Official Basketball Rules Basketball Equipment
|
|
|
- Brittney Stafford
- 9 years ago
- Views:
Transcription
1 Official Basketball Rules 2014 Basketball Equipment As approved by FIBA Central Board Barcelona, Spain, 2 nd February 2014 Valid as of 1 st October 2014
2 Page 2 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
3 TABLE OF CONTENTS 1 Backstop unit Backboard Basket ring Basket net Backboard support structure Padding Basketballs Game clock Scoreboard Shot clock Signals Player foul markers Team foul markers Alternating possession arrow Playing floor Playing court Lighting Advertising boards Support service areas Spectator areas References...22 TABLE OF DIAGRAMS Diagram 1 Backstop unit... 6 Diagram 2 Backboard markings... 7 Diagram 3 Rigidity of the backboard glass... 7 Diagram 4 Basket ring... 8 Diagram 5 Ring mounting plate... 9 Diagram 6 Ring mounting plate for existing baskets... 9 Diagram 7 Backboard padding...11 Diagram 8 Scoreboard for Level 1 (example of the layout)...14 Diagram 9 Shot clock display unit, duplicate game clock, and red light for Levels 1 and 2 (example of the layout)...15 Diagram 10 Alternating possession arrow (Example of the layout)...16 Diagram 11 Playing court...18 Diagram 12 Advertising in the playing court area...20 Diagram 13 Spectators' line of visibility...21 June 2014 OFFICIAL BASKETBALL RULES 2014 Page 3 of 22
4 Page 4 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
5 Basketball Equipment Throughout this section entitled Basketball Equipment, all references made to a timer, scorer, shot clock operator, etc. in the male gender also apply to the female gender. It must be understood that this is done for practical reasons only. Introduction The Basketball Equipment section of the Official Basketball Rules specifies all basketball equipment required at a game. Reference to high level competitions indicates that the equipment is essential and imperative for this level and strongly recommended for medium level and all of the other competitions. Reference to medium level competitions indicates that the equipment is essential and imperative for this level and strongly recommended for all other competitions. This Appendix shall be used by all parties involved directly in the game as well as by basketball equipment manufacturers, local organisers and FIBA for its equipment approval programme and to establish national and international standards. The competitions are divided into three (3) levels: High level competitions (Level 1): Main FIBA official competitions, as defined in Book 2 Chapter I of the FIBA Internal Regulations governing the FIBA Competitions. The facilities and equipment required for the following main FIBA official competitions are subject to FIBA approval (Levels 1 and 2): Olympic Tournaments; World Olympic Qualifying Tournaments for Men and Women, World Championships for Men, Women, U-19 and U-17; Zone Championships for Men and Women. All equipment at these competitions must be FIBA approved Level 1 and must display the FIBA logo in the FIBA approved layout. Medium level competitions (Level 2): All other FIBA official competitions as defined in Book 2 Chapter I of the FIBA Internal Regulations governing the FIBA Competitions, and high level competitions of the national federations. Other competitions (Level 3): All other competitions not included in the above. Notes: 1. All measurement tolerances are according to DIN ISO Standard 286 (see References [1]) except where other values are explicitly stated. 2. Reference is made to the FIBA publications "Guide to Basketball Facilities for High-Level Competitions" and "Guide to Small Basketball Facilities". June 2014 OFFICIAL BASKETBALL RULES 2014 Page 5 of 22
6 1 Backstop unit There shall be two (2) backstop units (Diagram 1), one (1) placed at each end of the playing court and each consisting of the following parts: One (1) backboard. One (1) basket ring with a ring mounting plate. One (1) basket net. One (1) basket support structure. Padding. Diagram 1 Backstop unit 2 Backboard 2.1 The backboards shall be made of a suitable transparent material (for Level 1 and 2, of a tempered safety glass), made in one (1) piece, non reflective, with a flat front surface and shall: Have a protective framework of the backboard support structure around the outer edge. Be manufactured such that, if broken, the pieces of glass do not split off. 2.2 For Level 3, the backboards may be made of other material(s) painted white, but must meet the other above specifications. 2.3 The backboards shall measure 1,800 mm (+ a maximum of 30 mm) horizontally and 1,050 mm (+ a maximum of 20 mm) vertically. 2.4 All lines on the backboards shall be: In white, if the backboards are transparent. In black, if the white painted backboards are non-transparent. 50 mm in width. 2.5 The borders of the backboards shall be marked with a boundary line (Diagram 2) and an additional rectangle behind the ring as follows: Outside dimensions: 590 mm (+ a maximum of 20 mm) horizontally and 450 mm (+ a maximum of 8 mm) vertically. The top edge of the base of the rectangle shall be level with the top of the ring and 150 mm (- 2 mm) above the bottom edge of the backboard. Page 6 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
7 2.6 For Levels 1 and 2, each backboard shall be equipped with lighting around its perimeter, mounted on the inside borders of the backboards and which lights up in red only when the game clock signal sounds for the end of a period. The lighting shall be a minimum of 10 mm in width and cover a minimum of 90 % along the edge of the backboard glass area. Diagram 2 Backboard markings 2.7 The backboards shall be firmly mounted on the backboard support structures at each end of the playing court at right angles to the floor, parallel to the endlines (Diagram 1). The central vertical line on their front surfaces, extended down to the floor, shall touch the point on the floor which lies 1,200 mm from the centre point of the inner edge of each endline, on an imaginary line drawn at right angles to this endline. 2.8 Rigidity test for the backboard tempered safety glass: When a square-shaped weight of 50 kg (250 mm wide and high, and 1,100 mm long) is applied along the centre of the backboard glass (without its frame), which is placed horizontally on two (2) parallel wooden bars at a distance of 1,200 mm from each other (Diagram 3), the maximum vertical deformation shall be 3 mm. Diagram 3 Rigidity of the backboard glass When a basketball is dropped onto the backboard, it shall rebound from it with a minimum rebounding height of 50%. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 7 of 22
8 3 Basket ring 3.1 The rings shall be made of solid steel and shall: Have an inside diameter of a minimum of 450 mm and a maximum of 459 mm. Be painted orange within the following Natural Colour System (NCS) FIBA approved spectrum (see References [2]): 0080-Y70R 0090-Y70R 1080-Y70R Have its metal a minimum of 16 mm and a maximum of 20 mm in diameter. 3.2 The net shall be attached to each ring in 12 places. The fittings for the attachment shall: Not have any sharp edges or gaps, Have gaps smaller than 8 mm, to prevent fingers from entering, Not be designed as hooks for Level 1 and 2. Diagram 4 Attachment of the net (example) Basket ring 3.3 The rings shall be fixed to the backboard support structures in such a way that any force applied to the ring cannot be transferred to the backboard itself. Therefore, there shall be no direct contact between the ring mounting plate and the backboard (Diagram 5). 3.4 The top edge of each ring shall be positioned horizontally, 3,050 mm (± a maximum of 6 mm) above the floor, equidistant from the two (2) vertical edges of the backboard. 3.5 The point on the inside circumference of the ring nearest the backboard shall be 151 mm (± a maximum of 2 mm) from the face of the backboard. Page 8 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
