2 Table of Contents Introduction Important Note Brick Types, Sizes & Estimating Bonds Brick Positions In Wall Joints Table of Contents Types, Sizes and Estimating 1 Bonds, Joints and Positions 1 Wall Types 2 Insulating Brick Walls 3 Mortarless Interior Brick Flooring 4 Fireplaces 5 Arches 6 Introduction This publication has been prepared as a guide to brick construction for the home builders. It is especially for the builder who may not be familiar with all areas of brick construction in the home building field. We have attempted to cover particularly those details of construction which will be most often used. However, since we cannot cover all possibilities we hope you will ask for additional information when needed. Brick Types, Sizes & Estimating H T H T L L H T Brick Type STANDARD MODULAR OVERSIZE QUEEN CLOSURE UTILITY T H L T H L T H L T H L T H L T H L Size (actual) 3 3 /4" 2 1 /4" 8" 3 5 /8" 2 1 /4" 7 5 /8" 3 3 /4" 2 3 /4" 8" 3" 2 3 /4" 8" 3 1 /2" 3 1 /2" 7 1 /2" 3 1 /2" 3 1 /2"11 1 /2" Nominal Joint 3/8" 3/8" 3/8" 3/8" 1/2" 1/2" Thickness L H T L H T L H T L Joints Concave Vee Grapevine Quoin Corners & Water Table 7 Steps 8 Exterior Paving 9 Brick Driveways 10 Walkways & Patios 11 Brick Cleaning 12 Mailboxes 13 Garden Walls 14 Retaining Walls 15 Exterior Brick Siding 16 Brick Does Not Leak 17 Cold Weather Masonry 18 Garage Door Openings 19 Simply contact: Brick SouthEast Suite University Executive Park Charlotte, NC BRICK/Charlotte, NC BRICK/Conyers, GA Important Note The products described in this booklet involve the use of hazardous materials, operations and/ or equipment. This booklet does not purport to address all of the safety practices associated with the use of these products. It is the responsibility of the user of this booklet to establish appropriate safety and health practices and to determine the applicability of regulatory limitations prior to the use of the products described. The information and suggestions contained in this booklet are based on available data and experience of the technical staff of Brick SouthEast. This information should be recognized as recommendations and should be used with judgement. Final decisions on the use of the information discussed herein are not within the purview of Brick SouthEast and must rest with the project owner, designer, or both. Units per Square Foot of Wall Cubic Feet of Mortar per 1000 Brick (including waste) Careful estimating is important. Correct quantities and prices will enable completion of the job without unnecessary waste and cost. Bonds Creative use of unique bond variations can add to the subtle elegance of any home or building. Through the use of these bonds and variations of the color and texture of the brick and of joint types and colors, an almost unlimited number of patterns can be developed. Familiarity with these patterns and a little creativity can insure a saleable home. Running Bond Flemish Bond Dutch Corners Flemish Bond English Corners Your brick manufacturer is available to help in estimating and selecting brick sizes and styles. Call on them for their expertise and advice. *Typical unit sizes and dimensions may vary from manufacturer to manufacturer. Brick Positions In Wall Rowlock Header Stretcher Soldier Rowlock Stretcher Sailor Flat Header Finishing the mortar joints serves several purposes; it helps insure weathertightness, and also influences the appearance of the wall. Careful selection of joint finishes can substantially enhance the overall appearance of a structure. 1 Weathered Flush Raked
3 Wall Types Insulating Brick Walls Wall Types Insulating Brick Walls Insulating The Brick Veneer Wall The brick veneer wall may be insulated by use of standard insulating sheathing and fiber glass batt insulation placed between studs, giving an R value of approximately 14, and a U value of approximately Mass of the brick veneer and the nominal one inch air space between veneer and sheathing adds greatly to energy efficiency of the brick veneer wall. Brick Veneer Wall Insulating The Brick Cavity Wall One of the most important advantages of the brick cavity wall is that the cavity may be used for placing insulation within the wall. Typical Brick Veneer Wall Details Brick Veneer Wall Brick veneer walls are currently the most widely used walls for residential construction. The brickwork is a veneer since it is a non-loadbearing facing built after framing is complete. This is a drainage type wall. An air space is provided back of the brickwork to allow any penetrating water to fall to the base of the veneer where flashing and weep holes are provided to divert water back out of the wall. Footing size and foundation anchorage should be determined per local building codes. Foundations should