project portfolio management

Size: px
Start display at page:

Download "project portfolio management"

Transcription

1 The business rationale of project portfolio management Several project management studies in the last five years have suggested that, the efficient and effective use of project management is critical to achieve the business goals and to achieve sustainable business benefits. Corporate projects are essential for achieving the company s strategic goals and performance targets. However, many projects fail to deliver the expected results or to meet the expectation of stakeholders. The Hungarian Project and Program Management Survey conducted by Ernst & Young Hungary in 2006 showed that only 51% of the projects are completed on time and within budget. On average, 34% of projects are finished late, and 25% exceed the originally planned budget. This tendency is reflected in the results of several international surveys as well. In addition to the variable project outcomes, due to the impact of the accelerated market environment, many projects are created in various levels of the organizations, often unnoticed by the senior management. This results in a complex multi-project environment, where the management often faces difficulties in overviewing and controlling the vast number of projects. An effective working project portfolio management provides a useful management toolset to help organizations, especially senior management, in planning and the efficient controlling the corporate project portfolio. The business rationale of project portfolio management The term project portfolio management does not have a standard definition. According to the Project Management Institute (PMI), the project portfolio is a collection of projects or programs and other work that is grouped together to facilitate effective management of that work to meet strategic business objectives. The projects or programs of the portfolio are not necessarily interdependent or directly related. Portfolio management is the centralized management of one or more portfolios, and involves identifying, prioritizing, authorizing, managing, and controlling projects, programs and other related work to achieve strategic business objectives. [PMI (2006)] Some other important aspects are outlined in related definitions Clifford F. Gray and Erik W. Larson are using the term Enterprise Project Management for the centralized management of a portfolio of projects to ensure the allocation of resources to projects is directed and balanced toward the strategic focus of the organization. [C.F.Gray, E.W.Larson (2003), p. 447.]. Platje and Fröhlich have highlighted some additional characteristics the projects are incorporated into the strategy of the organization (an integrative approach). Projects share the same scarce resources, and management is concerned with optimizing the use of this capacity [Platje and Fröhlich (2000)]. Project portfolio management can be defined as the planning and management of a set of concurrent projects and programs within the organization that are not necessarily connected or interdependent, but that rely on the same scarce resources of the organization. Many projects in different parts of the organization, even if not interdependent, have some impact on each other, and the integrated view of corporate project management and an efficient project portfolio management are essential to ensure that the set of projects are aligned with the company s business objectives. The business rationale of an efficient project portfolio management process can be summarized by the following list [Cooper, R., Edgett, S., E.Kleinschmidt (1997)]: Strategic alignment: The project portfolio management process has to ensure that the projects initiated and run are aligned with the organisation s strategic objectives. Through the transparent and consistent portfolio planning, there is a clear view on priorities of objectives and priorities of projects as well as programs. Value maximisation: The transparent project selection process has to ensure the maximisation of the value of the total project portfolio (through measures like NPV, ROI, TCO, etc.) Balance: The portfolio planning has to ensure the balancing of risks in the total portfolio (risk vs. return, balance of high, medium and low risk projects) The portfolio planning and project selection process has to ensure a balance of long term and short term inflows 34 Performance

2 The overall project selection process has to combine all relevant aspects of the organisation (e.g. financial, technical and other functional). In order to achieve these goals, there is a need for a consistent project selection and approval process and for an efficient coordination of simultaneously running projects. Figure 1: Critical factors to enable successful project portfolio management. [based on Figure 2.1.: Determinations of MPM in L.Capitani, P.Steinbusch, A.Szabo, M.Takei (2001)] Project portfolio management Project Portfolio planning Project Portfolio co-ordination Organizational structure Processes, controls & systems People Transparent and effective project portfolio planning and efficient project portfolio coordination require a supporting organizational structure, well defined processes and systems as well as enabling human factors. Organisational factors to support project portfolio management (refer to figure 1) According to professional studies and practical experience, successful project portfolio management requires a distinctive managerial level - the so called tactical management level - to liaise between the senior management and the operational management (project leaders and operational department heads) [Platje, A. and Fröhlichs, G. (2000)]. This tactical management level is responsible for supporting project portfolio planning as well as the continuous project portfolio coordination processes. Major tasks related to the project portfolio planning: Liaising between senior management, the project leaders and operational department heads. Providing a view on the feasible and proposed project portfolio for the senior management Coordinating the decision making on project approval and on resource allocation. Set clear priorities and propose a transparent and consistent process for project approval. Coordinating the trade-off of interest of all participants. Major tasks related to continuous project portfolio coordination: Tracking and reporting: Provide senior management with an overview of the set of projects within the organization and on their status. Continuous tracking should ensure that initiated projects are achieving the preset targets. Coordination in case of resource reallocation needs. Coordination of communication between senior management and operational management in relation to project priorities and any changes. Project support tasks (often in a separate Project Support Office): Provide standard tools and templates for project teams and support for project managers. Set rules for project management standards within the organization. Tracking and project support may require the standardization of certain elements of project management and project reporting Liaise in resolving conflicts. This tactical management level is usually known as the Portfolio Management Office (PMO) or the Project Management Office (the name may depend on the type of responsibilities as well). Besides having a dedicated body for project portfolio management and project support, the organizations have to fulfil the following requirements in order to succeed in portfolio management: Transparency of clear goals and business objectives to all employees. Performance 35