9 Must not extend below the bottom edge of the backboard Diagram 5 Ring mounting plate 3.6 For existing basket support structures, it is recommended that the ring mounting plate be fixed to the framework according to the measurements given in Diagram 6. Must not extend below the bottom edge of the backboard Diagram 6 Ring mounting plate for existing baskets 3.7 Pressure release rings with the following specifications shall be used for Levels 1 and 2 and are recommended for Level 3: It shall have rebound qualities close to those of the fixed ring. The pressure release mechanism shall ensure these characteristics, but not cause any damage to either the ring or the backboard. The design of the ring and its construction shall be such that the players' safety is ensured. The pressure release rings shall have a 'positive-lock' mechanism which must not disengage until a static load of a minimum of 82 kg and a maximum of 105 kg has June 2014 OFFICIAL BASKETBALL RULES 2014 Page 9 of 22
10 been applied vertically to the top of the ring at the most distant point from the backboard. The pressure release ring mechanism shall be adjustable within the given static load range. When the pressure release mechanism is released, the front or the side of the ring shall rotate no more than 30 degrees and no less than 10 degrees below the original horizontal position. After release, and with the load no longer applied, the ring shall return automatically and instantly to its original position. No fissures and no permanent deformation of the ring should be observed. Both rings must have identical rebound characteristics. 3.8 The rebound/elasticity of the ring and support system should be within 35% - 50% energy absorption range of total impact energy and with a 5% differential between both baskets on the same playing court. 4 Basket net 4.1 The nets shall be made of white cord and shall be: Suspended from the rings. Manufactured so that they check the ball momentarily as it passes through the basket. No less than 400 mm and no more than 450 mm in length. Manufactured with 12 loops to attach it to the ring. 4.2 The upper section of the net shall be semi-rigid to prevent: The net from rebounding up through or over the ring, creating possible entanglement. The ball from becoming trapped in the net or rebounding back out of the net. 5 Backboard support structure 5.1 For Level 1, only mobile or floor-fixed backboard support structures shall be used. This is also recommended for Level 2. For Levels 2 and 3, ceiling or wall mounted backboard support structures may also be used. Ceiling mounted backboards shall not be used in sports halls with a suspension height exceeding 10,000 mm in order to avoid excessive vibration in the support structure. 5.2 The backboard support structure shall be: For Levels 1 and 2, at a distance of at least 2,000 mm including padding, measured from the outer edge of the endline (Diagram 1). Of a bright colour, contrasting with the background, so that it is clearly visible to the players. Secured to the floor so as to prevent any movement. Should floor anchoring not be possible, an additional weight on the basket support base must be used to prevent any movement. Adjusted such as that once the top edge of the ring is at a height of 3,050 mm from the playing floor, this height cannot be changed. 5.3 The rigidity of the backboard support structure with ring shall fulfil the requirements of the EN 1270 norms. 5.4 The visible vibration of the backboard support unit shall end a maximum of four (4) seconds after a dunk shot. Page 10 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
11 6 Padding 6.1 The backboard and backboard support structure must be padded. 6.2 The padding shall be of a single solid colour and shall be the same colour on both backboards and support structures. 6.3 The padding shall be 20 to 27 mm thick from the front, back and side surface of the backboards. The padding shall be 48 to 55 mm thick from the bottom edge of the backboards. 6.4 The padding shall cover the bottom surface of each backboard and the side surface to a distance of 350 to 450 mm from the bottom. The front and back surface must be covered to a minimum distance of 20 to 25 mm from the bottom of each backboard. Diagram 7 Backboard padding 6.5 The padding of the backboard support structure shall cover: The vertical edges on each side, to a minimum height of 2,150 mm from the floor and with a minimum thickness of 100 mm (Diagram 1). The bottom and side surfaces of the supporting arm of the backboard, from the back surface of the backboard over a minimum length of 1,200 mm along the arm, with a minimum thickness of 25 mm (Diagram 1). 6.6 All padding shall: Be constructed so as to prevent limbs from being trapped. Have a maximum indentation factor of 50%. This means that when a force is applied suddenly to the padding, the indentation in the padding does not exceed 50% of its original thickness. Pass the test according to EN 913, Annex C (see References [3]). 7 Basketballs 7.1 For Levels 1 and 2, the outer surface of the ball shall be made of leather or artificial/- composite/synthetic leather. For Level 3, the outer surface of the ball may be made of rubber. 7.2 The surface of the ball shall not contain toxic materials or any materials which may cause an allergic reaction. The ball must not contain heavy metals (EN 71) or AZO colours. 7.3 The ball shall: Be spherical, with black seams not exceeding 6.35 mm in width and, either of a single shade of orange or of a FIBA approved colour combination. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 11 of 22
12 Be inflated to an air pressure such that, when it is dropped onto the playing floor from a height of approximately 1,800 mm measured from the bottom of the ball, it will rebound to a height of between 1,200 mm and 1,400 mm, measured to the top of the ball. Be marked with its respective size number. 7.4 For all men s competitions in all categories, the circumference of the ball shall be no less than 749 mm and no more than 780 mm (size 7) and the ball shall weigh no less than 567 g and no more than 650 g. 7.5 For all women s competitions in all categories, the circumference of the ball shall be no less than 724 mm and no more than 737 mm (size 6) and the ball shall weigh no less than 510 g and no more than 567 g. 7.6 In addition to checking the specifications listed above, the following tests shall be carried out: Fatigue strength test. Heat-storage test. Valve leak test. Practice test. For Levels 1 and 2, the category 1 ball black test. 7.7 For Levels 1 and 2, the organisers shall provide at least 12 balls of the same model and specification for practices and warm-ups. 8 Game clock 8.1 For Levels 1 and 2, the main game clock (Diagram 8) shall: Be a digital countdown clock with an automatic signal sounding for the end of the period as soon as the display shows zero (00:00.0). Have the ability to indicate time remaining in minutes and seconds; as well as tenths (1/10) of a second only during the last minute of the period. Be placed so that it is clearly visible to everyone involved in the game, including the spectators. 8.2 If the main game clock is placed above the centre of the playing court, there shall be a synchronised duplicate game clock at each end of the playing court, each of which must be high enough that it is clearly visible to everyone involved in the game, including the spectators. Each duplicate game clock shall display the score and the playing time remaining throughout the game. 8.3 For Levels 1 and 2, a whistle-controlled time system, interfaced with the connector equipped game clock may be used by the officials to stop the game clock, provided that this system is used in all of the games of a given competition. The officials shall also start the game clock, however this is, at the same time, also done by the timer. All FIBA approved scoreboards may provide the interface with the whistle controlled system. 9 Scoreboard 9.1 For Levels 1 and 2, two (2) large scoreboards shall be: Placed one (1) at each end of the playing court and, if so desired, a further scoreboard (cube) placed above the centre of the playing court. This does not exclude the need for the other two (2) scoreboards. Clearly visible to everyone involved in the game, including the spectators. Page 12 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