extend not less than 12 inches below the finished natural grade or engineered fill and in no case less than the frost line depth. Typical Brick Cavity Wall Details Brick Cavity Wall A cavity wall consists of two wythes of masonry separated by a continuous air space that is between two and four inches in width. The cavity wall is utilized because it is an exceptional all-weather wall. Because of its ease of insulation, it is an efficient energy saver. The cavity wall helps resist noise penetration, is fire resistant and is virtually maintenance free. The two walls are tied together with metal ties. Spacing and type of ties can vary and should be determined on a case by case basis. The brick cavity wall, a drainage type wall, is particularly impervious to moisture penetration because the air cavity (space) allows any moisture to drain to the bottom of the wall. Proper flashing and weep holes are important to drainage. Flashing directs moisture from the interior wythe to the outside of the exterior wythe. Flashing should be installed over all openings, under sills and, most importantly, at the bottom of the cavity wall just above ground level. In order to insulate the wall properly it is absolutely essential that the cavity be kept clean during construction. Insulations that have been used in cavity walls include loose fill poured type, rigid board type and foamed-in-place type. R value for a 12 inch brick and brick cavity wall insulated with poured vermiculite or a 2 inch rigid styrene board would be approximately 14, and the U value would be approximately Mass of the brickwork provides additional energy saving qualities not recognized in standard U value calculations. Brick Cavity Wall 2 For additional information you may request Tech Note 21B, Brick Masonry Cavity Walls Detailing. 3
4 Mortarless Interior Brick Flooring Fireplaces Mortarless Interior Brick Flooring Mortarless brick flooring may be placed on a concrete slab or on a wood flooring system as shown in the illustrations. The size of the brick is optional, except for patterns such as basket weave and herringbone, which require brick with length dimensions exactly twice that of the width, such as 4"x8" or 3 3/4"x7 1/2", etc. Thickness of brick used on a concrete slab may vary up to 2 1/4", but maximum thickness of 1 5/8" is recommended for wood flooring systems to reduce weight. Joist spacing of wood flooring systems should be limited to 12" o.c. Building paper is first placed on the supporting base with edges butted rather than lapped. Two layers of 15 lb. felt are recommended. Brick are placed directly on the felt in the desired pattern. Units should be placed tightly together. Clean, dry sand is then placed on the brick and swept into all joints. Surplus sand is swept off and sealer may be applied when floor is completely dry. Sealing is necessary as it locks sand in joints and creates an impervious floor finish. Because sealing is so important, it is suggested that great care be given to choosing and applying a ceiling product. For specific questions on sealing concerns, contact the technical department at Brick SouthEast. Brick floor on wood support system Brick floor on concrete slab Fireplaces Today, brick fireplaces are considered standard in almost all homes. The need for a backup or secondary heating system has created a renewed interest in the open fireplace that has historically been the Heart of the Home. Today s fireplace is subjected to higher temperatures and more prolonged use than at any other time in memory. Because of increased temperatures and length of use, the home builder must ascertain if his fireplace design meets all requirements of the Building Code and insure that constant supervision be given to the carpentry and masonry crews during construction of the structure and surrounding framing. Since the safety of human life is involved, these details should not be left solely to subcontracting crews. Also, special attention should be given to determining the type of chimney footing required. Building Codes require that concrete footings for chimneys rest on solid ground, and/or extend down to the level of main foundation footings and that they be bonded with main footings. Solid Ground means firm, undisturbed soil or adequately controlled fill. Section Size of the fireplace should be in proportion to the room size. The U.S. Department of Agriculture has determined that a fireplace 30 to 36 inch wide is generally suitable for a room having 300 square feet of floor space. A fresh air supply substantially increases the efficiency of a fireplace by reducing the amount of heated air taken from the living space. Details of the adjustable fresh air damper and ductwork are shown. The fireplace builder should be cautioned to leave room in masonry work for expansion of metal lintels, dampers and firebrick linings in order to avoid masonry cracks. For complete details of construction, refer to Brick SouthEast s publications, Good Practice for of Brick Fireplace and Fireplaces. Plan & Front Elevation 4 5
