Table C.2 Modified Cowan method for determining channel roughness Manning s n = (n b + n 1 + n 2 + n 3 + n 4) m
|
|
|
- Abraham Bell
- 9 years ago
- Views:
Transcription
1 Manning s Roughness Table C.2 Modified Cowan method for determining channel roughness Manning s n = (n b + n 1 + n 2 + n 3 + n 4) m Channel condition n and m Description values Channel material Earth Clay-based channels. (n b ) Bed rock Channels cut into bed rock. Sand fine gravel 0.024* Sandy creeks. Coarse gravel Gravel-based creeks (otherwise use Eqn C.1). Degree of Smooth 0.0 Smooth channel. irregularity (n 1 ) Minor Excavated channels in good condition. Moderate Channels with considerable bed roughness and some bank erosion. Severe * Natural channels: pools and riffles, exposed tree roots, boulders, and/or irregular banks. Variation in Uniform 0.0 Near-uniform channel section. channel Gradual * Large and small cross sections alternate occasionally cross section (eg. typical NCD n 2 = 0.003). (n 2 ) Severe Large and small cross sections alternate frequently (eg. a significant pool-riffle system). Effect of Negligible A few scattered obstructions (boulders, trees, logs) obstructions that occupy less than 5% of the channel. (n 3 ) Minor * Obstructions occupy 5 15% of the channel and the obstructions are generally isolated. excluding Appreciable Obstructions occupy 15 50% of the channel. vegetation Severe Obstructions occupy more than 50% of the channel (eg. severe debris collection). Amount of Small Grasses and/or weeds with the flow at least three vegetation times the height of the vegetation. (n 4 ) Medium * Grass and/or weeds with the flow one to two times the height of the vegetation; or reeds or tree seedlings Consideration growing with the flow two to three time the vegetation should be given height; or minor bed vegetation with medium bank to the obstruction vegetation. caused by Large Grasses and/or weeds with flow depth equal to vegetation vegetation height; or weedy beds with thick bank vegetation; or relative to moderate shrub growth across the bed and banks. channel width Very Large Grass and/or weeds more than twice the height of flow and depth depth; or dense, strong reed growth; or significant shrub growth within the channel; or significant inflexible vegetation within channel. Degree of Minor 1.00 Channel sinuosity is 1.0 to 1.2 channel Appreciable 1.15* Channel sinuosity is 1.2 to 1.5 meandering Severe 1.30 Channel sinuosity is greater than 1.5 (m) or; m = (Sinuosity), but 1.30 (*) Typical NCD channel roughness n = ( ) 1.15 =
2 APPENDIX C Table C.3 Manning s n for a watercourse floodplain Minimum Normal Maximum Description A. Pasture, no brush Short grass use design charts for grass High grass use design charts for grass B. Cultivated areas C. Brush No crop Mature crop Scattered brush, heavy weeds Light brush and trees Medium to dense brush D. Trees (also refer to Table C.5) Heavy stand of timber, a few fallen trees, little undergrowth, tree branches above flood level As above, but with tree branches below flood level Dense tree cover 143
3 Manning s Roughness Table C.4 Modified Cowan method for floodplain roughness Manning s n = (n b + n 1 + n 2 + n 3 + n 4) m Floodplain condition n and m Description values Floodplain Earth 0.020* Clay-based soil. material Bed rock Smooth, flat rock floodplains. (n b ) Sand Sandy soils. Gravel Gravel-based soils (otherwise use Eqn C.1) Degree of Smooth 0.0 Smooth, flat, floodplains. irregularity Minor Slightly irregular shape. A few rises and dips. (n 1 ) Moderate * Regular rises and dips. Severe Very irregular floodplains. Pasture furrows perpendicular to the flow. Variation in floodplain 0 Not applicable. cross section (n 2 ) Effect of Negligible A few scattered obstructions (debris, stumps, logs, boulders) obstructions occupying less than 5% of the floodplain flow area. (n 3 ) Minor * Obstructions occupy 5 15% of the flow area. excluding Appreciable Obstructions occupy 15 50% of the flow area. vegetation Amount of Small Grasses and/or weeds with the flow at least twice vegetation the height of the vegetation. (n 4 ) Medium Grass and/or weeds