13 In case video displays are used the complete required game information must be visible at any time during the game including intervals of play. The readability of the displayed information shall be identical compared to that of a digital scoreboard. 9.2 A game clock control panel shall be provided for the timer and a separate scoreboard control panel shall be provided for the assistant scorer. Computer panels may be used for entering data onto the scoreboard, however, to operate the equipment only dedicated control panels shall be used. Each panel shall enable easy correction of any incorrect data and have memory back-ups to save all game data for a minimum of thirty (30) minutes. 9.3 The scoreboard shall include and/or indicate: The digital countdown game clock. The points scored by each team, and for Level 1 the cumulative points scored by each individual player. For Levels 1 and 2 the number of each individual player number (in the order 00, 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 and 11-99), and for Level 1 also their corresponding surnames. There shall be a minimum of twelve (12) digits to display each player s surname. The team s names. There shall be a minimum of three (3) digits to display each team s name. The number of fouls committed by each player on the team from 1 to 5. The fifth foul shall be indicated in red or orange. The number may be shown with five (5) indicators or a number display with a minimum height of 135 mm. In addition, the 5 th foul may be indicated with a slow flashing display (~ 1 Hz) for five (5) seconds. The number of team fouls from 1 to 5, stopping at 5. The number of the period from 1 to 4, and E for an extra period. The number of charged time-outs per half from 0 to 3. A clock for timing the time-out (optional). The game clock must not be used for this purpose. 9.4 For Level 1 (obligatory) and Level 2 (recommended): The display on the scoreboard shall be in bright contrasting colours. The background of the display shall be antiglare. The digits used for displaying the numbers on the game clock and game score shall be a minimum height of 300 mm (Level 1) or 250 mm (Level 2) and a minimum width of 150 mm (Level 1) or 125 mm (Level 2). The digits and characters used for displaying the numbers of the team fouls and periods shall be a minimum height of 250 mm and a minimum width of 125 mm. The digits and characters used for displaying the team names, players surnames and numbers, and points scored by players shall be a minimum height of 150 mm. The scoreboard game clock, game scores and the shot clocks should have a minimum viewing angle of The scoreboard shall: Not have any sharp edges or burrs. Be mounted securely. Be able to withstand severe impact from any ball. Have specific protection, if necessary, which should not impair the readability of the scoreboard. Have electromagnetic compatibility in accordance with the statutory requirements of the respective country. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 13 of 22
14 Diagram 8 Scoreboard for Level 1 (example of the layout) 10 Shot clock 10.1 The shot clock shall have: A separate control unit provided for the shot clock operator, with a very loud automatic signal to indicate the end of the shot clock period when the display shows zero (0). A display unit with a digital countdown, indicating the time in seconds only The shot clock shall have the ability to be: Started from twenty-four (24) seconds. Started from fourteen (14) seconds. Stopped with the display indicating the seconds remaining. Restarted from the time at which it was stopped. Showing no display, if necessary For Levels 1 and 2 the shot clock shall be connected to the game clock so that when: The game clock stops, the shot clock shall also stop. The game clock starts, it is possible to start the shot clock manually. The shot clock stops and sounds, the game clock count continues and may be stopped, if necessary, manually For Levels 1 and 2 the shot clock display unit (Diagram 9), together with a duplicate game clock and a red light shall: Be mounted on each backboard support structure a minimum of 300 mm above and behind the backboard (Diagram 1) or hung from the ceiling. Have the different colours of the numbers of the shot clock and the duplicate game clock. Have the numbers of the shot clock display a minimum height of 230 mm and be larger than the numbers of the duplicate game clock. For Level 1, have three (3) or four (4) display surfaces per unit (recommended for Level 2 and 3) to be clearly visible to everyone involved in the game, including the spectators. Have the maximum weight of 60 kg, including the support structure. Page 14 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
15 Pass the test of protection against damage by balls according to DIN (see References [9]). Have electromagnetic compatibility in accordance with the statutory requirements of the respective country The electric light on the shot clock display unit shall be: Of a bright red colour. Synchronised with the game clock to light up when the signal sounds for the end of playing time for a period. Synchronised with the shot clock to light up when the signal sounds for the end of a shot clock period. Diagram 9 Shot clock display unit, duplicate game clock, and red light for Levels 1 and 2 (example of the layout) 11 Signals 11.1 There shall be at least two (2) separate sound signals, with distinctly different and very loud sounds: One (1) provided for the timer and the scorer which shall sound automatically to indicate the end of the playing time for a period. The timer and scorer shall be able to sound the signal manually when appropriate to attract the attention of the officials. One (1) provided for the shot clock operator which shall sound automatically to indicate the end of the shot clock period Both signals shall be sufficiently powerful to be easily heard above the most adverse or noisy conditions. The sound volume shall have the ability to be adapted according to the size of the sport hall and the noise of the crowd, to a maximum sound pressure level of 120 dba measured at a distance of one (1) m from the source of the sound. A connection to the public information system of the sports hall is strongly recommended. 12 Player foul markers The five (5) player foul markers provided for the scorer shall be: Of white colour. With numbers a minimum of 200 mm in length and 100 mm in width. Numbered from 1 to 5 (1 to 4 in black and the number 5 in red). June 2014 OFFICIAL BASKETBALL RULES 2014 Page 15 of 22