5 Arches Quoin Corners Water Table Arches The arch provides a method of spanning masonry wall openings that not only has structural advantages over lintels and beams, but gives designers a method of expressing various architectural effects and styles. Arches are constructed with the aid of temporary forming or centering which must carry dead loads until the arch has gained sufficient strength to support itself and other superimposed loads. Generally, forms should remain in place a minimum of ten days after completion of all masonry work to be supported by the arch. To help simplify construction of flat or jack arches, a steel angle (lintel) is sometimes used as a permanent form in brick veneer construction. Complete filling of all mortar joints is especially important in arch construction since joints are vital in maintaining the compression ring or Jack wedging effect of the arch. Any movement caused by the slightest sliding, settlement or rotation of abutments or supports or the arch itself may result in failure of the arch. Orders for brick arches should be placed with the brick manufacturer at the inception of the job, and detailed drawings, preferable full drawings of a half arch, should accompany the order. The following information should be on drawings: 1. Masonry Opening Dimensions 2. Mortar Joint Thickness 3. Number of Courses High 4. Bonding of Arch (One, Two, Three Piece) 5. Skewback Angle 6. Type and Texture of Brick used 7. Radius of Radiuses, if applicable For design information on brick arches, see Brick Institute of America Technical Notes, Number 31 series. Semicircular Quoin Corners Quoins are special ornamental projections executed in brickwork to mark corners of buildings and to create an overall appearance of strength, grandeur, and solidity. When constructing quoins, brick is laid in the standard method with a two inch air space allowed between the brick and the sheathing rather than the normal one inch of space. It is important that an adequate number of ties be used. This relatively simple masonry technique is a sign of elegance that will be a lasting reminder of the quality of the builder s work Water Table A brick water table can add that touch of early American architectural detail to any colonial style house. Quoin Elevations; Front & Side Quoins: Perspective & Plan Your brick representative can help in selecting the most appropriate factory-made brick water table design for a particular situation. Segmental Elliptical Typical Water Table: Brick Veneer Wall Details Arch Form 6 7
6 Steps Exterior Paving Steps Rowlock Tread/7" Riser Use 8"x8"x4" factory made corners Exterior Paving A few patterns Brick steps can be the final visual touch to provide handsome curb appeal for any home. Since steps are normally exposed to severe weathering, quality materials and good workmanship are essential for good construction and performance. All brick steps should be placed on concrete footings. Concrete should be 2500 PSI (28 days) placed in an area excavated to solid earth with a 12" minimum depth below finished grade. All footings should be a minimum of 8" deep and have a 4" projection past steps except where they abut an adjoining wall. In situations of questionable soil conditions, reinforcing steel should be used. All masonry used in steps should be laid with type S mortar. Rowlock tread steps having 7" risers and 12" treads should be built using factory-made corners which are available from all brick manufacturers. For specific tread and riser dimensions, consult with your local code official. Ogee Rowlock Step Tread Special units add a designer appearance. End Elevation and Step Elevation Respectively Brick walkways, patios and driveways are more popular now than ever before. Homebuilders are finding brick paving a must in today s highly competitive market. Brick paving is an easy way of adding value to the property you are putting on the market. Mortarless paving is much cheaper to build than mortared paving and, if built properly, can provide the same enduring qualities of conventional paving systems and materials. The most important consideration for mortarless paving is a good base. Solidly compacted earth and other base materials will generally eliminate settlement problems. Good drainage of the general area where mortarless paving is to be installed will help maintain a stable base and help prevent growth of algae on paving units. Providing good edge retention of mortarless paving is essential, and, of course, specifying weather-resistant brick paving units is important to a quality installation. Check with your brick manufacturer for availability. 8 9
