1 City of Peterborough Building Division Deck Guide Residential Information Guides This information is intended to only be used as a guide that outlines the minimum requirements for constructing decks and platforms, as well as what is required in order to make a complete application for a Building Permit. If you have any questions, feel free to contact the Building Division! May 2015 Questions? Phone: (705) x 1892 Web: 1 P a g e

2 General Requirements The following guide is provided to assist in clarifying the most critical health and safety requirements that will apply to an open, uncovered wood deck, for a residential building containing one or two dwelling units built to the standards of the Ontario Building Code, Part 9. For other projects, consult the Ontario Building Code for specific requirements. How to use this guide: This guide is intended to outline the minimum requirements for construction that are specified in the Ontario Building Code. The information contained in this guide will cover all the major Building Code Sections as they relate to residential deck construction. This guide is provided for informational purposes only. It is the responsibility of the owner, applicant, designer and contractor to review the Ontario Building Code to ensure that all construction meets or exceeds the current requirements. Any deck that will support a hot tub is required to be designed by a Professional Engineer. Best Practice When you see this, it indicates a best practice tip. While not required by the Building Code, a best practice is a recommendation based upon standard construction techniques and experience, and often gives the best results. 2 P a g e

3 Frequently Asked Questions Q: When do I require a Building Permit for my deck? A: A Building Permit is required for any construction on your deck project unless the deck area is less than 10m² (108ft²) and not adjacent to any other structure. Keep in mind that a deck/platform that does not require a Building Permit must still comply with the Zoning By-law with regard to location and heights. Q: How do I get a Building Permit for my deck? A: A Building Permit is obtained from the Building Division at City Hall by submitting a complete Building Permit application (see last question). A Building Permit will be issued within 10 business days if the drawings comply with the Ontario Building Code, are sufficiently detailed, and the application is complete. Q: Is it okay to start framing or digging foundations while you review my plans? A: No. Construction cannot start until a Building Permit has been issued. Q: How can I check to see if my contractor is licensed? A: At this time neither the province nor the City of Peterborough require licensing for most of the construction trades (except plumbers, electricians and sheet metal workers). Q: How much does the Building Permit cost? A: Building permit fees are determined by City Council each year. For 2016, a Building Permit costs $19.96 for every $1000 of estimated construction value, with a minimum charge of $ P a g e

4 Q: How long does it take to get a Building Permit? A: Provided that the Building Permit application is complete (see last question), the application will be reviewed and a permit issued within 10 business days, however, applications with the proper information are normally processed much faster. Q: Why do I have to go through all this, it s just a deck right? A: A deck is a structural floor system, similar to the flooring system in your house. However, a deck is also directly subjected to wind, snow and rain loads, as well as being fully exposed to the elements. Often decks will fail slowly over time resulting in damage to not only the deck, but often the house. Occasionally decks can have catastrophic failures as seen in the picture below, which could not only result in loss of life or injury, but also in liability if the deck was constructed improperly or without a Building Permit. Don t let this happen to you! 4 P a g e

5 Q: Can you recommend the name of a contractor to help me build my deck? A: Unfortunately we are unable to recommend anyone specific to you; however, we suggest that you take time to fully research the contractor you intend on using. Ask for written quotes from contractors before starting and check their references. Ensure that the contractor carries valid insurance and is knowledgeable in the process of obtaining a Building Permit. Remember that the Building Code sets out the minimum standards of construction, so exercise care in your choice of contractor. As the property owner, you are ultimately responsible to ensure that a Building Permit has been granted before starting construction. Q: What is required for a complete Building Permit application? A: A complete permit application requires the Building Permit application to be filled out, including Schedule 1. Payment is also required along with two sets of construction drawings (either hand drawn or computer drawn) drawn to scale and dimensioned. A set of required construction drawings consists of a site plan, foundation plan, floor plan, and cross section drawing. All plans must be drawn to scale and fully dimensioned. The site plan must have at least the following information to be accepted: - Lot size and the dimensions of the property and location/dimensions of all existing buildings. - Location/dimensions of the proposed deck, including setbacks from the property lines. - Site Plans must have metric measurements. The foundation plan must have at least the following information to be accepted: - Foundation type and sizes. Also include footing sizes as required. - If pier style foundations are used, indicate spacing between piers. - Structural framing layout: 5 P a g e