16 13 Team foul markers 13.1 The two (2) team foul markers provided for the scorer shall be: Of red colour. A minimum of 350 mm in height and of 200 mm in width. Clearly visible to everyone involved in the game, including the spectators, when positioned on either side of the scorer s table. Used to indicate the number of team fouls up to five (5) and to show that a team has reached the team foul situation Electrical or electronic devices may be used but they shall meet the above specifications. 14 Alternating possession arrow The alternating possession arrow device (Diagram 10) provided for the scorer shall: Have an arrow of a minimum length of 100 mm and height 100 mm. Display on the front side an arrow, illuminated in bright red colour when switched on, showing the direction of the alternating possession. Be positioned in the centre of the scorer s table and shall be clearly visible to everyone involved in the game, including the spectators. 100 mm 100 mm Diagram 10 Alternating possession arrow (Example of the layout) 15 Playing floor 15.1 The playing floor surface shall be made of: Permanent wooden flooring (Levels 1 and 2). Mobile wooden flooring (Levels 1 and 2). Permanent synthetic flooring (Levels 2 and 3). Mobile synthetic flooring (Levels 2 and 3) The playing floor shall: Be a minimum length of 32,000 mm and a minimum width of 19,000 mm. Have an antiglare surface For Level 1, permanent wooden flooring, the following requirements are valid: Sports functional requirements Force reduction (Shock absorption) according to EN 14808: min. 50 % Vertical deformation according to EN 14809: min. 2.3 mm, max. 5.0 mm Vertical ball behaviour according to EN (basketball): min. 93 % Sliding properties according to pren 14903: min. 0.4, max. 0.7 or according to EN (dry condition): min. 80, max. 110 The requirements for the above properties have to be fulfilled at each system testing spot Page 16 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
17 Area deflection according to DIN V ( ): average per direction: max. 20 %; single values up to 30 % Requirements regarding uniformity Force Reduction ± 5 % (absolute) from the average Vertical Deformation ± 0.7 mm from the average Vertical ball behaviour ± 3 % (absolute) from the average 15.4 For Level 1, mobile wooden flooring, the following requirements are valid: Sports functional requirements Force reduction (Shock absorption) according to EN 14808: min. 40 % Vertical deformation according to EN 14809: min. 1.5 mm, max. 5.0 mm Vertical ball behaviour according to EN (basketball): min. 93 % Sliding properties according to pren 14903: or according to EN (dry condition): min. 0.4, max. 0.7 min. 80, max. 110 The requirements for the above properties have to be fulfilled at each system testing spot Requirements regarding uniformity Force Reduction ± 5 % (absolute) from the average Vertical Deformation ± 0.7 mm from the average Vertical ball behaviour ± 3 % (absolute) from the average 15.5 For Levels 2 and 3, permanent synthetic flooring, the following requirements are valid: Sports functional requirements Force reduction (Shock absorption) according to EN 14808: min. 25 % Vertical deformation according to EN 14809: max. 3.5 mm Vertical ball behaviour according to EN (basketball): min. 90 % Sliding properties according to pren 14903: min. 80, max. 110 The requirements for the above properties have to be fulfilled at each system testing spot 15.6 The manufacturer, together with the flooring installation company, shall be obliged to produce documentation for each customer comprising of at least the following: Results of the prototype test, a description of the installation procedure, maintenance advice, results of the inspection and approval of the existing installation carried out by approved inspection officials The playing floor must have the ability to carry mobile or floor-fixed backboard support structures without degrading the characteristics of the backboard support structure. Conversely, the mobile backboard support structures must be constructed in such a way that their weight is spread over a bigger contact area, thus eliminating the risk for damage to the floor, both in game position and during transportation on the court. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 17 of 22
18 16 Playing court 16.1 The playing court shall be marked by: 50 mm lines, as per the Official Basketball Rules. A further boundary line (Diagram 11), in a sharply contrasting colour and having a minimum width of 2,000 mm. The colour of the further boundary line must be the same as that of the centre circle (if painted) and the restricted areas The scorer s table, a minimum of 6,000 mm in length and 800 mm in height, must be placed on a platform of a minimum of 200 mm in height All spectators must be seated at a distance of at least 5,000 mm from the outer edge of the boundary line of the playing court The height of the ceiling or the lowest obstruction above the playing floor shall be a minimum of seven (7) m. Further boundary line 2,000 Diagram 11 Playing court 17 Lighting 17.1 The playing court shall be uniformly and adequately lit. The lights shall be positioned so they do not hinder the players and officials vision The table below defines the lighting levels for FIBA televised events. Level 1 Level 2 Level 3 Competitions Description Illuminance Average Ug Uniformity (lux) % / 2m U1 U2 (E min/e max) (E min/e ave) Light source Colour Colour Temperature Rendering ( K) (Ra) E Cam > 2000 < 10 > 0.6 > to 6000 >= 90 E h 0.75 to 1.5 * E cam < 10 > 0.7 > 0.8 E Cam > 1400 < 10 > 0.6 > to 6000 >= 90 E h 0.75 to 1.5 * E cam < 10 > 0.7 > 0.8 E Cam > 1000 < 20 > 0.5 > to 6000 >= 80 E h 0.5 to 2 * E cam < 20 > 0.6 > 0.7 Page 18 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
19 Glossary E Cam Camera illuminance; quantity of light into the direction of a camera, at grid points 1.5 m above the FOP E h Horizontal illuminance; quantity of light at grid points on the FOP E ave Average illuminance on a grid E min Minimum illuminance on a grid E max Maximum illuminance on a grid FOP Field of Play Grid The basic layout of measuring and calculation points over the FOP (9 * 15 grid points, corresponding to 2 m * 2 m spacing) U1 Uniformity of illuminance; calculated as E min/e max U2 Overall uniformity of illuminance; calculated as E min/e ave Ug Uniformity gradient; the percentage difference of illuminance between adjacent grid points The above average levels are required during the event. A maintenance factor is usually specified to compensate for the ageing and soiling of the light sources, reflectors and front glasses. In the absence of the relevant information, it is recommended to use a maintenance factor of 0.8. The average illuminance towards the main camera for the first 12 rows of seats shall be between 10 and 25 % of the average illuminance of the FOP towards the main camera. Above the first 12 rows, the light level shall be uniformly reduced. For camera positions, please refer to the FIBA Television Manual, see Reference [6] All lighting installations shall: Reduce glare and shadows by the correct positioning of the lighting equipment. The luminary aiming angle (from downward vertical) shall be 65 and the intensity of the light source shall be adapted in relation to the installation height. Be in compliance with the national safety requirements for electrical equipment in the respective country. Provide Level 3 conditions for broadcasting continuity in the event of a power failure For Level 1, the strobe light system shall have: A wiring harness for the installation of four (4) lines, one (1) in each corner of the playing court. Each line shall have the ability to power a set of four (4) strobe lights. Each set with synchro-cabling and accessibility for the photographers via a switch exchange located in the vicinity of the basket support structure. Each set located at a distance of at least 5,000 mm from the boundary line and at a recommended height of 15,000 mm. Four (4) sockets for the strobe lights located 2,000 mm from the flashes. Each socket shall be separate and protected against interference between the lamps (thermal recognition differential magnet). The harness installed safely and out of the reach of the spectators. The flashes installed safely to prevent them from falling Individual flash photography is not permitted. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 19 of 22