3 Availability of real-time information on capacities (e.g. skills) to ensure efficient resource allocation and utilization. Efficient and seamless communication within the organization (e.g. crossdepartments communication). Flexibility within the organization (e.g. flexible reaction on changed priorities. See also human factors below). Based on the findings of the Project Management Survey in Hungary and in the Czech Republic, the maturity of the PMOs shows a varying picture among the organisations, and there is still space for development to increase maturity of special attention, as one of the most important success factors of the portfolio management body is its credibility within the organisation. Process related factors to support project portfolio management (refer to figure 1) In order to ensure the efficient handling of the portfolio of projects, the processes for portfolio selection and coordination need to be reviewed. Process related factors to support transparent and consistent portfolio planning: Ideally, projects are created by breaking down the strategy into actions; therefore are created from breaking down the strategy, there is often an implementation gap between the strategy created by the senior management and the operational action plans created by the operational management. Projects created in different departments and the priorities of these departments often do not relate to each other and to the corporate level strategy. [Gray, C.F. and Larson, E.W. (2003). They call attention onto the following threats if there is no clearly defined and transparent process for project portfolio prioritization and project portfolio planning: Implementation gap between top level strategic objectives and department level projects. project offices. Although more than 60% of the respondents answered that there is a Project Management Office within their organisation, its tasks and responsibilities vary from giving administrative project support to representing the project approving body. The overall satisfaction with the effectiveness of project offices clearly shows the need for further development. This requires strategic alignment of projects should be given by definition. In the real world, however, projects are not only created with a top-down approach driven from the strategy, but also based on bottom-up initiatives of the operational management at various parts of the organization. Furthermore, Erik W. Larson and Clifford E. Gray point out that, even when projects Misalignment of projects and priorities between departments. Corporate politics and lobbyism can influence decisions on projects. Resource conflicts and multi-tasking of employees are not taken into consideration at project initiation. 36 Performance

4 Based on best practice, an effective project portfolio planning process has to fulfill the following requirements: Project portfolio planning is a centralized final decision-making process that controls which projects get initiated and when. This centralized decision making should take all relevant aspects into consideration. The final decision on the project portfolio is done on the strategic level, after the consolidation of organizational aspects and proposals by the tactical level portfolio management team. Portfolio planning is a process that contains many iterations of proposals need to be transparent throughout the organization. There are various tools available to support an effective project approval process, which can be customized to the organization (e.g. strategic basket model, project scoring, project screening, etc.) Process-related factors to support continuous project portfolio coordination: The continuous portfolio coordination process has to ensure that projects are completed and deliver the expected benefits. The first critical element of project portfolio coordination is resource allocation. bodies. This is a typical approach, especially in cases of stage-gate models of project management. Using a stage-gate approach, first (in the initial phase) the project needs to get an approval on the approximate project content (rough project plan, ideas) in order to get resources in the next phase. The following phase (or phases) has to include a feasibility study, which delivers a more exact plan on project costs, CAPEX, time, etc. This needs to be approved again before proceeding to the next stages. These two decisions can be made by different bodies, but both decisions should be coordinated by the tactical level portfolio management team (e.g. PMO) and negotiations. The minimum content of the proposals and the negotiation process should be standardized as much as possible in order to provide a transparent decision making process. There is a need for clear pre-set priorities as a basis of portfolio decision making. These priorities Often the decisions on project initiations and on resource allocations are separated. As shown by the results of the Project Management Survey in Hungary, the approval on project content (i.e. approval on initiating the project) and the approval of the dedicated resources might be two separate decisions made by different If this feasibility study (or resource allocation) is rejected, then there are two possibilities of how to move forward: Re-work the project plan in order to be able to finish the project with less resource requirements (and make a new feasibility study), or Reject the whole project. Performance 37

