The Long-Term Safety Strategy for the Geological Disposal of Radioactive Waste

Size: px
Start display at page:

Download "The Long-Term Safety Strategy for the Geological Disposal of Radioactive Waste"

Transcription

1 Belgian agency for radioactive waste and enriched fissile materials Geological Disposal Programme The Long-Term Safety Strategy for the Geological Disposal of Radioactive Waste SFC1 level 4 report: second full draft P. Smith, SAM Ltd B. Cornélis, freelance technical writer M. Capouet, ONDRAF/NIRAS M. Van Geet, ONDRAF/NIRAS NIROND-TR E June 2009

2

3 ONDRAF/NIRAS NIROND-TR REPORT E Geological Disposal Programme The Long-Term Safety Strategy for the Geological Disposal of Radioactive Waste SFC1 level 4 report: second full draft P. Smith, SAM Ltd B. Cornélis, freelance technical writer M. Capouet, ONDRAF/NIRAS M. Van Geet, ONDRAF/NIRAS June 2009

4 This report was written by: P. Smith (SAM Ltd), B. Cornélis (freelance technical writer), M. Capouet (ONDRAF/NIRAS) and M. Van Geet (ONDRAF/NIRAS). It was edited by: the SFC1 coordination team of ONDRAF/NIRAS (M. Van Geet, M. Capouet, X. Sillen and H. Van Humbeeck). It was reviewed by: the members of the SFC1 steering committee (ONDRAF/NIRAS: M. Van Geet, M. Capouet, P. De Preter, X. Sillen and H. Van Humbeeck; SCK CEN: J. Marivoet and G. Volckaert) and by W. Cool (ONDRAF/NIRAS) and P. Lalieux (ONDRAF/NIRAS). It was approved by: P. Lalieux (ONDRAF/NIRAS). Contact persons at ONDRAF/NIRAS: M. Van Geet: M. Capouet: ONDRAF/NIRAS Avenue des Arts BRUSSELS BELGIUM The data, results, conclusions and recommendations contained in this report are the property of ONDRAF/NIRAS. The present report may be quoted provided acknowledgement of the source. It is made available on the basis that it will not be used for commercial purposes. All commercial uses, including copying and re-publication, require prior written authorisation of ONDRAF/NIRAS. ii NIROND-TR E, June 2009

5 Document Datasheet Title The Long-Term Safety Strategy for the Geological Disposal of Radioactive Waste Subtitle Author(s) of the document P. Smith (SAM Ltd), B. Cornélis (freelance technical writer), M. Capouet (ONDRAF/NIRAS), M. Van Geet (ONDRAF/NIRAS) Reviewer(s) of the document M. Capouet (ONDRAF/NIRAS), W. Cool (ONDRAF/NIRAS) P. De Preter (ONDRAF/NIRAS), P. Lalieux (ONDRAF/NIRAS), J. Marivoet (SCK CEN), X. Sillen (ONDRAF/NIRAS), M. Van Geet (ONDRAF/NIRAS), H. Van Humbeeck (ONDRAF/NIRAS), G. Volckaert (SCK CEN) Series Geological Disposal Programme Publication date Document type NIROND-TR Review status Working Document Status Open Revision number 1 ONDRAF/NIRAS number of report NIROND-TR E Subcontractor reference number NA ISBN NA Total number of pages 62 Approver(s) of the document P. Lalieux (ONDRAF/NIRAS) This report, NIROND-TR E, presents a refined view of the safety strategy first described in the report NIROND-TR E and intended to guide the stepwise development of a geological disposal system for high-level waste and low- and intermediate-level waste, long-lived (category B&C wastes) in Belgium. This second full draft report incorporates adaptations based on the application of the safety strategy in the framework of the preparation of the Safety and Feasibility Case 1 (SFC1). This report cannot be considered as the final version of a supporting document to SFC1. It remains a living document that will be discussed with the Belgian safety authorities in the period It also provides a basis for continuing discussions and contributions from ONDRAF/NIRAS staff, partner organisations and subcontractors. NIROND-TR E, June 2009 iii

6 iv NIROND-TR E, June 2009

7 Executive summary For over 25 years, ONDRAF/NIRAS has been studying geological disposal in poorly indurated clays as a solution for the long-term management of high-level waste and low- and intermediate-level waste, long-lived (HLW/LILW-LL or category B&C wastes), geological disposal in Boom Clay becoming progressively the reference solution, Ypresian Clays being considered as an alternative solution. In line with international practice, ONDRAF/NIRAS plans its geological repository for category B&C wastes and its implementation in a cautious, stepwise process, punctuated by the submission to the government of key documents, marking the end of successive stages in its B&C programme. These documents, called safety and feasibility cases, are intended to support decisions to be requested. A need to formalise the iterative approach to developing a geological repository adopted in the past and to refine and develop it further into a formal safety strategy was identified in the light of the findings of the international peer review of the Safety Assessment and Feasibility Interim Report 2 (the second major synthesis report of the B&C programme, published in 2001) and in the light of the need to organise the B&C Programme in a more structured, better founded way, towards the production of the successive safety and feasibility cases. To this end, ONDRAF/NIRAS set out to formalise its safety strategy, which it defines as the iterative process guiding, firstly, the stepwise development of plans for a safe and feasible geological repository and its implementation procedures and, secondly, the successive licence applications, this based on a concentrate and confine approach and taking account of all relevant boundary conditions. More specifically, it is the iterative process for developing the safety concept and the design of a geological repository and for acquiring evidence, developing arguments and carrying out analyses to show that these are both safe and feasible to implement as planned. This process was initiated in 2006 and led, in 2007, to a first draft report structuring and documenting the safety strategy in a formal manner, of which the present report is an update. Many of the elements of this strategy were already implicitly contained in the existing approach, but some new elements were also incorporated. The safety strategy has been developed on the basis of the experience, knowledge and understanding acquired in the context of the studies on geological disposal in Boom Clay, with the intention that it remains valid during the whole process of developing and implementing a safe geological repository. It is expected to be applicable to poorly indurated clays in general, thus also to Ypresian Clays, though this has still to be confirmed. It will have to be completed, refined and possibly adapted for the programme stages beyond SFC1, in particular to encompass aspects that it does not currently take into account, such as waste acceptance and siting. It will also have to take due account of aspects of safeguards. As in the earlier report on the safety strategy, the present report is first and foremost a report presenting a working methodology, whose application is then illustrated. It defines the aims of the safety strategy and describes its main elements, in terms of inputs, successive steps and outputs, including how these are linked together. The present report is a living document, that will be discussed, in particular, with the Belgian safety authorities in the period A NIROND-TR E, June 2009 v

8 final documented view on safety strategy, which will integrate new experience in the application of the safety strategy and further refinements, together with the still-to-be-formalised feasibility assessment methodology, which includes operational safety, would then be available by * * * In the safety strategy (see also the figure below), system development, that is, development of the system comprising the geological repository and the host formation in which it is built, and assessment of its safety and feasibility are constrained by boundary conditions. Boundary conditions include, in particular, the relevant international and national regulatory framework and, because the type of solution to be implemented for the long-term management of category B&C wastes has not yet been decided at the institutional level, the working hypotheses ONDRAF/NIRAS has had to make so as to manage its geological disposal programme in a focused way. High-level strategic choices made by ONDRAF/NIRAS on the basis of existing knowledge and understanding, while being constrained by the boundary conditions, aim to provide a general orientation for disposal system development and to establish the broad features that the system should have in order to meet its safety and feasibility objectives. Strategic choices of the B&C Programme 1. The repository shall be constructed at depth within the Boom Clay formation, considered as reference host formation, with the overlying sedimentary formations providing the geological coverage. Ypresian Clays are considered as an alternative host formation. 2. The materials and implementation procedures shall not unduly perturb the safety functions of the host formation, or of any other component. 3. In the case of heat-generating waste, the engineered barriers shall be designed to provide complete containment of the wastes and associated contaminants at least through the thermal phase. 4. Waste types shall be divided into groups to be emplaced in separate sections of the repository. 5. Repository construction and operation shall proceed as soon as possible, but taking due account of scientific, technological, societal and economic considerations. 6. The different disposal galleries and repository sections, and the repository as a whole, shall be closed (access routes backfilled and sealed) as soon as practically possible following emplacement of the wastes. 7. There are preferences for permanent shielding of the wastes and for minimisation of operations in the underground. 8. There are preferences for materials and implementation procedures for which broad experience and knowledge already exists. 9. Repository planning shall assume that post-closure surveillance and monitoring will continue for as long as reasonably possible. Boundary conditions and strategic choices are translated into requirements related to the disposal system as a whole, to subsystems or to individual components of the system. These requirements can be either general or specific, and cover a wide range of domains, such as long- vi NIROND-TR E, June 2009