with the flow one to two times the Consideration height of the vegetation; or tree seedlings growing should be with the flow two to three time the vegetation height. given to the Large Grasses and/or weeds with flow depth equal to vegetation obstruction height, or irregular shrub growth across the floodplain. caused by Very large * Grass and/or weeds more than twice the height of vegetation flow depth; or significant shrub growth, woody weeds, relative to or other inflexible vegetation growing across the floodplain. the depth of flow. Extreme Dense bushy shrub growth, or heavy stands of trees with understorey vegetation and a few fallen trees, or a heavy stand of trees with branches below flood level. Floodplain meander 1 Not applicable. (m) (*) Example calculation: n = ( ) 1.0 =
4 APPENDIX C Table C.5 Floodplain revegetation density guidelines for various Manning s n roughness values Manning s n Description 0.03 Short grass with the water depth >> grass height Short grass with water depth >> grass height on a slightly irregular earth surface. Trees at 10 metre spacing, area is easy to mow Long grass on an irregular (bumpy) surface with few trees. Irregular ground could make grass cutting difficult. Alternatively, trees at 8 metre spacing on an even, well-grassed surface, no shrubs, no low branches Long grass, trees at 6 metre spacing, few shrubs. The vegetation is easy to walk through. Area not mowed, but regular maintenance is required to remove weeds and debris Trees at 5 metre spacing, no low branches, few shrubs, walking may be difficult in some areas Trees at 4 metre spacing, some low branches, few shrubs, few restrictions to walking Trees at 3 metre spacing, weeds and long grasses may exist in some locations. Walking becomes difficult due to fallen branches and woody debris Trees at 2 metre spacing, low branches, regular shrubs, no vines. Canopy cover possibly shades weeds and it is difficult to walk through Trees at 1.5 metre spacing with some low branches, a few shrubs. Slow to walk through Trees and shrubs at 1 metre spacing, some vines, low branches, fallen trees, difficult and slow to walk through. Alternatively, a continuous coverage of woody weeds with sparse leaves and no vines Trees and shrubs at 1 metre spacing plus thick vine cover at flood level and fallen trees. Very difficult to walk through. Alternatively, a continuous coverage of healthy shrubs and woody weeds from ground level to above flood level. 145
5 Manning s Roughness Photo C1 Straight, excavated, tidal channel. Bed: n = 0.02 Banks: n = 0.06 Bankfull: n = Photo C2 Slight meandering, regular cross section, well maintained grass channel. Bankfull: n = Photo C3 Mown grass channel, regular cross section, slight meander. Bankfull: n = (clean) n = (some shrubs) 146
6 APPENDIX C Photo C4 Regular cross section, slight meandering, mown overbanks. Bankfull: n = 0.04 Overbank grass: n = 0.03 (shallow flow depth assumed) Photo C5 Mown grass banks, unmaintained wetland plants on bed, regular cross section, very slight meander. Bed: Manning s n is variable depending on flow depth. Bankfull components: bed n = bank n = resulting in a bankfull n =0.035 Photo C6 Canopy trees in early stages of growth, straight, regular channel. Bankfull: n = 0.04 Overbank: n =
7 Manning s Roughness Photo C7 Rock size approx. 300 mm, this results in a Manning s n = assuming deep water flow. Bed: n =0.04 Photo C8 Deep channel, irregular cross section, meandering channel. Bankfull: n = Photo C9 Near straight channel, full canopy cover with few weeds, pool-riffle system, shallow pools with boulders. Bed: n = Bank: n =
8 APPENDIX C Photo C10 Pool-riffle bed system, meandering channel, thick shrub growth on banks, deep pools. Bed: n = 0.04 Left bank: n = 0.06 Right bank: n = 0.20 Bankfull: n = 0.06 Photo C11 Channel vegetation in early growth stage, gradual bends, regular cross section, deep water, pool-riffle system. Bankfull (existing): n = 0.04 Long-term (full vegetation) bed: n = 0.05 banks: n = 0.15 Photo C12 Irregular, meandering, constructed channel with boulders. Bankfull: n = 0.05 Bank vegetation: n =