20 18 Advertising boards 18.1 Advertising boards may be located around the playing court and: Shall be located at a minimum distance of 2,000 mm from the endlines and sidelines (Diagram 12). Those along the endlines must have a minimum gap of 900 mm on each side of the mobile backstop units so that the floor wiper(s) and portable TV camera(s) can pass through, if necessary Advertising boards are permitted in front of the scorer's table provided that they are placed directly in front of and flush with the table Advertising boards shall: Not exceed a height of 1,000 mm from the playing court. Be padded around the top with a minimum thickness of 20 mm. Have no burrs and all edges shall be rounded off. Be in accordance with the national safety requirements for electrical equipment in the respective country. Have mechanical protection for all engine driven parts. Be non-flammable For Level 1, only electronic signage advertising boards are permitted. Team bench Scorer's table Advertising in front (vertical board) Team bench 2,000 mm Advertising board(s) Advertising board(s) Basket support 2,000 mm Further boundary line 2,000 mm 2,000 mm Advertising board(s) Basket support Advertising board(s) Advertising board(s) Diagram 12 Advertising in the playing court area Page 20 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
21 19 Support service areas 19.1 The support service areas, which must be fully accessible to persons with a disability, are the areas in which essential operations for the competition are carried out The required areas are: a) Changing rooms for teams. b) Changing rooms for referees and table officials. c) Rooms for commissioners and FIBA representatives. d) Doping control station. e) First aid station for players. f) Changing room for staff. g) Storage room and cloakroom. h) Administrative offices. i) Media area. j) VIP area. 20 Spectator areas 20.1 The spectator areas shall: Allow the free movement of the public, including persons with a disability. Enable spectators to have a comfortable view of the event. Have unobstructed lines of visibility from all seats, as shown in Diagram 13, unless the local standards allow for deviations. h = 800 mm d > 100 mm a b x = c d Diagram 13 Spectators' line of visibility 20.2 The seating capacity is defined as follows, unless the local standards allow for deviations: The total capacity of the sports hall is the total number of both the seated and standing positions. The number of seated positions is the total number of seats or the total length of the terraces or benches in metres, divided by 480 mm. The number of standing positions is the assigned floor space, with 35 spectators for every 10 m 2. The above specifications are recommendations only. June 2014 OFFICIAL BASKETBALL RULES 2014 Page 21 of 22
22 21 References [1] DIN ISO 286, 1990: ISO system of limits and fits; bases of tolerances, deviations and fits [2] National Colour System of Standardiseringkommissionen i Sverige (SIS), Doc. No. SS [3] EN 913, Annex C, 1996: Determination of shock absorption of padding [4] EN 71-3, 1995: Safety of toys. Specification for migration of certain elements [5] EN 1270, 1998: Playing field equipment Basketball equipment Functional and safety requirements, test methods [6] FIBA Television Manual, Edition April 2007 [7] EN 14904, 2006: Surfaces for sports areas Indoor surfaces for multi-sports use Specification. [8] DIN , 2001: Sport Hall surfaces, requirements, testing, maintenance [9] DIN , 1997: Sport halls: halls for gymnastic and games: testing of safety against ball throwing [10] ISO 9002, 1994: Quality assurance management [11] Floors for Indoor Sports, Design Guidance Note, Sport England, September 2007, Rev. 002 ISO standards are sold by the ISO General Secretary in Geneva, Switzerland: ISO Sales Case Postale Genève 20 SUISSE [email protected] Standards from the European Committee for Standardisation (CEN) and national standards are available directly from the national standards bodies. Page 22 of 22 OFFICIAL BASKETBALL RULES 2014 June 2014
RULE 1. The Field of Play
RULE 1 The Field of Play 1.1 Dimensions 1.1.1 The field of play shall be rectangular, the width of which shall not be more than 75 yards [68.58 m] or less than 70 yards [64.01 m] and shall not exceed the
Official Basketball Rules 2008
Official Basketball Rules 2008 As approved by FIBA Central Board Beijing, People s Republic of China, 26 th April 2008 Valid as of 1 st October 2008 April 2008 Page 2 of 80 April 2008 Page 3 of 80 TABLE
Official Basketball Rules 2014
Official Basketball Rules 2014 As approved by FIBA Central Board Barcelona, Spain, 2 nd February 2014 Valid as of 1 st October 2014 Page 2 of 86 OFFICIAL BASKETBALL RULES 2014 May 2014 TABLE OF CONTENTS
MONDOATHENS BASKETBALL SET (Reference PK110)
MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are
Official Basketball Rules 2010
Official Basketball Rules 2010 As approved by FIBA Central Board San Juan, Puerto Rico, 17 th April 2010 Valid as of 1 st October 2010 April 2010 Page 2 of 81 OFFICIAL BASKETBALL RULES 2010 OFFICIAL BASKETBALL
Official Basketball Rules 2012
Official Basketball Rules 2012 As approved by FIBA Central Board Rio de Janeiro, Brazil, 29 th April 2012 Valid as of 1 st October 2012 April 2012 Page 2 of 80 Table of contents / Table of diagrams RULE
Squash Court Design general points
Squash Court Design general points Contents: Contents:... 1 1. Squash Court Dimensions... 2 2. CourtTech Walls... 3 3. Dimensional requirements for courts with CourtTech Walls... 3 4. Loading of CT System
Official Basketball Rules 2010
Official Basketball Rules 2010 Referees Manual Two-Person Officiating As approved by FIBA Central Board San Juan, Puerto Rico, 17 th April 2010 Valid as of 1 st October 2010 April 2010 Page 2 of 78 Table
2 THE LAWS OF TABLE TENNIS
2 THE LAWS OF TABLE TENNIS 2.1 THE TABLE 2.1.1 The upper surface of the table, known as the playing surface, shall be rectangular, 2.74m long and 1.525m wide, and shall lie in a horizontal plane 76cm above
Official Basketball Rules 2010
Official Basketball Rules 2010 Referees Manual Three-Person Officiating As approved by FIBA Central Board San Juan, Puerto Rico, 17 th April 2010 Valid as of 1 st October 2010 April 2010 Page 2 of 30 THREE-PERSON
TABLE TENNIS SINGLES RULES
TABLE TENNIS SINGLES RULES Table Tennis Singles Rules 1) Elimination Tournament. 2) One player per team. 3) Play best of 3 games. Games to 21, unless ties at 20. In that case, alternate service and must
TABLE TENNIS TABLE TENNIS
1 The Official Special Olympics Sports Rules for Table Tennis shall govern all Special Olympics competitions. As an international sports program, Special Olympics has created these rules based upon International
GUIDE TO THE ARTIFICIAL LIGHTING OF HOCKEY PITCHES
GUIDE TO THE ARTIFICIAL LIGHTING OF HOCKEY PITCHES Sixth Edition Foreword There is an increasing desire to use an outdoor hockey facility over a long period of time each day. This will often entail the
INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999
INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS Published: April 1999 CONTENTS 1 Introduction 2 Test Procedures General 3 Standards and Specific Test Procedures
FIBA vs North American Rules Comparison
FIBA vs North American Rules Comparison by Anthony Reimer During his officiating career of over 20 years, Anthony Reimer became known in the province of Alberta, Canada, for his expertise in basketball
Official Wheelchair Basketball Rules
Official Wheelchair Basketball Rules 2010 As approved by IWBF Executive Council Birmingham, Great Britain, 13 th July 2010 Valid as of 1 st October 2010 October 2010 Page 2 of 88 OFFICIAL WHEELCHAIR BASKETBALL
OFFICIAL RULES OF THE NATIONAL SHUFFLEBOARD ASSOCIATION, INC. Revised 1997 Updated January 2005
OFFICIAL RULES OF THE NATIONAL SHUFFLEBOARD ASSOCIATION, INC. Revised 1997 Updated January 2005 A - GAME 1. The game of shuffleboard is played by: two (2) persons (called singles), or by four (4) persons
Each player must present a Rowan ID card before each contest to be eligible to participate.
