A new spring for EOR in Norway? Erik Søndenå Petoro Team Leader Technology
|
|
|
- Amanda Watkins
- 9 years ago
- Views:
Transcription
1 A new spring for EOR in Norway? Erik Søndenå Petoro Team Leader Technology
2 Agenda High average recovery factor in NCS, 46% Water-based EOR can reduce mobile and immobile oil From pilots to field implementation Challenges Possibilities
3 High recovery factor in Norwegian Continental Shelf 50 Average expected recovery (%) Slow development the last 10 years Distribution of oil-in-place volumes Immobile oil 25 % Remaining mobile oil 29 % Produced % Remaining reserves 9 % Close to 15 billion bbls of immobile and 17 billion bbls of mobile oil remains in some 40 producing fields
4 More wells and EOR the main drivers to achieve the reserves ambition for oil Split of reserves ambition 2020 Utbygging 17 % Driftsprosjekt 5 % Annet 5 % Reservoarprosjekt 26 % Strategic project Advanced water injection Brønner 52 % Strategic project Strategy for more wells Kilde: RNB2010 4
5 EOR Water based methods (Modified from BP) Mobilisation of residual / remaining oil in flooded zones Low salinity water injection (LSWI) Surfactants / PASF Target oil in poorly swept areas Polymers Polymer-Gel for flow diversion: Bright Water TM Link Polymer Solution (LPS) Na-silicate Petoro has focused on LSWI and Bright Water TM
6 Norwegian authorities require that no environmentally harmful produced water be discharged to the sea Discharge of chemical additives reduced by 99% on the NCS over the past 10 years Tons Chemicals considered: Silicate is not harmful Bright Water is expected to remain in the reservoir Injection of Polyacrylamid and LPS will most likely reach the producers Injection of polymer requires reinjection of water with high regularity
7 EOR pilots are being tested on NCS Field Pilot Decision date Comment A Two-well water diversion DG4 Q Started B Silicate well injectivity DG4 Q Yard test successful C LSWI one-well SWCTT DG Successful C Two-well Bright Water TM DG4 Q C LPS well injectivity test DG Successful Two successful injectivity tests in 2010/11 Two two-well test will be started in 2011/12.
8 Several field on Norwegian Continental Shelf are planning full field implementation of EOR with project sanction 2014/15 Field A: Chemical water injection Project sanction Fall 2011 Fall Field C: Chemical Water diversion Field F: Chemical Water Shutoff Field E: Surfactant flooding Field B: In-depth water diversion Field C: Link Polymer Solution LPS Field C: Low Salinity Water Injection Field D: Polymer assisted water flooding RC 7 RC Stopped Oil mill bbl o.e Well operations and prioritization of production may lead to delay in pilot execution resulting in later project sanction
9 Qualitative status of water-based EOR methods offshore Method Potential Inj. volume Maturity of method Complexity Cost HSE (% STOOIP) (fraction of PV) Mechanism Modelling Operational Subsurface process Operations LSWI 2-8 0,5* Surfactants 3-12 >0,5 Polymer flood 2-8 >0,5 Bright Water TM 2-8 <0,1** LPS ,5-1,0 Na-silicate 2-8 <0,2 (* reported by BP. ** pore volume of thief zone) Red is a challenge, not an insuperable obstruction! EOR potential ranges from 2 to 12 percent of STOOIP Challenges with surfactants and polymers are high injection volumes and costs Only LSWI and Na-Silicate do not have HSE objections Combination of several methods will increase the potential
10 Challenges EOR offshore long distance between wells with related long times between injection and increased production need for reliable prognoses based on poorly history matched models and immature simulation techniques requests for highest possible production conflict with drilling wells dedicated to prove new EOR techniques need to see EOR based changes in drainage strategy together with a well strategy The main challenge for EOR offshore is the decision maker willingness to take risk
11 Water-based EOR methods has a large potential A field pilot should not only be a demonstration project It is also a method for actively reducing uncertainty in the full-field project A decision on an IOR pilot before full-field implementation should be seen in the context of other similar decisions under uncertainty Identifying the value of the information and the probability that information from the pilot will change the decision Reducing the time taken from idea to full-field implementation has a significant impact on NPV Field implementation of EOR implies changes to the drainage and drilling strategy, with new placement of injectors and producers
OF EOR CHEMICALS. Ying Guo, Total E&P. Presented at FORCE - EOR Competence Building Workshop 6. November 2013
3 1 0 2 v o N 7 6 p o h s k r o w e c r o F ENVIRONMENTAL ASPECT OF EOR CHEMICALS Ying Guo, Total E&P Presented at FORCE - EOR Competence Building Workshop 6. November 2013 PRESENTATION OUTLINE Problems
Force workshop 6-7 Nov 2013. Field development projects The gain of applying polymer technology EOR qualification steps
Polymer Flooding Field Development Projects in Statoil 6th. November 2013 Dag Chun Standnes Leading advisor Advanced Recovery Methods Classification: Internal 2013-10-31 Outline Field development projects
The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.
