How To Recover From A Trading System Failure

Size: px
Start display at page:

Download "How To Recover From A Trading System Failure"

Transcription

1 Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT 601 Guide to Trading Services Disaster Recovery Issue April 2015

2 Important note This document has been produced by Oslo Børs to assist customers in the use of the Millennium platform on the Oslo Børs market place. Part of the documentation is based on documentation from Millennium IT and the London Stock Exchange Group. Where the document title includes a number (i.e. OSLMIT 201), the number corresponds to similar documentation from The London Stock Exchange and/or from Borsa Italiana. For more details, please see references in the appendix. If you have any general queries relating to this document, please technicalsupport@oslobors.no Further copies of this document can also be downloaded from the Oslo Børs website Disclaimer This document has been prepared on the basis of the best information available. Oslo Børs has taken reasonable efforts to ensure that the information in this publication is correct at the time of publication, but shall not be liable for decisions made in reliance on it. Oslo Børs will seek to provide notice to customers of changes being made to this document, but this notice cannot be guaranteed. Therefore, please note that this publication may be updated at any time. The information contained is therefore for guidance only. This document does not form part of the contractual documentation between the Oslo Børs and its customers. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 2

3 Change log This document can be updated at any time, and has been through the following iterations: Issue Date Description September 2012 Initial document release October 2012 First update, please refer to Appendix 1 for details November 2012 New release of the document as the Millennium platform is launched and the migration project is finalized. Minor wording changes to remove references to project and document links updated May 2012 Updated to include the Burgundy markets December 2014 Updated the name of the low latency market data channels and protocol April 2015 Removed references to the Burgundy market. Please note that only the latest issue of this document will be available from the Oslo Børs website. Details of the changes made in each issue of the document are described in the appendix. Changes from the previous issue of the document are indicated by a left margin bar. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 3

4 Content Important note... 2 Disclaimer... 2 Change log Introduction Purpose Readership Document series Trading Gateway Failure Loss of a Single Gateway General FIX Gateways (Trading, Post Trade and Drop Copy) Native Trading Gateway No Connection Possible Loss of Both Gateways Recovery Market Data Gateway Failure Other Component Failure Loss of Primary Site Approximate Schedule for a Site Failover Appendix 1 Issue updates Issue 1.0 Released 25 September Issue 1.1 Released 22 October Issue 2.0 Released 12 November Issue 2.1 Released 24 May Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 4

5 1. Introduction In November 2012, Oslo Børs migrated its equity and fixed income trading to the Millennium platform, a flexible, highly scalable trading platform with ultra-low latency from MillenniumIT, a company in the London Stock Exchange Group. Oslo Børs aims to strengthen its competitive position by migrating to this new technology, and is pleased to offer customers a trading system of the highest standard that offers all the functions one might expect from a state-of-the-art trading platform. 1.1 Purpose This document provides an overview of how a client should handle unexpected downtime and failures from the Millennium trading platform, and how both Oslo Børs and the client should recover when the system is back up. 1.2 Readership This document should be read in conjunction with the other technical documentation. Messages from any of the interfaces are highlighted in bold text in this document. Fields within messages are indicated by use of italic letters. References to other documents in the series are indicated by use of underlined italic letters. 1.3 Document series This document is a part of a series of documents providing a holistic view of full trading and information services available from Oslo Børs post the migration to the Millennium Exchange platform. The current series of documents are outlined below: General OSLMIT Oslo Børs Market Model Equities OSLMIT Oslo Børs Business Parameters - Equities OSLMIT Oslo Børs and Nordic ABM Market Model Fixed Income OSLMIT Oslo Børs and Nordic ABM Business Parameters Fixed Income Trading OSLMIT201 Guide to New Trading System OSLMIT202 FIX Trading Gateway (5.0 SP2) OSLMIT203 Native Trading Gateway OSLMIT204 Post Trade Gateway (FIX 5.0 SP2) OSLMIT205 Drop Copy Gateway (FIX 5.0 SP2) Market Data OSLMIT302 FIX/FAST Gateway OSLMIT303 MITCH Gateway OSLMIT306 FIX/FAST News and Indices Gateway OSLMIT401 Reference Data OSLMIT Derived Information Guidelines Other OSLMIT 501 Guide to Testing Services OSLMIT 502 Guide to Application Certification Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 5

6 OSLMIT 504 Guide to Dress Rehearsals (only relevant to the migration project) OSLMIT 505 Guide to Go-live (only relevant to the migration project) OSLMIT 601 Guide to Trading Services Disaster Recovery OSLMIT 602 Network Guide OSLMIT 604 Technical Parameters OSLMIT 605 Live Environment Connectivity OSLMIT 606 CDS Environment Connectivity OSLMIT 801 Reject Codes The latest version of this documentation series can be found on: Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 6

7 2. Trading Gateway Failure Each participant connection (identified by a CompID) will be enabled for access to the trading system via the primary and secondary gateways for each trading interface; Native Trading, FIX Trading, Post Trade and Drop Copy. 2.1 Loss of a Single Gateway In case of an unexpected disconnection from a primary gateway, participants should attempt to re-connect to the primary gateway again, before failing over to the secondary gateway. 2.2 General Participants with Cancel on Disconnect enabled should be aware that any orders sent by CompIDs connecting through a failed Primary Native Trading or FIX Trading Gateway will be deleted subject to the configuration adopted. 2.3 FIX Gateways (Trading, Post Trade and Drop Copy) On re-connection after an application failover (not site failover), the FIX gateways will increment outbound (to the participant) message sequence numbers by a configurable amount to ensure that any messages in-flight at the time of failure can be recovered. You can find this configurable amount in OSLMIT 604 Technical Parameters. A configurable amount of messages may be cached while the participant is logged of. Following log-on to the gateway, the cached Execution Reports or Trade Capture Reports generated by the system while participants are disconnected (including deletions due to Cancel on Disconnect), will automatically be re-sent. 2.4 Native Trading Gateway Participants should first connect to the real-time channel before connecting to the recovery channel. Following this any missed messages or Execution Reports generated by the system whilst participants are disconnected can be recovered via a Missed Message Request. 2.5 No Connection Possible Failed connection attempts on both the primary and secondary gateways may indicate a serious issue, and Oslo Børs should be contacted for guidance. See also; Chapter 5 Loss of Primary Site. 2.6 Loss of Both Gateways If both the primary and the secondary gateways fail, no connection will be possible to the Millennium Exchange platform. While the issue is investigated and resolved by Oslo Børs any market control actions and regular updates will be communicated via announcements from Oslo Børs. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 7

