1 Reference No: BUSINESS CONTINUITY POLICY UHB 050 Version No: 4 Previous Trust / LHB Ref No: N/A Documents to read alongside this Policy N/A Classification of document: Area for Circulation: Author: Executive Lead: Group Consulted Via/ Committee: Ratified by: Corporate UHB Wide Interim Civil Contingencies and Emergency Planning Manager Director of Planning Health Systems Management Board Version Number Date Published: Date of Review Reviewer Name Completed Action Approved By 2 Strategic Planning Committee 3 May March March 2015 Date Approved October 2010 New Review Date October 2013 October 2013 March 2015 March 2018 Disclaimer When using this document please ensure that the version you are using is the most up to date either by checking on the UHB database for any new versions. If the review date has passed please contact the author. OUT OF DATE POLICY DOCUMENTS MUST NOT BE RELIED ON Business Continuity Policy Page 1 of 7 Ref: UHB 050

2 Contents Page No. 1 INTRODUCTION POLICY STATEMENT AIM OBJECTIVES SCOPE ROLES AND RESPONSIBILITIES RESOURCES TRAINING AND IMPLEMENTATION REVIEW, MONITORING AND AUDIT ARRANGEMENTS RETENTION OR ARCHIVING EQUALITY REFERENCES... 7 Business Continuity Policy Page 2 of 7 Ref: UHB 050

3 1 INTRODUCTION National Health Service organisations have a duty under the Civil Contingencies Act 2004 to ensure that they have effective business continuity plans in place. Business continuity is the strategic and tactical capability of Cardiff and Vale University Health Board to plan for and respond to incidents and business disruptions in order to continue business operations at an acceptable predefined level. This Policy sets out the requirements of Clinical Boards and Directorates within the UHB to meet these duties. Thus ensuring compliance with the legislation and robust business resilience. 2 POLICY STATEMENT The Cardiff and Vale University Health Board will promote a culture of business continuity management that will instil confidence in its stakeholders (staff, patients and customers) in its ability to effectively deal with and recover from disruptive challenges. 3 AIM The UHB will have in place a series of business continuity or contingency plans that will: Set out agreed procedures to respond to business interruption incidents that could result in adversely affecting the productivity/normal operating of the UHB; Mitigate the impact of a disruptive challenge to the business of the Health Board; Provide guidance on the recommended methods to rapidly recover the situation back to normal operation. The requirement to develop business continuity plans will arise from the business impact assessments (i.e. the identification of risks to the business through the risk management process) undertaken at a range of levels from National (both UK and Welsh Assembly Governments) through Local Resilience Forum Community Risk Registers to University Health Board level. 4 OBJECTIVES This policy provides a clear commitment to business continuity planning and effective planning will enable the UHB to: Continue to provide critical services to the community; Provide better use of personnel and resources during times when both may be limited; Reduce the period of disruption to the organisation; Improve the resilience of the organisations infrastructure to reduce/mitigate the likelihood of disruption; Reduce the operational and financial impact of any disruption; Business Continuity Policy Page 3 of 7 Ref: UHB 050

4 5 SCOPE This Policy incorporates all activities of the UHB and its employees. Where the disruption of those activities impact on the wider community the UHB will engage with the community/its representatives and/or relevant partner agencies. 6 ROLES AND RESPONSIBILITIES The University Health Board (UHB) has in existence structures and committees, which set the strategic aims and direction of the organisation and monitor progress. The UHB is responsible for reviewing the effectiveness of Internal Controls financial, organisational and clinical. The Board is required to produce statements of assurance which demonstrate that it is doing its reasonable best to ensure that the UHB meets its objectives and protects patient, staff, the public and stakeholders against risks to its business in line with the requirements of the Civil Contingencies Act Health Systems Management Board (HSMB) The role of HSMB is to provide the Board with assurances that appropriate arrangements for effective internal control and for the identification and management of risks to the UHB s business. This is achieved through the approval of plans and the monitoring of progress reports. HSMB works closely with both the Audit Committee, and the Patient Safety and Quality Committee in carrying out this role in order to provide assurance to the Board that the UHB has effective systems of internal control. Chief Executive The Chief Executive has overall responsibility for: the management structures and systems necessary to implement corporate governance, controls assurance standards including business continuity management; meeting all statutory requirements to manage risks to normal business operations; adhering to guidance issued by the Welsh Assembly Government in respect of resilience and business continuity management; ensuring that the University Health Board receives an annual report on the effectiveness of organisational systems; the business continuity policy and procedure are subject to regular reviews in line with the UHB s policy document, and that measures for implementing the policy are established, maintained and monitored; funding for action required as a result of the business impact analysis is provided; there are competent people who have the knowledge and training to carry out appropriate business impact assessments. Business Continuity Policy Page 4 of 7 Ref: UHB 050