9 term safety, feasibility, which is taken to include operational safety and costs, knowledge of the waste to be disposed, knowledge of uncertainties and aspects of quality assurance. System development starts with the development of the so-called safety concept, defined as the integrated description of the elements on which the passive long-term safety of the proposed disposal system rests. This development is carried out on the basis of existing knowledge and understanding and of the requirements on the system and some of its subsystems. The description of the safety concept is based primarily on the safety functions fulfilled by the main components of the system and on the features of the system and its implementation that provide robustness. Together with the remaining requirements, the safety concept is translated into a structured set of so-called safety and feasibility statements, forming the cornerstone of the application of the safety strategy. Safety and feasibility statements, and the assessment of the level of support that is available for them, provide a useful tool to steer research and development activities, to guide the application of quality assurance procedures (such as completeness checks of the assessment basis and of safety and feasibility assessments, via lists of features, events and processes), and to structure the documentation of safety and feasibility cases. With the safety concept as a basis, the development of a repository design (and, as the programme matures, the development of implementation procedures), is carried out iteratively, in parallel with the development of the remainder of the assessment basis, comprising the existing knowledge and understanding and the analysis tools, and with so-called preparatory safety and feasibility assessments. Preparatory assessments, which are seen as the first step in assessing the safety and feasibility of the proposed disposal system, are partial assessments, generally taking the form of exploratory calculations (sensitivity analyses and/or model calculations of the evolution of the system or part(s) thereof). These aim to assess the impact of uncertainties on long-term safety and feasibility, qualitatively and, to the extent possible, quantitatively. Together with the development of the assessment basis, preparatory assessments generate multiple lines of evidence, arguments and analyses to support safety and feasibility statements. They also aim to identify any significant deficiencies in current knowledge and understanding and in the plans to address these in the research and development programme. Modifications can then be made in the programme and, should this appear necessary, in the strategic choices. Formal assessments of the proposed disposal system are carried out provided preparatory assessments indicate good prospects that these will confirm the safety and feasibility of the repository to the extent needed for the programme stage at hand. The formal assessments should provide a finer understanding of the remaining uncertainties and their safety relevance. If, as expected, the results of formal assessments, together with the other lines of evidence, arguments and analyses available, confirm the safety and feasibility of the proposed disposal system to a level that is judged adequate in view of the targeted decision, the main output of applying the safety strategy that is, the safety concept and a repository design with possible variants, the implementation procedures (depending on the current programme stage), and the evidence, arguments and analyses substantiating the structured set of safety and feasibility statements are used to compile a safety and feasibility case aimed to support the decision at hand. Should formal assessments not confirm the safety and/or the feasibility of the disposal NIROND-TR E, June 2009 vii

10 system, then the research and development programme, and possibly also the strategic choices, again need to be adjusted. Boundary conditions Strategic choices (based on the hypothesis of geological disposal in a poorly indurated clay) Requirements on system and some subsystems Requirements Requirements on subsystems and components System development + assessment of safety and feasibility Development: concept Safety concept Structured set of safety and feasibility statements Development: design, in parallel with remainder of assessment basis Assessment of safety and feasibility Repository design + implementation procedures Phenomenological description of disposal system evolution + uncertainties Assessment basis Methods, models, codes and datasets Preparatory assessment of S&F conclusive? yes Formal assessment of S&F conclusive? no no yes Guidance for adjusting the RD&D programme Input to SFCi (i = 1 n) Compile SFCi (i = 1 n) and move to next programme stage After a decision has been taken, the safety strategy is again applied iteratively, with a view to developing the necessary support for the decision to be requested at the end of the next programme stage. The application of the safety strategy will take account of any new boundary conditions that may have emerged. At least some of the requirements are thus expected to have to be adapted accordingly, and hence the structured set of safety and feasibility statements. The whole process of system development and assessment of its safety and feasibility will be repeated as necessary throughout the period of repository planning and licence applications. viii NIROND-TR E, June 2009

11 Table of contents 1 Introduction Need for a safety strategy Current scope of the safety strategy Purpose and structure of the report 5 2 The safety strategy: inputs, steps and outputs Input for applying the safety strategy Boundary conditions Assessment basis Major steps within the safety strategy Making of strategic choices Definition of the requirements System development Assessment of the safety and the feasibility Major outputs from the application of the safety strategy Input to the safety and feasibility case Feedback to system development and RD&D 24 3 Application of the safety strategy Current boundary conditions Strategic choices Requirements System development Safety concept Design choices and implementation procedures Tentative definition of safety and feasibility statements Statements concerning system definition and development Statements concerning long-term safety Statements concerning feasibility Statements concerning residual uncertainties 41 4 Further development and application of the safety strategy 43 Annex 1: Glossary 45 NIROND-TR E, June 2009 ix

12 Annex 2: Acronyms 49 References 51 x NIROND-TR E, June 2009

13 1 Introduction According to the International Atomic Energy Agency (IAEA), the fundamental safety objective of all radioactive waste management activities is to protect people and the environment from harmful effects of ionizing radiation [1]. Waste disposal, that is, emplacement of waste in an appropriate facility without the intention of retrieving it, is meant to provide that protection for present and future generations in such a way that the need for further action is minimised. As stated by the International Commission on Radiological Protection (ICRP) [2]: The principal objective of disposal of solid radioactive waste is the protection of current and future generations from the radiological consequences of waste produced by the current generation. Since the wastes and their packaging may contain toxic chemical substances, in some nations, including Belgium, the definition of the objective of disposal is extended to include protection from exposure to the chemically toxic, as well as radiologically toxic, constituents of the wastes, collectively designated as contaminants. Furthermore, some wastes have the potential to be misapplied (for example, diverted for terrorist or other unauthorised purposes) if adequate provision is not made for their security (safeguards). Geological disposal, that is, disposal in a repository constructed in a stable geological formation, is the solution currently recommended at the international level to protect man and the environment from the risks associated with high-level radioactive waste (HLW or category C waste, which generates heat and includes vitrified high-level waste and spent fuel declared as waste by its owner) and low- and intermediate-level waste, long-lived (LILW-LL or category B waste) (in particular, [1, 3, 4, 5, 6, 7]). This solution is based on a strategy of concentration and confinement of the radionuclides and other contaminants present in the wastes and their packaging, instead of a strategy of dilution and dispersion 1. It employs a system of engineered and natural barriers between the wastes and the surface environment in order to prevent these radionuclides and the other contaminants ever reaching it in such concentrations that they could present an unacceptable risk, for man and the environment. The protection provided by a geological disposal system, that is, a repository together with the host formation in which it is built, is achieved by passive means, meaning that it is not reliant on human society to provide, for example, supervising and monitoring structures, financial resources and human specialist knowledge. Passive systems have the advantage that their capacity to protect human beings is unlikely to be affected by the possibility of future instabilities in human society. Furthermore, they avoid imposing the burden of managing the disposed wastes on future generations that have not benefited from the activities that have given rise to these wastes. Consequently, in planning for geological disposal, the proposed disposal system must be shown to provide passive long-term safety if implemented according to design specifications and 1 In the case of radioactive waste, the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matters (commonly called the London Convention ), which Belgium has ratified, prohibits disposal at sea, which is an example of a dilute and disperse approach. NIROND-TR E, June