8 2.7 Recovery Oslo Børs will generally recover the primary gateway first. Dependent on the nature of the recovery, FIX sequence numbers will either be maintained from the previous session or be re-set to 1. This will be communicated to participants prior to re-connection. Once participants have re-connected, recovery actions should be identical to that for loss of a single gateway. In addition, after recovery it is recommended that all participants: - Carry out an Own Trade Download to confirm which trades have been sent to clearing and settlement. - Carry out an Own Order Book Download to reconcile their view of the order book with the order book from the Millennium Exchange platform. 3. Market Data Gateway Failure In normal circumstances, both the market data A- and B-feeds will have upper case market data group names, for example A for MITCH Equities Full Depth. However, if one of the gateways fails (or a full site failover is carried out), only one feed will continue, and the market data group name will be changed to lower case, for example a. The sequence number will be reset to 1 as well. Even if the primary gateway recovers and gets active again, the name will not change back to upper case until the next trading day. 4. Other Component Failure Millennium Exchange is made up of a number of components, with the exact system response to failure varying from component to component. Participants should be able to handle the following situations that may occur in the event of failure. - Temporary increase in message latency as a primary process fails over to its secondary - Complete loss of both primary and secondary major components (e.g. Matching Engine) resulting in an automatic Session Halt for impacted instruments, and any messages for these instruments rejected at the gateways Recovery procedures and market control actions will vary according to the nature of the failure. Guidance will be communicated via announcements from Oslo Børs, but participants should be prepared to: - Carry out an Own Trade Download to confirm which trades have been sent to clearing and settlement. - Carry out an Own Order Book Download to reconcile their view of the order book with that of the Millennium Exchange platform or to confirm that no orders are currently active. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 8

9 5. Loss of Primary Site Millennium Exchange will operate in cold standby mode on the secondary data center (SDC) and in the event of total loss of the primary site (primary data center, PDC) Oslo Børs will activate the Disaster Recovery Site on the secondary data center. This procedure is expected to take in the order of 2 hours. Any market control actions and regular updates will be communicated via announcements from Oslo Børs. Once the Disaster Recovery Site is active, all order books will be cleared down and the trading system is restarted. Following this, participants will be asked to connect to the Disaster Recovery Gateways. Participants should re-connect to their designated primary gateways using the same IP addressing as for the primary site. All FIX message sequence numbers will be reset to 1 on the FIX Gateways. Customers must also reset their outgoing sequence numbers to 1 before reconnecting. Oslo Børs cannot guarantee that any re-sent messages from before the disaster will not be processed if customer outgoing sequence numbers are not reset. In the event of disaster, only those trades that have been sent to participants via a Trade Capture Report from the Post Trade Gateway can be guaranteed to have been sent to clearing and settlement (if applicable). Participants should disregard any trades for which only an Execution Report has been sent prior to the disaster. Participants should note that no updated Execution Reports will be sent identifying those orders that have been deleted due to either Cancel on Disconnect or Oslo Børs clearing down order books as part of the recovery procedure. Any requests for missed messages on the Native Recovery channel will not return any messages from the trading system. Since all order books will be cleared, you will receive a number of OrderBookClear messages on MITCH, and Market Data Snapshot with MDEntryType(269) set to Empty Order Book (J) on FIX/FAST. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 9

10 5.1 Approximate Schedule for a Site Failover Time Event - X Primary Data Centre (PDC) becomes unavailable 0 Oslo Børs decides to do a failover to the Secondary Data Centre (SDC), and notifies the market. At this stage both PDC and SDC are unavailable for the market participants, who should await further notice from Oslo Børs. +45 min SDC is available for clients to connect. Oslo Børs will inform the market participants when this happens. At this stage, the market data gateways will send heartbeats from the secondary multicast feed only, however the sequence number will be reset to 1, and the participants can log on to the trading gateways. +50 min Symbol Directory / Security Definition messages are disseminated from the market data gateways. Market data participants should clear the order books, either manually or by doing snapshot requests for the entire market. Trading participants should also do an Own Order Book Download and Own Trade Download. All order books will be empty, but trades executed prior to the failure will be available, including unpublished delayed dissemination trades. +60 min The markets are moved into the Halt state. OrderBookClear messages will be disseminated on MITCH, and Market Data Snapshot with MDEntryType(269) set to Empty Order Book (J) on FIX/FAST. Oslo Børs will inform the market of the time of the opening auction. Oslo Børs will use the period between the Halt state and the Re-Opening Auction Call to monitor customer connectivity, and will be able to provide both technical support and market control actions min Markets move into Re-opening Auction Call and regular trading commences. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 10