5 To assist the Chief Executive with these responsibilities and provide support in relation to the infrastructure and corporate responsibilities, a Clinical Board Lead is appointed for key areas and the Director of Planning is the Executive lead for Civil Contingencies. Director of Planning The Director of Planning, nominated by the Chief Executive, is the lead Director for the co-ordination of business continuity management within the UHB and will: Ensure systems are in place to audit compliance with legislation and address any deficits identified; Ensure that legislative requirements are complied with; Ensure that effective systems are in place to support the effective coordination of business continuity management throughout the Health Board including any corporate risks identified; Clinical Board Directors Clinical Board Directors are instrumental in achieving the requirements of this policy, and are accountable to the Chief Executive for ensuring implementation of the business continuity policy within their area of responsibility; Directors must identify managers/clinicians who will co-ordinate business impact assessments and the resulting business continuity/contingency plans. Directors will also ensure that: the business continuity policy and procedure are implemented; all managers are competent to discharge their business continuity management responsibilities; business impact assessments and business continuity/contingency plans are completed and recorded on Clinical Board/Directorate risk register as appropriate; any business impact assessments that have a potential corporate impact are communicated to the Director of Planning; the need for additional funding or other resources within the directorate as a result of undertaking business impact assessments is identified; reports to the UHB in order to confirm that all business risks identified have suitable and sufficient plans that have been fully and effectively tested and are reviewed regularly; post incident debriefs are undertaken as/when required and plans are revised as required; Line Managers Line managers, which include any individual involved in the managerial process ranging from a directorate manager to an operationally based supervisor, are instrumental in achieving the requirements of the business continuity policy. Line managers will, within their areas of responsibility, ensure that: Business Continuity Policy Page 5 of 7 Ref: UHB 050

6 all staff have knowledge of and understand the business continuity policy and supporting business continuity/contingency plans; business impact assessments are undertaken, business continuity/contingency plans are developed, implemented and reviewed and that a ward/department risk register is maintained; the need for additional funding or other resources is, as a result of undertaking business impact assessments, identified; 7 RESOURCES In order to ensure consistency across the organisation, business impact assessments (risk assessments of the impact on normal business) will be undertaken in accordance with the University Health Board s approach to risk management and risk assessments. Resources in terms of time will be required to educate staff on both the requirements of this policy and the development of documents across the UHB. 8 TRAINING AND IMPLEMENTATION Business continuity plans are only successful when they have been communicated to staff, tested and rehearsed. It is the responsibility of the manager who owns the plan to ensure that all staff who may use it are trained. Managers will be trained by the Civil Contingencies Team to provide them with the knowledge that they require to discharge this responsibility. Corporate plans, the development of which will be coordinated by the Civil Contingencies Team, will be subjected to regular testing and exercising and staff subsequently trained as required. 9 REVIEW, MONITORING AND AUDIT ARRANGEMENTS This Strategic policy and Corporate business continuity/contingency plans will be reviewed annually. The review of Clinical Board/Directorate/Department plans will be for local determination but as a minimum will be reviewed every three years or as/when incident debriefs indicate or when legislation/guidance or the organisation changes. Compliance with this policy will be monitored by: the development of business continuity/contingency plans where the risk to normal business operations have been identified; through the post incident debrief of the response and recovery to untoward business impacting incidents; The Welsh Government Health Emergency Planning require an annual audit against healthcare Standard 4. The Civil Contingencies Manager will collate the response. Business Continuity Policy Page 6 of 7 Ref: UHB 050

