1 SMS from OSLO VAV - Secure and Monitored Service from Oslo VAV Application Number: ES Presented by Rita Ugarelli, senior scientist and Prof II., SINTEF W&E On behalf of the project team 1
2 Why did we want the SMS from OSLO VAV? KEY WORDS: EFFICIENCY SECURITY MONITORING CONTROL to improve the efficiency and the security in monitoring and control of the urban water and wastewater system of Oslo VAV 2
3 The project inspiration was the experience A wastewater pipe (siphon) between two islands in Oslofjorden was leaking for a long time, resulting in uncontrolled spills of untreated wastewater to the fjord. The structural condition of the pipe was unknown, and no alarm and communication system for detecting the event was available. All the events and national reports illustrate the needs for robust technical solutions and methods. Flooding of a wastewater pumping station due to communication failure. The control central did not receive alarms about critical water levels. Bekkelaget wastewater treatment plant was flooded due to power failure. Control valves did not close properly and the electrical control panels and cabinets were flooded, resulting in large spills of untreated wastewater to the fjord lasting for several months. An undetected leakage in the chlorination system at Oset water treatment plant wiped out much of the aquatic life in the river Akerselva. There was no ICT based detection system in place prior to the event. Recently the ICT information security in Oslo VAV has been an issue in one of the largest newspapers in Oslo. This puts pressure on existing ICT solutions, and is a large incentive for improvements. 3
4 The project work packages (WP) structure CONDITION MONITORING DATA AND SECURITY WP1: Wastewater pipes: condition monitoring, assessment and rehabilitation planning WP2: Wastewater pipes: Combining Risk, condition assessment and costs WP3: Wireless Communication WP5: Control Systems WP4: Information Security WP6: DISSEMINATION WP7: Management 4
5 WP1 and 2 motivation Oslo waterworks reviewing the master plan for wastewater networks Research questions 1. At strategic level (WP1): How much should Oslo VAV spend to improve the structural conditions of the network? 2. At tactical level (WP2): what pipe to rehabilitate first and when?
6 WP1 : Wastewater pipes: condition monitoring, assessment and rehabilitation planning Application of a model for wastewater pipes deterioration analysis to the wastewater network of OSLO VAV Activities 1. Data collection, filtering and adaption 2. Calibration of the deterioration models for the entire system including all available inspection data 3. Prediction of future deterioration states for inspected and notinspected wastewater pipes of Oslo 4. Development of appropriate rehabilitation strategies to improve the overall structural conditions of the system under budget constraints 5. Select a long-term investment plans to achieve set goals of improved system conditions.
7 WP2 - Wastewater pipes: Combining Risk, condition assessment and costs Given the selected scenario of WP 1 (1,6% rehabilitation rate) what actually are the pipes to be rehabilitated each year? WP 2 narrows the analysis down into a more detailed selection of the pipes to be prioritized per year (Tactical level). WP2 aims at prioritizing the pipes to be rehabilitated using risk matrix. 7
8 WP1 WP2Methodology and results Preliminary work (RFF pre-project) WP1 WP2 8
9 WP1 WP2: Methodology and results Preliminary work (RFF pre-project) 9
10 WP1 WP2. Methodology and results WP 1 WP 2 10
11 Experience and value for VAV - WP 1 and 2 The results have been used to compute the rehabilitation rate (WP1) for investment planning in the new sewerage Master plan The results from WP2 is used in the Rehabilitation plan (risk based approach). The project has helped us improve the quality of our sewer network database. The WP1 has also highlighted a major issue in the Norwegian guidelines (NORVAR 2007) used to classify pipes from visual inspection. Arnhild Krogh, Oslo VAV seksjonsleder
12 WP3-5 Smart Condition Monitoring Objective Develop methodology for detecting degradation at an early stage using available process measurement from the SCADA system Benefits Detect faults before they result in machine break-downs Reduce loss of energy 12
13 WP3-5 Wireless Condition Monitoring Objective Perform a pilot installation of wireless vibration sensors at water pumping station 14
14 WP3-5 Wireless Condition Monitoring: Vibration sensors Benefits Makes it possible to identify faults before they result in machine failure Can enable condition-based maintenance (before failure) instead of reactive maintenance (after failure) 15