11 Appendix 1 Issue updates This appendix describes the details of the changes made in each issue of this document. Issue 1.0 Released 25 September 2012 Intial release of document. Issue 1.1 Released 22 October 2012 Section 2.3 FIX Gateways (Trading, Post Trade and Drop Copy) Description Clarified that this chapters is about application failover, and not site failover. 3. Market Data Gateway Failure The sequence number after a failover will be reset to Loss of Primary Site 5.1 Approximate Schedule for a Site Failover OrderBookClear messages will be disseminated on MITCH, and Market Data Snapshot with MDEntryType(269)=Empty Order Book (J) will be disseminated on FIX/FAST. Issue 2.0 Released 12 November 2012 New issue of the document post migration to the Millennium platform. No changes to content, except minor wording changes to remove references to migration project and updated document links. Issue 2.1 Released 24 May 2013 Section General Description New issue of the document to include the Burgundy markets. 5. Loss of Primary Site Since Burgundy shares the same infrastructure, matching engine and trading gateways as Oslo Børs, both Oslo Børs and Burgundy will fail over to SDC in the event of total loss of the PDC. Issue 2.2 Released 10 November 2014 Updated the name of the low latency market data channels and protocol. Issue 2.3 Released 28 April 2015 Removed references to the Burgundy market. Oslo Børs OSLMIT 601 Guide to Trading Services Disaster Recovery 11

London Stock Exchange

London Stock Exchange London Stock Exchange MIT601 - Guide to Trading Services Disaster Recovery Issue 1.1 31 October 2014 Contents Disclaimer 4 1.0 Introduction 5 1.1 Purpose 5 1.2 Readership 5 1.3 Document Series 5 1.4 Document

More information

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 606 CDS Environment Connectivity

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 606 CDS Environment Connectivity Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT 606 CDS Environment Connectivity Issue 2.4 28 April 2015 Important note This document has been produced by Oslo Børs to assist

More information

The Oslo Børs cash equities and fixed income markets migration to Millennium Exchange. OSLMIT 501 Guide to Testing Services

The Oslo Børs cash equities and fixed income markets migration to Millennium Exchange. OSLMIT 501 Guide to Testing Services The Oslo Børs cash equities and fixed income markets migration to Millennium Exchange OSLMIT 501 Guide to Testing Services Issue 1.1 07 June 2012 Important note This document has been produced by Oslo

More information

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 502 Guide to Application Certification

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 502 Guide to Application Certification Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT 502 Guide to Application Certification Issue 2.2 10 November 2014 Important note This document has been produced by Oslo Børs

More information

SOLA - Oslo Børs Derivatives market. SOLA Production and Test Connections

SOLA - Oslo Børs Derivatives market. SOLA Production and Test Connections SOLA - Oslo Børs Derivatives market SOLA Production and Test Connections Issue 2.0 16 November 2015 Important note This document has been produced by Oslo Børs to assist customers in the use of the SOLA

More information

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT Derived Information Guidelines

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT Derived Information Guidelines Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT Derived Information Guidelines Issue 2.7 1 May 2015 Important note This document has been produced by Oslo Børs to assist customers

More information

London Stock Exchange Derivatives Market

London Stock Exchange Derivatives Market London Stock Exchange Derivatives Market LSEDM102 - Connectivity Guide Issue 4.0 08 June 2016 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Readership 4 1.3 Document Series 4 1.4 Document History 4 1.5

More information

London Stock Exchange

London Stock Exchange London Stock Exchange MIT501 - Guide to Testing Services Issue 16 31 October 2014 Contents Disclaimer 4 10.0 Participant Test Weekends 20 Appendix A: CDS Connectivity 20 1.0 Introduction 5 1.1 Purpose

More information

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 201 Guide to New Trading System

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT 201 Guide to New Trading System Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT 201 Guide to New Trading System Issue 2.4 28 April 2015 Important note This document has been produced by Oslo Børs to assist

More information

London Stock Exchange Derivatives Market

London Stock Exchange Derivatives Market London Stock Exchange Derivatives Market LSEDM102 - Connectivity Guide Issue 2.0 14 December 2015 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Readership 4 1.3 Document Series 4 1.4 Document History

More information

Turquoise Equities Connectivity Guide

Turquoise Equities Connectivity Guide T Q 1 0 2 T E C H N I C A L S P E C I F I C A T I O N Turquoise Equities Connectivity Guide I S S U E 2. 1 20 F e b r u a r y 2 0 1 3 Contents 1 Introduction... 3 1.1 Purpose... 3 1.2 Readership... 3 1.3

More information

Go-Live Activities Guide Weekend 9-10 April 2010

Go-Live Activities Guide Weekend 9-10 April 2010 O S L O B Ø R S C A S H E Q U I T Y A N D F I X E D I N C O M E M A R K E T M I G R A T I O N T O T R A D E L E C T Go-Live Activities Guide Weekend 9-10 April 2010 1 Contents 1. INTRODUCTION 3 1.1 Version

More information

Go-live Weekend 12/13 February 2011

Go-live Weekend 12/13 February 2011 MIT108 MIGRATION TO MILLENNIUM EXCHANGE Go-live Weekend 12/13 February 2011 Issue 1.0 8 February 2011 Contents 1. Introduction... 4 1.1. Purpose of this document... 4 1.2. Document History... 5 1.3. Enquiries...

More information

Johannesburg Stock Exchange

Johannesburg Stock Exchange Volume 200 - Guide to Testing Services Johannesburg Stock Exchange Version 1.00 Release Date 1 October 2011 Number of Pages 13 (Including Cover Page) 1 DOCUMENT CONTROL 1.1 Table of Contents Johannesburg

More information

LONDON STOCK EXCHANGE GROUP

LONDON STOCK EXCHANGE GROUP LONDON STOCK EXCHANGE GROUP GROUP TICKER PLANT GTP 007 - GTP LITE GUIDE ISSUE 4.0 29 JULY 2014 Powered by MillenniumIT Contents Guide Disclaimer... 3 1. Documentation... 4 1.1 This Guide... 4 1.2 Readership...