5 on 5 Basketball Rules Each player must present a Rowan ID card before each contest to be eligible to participate. All intramural participants are responsible for their own medical expenses. Any student
Socci Sport Alternative Games
- 1 - Socci Sport Alternative Games Table of Contents 1 Roller Socci 2 2 Pass and Shoot Socci 2 3 Punt & Catch Socci 2 4 Long Pass Socci 3 5 Pass, Dribble, and Shoot Socci 3 6 Scooter Socci Basketball
10 FREE BASKETBALL DRILLS
BASKETBALL DRILLS AND PRACTICE PLANS 1 10 FREE BASKETBALL DRILLS by Coach Patrick Anderson BASKETBALL DRILLS AND PRACTICE PLANS 2 CONTENTS 1.1 Rapid Swing Pass... 3 1.2 Box Out React Drill... 3 1.3 Bump...
FÉDÉRATION INTERNATIONALE DE GYMNASTIQUE. FIG Apparatus Norms
FÉDÉRATION INTERNATIONALE DE GYMNASTIQUE FIG Apparatus Norms TRA 75 2.5 TRA Trampoline Gymnastics Trampoline TRA 1 76 1. Frame 1.1. Interior measurements of the frame, with bed under tension, but without
MINI-BASKETBALL RULES
MINI-BASKETBALL RULES 2005 FEDERATION INTERNATIONALE DE BASKETBALL INTERNATIONAL BASKETBALL FEDERATION FIBA Founded in 1932 Address: Chemin de Blandonnet 8 P.O. Box 715 CH-1214 Vernier Geneva Switzerland
OFFICIAL BASKETBALL RULES SUMMARY OF CHANGES 2014
OFFICIAL BASKETBALL RULES SUMMARY OF CHANGES 2014 1 No Charge Semi-circle Rule The no-charge semi-circle rule shall be applied when the defensive player has one foot or both feet in contact with the no-charge
National Federation of State High School Associations. Basketball. Take Part. Get Set For Life.
National Federation of State High School Associations Basketball Three Officials Mechanics Take Part. Get Set For Life. Presentation ti Topics Terminology Pregame Jump Ball Primary Coverage Areas Rotations
Standard the the Raising
Raising the Standard Introduction to BS 5839-1:2013 An Overview of the BS 5839 1:2013 for professionals who are responsible for the provision of fire detection and alarm systems for buildings Agenda Introduction
Rules for the IEEE Very Small Competition Version 1.0
7th LATIN AMERICAN IEEE STUDENT ROBOTICS COMPETITION Joint with JRI 2008 (Brazilian Intelligent Robotic Journey) and SBIA 2008 (19 th Brazilian Symposium on Artificial Intelligence) Rules for the IEEE
Team Handball Study Guide
Team Handball Study Guide Grotthuss History Team Handball originated in northern Europe (Denmark, Germany, Norway and Sweden) in the end of the 19 th century. The Dane Holger Nielsen drew up the rules
TOURNAMENT RULES. American Darts Organization
American Darts Organization TOURNAMENT RULES AMERICAN DARTS ORGANIZATION 230 N. Crescent Way Unit #K Anaheim, CA 92801 (714) 254-0212 / 0214 Fax [email protected] American Darts Organization TOURNAMENT
NATIONAL PADDLEBALL ASSOCIATION FOUR-WALL / INDOOR PADDLEBALL OFFICIAL FOUR WALL RULES
NATIONAL PADDLEBALL ASSOCIATION FOUR-WALL / INDOOR PADDLEBALL OFFICIAL FOUR WALL RULES REVISED APRIL 2016 &CONSISTS OF 10 PAGES (POLICIES, RECOMMENDATIONS, & OUTDOOR PROVISIONS ARE PAGES 11 & 12) RULE
Ulster GAA Sport Science Services Fitness Testing Procedures 2012 2016. Ulster GAA Fitness Testing Procedures For County Academy Squads 2012-2016
Ulster GAA Fitness Testing Procedures For County Academy Squads 2012-2016 Introduction This document has been compiled by Kevin McGuigan (Ulster GAA, Sport Science Support Officer) following consultation
Blender Notes. Introduction to Digital Modelling and Animation in Design Blender Tutorial - week 9 The Game Engine
Blender Notes Introduction to Digital Modelling and Animation in Design Blender Tutorial - week 9 The Game Engine The Blender Game Engine This week we will have an introduction to the Game Engine build
FUTSAL RULES Below are additions and/or highlights to FIFA Futsal Rules For details on FIFA Rules, see Rules PDF.
FUTSAL RULES Below are additions and/or highlights to FIFA Futsal Rules For details on FIFA Rules, see Rules PDF. Equipment & Uniforms Game balls are to be provided. Personal Futsal balls are allowed,
Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide
Lunette 2 Series Curved Fixed Frame Projection Screen User s Guide Important Safety and Warning Precautions Please follow these instructions carefully to ensure proper maintenance and safety with your
EN 14904. Export Manager Pulastic Sports Surfaces The Netherlands www.descol.nl
Introduction by : Peter Minnée Export Manager Pulastic Sports Surfaces The Netherlands www.descol.nl Co-operation between European test institutes and standardization institutes formalized in 1961 Construction
RULES OF THE GAME FOR INTRAMURAL VOLLEYBALL Revised July 10, 2013
RULES OF THE GAME FOR INTRAMURAL VOLLEYBALL Revised July 10, 2013 OFFICE OF INTRAMURAL SPORTS DEPARTMENT OF UNIVERSITY RECREATION DIVISION OF STUDENT AFFAIRS MISSISSIPPI STATE UNIVERSITY General Information
Senses SV series industrial monitor user manual
Industrial Monitors Senses SV series Senses SV19 / SV17 User manual (Issue A) Part No: 85090084 Page 1 of 25 Copyright Copyright 2008 Amplicon Liveline Ltd. All rights reserved. This publication, including
The International Table Tennis Federation. The Ball (Version for 40mm Balls) Technical Leaflet T3
The International Table Tennis Federation The Ball (Version for 40mm Balls) Technical Leaflet T3 Chemin de la Roche 11, 1020 Renens/Lausanne, Switzerland Tel. +41 21 340 70 90 Fax +41 21 340 70 99 E-mail:
INTERNATIONAL BLIND SPORTS FEDERATION
INTERNATIONAL BLIND SPORTS FEDERATION GOALBALL RULES 2010-2013 January 1, 2010 Goalball is a game played by two teams of three players with a maximum of three substitutes for each team. The game is played
SECTION A OFFICIAL EVENTS
1 The Official Special Olympics Sports Rules for Football (Soccer) shall govern all Special Olympics competitions. As an international sports program, Special Olympics has created these rules based upon
AMPSEAL* Automotive Plug Connector and Header Assembly
AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2
SECURITY CAMERA INSTRUCTION MANUAL ENGLISH VERSION 1.0 LBC5451. www.lorextechnology.com
SECURITY CAMERA INSTRUCTION MANUAL ENGLISH VERSION 1.0 LBC5451 www.lorextechnology.com Contents 1x Camera and mounting stand 1x Power adapter 1x Mounting kit 1x Allen key 1x Screw cap 1x 60 ft. (18m)
HDA -----------------------------------------------------------
----------------------------------------------------------- Lightstrips ---------------------------------------------------------------------- Ceiling system for heating and cooling LIGHTSTRIPS LIGHTSTRIPS
A1.5 Classroom Standards
A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional
Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm.