A.2 Norway Volumes of Associated Gas Flared on Norwegian Continental Shelf Norway is a major oil producer, and its oil fields are located offshore in the Norwegian Continental Shelf (NCS). 81 In 2002,
Norwegian Experience with Sandstone Augmented Water Flooding
www.senergyltd.com Norwegian Experience with Sandstone Augmented Water Flooding Susanne Larsen Norwegian Experience Polymer in Snorre and Gullfaks Lab experiments => low salinity flooding/ alkaline flooding
Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites
Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites Eva Halland Norwegian Petroleum Directorate Trondheim CCS Conference June 14-16, 2011 1 29.06.2011 Storing of CO 2 offshore
BP North Sea EOR lessons learned. Euan Duncan North Sea Discipline Lead Reservoir Engineer
BP North Sea EOR lessons learned Euan Duncan North Sea Discipline Lead Reservoir Engineer Enhanced Oil Recovery BP North Sea lessons learned 1. Current Context 2. History A few pictures Enablers & Lessons
Specialist Reservoir Engineering
Specialist Reservoir Engineering RPS Energy - a global energy consultancy RPS Energy is part of RPS Group, a FTSE 250 company with a turnover of $700m and 4500 employees. It is one of the world s leading
Focused Seismic Monitoring (FSM) on Snorre
Classification: Statoil Internal Status: Draft Focused Seismic Monitoring (FSM) on Snorre The fourteenth SPE Bergen One Day seminar 18th April 2007 Mona Andersen 2 Outline Introduction to the Snorre Field
The most important chemicals used in the petroleum industry
The most important chemicals used in the petroleum industry and the potential content of persistent pollutants in these Hege Nilsen, Statoil Discharges to sea of chemicals from the Norwegian petroleum
How to find field candidates for enhanced recovery by water additives on the NCS
How to find field candidates for enhanced recovery by water additives on the NCS Enhanced Recovery by water additives FORCE Seminar 8. 2. 27 Jan Bygdevoll, Principal Engineer, NPD Why is a field a candidate
Towards an Ontology Driven EOR Decision Support System
Position Paper - W3C Workshop on Semantic Web in Energy Industries; Part I: Oil & Gas Emilio J. Nunez, Larry W. Lake, Robert B. Gilbert, Sanjay Srinivasan, Fan Yang and Mark W. Kroncke, The University
Upstream Project Value, Farm-in, Farm-out, Data Room
Financing E&P Companies and Projects on NCS The SPE Oslo Annual Seminar - hosted by PwC and Oslo Børs Upstream Project Value, Farm-in, Farm-out, Data Room Upstream IPRISK Management Methodology Olav Øvreberg,
SPE-139516 Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting
CMTC-440075-MS SPE-139516 Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting Copyright 2015, Carbon Management Technology
Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields"
Classification: Internal Status: Draft Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields" Underwater Technology Conference
Irresponsible of Statoil
Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was
Birth of a Norwegian. giant
EICT package for Det norske s Ivar Aasen project Birth of a Norwegian giant In 2008, Det norske discovered hydrocarbons in the Ivar Aasen field some 180 kilometers off the Norwegian coast. When the plan
Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle
Objectives Describing Waterflooding Definition Objectives Candidates Patterns Oil, water, and gas saturations Fractional flow Performance measures Practices and problems Reservoir monitoring 1 2 Reservoir
The Norwegian Experience
The Norwegian Experience Jerusalem, January 23 rd 2012 www.agr.com 1 About the presenters Eivind Reiten Chairman AGR CEO Hydro from 2001 to 2009 Minister of Oil & Energy from 1989 to 1990 Minister of Fishery
Available online at www.vurup.sk/petroleum-coal Petroleum & Coal 55 (4) 261-272, 2013
Petroleum & Coal ISSN 1337-7027 Available online at www.vurup.sk/petroleum-coal Petroleum & Coal 55 (4) 261-272, 2013 EVALUATION OF OIL RECOVERY AND ECONOMICS OF WATERFLOODING IN NIGERIA Chukwuemeka M.