More information

London Stock Exchange Derivatives Market

London Stock Exchange Derivatives Market London Stock Exchange Derivatives Market LSEDM102 - Connectivity Guide Issue 1.0 30 September 2013 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Readership 4 1.3 Document Series 5 1.4 Document History

More information

Technical User Group Friday 21 October 2011

Technical User Group Friday 21 October 2011 Technical User Group Friday 21 October 2011 1 Agenda Introduction Borsa Italiana - Millennium Migration Update London Stock Exchange - Trading Services Millennium Enhancements London Stock Exchange - Information

More information

LONDON STOCK EXCHANGE GROUP

LONDON STOCK EXCHANGE GROUP LONDON STOCK EXCHANGE GROUP GROUP TICKER PLANT GTP 005 - TESTING GUIDE ISSUE 8.0 17 APRIL 2013 Powered by MillenniumIT Contents Guide Disclaimer... 3 1. Documentation... 4 1.1 This Guide... 4 1.3 Document

More information

Technical User Group Friday 14 September 2012

Technical User Group Friday 14 September 2012 Technical User Group Friday 14 September 2012 1 Agenda Introduction London Stock Exchange MIT Functional Release London Stock Exchange - Real Time Information Services - Group Ticker Plant Project Update

More information

London Stock Exchange

London Stock Exchange London Stock Exchange MIT502 - Guide to Application Certification Issue 11 26 June 2015 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Readership 4 1.3 Document Series 4 1.4 Document History 4 1.5 Contacts

More information

Turquoise Equities. TQ401 - Level 2 MITCH UDP Market Data. Issue 3.3 19 November 2015

Turquoise Equities. TQ401 - Level 2 MITCH UDP Market Data. Issue 3.3 19 November 2015 Turquoise Equities TQ401 - Level 2 MITCH UDP Market Data Issue 3.3 19 November 2015 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Readership 4 1.3 Document Series 4 1.4 Document History 5 1.5 Enquiries

More information

NASDAQ OMX Nordic Business Continuity Plan Description

NASDAQ OMX Nordic Business Continuity Plan Description NASDAQ OMX Nordic Business Continuity Plan Description October 10 th, 2013 This document is valid for NASDAQ OMX Nordic, including the legal entities: NASDAQ OMX Stockholm AB NASDAQ OMX Copenhagen A/S

More information

Market Data Technical Parameters

Market Data Technical Parameters MIGRATION TO MILLENNIUM EXCHANGE Market Data Technical Parameters Issue 1.0 8 October 2010 Disclaimer The London Stock Exchange Group has taken reasonable efforts to ensure that the information contained

More information

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT Oslo Børs and Burgundy Market Model Equities

Millennium Exchange - Oslo Børs cash equities and fixed income markets. OSLMIT Oslo Børs and Burgundy Market Model Equities Millennium Exchange - Oslo Børs cash equities and fixed income markets OSLMIT Oslo Børs and Burgundy Market Model Equities Issue 7.5 10 November 2014 Important note This document has been produced by Oslo

More information

Guide to Market Data Services

Guide to Market Data Services MIT301 - BIT MIGRATION TO MILLENNIUM EXCHANGE Guide to Market Data Services Issue 2.1 April 2014 Contents 1. Introduction... 4 1.1. Purpose... 4 1.2. Readership... 4 1.3. Document Series... 5 1.4. Document

More information

Mandatory Customer Dress Rehearsals Guide

Mandatory Customer Dress Rehearsals Guide OSLO BØRS CASH EQUITY AND FIXED INCOME MARKET MIGRATION TO INFOLECT Mandatory Customer Dress Rehearsals Guide Saturday 12 December 2009 Saturday 16 January 2010 Saturday 30 January 2010 This guide is produced

More information

JSE ITAC INITIATIVE. Frequently Asked Questions. July 2014

JSE ITAC INITIATIVE. Frequently Asked Questions. July 2014 JSE ITAC INITIATIVE Frequently Asked Questions July 2014 JSE Limited Reg No: 2005/022939/06 Member of the World Federation of Exchanges JSE Limited I 2014 Page 1 of 6 Frequently asked questions General:

More information

MIT308 EuroTLX - MILLENNIUM EXCHANGE. FTP Services Trading Calendars

MIT308 EuroTLX - MILLENNIUM EXCHANGE. FTP Services Trading Calendars MIT308 EuroTLX - MILLENNIUM EXCHANGE FTP Services Trading Calendars Issue 1.0 April 2015 1 Contents 1 Introduction... 4 1.1 Purpose... 4 1.2 Readership... 4 1.3 Document series... 4 1.4 Document History...

More information

BATS Chi-X Europe Disaster Recovery Guide

BATS Chi-X Europe Disaster Recovery Guide BATS Chi-X Europe Disaster Recovery Guide 23 September 2013 BATS Trading Limited is a Recognised Investment Exchange regulated by the Financial Conduct Authority. BATS Trading Limited is an indirect wholly-owned

More information

London Stock Exchange

London Stock Exchange London Stock Exchange MIT205 - Drop Copy Gateway (FIX 5.0) Issue 11.6 17 August 2015 Contents Disclaimer 4 1.0 Introduction 5 5.2 Possible duplicates 26 5.3 Possible resends 26 5.4 Transmission of missed

More information

Technical User Group. Monday 31 March 2014. Page 1

Technical User Group. Monday 31 March 2014. Page 1 Technical User Group Monday 31 March 2014 Page 1 Agenda Introduction Group Ticker Plant Update EuroTLX Migration to Millennium IT Settlement Cycle changes (T+2) CC&G New Clearing Front-end Q&A session

More information

Document Version June 2012 First Issue 3

Document Version June 2012 First Issue 3 Service and Technical Description Third Party Connectivity - Network Service Providers (NSPs) Issue 1 September 2012 Contents Third Party Connectivity - Network Service Providers (NSP)... 1 Contents...