Conveyor Solutions Whatever your logistic needs, we can offer a conveyor solution. Our flexible systems primary and secondary packaging for single and multi packages, can transport your goods from one
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
COACHING THE TACKLE Jim Mc CORRY
COACHING THE TACKLE Jim Mc CORRY Defensive play is comprised of both individual defending and team defending and they form the platform for many a successful side. The purpose of this coaching session
e-4 AWT07MLED 7 Q TFT LCD MONITOR (LED Backlighted) USER MANUAL
Thank you for purchasing our product. Please read this User s Manual before using the product. Change without Notice AWT07MLED 7 Q TFT LCD MONITOR (LED Backlighted) USER MANUAL e-4 SAFETY PRECAUTIONS Federal
III. TEAM COMPOSITION
Volleyball Rules I. GAME CHARACTERISTICS 1. Volleyball is a sport played by two teams on a playing court divided by a net. There are different, versions available for specific circumstances in order to
Linkeo 19" freestanding cabinets
87045 LIMOGES Cedex France Telephone: (+33) 05 55 06 87 87 - Fax: (+33) 05 55 06 88 88 Linkeo 19" freestanding cabinets Page 1. General characteristics....1 2. Range....2 3. Technical characteristics...3
Team Selection. Team Selection. Advanced Game. Positions. Advanced Game
Welcome to Subbuteo Dream Team Stadium: the classic game of tabletop football, now with an all-star, international line-up. You are the player-manager of an elite dream team, made up of the most talented
SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design
SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design Ideal installation for; Offices Branch Offices Schools Computer Aided Classes Government Offices Hotels
Wespot. SecNurse A NEW GENERATION TECHNICAL AIDS USER S GUIDE
Wespot SecNurse A NEW GENERATION TECHNICAL AIDS USER S GUIDE EN This manual is published by OPTEX, without any warranty. Improvements and changes to this manual necessitated by typographical errors, inaccuracies
Spring Doubles Tennis Rules
Spring Doubles Tennis Rules USTA Tennis Rules Condensed USTA Rules may be modified for IM Play at the discretion of the Intramural Sports Office RULE 1: The Court The court shall be a rectangle, 78 feet
Pool Dimensions and Equipment
RULE 1 Pool Dimensions and Equipment SECTION 1. Pool Dimensions [recommended] Long-Course Swimming ARTICLE 1. a. For facilities (those with architectural plans dated after September 1, 1996), it is preferred
Summary of FUTSAL Laws of the Gamel. A summary of FIFA's Futsal Laws of the Game
Summary of FUTSAL Laws of the Gamel A summary of FIFA's Futsal Laws of the Game This is a summary of FIFA's "Laws of the Game for Futsal (Indoor Football)" Click the hypertext in the above sentence for
Industrial infrared heater IR For premises with large volumes and high ceilings
3 3000 6000 W Electrical heat 3 models Industrial infrared heater For premises with large volumes and high ceilings Application is suitabe for total or supplementary heating of premises with large volume
DOSSIER EN 12464-1. 10.80 m 10.30 CONCISE DESCRIPTION OF THE STANDARD. 2nd edition, june 2012
DOSSIER EN 12464-1 10.80 m 10.30 500 500 CONCISE DESCRIPTION OF THE STANDARD 2nd edition, june 2012 500 500 Foreword EN 12464-1 is an application standard for lighting. The original standard was written
Cross-beam scanning system to detect slim objects. 100 mm 3.937 in
891 Object Area Sensor General terms and conditions... F-17 Related Information Glossary of terms... P.1359~ Sensor selection guide...p.831~ General precautions... P.1405 PHOTO PHOTO Conforming to EMC
FR 3 SWIMMING POOLS FOR OLYMPIC GAMES AND WORLD CHAMPIONSHIPS FR 6 DIVING FACILITIES FOR OLYMPIC GAMES AND FR 8 WATER POLO POOLS FOR OLYMPIC GAMES AND
FINA FACILITIES RULES PREAMBLE FR 1 GENERAL FR 2 SWIMMING POOLS FR 3 SWIMMING POOLS FOR OLYMPIC GAMES AND WORLD CHAMPIONSHIPS FR 4 AUTOMATIC OFFICIATING EQUIPMENT FR 5 DIVING FACILITIES FR 6 DIVING FACILITIES
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions
The first rules, written in longhand by Mr. Morgan, contained the following basic features:
HISTORY OF VOLLEYBALL RULES Adapted and updated to 2006, from A Summary of Seventy-Five Years of Rules by William T. Odeneal, which appeared in the 1970 Annual Official Volleyball Rules and Reference Guide
YMCA Basketball Games and Skill Drills for 3 5 Year Olds
YMCA Basketball Games and s for 3 5 Year Olds Tips ( s) Variations Page 2 Dribbling Game 10 Players will learn that they must be able to dribble to attack the basket (target) to score in basketball. The
VOLUME AND SURFACE AREAS OF SOLIDS
VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b
Rules 2012/13. www.englandhockey.co.uk/in2hockey. The Rules of In2Hockey. are published by the EHB
Rules 2012/13 The Rules of In2Hockey www.englandhockey.co.uk/in2hockey are published by the EHB in2hockey 7-A-Side Rules 2012/13 RULE 1 TEAMS a. The game is played between two teams. They shall each have
Laserlyte-Flex Alignment System
Laserlyte-Flex Alignment System LaserLyte-Flex The LaserLyte-Flex Alignment System is a unique, interchangeable, low cost plug and play laser system. Designed specifically for aligning and positioning
Sliding and Folding Door Fittings Sliding Door Accessories
Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
Adaptive strategies for office spaces in the UK climate
International Conference Passive and Low Energy Cooling 631 Adaptive strategies for office spaces in the UK climate I. Gallou Environment & Energy Studies Programme, Architectural Association Graduate
GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE
Growth Contract No. GRD2-2000-30024 GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE Principal author: G. DE SCHUTTER September 2005 European Research Project: MEASUREMENT OF PROPERTIES OF FRESH SELF-COMPACTING
Most Misunderstood Basketball Rules
Most Misunderstood Basketball Rules This is a list of basketball rules that are often misunderstood by coaches, players, and parents. This has been developed over the past twenty-five years, officiating
As soon as we receive your payment of CHF 4,000. - (test fees) on our account number:
Dear Sir / Madame, We thank you for your inquiry concerning FIVB homologation. We draw your attention to the fact that only ball producers (manufacturers) can submit a request for ball homologation. We
DiwiTherm, Resistance Thermometers Model TR75, with digital Display Battery or Solar Powered
Electrical Temperature Measurement DiwiTherm, Resistance Thermometers Model TR75, with digital Display Battery or Solar Powered WIKA Data Sheet TE 60.75 Applications Machinery, plant and tank construction
CONTENTS. References to the International Tennis Federation or ITF shall hereafter mean ITF Limited.