7 10 RETENTION OR ARCHIVING In cases of Police investigations/public enquiries and other legal processes it is often necessary to demonstrate that the policy in place at the time of the incident. The Director of Governance must therefore ensure that copies of policies and procedures are archived and stored in line with the University Health Board Records Management Policy and are made available for reference purposes should the situation arise. 11 EQUALITY An Equality Impact Assessment has been undertaken to assess the relevance of this policy to equality and the potential impact on different groups, specifically in relation to the General Duty of the Race Relations (Amendment) Act 2000 and the Disability Discrimination Act 2005 and including other equality legislation. The assessment identified that the Policy presented a low risk to the UHB. In the event of a Major Incident there may be some differential impact, but these do not have disproportionate or inequitable outcomes and can be reasonably justified. Business Continuity Policy Page 7 of 7 Ref: UHB 050

South Norfolk Council Business Continuity Policy

South Norfolk Council Business Continuity Policy South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

Emergency Management and Business Continuity Policy

Emergency Management and Business Continuity Policy www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3

More information

SFJCCAD2 Promote business continuity management

SFJCCAD2 Promote business continuity management Overview This unit is about providing advice and assistance on business continuity management, including general advice for the business and voluntary sectors, and specific advice and assistance to individual

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

Version: 3.0. Effective From: 19/06/2014

Version: 3.0. Effective From: 19/06/2014 Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016

More information

TRUST POLICY FOR EMERGENCY PLANNING

TRUST POLICY FOR EMERGENCY PLANNING TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author

More information

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy

South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author

More information

Strategic Alliance. Business Continuity Policy

Strategic Alliance. Business Continuity Policy Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective

More information

1.0 Policy Statement / Intentions (FOIA - Open)

1.0 Policy Statement / Intentions (FOIA - Open) Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies

More information

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012

BSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012 To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached

More information

NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12

NOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12 POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12

More information

Business Continuity Policy and Business Continuity Management System

Business Continuity Policy and Business Continuity Management System Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain

More information

PROTOCOL TO APPLY FOR AND SUBSEQUENTLY USE REMOTE ACCESS SOFTWARE. UHB 007 Version No: UHB 1. Data Protection Policy, IT Security Policy,

PROTOCOL TO APPLY FOR AND SUBSEQUENTLY USE REMOTE ACCESS SOFTWARE. UHB 007 Version No: UHB 1. Data Protection Policy, IT Security Policy, PROTOCOL TO APPLY FOR AND SUBSEQUENTLY USE REMOTE ACCESS SOFTWARE Reference No: UHB 007 Version No: UHB 1 Previous Trust / LHB Ref No: T/208 Documents to read alongside this Policy, Procedure etc (delete

More information

Business Continuity Policy. Version 1.0

Business Continuity Policy. Version 1.0 Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Reference Number: 243 Author & Title: Siân Dyson Resilience Manager Responsible Director: Chief Operating Officer Review Date: 29 May 2018 Ratified by: Francesca Thompson Chief

More information

HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT

HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT February 2012 1 Role of the Health and Social Care Board The role of the Health and Social Care Board (the Board) is broadly contained

More information

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY

More information

NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0

NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0 NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,

More information

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS Document Reference No: Version No: 6 PtHB / CP 012 Issue Date: April 2015 Review Date: January 2018 Expiry Date: April 2018 Author:

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

Solihull Clinical Commissioning Group

Solihull Clinical Commissioning Group Solihull Clinical Commissioning Group Business Continuity Policy Version v1 Ratified by SMT Date ratified 24 February 2014 Name of originator / author CSU Corporate Services Review date Annual Target audience