5 A consistent and transparent approach to resource allocation and to potential reallocation is required in order to operate a credible portfolio management process. The second important element of continuous project portfolio coordination is the level of standardization in project start-up and project management within the organization. Even if project managers are encouraged to use own methodologies, and many organizations leave the freedom of using the right project management tools to the project manager, there is a need for a certain level of standardization, especially if the organization has reached a critical mass of projects. Standard tools and templates can provide a common language across departments. A particular phase is the project start-up, where the common understanding of the project details across the project team is essential. Therefore, some elements of project start-up (e.g. project definition template, or questionnaire among team members) could be made mandatory for projects within the organization. Closely connected to the project management tools, a third critical factor of continuous project portfolio management is tracking and reporting. Again, the standardized reporting templates can provide a consistent view on the state of the project portfolio. The project portfolio management body has a key role in consolidating information, on individual projects, and in providing a summarized overview on the status of projects and on the completion of major milestones to the senior management. It is critical to ensure that issues are escalated to the appropriate management level as soon as possible and the necessary decisions can be made on time, based on real information. e.g. project slippages can be handled quickly and individual project slippages do not endanger the timely completion of other projects. A critical enabler for the continuous project-tracking is an accurate information system that is used across the organization. The last critical factor of project portfolio management comprises the processes of resolving conflicts and terminating projects. In many cases project initiations are well regulated, but a clear process for project termination is missing. This is a common mistake, as a visible and fair process for project termination would be required to show clear guidelines for stopping projects when necessary. Changes in organizational circumstances may entail a shift in the strategic priorities, and this may cause a delay in some projects or even the need to stopping some projects. If there is a clear process for project terminations, and project terminations are not handled as project failures, then resources can be redirected to other projects and used in a more efficient way. To summarize, the key questions of process-related factors affect the level of standardization and centralization in project management processes and in project related decision-making. These questions are often raised as some level of standardization is required to support a quick overview and efficient control on the corporate portfolio of projects. In addition, a level of decentralization is required to keep the flexibility of the organization. As a general rule, the following can be stated: On a strategic level, there is a need to standardize planning and control of the project portfolio. Therefore, some standardized tools (e.g. project definition templates, project reporting templates) are required. On an operational level, it is often more efficient to allow more flexibility for the individual projects and allow project managers to use preferred tools, customized to the individual project or project team. This approach allows: Comparing projects on a portfolio level: this includes the calculation of resources on a standardized and comparable way, the possibility to redirect resources due to the standard reporting tools, and the availability of information on resource utilization The management and control of individual projects which can be customized according to the individual needs, and can avoid unnecessary bureaucracy. Human factors to support project portfolio management (refer figure to 1) The third enabler of successful project portfolio management is the human capital of the organization. There are some distinctive characteristics of the preferred management style in case of organizations dealing with a 38 Performance

6 Figure 2: Resource dedication profile Project leaders Resource leaders Specialists Project leaders Resource leaders All round project members Experts Service employees Source: M. Hendriks, B. Voeten and L. Kroep; (1999) larger number of simultaneously running projects [L.Capitani, P.Steinbusch, A.Szabo, M.Takei (2001)]. It is critical that responsibilities are delegated to the lowest possible organizational level and that people at all organizational levels are clear about the strategic priorities and can be assigned an individual and specific responsibility. The role of the general management should be restricted to setting priorities, authorizing the overall proposed portfolio and resolving those bottlenecks or conflicts that may not be resolved on the operational or portfolio management level. This management style also presumes active communication at all levels of the organization. Another interesting people factor that supports the efficient and smooth project portfolio management is the flexibility and multi-skilled profile of employees. Hendriks, Voeten and Kroep [Hendriks, M., Voeten, B. and Kroep, L. (1999)] point out that in order to become a more flexible organization, project teams should consist of all-round project members, supporting employees and some experts, instead of only specialists. This is shown in figure 2. All-round project members have general knowledge of the project, and can be placed in different areas within the project. Similarly, supporting service employees who do routine-type activities can be reassigned to different projects. Summary The project portfolio management activities in an organization have to ensure that the corporate portfolio of projects is aligned with the company s strategic objectives, and that the projects in the portfolio are achieving the expected results. Success requires a conscious review of the organizational factors and also an effective handling of processrelated and people-related factors to support an efficient and smoothly operating project portfolio management. Author Anita Szabo, Senior Consultant, Advisory Services, E&Y Hungary Performance 39

Project Management Office Charter

Project Management Office Charter Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management

More information

Organizational Design Toolkit

Organizational Design Toolkit Organizational Design Toolkit We provide below highlights of the approach to developing/confirming the preferred service delivery model and organizational structure for an organization. The key steps are:

More information

The Value of the Project Management Office. March 2009 A survey conducted by Pole to Pole Communications, on behalf of CA

The Value of the Project Management Office. March 2009 A survey conducted by Pole to Pole Communications, on behalf of CA The Value of the Project Management Office March 2009 A survey conducted by Pole to Pole Communications, on behalf of CA CONTENTS THE VALUE OF THE PROJECT MANAGEMENT OFFICE 02 Contents 1.0 Survey highlights

More information

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended. Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide

More information

Frank P.Saladis PMP, PMI Fellow

Frank P.Saladis PMP, PMI Fellow Frank P.Saladis PMP, PMI Fellow Success factors for Project Portfolio Management The Purpose of Portfolio Management Organizational Assessment Planning a Portfolio Management Strategy The Portfolio Management