6 - Joist sizes, spans and spacing. - Beam sizes, spans and spacing. - Stair foundation and landing details. - Detail of connection to house. - Plans will be accepted in either metric or imperial measurements. The floor plan must have at least the following information to be accepted: - Decking material. - Guard style (if installed). - Stair sizing: - Tread depth and riser height. - Stair width. - Handrail construction detail. - Include any other built-in features such as benches or outdoor kitchens. - Plans will be accepted in either metric or imperial measurements. The cross section detail drawing must have at least the following information to be accepted: - Height of deck clearly shown. - Foundation type and sizes. Also include footing sizes as required. - If pier style foundations are used, indicate spacing between piers. - Show foundation depth. - Show existing foundation of house. - Structural framing: - Joist sizes and beam to joist connection details. - Beam sizes and post connection details. - Guard style (if installed). - Detail of connection to house. - Plans will be accepted in either metric or imperial measurements. 6 P a g e

7 Construction details These pages will outline the Building Code requirements and construction details that should be utilized for the design and construction of a residential deck serving not more two dwelling units. FOUNDATION SYSTEMS: Foundations for decks must comply with Footings and Foundations of the OBC. The depth of excavation must meet Excavation requirements. Undisturbed Soil: Regardless of the foundation style, the footing of the foundation must always bear on undisturbed soil. If the footing is to be located within 1.5m (5 ) of an existing building, then the footing for the deck must extend to the depth of the footing for the building it is adjacent to. Footings must always bear on undisturbed soil, as disturbed soil will compact after construction, causing the structure to list or tilt. Disturbed soil is any soil that has, at any time, been backfilled. Depth: Footing depth is determined based on geographical area. For the City of Peterborough, minimum footing depth is 1.2m (4 ). The reason that the footing depth is required is to prevent frost heave. During the winter, moisture in the ground will freeze and expand, causing heave. This is a phenomenon known as Ice Lensing. If the footing has not been placed deep enough, the heave will cause the deck footing to fail by pushing it up during the winter and allowing it to settle during the spring. 7 P a g e

8 Frost protection for footings is not required if the deck meets all of the following four conditions: 1) The deck is under 600mm (23-5/8 ) in height (see diagram, next page) 2) The deck is not attached to any structure 3) The deck is not supporting a roof (which includes a pergola/trellis) 4) The area of the deck is not more than 55m² (592 ft²) A deck that meets all of the above conditions is permitted to be constructed with a surface foundation system. In order to construct a deck foundation like this, the surface must still be prepared by removing all the topsoil and organic matter, but there is no requirement for the minimum footing depth. The footing must rest on undisturbed soil. Soil is only considered to be undisturbed if it is native soil and not backfill If you intend to build a deck with a full depth foundation system, you are permitted to attach the deck to the structure of your house. This will eliminate the need for an additional row of supports near the building. The footings must extend to a minimum of 1.2m (4 ) below the surface. Backfill: After a foundation system has been installed, it should be backfilled in such a way that will prevent damaging the foundation. The fill should be free of organic matter, pyritic material (rock containing iron) or any objects larger than 250mm (10 ). Best Practice Ideally the fill should be comprised of gravel, which is a mix of 1 stone and small aggregates. Foundation Types: There are multiple types of foundations that are acceptable for supporting a deck. The most common is a pier type foundation. 8 P a g e

9 Beam Length Footing Sizes: Footings are sized based on the load that will be imposed upon them. This is determined based on the area of the structure overtop of the support, also known as the Tributary Area. The Tributary Area is calculated as the area halfway between adjacent supports. If the members are cantilevered beyond the supports, the area of the cantilever is also included, as this is bearing directly on those supports. The size of a footing (also known as the footing area) is calculated based on the following formula: For convenience, the following two charts can be used to help you calculate the minimum footing area depending on the beam length and supported joist length. The chart below is a simplified chart, while the chart on the next page offers a more detailed breakdown of sizes. Minimum Required Footing Area - Simplified Supported Joist Length dia. 12 dia. 13 dia. 15 dia. 16 dia. 16 dia. 17 dia dia. 13 dia. 15 dia. 16 dia. 17 dia. 18 dia. 19 dia dia. 14 dia. 16 dia. 17 dia. 18 dia. 19 dia. 20 dia dia. 15 dia. 16 dia. 18 dia. 19 dia. 20 dia. 21 dia dia. 16 dia. 17 dia. 19 dia. 20 dia. 21 dia. 22 dia. 9 P a g e