7 Driveways Walkways & Patios Driveways Specifications Mortarless brick paving should conform to the alignment and grade as shown on the plans. The subgrade (earth) should be well compacted with all organic material and soft soil removed and replaced with an approved soil. Paving brick should conform to ASTM C902, Class SX. Color and dimensions should be approved from a sample. Mortarless brick paving may be installed by semi-skilled labor. Installation 1. Install a row of curb brick on one side of the driveway, settling units to the required height. Use mortar behind and under curb units as needed for support. Set a temporary form on the opposite side of driveway to proper grade, 2-3 inches outside of the location of curb brick installation. 2.A base course should be placed and compacted. The base material should be of Aggregate Base Course (ABC) conforming to DOT specifications. The aggregate should be placed on an approved subgrade between the curb brick row and the temporary form. The aggregate can be compacted with a vibratory place compactor or by hand and should have a slight crown upon completion. When compaction is complete the base course should be smooth, hard, dense, unyielding and well bonded. 3. Place a 1/2" to 1" layer of sand or stone screenings on the base course, using screed to spread uniformly over the entire area. Moisten and compact by hand or a mechanical devise. Rescreed this layer as required to bring surface to the exact grade. 4. Begin laying pavers along previously installed rows of curb brick, using specified bonding pattern and continuing until all paving is laid. Normally, paving units are placed tightly together leaving no space between individual pavers. However, if units have very smooth uniform edges or if pavers are very uniform in size, 1/16" should be left between units to allow a space for sand to surround each unit. 5. Remove the temporary form. Install final row of curb brick tightly along the outer row of pavers by removing groups of 5 or 6 pavers from the outer row and excavating a small trench for the curb brick in this area. Place the curb brick in this trench, backfill and tamp on both sides and use mortar behind and under units as needed for support. Set curb units to required grade. Replace and smooth screenings and replace paving brick. 6. Scatter stone screenings or sand over entire surface and sweep into cracks. Walkways & Patios Specifications Mortarless brick paving should conform to the grade as shown on plans. The subgrade (earth) should be well compacted with all organic material and soft soil removed and replaced with an approved soil. The paving brick should conform to ASTM C902, Class SX. Color and dimensions should be approved from sample. Installation 1.Install a row of edge brick on one side of the walk to the required alignment and grade. Set a temporary form on the other side of the walk to the proper grade, 2"-3" outside of edge brick location. 2.Complete grading as shown in sketch below and place stone screenings or sand between the forms to approximate required depth using the screed to spread uniformly over the area. Moisten screenings or sand and compact by hand or mechanical equipment. Rescreed screenings or sand, as required, to smooth base and bring surface to the required grade. 3.Start laying pavers along the previously installed row of edge brick, using specified bonding pattern, and continue this until all pavers are laid. Normally, paving units are placed tightly together, leaving no space between individual pavers. However, if the units have very smooth uniform edges or if pavers are very uniform in size, 1/16" should be left between units to allow a space for sand to surround each unit. 4.Remove the temporary form. Install final row of edge brick tightly along outer row of pavers by removing groups of 5 or 6 pavers from outer row and excavating a small trench for edge brick in this area. Place edge brick in this trench, backfill and tamp on both sides, replenish and smooth the screenings or sand and replace paving brick. 5.Scatter stone screenings or sand over entire surface and sweep into the cracks. For additional information see Brick Paver Paths, Patios, & More available from Brick SouthEast. Perspective Sections Perspective Sections 10 NOTCH THICKNESS OF BRICK (BOTH ENDS) 11