More information

MoP Glossary of Terms - English

MoP Glossary of Terms - English English Term aggregated risk English Definition The overall level of risk to the portfolio when all the risks are viewed as a totality rather than individually. This could include the outputs of particular

More information

10 Reasons Why Project Managers Need Project Portfolio Management (PPM)

10 Reasons Why Project Managers Need Project Portfolio Management (PPM) 10 Reasons Why Project Managers Need Project Portfolio Management (PPM) Introduction Many project managers might think they are doing just fine with spreadsheets or basic project management software and

More information

Audit of the Management of Projects within Employment and Social Development Canada

Audit of the Management of Projects within Employment and Social Development Canada Unclassified Internal Audit Services Branch Audit of the Management of Projects within Employment and Social Development Canada February 2014 SP-607-03-14E Internal Audit Services Branch (IASB) You can

More information

PM Services. Our Corporate Profile and Credentials

PM Services. Our Corporate Profile and Credentials PM Services Our Corporate Profile and Credentials The Power of One: ISG-One ISG Services Tools ISG is a leading technology insights, market intelligence and advisory services company, offering clients

More information

Qlik UKI Consulting Services Catalogue

Qlik UKI Consulting Services Catalogue Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction

More information

Topic 1 Introduction. to the Fundamentals of Project Management INTRODUCTION LEARNING OUTCOMES

Topic 1 Introduction. to the Fundamentals of Project Management INTRODUCTION LEARNING OUTCOMES Topic 1 Introduction to the Fundamentals of Project Management LEARNING OUTCOMES By the end of this topic, you should be able to: 1. Describe the nature of projects; 2. Identify the project life cycle;

More information

Project and Portfolio Management for the Innovative Enterprise

Project and Portfolio Management for the Innovative Enterprise WHITE PAPER June 2011 Project and Portfolio Management for the Innovative Enterprise Accelerating the Rate of Return from Innovation James Ramsay Principal Consultant, CA Technologies Project and Portfolio

More information

Identifying & Implementing Quick Wins

Identifying & Implementing Quick Wins Identifying & Implementing Quick Wins 1 Executive Summary........3 2 Introduction....... 5 3 Key Steps to Quick Wins....... 7 4 Sample Quick Wins...8 4.1 People Quick Wins... 8 4.2 Process Quick Wins......9

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

A Comparison of Project, Program & Portfolio Management Responsibilities and who should be responsible for what. By R. Max Wideman

A Comparison of Project, Program & Portfolio Management Responsibilities and who should be responsible for what. By R. Max Wideman A Comparison of, & Management Responsibilities and who should be responsible for what. By R. Max Wideman This analysis was inspired by Darren Radford, coauthor of Going Beyond The Waterfall, published

More information

Measuring ROI of Agile Transformation

Measuring ROI of Agile Transformation Measuring ROI of Agile Transformation Title of the Paper: Measuring Return on Investment (ROI) of Agile Transformation Theme: Strategic & Innovative Practices Portfolio, Programs & Project (PPP) Management

More information

White Paper. Making the case for PPM

White Paper. Making the case for PPM Introduction There are many reasons why organizations decide to implement project portfolio management solutions, but typically it is to help senior management confidently and consistently answer questions

More information

Role Description Vendor Relationship Manager ICT

Role Description Vendor Relationship Manager ICT Role Description Vendor Relationship Manager ICT Classification/Grade/Band Clerk Grade 9/10 ANZSCO Code PCAT Code Date of Approval Primary purpose of the role The Vendor Relationship Manager ICT is responsible

More information

Agile project portfolio manageme nt

Agile project portfolio manageme nt Agile project portfolio manageme nt Agile project & portfolio summit at Harrisburg University May 9, 2016 Agile project portfolio management Agenda Portfolio management challenges Traditional portfolio

More information

The ITIL v.3. Foundation Examination

The ITIL v.3. Foundation Examination The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 3, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.

More information

Project Management vs. Change Management Presentation to the National Institutes of Health July 21, 2015

Project Management vs. Change Management Presentation to the National Institutes of Health July 21, 2015 Project Management vs. Change Management Presentation to the National Institutes of Health July 21, 2015 Presentation Objectives 1. Understand the key challenges and linkages between the disciplines. 2.

