Industrial stairways & handrailings in Aluminium
|
|
|
- Reynold Golden
- 9 years ago
- Views:
Transcription
1 Industrial stairways & handrailings in Aluminium
2 Reference installations Sewage treatment works District heating plant Sawmill Brewery Automobile showroom Sewage treatment works 2
3 Contents Contents Page Reference installations 2 List of contents 3 Points to consider when designing stairways 4 Cross-grooving 5 Step- and stringerprofiles 6-7 Profile range Staircases 8 Mounting accessories 9 Industrial handrailings in aluminium 10 Standard requirements and functions 11 Handrailings 40 and Assembly instructions for handrailings Components, handrailings 40 and We reserve the right to make changes and amendments to the specifications in this brochure. Ramp for disabled people. Factory stairway 3
4 Stair designing Detail design When the string profile continues in the intermediate landing both parts are cut in an angle and butt welded together. A bolted overlapped joint or a joint using extra flat bars can also be used. Against a beam the stair is usually attached by means of a flat bar welded to the string profile. Alternatively it can be bolted using an L-profile. The string profiles are put straight on top of the load bearing structure. Certain guiding principles apply when a stair case is built. The height and the depth of the steps should be equal in all stretchers. The height should not exceed 200 mm and the length of the stair stretchers should not be more than steps. The stair should be made as narrow as possible, but with the recommendations in national standards (BBR) taken into consideration. A stair with the width of 60 cm is easy to walk in, with 80 cm width there are no problems to carry a toolbox and with the width increased to 90 cm it is easy for two people to pass each other. The size of the intermediate landing is more decisive of the maximum size of an object transported in the stair than the width of the stair. If the stair is mounted directly on a floor the string profile is bolted to the floor. This is made by means of a flat bar or L-profile welded to the string profile. When a stair hits a lower intermediate landing it is suitable to put the first step in the same level as the landing. This way the stair does not have to overlap the landing. If there is a lot of space below the landing an L- or U-shaped beam can be fixed to the wall using expanders and then the stair with the landing can be put on top. If the strength of the string profile is used to the maximum the cut where it is connected needs reinforcement. A stiffener with the same thickness as the flange of the beam is butt welded to the flange and fillet welded to the waist. 4
5 Cross-grooving 7mm Cross-grooving for safety All flooring and step profiles that have grooves on the walking surface are cross-grooved except for step SFT 110/26. Cross-grooving, which is designated with an R, increases safety for pedestrians. When pedestrians tread on the profile, the soles of their shoes sink into the 7 mm wide cross-grooving which provides a grip and thus reduces the risk of slipping. Floor- and step profiles with cross-groving less than 7 mm are not recommended! 7mm Protecting profiles during installation Untreated profiles have a high quality finish. In order to maintain this, it is appropriate to protect the flooring profiles during installation and the building stage. The laying should be planned with other activities on site in mind. If it is important to have a very high quality finish, the profiles should be protected against the following: Dirt and dust. Cover the flooring with building foil or paper immediately after it has been laid. This protects the floor and facilitates cleaning work. Welding spray. Cover the area around the work place with masonite, for example. Welding spray causes small stains that are difficult to remove. Concrete and mortar splashes. Marks can be prevented by covering the flooring. Both materials are strongly alkaline and can cause discoloration to the metal. Storage 3 points to consider Do not open the plastic packaging unnecessarily. One cubic metre of packaged flooring profiles is equivalent to m 2 of floor and weighs approximately 500 kg. In order to maintain the high finish that the profiles have on delivery, the person responsible for the storage should keep three things in mind when storing the profiles: 1. Keep them dry. Corrosion never occurs without water. The product is always dry on delivery. 2. Keep them covered. Keep the covering on as long as possible. This prevents both water and dirt from getting to the profiles. 3. Keep them ventilated. Ventilate where possible. Air helps to keep the profiles dry and looking good. 5