More information

Technical User Group. Milano. 18 November 2015

Technical User Group. Milano. 18 November 2015 Technical User Group Milano 18 November 2015 Page 1 Agenda GTP Phase II New Functionalities on IDEM New Trading Hours for Borsa Italiana Markets New SeDeX Market Model MiFID II Roadmap for 2016 Q & A Page

More information

Connectivity WORLD LEADING ACCESS TO THE MARKETS

Connectivity WORLD LEADING ACCESS TO THE MARKETS Connectivity WORLD LEADING ACCESS TO THE MARKETS London & Milan Design Overview Key features ASSET CLASS ACCESS TO MULTIPLE MARKETS TRADING PLATFORM LOW LATENCY NETWORK CUSTOMER HOSTED CABINETS ULTRA LOW

More information

LONDON STOCK EXCHANGE GROUP

LONDON STOCK EXCHANGE GROUP LONDON STOCK EXCHANGE GROUP GROUP TICKER PLANT GTP 004 - PARAMETERS GUIDE ISSUE 13.0 4 MAY 2016 Powered by MillenniumIT Contents Guide Disclaimer... 3 1. Documentation... 4 1.1 This Guide... 4 1.3 Document

More information

HKEx Orion Market Data Platform MMDH Certification Test Instructions v1.0

HKEx Orion Market Data Platform MMDH Certification Test Instructions v1.0 Session 1: Logon & Password Handling During this session, the client is required to verify the capability of the feed handler to MMDH logon, password and heartbeat handling. From 9:00 to 11:00 am, the

More information

Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario

Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario Version 7.2 November 2015 Last modified: November 3, 2015 2015 Nasuni Corporation All Rights Reserved Document Information Testing

More information

Document Version. January 2013

Document Version. January 2013 Service and Technical Description Vendor Access Network Providers (VAN) January 2013 Contents Vendor Access Network Providers (VAN)... 1 Contents... 2 Document Version... 3 1. Introduction... 4 1.1. Purpose

More information

Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario

Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario Testing and Restoring the Nasuni Filer in a Disaster Recovery Scenario Version 7.0 July 2015 2015 Nasuni Corporation All Rights Reserved Document Information Testing Disaster Recovery Version 7.0 July

More information

Guide to Production Migration

Guide to Production Migration MIT102 MIGRATION TO MILLENNIUM EXCHANGE Guide to Production Migration Issue 3.0 19 January 2011 Contents 1. Introduction... 4 1.1. Purpose of this document... 4 1.2. Document History... 5 1.3. Enquiries...

More information

SECTION 1 INTRODUCTION... 2 1. SECTION 2 Overview of HKEx Orion Market Data Platform... 3

SECTION 1 INTRODUCTION... 2 1. SECTION 2 Overview of HKEx Orion Market Data Platform... 3 CONTENTS Page No. SECTION 1 INTRODUCTION... 2 1 SECTION 2 Overview of HKEx Orion Market Data Platform... 3 SECTION 3 Rollout Phases of HKEx Orion Market Data Platform... 7 SECTION 4 Securities Market &

More information

Disaster Recovery White Paper

Disaster Recovery White Paper Introduction Remote access plays a critical role in successfully executing a business recovery plan both in terms of providing access for existing remote users and accommodating the potential increase

More information

NASDAQ ITCH to Trade Options

NASDAQ ITCH to Trade Options Market Data Feed Version 3.02 NASDAQ ITCH to Trade Options 1. Overview NASDAQ ITCH to Trade Options (ITTO) is a direct data feed product in NOM2 system offered by The NASDAQ Option Market, which features

More information

G U I D E T O T E S T I N G S E R V I C E S. Oslo Børs cash equity and fixed income market migration to TradElect

G U I D E T O T E S T I N G S E R V I C E S. Oslo Børs cash equity and fixed income market migration to TradElect G U I D E T O T E S T I N G S E R V I C E S Oslo Børs cash equity and fixed income market migration to TradElect Important note This Guide to Testing Services sets out the current position regarding the

More information

Service & Technical Description

Service & Technical Description Service & Technical Description New Trading Service for ETFs - Euroclear Bank Settlement Version 1.3 4 November 2013 1. Introduction...5 1.1. Purpose... 5 1.2. Readership... 5 1.3.Overview of new Trading

More information

Technical User Group. Thursday 9 December 2010

Technical User Group. Thursday 9 December 2010 Technical User Group Thursday 9 December 2010 Extranex 1Gb roll-out update Glen Harding Agenda Delivery of services over Extranex 1Gb Migration of services onto 1Gb Performance of the 1Gb service Ordering

More information

High Availability Using Raima Database Manager Server

High Availability Using Raima Database Manager Server BUSINESS WHITE PAPER High Availability Using Raima Database Manager Server A Raima Inc. Business Whitepaper Published: January, 2008 Author: Paul Johnson Director of Marketing Copyright: Raima Inc. Abstract

More information

Service & Technical Description

Service & Technical Description Service & Technical Description Introduction of new currencies within Trading Service for ETFs - Euroclear Bank settlement Version 1.1 1. Introduction...5 1.1. Purpose... 5 1.2. Readership... 5 1.3. Overview

More information

New ilink Architecture Phase 2 Pre-Launch Mock Trading Sessions

New ilink Architecture Phase 2 Pre-Launch Mock Trading Sessions New ilink Architecture Phase 2 Pre-Launch Mock Trading Sessions Customer Test: January 30, 2016 February 20, 2016 March 5, 2016 1 Table of Contents Contents 1. Introduction & Overview... 3 2. Timeline...

More information

Cisco Active Network Abstraction Gateway High Availability Solution

Cisco Active Network Abstraction Gateway High Availability Solution . Cisco Active Network Abstraction Gateway High Availability Solution White Paper This white paper describes the Cisco Active Network Abstraction (ANA) Gateway High Availability solution developed and

More information

Customer Managed Connectivity - Milan

Customer Managed Connectivity - Milan Customer Managed Connectivity - Milan Service and Technical Description December 2015 Version 1 Table of Contents 1.0 Document Scope 3 1.1 1.2 1.3 1.4 Structure of this document 3 Version History 3 Use

More information

McAfee Endpoint Encryption Hot Backup Implementation

McAfee Endpoint Encryption Hot Backup Implementation McAfee Endpoint Encryption Hot Backup Implementation 1 Endpoint Encryption Hot Backup Implementation Planning, Implementing and Managing SafeBoot Enterprise Systems SafeBoot Hot Backup Implementation Having

More information

Moscow Exchange Fix protocol specifications for OTC trades report system (OTC-monitor)

Moscow Exchange Fix protocol specifications for OTC trades report system (OTC-monitor) Moscow Exchange Fix protocol specifications for OTC trades report system (OTC-monitor) Moscow, 2014 1 Table of Contents 1. Introduction... 4 1.1. Document purpose... 4 1.2. General description... 4 2.