More information

2007 & 2008 Dennis L. Bolles and Darrel G. Hubbard 1

2007 & 2008 Dennis L. Bolles and Darrel G. Hubbard 1 Achieving the Power of Enterprise-Wide Project Management Dennis L. Bolles, PMP, President DLB Associates, LLC Darrel G. Hubbard, PE, President D.G.Hubbard Enterprises, LLC Project Management Is a Business

More information

STEPS IN THEATRE PROJECT PLANNING

STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates Research, Planning and Management Consultants Specializing in Theatre since 1981 STEPS IN THEATRE PROJECT PLANNING Janis A. Barlow & Associates www.barlowandassociates.com

More information

Portfolio Management Professional (PfMP)SM. Examination Content Outline

Portfolio Management Professional (PfMP)SM. Examination Content Outline Portfolio Management Professional (PfMP)SM Examination Content Outline Project Management Institute Portfolio Management Professional (PfMP) SM Examination Content Outline Published by: Project Management

More information

PPM and Agile: Realizing the Best of Both Worlds

PPM and Agile: Realizing the Best of Both Worlds PPM and Agile: Realizing the Best of Both Worlds This white paper discusses the challenges of integrating agile methods into a PPM framework and how to deliver executive visibility into agile projects

More information

In control: how project portfolio management can improve strategy deployment. Case study

In control: how project portfolio management can improve strategy deployment. Case study Case study In control: how project portfolio can improve strategy deployment Launching projects and initiatives to drive revenue and achieve business goals is common practice, but less so is implementing

More information

Role Reporting Information. Role Family Analyst (Why the family exists and how it adds value to EnergyAustralia)

Role Reporting Information. Role Family Analyst (Why the family exists and how it adds value to EnergyAustralia) Role Reporting Information Role Title Business Analyst Position Number Role Reports Directly To Practice Leader EnergyAustralia Group Executive Manager Chief Information Officer Date 10/08/2015 Role Family

More information

Introduction to Project Management

Introduction to Project Management CHAPTER 1 Introduction to Project Management This chapter provides an overview of project management, defining both projects and project management and exploring the difference between project management

More information

10 Essential Steps to Portfolio Management

10 Essential Steps to Portfolio Management 10 Essential Steps to Portfolio Management Portfolio Planning for 2013 Revised November 2012 http://epmlive.com Contents Introduction...2 Portfolio Management Overview...3 Portfolio Management Process

More information

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 The Standard for Portfolio Management Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 Purpose of this Presentation To provide information about The Standard for Portfolio Management Agenda Background

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that

More information

Job Grade: Band 5. Job Reference Number:

Job Grade: Band 5. Job Reference Number: Job Title: Business Analyst Job Grade: Band 5 Directorate: Job Reference Number: People and Transformation P01216 The Role: This is a challenging role working with and across all services to support the

More information

Implementing Portfolio Management: Integrating Process, People and Tools

Implementing Portfolio Management: Integrating Process, People and Tools AAPG Annual Meeting March 10-13, 2002 Houston, Texas Implementing Portfolio Management: Integrating Process, People and Howell, John III, Portfolio Decisions, Inc., Houston, TX: Warren, Lillian H., Portfolio

More information

Enterprise Release Management

Enterprise Release Management Enterprise Release Management Plutora helps organizations manage complex IT Feature Pipeline, IT Releases and IT Test Environments in a simple and transparent manner. Enterprise Releases Transparency and

More information

PPM Maturity Value Assessment for Your Company

PPM Maturity Value Assessment for Your Company PPM Maturity Value Assessment for Your Company Date Sponsored by: Prepared For: Valued Customer Name Third party model, methodology and data provided by: Disclaimer: NOTICE - THIS INFORMATION IS PROVIDED

More information

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB

Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...

More information

Results & Key Findings

Results & Key Findings Results & Key Findings Sample Executive Assessment Overview 310.652.5678 fax 310.652.5677 www.profitablesolutions.com TABLE OF CONTENTS OVERVIEW..... ii METHODOLOGY iii EXECUTIVE SUMMARY Assessment Highlights....

More information

Guide to: Successful Customer Onboarding

Guide to: Successful Customer Onboarding Guide to: Successful Customer Onboarding Getting Started The first 90 days will decide the fate of most implementations. While the complexity of your product could shift the timeline, if a customer feels

More information

Strategic solutions to drive results in matrix organizations

Strategic solutions to drive results in matrix organizations Strategic solutions to drive results in matrix organizations Copyright 2004-2006, e-strategia Consulting Group, Inc. Alpharetta, GA, USA or subsidiaries. All International Copyright Convention and Treaty

More information

Customer Relationship Team reporting to Product Manager

Customer Relationship Team reporting to Product Manager Position Description Employee: Position title: Location: Grade: Organisation: Head Office: 60-68 Moorabool Street, Geelong. Technical Specialist Customer Relationship Team reporting to Product Manager

More information

Project Portfolio Management: James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International

Project Portfolio Management: James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International Project Portfolio Management: Metrics that Work James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International Agenda PPM Interest What is Project Portfolio Management? Challenges Myths Benefits

More information

Project organisation and establishing a programme management office

Project organisation and establishing a programme management office PROJECT ADVISORY Project organisation and establishing a programme office Leadership Series 1 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital

More information

Training. Project Management & Process Management

Training. Project Management & Process Management Training Project Management & Process Management PROJECT MANAGEMENT ORGANIZATIONAL DEVELOPMENT Content The career profile of a "project manager" is established and recognized in most modern organizations.