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications

More information

NHS Commissioning Board: Information governance policy

NHS Commissioning Board: Information governance policy NHS Commissioning Board: Information governance policy DOCUMENT STATUS: To be approved / Approved DOCUMENT RATIFIED BY: DATE ISSUED: October 2012 DATE TO BE REVIEWED: April 2013 2 AMENDMENT HISTORY: VERSION

More information

Business Continuity Management Policy

Business Continuity Management Policy Governance: Business Committee Policy Owner: Chief Superintendent, Corporate Services Department: Corporate Services Policy Number: 002 Version: 3.0 Policy Writer: Business Continuity Co-ordinator Effective

More information

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy

NHS Hardwick Clinical Commissioning Group. Business Continuity Policy NHS Hardwick Clinical Commissioning Group Business Continuity Policy Version Date: 26 January 2016 Version Number: 2.0 Status: Approved Next Revision Due: January 2017 Gordon Stevens MBCI Corporate Assurance

More information

Staffordshire County Council. Civil Contingencies Policy

Staffordshire County Council. Civil Contingencies Policy Staffordshire County Council Civil Contingencies Policy Version 1 September 2012 Staffordshire County Council s Civil Contingencies Policy 1.1 Introduction The County Council aims to protect the wellbeing

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities

More information

Business Continuity Management Framework 2014 2017

Business Continuity Management Framework 2014 2017 Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity

More information

Business Continuity Management (BCM) Policy

Business Continuity Management (BCM) Policy Business Continuity Management (BCM) Policy Reference number: Corporate 042 Title: Business Continuity Management (BCM) Policy Version number: Version 2 Policy Approved by: LLR PCT Cluster Board Date of

More information

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy

Essex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS

More information

West Sussex County Council Resilience Policy

West Sussex County Council Resilience Policy West Sussex County Council Resilience Policy INDEX page 2 Policy Statement page 3 Vision Statement,Values and General Principles page 4 Introduction and purpose page 4 Scope of the Policy page 4 The Council

More information

Business Continuity Management Policy and Plan

Business Continuity Management Policy and Plan Business Continuity Management Policy and Plan Version No Author Date of Update 0.3 Allan Jude and Charmaine Grundy 05/06/2015 1 P a g e Contents Contents... 2 1. Introduction... 3 2. Purpose... 4 3. Definitions...

More information

WILTSHIRE POLICE FORCE POLICY

WILTSHIRE POLICE FORCE POLICY Template v4 WILTSHIRE POLICE FORCE POLICY BUSINESS CONTINUITY MANAGEMENT SYSTEMS (BCMS) Effective from: July 2013 Version: 2.0 Next Review Date: July 2015 POLICY STATEMENT Wiltshire Police has a statutory

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title

More information

Business Continuity Management. Policy Statement and Strategy

Business Continuity Management. Policy Statement and Strategy Business Continuity Management Policy Statement and Strategy November 2011 Title Business Continuity Management Policy & Strategy Date of Publication: Cabinet Council Published by Borough Council of King

More information

BUSINESS CONTINUITY MANAGEMENT FRAMEWORK

BUSINESS CONTINUITY MANAGEMENT FRAMEWORK BUSINESS CONTINUITY MANAGEMENT FRAMEWORK Document Author: Civil Contingencies Service - Authorised by the CCS Joint Management Board - Version 1.0. Issued December 2012 Page 1 FRAMEWORK STATEMENT Business

More information

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)

NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy

More information

PS 170 Business Continuity Management Policy

PS 170 Business Continuity Management Policy PS 170 Business Continuity Management Policy July 2013 Version 2 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

NHS WALES SPECIAL LEAVE POLICY

NHS WALES SPECIAL LEAVE POLICY Reference Number: 077 Version Number: 2 Date of Next Review: November 2016 NHS WALES SPECIAL LEAVE POLICY 1. Policy Statement Cardiff and Vale University Health Board (the UHB) is committed to providing