14 to be feasible to implement according to these specifications, with due regard to engineering practicality, operational safety and financial costs. The planning of a geological repository is a lengthy process, involving a range of detailed studies. In Belgium, research, development and demonstration (RD&D) activities related to the safety and feasibility of geological disposal as solution for the long-term management of category B&C wastes have been ongoing for many years. The R&D programme initiated as early as 1974 by the Belgian Nuclear Research Centre (SCK CEN) at Mol was pursued from the early 1980s under ONDRAF/NIRAS responsibility. These studies quickly focused on the Boom Clay formation at Mol Dessel, in northeastern Belgium, as a potential host formation for a geological repository, benefiting significantly from the existence of the HADES underground research laboratory at Mol, which was constructed at the beginning of the 1980s soon after the inception of the programme. The state of scientific and technical research on the possible disposal of B&C wastes in clay layers carried out in the period was presented in SAFIR (Safety Assessment and Feasibility 2 Interim Report) in 1989 [8] and the state of research carried out in the period was presented in SAFIR 2 (Safety Assessment and Feasibility Interim Report 2) in 2001 [9, 10]. Over time, geological disposal in Boom Clay had progressively become the reference solution of ONDRAF/NIRAS for the long-term management of category B&C wastes, geological disposal in Ypresian Clays being considered as an alternative solution. These solutions had not, however, been discussed at the societal level and had not been formally confirmed at the political (federal) level. SAFIR 2 and its national (Annex 5 in [9]) and international [11] peer reviews, the latter under the auspices of the Nuclear Energy Agency (NEA) of the Organisation for Economic Cooperation and Development (OECD), confirmed that the proposed solution of disposal in Boom Clay is promising: Boom Clay appears exempt from major flaws in terms of safety and feasibility for the wastes that had been studied most, namely vitrified high-level waste from reprocessing and, to a lesser extent, spent fuel. The conclusions of the NEA peer review mention, in particular, that the acquired knowledge and expertise enable the programme to move on to the process of choosing a site for implementing the disposal solution, while pursuing the RD&D necessary to reduce the remaining uncertainties. They mention, however, just as ONDRAF/NIRAS does in the context document [12] of SAFIR 2, that the conditions for implementing such a solution are not so far met. On the one hand, the solution should benefit from adequate societal support and its development should fit in a decision-making process, yet to be established, supported by the stakeholders. On the other hand, the legal and regulatory framework applicable to disposal should be made more specific and be supplemented. After the SAFIR 2 peer reviews, ONDRAF/NIRAS reassessed its B&C Programme to take account of recommendations, carried out further the RD&D and started to prepare its so-called Waste Plan, a general plan on the long-term management of radioactive waste in Belgium, focused on B&C wastes. This plan will be submitted to the government by the end of 2010 and should lead to a decision-in-principle regarding the type of solution to be implemented for the long- 2 In the B&C Programme, the term safety assessment refers to the assessment of long-term or post-closure safety. It excludes operational safety assessment, which is taken to fall within the scope of feasibility assessment. 2 NIROND-TR E, June 2009

15 term management of category B&C wastes, currently assumed to be geological disposal in a poorly indurated clay. Recently, ONDRAF/NIRAS also launched a societal dialogue around the choice of that solution and developed an outline of a stepwise decision-making process intended to help the programme converge towards the implementation of the solution that will be chosen through the decision-in-principle. The B&C Programme thus now comprises both an RD&D programme and societal aspects. In line with international practice, the geological repository for B&C wastes and its implementation are planned in a cautious, stepwise process, punctuated by the submission to the government of key documents marking the end of successive periods in the B&C Programme, called programme stages. The ends of the first and second stages of the B&C Programme were marked by SAFIR and SAFIR 2; the ends of forthcoming stages in the B&C Programme will be marked by so-called safety and feasibility cases [13], which will be submitted in support of decisions to be requested. According to the stepwise process, the proposed disposal system, and the means to assess its safety and feasibility, are developed iteratively and in parallel over a number of years and the system is repeatedly evaluated, refined or more fundamentally revised in the light of increasing knowledge, becoming progressively more firmly established. Safety and feasibility cases are defined by ONDRAF/NIRAS as follows in the context of the longterm management of category B&C wastes (HLW/LILW-LL). Safety and feasibility case An integration of scientific and technological arguments and evidence that describe, substantiate and, if possible, quantify the safety and feasibility of, and the level of confidence in, the proposed long-term management solution for HLW/LILW-LL, namely geological disposal, at a given stage of development. It consists of a series of documents supporting in particular the statements that the proposed disposal system will provide passive long-term safety if implemented according to design specifications; the proposed disposal system can be constructed, operated and progressively closed taking into account operational safety issues, and its costs can be covered with the current funding mechanism (in other words, it is feasible). These statements need to be supported at least to the degree necessary for the decision at hand. Uncertainties and open issues may remain as long as the safety and feasibility case discusses their significance in the context of the decision at hand and provides guidance for work to resolve those that have been found to be both relevant and significant to future development stages. SFC1, the first safety and feasibility case, planned for 2013, will be devoted to assessing the safety and feasibility of a disposal system in, on the one hand, one or several zones delineated in Boom Clay (SFC1 BC ) and, on the other hand, one or several zones delineated in Ypresian Clays (SFC1 YC ), with a view to supporting a decision of the type go for siting. The part devoted to Ypresian Clays will however be much less detailed than that devoted to Boom Clay, since it will focus on a study of the possibility to transfer the achievements related to geological disposal in Boom Clay to Ypresian Clays. If SFC1 leads to a decision of the type go for siting, which is likely to also be based on nontechnical elements, such as input from the recently launched societal dialogue, ONDRAF/NIRAS NIROND-TR E, June

16 will prepare an SFC2, intended to provide the competent authorities with the scientific and technical elements needed for enabling them to choose, with full knowledge of the facts, the site of the future repository, together with an integrated preliminary project of disposal system tailored to this site and that takes due account of local socio-economic conditions. Based on SFC2, a go-ahead for launching the detailed engineering studies needed to prepare licensing applications could be given. The decision of the type go for licensing would give the green light to the preparation of the licence application files and would thus mark the transition towards the project phase, that is, the phase aiming to bring the chosen integrated project from its current status to the status of a project that is ready to be implemented. 1.1 Need for a safety strategy A need to formalise the iterative approach to developing a geological disposal system adopted in the past and to refine and develop it further into a formal safety strategy was identified in the light of the findings of the NEA peer review of SAFIR 2 and of the necessity to organise the B&C Programme towards the production of decision-oriented documents the safety and feasibility cases that will be documented and presented to the competent authorities. The aim was to organise the approach in a more structured, better founded way so as to guide the RD&D activities required for generating the necessary input to build safety and feasibility cases, concentrating in particular on any major uncertainties or open questions that could call into question either the safety or feasibility of the proposed disposal system. To this end, ONDRAF/NIRAS set out to formalise the safety strategy for guiding, firstly, the stepwise development of a geological disposal system and its implementation procedures and, secondly, the licence applications required for repository construction, operation and closure 3. This process was initiated in 2006, in close collaboration with members of the two main partner organisations of ONDRAF/NIRAS involved in research and development, assessments, demonstrations and other activities aimed at establishing a safe and feasible geological disposal system: SCK CEN and the economic interest grouping EURIDICE, which brings together SCK CEN and ONDRAF/NIRAS. The collaboration led, in 2007, to a first draft report structuring and documenting the safety strategy in a formal manner [14], of which the present report is an update (Section 1.3). Many of the elements of this strategy were already implicitly contained in the existing approach, but some new elements were also incorporated. The expression safety strategy is used rather than long-term safety and feasibility strategy since long-term safety is the principal objective of disposal and is often simply referred to as safety. This objective will, however, only be achieved if the proposed disposal system is feasible to implement, and so considerations of feasibility as well as safety enter into the safety strategy. 3 According to current Belgian regulations, a safety and feasibility case is not a legally required document and does not replace the legally required licensing documents needed before constructing, operating and closing a disposal facility. A safety and feasibility case is, however, likely to support the licensing documents. 4 NIROND-TR E, June 2009