Statoil (U.K.) Limited 2008 Offshore Environmental Statement
Statoil (U.K.) Limited 2008 Offshore Environmental Statement 23 March 2009 Statoil (U.K.) Limited Statoil House 11a Regent Street London SW1Y 4ST (until 19 June 2009) Statoil (U.K.) Limited 1 Kingdom Street
The Competitive Edge. The Foundation For Competing
Passion - Creativity - Innovation - Initiative - Intellect - Dedication - Compliance - The Competitive Edge The Foundation For Competing Statoil s Subsea Technology Strategy, with selected technology challenges
Oil and gas fields in norway Industrial Heritage plan
survey of all the areas, fields and installations on the Norwegian continental shelf. It also describes developments in these waters since the 1960s, including why Norway was able to become an oil nation,
The report was prepared by Halfdan Wiig from INSA, Lise Siverts from Kvale Advokatfirma DA and Reidar Kierulf from IPAN.
Yesterday we presented the challenges arising from the sources and sink structure in the BASREC region. Today we will look into cost structures in storage and transportation operations. As can be seen
California Carbon Capture and Storage Review Panel
California Carbon Capture and Storage Review Panel CCS: PROPERTY LAW AND LIABILITY ISSUES Jerry R. Fish Stoel Rives LLP April 22, 2010 1 Outline of Topics Real Property Rights Required for CCS Who Owns
Risk and Uncertainty Management
Risk and Uncertainty Management Enhancing value 2 Decision Risk Management Portfolio Optimisation Integrated Project Uncertainty Risks versus Rewards All Oil and Gas projects have significant uncertainties,
OG21 - Oil and Gas in the 21st Century for the 21st Century Strategy DoCument
OG21 - Oil and Gas in the 21st Century Norway s Technology Strategy for the 21st Century Strategy DoCument Oil and gas for the 21 st Century og21 c/o The research council of norway stensberggata 26 PO
ANNUAL REPORT 2007. Page 1
ANNUAL REPORT 2007 BP Norge AS carries out exploration and production of oil and gas from the Norwegian Continental Shelf. The company's head office is in Stavanger. Profit The petroleum revenues for 2007
Oman s Oil & GAS Industry
Oman s Oil & GAS Industry Presented By: Ali Abdullah Al-Riyami Director General of Oil & Gas Marketing Ministry of Oil & Gas Sultanate of Oman Outline 1. Introduction about the Ministry of Oil & Gas 2.
The Technology Challenge. Agenda - The Technology Challenge
The Technology Challenge British and Norwegian Oil and Gas Industry Collaboration Conference R. Rasmus Sunde Executive Vice President London, October 26, 2005 Agenda - The Technology Challenge Overall
RPSEA Project Management Plan
RPSEA Project Management Plan 09123-18.01 Characterization of Potential Sites for Near Miscible CO2 Applications to Improve Oil Recovery in Arbuckle Reservoirs 09123-18 April 15, 2011 Jyun-Syung Tsau Associate
DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)
DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of
Study on Characteristics of Polymer Surfactant and Application of Polymer Surfactant Flooding Technology in Oilfield
International Journal of Chemistry and Applications. ISSN 0974-3111 Volume 6, Number 1 (2014), pp. 1-6 International Research Publication House http://www.irphouse.com Study on Characteristics of Polymer
AspiroTM. EOR Polymers and Surfactants
AspiroTM EOR Polymers and Surfactants Aspiro TM Products for Enhanced Oil Recovery BASF, as the world s leading chemical company, offers a broad range of products which are widely used in the oil and gas
CTour Simultaneous Removal of Dispersed and Dissolved Hydrocarbons in Produced Water John B. Sabey, VP Business Development, ProSep Technologies, Inc.
CTour Simultaneous Removal of Dispersed and Dissolved Hydrocarbons in Produced Water John B. Sabey, VP Business Development, ProSep Technologies, Inc. Abstract In order to meet tighter and tighter legislation
Perspectives for the Danish Sector of the North Sea. Challenges and opportunities ahead!