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for

More information

Gravesham Borough Council

Gravesham Borough Council Classification: N/A Key Decision: No Gravesham Borough Council Report to: Performance & Administration Committee Finance & Audit Committee Date: 12 November 2015 18 November 2015 Reporting officer: Subject:

More information

Information Governance Strategy & Policy

Information Governance Strategy & Policy Information Governance Strategy & Policy March 2014 CONTENT Page 1 Introduction 1 2 Strategic Aims 1 3 Policy 2 4 Responsibilities 3 5 Information Governance Reporting Structure 4 6 Managing Information

More information

EMERGENCY PREPAREDNESS POLICY

EMERGENCY PREPAREDNESS POLICY EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness

More information

Business Continuity Management Policy

Business Continuity Management Policy Governance 1 Purpose The purpose of this policy is to communicate Business Continuity Management (BCM) framework, responsibilities and guiding principles for Victoria to effectively prepare for and achieve

More information

Risk Management and Business Continuity Strategy. www.aberdeenshire.gov.uk

Risk Management and Business Continuity Strategy. www.aberdeenshire.gov.uk Risk Management and Business Continuity Strategy www.aberdeenshire.gov.uk 2 Foreword by Anne Robertson and Colin Mackenzie The Council recognises risk management and business continuity as an integral

More information

How to Exercise a Business Continuity Plan (BCP)

How to Exercise a Business Continuity Plan (BCP) How to Exercise a Business Continuity Plan (BCP) This document provides a step by step guide to exercising a Business Continuity Plan (BCP). The exercise of a BCP should not be undertaken in isolation,

More information

Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015

Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015 Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015 Business Continuity Policy Statement 2015 This Policy sets the direction for Business Continuity

More information

Business Continuity Business Continuity Management Policy

Business Continuity Business Continuity Management Policy Business Continuity Business Continuity Management Policy : Date of Issue: 28 January 2009 Version no: 1.1 Review Date: January 2010 Document Owner: Patricia Hughes Document Authoriser: Tony Curtis 1 Version

More information

39 GB Guidance for the Development of Business Continuity Plans

39 GB Guidance for the Development of Business Continuity Plans 39 GB Guidance for the Development of Business Continuity Plans Policy number: Version 2.2 Approved by Name of author/originator Owner (director) 39 GB Executive Committee Date of approval August 2014

More information

How To Improve The Shared Services Partnership Business Continuity Plan

How To Improve The Shared Services Partnership Business Continuity Plan Audit and Governance Committee 24 September 2015 Business Continuity Plan For Information Portfolio Holder(s) Environmental Protection & Assets Senior Leadership Team Contact: Strategic Director 1. Purpose

More information

VISION FOR LEARNING AND DEVELOPMENT

VISION FOR LEARNING AND DEVELOPMENT VISION FOR LEARNING AND DEVELOPMENT As a Council we will strive for excellence in our approach to developing our employees. We will: Value our employees and their impact on Cardiff Council s ability to

More information

Emergency management in Cardiff. A practical guide

Emergency management in Cardiff. A practical guide Emergency management in Cardiff A practical guide Emergency management in Cardiff Introduction It is very unlikely that any of us will ever be caught up in an emergency or disaster, but by being informed

More information

Business Continuity Management

Business Continuity Management Annex A Business Continuity Management Programme Business Continuity Management Policy 1. Introduction This Business Continuity Management (BCM) Policy defines the scope of the SPCB s ability to maintain

More information

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu abcdefghijklmnopqrstu Business Continuity A Framework for NHS Scotland Strategic Guidance for NHS Organisations in Scotland 1 Contents 1. Introduction 4 1.1 Business Continuity Overview 5 2. Roles and

More information

Business Continuity Policy

Business Continuity Policy Page 1 of 16 Business Continuity Policy Issue Date: Aug 2013 Document Number: 00241 Prepared by: Business Management and Continuity Senior Manager Next Review Date: April 2014 Page 2 of 16 NHS England

More information

Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016

Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Policy Statement - 2016 This Policy sets the direction for Business Continuity Management at Leicester

More information

Policy for the Management of Business Continuity

Policy for the Management of Business Continuity Policy for the Management of Business Continuity VERSION 2.1 Prepared by: Jeremy Cowen 29 January 2014 Page 1 of 7 1.0 Version Control Date Version Amendment Amended by 12 Jan 2011 1.0 Document created

More information

Information Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.