17 1.2 Current scope of the safety strategy The safety strategy has been developed on the basis of the experience, knowledge and understanding acquired in the context of the studies on geological disposal in Boom Clay, with the intention that it remains valid during the whole process of developing and implementing a safe geological repository. It is expected to be applicable to poorly indurated clays in general, thus also to Ypresian Clays, though this has still to be confirmed. It will have to be completed, refined and possibly adapted for the programme stages beyond SFC1, in particular to encompass aspects that it does not currently take into account, such as waste acceptance and siting. It will also have to take due account of aspects of safeguards. 1.3 Purpose and structure of the report This report presents a refinement of the first iteration of the safety strategy, as described in [14], based on the practical experience acquired in applying the strategy and on the further concepts developed in the framework of two other important reports for the future SFC1: the plan for the Safety and Feasibility Case 1 [13] and the long-term safety assessment methodology for the geological disposal of radioactive waste [15]. This refined strategy does not contradict the first description. As in the earlier report on the safety strategy, the present report is first and foremost a report presenting a working methodology, whose application is then illustrated. It defines the aims of the safety strategy and describes its main elements, in terms of inputs, successive steps and (intermediate) outputs, including how these are linked together (Figure 2 in Chapter 2). These outputs include a description of the disposal system currently under consideration, as well as the conceptual thinking behind associated choices. The present report remains a living document, that will be discussed with the Belgian safety authorities in the period It also provides a basis for continuing discussions and contributions from ONDRAF/NIRAS staff, partner organisations and subcontractors. A final documented view on safety strategy, that will integrate the still-to-be-formalised feasibility assessment methodology, which includes operational safety, would then be available by The remainder of this report is structured as follows. Chapter 2 defines the safety strategy and describes its inputs, major steps and outputs. Chapter 3 gives examples of the application of the safety strategy at the current stage of the B&C Programme, with a focus on vitrified high-level waste and spent fuel disposal. Much of the discussion relates to choices in the design of the engineered components of the repository. (However, ONDRAF/NIRAS is, at the same time, continuing RD&D activities to improve its knowledge of the Boom Clay and the surrounding geological environment.) Chapter 4 describes how the safety strategy will be further developed and applied, and the present report further developed, in the coming years. The report ends with a glossary containing definitions of key terms and a list of acronyms. NIROND-TR E, June

18 6 NIROND-TR E, June 2009

19 2 The safety strategy: inputs, steps and outputs The safety strategy is defined by the B&C Programme as follows: Safety strategy The iterative process guiding, firstly, the stepwise development of plans for a safe and feasible geological repository and its implementation procedures and, secondly, the successive licence applications, this based on a concentrate and confine approach and taking account of all relevant boundary conditions (Figure 1). More specifically, the safety strategy is the iterative process for developing the safety concept and the design of a geological repository and for acquiring evidence, developing arguments and carrying out analyses to show that these are both safe and feasible to implement as planned. The process is designed to be flexible, allowing, for example, for the incorporation of new scientific information as it becomes available. The safety strategy can also be viewed as the whole of coordinated actions that connect together the various elements contributing to developing a geological repository and that integrate them through an iterative process. Programme stage i : RD&D Boundary conditions Safety strategy to develop safety concept + repository design SFCi (i = 1 to n) no Does case support a 1 st licence application? yes towards implementation Programme stage j : implementation Safety strategy to support further applications SFCj (j = 1 to m) no Does case support a closure licence application? yes towards repository closure Figure 1 Iterative process of repository planning leading to eventual licence applications, showing the relationship between the safety strategy and the successive safety and feasibility cases that will be presented by ONDRAF/NIRAS to its supervising authority at key decision points in the B&C Programme. The figure is based on the assumption that the requested decisions are taken as planned. NIROND-TR E, June

20 The term safety concept is defined by the B&C Programme as follows: Safety concept The integrated description of the elements on which the passive long-term safety of the proposed system for the disposal of category B&C wastes rests, where this description, which is given at a level of detail appropriate to the stage of disposal system development, includes (1), the safety functions provided by the main components of the system and its geological coverage and (2), features of the system and its implementation providing robustness by ensuring that each of the safety functions will, in reality, be fulfilled over at least the assigned time frames, irrespective of any remaining uncertainties. In the safety strategy (Figure 2), system development and assessment of its safety and feasibility are constrained both by boundary conditions (Section 2.1.1) and by a number of strategic choices (Section 2.2.1) made by ONDRAF/NIRAS, which are themselves constrained by the boundary conditions. These strategic choices and the boundary conditions are translated into requirements (Section 2.2.2) related to the disposal system as a whole, to subsystems or to individual components of the system with a view to meeting the objectives of passive long-term safety and feasibility. System development and assessment of its safety and feasibility are carried out largely in parallel, iteratively. System development (Section 2.2.3) starts with the development of the safety concept, on the basis of existing knowledge and understanding and of the requirements on the system and some of its subsystems. The safety concept, together with the remaining requirements, is translated into a structured set of statements, collectively designated as safety and feasibility statements, used as a guiding tool throughout further system development and safety and feasibility assessments. With the safety concept as a basis, the development of a repository design (and, as the programme matures, the development of implementation procedures) is carried out iteratively, in parallel with the development of the remainder of the assessment basis, comprising the existing knowledge and understanding and the analysis tools, and with preparatory safety and feasibility assessments (Section 2.1.2). Preparatory assessments, which are seen as the first step in assessing the safety and feasibility of the proposed disposal system (Section 2.2.4), are partial assessments, generally taking the form of exploratory calculations, aimed to assess the impact of uncertainties on long-term safety and feasibility, qualitatively and, to the extent possible, quantitatively. Together with the development of the assessment basis, they generate multiple lines of evidence, arguments and analyses to support safety and feasibility statements. They also aim to identify any significant deficiencies in current knowledge and understanding and in the plans to address these in the RD&D programme. Modifications can then be made in the programme and, should this appear necessary, in the strategic choices (Section 2.3.2). Formal assessments of the proposed disposal system are carried out provided preparatory assessments indicate good prospects that these will confirm the safety and feasibility of the repository to the extent needed for the programme stage at hand. The formal assessments should provide a finer understanding of the remaining uncertainties and their safety relevance (Section 2.2.4). Together with the other lines of evidence, arguments and analyses available, they then provide input to the safety and feasibility case, in the form of the safety concept and a repository design with possible variants, implementation procedures (depending on the current programme 8 NIROND-TR E, June 2009

21 stage), and evidence, arguments and analyses (Section 2.3.1). Should formal assessments not confirm the safety and/or the feasibility of the disposal system, then the RD&D programme, and possibly also the strategic choices, again need to be adjusted (Section 2.3.2). Boundary conditions (Section 2.1.1) Strategic choices (Section 2.2.1) (based on the hypothesis of geological disposal in a poorly indurated clay) Requirements on system and some subsystems Requirements (Section 2.2.2) Requirements on subsystems and components System development + assessment of safety and feasibility Safety concept Development: concept (Section 2.2.3) Structured set of safety and feasibility statements Development: design, in parallel with remainder of assessment basis (Section 2.2.3) Develop knowledge and understanding Assessment of safety and feasibility (Section 2.2.4) Assess support for S&F statements through preparatory assessment Develop repository design Build assessment toolbox Enough support to go to formal assessment? no Design (materials, layout, etc.) Phenomenological description of disposal system evolution + uncertainties Methods, models, codes and datasets yes Perform formal assessment of S&F (Re)consider implementation options Implementation procedures Assessment basis (Section 2.1.2) Formal assessment of S&F conclusive? yes no Guidance for adjusting the RD&D programme (Section 2.3.2) Input to SFCi (i = 1 n) (Section 2.3.1) Compile SFC i (i = 1 n) and move to next programme stage Figure 2 Overview of the safety strategy, which is the iterative process guiding, firstly, the stepwise development of plans for a safe and feasible geological repository and its implementation procedures and, secondly, the successive licence applications, this based on a concentrate and confine approach and taking account of all relevant boundary conditions. The iterative nature of system development at the design level (and, to a lesser degree, at the level of the safety concept) and the role of assessments in system development are indicated by the feedback loops. NIROND-TR E, June