8 Brick Cleaning Mailboxes Brick Cleaning Four Simple Steps For Better Brick Cleaning Often forgotten, brick cleaning is actually one of the most important parts of new home construction so far as the Home Buyer is concerned. Why not give brick cleaning the same concern given other Final Appearance items? Brick cleaning is not difficult if properly done. First thing to do is to ask the brick manufacturer for recommendation on cleaning the particular brick. If a decision is made to use an acid cleaning system, then a particular acid product should be agreed upon. Before applying acid solution, larger mortar particles should be removed by use of hand tools, reducing unwanted mortar deposits to paperthin smears. Next, apply plenty of water to the masonry, enough to satisfy thirst of the wall and keep water standing on surface of masonry. 1.Remove large particles of mortar with hand tools before washing the wall. Apply acid solutions, mixed according to instruction on container. Scrape any remaining mortar particles, reapply solution and rinse wall thoroughly, flushing off all acid and dissolved mortar particles. Care should be taken to protect nearby painted surfaces, glass, metal, etc. Test areas should be treated and necessary approval secured before continuing. High pressure water systems may be used to rinse masonry, but may not be used to apply acids. Test areas should be rinsed and necessary approval secured before continuing with high pressure water systems. Sandblast cleaning is an acceptable method for cleaning new masonry. As with all cleaning systems, test sections should be cleaned and necessary approval secured before continuing sandblasting. For complete information on the cleaning systems described above and for information on specialty cleaning see the Brick Association publication Cleaning New Brickwork. * * The publication can be accessed at (professional segment). 3.Apply cleaning solution with brush, mixed as directed on container. Follow printed instructions as to length of time solution should remain on wall. Scrape as needed, and continue brushing. Mailboxes A brick mailbox is a simple, but unique way to dress up your front yard and add that final touch of class to your home. It is a simple, do-it-yourself project that can be done by the weekend mason in the family. Pictured here are just a few of the many designs available. Use one of these or design your own. Brick mailboxes let you be as creative as you like Thoroughly pre-wet with water before cleaning. Plenty of water is the secret of good masonry cleaning. Be sure the brickwork below the area being cleaned is thoroughly soaked with water so dissolved mortar from above won t be drawn into face of the brick below. 4.Rinse thoroughly with water immediately. Remember, the secret of good masonry cleaning is using plenty of water. 13
9 Garden Walls Retaining Walls Garden Walls Elevation Section A-A Retaining Walls English Bond with pattern formed by headers alternately projected and omitted Note: For back fill up to 3 feet above footing Flemish Bond with open pattern of crosses Flemish Bond with open header pattern 14 15
10 Exterior Remodeling with Brick Brick Does Not Leak Exterior Remodeling with Brick Brick Veneer An experienced builder can transform old buildings into new ones with brick veneer. Brick veneer is applied as in regular new brick veneer construction. The brick are secured with metal veneer ties attached to the existing wall and spaced no further Details apart than 16" vertically, and 24" horizontally. Footings If the existing footing projects at least 5", this is sufficient to start the new brick veneer. Otherwise, an additional concrete footing approximately 8" deep (minimum) should be installed. Note: Engineering analysis required for all details. Brick Does Not Leak Occasionally one may encounter the problem of a leaky wall. Experience shows, however, the cause of the problem is not the brick, but improper construction technique. The following improper conditions may contribute to the leaky wall problem and should be avoided: Poor bond between brick and mortar Use of raked or scratched joints Use of poor quality mortar Excessive mortar droppings in air space or cavity Poor foundation walls In spite of the need to supervise all aspects of construction, it is obvious one cannot be everywhere and do everything. For this reason, we offer this information to acquaint you with some basic techniques to help prevent these problems. It will be helpful if you keep a copy on the job site. Head Joint Brick Veneer on Wood Frame Solid (Composite) Walls 16 17