CONTENTS FOREWORD 1 Rule 1 THE COURT 2 Rule 2 PERMANENT FIXTURES 3 Rule 3 THE BALL 3 Rule 4 THE RACKET 4 Rule 5 SCORE IN A GAME 5 Rule 6 SCORE IN A SET 5 Rule 7 SCORE IN A MATCH 6 Rule 8 SERVER & RECEIVER
WEDNESDAY, 4 MAY 10.40 AM 11.15 AM. Date of birth Day Month Year Scottish candidate number
FOR OFFICIAL USE G KU RE Paper 1 Paper 2 2500/403 Total NATIONAL QUALIFICATIONS 2011 WEDNESDAY, 4 MAY 10.40 AM 11.15 AM MATHEMATICS STANDARD GRADE General Level Paper 1 Non-calculator Fill in these boxes
This section deals with mandatory and optional equipment for your vehicle as well as suggestions for safer road use.
3. EQUIPMENT This section deals with mandatory and optional equipment for your vehicle as well as suggestions for safer road use. 3.1 Lights No person shall drive a vehicle on a highway at nighttime or
IH 17025 E Sigma Island 90
INSTRUCTIONS FOR USE Kitchen extractor hood Type: IH 17025 E Sigma Island 90 Dear Customer!! You are now a user of the newest generation kitchen extractor hood type IH 17025 E Sigma Island 90. This hood
MEMORANDUM. Stefanie Sparks Smith Secretary-Rules Editor, NCAA Women s Lacrosse Rules Committee.
MEMORANDUM September 25, 2015 VIA EMAIL TO: Head Women s Lacrosse Coaches and Officials. FROM: Julie Myers Chair, NCAA Women s Lacrosse Rules Committee. Stefanie Sparks Smith Secretary-Rules Editor, NCAA
Isola Steel Gutters Strength and design for extreme climate!
Isola Steel Gutters Strength and design for extreme climate! Dry and healthy buildings Isola Steel Gutters Steeled against wind and weath The four seasons Wide temperature variations and highly variable
HERZ-Thermal Actuators
HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01
FIVB E-SCORESHEET APP USER GUIDELINES FOR ORGANISERS TABLET APPLICATIONS FOR COACHING STAFF AND REFEREES: ES BENCH ES REFEREE
FIVB E-SCORESHEET APP USER GUIDELINES FOR ORGANISERS TABLET APPLICATIONS FOR COACHING STAFF AND REFEREES: ES BENCH ES REFEREE RELEASED ON: 20/08/2015 Index Connectivity... 3 Configuration and equipment...
Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998)
Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) 1 Scope This part of EN 10228 describes the method and acceptance criteria to be used for the penetrant testing
12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual
12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual This 30Amp charge controller is designed to protect your 12Volt Lead-acid or Gel-cell battery from being overcharge by solar
NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE
B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY
TECHNISCHE FICHE - TECHNISCHE FICHE - Chat Board: Classic
- TECHNISCHE FICHE - Chat Board: Classic Classic is a magnetic glass- and writing board for use in modern offices and private homes. CHATBOARD Classic is Danish Design - made in Denmark. Classic is a glass
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
DSD 70 Dual Channel Hall Effect Speed Sensor for Railway Applications, compliant with EN 50155
DSD 70 Dual Channel Hall Effect Speed Sensor for Railway Applications, compliant with EN 50155 Technical information Version: 07.14 General Function The speed sensors family DSD.70 are suitable for generating
Thickness Gauges. convex R 15 or R 40, flat 10 mm Ø, spherical
Thickness Gauges Technical Data for Metric Thickness Gauges Page Model Lifting Contact points Contact points mm mm mm device standard available on request 130 K 15 0.1 10 15 no 6.35 mm Ø flat Ø flat, 130
PNEUMATIC - HIGH PRESSURE FLAT-FORM HEAVY LIFTING BAGS
PLEASE READ AND UNDERSTAND THIS MANUAL BEFORE USING SAVA LIFTING BAGS PNEUMATIC - HIGH PRESSURE FLAT-FORM HEAVY LIFTING BAGS & INFLATION ACCESSORIES SAFETY, OPERATION AND MAINTENANCE INSTRUCTIONS NON-COMPLIANCE
EXHIBITION DISPLAY RULES
RULES AND REGULATIONS Responsibility of the exhibiting company to comply with SPIE rules and regulations. Non-compliance may require modifications at the exhibitor s expense SPIE Exhibition Management
Competition rules FLYCASTING. Standard flyfishing equipment EVENTS
Competition rules FLYCASTING ard flyfishing equipment EVENTS Trout accuracy Trout distance Seatrout distance Salmon distance Spey distance 15 1 Spey distance 16 /18 Ed. 1 - March 2010 1. General rules
VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A
Technical Data Manual Model Nos. and pricing: see Price List Vacuum tube collector based on the heat pipe principle For the utilisation of solar energy VITOSOL r 200-T SP2A Product may not be exactly as
4 on 4 Intramural Volleyball Rules
4 on 4 Intramural Volleyball Rules COURT 1. NET HEIGHT: Men: 7'11", Women/Co-Rec: 7'4" 2. OUT AREA: The players have the right to play the ball in the out court. Where competition is being conducted on
GK Packing System Welding Instructions
GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL [email protected], www.roxtec.de Welding instructions
Single Channel Loop Detector
Single Channel Loop Detector Model - LD100 Series The LD100 is a single channel inductive loop detector designed for parking and access control applications. The detector is connected to an inductive loop
Operating Instructions. Room temperature controller
Operating Instructions 1. Area of application The room temperature controller is used to regulate the temperature in closed rooms such as flats, schools, function suites, workshops, etc. Safety instructions
AutoLink Three-Phase Sectionalizer Specifications. Scope. General. Applicable Standards. Operating principle
Scope This specification stipulates the minimum requirements for mechanically linked three-phase electronic sectionalizers, for use on outdoor medium voltage overhead lines of 15, 27, and 38 kv. Electronic