10 Beam Length Minimum Required Footing Area - Detailed Supported Joist Length x 7 8 x 8 8 x 8 9 x 9 10 x x x 11 8 dia. 9 dia. 9 dia. 10 dia. 11 dia. 12 dia. 12 dia. 7 x 7 8 x 8 9 x 9 10 x x x x 12 8 dia. 9 dia. 10 dia. 11 dia. 12 dia. 13 dia. 13 dia. 8 x 8 9 x 9 10 x x x x x 13 9 dia. 10 dia. 11 dia. 12 dia. 13 dia. 13 dia. 14 dia. 8 x 8 9 x 9 10 x x x x x 13 9 dia. 11 dia. 12 dia. 13 dia. 13 dia. 14 dia. 15 dia. 9 x 9 10 x x x x x x dia. 11 dia. 12 dia. 13 dia. 14 dia. 15 dia. 16 dia. 9 x 9 10 x x x x x x dia. 12 dia. 13 dia. 14 dia. 15 dia. 16 dia. 17 dia. 10 x x x x x x x dia. 12 dia. 13 dia. 15 dia. 16 dia. 16 dia. 17 dia. 10 x x x x x x x dia. 13 dia. 14 dia. 15 dia. 16 dia. 17 dia. 18 dia. 10 x x x x x x x dia. 13 dia. 15 dia. 16 dia. 17 dia. 18 dia. 19 dia. 11 x x x x x x x dia. 14 dia. 15 dia. 16 dia. 17 dia. 18 dia. 19 dia. 11 x x x x x16 17 x x dia. 14 dia. 16 dia. 17 dia. 18 dia. 19 dia. 20 dia. 12 x x x x x x x dia. 15 dia. 16 dia. 17 dia. 18 dia. 20 dia. 21 dia. 12 x x x x x x x dia. 15 dia. 16 dia. 18 dia. 19 dia. 20 dia. 21 dia. 13 x x x x x x x dia. 15 dia. 17 dia. 18 dia. 20 dia. 21 dia. 22 dia. 13 x x x x x x x dia. 16 dia. 17 dia. 19 dia. 20 dia. 21 dia. 22 dia. 13 x x x x x x x dia. 16 dia. 18 dia. 19 dia. 21 dia. 22 dia. 23 dia. 13 x x x x x x x dia. 17 dia. 18 dia. 20 dia. 21 dia. 22 dia. 23 dia. 13 x x x x x x x dia. 17 dia. 19 dia. 20 dia. 21 dia. 23 dia. 24 dia. 14 x x x x x x x dia. 17 dia. 19 dia. 21 dia. 22 dia. 23 dia. 25 dia. 14 x x x x x x x dia. 18 dia. 19 dia. 21 dia. 22 dia. 24 dia. 25 dia. 14 x x x x x x x dia. 18 dia. 20 dia. 21 dia. 23 dia. 24 dia. 26 dia. 15 x x x x x x x dia. 18 dia. 20 dia. 22 dia. 23 dia. 25 dia. 26 dia. 15 x x x x x x x dia. 19 dia. 21 dia. 22 dia. 24 dia. 25 dia. 26 dia. 15 x x x x x x x dia. 19 dia. 21 dia. 23 dia. 24 dia. 26 dia. 27 dia. 15 x x x x x x x dia. 19 dia. 21 dia. 23 dia. 25 dia. 26 dia. 27 dia. 10 P a g e