More information

Planning, Implementing and Managing SafeBoot Enterprise Systems

Planning, Implementing and Managing SafeBoot Enterprise Systems Off s a f e b o o t h o t b a c k u p d e s i g n Overview Having a single physical server for your SafeBoot enterprise is obviously risky, and even if regular backups are taken delays can occur in user

More information

Connectivity. Alliance Access 7.0. Database Recovery. Information Paper

Connectivity. Alliance Access 7.0. Database Recovery. Information Paper Connectivity Alliance Access 7.0 Database Recovery Information Paper Table of Contents Preface... 3 1 Overview... 4 2 Resiliency Concepts... 6 2.1 Database Loss Business Impact... 6 2.2 Database Recovery

More information

US Equities/Options Multicast PITCH Specification. Version 2.20.4

US Equities/Options Multicast PITCH Specification. Version 2.20.4 US Equities/Options Multicast PITCH Specification Version 2.20.4 January 29, 2014 Contents 1 Introduction... 5 1.1 Overview... 5 1.2 Feed Connectivity Requirements... 6 1.3 Symbol Ranges, Units, and Sequence

More information

Connectivity. Alliance Access 7.0. Database Recovery. Information Paper

Connectivity. Alliance Access 7.0. Database Recovery. Information Paper Connectivity Alliance 7.0 Recovery Information Paper Table of Contents Preface... 3 1 Overview... 4 2 Resiliency Concepts... 6 2.1 Loss Business Impact... 6 2.2 Recovery Tools... 8 3 Manual Recovery Method...

More information

CME ClearPort (CP) API v.2.0. Certification Process Checklist

CME ClearPort (CP) API v.2.0. Certification Process Checklist CME ClearPort (CP) API v.2.0 Certification Process Checklist Revision History By (full name) Date Reason & of Changes Version Mildred Rodriguez 10/23/2009 Initial Draft 1.0 Michael Healy 12/07/2009 MQ

More information

ACP ThinManager Tech Notes. Terminal Services Display Clients

ACP ThinManager Tech Notes. Terminal Services Display Clients ACP ThinManager Tech Notes Terminal Services Display Clients Use the F1 button on any page of a ThinManager wizard to launch Help for that page. Visit www.thinmanager.com/technotes4/01_intro/manuals.shtml

More information

London Stock Exchange. Release 8.7 - Customer Dress Rehearsal Saturday 19 September 2015

London Stock Exchange. Release 8.7 - Customer Dress Rehearsal Saturday 19 September 2015 London Stock Exchange Release 8.7 - Customer Dress Rehearsal Saturday 19 September 2015 Issue 1.0 15 September 2015 Contents 1.0 Introduction 4 1.1 Purpose 4 1.2 Enquires 4 2.0 Test Overview 4 3.0 Pre-Dress

More information

RSM Web Gateway RSM Web Client INSTALLATION AND ADMINISTRATION GUIDE

RSM Web Gateway RSM Web Client INSTALLATION AND ADMINISTRATION GUIDE RSM Web Gateway RSM Web Client INSTALLATION AND ADMINISTRATION GUIDE Installation and Administration Guide RSM Web Client and RSM Web Gateway 17 August, 2004 Page 1 Copyright Notice 2004 Sony Corporation.

More information

IBM Rapid Restore PC powered by Xpoint - v2.02 (build 6015a)

IBM Rapid Restore PC powered by Xpoint - v2.02 (build 6015a) IBM Rapid Restore PC powered by Xpoint - v2.02 (build 6015a) User s Reference Guide Internal IBM Use Only This document only applies to the software version listed above and information provided may not

More information

THE BUDAPEST STOCK EXCHANGE LTD. REGULATIONS ON THE USE OF REMOTE TRADING

THE BUDAPEST STOCK EXCHANGE LTD. REGULATIONS ON THE USE OF REMOTE TRADING THE BUDAPEST STOCK EXCHANGE LTD. REGULATIONS ON THE USE OF REMOTE TRADING Date and reference no. of approval/modification resolutions by the Board of Directors: Date and reference no. of approval by Supervisory

More information

SCHEDULE 1 SERVICE DESCRIPTION

SCHEDULE 1 SERVICE DESCRIPTION SCHEDULE 1 SERVICE DESCRIPTION . Introduction Service Description a) Accreditation Process The Service Provider ( SP ) wishing to be approved by Borsa Italiana as an accredited Service Provider who can

More information

State of California Child Welfare Services/Case Management System. Contract 31091, Amendment 21 Remote Access Migration Guide Amend21 Ref Dial-up

State of California Child Welfare Services/Case Management System. Contract 31091, Amendment 21 Remote Access Migration Guide Amend21 Ref Dial-up State of California Child Welfare Services/Case Management System Contract 31091, Amendment 21 Remote Access Migration Guide Amend21 Ref Dial-up Version 2.2 February 8, 2006 Document Information Document

More information

Avid. inews. Redundancy and Failover in Avid News Management Solutions

Avid. inews. Redundancy and Failover in Avid News Management Solutions Avid Redundancy and Failover in Avid News Management Solutions Table of Contents Introduction............................................................1 Newsroom Computer System (NRCS)....................................2

More information

Contents. SnapComms Data Protection Recommendations

Contents. SnapComms Data Protection Recommendations Contents Abstract... 2 SnapComms Solution Environment... 2 Concepts... 3 What to Protect... 3 Database Failure Scenarios... 3 Physical Infrastructure Failures... 3 Logical Data Failures... 3 Service Recovery

