 217 ft This report has been created by:
In Situ Bioremediation for the Hanford Carbon Tetrachloride Plume
In Situ Bioremediation for the Hanford Carbon Tetrachloride Plume Subsurface Contaminants Focus Area Prepared for U.S. Department of Energy Office of Environmental Management Office of Science and Technology
Marcellus Fast Facts
1 Marcellus Fast Facts Covers about 95,000 square miles in 6 states Occurs at depths of up to 9,000 feet Thickness of 250 feet or more Largest natural gas reservoir in North America (est. 500 TCF recoverable
TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO Steven Jones, M.S., P.E. September 4, 2013 Outline Micro Hydro Power Basics Hydro Power Equipment
Soil remediation you can trust In Situ Thermal Desorption. The real ISTD TERRATHERM R TECHNOLOGY. Technology
Soil remediation you can trust In Situ Thermal Desorption TERRATHERM R TECHNOLOGY Technology The real ISTD ISTD Testing the efficiency Our pilot ISTD system is easy and ready to use if a client wants to
January 2014: Jeanne Briskin of the U.S Environmental Protection Agency (EPA)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 The Upstate New York Society for Risk Analysis Webinar Series, Scientific Studies on Impact of Natural Gas Extraction from
Department of Public Welfare (DPW)
Department of Public Welfare (DPW) Office of Income Maintenance Electronic Benefits Transfer Card Risk Management Report Out-of-State Residency Review FISCAL YEAR 2012-2013 June 2013 (March, April and
ONE CALL CENTER REPORT
ITIC Mobile HTML Version of Excavators Ticket HTML format for proper display on any device Allows for different fonts, colors and embedded links Printed copies use greyscale TicketLINK Enhanced for ETM
Soil and Groundwater. Removing Contaminants. Groundwater. Implementing. Remediation. Technologies 1 / 6
carol townsend, C: 469-263-4343, [email protected] robert sherrill, C: 512-470-8710, [email protected] October 2012. ALL RIGHTS RESERVED. Revised Nov. 12, 2012 Background:
Accident & Emergency Department Clinical Quality Indicators
Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect
Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA
Swamp AMD Chemistry Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA A Technical Report for Trout Unlimited and the Kettle Creek Watershed Association Prepared by Hedin Environmental
Comparing share-price performance of a stock
Comparing share-price performance of a stock A How-to write-up by Pamela Peterson Drake Analysis of relative stock performance is challenging because stocks trade at different prices, indices are calculated
Removing Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media
Case History MAR Systems Inc. Removing Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media Trace thallium levels in process and wastewater streams pose a human toxicity threat. Tidwell
Remediation System Evaluation (RSE) Alaric, Inc. Superfund Site Tampa, Florida
Office of Solid Waste and Emergency Response (5102G) EPA 540-R-10-013 January 2010 www.clu-in.org/optimization Remediation System Evaluation (RSE) Alaric, Inc. Superfund Site Tampa, Florida REMEDIATION
CAFIS REPORT 2015.10
CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Federal Remediation Technologies Roundtable Arlington, VA November 14, 2013 Jim Woolford, Director Office of Superfund Remediation and Technology
Federal Remediation Technologies Roundtable Arlington, VA November 14, 2013 Jim Woolford, Director Office of Superfund Remediation and Technology Innovation Presentation Outline Importance of Groundwater