11 Best Practice Oversize the footings by 25%. This will help to accommodate any changes/error to the framing and provide a sturdier structure. Alternative Foundation Systems: Pre-engineered foundations systems are becoming increasingly popular for a variety of reasons. Some products utilize a preformed plastic base to assist with forming concrete. Other products, such as helical steel piles, eliminate the need for concrete all together. When using a Pre-engineered foundation system, it is important to follow the manufacturer s specifications for determining allowable loads and/or spacing requirements. FRAMING: Framing for decks must comply with Wood-Frame Construction of the OBC. The Columns must meet Columns requirements. Columns: Columns are the vertical members that transfer and carry the load of the deck from the beam system to the foundation system. Columns can be constructed of steel, solid concrete, concrete masonry units, or wood. Concrete Columns: A concrete column can be either solid concrete, or concrete masonry units (CMUs). If it is solid concrete, it must be at least 230mm (9 ) in diameter or 200mm x 200mm (8 x 8 ). Unit masonry columns must be at least 290mm x 290mm (12 x 12 ) or 240mm x 380mm (10 x 16 ) Wood Columns: A wood column must be the greater of: i) 140mm (5.5 ) x 140mm (5.5 ), aka 6 x6 nominal or ii) the width of the supported member (beam). 11 P a g e

12 A wood column can either be a solid member or built-up. If it is built-up, it must consist of members that are at least 38mm (1.5 ) thick, nailed together with no less than 76mm (3 ) nails at 300mm (12 ) on centre. Beams: Beams are the horizontal structural members that transfer the load from the floor system to the columns. Beams can be constructed of either wood or steel. Wood beams must be of a built-up style as shown below. The use of Solid Sawn timbers must be supported by calculations, which would involve retaining the services of a Professional Engineer. Beams are sized based on the amount of load transferred onto them. This involves knowing how long the floor joists are that will bear weight on them. The supported length is measured as half the sum of the joist spans on both sides of the beam. If the joists are cantilevered beyond the beam, you would also include the length of the cantilever. See the chart below to determine the beam size: Maximum Beam Span, m (ft) SPF No. 2 Lumber Supported 3-38x184 (2 x8 ) 3-38x235 (2 x10 ) 3-38x286 (2 x12 ) Length of Joists 2.4 (7-10 ) 3.07 (10-0 ) 3.92 (12-10 ) 4.57 (15-0 ) 3.0 (9-10 ) 2.85 (9-4 ) 3.52 (11-6 ) 4.09 (13-5 ) 3.6 (11-9 ) 2.63 (8-7 ) 3.22 (10-6 ) 3.73 (12-3 ) 4.2 (13-9 ) 2.44 (8-0 ) 2.98 (9-9 ) 3.46 (11-4 ) 4.8 (15-9 ) 2.28 (7-6 ) 2.79 (9-2 ) 3.23 (10-7 ) Beam Splicing: It is recommended that beams be installed so that they are comprised of full length plies. Lumber up to 16 lengths are commonly available at most yards, and some yards are able to order lengths up to 24. When it is not feasible to use a full length, it is permissible to splice a beam to increase the length; however, this must be done carefully to ensure the construction will comply with the prescriptive requirements of the code. A beam can only be spliced in one of two locations. Ideally it would be 12 P a g e

13 spliced directly over a mid-support (eg. centre column in a deck with 3 or more supports). A single individual ply of a beam can also be spliced within 150mm (6 ) of the ¼ point of a span adjacent to a mid-support. See the image to help visualize this. Acceptable Locations for a beam splice Unacceptable Locations 13 P a g e