6 Step profiles Stairs in aluminium are an important part of a complete flooring system a system with floor, steps and strings that is smart, strong and does not rust. Nomenclature It is useful to be familiar with the following terms when discussing stairs: 1. The rise of the steps should be the same in each flight of stairs and preferably the same for all flights in the staircase. 2. The tread is the horizontal plane of the stairs. The steps should be well lit and easy to keep clean. 3. The nosing is the front edge of the tread. This should not be sharp, but neither should it be too rounded. 4. The going is the horizontal distance from nosing to nosing. The treads overlap one another in steep staircases and ladders. The overlap is not included in the depth of tread 5. The riser is the perpendicular surface between two treads that can be completely or partially open. 6. The strings are the cantilever beams which together with the treads form a flight of stairs. These provide a support for the steps between landings. The steps and handrails are fixed into the strings. 7. The run of a step is the length of a tread, i.e. the distance between the insides of the strings. This dimension is often called the width of a staircase. Standards Most building regulations require staircases and ramps to be designed so that people can use them with safety. For homes etc., staircases and ramps should permit the safe passage of stretchers. If there is no lift in the building, the staircase must be at least 1.2 m wide. Staircases should be terminated laterally against restraining walls or provided with handrails. The incline and length of a staircase between the height and depth of the stairs should be considered at the design stage. The going in staircases should be at least 0.25 metres, measured in the walking line. Staircases and ramps used by children must be designed with safety in mind. The openings between treads should be a maximum of 100 mm. Staircases and ramps with a drop of more than 0.5 metres should have handrails on both sides. Staircases wider than 2.5 metres should be divided by having balustrades or handrails in two or more runs. Step profiles Step and string profiles are stocked as part of the Sapa Flooring System as described below. Together with balustrades, staircases can be built for virtually any purpose. Step profiles, with the exception of SFT 110/26, are cross-grooved. The largest run for profiles is calculated from a loading requirement of 5 kn/m 2 over the whole surface. Alternatively, the steps should withstand a point load of 1.5 kn in the centre. The deflection has been limited to the run/200. Lengths of 6500 mm are stocked. The step profiles can be cut to a specific length as required. The tolerance is +0/-3 mm. For production orders SAPA s normal tolerances apply unless otherwise agreed. Profile Application Largest run of step Non-holed (R) Holed (RH) SFT 110/26 Steps, ladders 0,70 m SFT 185/32 Ladders, staircases 1,05 m 0,95 m SFT 250/32 Staircases 1,15 m* 1,05 m* SFG 250/40 Staircases 1,90 m* 1,75 m* SFT 250/60 Wide staircases 2,35 m* 2,20 m* * In public areas the run should be reduced by 20% 6
7 Cross-section data Table 7:1 cross-section data is given for non-holed standard profiles and in Table 7:2 for holed ones. Table 7:1 R=non-holed Profile I x (mm 4 ) W x (mm 3 ) Kv (mm 4 ) Xg(mm) vt (kg/m) SFT 110/26 R 4,35 x ,76 x ,7 1,5 SFT 185/32 R 10,40 x ,97 x ,9 2,7 SFT 250/32 R 11,75 x ,18 x ,7 3,1 SFG 250/40 R 32,25 x ,50 x ,9 4,0 SFT 250/60 R 61,70 x ,72 x ,2 3,6 Detailed measurements Step profiles are normally bolted to pre-drilled strings. Stainless M8 bolts are screwed into the bolt pocket of the step profile. The steps can also be welded along the bottom of the step profile and in the leg. In this way local changes in colour and surface structure of the top will be less visible. Table 7:2 RH=holed Profile I x (mm 4 ) W x (mm 3 ) Xg (mm) Weight (kg/m) SFT 185/32 RH 8,83 x ,40 x ,1 2,5 SFT 250/32 RH 9,99 x ,67 x ,4 2,7 SFG 250/40 RH 27,41 x ,13 x ,6 3,6 SFT 250/60 RH 52,44 x ,21 x ,9 3,2 Table 7:3 Step type/mm a b c d e Notes SFT 110/ bolts SFT 185/ bolts SFT 250/ bolts, asymm. SFT 250/ M8 bolts 1 M10, asymm. String profiles and Risers Dimensioning of the strings SFV 120/35 Diagram 7:4 kn/m 10 SFV 136/33 Not in stock SFV 195/50 SFV 230/45 5 SFV 255/40 SFT 50/70 Not in stock 2 SFV 195/50 SFV 230/45 SFV 255/40 The U-shaped string pro files and ris er pro files can be weld ed or bolt ed to a load-bearing struc ture. The ris er pro file is bolt ed to the rear edge on steps SFT 250/32, SFG 250/40 and SFT 250/60 which in -creas es the go ing by 50 mm and re duc es the open ing between steps by 70 mm. (Stock length 6500 mm.) SFV 136/33 Table 7:5 SFV 120/ m Suitable strings can be chosen using diagram 7:4. When calculating from the diagram it has been presupposed that the stairs are not too flat. It is applicable for an incline of down to 45 degrees. Item No. I x (mm 4 ) W x (mm 3 ) Weight (kg/m) Use with SFV 120/35 118,4 x ,7 x ,7 SFT 110/26 SFV 136/33 184,9 x ,2 x ,1 SFT 110/26 SFV 195/50 445,3 x ,7 x ,3 SFT 185/32 { SFV 230/45 669,2 x ,2 x ,9 SFT 250/32 SFV 255/40 887,7 x ,6 x ,1 SFG 250/40 SFT 250/60 SFT 50/70 { 7