Information Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2. Information Governance Strategy and Policy Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.0 Status: Final Revision and Signoff Sheet Change Record Date Author Version Comments

More information

NHS Lancashire North CCG Business Continuity Management Policy and Plan

NHS Lancashire North CCG Business Continuity Management Policy and Plan Agenda Item 12.0. NHS Lancashire North CCG Business Continuity Management Policy and Plan Version 2 Page 1 of 25 Version Control Version Reason for update 1.0 Draft for consideration by Executive Committee

More information

RECORDS MANAGEMENT FRAMEWORK

RECORDS MANAGEMENT FRAMEWORK RECORDS MANAGEMENT FRAMEWORK Policy Number: 253 Supersedes: Standards For Healthcare Services No/s 1, 19, 20 Version No: Date Of Review: Reviewer Name: 1.1 Nov 2011 Alison Gittins 1.2 Mar 2015 Alison Gittins

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Page 1 of 15 Business Continuity Policy First published: Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/14 Vicky Ryan Updated to include

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

Business Continuity Policy & Plans

Business Continuity Policy & Plans Agenda Item 8.3a SNCCG Governing Body 11.03.2014 Business Continuity Policy & Plans Ref Number: Version: 1 Status: Pending Approval Author: A Brown Approval body Governing Body Date Approved Date Issued

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy St Mary Magdalene Academy V1.0 / September 2014 Document Control Document Details Document Title Document Type Business Continuity Policy Policy Version 2.0 Effective From 1st

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain its essential business functions during

More information

Coping with a major business disruption. Some practical advice

Coping with a major business disruption. Some practical advice Coping with a major business disruption Some practical advice Coping with a major business disruption What is business continuity? Business continuity planning (BCP) is a management process that helps

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood

More information

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy

Birmingham CrossCity Clinical Commissioning Group. Business Continuity Management Policy Birmingham CrossCity Clinical Commissioning Group Business Continuity Management Policy Version V1.0 Ratified by Operational Development Group Date ratified 6 th November 2014 Name of originator / author

More information

Business Continuity Policy

Business Continuity Policy Title: Business Continuity Policy Document Author: Board Secretary/Emergency Planning Lead Document type: Policy Document library section: Corporate Document status: Final Approved by: Governance and Assurance

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

BSBCCO501B Develop business continuity strategy

BSBCCO501B Develop business continuity strategy BSBCCO501B Develop business continuity strategy Release 2 BSBCCO501B Develop business continuity strategy Modification History Release Release 2 Comments New release of this Unit with version 7.0 of BSB07

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

The Informatics Policy Information Governance Process

The Informatics Policy Information Governance Process Informatics Policy Information Governance Policy Ref: 3593 Policy Title Author/Contact Document Reference 3593 Pauline Nordoff-Tate, Information Assurance Manager Document Impact Assessed Yes/No Date:

More information

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1

GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1 GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY CONTENTS PAGE 1. Occupational Health and Safety Policy Statement 1 2. Occupational Health and Safety Management System 2 3. Organisational Management

More information

Council Policy Business Continuity Management

Council Policy Business Continuity Management Policy Name: Business Continuity Management Council Policy Business Continuity Management ADOPTED BY COUNCIL: 19 th April 2016 DATE OF NEXT REVIEW: 18 th April 2020 RESPONSIBLE OFFICER: REFERENCES: Chief

More information

Update from the Business Continuity Working Group

Update from the Business Continuity Working Group 23 June 2014 Performance and Resources Board 19 To note Update from the Business Continuity Working Group Issue 1 The Business Continuity Working Group oversees the development, maintenance and improvement