14 Joists: Joists are the part of the flooring system that transfers the load of the decking to the beams. The spacing of the joists will often be determined based on the choice of decking and installation. Composite decking, or decking installed at a 45 degree angle can require closer spacing. The spacing of the joists also has an effect on the span of the joists. If the joists are closer, then the joists can span further. The following chart may be used to determine the size of joists you will require: Maximum Joist Span, m (ft) SPF No. 2 Lumber Joist Size & Spacing Maximum Span 38x184 (2 x8 ) at 305mm (12 ) o.c (12-2 ) 38x184 (2 x8 ) at 406mm (16 ) o.c (11-7 ) 38x184 (2 x8 ) at 610mm (24 ) o.c (11-0 ) 38x235 (2 x10 ) at 305mm (12 ) o.c (14-4 ) 38x235 (2 x10 ) at 406mm (16 ) o.c (13-7 ) 38x235 (2 x10 ) at 610mm (24 ) o.c (13-0 ) 38x286 (2 x12 ) at 305mm (12 ) o.c (16-4 ) 38x286 (2 x12 ) at 406mm (16 ) o.c (15-7 ) 38x286 (2 x12 ) at 610mm (24 ) o.c (14-10 ) Joists are permitted to cantilever beyond the beam provided that, for a 2 x8 the cantilever does not exceed 400mm (16 ), or for a 2 x10 or larger the cantilever does not exceed 600mm (24 ). Decking: SPF wood decking is required to be installed so that the maximum distance between supports is not more than 600mm (24 ), but in many instances joist spacing must be reduced. If the decking is installed at a 45 degree angle to the joists, the joists may have to be installed at 300mm (12 ) or 400mm (16 ) on centre, if a cantilever picket guard is installed, joists may have to be installed at 400mm (16 ) on centre, if a Northern Species of wood decking is used (such as cedar), supports must be not more than 400mm (16 ) on centre, and if composite decking is used, the manufacturer s specifications determine the support spacing, which in some cases may be 300mm (12 ) on centre. 14 P a g e

15 STAIRS, RAMPS, HANDRAILS & GUARDS: Stairs for decks must comply with to of the OBC. The construction of ramps must meet requirements. Landings are often mandatory at the top and bottom of stairs and ramps, and must be constructed to of the OBC. Handrails are often required on stairs and ramps and are required to be installed as per the requirements of Guards (aka Guardrails/Railings): A Guard is the component of a deck that is designed to prevent someone from falling off the walking surface. Guard is the proper term for this element, it should not be called a Railing, which is not a proper building term and does not distinguish it from a Handrail (which is design to assist a person when using a stair/ramp). Please see the separate handbook entitled, Guards for Residential Decks, or SB-7 of the Ontario Building Code for the requirements for installation. Handrails: It is recommended that a handrail be installed regardless of the number of risers, but it is not always required. A handrail is a required component when an exterior flight of stairs has more than 3 risers, or if a ramp rises more than 400mm (16 ). A handrail must be graspable and continuous along the entire length of the flight of stairs. Best Practice You should be able to wrap your entire hand around the handrail and it should be no larger than 2 wide. A piece of galvanized pipe, steel stock, or a wood 2 x2 can be used. A 2 x4 on edge is not a suitable handrail, since the average person cannot fully grasp it. The handrail must have a clearance of at least 50mm (2 ) between it and any surface behind it. The height of the handrail must be between 865mm (34 ) and 965mm (38 ), measured vertically at the nosing of the tread, or 15 P a g e

16 the surface of the ramp. A handrail on a landing is permitted to be between 865mm (34 ) and 1070mm (42 ), which allows for the proper transitioning of stairs between landings. Handrails are required to be supported at attachment points no farther than 1.2m (4 ) apart, with support required within 300mm (12 ) of each end of the handrail. Stairs: When stairs are constructed, it is very important that they are constructed safely to prevent injury/accident to people who use the deck. If the stairs serve part of a required building exit, provisions in addition to those below may also apply. For simplicity, this section only covers straight stairs. Curved stairs or straight runs with winders have additional requirements. Stair Width: Stairs are required to have a minimum width of 860mm (2-10 ), measured between the inner faces of the stringer or guard. A handrail can project into this required width up to a maximum of 100mm (4 ). Stair Risers: The riser of a stair is measured as the vertical nosing-to-nosing distance and must be between 125mm (4-7/8 ) and 200mm (7-7/8 ). The height of risers can not vary by more than 5mm (3/16 ) between adjacent risers. However, all risers in a flight of stairs can not vary by more than 10mm (3/8 ). For example, if the largest riser height in a flight was 7-1/4, then the shortest riser could not be less than 6-7/8. Stair Treads & Run: The tread depth of a stair is different than the run of a stair. The run is measured as the horizontal nosing-to-nosing distance, while the tread depth is the measurement of the entire horizontal surface where one can step. The run of a stair can be no less than 210mm (8-1/4 ), but no more than 355mm (14 ). The maximum variance of treads is the same as that 16 P a g e