22 Several iterations may be needed within every programme stage in order to develop a design that satisfies all relevant requirements, an assessment basis that is adequate for the purposes of safety and feasibility assessments, and the evidence, arguments and analyses to support a safety and feasibility case that is adequate for the purposes of the next programme stage. Some of these iterations may consist, for example, of a designer working alone and assessing in qualitative terms the advantages and disadvantages of different options. Other iterations may require for example a multidisciplinary team to perform a detailed evaluation of the potential impact of a specific feature on long-term safety. The safety strategy is not expected to be particularly prone to change, in terms of the elements and sequence of steps foreseen, as the programme progresses from one stage to the next. The safety strategy will, however, need to be completed and refined (Section 1.2). Should significant changes need to be brought to it, their impact on past work would then need to be examined. Although the safety strategy is expected to remain relatively stable, its outputs themselves will progressively develop as the safety strategy is repeatedly applied. At early stages of the B&C Programme, those of SAFIR and SAFIR 2, the decision to proceed from one stage to the next was based on a demonstration of the broad viability of disposal. For this purpose, a broadbrush description of at least some aspects of the disposal system the main components, what functions they performed and how they were to be implemented was found to be sufficient, and quantitative assessments could be limited to long-term safety. At later stages, more formal analyses of additional factors such as operational safety will also be made. It will then be necessary not only to show that the safety concept and the repository design are fit for purpose in that they can be shown to provide passive long-term safety and are feasible to implement, but also to select between different potentially suitable design variants, given that more than one design may conform to the safety concept and satisfy safety and feasibility requirements. For choosing between design options, more detailed descriptions of the safety concept and possible designs will have to be developed and assessed in terms of all relevant factors. Thus, although the same strategy will be applied repeatedly at successive programme stages, the outcome in terms of the description of safety concept and repository design, and in terms of the evidence, arguments, and analyses to support a safety and feasibility case, will vary as the programme develops, decisions are made, knowledge is acquired and the assessment basis is refined. This support includes not only work carried out within the B&C Programme, but also within other disposal programmes internationally, and advances in science and technology in general. The need for wide-ranging evidence and arguments to support the safety and feasibility case is likely to grow as the programme proceeds through successive stages. Some less essential issues that, for example, were deferred at early stages, will have to be addressed at later stages. The inputs, major steps and outputs of the safety strategy, which are major foundations of safety and feasibility cases, are detailed in Sections 2.1, 2.2 and 2.3, respectively. 10 NIROND-TR E, June 2009

23 2.1 Input for applying the safety strategy At every programme stage, the application of the safety strategy is constrained by the so-called boundary conditions and uses the existing knowledge base and analysis tools of the assessment basis Boundary conditions The application of the safety strategy must take account of boundary conditions, which the B&C Programme groups into the following five categories: ONDRAF/NIRAS working hypotheses, international framework, Belgian legal and regulatory framework, institutional policy, other stakeholder conditions. The relevant boundary conditions must be identified exhaustively in order to ensure completeness of the strategic choices and of the requirements to which they lead. Except for the working hypotheses, all of them originate from actors that are external to ONDRAF/NIRAS. Many of the existing boundary conditions (Section 3.1) are likely to be modified during repository planning. In addition, new boundary conditions will emerge as, for example, the safety authorities (Federal Agency for Nuclear Control or FANC) develop further the existing Belgian legal and regulatory framework and as the safety concept, the repository design and possible variants are discussed with various stakeholders. The process defined by the safety strategy must be repeated to account for any such changes when appropriate ONDRAF/NIRAS working hypotheses The ONDRAF/NIRAS working hypotheses are hypotheses that ONDRAF/NIRAS has had to make in order to be able to plan and carry out its B&C Programme in a focused way. They currently amount to saying that ONDRAF/NIRAS reference solution for the long-term management of category B&C wastes is geological disposal in Boom Clay, that this solution should be implemented as soon as possible, and that geological disposal in Ypresian Clays, also as soon as possible, is an alternative solution. During the course of the programme, these hypotheses will be considered by third parties outside ONDRAF/NIRAS, such as the Federal Government, the supervising authority, FANC and local partners, and they will be confirmed, elaborated, modified or rejected as a result of their deliberations International framework The international framework has been divided into three groups of items respectively called conventions and directives, general texts on safety and radiological protection, and texts and practice regarding radioactive waste management and disposal, by international organisations NIROND-TR E, June

24 that are active in nuclear-related matters (for instance, the IAEA, the ICRP, the NEA/OECD and the European Union), and also, where relevant, guidance observed in other industries. The international framework is not compulsory, except for the European directives, which must be implemented through promulgation of Belgian legislation; the conventions and treaties to which Belgium is a signatory, for example, the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter (London Convention, 1972) and its Protocol (1996), the Joint Convention on the Safety of Spent Nuclear Fuel and the Safety of Radioactive Waste Management [16], the Treaty establishing the European Atomic Energy Community (Euratom, 1957) and the Treaty on the Non- Proliferation of Nuclear Weapons (1968). ONDRAF/NIRAS considers it appropriate, however, to take all relevant aspects of the international framework into consideration for all its activities. Conventions and directives include treaties and directives at the European level and conventions and treaties at the wider international level. The general texts on safety and radiological protection include the basic principles of radiological protection of the ICRP [17, 18], the basic radiological standards defined through the so-called international Basic Safety Standards of the IAEA [19], which have been incorporated into European legislation [20] and Belgian legislation [21 and its subsequent amendments], and the Fundamental Safety Principles of the IAEA [1, 3]. The texts on radioactive waste management and disposal include recommendations of the ICRP on the application of radiological protection principles to radioactive waste disposal [22, 2], and standards and principles of the IAEA [1, 3, 7, 23]. Relevant general practice at the international level includes in particular the two essential principles of robustness and demonstrability, where robustness is closely related to the demonstrability of long-term safety. Robustness refers to the ability of a disposal system to provide safety in all reasonably foreseeable circumstances despite the remaining uncertainties as regards its evolution and functioning, which entails that its components fulfil their assigned long-term safety functions in those circumstances despite the remaining uncertainties as regards their exact behaviour. Long-term safety functions are defined as the functions that a disposal system should fulfil so as to achieve its fundamental objective of providing long-term safety through a concentration and confinement strategy, while limiting the burden placed on future generations (for example, [1, 3, 7, 23]). Demonstrability is achieved by adopting methods of system development that make it possible to demonstrate (in the sense of providing convincing arguments) that safety will be provided no matter what reasonably foreseeable disturbances may impact on system evolution. Robustness and demonstrability favour concepts and designs that incorporate features such as defence in depth and flexibility, are simple in terms of their features and evolution, and use well-understood materials and techniques. 12 NIROND-TR E, June 2009

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader

More information

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND 1. NATIONAL FRAMEWORK FOR MANAGEMENT AND REGULATION OF RADIOACTIVE WASTE AND DECOMMISSIONING 1.1 National framework 1.1.1 Overview of national

More information

Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations

Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE CONTAINMENT: CHEMICAL PLANTS Document Type: Nuclear Safety Technical Assessment Guide Unique Document ID and Revision No: NS-TAST-GD-021 Revision 2 Date Issued: March 2013 Review Date: March

More information

Deployment Plan 2011 2016

Deployment Plan 2011 2016 IGD-TP Implementing Geological Disposal of Radioactive Waste Technology Platform Deployment Plan 2011 2016 June 2012 IGD-TP Implementing Geological Disposal of Radioactive Waste Technology Platform Deployment

More information

International Action Plan On The Decommissioning of Nuclear Facilities

International Action Plan On The Decommissioning of Nuclear Facilities International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical

More information

United Kingdom Nirex Limited CONTEXT NOTE. 4.5: Security. September 2005 Number: 484118

United Kingdom Nirex Limited CONTEXT NOTE. 4.5: Security. September 2005 Number: 484118 United Kingdom Nirex Limited CONTEXT NOTE 4.5: Security September 2005 Number: 484118 CONTEXT NOTE 4.5: Security September 2005 Number: 484118 Conditions of Publication This technical note is made available

More information

Cost Comparison of Spent Fuel Storage and Deep Geological Disposal

Cost Comparison of Spent Fuel Storage and Deep Geological Disposal Unstable, Carbon Constrained dworld Cost Comparison of Spent Fuel Storage and Deep Geological Disposal GMS Abingdon Ltd gmsabingdon@btinternet.com Two Assertions That the costs of storing spent fuel above