15 WP3-5 Information Security: Checklist development Checklists should be used as a tool for raising consciousness on Information Security 16
16 WP3-5 Information Security: Incident response management Sector specific incident reporting scheme should be established: Quicker dissemination of threats and attacks Better learning after incidents 17
17 Experience and value for VAV - WP 3-5 WP3 trådløs datakommunikasjon Flere alternativer for trådløs overføring av måleinformasjon har vært prøvd ut En rekke av våre anlegg har behov for en sekundær kommunikasjonsvei mellom lokalt styringsutstyr og SCADA-system Automatisk omruting via trådløs kommunikasjon er et interessant alternativ Wifi kan også tenkes brukt som sekundær kommunikasjonsvei inne i behandlingsanlegg WP4 informasjonssikkerhet Informasjonssikkerhet (IS) har vært et satsningsområde i VAV siden 2011 VAV utvikler eget styringssystem for informasjonssikkerhet SINTEF har vært en viktig medspiller for IS i VAV både i SMS og i andre sammenhenger SINTEF var medansvarlig for et meget vellykket seminar mars 2014 om informasjonssikkerhet i driftskontrollsystemer WP5 tilstandsanalyse anleggsutstyr Prosjektet har vist at målehistorikk fra anlegg kan bearbeides til tilstandsanalyser for viktig utstyr data om strømforbruk, temperatur og vibrasjoner gav tydelige indikasjoner på slitasje i lagre på viktige pumper En systematisk bruk av modellene kan gi bedre preventivt vedlikehold Bearbeidet driftsinformasjon kan knyttes direkte til vårt drifts- og vedlikeholdssystem By Harald Rishovd, Oslo VAV Seksjonsleder at Oslo kommune, Vann- og avløpsetaten
18 WP6 - Dissemination Intense and successful dissemination at national and international level 19
19 WP6 - Dissemination At the end of the project SINTEF sent out a press release for the project. This press release was sent out nationally:
20 WP 6 Dissemination 1. Berge, S. P., Floor Lund B., Ugarelli R., (2013). Condition Monitoring for Early Failure Detection - Frognerparken Pumping Station as Case Study. Procedia Engineering 70C (2014) pp , CCWI 2013, Available online at 2. Jaatun M.G., Røstum J., Petersen S. and Ugarelli U. (2013a). Security Checklists: A Compliance Alibi, or a Useful Tool for Water Network Operators? In proceedings from 12th International Conference on Computing and Control for the Water Industry, CCWI2013. Procedia Engineering 00 (2013) , Available online at 3. Jaatun, M. G., Røstum, J. and Petersen, S. (2013b). Security guidelines for industrial information and control systems used for water and wastewater systems (in Norwegian). Norsk Vann Rapport, Norsk Vann. 4. Jaatun M.G (2013). Sikkerhet av driftskontrollsystemer innen VA. Hva kan gå galt og hva bør en gjøre for å sikre seg? Presentation at regional water conference. ( 5. Lund, B. F Prosjektnotat: SMS : Muligheter for tilstandsovervåkning i Frognerparken pumpestasjon (in Norwegian). 6. Krogh A. og Røstum J. (2013). Bruk av rørinspeksjonsdata for å fastsette fornyelsesbehov for avløpsledninger. Foredrag kursdagene NTNU Petersen S., Myhre B. And Røstum J. (2013). Wireless Instrumentation for the Water and Wastewater Industry. In proceedings fr om 12th International Conference on Computing and Control for the Water Industry, CCWI2013. Procedia Engineering 00 (2013) , Available online at 8. Røstum J. Jaatun M.G. and Petersen S. (2013). Safety in industrial information and control systems used in the (in Norwegian). Presentation at Annual conference Norwegian Water Association in Bergen 31. September Røstum J. (2013a). Safety in industrial information and control systems used in the (in Norwegian). Presentation for Porsgrunn municipality 23. October 2013 in Langesund. 21 publications 10. Røstum J. (2013b). Risk and vulnerability in industrial information and control systems used in water industry. Presentation conference Norwegian Centre for Information Security (NorSIS) Ugarelli R.M., Le Gat Y., Selseth I. and Rostum J. (2013a). Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning. In proceedings from LESAM 12. Ugarelli R.M., Le Gat Y., Selseth I., Rostum J and Arnhilg Krogh. (2013b). Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning. In proceedings from NORDIWA th Nordic wastewater conference. 13. Ugarelli R., Selseth I., Le Gat Y (2013c). SMS from Oslo VAV Secure and Monitored Service from Oslo VAV, RRF -project report (SBF2013F0049). 14. Ugarelli, R. M.; Selseth, Ingrid; Le Gat, Yves; Røstum, Jon; Krogh, Arnhild Helene. (2013d) Wastewater pipes in Oslo: From condition monitoring to rehabilitation planning. Water Practice and Technology. volume 8 (3-4). 