8 Profile range Staircases Cross-grooved step profiles All step profiles can be obtained both holed and crossgrooved with the exception of SFT 110/26. Flooring profile SFG 250/40 can also be used for steps, most appropriately with gusset SFM The red profile versions shown below are NOT stocked. SFG 250/40 Width: 250 mm Height: 40 mm Non-holed (R): lx: 32,25 x 10 4 mm 4 Wx: 13,50 x 10 3 mm 3 Holed (RH): lx: 27,41 x 10 4 mm 4 Wx: 12,12 x 10 3 mm 3 SFT 110/26 Width: 110 mm Height: 26 mm Non-holed (R): lx: 4,35 x 10 4 mm 4 Wx: 2,76 x 10 3 mm 3 SFT 185/32 Width: 185 mm Height: 32 mm Non-holed (R): lx: 10,40 x 10 4 mm 4 Wx: 4,97 x 10 3 mm 3 Holed (RH): lx: 8,83 x 10 4 mm 4 Wx: 4,40 x 10 3 mm 3 SFT 250/32 Width: 250 mm Height: 32 mm Non-holed (R): lx: 11,75 x 10 4 mm 4 Wx: 5,18 x 10 3 mm 3 Holed (RH): lx: 9,99 x 10 4 mm 4 Wx: 4,67 x 10 3 mm 3 Stringer profiles SFV 120/35 Height: 120 mm Width: 35 mm Ix: 118,4 x 10 4 mm 4 Wx: 19,7 x 10 3 mm 3 SFV 230/45 Height: 230 mm Width: 45 mm Ix: 669,2 x 10 4 mm 4 Wx: 58,2 x 10 3 mm 3 SFV 136/33 Height: 136 mm Width: 33 mm lx: 184,9 x 10 4 mm 4 Wx: 27,2 x 10 3 mm 3 SFV 255/40 Height: 255 mm Width: 40 mm lx: 887,7 x 10 4 mm 4 Wx: 69,6 x 10 3 mm 3 SFT 250/60 Width: 250 mm Height: 60 mm Non-holed (R): lx: 61,70 x 10 4 mm 4 Wx: 15,72 x 10 3 mm 3 Holed (RH): lx: 52,44 x 10 4 mm 4 Wx: 14,21 x 10 3 mm 3 SFT 300/35 Width: 300 mm Height: 35 mm Non-holed (R): lx: 28,01 x 10 4 mm 4 Wx: 12,16 x 10 3 mm 3 Holed (RH): lx: 23,80 x 10 4 mm 4 Wx: 10,94 x 10 3 mm 3 SFT 300/40 Width: 300 mm Height: 40 mm Non-holed (SR): lx: 38,28 x 10 4 mm 4 Wx: 14,80 x 10 3 mm 3 SR SFV 195/50 Height: 195 mm Width: 50 mm lx: 445,3 x 10 4 mm 4 Wx: 45,7 x 10 3 mm 3 SFT 50/70 Width: 50 mm Height: 70 mm 8
9 Mounting accessories Accessories There is a range of accessories for connecting and installing flooring profiles. Accessories are sold individually. Gusset Used when mounting staircases and ladders. Step profiles SFG 250/40 and SFT 250/60 are mounted on the gusset with hexagonheaded bolts M8 x 22, which fit into the profile s race groove. The gusset is pre-drilled. Item No. SFM Bolt M8 Used when fixing profiles SFT 110/26, SFT 185/32 and SFT 250/32, for the purpose of attaching steps to strings. The bolt M8 with nut and washer is also used for mounting profiles SFG 250/40 and SFT 250/60 on gusset SFM Size: M8 x 22, stainless. Item Nos. SFM bolt SFM nut, washer Installing step profiles For each step profile there is a suitable string. The steps are mounted directly into the strings. A hole is made using the step s race groove (in the lower edge of the step profile) as a template. Fit with M8 bolts. These bolts, which should be stainless, are knocked in with a hammer until the threads get a grip. Then they are screwed home. There are advantages in welding the steps to the strings. To mount the SFG 250/40 profile as a step in a staircase construction a gusset is used. The gusset is mounted in the strings with M10 bolts. The step is then secured to the gusset with M8 bolts. A gusset can also be used for SFT 250/60. The riser profile extends the step by 50 mm and reduces the opening by 70 mm. Simultaneously it prevents dirt and loose objects from falling down between the stairs. The riser profile is mounted on the rear edge of the step profiles with bolts. Alternatively it can be welded in place. The staircase is simply mounted at the top and bottom with an angle iron that can either be secured with bolts or welded in position. 9
10 Industrial railings in aluminium Simple assembly no welding needed Sa pa railings are manufactured as finished components for rapid, safe and simple installation on site with every conceivable possibility for adaptations to specific needs and circumstances. Any adjustment cutting necessary is performed on the site. No welding all parts are secured with rivets or bolts. 10
11 Requirements and functions Standard requirements and functions Standard requirements We here show the Swedish requirements (BBR and BKR) for hand railings. When used in other countries, please check the requirements in the current country. BBR and BKR present the general requirements of the strength and stiffness of railings. The main requirements are shown here. For detailed requirements see BKR and BBR. The total height of the railing: Minimum 1100 mm where a risk of falling exist, otherwise 900 mm. Load requirements: The railing must bear a load of 0.8 kn/m horizontally in the top of the railing where crowding is expected, in other respects 0.4 kn/m. Intermediate rail shall be mounted on the whole railing on half its height. Kick plate should exist where there is an opening between the landing and either a wall or a floor that are greater than 50 mm. The height of the kick plate must be at minimum 100 mm above floor level. The aluminium railing fulfil these requirements. The railing is intended to be used in industrial environments, stairs, shielding between streets and walkways. The railing can be provided with different fillers. Included parts Railing 40 and 80 All parts are extruded in aluminium (SS-EN AW 6063-T6), the same alloy as the step profiles. They are clear anodised minimum 15 microns. Handrail Railing 40 diameter 45 mm Railing 80 diameter 55 mm Intermediate rail Railing 40 diameter 35 mm Railing 80 diameter 45 mm Bends Theoretical length from the corner 200 mm, with the radius 110 mm alternatively a mitre cut corner. Standard angles are 30, 45, 60 and 90 degrees. Standard appearance This is how the railing normally looks like, when the maximum strength is used. The intermediate rail is usually mounted continuously on the side. Finished floor Post spacing (55) ø45 (45) ø35 Posts Railing 40 square pipe 42 mm Railing 80 square pipe 52 mm Placed with the maximum distance of 1500 mm. Gate Has stainless steel spring hinges and stop that prevents it from opening outwards. 