Perspectives for the Danish Sector of the North Sea Challenges and opportunities ahead! Presentation Energinet.dk Offshore Forum 28 May 2014 July 30, 2015 page 1 Presentation agenda 1 2 3 Oil Gas Denmark,
Badger Explorer ASA Q1, 2010. Kjell Erik Drevdal CEO Gunnar Dolven - CFO
Badger Explorer ASA Q1, 2010 Kjell Erik Drevdal CEO Gunnar Dolven - CFO Oslo, April 30th, 2010 Stavanger, April 30th, 2010 Agenda I. Highlights II. III. IV. Badger Explorer Rig-less Exploration - a Game
To enable transport of wellstream over long distances. Compressor located by the wellheads.
487 subsea wells Subsea compression is increase of gas wellstream pressure by means of a compressor: To enhance reservoir recovery reducing the back-pressure on the reservoir To enable transport of wellstream
Low Salinity Waterflooding Fundamentals and Case Studies
Low Salinity Waterflooding Fundamentals and Case Studies Norman R. Morrow Chemical & Petroleum Engineering University of Wyoming and Charlie Carlisle Chemical Tracers, Inc. 2012 IOR/EOR Conference Jackson,
Photo: Erik Nærbø. QHSE program. www.odfjelldrilling.com
Photo: Erik Nærbø 2015 QHSE program www.odfjelldrilling.com 3 Preface 4 policy 4 HSE policy 4 Environmental principles 5 Security Policy 6 Corporate 7 Mobile Offshore Drilling Units 8 Odfjell Well Services
ARCTIC OIL & GAS CHALLENGES AND OPPORTUNITIES UNIS, LONGYEARBYEN, APRIL 12TH, 2016
ARCTIC OIL & GAS CHALLENGES AND OPPORTUNITIES UNIS, LONGYEARBYEN, APRIL 12TH, 2016 BENGT LIE HANSEN, BLH ENERGY CONSULTING, CHAIRMAN ATT FORMER SENIOR VICE PRESIDENT HYDRO AND PRESIDENT STATOIL RUSSIA,
Background. When the Government Is the Landlord. 1 Norway's oil and gas reserves are all offshore.
Regional Details: Norway In this appendix, we describe the methods the government uses to obtain revenues from oil and gas production in Norway. We present quantitative estimates of revenues as well as
Det norske a new large independent. Odd Ragnar Heum, Det norske oljeselskap ASA
Det norske a new large independent Odd Ragnar Heum, Det norske oljeselskap ASA A new large independent Who we are... How we will operate A fully fledged O&G company Among the largest European Independents
SPE Distinguished Lecturer Program
SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this
PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA
PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA Table of content 1. INTRODUCTION... 2 1.1. Purpose of document... 2 1.2. Det norske oljeselskap... 2 1.3. HSE... 2 2. ABOUT THE IVAR AASEN FIELD... 2 2.1.
SPE Distinguished Lecturer Program
SPE Distinguished Lecturer Program The SPE Distinguished Lecturer Program is funded principally through a grant from the SPE Foundation. The society gratefully acknowledges the companies that support this
Geological Formations in the San Joaquin Valley -- Potential for Carbon Sequestration Dr. Jan Gillespie California State University Bakersfield Target formations for CO 2 storage Burruss et al., 2009
Licensing system in Norway. Steinar Njå Norwegian Petroleum Directorate
Licensing system in Norway Steinar Njå Norwegian Petroleum Directorate Licensing system in Norway Discretionary system The Government invites companies to apply for exclusive rights to petroleum activities
ENHANCED OIL RECOVERY PROCESSES IN SANDSTONE RESERVOIRS CONTAINING LIGHT OIL IN OFFSHORE FIELDS**
http://dx.doi.org/10.7494/drill.2014.31.1.99 * * ENHANCED OIL RECOVERY PROCESSES IN SANDSTONE RESERVOIRS CONTAINING LIGHT OIL IN OFFSHORE FIELDS** 1. INTRODUCTION The initial stage of oil production is
FIELDS UNDER DEVELOPMENT. Ga p fr FACTS 111
11 FIELDS UNDER DEVELOPMENT n Ga p fr 2011 FACTS 111 0 10 20 G 30 Blo pro Goliat 70 Hammerfest 70 Dis Dev Ope Lice Rec Tromsø Exp As o Bodø 65 Dev No The me ins Marulk Skarv 65 Trondheim Res and the Jur
Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs
Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs BABAK AMINSHAHIDY 1, MEHDI FOROOZANFAR 2 1 Department of Petroleum Engineering,University
Northern Norway Subsea Value Chain
Reliable subsea production solutions Northern Norway Subsea Value Chain November Conference 2012 Technology & Business Development in the North Arne Bengt Riple Vice President, Aker Solutions SLS Who we
Investigation of the Effect of Dynamic Capillary Pressure on Waterflooding in Extra Low Permeability Reservoirs
Copyright 013 Tech Science Press SL, vol.9, no., pp.105-117, 013 Investigation of the Effect of Dynamic Capillary Pressure on Waterflooding in Extra Low Permeability Reservoirs Tian Shubao 1, Lei Gang
Re-Fracturing and Water Flooding Western Canada Tight Oil Reservoir Horizontal Wells
Re-Fracturing and Water Flooding Western Canada Tight Oil Reservoir Horizontal Wells Andrew Cao *, Tim Stephenson, Robert Jobling, Richard Baker Andrew Cao, Baker Hughes Canada, [email protected]
APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract
APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall
Enhanced Oil Recovery (EOR) in Tight Oil: Lessons Learned from Pilot Tests in the Bakken
Enhanced Oil Recovery (EOR) in Tight Oil: Lessons Learned from Pilot Tests in the Bakken Tight Oil Optimization Workshop Calgary, Alberta, Canada March 12, 215 James Sorensen John Hamling 215 University
Interview with Vello Kuuskraa
Recovery of Stranded Oil from the ROZ Advanced Resources International, Inc. Arlington, VA December, 2013 Midland, Texas 1 The Residual Oil Zone In a series of reports and presentations, Steve Melzer convincingly
Odfjell Drilling Ltd.
Odfjell Drilling Ltd. Report for the 3 rd quarter of 2015 This interim report is unaudited and has been prepared in accordance with IAS 34 Interim Financial Reporting. Key figures for the Group All figures
Accelerating Commercial Deployment of CCS: Developing Incentives to Expand Anthropogenic CO2 Supply for Enhanced Oil Recovery Commercial
Accelerating Commercial Deployment of CCS: Developing Incentives to Expand Anthropogenic CO2 Supply for Enhanced Oil Recovery Commercial Brad Crabtree Great Plains Institute From a Bridge to a Destination:
Conventional Oil and Gas Technologies
Conventional Oil and Gas Technologies HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Oil and gas technologies include the exploration and development of oil and gas fields, and production processes. Over the
A new approach for dynamic optimization of water flooding problems
A new approach for dynamic optimization of water flooding problems Rolf J. Lorentzen Aina M. Berg Geir Nævdal Erlend H. Vefring IRIS International Research Institute of Stavanger (formerly Rogaland Research)
Fossil Energy Study Guide: Oil
Petroleum or crude oil is a fossil fuel that is found in large quantities beneath the Earth s surface and is often used as a fuel or raw material in the chemical industry. It is a smelly, yellow-to-black
Discover Performance Through Digital Intelligence The Digital Suites for Oil and Gas
2014 Honeywell Users Group Europe, Middle East and Africa Discover Performance Through Digital Intelligence The Digital Suites for Oil and Gas Dan Obrien & Michele Loseto, Honeywell 1 Subsea Ecosystem
New technologies of enhanced oil recovery
New technologies of enhanced oil recovery Stanisław Rychlicki 1, Jerzy Stopa and Paweł Wojnarowski Nové technológie zvýšenia ťažby ropy It is known from the literature that up to 27 % of oil in oilfields
Tanzania gas project. From discovery to gas sales
Tanzania gas project From discovery to gas sales An emerging gas sector Major gas discoveries have been made offshore Tanzania and the country emerges as a potential large gas producer in East Africa.
EXECUTIVE SUMMARY. Availability of fossil fuels
EXECUTIVE SUMMARY 17 EXECUTIVE SUMMARY Fossil fuels currently meet 80% of global energy demand. Even if current policy commitments and pledges made by countries to tackle climate change and other energy-related
Cubility - Facilities and offices
MudCube by Cubility Cubility - Facilities and offices Head office and sales offices Cubility s head office is located in Sandnes, Norway A major part of the oil and gas activity in the North Sea is operated
Wellbore Integrity Restoration Services
Wellbore Integrity Restoration Services New Life for Mature Wells Optimize and extend recovery with cost-effective, integrated services for permanent casing repair and a full range of isolation applications.