More information

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission Security and Safeguards Considerations in Radioactive Waste Management Raoul Awad Director General, Directorate of Security and Safeguards Canadian Nuclear Safety Commission Radioactive Waste Management

More information

SAPIERR PAVES THE WAY TOWARDS EUROPEAN REGIONAL REPOSITORY

SAPIERR PAVES THE WAY TOWARDS EUROPEAN REGIONAL REPOSITORY SAPIERR PAVES THE WAY TOWARDS EUROPEAN REGIONAL REPOSITORY Vladan Štefula DECOM Slovakia Jána Bottu 2, 917 01 Trnava, Slovakia stefula@decom.sk Charles McCombie ARIUS Täfernstrasse 11, 5405 Baden, Switzerland

More information

Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository

Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository Developing a Safety Case for Ontario Power Generation s L&ILW Deep Geologic Repository T. Kempe, P. Gierszewski, R. Heystee, M. Jensen and H. Leung Ontario Power Generation, Canada NEA/EC/IAEA Symposium

More information

Status, responsibilities and missions of ANDRA (France)

Status, responsibilities and missions of ANDRA (France) Status, responsibilities and missions of ANDRA (France) Marie-Claude DUPUIS ANDRA - CEO Contents 1. Legal framework, organization and general information 2. ANDRA today: An Industrial Operator An Innovating

More information

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 - CRAFT - The International Project on COMPLIMENTARY SAFETY

More information

Please send any queries regarding this document to claudio.pescatore@oecd.org

Please send any queries regarding this document to claudio.pescatore@oecd.org Unclassified English - Or. English Unclassified NEA/RWM/PEER(2012)2 Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development 12-Jun-2012 English

More information

Position paper on the implications of deep sea disposal of radioctive waste

Position paper on the implications of deep sea disposal of radioctive waste Agenda Item 4 English only OSPAR Convention for the Protection of the Marine Environment of the North-East Atlantic Meeting of the Radioactive Substances Committee (RSC) Stockholm (Sweden): 20-23 April

More information

NURTURE OF HUMAN RESOURCES FOR GEOLOGICAL REPOSITORY PROGRAM. Mr. A. Fujiwara Radioactive Waste Management Funding and Research Center (RWMC), Japan

NURTURE OF HUMAN RESOURCES FOR GEOLOGICAL REPOSITORY PROGRAM. Mr. A. Fujiwara Radioactive Waste Management Funding and Research Center (RWMC), Japan NURTURE OF HUMAN RESOURCES FOR GEOLOGICAL REPOSITORY PROGRAM Mr. A. Fujiwara Radioactive Waste Management Funding and Research Center (RWMC), Japan Mr. T. Tsuboya Radioactive Waste Management Funding and

More information

List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page

List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page Overview 1 The Radiation Protection (Medical Exposures) Directive 11 The Public Information (Radiological Emergency)

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

2.0 Land Quality Programme

2.0 Land Quality Programme 2.0 Land Quality Programme The Sellafield site has a legacy of ground contamination from its historical use as a Royal Ordnance factory and its subsequent development as a nuclear facility. The ground

More information

The International Peer Review under Aegis of the OECD/NEA, of SKB s Post-closure Safety Case for a Spent Fuel Repository in Sweden 14641

The International Peer Review under Aegis of the OECD/NEA, of SKB s Post-closure Safety Case for a Spent Fuel Repository in Sweden 14641 The International Peer Review under Aegis of the OECD/NEA, of SKB s Post-closure Safety Case for a Spent Fuel Repository in Sweden 14641 Claudio Pescatore OECD Nuclear Energy Agency (NEA), Paris, France.

More information

Report. Radioactive Waste Disposal Facilities Safety Reference Levels

Report. Radioactive Waste Disposal Facilities Safety Reference Levels Report Radioactive Waste Disposal Facilities Safety Reference Levels - 22 December 2014 Radioactive Waste Disposal Facilities Safety Reference Levels Table of Content - Executive Summary 4 WENRA Policy

More information

Nuclear Power, Nuclear Waste and Geological Disposal

Nuclear Power, Nuclear Waste and Geological Disposal Introduction Nuclear Power, Nuclear Waste and Geological Disposal Nuclear Power, Nuclear Waste and Geological Disposal Charles McCombie Arius Association 5405 Baden, Switzerland For many years, nuclear

More information

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Provisional Translation Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management National Report of Japan for the Second Review Meeting October 2005 Government

More information

Multinational and Regional Disposal Initiatives: Nearing a Turning Point. Charles McCombie and Neil Chapman

Multinational and Regional Disposal Initiatives: Nearing a Turning Point. Charles McCombie and Neil Chapman Multinational and Regional Disposal Initiatives: Nearing a Turning Point Charles McCombie and Neil Chapman Arius Association, Täfernstrasse 11, 5405 Baden, Switzerland Charles.McCombie@arius-world.org

More information

IGD-TP Implementing Geological Disposal of Radioactive Waste Technology Platform. Strategic Research Agenda 2011

IGD-TP Implementing Geological Disposal of Radioactive Waste Technology Platform. Strategic Research Agenda 2011 IGD-TP Implementing Geological Disposal of Radioactive Waste Technology Platform Strategic Research Agenda 2011 Tänd ett lager: P, R eller TR. IGD-TP Strategic Research Agenda (SRA) July 2011 ISBN 978-91-979786-0-6

More information

New legislation in the nuclear field in Sweden

New legislation in the nuclear field in Sweden 1 New legislation in the nuclear field in Sweden A presentation at INLA Congress 2012 (Manchester) - 11 October 2012 by Ingvar Persson, Swedish National Council for Nuclear Waste and PP 1 Presentation

More information

IAEA Recommendations on a Decommissioning Plan (DP)

IAEA Recommendations on a Decommissioning Plan (DP) IAEA Recommendations on a Decommissioning Plan (DP) Ernst Warnecke, IAEA-NSRW Patrick O Sullivan, IAEA-NEFW Research Reactor Decommissioning Demonstration Project (R²D²P) Review of a Decommissioning Plan

More information

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission Background The U.S. Nuclear Regulatory Commission (NRC)

More information

Implementation of a Quality Management System for Aeronautical Information Services -1-

Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models

Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models 2013 Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models 1 Contents 1 Context... 1 2 General... 2 3 Guidelines on Pre-application for Internal Models...

More information

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY M. DUTZER, J.P. VERVIALLE, P. CHARTON Andra - Agence Nationale pour la Gestion des Déchets Radioactifs 1-7 rue Jean Monnet, 92298 Châtenay-Malabry

More information

Anhörung Rückholung/Rückholbarkeit hoch radioaktiver Abfälle aus einem Endlager, Reversibilität von Entscheidungen

Anhörung Rückholung/Rückholbarkeit hoch radioaktiver Abfälle aus einem Endlager, Reversibilität von Entscheidungen Geschäftsstelle Kommission Lagerung hoch radioaktiver Abfallstoffe gemäß 3 Standortauswahlgesetz 16. Sitzung der Kommission am 2. Oktober 2015 Anhörung Rückholung/Rückholbarkeit hoch radioaktiver Abfälle

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 3.3.2015 COM(2015) 78 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the work under the nuclear decommissioning assistance

More information

Management of Radioactive Waste & Materials Inventory Data

Management of Radioactive Waste & Materials Inventory Data Management of Radioactive Waste & Materials Inventory Data Critical Enabler Contents Executive Summary... 3 1. Introduction... 4 2. Inventory Data Users... 5 3. Current Situation... 7 3.1 Management of

More information

FUNDAMENTALS OF A STATE S NUCLEAR SECURITY REGIME: OBJECTIVE AND ESSENTIAL ELEMENTS

FUNDAMENTALS OF A STATE S NUCLEAR SECURITY REGIME: OBJECTIVE AND ESSENTIAL ELEMENTS IAEA NUCLEAR SECURITY SERIES NO. FUNDAMENTALS OF A STATE S NUCLEAR SECURITY REGIME: OBJECTIVE AND ESSENTIAL ELEMENTS Revision 17.04 Page 1 of 20 FOREWORD [TO BE PROVIDED BY THE SECRETARIAT AT A LATER TIME]