880 standard Max 1000 Kick plate L-profile 100 x 40 x 3 mm that attaches to the posts with a couple of mm spacing to the surface of the floor. Wall bracket for handrail The bracket is bolted with an expander or chemical anchor in walls made of concrete or bricks respectively. In other cases with a stainless steel bolt. A steel kick plate can constitute a part of the bearing structure. A strong L-profile can carry the flooring profile on the short flange. In the longer upwards going flange the post of the railing can be attached. Tools Saw, drill, pop rivet pliers and a open-ended spanner. 11
12 Railings 40 and 80 Railings 40 and 80 of aluminium SS (AA 6063-T6). Clear anodised μm. Dimensioned for the loadings specified in the Swedish Building Code, 400 N/m and 800 N/m respectively. 1. Railing with one intermediate rail (55) ø45 2. Railing with gate Post spacing (45) ø standard Max 1000 Finished floor 4 & 5. Railing with kick plate Railing 40 spacing max 1500 mm for load 400 N/m Railing 80 spacing max 1500 mm for load 800 N/m Railing 80 spacing max 2500 mm for load 400 N/m 6. Railing with two intermediate rails (specify space) b a 8. Railing in staircases Handrail and intermediate rail, placing according to 15C Alternative continuation End A 13. Railing in corner with bend 14. Railing in corner with corner posts Alternative C. Movable top 450 ca x 5 x 489 Max α 45 max 1200 α 45 max 1000 α Supplied asphaltdipped Supplied 170 asphaltdipped mm170 mm or mm or mm Draining hole when casting outdoors Alternative Fixings: 19 19b 20b 21 21b 22 Specify alterative with floor brackets Min. c/c Self-tapping screw For installation in ground: grouting length = 300 mm M10x Selftapping screw Al-wedge to be driven in 110 (120) (92) Expander bolt M10 Expander bolt 150 Steel or aluminium ø 30 (ø 35) Removable Removable Milled post
13 3. Removable railing Max Expansion joint outdoors 10. Railing attached to wall Sliding coupler 6-12 Wall brocket Expansion joint intervals of 5,9 m 7. Removable raling End A Max Min 2 posts 10 11:1. (Type A) Railing with straight end termination 11:2. (Type C) Railing with turned end termination 12. (Type B) Railing with end termination ( ) Kick plate Placing of handrails and intermediate rails 31. Rail arch End termination: straight End termination: turned 32. Rail arch with intermediate rail or optional filler Transition: Ø Ø A B C Wall bracket for handrail 30. Railing in curve (minimum radius 1000 mm) Handrails and intermediate rails to be positioned according to 15 B or 15 C and 15 D. Expander bolt (94) Only Only 40 r m 110(125) 16. Bend a Adjustable joint angle a = 30, 45, 60, 90,
14 Assembly instructions, Railings 40 and 80 Fixing posts in concrete Fixing type 19/19 B The embedment length in a recess must be approx. 150 mm and the recess approx. 100x100x200 mm. The embedment length in the ground must be approx. 300 mm. The base must be at least Ø 200x800 mm. Post parts are delivered dipped in asphalt for grouting into concrete. Fixing type 22, studs Studs, 30x30, Ø 30 mm (40x40, Ø 35 mm) of aluminium or galvanized steel are grouted into a recess or drilled hole Ø 35 mm (Ø 40 mm). The post is fixed to the studs with stop screws or selftapping screws. Fixing against concrete Fixing type 21/21 B, bracket Drill holes in the concrete at intervals of 82 mm (92 mm) in accordance with the expander manufacturer s instructions. Determine the height. Secure the bracket and insert the post at the correct height. Drill and tighten bolts. Align with wedges. Fixing type 24, post with foot plate Drill holes in the concrete at intervals of 76 mm (104 mm) in accordance with the expander manufacturer s instructions. Secure the foot plate to the floor and align it with wedges. NOTE! Drain hole Concrete in post Fixing against steel Fixing type 22, studs Fix the post with stop screws or self-tapping screws to steel studs 30x30 mm (40x40 mm) which are welded to the girder. Insulate the studs with tape or zinc primer (approx. 