9 Manning s Roughness Photo C13 Irregular channel with meanders and woody debris (logs). Bankfull: n = 0.05 Overbank: n = 0.10 Photo C14 Bed is a combination of thick, flexible vegetation and open rock pools and riffles. banks have sparse trees and woody shrubs. Irregular channel shape with slight meandering. Bed: n = 0.06 Bank: n = 0.12 Bankfull: n = 0.07 Photo C15 Weedy channel passing through a long grass floodplain. Irregular channel cross section with some meanders. Bankfull: n = 0.08 (assuming low velocity and shallow depth that will not flatten reeds) Overbank: n = 0.03 to 0.10 (depends on flow depth and velocity) 150
10 APPENDIX C Photo C16 Irregular mountain creek with flexible understorey plants, few vines or woody shrubs. Bankfull: n = 0.10 to 0.12 Photo C17 Overbank vegetation at approximately 8 metre spacing with no shrubs. Overbank: n = 0.05 Photo C18 Overbank vegetation consists of tall truck trees, no low branches or shrubs. Tree spacing of approx. 8 metres. Overbank: n =
11 Manning s Roughness Photo C19 Irregular channel with meanders. Channel: n = 0.04 to 0.05 depending on channel irregularity and debris content. Overbank area consists of single truck trees with no low branches or shrubs. LHS (5 m spacing): n = RHS (6-7 m spacing): n = 0.05 Photo C20 Trees at approx. 5 metre spacing, no low branches. Overbank: n = Photo C21 Irregular natural channel and wetland system with many weeds. Overbank: n =
12 153 Natural Channel Design Guidelines
13 154
14 Brisbane City Council Information GPO Box 1434 Brisbane Qld Printed on recycled paper K For more information please telephone Brisbane City Council on (07)
3. Design Procedures. Design Procedures. Introduction
Design Procedures 3. Design Procedures Introduction This chapter presents a procedure for the design of natural channels. The chapter primarily focuses on those physical properties of the channel required
CHAPTER 5 OPEN CHANNEL HYDROLOGY
5.4 Uniform Flow Calculations 5.4.1 Design Charts CHAPTER 5 OPEN CHANNEL HYDROLOGY Following is a discussion of the equations that can be used for the design and analysis of open channel flow. The Federal
Basic Hydrology. Time of Concentration Methodology
Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from
Rural Flooding: The Potential Role of Forestry
Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland
Prepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
Neversink River East Branch
Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
Open Channel Flow in Aquaculture
SRAC Publication No. 74 Southern Regional Aquaculture Center March 1995 PR VI Open Channel Flow in Aquaculture J. David Bankston, Jr. 1 and Fred Eugene Baker Open channel flow of water has been used in
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
Crossing creeks Stream crossings on farms
Crossing creeks Stream crossings on farms Looking after all our water needs Crossing creeks Stream crossings on farms Looking after all our water needs Department of Water 168 St Georges Terrace Perth
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual
Seattle Public Utilities Natural Drainage Systems (NDS) Maintenance Manual 1 Revision Date: December 2007 2 Table of Contents I. Overview... 4 II. How to Use This Manual... 4 III. NDS Contacts... 4 List
Channel Stabilization with Basic Flow Calculations
Channel Stabilization with Basic Flow Calculations Description Selection Criteria The selection of a channel lining will greatly influence how a drainage channel performs, the amount of erosion and scour,
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Stream Restoration Making It Happen: The Restoring The Waters Project
Stream Restoration Making It Happen: The Restoring The Waters Project STEPHEN FROST, Fairfield City Council ROD WIESE, Department of Land & Water Conservation BARBARA SCHAFFER, Schaffer Barnsley Landscape
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
The Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Chapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
How To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
Evaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.
Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource
Topic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
Experiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
The students will be working in and alongside the stream, so safety is a consideration. Suitable sites should have the following characteristics:
Measuring Stream Banks: Height and Slope Stream bank heights and slopes are of interest because they yield information relevant to bank erosion and stability. A high, steep bank is likely to be unstable
Waterway Technote Drains
Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008
GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008 The following guidelines for soil filter media in bioretention systems have been prepared on behalf of the Facility for
Habitat of rivers and creeks
Water and Rivers Commission W N 8 J a n u a ry 2000 Habitat of rivers and creeks Stream systems play an important role in the hydrological cycle, transporting water off the landscape and back to the estuaries
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
EMERGENCY HOME PROTECTION. Homeowner's Guide for Emergency Flood Control. Contents INTRODUCTION
EMERGENCY HOME PROTECTION Homeowner's Guide for Emergency Flood Control Contents Discussion or Section Page Number Introduction 3 Potential Flooding Periods 4 General Rules and Control Aids 5,6 Sandbags
Riprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Sand and Silt Removal from Salmonid Streams
Sand and Silt Removal from Salmonid Streams Stream bank erosion Poor land use practices Sources of Sand and Silt Impacts of Sand and Silt Interstitial spaces infilled Little or no flow through the streambed
Design of open channel
Design of open channel Manning s n Sides slope Seepage losses Evaporation losses Free board Data ssumptions Two unknowns b & Flow rate Q Tpe of soil Longitudinal slope S Meterlogical data (temp., wind...etc.
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters
2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY
ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...
WONDERFUL, WATERFUL WETLANDS
WONDERFUL, WATERFUL WETLANDS OBJECTIVES The student will do the following: 1. List characteristics of wetlands. SUBJECTS: Science, Language Arts TIME: 60 minutes 2. Describe the functions of a wetland.
RainScapes. Runoff/Erosion: RainScapes for Schools Environmental Report Card. Excess runoff will affect these indicators of Bay health:
RainScapes Environmentally Friendly Landscapes for Healthy Watersheds RainScapes for Schools Environmental Report Card How is your schoolyard doing? Is it helping the Chesapeake Bay, or is it contributing
What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
Proceeding of International Seminar on Application of Science Matehmatics 2011 (ISASM2011) PWTC, KL, Nov, 1-3, 2011
Proceeding of International Seminar on Application of Science Matehmatics 2011 (ISASM2011) PWTC, KL, Nov, 1-3, 2011 INFLUENCE OF BED ROUGHNESS IN OPEN CHANNEL Zarina Md Ali 1 and Nor Ashikin Saib 2 1 Department
A guide to preventing structural damage
A guide to preventing structural damage Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from movement in clay soils caused by varying moisture conditions
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Are My. Pine Trees. Ready To Thin?
Are My Pine Trees Ready To Thin? ARE MY PINE TREES READY TO THIN? One question private forest landowners ask most frequently is, Are my pine trees ready to thin? There is no definite answer to this question,
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
Your Defensible Space Slideshow
Your Defensible Space Slideshow Red = Trees to Remove Your Defensible Space Slideshow This slideshow was created to highlight actions you can take to dramatically improve the chances of your home surviving
WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?