More information

Nuclear Energy of Ukraine - History

Nuclear Energy of Ukraine - History Nuclear Energy of Ukraine - History 1950-s Uranium Industry was started 1962 Ministry of Energy and Electrification of Ukraine was established(ukraine a Republic of Soviet Union) 1965 Unique Energy System

More information

Preliminary information on UK and Scotland. UK Environmental Law Association: making the law work for a better environment

Preliminary information on UK and Scotland. UK Environmental Law Association: making the law work for a better environment UKELA s response to Milieu consultants questionnaire on the effectiveness of the Recommendation 2014/70/EU on exploration and production of hydrocarbons (such as shale gas) using high- volume hydraulic

More information

ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle

ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle VISION STATEMENT ASTM C26 continues to be the Internationally-recognized leader in the development of consensus standards for the Nuclear Fuel

More information

AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM. (As amended 30 November 2007)

AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM. (As amended 30 November 2007) AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM (As amended 0 November 2007) AGREEMENT ON AN INTERNATIONAL ENERGY PROGRAM (As amended 0 November 2007) TABLE OF CONTENTS PREAMBLE Article 1... 6 Chapter I EMERGENCY

More information

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1)

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1) Licensing Process for New Nuclear Power Plants in Canada INFO-0756 (Revision 1) May 2008 Licensing Process for New Nuclear Power Plants in Canada Minister of Public Works and Government Services Canada

More information

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November

More information

Nuclear third-party insurance and liability.

Nuclear third-party insurance and liability. ROADMAP TITLE OF THE INITIATIVE Nuclear third-party insurance and liability. LEAD DG RESPONSIBLE UNIT DG ENER.D.1 DATE OF ROADMAP 08 / 2013 This indicative roadmap is provided for information purposes

More information

OPEN SOURCE INFORMATION ACQUISITION, ANALYSIS, AND INTEGRATION IN THE IAEA DEPARTMENT OF SAFEGUARDS 1

OPEN SOURCE INFORMATION ACQUISITION, ANALYSIS, AND INTEGRATION IN THE IAEA DEPARTMENT OF SAFEGUARDS 1 JAMES MARTIN CENTER FOR NONPROLIFERATION STUDIES Twentieth Anniversary Celebration: The Power and Promise of Nonproliferation Education and Training December 3-5, 2009 OPEN SOURCE INFORMATION ACQUISITION,

More information

Project Execution Guidelines for SESAR 2020 Exploratory Research

Project Execution Guidelines for SESAR 2020 Exploratory Research Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project

More information

Safety Analysis for Nuclear Power Plants

Safety Analysis for Nuclear Power Plants Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs

More information

Authorisation and Restriction Newsletter

Authorisation and Restriction Newsletter Authorisation and Restriction Newsletter August 2010, N 1 The information contained in this document is intended for guidance only and whilst the information is provided in utmost good faith and has been

More information

Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015

Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015 Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015 Office for Nuclear Regulation page 1 of 27 Executive summary The Office for Nuclear Regulation (ONR) is the

More information

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall

More information

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management

More information

IAEA Safety Standards for Regulatory Activities

IAEA Safety Standards for Regulatory Activities Safety Standards for Regulatory Activities April 2010 Gustavo Caruso Regulatory Activities Section Division of Nuclear Installation Safety International Atomic Energy Agency Content Safety Standards and

More information

ACT ON LIABILITY FOR NUCLEAR DAMAGE

ACT ON LIABILITY FOR NUCLEAR DAMAGE ACT ON LIABILITY FOR NUCLEAR DAMAGE Published in the Official Gazette of the Republic of Slovenia - International Treaties, No. 77/2010 UNOFFICIAL TRANSLATION I. GENERAL PROVISIONS Article 1 (Contents)

More information

INSPIRE, The Dutch way Observations on implementing INSPIRE in the Netherlands

INSPIRE, The Dutch way Observations on implementing INSPIRE in the Netherlands European Commission DG Environment, Unit D.4 Governance, Information & Reporting 1049 Brussels Belgium Dir. Ruimtelijke Ontwikkeling Plesmanweg 1-6 Den Haag Contactpersoon Per mal INSPIRE, The Dutch way

More information

COUNCIL DIRECTIVE 2013/51/EURATOM

COUNCIL DIRECTIVE 2013/51/EURATOM L 296/12 Official Journal of the European Union 7.11.2013 DIRECTIVES COUNCIL DIRECTIVE 2013/51/EURATOM of 22 October 2013 laying down requirements for the protection of the health of the general public

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

ONDRAF/NIRAS Repository Concept for Category C Wastes First full draft report

ONDRAF/NIRAS Repository Concept for Category C Wastes First full draft report Belgian agency for radioactive waste and enriched fissile materials Evolution of the Near-Field of the ONDRAF/NIRAS Repository Concept for Category C Wastes First full draft report Editor and principal

More information

Kingdom of Belgium. May 2009. National Report

Kingdom of Belgium. May 2009. National Report Kingdom of Belgium Third meeting of the Contracting Parties to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management May 2009 National Report This

More information

SANITARY AND PHYTOSANITARY MEASURES (SPS)

SANITARY AND PHYTOSANITARY MEASURES (SPS) TEXTUAL PROPOSAL SANITARY AND PHYTOSANITARY MEASURES (SPS) Article 1 Scope and coverage This Chapter applies to all SPS measures that may, directly or indirectly, affect trade between the Parties. This

More information

The Netherlands response to the public consultation on the revision of the European Commission s Impact Assessment guidelines

The Netherlands response to the public consultation on the revision of the European Commission s Impact Assessment guidelines The Netherlands response to the public consultation on the revision of the European Commission s Impact Assessment guidelines Introduction Robust impact assessment is a vital element of both the Dutch

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Proposal for an Interinstitutional Agreement on Better Regulation

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Proposal for an Interinstitutional Agreement on Better Regulation EUROPEAN COMMISSION Strasbourg, 19.5.2015 COM(2015) 216 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Proposal for an Interinstitutional Agreement on Better Regulation

More information

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1

More information

TR-01-16. Feasibility Studies Östhammar, Nyköping, Oskarshamn, Tierp, Hultsfred and Älvkarleby. Summary Report. Technical Report

TR-01-16. Feasibility Studies Östhammar, Nyköping, Oskarshamn, Tierp, Hultsfred and Älvkarleby. Summary Report. Technical Report Technical Report TR-01-16 Feasibility Studies Östhammar, Nyköping, Oskarshamn, Tierp, Hultsfred and Älvkarleby Summary Report Svensk Kärnbränslehantering AB June 2001 Svensk Kärnbränslehantering AB Swedish

More information

REGULATION (EEC) No 2309/93

REGULATION (EEC) No 2309/93 REGULATION (EEC) No 2309/93 Council Regulation (EEC) No 2309/93 of 22 July 1993 laying down Community procedures for the authorization and supervision of medicinal products for human and veterinary use

More information

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES Introduction 1. This statement of the UK Government and devolved administrations policy on the decommissioning of nuclear facilities updates

More information

How To Strengthen Nuclear Security

How To Strengthen Nuclear Security COUCIL OF TH UROPA UIO N The Hague, 25 March 2014 8193/14 (OR. en) PRSS 187 The Hague uclear Security Summit Communiqué We, the leaders, met in The Hague on 24 and 25 March 2014 to strengthen nuclear security,

More information

NEGOTIATING FRAMEWORK FOR TURKEY. Principles governing the negotiations

NEGOTIATING FRAMEWORK FOR TURKEY. Principles governing the negotiations NEGOTIATING FRAMEWORK FOR TURKEY Principles governing the negotiations 1. The negotiations will be based on Turkey's own merits and the pace will depend on Turkey's progress in meeting the requirements

More information

A guide to the Defence Trade Controls Amendment Bill 2015

A guide to the Defence Trade Controls Amendment Bill 2015 A guide to the Defence Trade Controls Amendment Bill 2015 Introduction This guide has been produced to support public consultation on the Defence Trade Controls Amendment Bill 2015 (the Amendment Bill).