17 for risers, which is a maximum tolerance of 5mm (3/16 ) between adjacent treads and no more than 10mm (3/8 ) between the deepest and shallowest treads in a flight. Stair Landings: A landing is required at the top and bottom of every flight of stairs, except when stairs have no more than 3 risers. The dimensions of the landing shall be no less than the full width of the stairs, and at least 900mm (3-0 ) deep. The landing is required to be a level area with a slope of no more than 1 in 50 (2%). If a landing is not required, and the bottom riser adjoins a finished sloping surface (such as a driveway), the riser height measured across the bottom riser is permitted to have a variation of no more than 1 in 12. Stair Foundations: The base of the stringer is required to be supported and secured to a foundation. Depending on the number of risers, the necessary foundation for the stairs will vary. All stairs that are constructed must be supported and secured at the top and bottom. The top support is most easily achieved by using a mechanical hanger that is designed to support stairs. The bottom support can be done by notching a 2 x4 into the bottom stringer that is anchored to a concrete pad, similar to the image below: 17 P a g e

18 Sample Plans Framing Plan 18 P a g e

19 Sample Plans Cross Section 19 P a g e

20 Notes 20 P a g e

21 Notes 21 P a g e

22 Notes 22 P a g e

23 Required Inspections Inspections: After your permit has been issued, you will be required to notify the Building Inspector at various stages that you are ready to have your deck inspected. As you construct the deck, you will be required to have the deck inspected multiple times. Excavation (aka pre-footing) - You must call for this inspection after you have dug out all of the holes for footings, but before you pour any concrete. - If you are using a preformed footing base, this should be backfilled as per the manufacturer s instructions. - The Building Inspector will be checking the depth of the hole, ensuring that it is free of water/leaves, and that the size and location match the approved drawings. Framing (platform) - Every element of the framing is required to be inspected. At this inspection, the Building Inspector will review the columns, beams and joists. They will review the connections and ensure that the proper fasteners and hardware have been used. Framing (Guards) - If guards are required, or if they are not required but have been installed, they will need to be inspected fully. All components of the guard system are inspected, including the posts, rails and balusters. They will review the connections and ensure that the proper fasteners and hardware have been used. Final - At the last inspection, the Building Inspector will review any remaining elements and verify that construction has been completed. The Inspector will review the final framing, including the stairs, handrails and decking. 23 P a g e

24 Checklist A Building Permit application filled out (including Schedule 1) Payment ready (Cash, cheque or Interac Debit) Two (2) complete sets of drawings including: Site plan Foundation plan Floor plan Cross section drawing Questions? Phone: (705) x 1892 Web: 24 P a g e

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings.

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings. September 2015 2 contents General Information

More information

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards. Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Residential Decks Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

The Homeowner s Building Application Checklist for Constructing a Residential Sundeck

The Homeowner s Building Application Checklist for Constructing a Residential Sundeck This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential sundeck. Regardless of the deck s walking surface area, if the deck is adjacent

More information

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44

More information

RESIDENTIAL WOOD DECKS

RESIDENTIAL WOOD DECKS RESIDENTIAL WOOD DECKS 1 A Building Permit is required for the construction of a wood deck where the deck is more than 600 mm above grade at any point. Definition: For the purposes of this pamphlet, a

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Number of Sides Required to Have a Handrail

Number of Sides Required to Have a Handrail Excerpt from 2012 B.C. Building Code HANDRAILS & GUARDS 9.8.7. Handrails 9.8.7.1. Required Handrails 1) Except as provided in Sentences (2) to (4), handrails shall be installed on stairs and ramps in accordance

More information

Patio Covers / Carports

Patio Covers / Carports Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. www.jon Eakes.com

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. www.jon Eakes.com Wood Projects Outdoors Post Hole Specifications & Deck Span Tables www.jon Eakes.com Building Fences The depth of the fence posts into the ground must be at least one foot below the frost level for your

More information

New Ontario Building Code Highlights

New Ontario Building Code Highlights New Ontario Building Code Highlights Part 9 This summary highlights items that are believed to be significant changes to the 2012 OBC and is not intended to include all changes made within this or other

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 STAIRWAYS 46. LANDINGS. Section R311 IRC 2009 R311.7.5 Landings for stairways. There shall be a floor or