NAME DATE WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST 1. The diagram below shows a meandering stream. Measurements of stream velocity were taken along straight line AB. Which graph best shows the
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Basic Soil Erosion and Types
Basic Soil Erosion and Types 2015 Wisconsin Lakes Convention Stacy Dehne DATCP Engineer Types of Soil Erosion Rain drop or splash erosion: Erosion preceded by the destruction of the crumb structure due
Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program
Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow
Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
Course Plan Day 1: Introduction and Overview Hydrology & Fluvial Geomorphology Day 2: Fieldwork on the Braid Burn Alan Jones
Course Plan Day 1: Introduction and Overview Hydrology & Fluvial Geomorphology Alan Jones E:mail: [email protected] Water cycle Globally & Locally River shapes and forms River behaviour Closer look at
Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)
Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach
Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office
Lisgar District Basement Water Infiltration Investigation Part A Answers to Technical Questions 1. There has been a tremendous amount of work done everywhere along the creek. If there was nothing wrong
THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C
Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C Position Purpose: The purposes of this position are to assist in maintaining all town rights-of-way, equipment and other
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
1 SEEDLING QUALITY. Seedling quality
Seedling quality Quality versus quantity A nursery manager s most important goal is to produce quality trees. Quality is more important than quantity. It is a common mistake in nurseries to concentrate
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
Two Main Precautions Before You Begin Working
Pruning Mango Trees Roy Beckford, Ag/Natural Resources Agent, UF/IFAS Lee County Two Main Precautions Before You Begin Working 1. Mango peel and sap contain urushiol, the chemical in poison ivy and poison
CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow
CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented
REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY
REQUEST FOR PROPOSAL LANDSCAPING AND LAWN MAINTENANCE FIRE DISTRICT NO. 3 TOWNSHIP OF HAMILTON MERCER COUNTY PROPOSALS MUST BE SUBMITTED BY: APRIL 4, 2014 Hamilton Township Fire District No. 3 Office of
TOOLS FOR SELF RELIANCE REFURBISHING SHEET No 2. Registered Charity No 280437. Saws for Woodworking
Registered Charity No 280437 Saws for Woodworking Issued December 2002 Registered Charity No 280437 page no 1 SAW TYPES Rip saw For cutting along the grain Crosscut saw [A smaller version is known as a
Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
Raised beds page. What are the benefits of raised beds? What are the difficulties with raised beds?
Raised beds are an attractive addition to a garden and offer practical advantages for all gardeners. However, as with any permanent garden feature, it s worth considering a few key points when deciding
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
EPR Exempt Flood Risk Activities: descriptions and conditions
EPR Exempt Flood Risk Activities: descriptions and conditions Version 1 April 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing climate
Module 112. Open Channel Hydraulics.EDC National Employee Development Center. Engineering Hydrology Training Series
Module 112 Open Channel Hydraulics.EDC National Employee Development Center Engineering Hydrology Training Series Module 112-0pen Channel Hydraulics Module Description Overview This module provides background
o d Propagation and Moon Planting Fact Sheet
o d Propagation and Moon Planting Fact Sheet Propagation Propagation is actually quite simple and requires very little effort on your part. Most seeds are ready to go, complete with all the nutrients and
Overview of Reclamation of Lands Disturbed by Mining for Heavy Minerals in OZ and USA. Heavy Mineral Sands
Overview of Reclamation of Lands Disturbed by Mining for Heavy Minerals in OZ and USA Heavy Mineral Sands Rutile TiO 2 Ilmenite FeTiO 3 Leucoxene White Ilmenite Zircon ZrSiO 4 Magnetite and other less
How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
GUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
AUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
VOLUME AND SURFACE AREAS OF SOLIDS
VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
SCOPE OF WORK Specifications for Landscaping, Lawn Maintenance & Pest Control
January 10, 2013 Request for Proposal for WINDRUSH BAY CONDOMINIUM ASSOCIATION, INC 700 Windrush Bay Drive, Tarpon Springs, FL 34689 www.windrushbay.org SCOPE OF WORK Specifications for Landscaping, Lawn
GRI-GT13(a) Specification Geotextile Separation for Roadways (ASTM Test Method Based)
GRI-GT13(a) Specification Geotextile Separation for Roadways (ASTM Test Method Based) placed between subgrade soil and an overlying aggregate layer separation prevents mixing and intrusion meant for firm
WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION. www.sindlar.eu
Geomorphological processes of watercourse development, system of typology and application of the results in practice Part 01 Analysis of geomorphological processes in watercourses Part 02 Applications