Classic Waterflooding Predicitive Models
Classic aterflooding Predicitive Models Initial water injection to water breakthrough: Buckley-Leverett Buckley and Leverett (1942) developed a mathematical approach to describe two-phase, immiscible displacement
Certificate Programs in. Program Requirements
IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: [email protected] Copyright International Human
Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development
Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development Opening Remarks The Obvious Fossil fuels will be the main energy supply, accounting
Techno-Economic Reservoir Modelling Final Report
Techno-Economic Reservoir Modelling Final Report February 2015 Peter Olden, Prof. Eric Mackay, Dr. Gillian Pickup Institute of Petroleum Engineering School of Energy, Geoscience, Infrastructure & Society
ANNUAL Financial statements 20-F. 4th quarter 2013
ANNUAL Financial statements REPORT and review /2012 /2013 20-F 4th quarter 2013 2013 FOURTH QUARTER RESULTS Statoil's fourth quarter and preliminary 2013 results and capital markets update Statoil's fourth
Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil 2011-08-11
Subsea processing Oslo 8. September 2011 Håvard Eidsmoen, Statoil Content Introduction/Motivation Why subsea processing? Overview of technologies, applications and examples Boosting Separation Compression
10.00-10.30: Welcome to Stavanger and South West Norway, by Anna Aabø, President IRIS, and "Greater Stavanger".
Welcome to IRIS Agenda 10.00-10.30: Welcome to Stavanger and South West Norway, by Anna Aabø, President IRIS, and "Greater Stavanger". 10.30-11.00 Presentation, the Brazilian delegation 11.00-11.30 ULLRIGG
ROSS Technology Removal of Oil, Solids and Scale Formers
ROSS Technology Removal of Oil, Solids and Scale Formers Frac Flowback and Produced Treatment for Reuse WATER TECHNOLOGIES Treatment for Reuse and Enhanced Oil Recovery ROSS Technology is a an effective
Goliat Produced Water Management
Goliat Produced Water Management Hans Tore Nordbø, Process Engineer, Eni Norge AS Tekna Produced Water Management, 21.01.10-22.01.10, Clarion Hotel Stavanger www.eninorge.no PL229 Goliat location, ownership
Maintech konferansen. Ola Borten Moe 31.3.16
Maintech konferansen Ola Borten Moe 31.3.16 Non-developed resources on NCS 7050 MBO (Resources likely to be developed as classified by NPD) 92 undeveloped discoveries No of fields 35 30 25 970 MBO 11 Barents
Remediation of Sodium Contaminated Sites
Remediation of Sodium Contaminated Sites Environmental Challenges and Innovations Conference: Gulf Coast 2007 Mark Landress P.G. Project vigator, Ltd. 10497 Town & Country Way Suite 830 Houston, TX 77024
Oil & Gas UK I N D E X. December 2009
Oil & Gas UK I N D E X December 09 THE OIL & GAS UK INDEX 1 Summary The Oil & Gas UK Index The Oil & Gas UK Index is a new quarterly index which measures changes in activity and business confidence across
Wintershall Norge ASA Maria Development Project. Maria Åpenbaring - Nytt felt og Nye muligheter i Haltenbanken området
Wintershall Norge ASA Maria Development Project Maria Åpenbaring - Nytt felt og Nye muligheter i Haltenbanken området E. Braune/ Norskehavskonferansen Stjørdal 8. mars 2012 1 Wintershall - Core Regions
An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations ABSTRACT
11 th International Petroleum Environmental Conference Albuquerque, New Mexico, October 12-15, 24. An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations M-I SWACO ABSTRACT Drill
A Selective Literature Review of CO 2 EOR in the UK North Sea Continental Shelf
A Selective Literature Review of CO 2 EOR in the UK North Sea Continental Shelf This work has been carried out by Aiken Reid Energy Limited, on behalf of the UK CCS Transport & Storage Development Group,
Determination of Flared Gas Volumes Offshore Norway. By Stig Arvid Knutsson Principal Engineer Fiscal Metering Norwegian Petroleum Directorate
Determination of Flared Gas Volumes Offshore Norway By Stig Arvid Knutsson Principal Engineer Fiscal Metering Norwegian Petroleum Directorate Presentation Outline Regulatory requirements Flaring of Associated
Experimental investigation of use of horizontal wells in waterflooding
Experimental investigation of use of horizontal wells in waterflooding N. Hadia a, L. Chaudhari a, Sushanta K. Mitra a,, M. Vinjamur b, R. Singh c a Department of Mechanical Engineering, IITB-ONGC Joint