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings H:/forms/handouts/bldg071.docx Shed and Garage Construction

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

http://www.iccsafe.org/

http://www.iccsafe.org/ Sections R311 and R312 from the 2006 International Residential Code These sections of Chapter 3 of the 2006 International Residential Code for One and Two Family Dwellings (R311 and R312) including the

More information

City of Peterborough

City of Peterborough City of Peterborough Building Division Basement Finishing Guide Residential Information Guides This information is intended to be used as an guide that outlines minimum requirements when finishing a basement,

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

Stair Layout Guide. Taking You To The Next Level. 1480 E. 6 th Street Sandwich IL 60548. 815-786-7600 www.designedstairs.com

Stair Layout Guide. Taking You To The Next Level. 1480 E. 6 th Street Sandwich IL 60548. 815-786-7600 www.designedstairs.com Stair Layout Guide Taking You To The Next Level 1480 E. 6 th Street Sandwich IL 60548 815-786-7600 www.designedstairs.com The information in this manual will guide you through a simple stair layout. For

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION

TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION TOWNSHIP OF TOMS RIVER ZONING OFFICE DECK CONSTRUCTION The information contained herein serves as a general guideline and may not be all encompassing. Applicants are cautioned that additional Federal,

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

Typical Deck Details

Typical Deck Details Fairfax County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot deviate

More information

I N T E R N A T I O N A L R E S I D E N T I A L CO D E

I N T E R N A T I O N A L R E S I D E N T I A L CO D E Visual Interpretation Of The I N T E R N A T I O N A L R E S I D E N T I A L CO D E 2006 STAIR BUILDING CODE Portions of this document reproduce sections from the 2006 International Residential Code, International

More information

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: GUARDING FLOORS, STAIRS, AND OTHER OPENINGS Guidelines: This checklist covers some of the

More information

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER: Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER: SECTIONS 1, 2, 3, AND 4 MUST BE COMPLETED BY APPLICANT BEFORE INSPECTION

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

NRC Canadian Codes Centre. Codes Update. Nedjma Belrechid October 2012

NRC Canadian Codes Centre. Codes Update. Nedjma Belrechid October 2012 NRC Canadian Codes Centre Codes Update Nedjma Belrechid October 2012 Codes Update Outline Activities of CCBFC, PTPACC, NRC-IRC Code Development Public Reviews Active/Inactive SC Tasks Detailed: Step Dimensions

More information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

WINDOW AND DOOR REPLACEMENT REQUIREMENTS WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.

More information

International Greenhouse Company

International Greenhouse Company Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to

More information

RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE

RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE RESIDENTIAL WOOD DECK CONSTRUCTION GUIDE Based on The 2009 Michigan Residential Code Revised March 19, 2015 The Following Organizations Support the use of this Guide: The details in this document apply

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh Accessory Apartment Construction Guide For Single Detached Dwelling and Semi-Detached Dwellings that have been in existence for at least five (5) years Notes: Buildings that are less than five (5) years

More information

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair 49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

The replacement or modification of existing windows shall comply with the following requirements:

The replacement or modification of existing windows shall comply with the following requirements: City of La Habra Heights Building Division 1245 N. Hacienda Road La Habra Heights, CA 90631 Office: (562) 694-6302 ext. 228 Fax: (562) 690-5010 WINDOW REPLACEMENT 2010 CALIFORNIA RESIDENTIAL CODE (CRC)

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

Mobile Home Pre-Inspection Checklist

Mobile Home Pre-Inspection Checklist Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

Simplified Steel Stair Design for Commercial and Institutional Buildings

Simplified Steel Stair Design for Commercial and Institutional Buildings Simplified Steel Stair Design for Commercial and Institutional Buildings Collaborating with steel stair fabricators during the design of commercial and institutional buildings promotes integrated practice

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC) A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC) Note: this general guide has been prepared to assist homeowners and is not to be considered as a substitute for RDOS

More information

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW

BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW BUILDING A FENCE? THE CITY OF CAMBRIDGE REQUIRES THAT ALL FENCES WITHIN THE CITY CONFORM TO THE REGULATIONS OF FENCE BY-LAW FENCING FOR SWIMMING POOLS/HOT TUBS SPECIAL INFORMATION Your attention is drawn