11 Cold Weather Masonry & Protection Recommendations Alternate Method for Support of Brick Veneer above Garage Door Openings Cold Weather Masonry & Protection Recommendations * Cold weather masonry construction and its quality control require some additional attention to construction practices and protection. Attention should be directed to the following details as well as those normally attended. 1. The cold weather construction and protection recommendation of this recommended practice should be closely followed. 2. materials should be received, stored, and protected in ways that prevent water from entering the materials. 3. If climactic condition warrant, temperatures of construction materials should be measured frozen sand and wet masonry units must be thawed. Masonry units below 20 o F must be heated above 20 o F without overheating. *This brochure contains general cold weather construction recommendations. Code specific recommendations for hot and cold weather construction can be found in the Masonry Standards Joint Committee document. 4. Sufficient mortar ingredients should be heated to produce mortar temperatures between 40 o F and 120 o F. Every effort should be made to produce consecutive batches of mortar with the same temperatures falling within this range. The mortar temperature after mixing and before use should be above 40 o F, maintainable either by auxiliary heaters under the mortar board or by more frequent mixing of mortar batches. Heated mortar on mortar boards should not become excessively hot (greater than 120 o F). 5 During below-normal temperatures, masonry should be placed only on sound unfrozen foundations. Masonry should never be placed on a snow or ice-covered surface, because of the danger of movement when the base thaws and the possibility of very little bond being developed between the mortar and the supporting surface. 6. At the end of the day, the top surface of all masonry should be protected to prevent moisture, as rain, snow or sleet, from entering the masonry. This protection must cover the top surface and should extend a minimum of 2 feet down all sides of the masonry. Alternate Method for Support of Brick Veneer above Garage Door Openings Typically garage door openings over 10 feet are required to be designed by an engineer. However, some officials recognize an alternate method of support that incorporates the concept of reinforcing the brick veneer. This technique allows the use of ladder wire joint reinforcing in the first few horizontal mortar joints above the openings as described by the diagram below. We recommend presenting this alternate method to your local official for approval in advance of actual construction. Considerations: 1. The maximum openings allowed by this method is 18 feet 3 inches with a minimum of 1 foot 6 inches of brick required on either side of the opening. 2. A maximum height of 5 feet of brick may be supported above the opening provided there is. a minimum of 13 inches of veneer above the opening edges (approximately 5 brick courses). 3. A maximum height of 12 feet of brick may be supported above the opening provided there is a minimum of 2 feet of veneer above the opening edges (approximately 9 brick courses). 4. A maximum height of 35 feet of brick may be supported above the opening provided there is a minimum of 5 feet of veneer above the opening edges (approximately 22 brick courses). 5. Care must be taken with the placement of additional openings (i.e. windows) above the garage opening. If the height of veneer is less than 3 feet no openings should be placed. For veneer heights above 3 feet the depth of openings should be limited to 1/2 the height of the veneer and they must be placed within 12 inches of the bottom and 6 inches from the top of the veneer. 6.A 5"x 3 1 /2"x 5 /16" angle should be used to facilitate installation and should be shored for at least 7 days after installation. 18 Mean Daily Protection Temperature* Requirement Requirement Above 40 o F Normal masonry procedures. Cover walls with plastic or canvas at end of work day to prevent water entering masonry. 40 o F 32 o F Heat mixing water to produce Cover walls and materials for a minimum of 24 mortar temperatures between hours after construction to prevent wetting and 40 o F 120 o F. freezing. Covers should be plastic or canvas. 32 o F 25 o F Heat mixing water & sand to With wind velocities over 15mph provide windproduce mortar temperatures between 40 o F 120 o F breaks during the work day and cover walls and materials at the end of the work day to prevent wetting and freezing. Maintain masonry above freezing for 24 hours using auxiliary heat or insulated blankets. 25 o F 20 o F Mortar on boards should be maintained above 40 o F. 20 o F 0 o F Heat mixing water & sand to Provide enclosures and supply sufficient heat produce mortar temperatures to maintain masonry enclosure above 32 o F for between 40 o F 120 o F 24 hours. * For questions regarding specific temperature concerns, contact the Technical Department of Brick SouthEast. 19