More information

The PMO as a Project Management Integrator, Innovator and Interventionist

The PMO as a Project Management Integrator, Innovator and Interventionist Article by Peter Mihailidis, Rad Miletich and Adel Khreich: Peter Mihailidis is an Associate Director with bluevisions, a project and program management consultancy based in Milsons Point in Sydney. Peter

More information

The integrated leadership system. ILS support tools. Leadership pathway: Individual profile EL1

The integrated leadership system. ILS support tools. Leadership pathway: Individual profile EL1 The integrated leadership system ILS support tools Leadership pathway: Individual profile Executive Level 1 profile Shapes strategic thinking Achieves results Cultivates productive working relationships

More information

Agile Project Portfolio Management

Agile Project Portfolio Management C an Do GmbH Implerstr. 36 81371 Munich, Germany AGILE PROJECT PORTFOLIO MANAGEMENT Virtual business worlds with modern simulation software In view of the ever increasing, rapid changes of conditions,

More information

AGILE - QUICK GUIDE AGILE - PRIMER

AGILE - QUICK GUIDE AGILE - PRIMER AGILE - QUICK GUIDE http://www.tutorialspoint.com/agile/agile_quick_guide.htm Copyright tutorialspoint.com AGILE - PRIMER Agile is a software development methodology to build a software incrementally using

More information

project portfolio management Effectively plan, manage, and control projects and resources Planview Enterprise Planview Project Portfolio Management

project portfolio management Effectively plan, manage, and control projects and resources Planview Enterprise Planview Project Portfolio Management project portfolio management Effectively plan, manage, and control projects and resources Planview Project Portfolio Management gives you the tools you need to effectively manage projects and resources

More information

Introduction to OpenPPM

Introduction to OpenPPM 0 Introduction to OpenPPM Content Table Introduction to OpenPPM... 1 0.1. OpenPPM: A tool thought by and for Project Managers... 2 0.2. Project, Program and Portfolio Management... 3 0.3. What is not OpenPPM?...

More information

IT Customer Relationship Management supported by ITIL

IT Customer Relationship Management supported by ITIL Page 170 of 344 IT Customer Relationship supported by ITIL Melita Kozina, Tina Crnjak Faculty of Organization and Informatics University of Zagreb Pavlinska 2, 42000 {melita.kozina, tina.crnjak}@foi.hr

More information

Department of Administration Portfolio Management System 1.3 June 30, 2010

Department of Administration Portfolio Management System 1.3 June 30, 2010 E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2

More information

Application Overhaul. Key Initiative Overview

Application Overhaul. Key Initiative Overview Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an

More information

How Technology Supports Project, Program and Portfolio Management

How Technology Supports Project, Program and Portfolio Management WHITE PAPER: HOW TECHNOLOGY SUPPORTS PROJECT, PROGRAM AND PORTFOLIO MANAGEMENT SERIES 4 OF 4 How Technology Supports Project, Program and Portfolio Management SEPTEMBER 2007 Enrico Boverino CA CLARITY

More information

ILO. Information Technology Governance Committee (ITGC) Charter

ILO. Information Technology Governance Committee (ITGC) Charter ILO Information Technology Governance Committee (ITGC) Charter TABLE OF CONTENTS Charter... 1 Purpose... 1 Authority... 1 Membership... 1 Responsibilities... 2 Responsibilities of the ITG Committee...

More information

TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER. Real-Time Test Management

TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER. Real-Time Test Management TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER Real-Time Test Management How to Select the Best Test Management Vendor? The implementation of a Test Management system to automate business processes

More information

PM Services. Portfolio Strategy, Design and Build

PM Services. Portfolio Strategy, Design and Build PM Services Portfolio Strategy, Design and Build Portfolio Strategy, Design and Build PM Services consultants will design an effective portfolio management system and works closely with client management

More information

Request for Proposal (RFP) Event Management Services. For. Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC)

Request for Proposal (RFP) Event Management Services. For. Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC) Request for Proposal (RFP) Event Management Services For Project Management Institute Ottawa Valley Outaouais Chapter (PMI OVOC) Project Management Institute Ottawa Valley Outaouais Chapter Page 1 SECTION

More information

Why are PMO s are Needed on Large Projects?

Why are PMO s are Needed on Large Projects? Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects

More information

BALANCED SCORECARD What is the Balanced Scorecard?