15. Ugarelli, R., Selseth, I., Myhre, B., Berge, S. P. and Jaatun, M. G SMS from VAV- First periodic progress report - Project objectives, work progress and achievements, project management, SINTEF 16. Ugarelli, R (2014). Wastewater pipes in Oslo: from condition monitoring to risk based rehabilitation planning. Presentation at Fagtreffuka February 2014, Norsk Vann. 17. Røstum, J. (2014). Sikkerhet i driftskontrollsystemer. Presentation for Arendal municipality. March Myhre B, S Petersen and R Ugarelli (2014).Using wireless vibration monitoring to enable condition-based maintenance of rotating machinery in the water and wastewater industries", WDSA Tøndel I.A., Jaatun M.G. and Røstum J. (2013). IKT og sikkerhet i VA-sektoren: Hva kan gå galt? In Journal Vann. 20. Tøndel I.A. (2013). Safety in SCADA systems (Sikkerhet ved driftskontrollsystemer). Presentation at Norwegian Water Association gathering in October Røstum J., Riktig utskiftingstakt på VA-ledninger. Presentation at regional meeting in Trøndelag for water and wastewater operators (Driftsassistansen i Sør Trøndelag). 8 April
21 WP 6 Dissemination And more Results from the SMS from VAV project will be further spread and developed also on the international arena. Project members from SMS from VAV will particpate in these workshop/conference where new initiatives and ideas will be explored. 22
22 WP 6 Dissemination We would like to state that the dissemination from the project has been successful due to a combination of easy understandable results and the need within the water industry for new approached in the field. New "SMS from " Projects are under definition thanks to the dissemination work Not just Oslo but more regions will benefit from this project! 23
23 WP 6 Dissemination The final report has been delivered end of March as "open" document. The report is organized as dynamic and practical document with hyperlinks to the different topics. WP1 - REHABILITATION PLANNING OF WASTEWATER PIPES - DETERIORATION MODELING chapter 4 WP2 - REHABILITATION PLANNING OF WASTEWATER PIPES - PRIORITIZATION Chapter 5 WP3 - WIRELESS COMMUNICATION IN THE WATER SYSTEMS chapter 6 WP4 - IT - SECURITY chapter 7 WP5 - CONDITION MONITORING OF PUMPING STATIONS chapter 8 WP6 - DISSEMINATION chapter 9 24
24 SMS from OSLO VAV results in a glance! WIFI communication & Smart condition monitoring system more reliable pumping stations Frognerparken and Svenstua State of the art rehabilitation planning implemented in new Masterplan for Oslo ( ) Intense and successful dissemination - national and international Bonus: New market opportunity created in the water sector related to ICT (RFF 2014) Initiated revision of national and Nordic guidelines for CCTV inspection of pipes Information security - developed a checklist for security baseline assessment of water utilities The project has helped us improve our data system, investment planning and overall planning to improve pipe conditions! Arnhild Krogh, Oslo VAV 25
25 SMS from OSLO VAV - Secure and Monitored Service from Oslo VAV project is funded by Oslo Vann og Avløp and the The research Council of Norway. The Project team: Arnhild Krogh, Oslo kommune, VAV Erik Gløersen, Oslo kommune, VAV Steinar Nilo, Oslo kommune, VAV Thomas Refsdal, Oslo kommune, VAV Ingrid Selseth, SINTEF Yves Le Gat, Irstea (F) Jon Røstum, SINTEF
26 27
Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning
NORDIWA - 2013 Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning R.M. Ugarelli, PhD, SINTEF, Norway, [email protected] I. Selseth, SINTEF, NORWAY J. Røstum, PhD, SINTEF,
Trondheim og Sør Trøndelag som levende laboratorium for FoU
Versjon av 2014 02 20 Trondheim og Sør Trøndelag som levende laboratorium for FoU Noen arenaer hvor vi arbeider sammen Terje Jacobsen, SINTEF Byggforsk [email protected], 41 664 331 SINTEF Byggforsk
Why Smart Water Networks Boost Efficiency
Why Smart Water Networks Boost Efficiency by Jeff M. Miller and Mark Leinmiller Executive summary The Smart Water Network (SWAN) is the water utility industry s equivalent to the energy industry s Smart
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
Kvalifisering av ny teknologi
Kvalifisering av ny teknologi Siemens AS 26.05.2011 Siemens Oil & Gas solutions - Offshore 2010. All rights reserved. De tre viktigste tingene subsea: Pålitelighet Pålitelighet Pålitelighet Hvorfor kvalifisering?
Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain.
SMART WATER Murcia. Capital and most populous city of the Region de Murcia. Seventh largest city in Spain. Population of the city: 450.000 inhabitants. (about one third of the total population of the Region).