12 Guide Notes Although this document has been provided for your use, it should not be reproduced in part or in whole without prior written permission. Additional copies are available from Brick SouthEast BRICK Copyright 2006 BRICK SOUTHEAST 20
13 BRICK Suite University Executive Park Charlotte, NC BRICK Suite A 1810 Overlake Drive Conyers, GA Boral Bricks, Inc. Carolina Ceramics Brick Co. Cherokee Brick & Tile Columbus Brick Co. Cunningham Brick Co. General Shale Brick Hanson Brick Henry Brick Co. Jenkins Brick Co. Lee Brick & Tile Co. Nash Brick Co. New London Brick Works Old Carolina Brick Co. Palmetto Brick Co. Pine Hall Brick Co., Inc. Statesville Brick Co. Taylor Clay Products Co. Triangle Brick Co
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11
Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
Cold Weather Concrete Practices
Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
Metropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
Dimensioning and Estimating Brick Masonry
TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 10 February 2009 Dimensioning and Estimating Brick Masonry Abstract: This Technical
International Greenhouse Company
Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
K2 STONE NATURAL VENEER
INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement
cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement Lafarge in North America The Lafarge Group is the world leader
Ver. 2. Guide to. Inspecting Residential Brick Veneer
Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
How to Install Pavers
1 of 6 9/11/2012 10:41 AM How to Install Pavers Looking to give your property a durable driveway, a whimsical walkway, or a patio with pizazz? If you're reading this article, you're probably already on
What you need to know about concrete block basement construction.
Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home
4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.
GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement
Manufactured Stone Veneer Installation Instructions
Manufactured Stone Veneer Installation Instructions Published: 8/14/2008 Revised: 6/25/2010 Table of Contents PART 1 -- INTRODUCTION PART 2 -- MATERIAL REQUIREMENTS PART 3 EXECUTION REQUIREMENTS PART 4
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Ceramic Glazed Brick Exterior Walls
TECHNICAL NOTES on Brick Construction 13 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Ceramic Glazed Brick Exterior Walls Abstract: Buildings and other structures employ
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
Free-Form Concrete Pool
The tranquil beauty and playful shimmer of a reflecting pool or fountain is just the thing to enhance the charm of your garden or patio. Best of all, you can do all the work yourself. Add goldfish or water
Masonry Blueprint. * Considered essential competencies ** Should be mastered at the journeyman level All other items are considered supplemental
Masonry Blueprint This Blueprint contains the subject matter content of this Skill Connect Assessment. This Blueprint does NOT contain the information one would need to fully prepare for a SkillsUSA Championships
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428
Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428 Phone: 616-457-2244 Fax: 616-457-0236 www.miedemaconcrete.com Dear Valued Customer, Ron Miedema Concrete Contractors (RMCC) takes pride
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
The Difference Between Cast Stone and Adhered Manufactured Stone Masonry Veneer
Submitted 9/16/08 For publication - Feb 2009 Masonry Construction Magazine by Bill Russell Chairman, Cast Stone Institute Committee on Educational Standards On many construction documents today, there
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
Installation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide GeneralShale.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines
Natural Thin Stone Veneer
Natural Thin Stone Veneer Until recently, if a project called for the natural look of stone but could not support its weight or thickness, the options were limited to manufactured imitation stone. More
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
Certification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
Mid-West Collection Brick Guide
Mid-West Collection Brick Guide 1 Mid-West Collection cover small left Tierra cover small middle Royal Oak cover small right Faulkston cover large photo Mulberry left Roman Red Find inspiration in a fresh
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
Basic Requirements for Residential Plan Review _
Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,
Laying the First Course. 1. Excavate the site and construct the footing.