BALANCED SCORECARD What is the Balanced Scorecard? BALANCED SCORECARD What is the Balanced Scorecard? January 2014 Table of Contents Table of Contents... 1 The Balanced Scorecard... 2 The Four Perspectives... 3 Key Performance Indicators (KPIs)... 4 Scorecard

More information

The PNC Financial Services Group, Inc. Business Continuity Program

The PNC Financial Services Group, Inc. Business Continuity Program The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page

More information

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

Position Description

Position Description Position Description Job title Group Section Responsible to Responsibility for staff Project Coordinator Natural Resource Operations Rotorua Lakes Protection & Restoration Programme Rotorua Lakes Business

More information

Assessing the Appropriate Level of Project, Program, and PMO Structure

Assessing the Appropriate Level of Project, Program, and PMO Structure PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects

More information

Developing a Public-Private Partnership Framework: Policies and PPP Units

Developing a Public-Private Partnership Framework: Policies and PPP Units Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework

More information

APPROACHES TO SPEND ANALYSIS AND SOURCING WITH IMMEDIATE ROI THAT NO ONE TOLD YOU ABOUT, UNTIL NOW

APPROACHES TO SPEND ANALYSIS AND SOURCING WITH IMMEDIATE ROI THAT NO ONE TOLD YOU ABOUT, UNTIL NOW APPROACHES TO SPEND ANALYSIS AND SOURCING WITH IMMEDIATE ROI THAT NO ONE TOLD YOU ABOUT, UNTIL NOW Enporion, Inc. September, 2008 www.enporion.com TABLE OF CONTENTS Introduction... 3 With benefits like

More information

Leadership and Management Competencies

Leadership and Management Competencies Leadership and Management Competencies 0 The Saskatchewan Public Service Vision: The Best Public Service in Canada Our Commitment to Excellence Dedicated to service excellence, we demonstrate innovation,

More information

Xavier University: IT Portfolio Management and the Project Request Process

Xavier University: IT Portfolio Management and the Project Request Process A guideline and process document to establish the governance framework for technology related project requests laying the groundwork for strategic portfolio management Xavier University: IT Portfolio Management

More information

Setting the Expectation for Success: Performance Management & Appraisal System

Setting the Expectation for Success: Performance Management & Appraisal System HILLSBOROUGH COUNTY CIVIL SERVICE BOARD OFFICE Setting the Expectation for Success: Performance Management & Appraisal System Supervisor s Guide PROCESS OVERVIEW Setting the Expectation for Success: Performance

More information

Developing a Project. Management System. Using Project Agency Template. Approach. - the Process and the Benefits

Developing a Project. Management System. Using Project Agency Template. Approach. - the Process and the Benefits Developing a Project Management System Using Project Agency Template Approach - the Process and the Benefits Project Agency June 2008 Developing your own Project Management System. Project Agency has worked

More information

Enterprise Architecture and Portfolio Management: The Need for IT Governance

Enterprise Architecture and Portfolio Management: The Need for IT Governance Enterprise Architecture and Portfolio Management: The Need for IT Governance By Kavita Kalatur In a federal environment characterized by shrinking budgets and increasing regulation, CIOs are under constant

More information

Project Management Manual

Project Management Manual Project Management Manual PM01 Introduction to the Project Management Manual Ref: PM01 (V7.01) - Uncontrolled once Printed Issued on 20 th December 2006 Manual Owner: James Couper Head of Project Management

More information

WITH BUSINESS STRATEGY

WITH BUSINESS STRATEGY ALIGNING IT COST OPTIMIZATION WITH BUSINESS STRATEGY TABLE OF CONTENTS 2 The truth is in the data 4 A sustainable cost-optimization methodology 4 Context is king 5 Alfabet: Insight for IT financial management

More information

The ITIL v.3 Foundation Examination

The ITIL v.3 Foundation Examination The ITIL v.3 Foundation Examination Sample Paper A, version 3.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions. 3. All answers are to be marked on

More information

How To Write An Impactful Audit Report

How To Write An Impactful Audit Report IIA Chicago Chapter 53 rd Annual Seminar April 15, 2013, Donald E. Stephens Convention Center @IIAChicago #IIACHI How To Write An Impactful Audit Report The role of Audit adds increasingly more value Susan

More information

PROJECT MANAGEMENT SALARY SURVEY 2014

PROJECT MANAGEMENT SALARY SURVEY 2014 ESI INTERNATIONAL ASIA PACIFIC PROJECT MANAGEMENT SALARY SURVEY 2014 An ESI International study SURVEY OBJECTIVES The inaugural Asia Pacific project management salary survey conducted by ESI International

More information

MGMT 4135 Project Management. Chapter-16. Project Oversight

MGMT 4135 Project Management. Chapter-16. Project Oversight MGMT 4135 Project Management Chapter-16 Project Oversight Project Oversight: defined as a set of principles and processes to guide and improve the management of projects. Ensures projects meet the needs

More information

15 Principles of Project Management Success

15 Principles of Project Management Success 15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.

More information

Need Information? Go to: www.chr.alberta.ca/apscompetencies. Have Questions? Email: [email protected]

Need Information? Go to: www.chr.alberta.ca/apscompetencies. Have Questions? Email: apscompetencies@gov.ab.ca Need Information? Go to: www.chr.alberta.ca/apscompetencies Have Questions? Email: [email protected] Table of Contents Background... 3 Why Behavioural Competencies?... 3 The APS Competency Model...