More information

Veritas Storage Foundation and High Availability Solutions HA and Disaster Recovery Solutions Guide for Enterprise Vault

Veritas Storage Foundation and High Availability Solutions HA and Disaster Recovery Solutions Guide for Enterprise Vault Veritas Storage Foundation and High Availability Solutions HA and Disaster Recovery Solutions Guide for Enterprise Vault Windows Server 2003 Windows Server 2008 5.1 Service Pack 2 Veritas Storage Foundation

More information

Using Avaya Aura Messaging

Using Avaya Aura Messaging Using Avaya Aura Messaging Release 6.3.2 Issue 1 December 2014 Contents Chapter 1: Getting Started... 4 Messaging overview... 4 Prerequisites... 4 Accessing your mailbox from any phone... 4 Accessing the

More information

ZAR Including VAT. API Service Fee R 9 131.15 R 10 409.51 $ 1 160. Additional per Slot R 19 198.39 R 21 886.17 $ 2 439

ZAR Including VAT. API Service Fee R 9 131.15 R 10 409.51 $ 1 160. Additional per Slot R 19 198.39 R 21 886.17 $ 2 439 Equity Market Price List v1.0 2014 Membership Fees Category A R 41 278.64 R 47 057.65 Category B R 24 732.70 R 28 195.28 Category C R 19 787.58 R 22 557.84 Category D R 16 544.76 R 18 861.02 Category E

More information

Order Handling Risk Management Recommendations for Executing Brokers

Order Handling Risk Management Recommendations for Executing Brokers Building on recent FIA publications, including Market Access Risk Management Recommendations (April 2010) and Recommendations for Risk Controls for Trading Firms (November 2010), this document offers a

More information

Exchange Server Backup and Restore

Exchange Server Backup and Restore WHITEPAPER BackupAssist Version 6 www.backupassist.com Cortex I.T. 2001-2007 2 Contents 1. Introduction... 3 1.1 Overview... 3 1.2 Requirements... 3 1.3 Requirements for remote backup of Exchange 2007...

More information

SIP-DECT Knowledge Base SIP-DECT System Update

SIP-DECT Knowledge Base SIP-DECT System Update SIP-DECT Knowledge Base SIP-DECT System Update MAI 2015 DEPL-2046 VERSION 1.6 KNOWLEDGE BASE TABLE OF CONTENT 1) Introduction... 2 2) Update (New Service Pack in the same Release)... 3 2.1 OMM HOSTED ON

More information

Pervasive PSQL Meets Critical Business Requirements

Pervasive PSQL Meets Critical Business Requirements Pervasive PSQL Meets Critical Business Requirements Pervasive PSQL White Paper May 2012 Table of Contents Introduction... 3 Data Backup... 3 Pervasive Backup Agent... 3 Pervasive PSQL VSS Writer... 5 Pervasive

More information

LMAX Exchange FIX4.4 & API FAQs April 2015

LMAX Exchange FIX4.4 & API FAQs April 2015 LMAX Exchange FIX4.4 & API FAQs April 2015 Disclaimer LMAX Exchange has taken reasonable efforts to ensure that the information contained in this publication is correct at the time of going to press, but

More information

IBM TSM DISASTER RECOVERY BEST PRACTICES WITH EMC DATA DOMAIN DEDUPLICATION STORAGE

IBM TSM DISASTER RECOVERY BEST PRACTICES WITH EMC DATA DOMAIN DEDUPLICATION STORAGE White Paper IBM TSM DISASTER RECOVERY BEST PRACTICES WITH EMC DATA DOMAIN DEDUPLICATION STORAGE Abstract This white paper focuses on recovery of an IBM Tivoli Storage Manager (TSM) server and explores

More information

How To Trade On Orb

How To Trade On Orb SER V I C E D E S C R I P T I O N Electronic Order Book for the UK Retail Bond Market Contents 1. Introduction... 3 1.1 Main Characteristics. 3 1.2 Scope of Changes 3 1.3 Readership.. 4 1.4 Relevant Documentation.

More information

IBRIX Fusion 3.1 Release Notes

IBRIX Fusion 3.1 Release Notes Release Date April 2009 Version IBRIX Fusion Version 3.1 Release 46 Compatibility New Features Version 3.1 CLI Changes RHEL 5 Update 3 is supported for Segment Servers and IBRIX Clients RHEL 5 Update 2

More information

Secure Web Gateway Version 11.7 High Availability

Secure Web Gateway Version 11.7 High Availability Secure Web Gateway Version 11.7 High Availability Legal Notice Copyright 2015 Trustwave Holdings, Inc. All rights reserved. This document is protected by copyright and any distribution, reproduction, copying,

More information

A CommVault White Paper: Business Continuity: Commserve Licensing & Recovery Procedure

A CommVault White Paper: Business Continuity: Commserve Licensing & Recovery Procedure A CommVault White Paper: Business Continuity: Commserve Licensing & Recovery Procedure CommVault Corporate Headquarters 2 Crescent Place Oceanport, New Jersey 07757-0900 USA Telephone: 888.746.3849 or

More information

Contents 1 Introduction... 4. 2 Technical Configuration... 6. 3 Customer Support... 10. 4 How to Order... 11

Contents 1 Introduction... 4. 2 Technical Configuration... 6. 3 Customer Support... 10. 4 How to Order... 11 S e r v i c e a n d T e c h n i c a l D e s c r i p t i o n BIt Network Service I s s u e 1. 1 J a n u a r y 2 0 1 2 Contents 1 Introduction... 4 1.1 Purpose of this document... 4 1.2 Associated Documentation...