More information

Solar Panel Installations

Solar Panel Installations Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package Uniform Construction Code (UCC) Manufactured Homes (Single-Wide, Double-Wide) Modular Homes Building Permit Application Package Per the Uniform Construction Code (UCC) all structures must be built per

More information

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS AIM AND APPLICATION OF THE GUIDE This guide is intended to help you better understand the requirements for building as set by applicable law, which could

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015

More information

CITY OF TORONTO. BY-LAW No. 349-2008

CITY OF TORONTO. BY-LAW No. 349-2008 Authority: Licensing and Standards Committee Item 12.3, adopted as amended, by City of Toronto Council on April 28 and 29, 2008 Enacted by Council: April 29, 2008 CITY OF TORONTO BY-LAW No. 349-2008 To

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Solar Water Heating and Solar Electric Generators Installed on One or Two Family Dwellings

Solar Water Heating and Solar Electric Generators Installed on One or Two Family Dwellings Solar Water Heating and Solar Electric Generators Installed on Category: Residential Construction Revised: [Paul L. Scarlett], Director Responsible Bureau Section: Development Services Center 1900 SW Fourth

More information

Handicap Ramp. Design and Construction. Guidelines

Handicap Ramp. Design and Construction. Guidelines Handicap Ramp Design and Construction Guidelines January 2015 Created June 2006 Rev 10/30/2007 Rev 11/6/2010 Rev 10/5/2012 Rev 1/31/2015 Rockwell Collins Retiree Volunteers RCRV and Wheelchair Ramp Assistance

More information

Basic Principles & Common Practices

Basic Principles & Common Practices DETAILING STAIRS: Basic Principles & Common Practices Figure 1: Stair Terminology By Andrew J. Bellerby This article is designed to provide an introduction to detailing stairs. It explains the basic principles

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Section A Roof Truss

Section A Roof Truss Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

STAIR TREAD & RISER INSTALLATION GUIDELINES

STAIR TREAD & RISER INSTALLATION GUIDELINES STAIR TREAD & RISER INSTALLATION GUIDELINES ARTISTIC FINISHES DOES NOT WARRANTY THE COMPLETENESS OR ACCURACY OF ANY INSTALLATION. THE INSTALLATION CONTRACTER MUST HAVE THE EXPERIENCE AND KNOWLEDGE TO COMPLETE

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

How To Retaining Wall Guide

How To Retaining Wall Guide How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra

More information

Basic Requirements for Residential Plan Review _

Basic Requirements for Residential Plan Review _ Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,

More information

AMERICAN GOTHIC PLAYHOUSE

AMERICAN GOTHIC PLAYHOUSE AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Uniform Construction Code (UCC) Building Permit Application Package

Uniform Construction Code (UCC) Building Permit Application Package Uniform Construction Code (UCC) Residential Building Permit Application Package Per the Uniform Construction Code (UCC) all structures must be built per the standards of the most currently adopted International

More information

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014 TOWNSHIP OF HILLSBOROUGH COUNTY OF SOMERSET Hillsborough Township Municipal Complex The Peter J. Biondi Building 379 South Branch Road Hillsborough, NJ 08844 P: (908) 369-4313 F: (908) 369-3954 Building

More information

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD.

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD. DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty Welcome To The Even Greater Outdoors. Congratulations on choosing MoistureShield for your

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

Safe ladder use. Construction Safety Series. When climbing up or down, workers should:

Safe ladder use. Construction Safety Series. When climbing up or down, workers should: Safe ladder use When climbing up or down, workers should: Always face the ladder. Workers must not use ladder-type material hoists for roof access unless the hoists are designed for that purpose. Use a

More information

PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE. decking guard. rim joist joists

PRESCRIPTIVE RESIDENTIAL DECK CONSTRUCTION GUIDE. decking guard. rim joist joists PRESCRIPTIVE Pend Oreille County Community Development Department RESIDENTIAL DECK P. O. Box 5066 Newport, Washington 99156-5066 Phone: 509-447-4821 Fax: 509-447-5890 CONSTRUCTION GUIDE BP-68 MULTIJURISDICTIONAL

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information