100 μm). Fixing type 24, post with foot plate Drill holes with a diameter of 12 mm at intervals of 76 mm (104 mm) in the steel girder. Bolt the upright post with insulated foot plate to the steel girder and align with wedges. Fixing type 27. Bracket against girder (only railing 40) Drill holes with a diameter of 12 mm at intervals of 82 mm in the steel girder. Secure the post to the steel girder with a bracket. Adjust the post height before tightening the bracket. Fitting the handrails Delivered undrilled in lengths of 5900 mm. Normal fixing: place the handrail in the milled cradle. Drill Ø 5 mm holes in the handrail through the predrilled holes in the post. Rivet the handrail to the posts with 4 pop rivets. Make sure that contact between handrail and post is sufficiently good when riveting. Adjustable top or inclined milled cradle Used in staircases and elsewhere. The erection procedure is the same as for normal fixing in a milled cradle. Joining of pipes This is done with a coupler which is fitted with the opening downwards. The coupler is riveted to one of the pipes with at least two pop rivets and is permitted to run freely in the other (see illustration) to absorb temperature movements. Bear in mind that pipes or pipe parts must extend over at least two posts. Leave a space of 6-12 mm between the pipes, adapting the distance to the temperature at assembly. (When installing in an indoor location with uniform temperature no thermal expansion joint is needed. Intermediate rail Delivered undrilled in lengths of 5900 mm. The intermediate rail is secured to the post, which has pre-drilled Ø 5,4 mm holes, with self-tapping screws. Drill Ø 5 mm holes in the intermediate rail throug the predrilled holes in the bracket. Join the intermediate rail and bracket together with two pop rivets. Make sure that there is good contact between the bracket and intermediate rail. Joining of intermediate rails is performed in the same way as joining of handrails. If the intermediate rail is likely to be exposed to particularly great stresses two brackets per post should be used for pipes Ø 35 mm. For pipes with a diameter of 45 mm clamps are used which surround the pipe and riveting is not necessary. Rivet: length 12 mm Rivet: length 16 mm Clamp Rivet: length 12 mm 6-12 mm outdoors 14
15 Rail terminations Must be made very carefully to ensure that the finished railing does not have any sharp edges or can cause injury in some other way. End termination A/C (end plug) Handrails and intermediate rails are terminated with end plugs. Ends A and C are struck into the end of the pipe with a soft mallet and secured if necessary with a pop rivet. End termination B (pipe bends/couplers) The railing is terminated with two pipe bends and a tapered transition against the intermediate rail. Note that transition Ø 45 - Ø 35 mm (Ø 55 - Ø 45) acts as coupler and must be riveted with two rivets to each intermediate rail and 90 pipe band. Make sure that the joint is tight. Paling sections Sort out the sections on the basis of any angles and special lengths in accordance with the directions on the construction drawing. Paling sections for Sapa railings are delivered with surplus lengths. Measure the distance between the posts. Adjust the top/bottom bar of the paling section. Make sure that the first and last pale come at the same distance from the posts. Push a paling section lock into each end of the top bars and bottom bars of the paling sections. Lift the section in between the posts and push the locks into the corresponding holes in the post. Then secure the locks with rivets. 180 pipe bend In staircases the handrail can be terminated with 180 pipe bend (see sketch). The bend is attached to the lowermost railing post by bolting the disk to the post. Cut the bend to the correct length and pass it over the disk. Drill Ø 5 mm holes simultaneously through the bend and the disk. Then rivet the bend to the top of the post. Be careful where the joint is placed! Pedestrian gate Pedestrian gates for Sapa Aluminium Ralings have a standard width of 850 mm. The distance between the gate posts must be 880 mm = ± 5 mm. The gates are delivered with single-acting spring hinges and stops. Can be supplemented with fittings for a padlock or other types of locks. Hinges are bolted to the railing posts. Drill and tap M5 holes for the stainless bolts supplied with the gate. Disk Rivet: length 12 mm 880 standard Max 1000 A detaled assembly instruction are enclosed all deliveries from Sapa. 15
16 Components Railing 40 and 80 All parts in extruded aluminium SS-EN AW-6063-T6. Surface: Clear anodised min 15 μm Railing 40 Railing Posts Item no SFR L=1365 mm Side mounting SFR L=1365 mm Adjustable top SFR , L=1215 mm Side mounting SFR , L=1215 mm Adjustable top SFR , L=1065 mm + Foot plate Handrails Ø 45 mm Item no SFR , L=5900 mm Intermediate rails Ø 35 mm Item no SFR , L=5900 mm Bracket Ø 35 mm Item no SFR Kickplate, L 100 x 40 x 3 mm Item no SFR , L=5900 mm Gate (standard 850 mm) Item no SFR Couplers Item no SFR (Handrails Ø 45 mm) SFR (Intermediate rails Ø 35 mm) SFR (Sliding for handrails) SFR (Sliding for intermediate) Wall bracket Item no SFR Brackets for posts Item no SFR /600 (19b), (20), (21), (21b), (22), (24), (27), (29) Pipe bends Ø 45 mm Item no SFR (30 ), (45 ), (60 ), (90 ), (180 ) Art nr. SFR (Adjustable joint angle) Pipe bends Ø 35 mm Item no SFR (30 ), (45 ), (60 ), (90 ), (180 ) Art nr. SFR (Adjustable joint angle) End terminations Ø 45 mm Item no SFR (type A), (type C), (type B), SFR (plastic plug) End terminations Ø 35 mm Item no SFR (type A), (type C), SFR (plastic plug) Posts Item no SFR L=1365 mm Side mounting SFR L=1365 mm Adjustable top SFR , L=1215 mm Side mounting SFR , L=1215 mm Adjustable top SFR , L=1065 mm + Foot plate Handrails Ø 55 mm Item no SFR , L=5900 mm Intermediate rails Ø 45 mm Item no SFR , L=5900 mm Bracket Ø 45 mm Item no SFR Kickplate, L 100 x 40 x 3 mm Item no SFR , L=5900 mm Gate (standard 850 mm) Item no SFR Couplers Item no SFR (Handrails Ø 55 mm) SFR (Intermediate rails Ø 45 mm) SFR (Sliding for handrails) SFR (Sliding for intermediate) Brackets for posts Item no SFR /600 (19b), (21), (21b), (22), (24) Pipe bends Ø 55 mm Item no SFR (30 ), (45 ), (60 ), (90 ), (180 ) Item no SFR (Adjustable joint angle) Pipe bends Ø 45 mm Item no SFR (30 ), (45 ), (60 ), (90 ), (180 ) Item no SFR (Adjustable joint angle) End terminations Ø 55 mm Item no SFR (type A), (type C), SFR (type B) SFR (plastic plug) End terminations Ø 45 mm Item no SFR (type A), (type C), SFR (plastic plug) Markaryds Grafiska AB -06 Sapa Building System AB SE Vetlanda Phone Fax [email protected] Internet: GB-1000/06.12
UNIVERSAL RAILING, STEEL
RAILINGS Page Universal Railing, steel 108-109 Large Module Railing, steel 110-111 Allround Railing, aluminium 112-113 Module Railing, aluminium 114-115 Standard Type Railing, aluminium 116-117 107 UNIVERSAL
WELAND TERMINOLOGY LOAD BEARING BAR CROSS BAR GRATING TYPE SAF MESH OPENING GRATING. LENGTH, SPAN WIDTH or LENGTH OF LOAD BAR GRATING
GRATING Page Terminology 6-7 Pedestrian Walkway Multipanels from Stock 8-13 Duckboard 13 Vehicular Multipanels with Load Tables 14-15 Kerb Angle Frames 16-17 Entrance Mats 18-20 Special Grating 22 Mesh
Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa
Profiles in stock Standard catalogue Discover the possibilities with aluminium from Sapa You can create your own profile or you can choose from a wide selection of standard. Delivery: 1 2 weeks for standard
Stair Parts Installation. Tricks
Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT
Pole Lathe and Shave Horse Design
Pole Lathe and Shave Horse Design These pictures and accompanying words are Copyright Michael Hughes February 2002. They are not to be re-produced, in part or whole, without permission from the author.
HANDRAIL STANDARDS HANDRAILS AXESS LADDER SYSTEM KICK FLAT SYSTEM OPEN FLOORING
ENGINEERING LTD. HANDRAIL STANDARDS HANDRAILS AXESS LADDER SYSTEM KICK FLAT SYSTEM OPEN FLOORING Member of PF Group Guardrail Engineering Limited Manders Industrial Estate Old Heath Road Wolverhampton
Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair
49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES
PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES BUSHING WITH PLUG CONNECTION WITH OUTER CONE PPS CHARACTERISTICS The PPS bushing can be used as a fixed section for the entry of medium
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
SPIRAL STAIR KIT INSTALLATION MANUAL
SPIRAL STAIR KIT INSTALLATION MANUAL Effective January 1, 2014 If you have any questions, please call the location that your Stair Kit was purchased from: Broomall, Pennsylvania 1-800-52-7427 Ontario,
Modular Locomotive System Instruction Manual for HBK8 George Body Kit
Modular Locomotive System Instruction Manual for HBK8 George Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302
HORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
K17.11 DOOR BOLTS K17 DOORS 01.09.2013
K17 DOORS K17.11 01.09.2013 Waregemstraat 5-9870 Zulte - Belgium - T. +32 9 388 88 81 - F. +32 9 388 88 21 - [email protected] - www.sobinco.com CONTENTS 1. Locking set series 86000...K17.11.03 2.
Isola Steel Gutters Strength and design for extreme climate!
Isola Steel Gutters Strength and design for extreme climate! Dry and healthy buildings Isola Steel Gutters Steeled against wind and weath The four seasons Wide temperature variations and highly variable
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
KIRÁLY TRADING KFT H-1151 Budapest Mogyoród útja 12-14 tel: 061307-3801 [email protected]. Clamps Clamping devices
04000 Clamps Clamping devices 23000 22000 21000 20000 09000 08000 07000 06000 05000 04000 03000 02000 01000 297 04010 Adjustable straps Tempered steel 1.1191 Black oxide finish nlm 04010-101 Suitable thrust
Söll GlideLoc Aluminium Ladders. Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073
Söll GlideLoc Aluminium Ladders Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073 7 Söll GlideLoc Aluminium ladders Y-spar Profile 52 x 51 mm With connector Mounting
AZEK Rail Install Guide
TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail
Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...
tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or
CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.
CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT
Gate Leg Drop Leaf Table Plans
Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing
Timber Decks. Technical Note. March 2007
Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.
Removable Aluminium posts
Post Solent Sail Shades Ltd 120 Billington Gardens Hedge End Southampton SO30 2RT Tel/Fax: 01489 788243 www.solentsailshades.co.uk Email: [email protected] Removable Aluminium posts Single Pole
Premier & Deluxe 3-Season Room Sliding Glass Door
DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen
Machine devices, jig devices
Machine devices, jig devices 853 K0697 Rolled thread studs DIN 6379 Material: Tempered steel. KIPP Rolled thread studs DIN 6379 Order No. D L B1 B2 Approx. weight g Surface finish: Thread rolled. Class
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Installation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Saferand easierinstallation
EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little
MGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls
Installation Manual Toilet Partitions, Dressing Compartments & Shower Stalls Metpar Corp 95 State Street, Westbury, New York, USA, 11590 Tel: 516-333-2600 Fax: 516-333-2618 Internet: http://www.metpar.com
How to Install UnderDeck The Original.
How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter
FRP Grating, Handrail, Guidelines for Ladders & the Engineer Structural and Designer Shapes
Guidelines for the Engineer and Designer FRP Grating, Handrail, Ladders & Structural Shapes Corrosion Resistant Fire Retardant Low Maintenance Long Service Life High Performance Composite Solutions 1.0
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
Installation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit
Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302
Simplified Steel Stair Design for Commercial and Institutional Buildings
Simplified Steel Stair Design for Commercial and Institutional Buildings Collaborating with steel stair fabricators during the design of commercial and institutional buildings promotes integrated practice
INSTRUCTIONS: LocknCharge Laptop Carts
INSTRUCTIONS: LocknCharge Laptop Carts www.lockncharge.com Extra Tools required: Hammer, Philips head screwdriver, medium adjustable spanner. (Allen key supplied) (Panel colours for illustration purposes
Owner's Manual & Assembly Instructions
Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY
Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS
Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44
LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.
LK Wallbox UNI Push Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push 16 Single Article no. 188 06 38 LK Wallbox UNI Push 20 Single Article no. 188 06 39 LK Distance template LK Wallbox UNI
Preface nivtec.com 3
nivtec.com Preface nivtec.com 3 nivtec 4 nivtec.com Planning with an Eye for Details nivtec.com 5 prolight+sound 2012 6 nivtec.com Meeting Point Fair Booth nivtec.com 7 Our Preparations 8 nivtec.com Enable
www.cornholesupplies.com
www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure
BUILDINGA 1/10 SCALE FLATBED TRAILER
VOLUME 1, ISSUE 1 BUILDINGA 1/10 SCALE FLATBED TRAILER BUILT, DESIGNED & WRITTEN BY NATHAN MYERS MATERIALS: FEATURES: While the design was kept simple to allow anyone to be able to build their own trailer,
SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair
SERVICE MANUAL US Corpus 3G Seat system for electric wheelchair How to contact Permobil Head Office of the Permobil group Produced and published by Permobil AB, Sweden Version 4, 2014-07 Item No.: 205260-US-0
CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL
SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Model CCX-AG Note: 40 lbs. of sand required!
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
lindab duct suspension & support system Duct suspensions & Support systems
lindab duct suspension & support Duct suspensions & Support s lindab duct suspension & support Content Duct suspensions & Support s Duct suspension Duct suspension FB... DRSN... 0 DRSNR... 0 Channels and
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
RadianceRail Installation Guide
RadianceRail Installation Guide Installing RadianceRail with CableRail by Feeney... 2 Installing CableRail by Feeney for RadianceRail... 7 Installing RadianceRail Stairs with CableRail by Feeney... 10
Lathe Milling Attachment
Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,
Ceiling Mounted Folding Attic Ladders Installation Instructions
Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:
Go-kart for little race-drivers
Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN 05.2015 www.rehau.com/relazzo
Construction Automotive Industry RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE REHAU R20680 EN 05.2015 www.rehau.com/relazzo Scan the QR code and learn more: RELAZZO DECKING THE TERRACE. Installation
Awning Instructions. Standard Manual 1.5m to 4.5m
Awning Instructions Standard Manual 1.5m to 4.5m English Standard Manual Instructions Contents Warning 1.5m 3.0m Awnings 4 x Expansion bolts (2 per bracket)** 2 x brackets 1 x Awning 1 x Winder handle
Installation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
Basic Principles & Common Practices
DETAILING STAIRS: Basic Principles & Common Practices Figure 1: Stair Terminology By Andrew J. Bellerby This article is designed to provide an introduction to detailing stairs. It explains the basic principles
Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide
Lunette 2 Series Curved Fixed Frame Projection Screen User s Guide Important Safety and Warning Precautions Please follow these instructions carefully to ensure proper maintenance and safety with your
IKG Bar Grating: Anchoring
IKG Bar Grating: Anchoring All bar grating must be tightly fastened in place. Welding of the grating panels to the supporting members provides a superior, permanent installation. Although, for gratings
CRASH RAIL INSTALLATION HEIGHT
PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS
SYSTEM COMPONENTS PREASSEMBLED ELEMENTS FOR FIFTING AND SLIDING DOORS s r ood gn i d i l s dna gn i t f i f r o f s t neme l e de l bme s s ae r P PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS These
SSG PRODUCTS FOR SHIPS AND OFFSHORE
6.1 SSG PRODUCTS FOR SHIPS AND OFFSHORE SSG workshop cabinets, tables and shelving system specially adapted to be used on-board ships and offshore. Developed in close cooperation with users from these
Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions
ABS-Lock X / X - SR Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions The ABS-Lock X system was developed to provide both a secure single anchorage point for
FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware
Removing chips is a method for producing plastic threads of small diameters and high batches, which cause frequent failures of thread punches.