More information

Elements of Technology Strategy:

Elements of Technology Strategy: Elements of Technology Strategy: Identification of Key Technologies and Developing Sourcing, Innovation and Balancing Strategies. Presentation to: Saudi Aramco Technical Exchange Meeting (TEM) 2003 Dhahran,

More information

DEVELOPING THE PROJECT PORTFOLIO MANAGEMENT PROCESS AND MATURITY STEP BY STEP

DEVELOPING THE PROJECT PORTFOLIO MANAGEMENT PROCESS AND MATURITY STEP BY STEP 1 (7) DEVELOPING THE PROJECT PORTFOLIO MANAGEMENT PROCESS AND MATURITY STEP BY STEP IPMA World Congress 2009-06-11 Seminar 1: Strategy Creation and Project Portfolios Tuesday, June 16, 2009, 10:30-11.00

More information

Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership. Office of the Commissioner - Corporate Affairs

Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership. Office of the Commissioner - Corporate Affairs Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership Office of the Commissioner - Corporate Affairs The Manager, Corporate Planning & Reporting is responsible for

More information

An Unbalanced Scorecard

An Unbalanced Scorecard An Unbalanced Scorecard Twelve New IT Metrics for an Era of Change CEB CIO Leadership Council A Framework for Member Conversations The mission of CEB Inc. and its affiliates is to unlock the potential

More information

Adapting a PMO to Today s Agile World: Strategies for Success. Barbara Bostian, Director, PMO Leigh Baudreau, Senior Manager, Product Planning

Adapting a PMO to Today s Agile World: Strategies for Success. Barbara Bostian, Director, PMO Leigh Baudreau, Senior Manager, Product Planning Adapting a PMO to Today s Agile World: Strategies for Success Barbara Bostian, Director, PMO Leigh Baudreau, Senior Manager, Product Planning About the Speakers Introductions and Contact Information [email protected]

More information

What you need to know about PMOs

What you need to know about PMOs What you need to know about PMOs By Bahar Banyahmad 2009 Overview With PMOs becoming more pervasive in large and medium enterprises, this whitepaper explores different PMO models and functions. It explores

More information

Executive Assistant to CEO

Executive Assistant to CEO JOB DESCRIPTION FOR THE POSITION OF Executive Assistant to CEO Incumbent: Vacant Date developed: September 2012 Date last updated: May 2013 To provide high level administrative and secretarial support

More information

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director

Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project

More information

Enterprise Architecture (Re)Charter Template

Enterprise Architecture (Re)Charter Template Enterprise Architecture (Re)Charter Template To learn more about this full research or to inquire about membership, contact us: +1-866-913-8101 IT.Support@ executiveboard.com www.cebglobal.com/it CEB Enterprise

More information

the role of the head of internal audit in public service organisations 2010

the role of the head of internal audit in public service organisations 2010 the role of the head of internal audit in public service organisations 2010 CIPFA Statement on the role of the Head of Internal Audit in public service organisations The Head of Internal Audit in a public

More information

CORPORATE INFORMATION AND TECHNOLOGY STRATEGY

CORPORATE INFORMATION AND TECHNOLOGY STRATEGY Version 1.1 CORPORATE INFORMATION AND TECHNOLOGY STRATEGY The City of Edmonton s Information and Technology Plan, 2013-2016 Bringing the Ways to Life through Information and Technology June 2013 2 Copyright

More information

Role Expectations Report for Sample Employee and Receptionist

Role Expectations Report for Sample Employee and Receptionist Role Matching of Sample Employee and Receptionist Page 1 Role Expectations Report for Sample Employee and Receptionist TUTORIAL WORKSHEET In order to match a candidate to a particular role, look at several

More information

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator

Project Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator Project Management for Process Improvement Efforts Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator 2 Project and Process Due to the nature of continuous improvement, improvement

More information

Assessing Your Information Technology Organization

Assessing Your Information Technology Organization Assessing Your Information Technology Organization Are you running it like a business? By: James Murray, Partner Trey Robinson, Director Copyright 2009 by ScottMadden, Inc. All rights reserved. Assessing

More information

Agile Manufacturing for ALUMINIUM SMELTERS

Agile Manufacturing for ALUMINIUM SMELTERS Agile Manufacturing for ALUMINIUM SMELTERS White Paper This White Paper describes how Advanced Information Management and Planning & Scheduling solutions for Aluminium Smelters can transform production

More information

HEAD OF SALES AND MARKETING

HEAD OF SALES AND MARKETING HEAD OF SALES AND MARKETING Job details Reference number: GO-HOSM-2013 Job Title: Head of Sales and Marketing Supervisor: Managing Director Location: Kenya Job summary Reporting to the Managing Director,

More information