More information

Draft IAEA Action Plan on Nuclear Safety

Draft IAEA Action Plan on Nuclear Safety Atoms for Peace Board of Governors General Conference GOV/2011/59-GC(55)/14 Date: 5 September 2011 For official use only Item 3(b) of the Board's provisional agenda (GOV/2011/46) Item 14(b) of the Conference's

More information

EBA FINAL draft Regulatory Technical Standards

EBA FINAL draft Regulatory Technical Standards EBA/RTS/2015/03 03 July 2015 EBA FINAL draft Regulatory Technical Standards on resolution colleges under Article 88(7) of Directive 2014/59/EU Contents 1. Executive summary 3 2. Background and rationale

More information

Basic principles of radioactive waste management

Basic principles of radioactive waste management Title of publication Basic principles of radioactive waste management An introduction to the management of higher activity radioactive waste on nuclear licensed sites Joint guidance from the Office of

More information

Code of Conduct on the Safety and Security of Radioactive Sources

Code of Conduct on the Safety and Security of Radioactive Sources FOREWORD In recent years there has been a growing awareness of the potential for accidents involving radiation sources, some such accidents having had serious, even fatal, consequences. More recently still,

More information

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 September 2013 Accident Management: Severe Accident Regulatory Document REGDOC-2.3.2 Canadian

More information

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Mexico started in 1990 and by 2002 there were

More information

IAEA Action Plan on Nuclear Safety 1

IAEA Action Plan on Nuclear Safety 1 IAEA Action Plan on Nuclear Safety 1 In June 2011 a Ministerial Conference on Nuclear Safety was convened to direct, under the leading role of the IAEA, the process of learning and acting upon lessons

More information

Energy Security: Role of Regional Cooperation

Energy Security: Role of Regional Cooperation Energy Security: Role of Regional Cooperation Traian Chebeleu Today s Conference is dedicated to a topic that has deeply preoccupied the governments and the business communities in the Emerging Europe,

More information

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT Australia is one of the only developed countries that does not use electricity, either indigenous

More information

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document. 2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...

More information

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION

FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION OFFICE OF THE MINISTER OF COMMERCE The Chair CABINET ECONOMIC GROWTH AND INFRASTRUCTURE COMMITTEE FINANCIAL ADVISERS REGULATION: VOLUNTARY AUTHORISATION PROPOSAL 1 I propose that regulations be promulgated

More information

Ocean Dumping Act: A Summary of the Law

Ocean Dumping Act: A Summary of the Law Claudia Copeland Specialist in Resources and Environmental Policy December 15, 2010 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of Congress 7-5700 www.crs.gov

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM 13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker

More information

Government Degree on the Safety of Nuclear Power Plants 717/2013

Government Degree on the Safety of Nuclear Power Plants 717/2013 Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and

More information

Nuclear Waste. - Barriers, Biosphere and Society. KASAM s Review of the Swedish Nuclear Fuel and Waste Management Co s (SKB s) RD&D Programme 2004

Nuclear Waste. - Barriers, Biosphere and Society. KASAM s Review of the Swedish Nuclear Fuel and Waste Management Co s (SKB s) RD&D Programme 2004 Nuclear Waste - Barriers, Biosphere and Society SOU 2005:47 Nuclear Waste - Barriers, Biosphere and Society KASAM s Review of the Swedish Nuclear Fuel and Waste Management Co s (SKB s) RD&D Programme 2004

More information

Nuclear Legislation in

Nuclear Legislation in Nuclear Legislation in OECD and NEA Countries Regulatory and Institutional Framework for Nuclear Activities Nuclear Legislation in OECD Countries OECD 2008 I. General regulatory regime... 3 1. Introduction...

More information

Financial Services Guidance Note Outsourcing

Financial Services Guidance Note Outsourcing Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14

More information

UQ Student Energy Network

UQ Student Energy Network UQ Student Energy Network Kieran Sullivan UQ SEN President Wednesday 29 th October GHD Auditorium, AEB Email: uqenergyclub@gmail.com Facebook: UQ Student Energy Network UQ STUDENT ENERGY NETWORK (UQ SEN)

More information

Old Phase Description New Phase Description

Old Phase Description New Phase Description Prologue This amendment of The FAA and Industry Guide to Product Certification (CPI Guide) incorporates changes based on lessons learned and supports the broader use of this guide by providing additional

More information

Competency Standard for Registration as a Professional Engineer

Competency Standard for Registration as a Professional Engineer ENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System Competency Standard for Registration as a Professional Engineer Status: For approval of amendments by Council Document : R-02-PE Rev-1.3

More information

Long-Term Recovery from Nuclear Accidents

Long-Term Recovery from Nuclear Accidents Long-Term Recovery from Nuclear Accidents THE SCIENCE AND RESPONSE TO A NUCLEAR REACTOR ACCIDENT Post Emergency Transition to Recovery The National Academy of Sciences Washington, DC May 13, 2014 S.Y.

More information

Constraining the cumulative amount of revenue recognised

Constraining the cumulative amount of revenue recognised IASB Agenda ref 7A STAFF PAPER Week of 24 September 2012 FASB IASB Meeting Project Revenue Recognition FASB Education Session 19 September, 2012 IASB Education Session 20 September, 2012 Paper topic Constraining

More information

IAEA-TECDOC-1222. Waste inventory record keeping systems (WIRKS) for the management and disposal of radioactive waste

IAEA-TECDOC-1222. Waste inventory record keeping systems (WIRKS) for the management and disposal of radioactive waste IAEA-TECDOC-1222 Waste inventory record keeping systems (WIRKS) for the management and disposal of radioactive waste June 2001 The originating Section of this publication in the IAEA was: Waste Technology

More information

THE DOCTORATE CHARTER OF THE UNIVERSITY OF STRASBOURG

THE DOCTORATE CHARTER OF THE UNIVERSITY OF STRASBOURG THE DOCTORATE CHARTER OF THE UNIVERSITY OF STRASBOURG Preparing a doctorate combines high-level training and professional research experience. Once the thesis has been defended, a Philosopher's Degree

More information

Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document

Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document INSPIRE Infrastructure for Spatial Information in Europe Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document Title Creator Justification document Creation date 2008-12-15

More information

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT 1 Introduction 3 2 Scope of application 3 3 Development and use of the PRA 4 3.1 General requirements 4 3.2 PRA during the design

More information

Presentation by Mrs. Ton Nu Thi Ninh Former Ambassador of Viet Nam to EU Former Vice Chair Foreign Affairs Committee, National Assembly of Viet Nam

Presentation by Mrs. Ton Nu Thi Ninh Former Ambassador of Viet Nam to EU Former Vice Chair Foreign Affairs Committee, National Assembly of Viet Nam Presentation by Mrs. Ton Nu Thi Ninh Former Ambassador of Viet Nam to EU Former Vice Chair Foreign Affairs Committee, National Assembly of Viet Nam Viet Nam s nuclear energy planning & development What

More information

Great Lakes National Program Office and Office of Water Quality Management Training Modules

Great Lakes National Program Office and Office of Water Quality Management Training Modules GLOSSARY Assessment - the evaluation process used to measure the performance or effectiveness of a system and its elements. As used here, assessment is an all-inclusive term used to denote any of the following:

More information

Enhancing of Regulatory Control in Georgia Main Trends and Current Developments

Enhancing of Regulatory Control in Georgia Main Trends and Current Developments Enhancing of Regulatory Control in Georgia Main Trends and Current Developments GEORGIA Department of Nuclear and Radiation Safety Ministry of Energy 11.12.2012 J. Mamasakhlisi 1 Regulatory control over

More information

Insights of the Periodic Reviews Regarding the Physical Protection of Nuclear Power Plants Designed to Earlier Standards

Insights of the Periodic Reviews Regarding the Physical Protection of Nuclear Power Plants Designed to Earlier Standards Insights of the Periodic Reviews Regarding the Physical Protection of Nuclear Power Plants Designed to Earlier Standards A. Hagemann Systems Technology and Operating Experience Division Gesellschaft für

More information