More information

GLASGOW LIFE Review of Business Continuity Planning. Final Report

GLASGOW LIFE Review of Business Continuity Planning. Final Report Final Report INTERNAL AUDIT September 2011 Glasgow City Council Internal Audit 1 Table of Contents Section No Section Title 1 Introduction and Background 2 Audit Remit 3 Audit Opinion 4 Conclusions 5 Recommendations

More information

Information Governance Policy

Information Governance Policy Information Governance Policy Information Governance Policy Issue Date: June 2014 Document Number: POL_1008 Prepared by: Information Governance Senior Manager Insert heading depending on Insert line heading

More information

Business Continuity & Crisis Management

Business Continuity & Crisis Management Group Standard Business Continuity & Crisis Management The need to plan and respond effectively is critical to the successful management of any crisis situation. Business Continuity Management is the holistic

More information

All CCG staff. This policy is due for review on the latest date shown above. After this date, policy and process documents may become invalid.

All CCG staff. This policy is due for review on the latest date shown above. After this date, policy and process documents may become invalid. Policy Type Information Governance Corporate Standing Operating Procedure Human Resources X Policy Name CCG IG03 Information Governance & Information Risk Policy Status Committee approved by Final Governance,

More information

Business Continuity Plan Toolkit

Business Continuity Plan Toolkit Business Continuity Plan Toolkit March 2015 1 Contents The Template instructions for use... 2 Introduction... 3 What is the purpose of this toolkit?... 3 Why do you need a Business Continuity Plan?...

More information

Pandemic Influenza Plan 2015/2016

Pandemic Influenza Plan 2015/2016 NOT PROTECTIVELY MARKED Pandemic Influenza Plan 2015/2016 Policy number: N/A Version 1.5 Approved by Name of author/originator Owner (director) Executive Management Team Mark Twomey, Deputy Director of

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Policy Holder: Authoriser: Caroline Gover, Head of Business Continuity Caroline Thomson, Chief Operating Officer Reviewed on: Feb 08 Reviewed on: Feb 08 Next Review

More information

Introduction UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT

Introduction UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT INFORMATION SECURITY: UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT FACTSHEET This factsheet will introduce you to Business Continuity Management (BCM), which is a process developed to counteract systems

More information

London Borough of Bromley. Executive & Resources PDS Committee. Disaster Recovery Plans for London Borough of Bromley

London Borough of Bromley. Executive & Resources PDS Committee. Disaster Recovery Plans for London Borough of Bromley Report No. DRR12/041 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive & Resources PDS Committee Date: 4 th April 2012 Decision Type: Non-Urgent Non-Executive Non-Key Title: Disaster

More information

TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE

TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE AGENDA ITEM 9 TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE SUBJECT: REVIEW OF TFL RESILIENCE MANAGEMENT POLICY FRAMEWORK DATE: 20 JULY 2010 1 PURPOSE AND DECISION REQUIRED 1.1

More information

INFORMATION GOVERNANCE STRATEGY

INFORMATION GOVERNANCE STRATEGY INFORMATION GOVERNANCE STRATEGY Page 1 of 10 Strategy Owner Valerie Penn, Head of Governance Strategy Author Caroline Law, Information Governance Project Manager Directorate Corporate Governance Ratifying

More information

Information governance strategy 2014-16

Information governance strategy 2014-16 Information Commissioner s Office Information governance strategy 2014-16 Page 1 of 16 Contents 1.0 Executive summary 2.0 Introduction 3.0 ICO s corporate plan 2014-17 4.0 Regulatory environment 5.0 Scope

More information

Position Description

Position Description Position Description Title Emergency Management Project Officer Directorate Community Development Department Health, Active Ageing & Disability Services Location Camberwell Classification Band 7 Position

More information

Equality Impact Assessment

Equality Impact Assessment Equality Impact Assessment Directorate: Service: Name of Officer/s completing assessment: Date of Assessment: Name of service/function or policy being assessed: 1. What are the aims, objectives, outcomes,

More information