Plastic Threads Technical University of Gabrovo Yordanka Atanasova Threads in plastic products can be produced in three ways: a) by direct moulding with thread punch or die; b) by placing a threaded metal
Technical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
Cedar Cottage Doghouse Plans
Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent
BSF and BCC beam connections
No. 2512 Norwegian member of European Organisation for Technical Approvals, EOTA, and European Union of Agrément, UEAtc Issued: 11.09.2007 Revised: Valid until: 11.09.2012 Page: 1 of 5 BSF and BCC beam
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
Mounting instructions for SOT78 (TO-220AB); SOT186A (TO-220F)
Mounting instructions for SOT78 (TO-220AB); SOT186A (TO-220F) Rev. 1 29 May 2012 Application note Document information Info Keywords Abstract Content SOT78; SOT186A; TO-220AB; TO-220F This application
INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************
Bill of Materials: RAC0012 Green Wing Aerodynamic Skirt Kit Item Part Number Description Quantity 1 RMC0218 Gen 2 Trailer Skirt Roadside 1 2 RMC0219 Gen 2 Trailer Skirt Curbside 1 3 RMC0041 Trailer Skirt
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
6 LED colours: White Blue Green Red Yellow Amber
Illuminated contours can be found in many places on petrol stations and buildings of industrial, commercial and service companies. Such light bands visually emphasize the contours of a building during
BIS Gulv / Radiator Beslag
O BIS Gulv / Radiator Beslag BIS Manifold Fixings BIS Manifold Fixing 2 BIS Pipe Protection BIS Protection Plate BIS Two-Part Floor Bend BIS Floor Bend BIS Bend Guider BIS Protective Pipe BIS PE Flexible
TECHNICAL SPECIFICATION
THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,
Laserlyte-Flex Alignment System
Laserlyte-Flex Alignment System LaserLyte-Flex The LaserLyte-Flex Alignment System is a unique, interchangeable, low cost plug and play laser system. Designed specifically for aligning and positioning
Mechanical arms, belts and sheets
Car parks Mechanical arms, belts and sheets DETAIL ARM CAR PARK (mm) 5000 Platen 100x5mm Iron sheets 4mm 5000 485 2100 Belts type C 120x50x2 mm 4915 5400 Hot dipped galvanized UNE-EN ISO 1461 or black
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
Installation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 STAIRWAYS 46. LANDINGS. Section R311 IRC 2009 R311.7.5 Landings for stairways. There shall be a floor or
INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk
INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk This guide explains how to correctly install our chain link fencing and post system. The guide provides details of the
Tools Required. Recommended Adhesives Vinyl Bonding: - Christy s White Hot Vinyl Cement
Assembly Instructions STEP-BY-STEP HANDRAIL INSTALLATION for 1-1/2" vinyl handrail component system Rise in inches Run in inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40
glass & Glazing Products
glass & Glazing Products WallMaker Create an unlimited variety of bright, beautiful and secure interior environments with the easy-to-install Stylmark WallMaker glass wall system. This versatile system
INSTRUCTIONS FOR USE
2/2013 ANCHOR BOLTS INSTRUCTIONS FOR USE - Threaded rebars ATP, AHP, AJP - Threaded high strength steel bolts ALP-L, ALP-P, AMP ATP AHP ALP-L ALP-P AMP Eurocode design according to EN1993-1-8 (2005) &
12.1 Schlüter -KERDI-BOARD
I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter
R O A D M A S T E R, I N C.
R O A D M A S T E R, I N C. ROADMASTER, Inc. 6110 NE 127th Ave. Vancouver, WA 98682 12 10 3 11 4 5 13 7 8 360-896-0407 fax 360-735-9300 www.roadmasterinc.com ITEM QTY NAME MATERIAL 1... 4...1/2 x 1 1/2
Owner s Manual Read and keep this manual. Patents World Wide
Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist
Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows
Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL