1 GeoTEXTILE Products INSTALLATION QUALITY ASSURANCE manual
2 Contents 1.0 INTRODUCTION MATERIAL MATERIAL DELIVERY SITE UNLOADING PROCEDURES SITE HANDLING & STORAGE PROCEDURES INSTALLATION SEAMING QUALITY & METHOD...2 Appendix A: Inventory Check List... 3 Appendix B: Certificate of Acceptance... 4
3 1.0 INTRODUCTION This manual provides an overview of the GSE Installation Quality Assurance procedures consistent with industry accepted practices to ensure that the nonwoven geotextile products installed will best perform for its intended purpose. In addition, all installation work will be performed in strict accordance per the customer s specifications. Please read the procedures below completely before you begin. If you need further clarification, contact the GSE Engineering Support Staff for assistance. Remember safety first and use safe practices always on every project. 2.0 MATERIAL GSE nonwoven geotextiles are tough and durable materials packaged to withstand normal wear and tear on a typical construction site. However, as with any construction material, all nonwoven geotextiles should be handled with care and stored properly to ensure that the material properties required for a project are retained to serve long-term project needs. In general, GSE recommends that American Society of Testing and Material (ASTM) standard D 4873 Standard Guide for Identification, Storage and Handling of Geosynthetic Rolls & Samples be followed in its entirety. Specific recommendations by GSE are elaborated in the following sections. 3.0 MATERIAL DELIVERY A. Upon arrival on site, QA personnel will inventory all materials on-site. B. Roll numbers of the nonwoven geotextile will be logged on the Inventory Check List (Appendix A) and cross-referenced with the Bill of Lading. C. Copies of the Inventory Check List and signed Bill of Lading should be sent to GSE corporate head quarters while the on-site QA personnel retains the original copies. D. Any visible damage to roll materials should be noted on the roll and Inventory Check List. 4.0 SITE UNLOADING PROCEDURES A. A forklift or front end loader fitted with a tapered pole is recommended for loading and unloading nonwoven geotextile rolls. B. The pole should be long enough to extend at least 2/3 (10 feet) of the way into the nonwoven geotextile roll core to avoid the possibility of buckling or breaking the core. C. Nonwoven geotextile rolls may also be lifted from flatbed trailers using straps hoisted by a crane or loader. D. No more than three rolls should be lifted at the same time. For special length rolls, 1,000 feet or longer, each roll should be handled one at a time. 5.0 SITE HANDLING & STORAGE PROCEDURES A. Nonwoven geotextile rolls should be lifted off of the ground when moving. B. Nonwoven geotextile should be deployed as closely as possible to the designated location minimizing dragging against the ground surface. C. Operations of heavy construction equipment directly on the nonwoven geotextile should be avoided. D. Nonwoven geotextiles should be stored in a flat, dry and well drained area. All sources of contamination, such as oil, grease, soil and aggregate should be separated from the materials. E. During on-site storage, nonwoven geotextile rolls should be protected from moisture, sunlight, theft and vandalism. F. The protective wrapping should not be removed until the nonwoven geotextile is ready to be installed. G. If stored outdoors for long durations, the nonwoven geotextile should be elevated from the ground surface and covered with a tarpaulin or other opaque plastics. Geonet & Geocomposite Products 1
4 6.0 ULTRAVIOLET LIGHT EXPOSURE When left exposed to ultraviolet light, all nonwoven geotextiles slowly degrade, losing strength in the process. It is highly recommended not to expose GSE nonwoven geotextiles to sunlight prior to installation. Once installed, GSE geotextiles should be covered with designated overlying material. The nonwoven geotextile should not be left exposed to sunlight for more than 30 days INSTALLATION GSE nonwoven geotextiles should be installed only after the underlying material or subgrade has been properly inspected and approved. The nonwoven geotextiles should be installed to the grade and location specified in project specifications. The project construction quality assurance and construction quality control (CQA/CQC) guidelines must be followed during the installation. An additional important resource for construction guidelines for all geosynthetics is Technical Guidance Document: Quality Assurance and Quality Control for Waste Containment Facilities by United States Environmental Protection Agency (Ref. EPA/600/R-93/182). GSE recommends minimum geotextile overlap distance from 12 inch to 24 inch, in both machine and transverse directions, unless the project CQA/CQC guidelines specify otherwise. Care should be taken not to entrap stones or excessive moisture in the nonwoven geotextile during placement. In the presence of wind, all geotextiles should be weighed with temporary ballasting such as sandbags. On slopes, the nonwoven geotextile should be securely anchored and then rolled down the slope in such a manner as indicated by good construction practices and safety considerations. Prior to the placement of overlying materials, a Certificate of Acceptance (Appendix B) must be signed by a responsible party and an installer s representative. All overlying materials on the nonwoven geotextile should be placed such that: The nonwoven geotextile and the underlying material are not damaged. Any movement of the nonwoven geotextile is kept to a minimum. Excess stresses in the nonwoven geotextile are kept to a minimum. 8.0 SEAMING QUALITY & METHOD GSE nonwoven geotextiles can be seamed using sewing, hot wedge welding or flame. The quality of a seam depends on seaming equipment, operator experience and site conditions, such as temperature and humidity. Laboratory testing has shown that sewn and hot wedge weld seam provide comparable seam quality, while flame welding is much dependent on operator experience. In general, it is possible to obtain seam efficiency (defined as strength of seam divided by strength of geotextile of up to 80%), if controls are established and implemented. Seaming procedures are typically included in project specifications. GSEworld.com Manufacturing Quality Assurance Manual 2
5 Appendix A: Inventory Check List Inventory Check List Project: Site Manager: Date: Project # QA Technician: Page: of Material Roll # Used Material Roll # Used Material Roll # Used Material Roll # Used Geonet & Geocomposite Products 3
6 Appendix B: Certificate of Acceptance GSE Environmental Job.: Gundle Road Houston, Texas TF F Project: Client: Bill To: Job Description: % Complete of Total Job: Material Estimated Square Feet Final Quantity/Description I, the undersigned, duly represntative of: Do hereby take over and accept the work described above from the date hereof and confirm to the best of my knwledge the work has been completed in accordance with specifications and the terms and conditions of the contract. Name Signature Title Date Certificate accepted by GSE Environmental Representative. Name Signature Title Date GSEworld.com Manufacturing Quality Assurance Manual 4
7 GSE is a leading manufacturer and marketer of geosynthetic lining products and services. We ve built a reputation of reliability through our dedication to providing consistency of product, price and protection to our global customers. Our commitment to innovation, our focus on quality and our industry expertise allow us the flexibility to collaborate with our clients to develop a custom, purpose-fit solution. For more information on this product and others, please visit us at GSEworld.com, call or contact your local sales office. REV 17JAN2013
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN DOMINION CHESAPEAKE ENERGY CENTER INDUSTRIAL SOLID WASTE LANDFILL PERMIT #440 CHESAPEAKE, VIRGINIA
CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN DOMINION CHESAPEAKE ENERGY CENTER INDUSTRIAL SOLID WASTE LANDFILL PERMIT #440 CHESAPEAKE, VIRGINIA Prepared for: Chesapeake Energy Center 2701 Vepco Street Chesapeake,
NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012
NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
SEWING MAINTENANCE CHECKLIST
SEWING MAINTENANCE CHECKLIST Many Retail, Brand-name Marketing, Mail Order and Sourcing Companies are visiting existing and potential Contractor sewing facilities and evaluating their sewing capabilities
INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425)
INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013
ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 READ CAREFULLY These instructions are intended to cover good practices in
Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes
Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to
GRI Standard Practice GT7 * Determination of the Long-Term Design Strength of Geotextiles
Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII adopted -1989 Rev. 1 1992 Rev. 2 (editorial) 2012 GRI Standard Practice
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
SC-07 STORM DRAIN INLET PROTECTION
Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING
CHAPTER 6 ASPHALT ROLL ROOFING
CHAPTER 6 ASPHALT ROLL ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 6.1.1 General 6.1.3 Mineral-Surfaced Asphalt roll roofing is roofing in sheet form Mineral-surfaced roll roofing is composed
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
FOREWORD. The Plastics Pipe Institute. This Technical Note, TN-30, was first issued in January 2006 and was revised and republished in September 2013.
Requirements for the Use of Rework Materials in Manufacturing of Polyethylene Gas Pipe TN-30/2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org FOREWORD
Team Skills Challenge Event # 1 Plant Layout Score Sheet
Team Skills Challenge Event # 1 Plant Layout Score Sheet State Name: Team Members: 1. 2. 3. 4. Placement of Plant Material 25 Deduct 5 points/plant not placed within 6 inches +/- of correct placement to
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
Standard FIBC Handling Guide
Standard FIBC Handling Guide Page 2 Introduction Dickson s FIBC (Flexible Intermediate Bulk Containers) are specifically designed for the bulk packing & movement of aggregate and other loose products.
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
Spandrel Glass Types and Recommendations
Spandrel Glass Types and Recommendations Introduction PPG has long offered recommendations regarding alternatives for glass spandrel applications. Over the years these recommendations were included in
DC MOTOR ANALYSIS & TROUBLESHOOTING
DC MOTOR ANALYSIS & TROUBLESHOOTING By Don Shaw Condition assessment of DC motors requires a basic understanding of the design and operating characteristics of the various types available: the series motor,
Content Sheet 4-1: Purchasing and Inventory Overview
Content Sheet 4-1: Purchasing and Inventory Overview Role in quality management systems Purchasing and inventory management is a critical, or essential, component of the quality management system. Efficient
Quality Assurance Concepts. Outline
Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to
GEOTEXTILES IN ROAD CON- STRUCTION, MAINTENANCE AND EROSION CONTROL
GEOTEXTILES IN ROAD CON- STRUCTION, MAINTENANCE AND EROSION CONTROL Textiles were first applied to roadways in the days of the Pharaohs Even they struggled with unstable soils which rutted or washed away
University of Tennessee Safety Guidelines
University of Tennessee Safety Guidelines Guideline Subject: Compressed Gases and Cryogenics Safety Guidelines Approval Date: 10/1/15 (Rev. 1) Next Scheduled Review: 10/1/19 Date Effective: 1/01/09 Contact
BMP 6.4.6: Dry Well / Seepage Pit
BMP 6.4.6: Dry Well / Seepage Pit A Dry Well, or Seepage Pit, is a variation on an Infiltration system that is designed to temporarily store and infiltrate rooftop runoff. Key Design Elements Fllow Infiltration
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: [email protected] Module - 4
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
Architectural Testing
FIELD AND MOCK-UP TESTING SERVICES 130 Derry Court York, PA 17406-8405 phone: 717-764-7700 fax: 717-764-4129 www.archtest.com Mock-up Test Methods (Laboratory Mock-up or Field Mock-up): ASTM E 283, Standard
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
E-82. Access Roads and Crane Platforms. 77m steel tower. 1 of 12. Specification Access Roads and Crane Platforms E-82/ 77m steel tower.
E82/ 77m steel tower 1 of 12 E82 77m steel tower PMCWSP023E8277m Zuwegung und Kranstellfläche Rev005gereng E82/ 77m steel tower 2 of 12 CONTENTS 1. Assembling the tower and wind energy converter 3 2. Crane
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Installation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
Section 14. Forklift Safety Contents 14.1 Operator Safety
Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
MaxCell Technical Manual Design Parameters
MaxCell Technical Manual Design Parameters Breaking Strength by Product Style, lbs Product Style Standard MaxCell Fire Resistant MaxCell Test Method 4 Cell 2,750 2,200 ASTM D 5 Bellcore 5 5.. Cell 2,50
4. Cryogenic gloves are generally designed to protect the hands from intense cold or heat.
PROTECTIVE GLOVES In many University laboratories, exposure to chemicals, infectious agents, sharp objects, extreme temperatures and other hazards can create a potential for injury to the hand. Wherever
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
EMERGENCY HOME PROTECTION. Homeowner's Guide for Emergency Flood Control. Contents INTRODUCTION
EMERGENCY HOME PROTECTION Homeowner's Guide for Emergency Flood Control Contents Discussion or Section Page Number Introduction 3 Potential Flooding Periods 4 General Rules and Control Aids 5,6 Sandbags
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
Tractor Painting Tips
Keeping your tractor or equipment well kept & free from rust & corrosion will extend the life of your investment & help retain its value for a longer period of time. It can be difficult, in many cases,
GSI. Geosynthetic Institute GRI. 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GII GAI GCI. GRI Test Method GM21
Geosynthetic Institute 4 Kedron Avenue Folsom, PA 133-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII Revision 4: December 17, 2012 Revision schedule on pg. 11 GRI Test Method GM21
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
Heat Transfer. Condensation. Revaporization
Objectives Wrapping a Towel Around the Problem of Wet Packs Identify causes of wet packs in steam sterilization Review suggested documentation that can assist in solving wet pack problems Why are Wet Packs
Portable Ladder Safety
Portable Ladder Safety Agenda Importance of Ladder Safety An Approved Ladder Controlling Hazards Inspecting the Ladder Set Up Use Importance of Ladder Safety Any fall can be serious, and a fall from the
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
1.5 In order to retain this strength, the rope must be properly maintained.
TRAINING BULLETIN ROPE 1 August 16, 2007 1. INTRODUCTION 1.1 The life saving rope is 9/16 in diameter. It is made of a continuous filament of Nylon 707 with a length of 150, weight of 14½ pounds, and a
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
Standard Test Procedures Manual
STP 206-4 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description of Test This method describes the procedure for determining the liquid limit, plastic limit and the plasticity index of coarse-grained
Heat Illness Prevention Program
I. Policy Heat Illness Prevention Program Responsible Executive: Vice President for Administration and Finance Responsible Office: Environmental Health and Instructional Safety Originally Issued: February
EMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
Operating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline
Reliance Industrial Products, LLC Operating instructions for 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline Model # 6095 Reliance Industrial Products PO Box 140008 Denver, CO 80214 Ph. (800)
Montgomery County Health Department Mobile Food Guidelines. Definitions
Montgomery County Health Department Mobile Food Guidelines Definitions Commissary A permitted food establishment to which a mobile unit returns on a daily basis for such tasks as discarding liquid and/or
GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM
GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM SECTION 32 14 13.19 AquaPave Permeable Interlocking Concrete Pavement Note: This guide specification is for the
Oil and Gas Containment Systems
FRONT COVER Oil and Gas Containment Systems FACING THE CHALLENGE Oil and natural gas production is one of the most hazardous and complex industries in the world. In addition to typical day-to-day business
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS
ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS
Safe Dry Goods Storage
FOOD PROTECTION CONNECTION 1 HOUR SAN Safe Dry Goods Storage by Melissa Vaccaro, MS, CHO Not too long ago a consumer brought an open pouch of hot chocolate into our office for testing. She claimed there
NEOGARD. Preventive Maintenance Manual
NEOGARD Preventive Maintenance Manual Fluid-Applied Roof Coating Systems December 2014 Notes NEOGARD luid-applied roof coating systems are designed to be long lasting, monolithic membranes which provide
High Performance PSA in Sheet Membrane in Water Protection
High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
Standards A complete list of the standards covered by this lesson is included in the Appendix at the end of the lesson.
Lesson 3: Albedo Time: approximately 40-50 minutes, plus 30 minutes for students to paint pop bottles Materials: Text: Albedo (from web site 1 per group) Small thermometers, at least 0ºC to 100ºC range
GRI-GT13(a) Specification Geotextile Separation for Roadways (ASTM Test Method Based)
GRI-GT13(a) Specification Geotextile Separation for Roadways (ASTM Test Method Based) placed between subgrade soil and an overlying aggregate layer separation prevents mixing and intrusion meant for firm
Aggregates for Path Construction
Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling
Installation & Technical Guide
Of the very few negative responses that I have received regarding this product, the one that I find most humorous is this one: Contractors are too rough on the product. I don t think this can stand up
Claims Management Policy
Claims Management Policy INTRODUCTION ARCELORMITTAL DOFASCO CLAIMS MANAGEMENT POLICY This general claims policy covers light flat rolled sheet products produced at all ArcelorMittal Dofasco flat rolled
These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.
TECHNICAL BULLETIN Suggested Specification for White Concrete Floors Specifier Notes: 1. The Architect or Engineer should review the contents and adopt the suggested language as appropriate, ensuring it
QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION
QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION 50.4(1) An owner of a place of employment, an employer and a contractor shall each ensure that each component of a fall-protection system is inspected
Construction of Quality Hot Mix Asphalt Pavements
59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed
BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING
FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam
CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
COTTON PICKER MANAGEMENT AND HARVESTING EFFICIENCY
COTTON PICKER MANAGEMENT AND HARVESTING EFFICIENCY With good crop and machinery management, favorable weather conditions, and good ginning practices, most cotton from the first picking should grade very
Heat Illness Prevention Program
Heat Illness Prevention Program I. Policy Employees working in outdoor places of employment or in other areas at times when the environmental risk factors for heat illness are present, are at risk for
Polymeric membrane for roof waterproofing
Product Data Sheet Edition 09.2008 Revision no: 0 Identification no: 01 09 01 02 200 0 120000 Sarnafil TS 77-12 Polymeric membrane for roof waterproofing Construction Product Description Uses Characteristics
THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention
THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS Thank you purchasing the Metalith Perimeter Security System. The following document provides the manufacturer s recommendations for successful
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
Product Guide Specification
Reef Industries, Inc. 9209 Almeda Genoa Rd. Houston, Texas 77075 Toll Free (800) 231-6074 Phone (713) 507-4251 Fax (713) 507-4295 Web Site www.reefindustries.com E-Mail [email protected] Product Guide
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.
!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!
Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing
Compressed Gas Cylinder Safety
Compressed Gas Cylinder Safety I. Background. Due to the nature of gas cylinders, special storage and handling precautions are necessary. The hazards associated with compressed gases include oxygen displacement,
The regulations that impact outdoor space, surfacing, fall zones, equipment, entrapments, hazards and supervision are:
Small Group, Large Group and School Age Child Care Licensing POLICY STATEMENT: Playground Safety 6.06 CMR 7.07(7); 7.07(16)(e); 7.07(13); 7.10(10) According to the U. S. Consumer Product Safety Commission
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,
Riprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
Secondary Containment Comparison ATI Ultra COAT vs HDPE
When choosing a secondary containment system it must be chosen based on its ability to withstand long term contact with the natural elements (weather), whatever the tanks hold (unrefined oil, fuels, acids,