Use QUIKRETE Mortar Mix or Mason Mix lay up a concrete block wall as shown. QUIKRETE Mortar Mix or Mason Mix Concrete block Mason's line Line blocks 4' level brick trowel Jointer Mason's hammer Stiff brush
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
3 Masonry and Manufactured Stone (Interior and Exterior)
3 Masonry and Manufactured Stone (Interior and Exterior) 3.1 Efflorescence (a whitish crystalline powder) is present on masonry surfaces. Efflorescence commonly occurs on masonry surfaces. This is not
GOOD NEWS BUT NOT ALWAYS
GOOD NEWS BUT NOT ALWAYS The prospective homebuyer and homeowner in the Amarillo area are indeed fortunate. Typically, he has a wide choice of type home, size, and location for wide ranges of pricing.
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
symptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.
117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This
CHIMNEYS AND FIREPLACES
CHAPTER 10 CHIMNEYS AND FIREPLACES > > Pursuant to ORS 215.730, if a single-family dwelling located on forest-zoned lands has a chimney or chimneys, each chimney shall have a spark arrester. SECTION R1001
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
MASONRY RESTORATION Lime Putty Mortar Repointing Guide
1.0 Preparation for Lime Putty Mortar Pointing 1.1 Tools & Approach A. Grinding - When used in a controlled way, angle grinders with diamond-impregnated metal blades with a maximum 1/8-inch-thickness and
Construction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
2008-2009 Cost Comparisons for Common Commercial Wall Systems
An Independent Study LA MS KY TN AL GA SC NC FL 2008-2009 Cost Comparisons for Common Commercial Systems CAPITAL BUILDING CONSULTANTS PROFESSIONAL CONSTRUCTION ESTIMATORS 2008 2009 INDEPENDENT COST COMPARISONS
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
MUNICODE SERVICES LTD.
The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved
Residential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional
Gas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
Proposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Residential Decks Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
Foundation. Foundation
Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their
SUPER SHED. Indoor shelter for your outdoor tools.
SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
Thin Veneer Stone Installation Guide
Thin Veneer Stone Installation Guide Complete step by step How-to guide for installing Thin Veneer Stone. Important: From pallet to pallet of natural thin veneer stone, as with any natural stone product,
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
Connex. Mortarless Masonry Block System
Connex Mortarless Masonry Block System Connex Mortarless block wall system from Boral The Boral Connex mortarless system comprises three modular components which key together eliminating the need for mortared
Holland Stone Series Concrete Pave Stones
Holland Stone Series Concrete Pave Stones Holland Stone Series With the renowned durability of interlocking pave stones, Holland Stone offers the old world charm of a simple paver shape. The rectangular
Architectural Concrete Masonry
1. Adams Profile Split Face Units (PSF). 2. Adams Profile Split Face Single Score Units (PSF-1). 3. Adams Profile Split Face Double Score Units (PSF-2) 4. Adams Profile Wide Split Rib Four Units (PWSR-4).
Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair
49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability
1/9/13 By Brett T. Fagan, P.E. Presented by Marie Horan, P.E. Building Diagnostics, Inc. Building Diagnostics Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067
Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com
Uncovered Decks & Porches
Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
Garver Feed Mill Condition Evaluation
Garver Feed Mill Condition Evaluation OUTLINE Brick masonry overview Condition assessment & methodology Project overview Existing conditions Stabilization Probable costs Summary BRICK MASONRY OVERVIEW
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
CH. 2 LOADS ON BUILDINGS
CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends
PERFORMANCE GUIDELINES
1. Foundation/Basement 17 PERFORMANCE GUIDELINES 1. FOUNDATION/BASEMENT 1.1 Efflorescence on concrete or masonry surfaces Efflorescence is the formation of a white crystalline or powdery deposit on the
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section