More information

Sophos SafeGuard Native Device Encryption for Mac Administrator help. Product version: 7

Sophos SafeGuard Native Device Encryption for Mac Administrator help. Product version: 7 Sophos SafeGuard Native Device Encryption for Mac Administrator help Product version: 7 Document date: December 2014 Contents 1 About SafeGuard Native Device Encryption for Mac...3 1.1 About this document...3

More information

Non-Native Options for High Availability

Non-Native Options for High Availability The Essentials Series: Configuring High Availability for Windows Server 2008 Environments Non-Native Options for High Availability by Non-Native Options for High Availability... 1 Suitability and Cost...

More information

Section 1: Disaster Recovery

Section 1: Disaster Recovery Pharmacy Benefit Management (PBM) and eprescribing (erx) Solution Contingency Plans (Last Revised on February 15, 2015 - Next revision June 30, 2015) This document will address the existing disaster recovery,

More information

High Availability for Oracle 9i Using Double-Take

High Availability for Oracle 9i Using Double-Take High Availability for Oracle 9i Using Double-Take High Availability for Oracle 9i Using Double-Take published November 2002 NSI and Double-Take are registered trademarks of Network Specialists, Inc. All

More information

SERVICE AND TECHNICAL DESCRIPTION. Electronic Order Book for the UK Retail Bond Market

SERVICE AND TECHNICAL DESCRIPTION. Electronic Order Book for the UK Retail Bond Market SERVICE AND TECHNICAL DESCRIPTION Electronic Order Book for the UK Retail Bond Market 1 Contents 1. Introduction... 3 1.1 Main Characteristics...3 1.2 Scope of Changes...4 1.3 Readership...4 1.4 Relevant

More information

Microsoft Office 365 from Vodafone. Administrator s Guide for Midsize Businesses and Enterprises

Microsoft Office 365 from Vodafone. Administrator s Guide for Midsize Businesses and Enterprises Microsoft Office 365 from Vodafone Administrator s Guide for Midsize Businesses and Enterprises Contents Footer bar Return to contents page Go to next of section Return to start of section Previous page

More information

London Stock Exchange

London Stock Exchange London Stock Exchange MIT201 - Guide to the Trading System Issue 12.4 effective from 22 June 2015 1.0 Introduction 6 1.1 Purpose 6 1.2 Relevant London Stock Exchange communication channels 7 1.3 Readership

More information

Advanced Farm Administration with XenApp Worker Groups

Advanced Farm Administration with XenApp Worker Groups WHITE PAPER Citrix XenApp Advanced Farm Administration with XenApp Worker Groups XenApp Product Development www.citrix.com Contents Overview... 3 What is a Worker Group?... 3 Introducing XYZ Corp... 5

More information

emidas Users Brochure

emidas Users Brochure Users Brochure Table of Contents Introduction 2 What is emidas? 3 Welcome Letter 4 Login Page 5 Reports 6-8 Daily & Monthly Statements 9 Query 10-12 Snapshots 13 Tools 14 Introduction The MF Global emidas

More information

Maximum Availability Architecture. Oracle Best Practices For High Availability. Backup and Recovery Scenarios for Oracle WebLogic Server: 10.

Maximum Availability Architecture. Oracle Best Practices For High Availability. Backup and Recovery Scenarios for Oracle WebLogic Server: 10. Backup and Recovery Scenarios for Oracle WebLogic Server: 10.3 An Oracle White Paper January, 2009 Maximum Availability Architecture Oracle Best Practices For High Availability Backup and Recovery Scenarios

More information

PATROL Console Server and RTserver Getting Started

PATROL Console Server and RTserver Getting Started PATROL Console Server and RTserver Getting Started Supporting PATROL Console Server 7.5.00 RTserver 6.6.00 February 14, 2005 Contacting BMC Software You can access the BMC Software website at http://www.bmc.com.

More information

Trade Reporting Services: Service Description

Trade Reporting Services: Service Description Trade Reporting Services: Service Description Status: Issued BATS Chi-X Europe March 13 th 2015 Version 1.9 1 CONTENTS 1. INTRODUCTION... 4 2. HOW BATS WORKS... 4 3. THE SERVICES... 4 3.1 TDM Service...

More information

Enterprise Manager. Version 6.2. Administrator s Guide

Enterprise Manager. Version 6.2. Administrator s Guide Enterprise Manager Version 6.2 Administrator s Guide Enterprise Manager 6.2 Administrator s Guide Document Number 680-017-017 Revision Date Description A August 2012 Initial release to support version

More information

Canadian Securities Exchange enhances Trading Network by adding a FIX Protocol Router Appliance

Canadian Securities Exchange enhances Trading Network by adding a FIX Protocol Router Appliance The Canadian Securities Exchange (CSE) began operations in 2003 to provide a modern and efficient alternative for companies looking to access the Canadian public capital markets. The operating company,

More information

Oracle Data Guard for High Availability and Disaster Recovery

Oracle Data Guard for High Availability and Disaster Recovery Oracle Data Guard for High Availability and Disaster Recovery John Zhong Senior Technical Specialist Global Database Management Group Citigroup and Vice President of American DBAOnline John_j_zhong@yahoo.com

More information

Caché High Availability Guide

Caché High Availability Guide Caché High Availability Guide Version 2015.1 11 February 2015 InterSystems Corporation 1 Memorial Drive Cambridge MA 02142 www.intersystems.com Caché High Availability Guide Caché Version 2015.1 11 February

More information

Upgrade of HKATS and DCASS to Genium INET Platform. Fallback Plan. for Exchange and Clearing Participants

Upgrade of HKATS and DCASS to Genium INET Platform. Fallback Plan. for Exchange and Clearing Participants Upgrade of HKATS and DCASS to Genium INET Platform Fallback Plan for Exchange and Clearing Participants Issue Date: August 2013 Table of Content 1. Introduction... 1 2. Fallback Arrangement... 2 3. Services

More information

Extreme Networks Security Upgrade Guide

Extreme Networks Security Upgrade Guide Extreme Networks Security Upgrade Guide 9034868 Published July 2015 Copyright 2012 2015 All rights reserved. Legal Notice Extreme Networks, Inc. reserves the right to make changes in specifications and

More information