Full scale application of network monitoring tools for leakage reduction and asset rehabilitation prioritization
Presenting company logo Full scale application of network monitoring tools for leakage reduction and asset rehabilitation prioritization Miguel MOLINA Technological Development Manager Smart water networks
Assessment of the technical dossier submitted under EFSA/GMO/NL/2011/91 for approval of transgenic soya event DAS-68416-4 from Dow AgroSciences LLC
Assessment of the technical dossier submitted under EFSA/GMO/NL/2011/91 for approval of transgenic soya event DAS-68416-4 from Dow AgroSciences LLC Submitted to Direktoratet for Naturforvaltning by David
PRIORITIZATION OF FLOOD PREVENTION MEASURES IN WASTEWATER SYSTEMS IN NORWEGIAN CITIES
PRIORITIZATION OF FLOOD PREVENTION MEASURES IN WASTEWATER SYSTEMS IN NORWEGIAN CITIES Geir Torgersen Assistant professor, Ostfold University College, Norway PhD-student, Norwegian University of Life Sciences
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
QUICK REFERENCE GUIDE MOBILE HUMAN MACHINE INTERFACE (HMI): INNOVATION THAT EMPOWERS THE MOBILE OPERATOR
MOBILE HUMAN MACHINE INTERFACE (HMI): INNOVATION THAT EMPOWERS THE MOBILE OPERATOR Mobile operators are critical to ensuring the overall efficiency and uptime of the production line and play a critical
NORGES TEKNISK- NATURVITENSKAPELIGE UNIVERSITET INSTITUTT FOR VANN- OG MILJØTEKNIKK
ORGES TEKISK- ATURVITESKAPELIGE UIVERSITET ISTITUTT FOR VA- OG MILJØTEKIKK Oppgavens tittel: Use and Collection of data in Gemini VA in Asset Management Dato: 30/6-10 Antall sider (inkl. bilag): 99 Masteroppgave
UNIVERSITY OF OSLO. Faculty of Mathematics and Natural Sciences
UNIVERSITY OF OSLO Faculty of Mathematics and Natural Sciences Exam: INF 4300 Digital image analysis Date: Friday December 11, 2009 Exam hours: 14.30-17.30 Number of pages: 7 pages plus 1 page enclosure
SATELLITTKOMMUNIKASJON I NORDOMRÅDENE
SATELLITTKOMMUNIKASJON I NORDOMRÅDENE TELEKOMMUNIKASJON OFFSHORE 2014 GUDMUND HOLTE 1 Agenda Kort introduksjon av Harris CapRock Communications Oversikt over satellitteknologier Kommunikasjonsløsninger
Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum Operations
Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum Operations Jan Erik Vinnem Preventor/Stavanger University College, Bryne, Norway Terje Aven Stavanger University College,
Vattenfall Eldistribution AB, Sweden Project AMR Automatic Meter Reading
Vattenfall Eldistribution AB, Sweden Project AMR Automatic Meter Reading Toveiskommunikasjon i Norge 2008 21. mai 2008, Gardemoen, Oslo Fra planleggning til ferdig installasjon och drift Erik Nordgren
Furmanite on-site engineering services
Furmanite on-site engineering services 24/7 phone numbers: Sweden +46 (0)303 65 680 Norway +47 35 51 60 80 Denmark +45 35 34 60 80 Date - Presentation Topic - Author Furmanite Worldwide Founded in 1929
Deployment of networks of innovative water quality sensors for distribution network monitoring Joep van den Broeke (Ph.D.)
AWWA Water Infrastructure Conference Deployment of networks of innovative water quality sensors for distribution network monitoring Joep van den Broeke (Ph.D.) 28 October 2014 Challenges for Water Utilities
Seilingsliste. Nordgående. Januar. Februar
6 Nordgående Skip Fra Bergen Til og a Sandnessjøen Harstad Hammerfest Ankomst Trdheim Bodø Trom Hningsvåg Kirkenes Finnrken ** Kg Harald Finnrken * Kg Harald Finnrken Kg Harald Finnrken Kg Harald Finnrken
Vandforsyningen i fremtiden. Lars Troldahl
Vandforsyningen i fremtiden Lars Troldahl Vandforsyningen i fremtiden... Forsyningssektorerne står over for en række udfordringer, og må finde nye løsninger. Schneider Electric øger fokus på vand, varme
MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO
MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO Authors: Ulf E. Roysted 1, Marit Melhuus 1 and Geir J. Lindholm 2 1. Oslo Water and Sewage Works(VAV), Herslebs gate 5, N-0561 Oslo e-mail:
Hvor går RFID forskning og utvikling?
Technology for a better society Enabling the Real Time Enterprise Hvor går RFID forskning og utvikling? Ovidiu Vermesan, SINTEF IKT og Edvin Holsæter, Telenor Iris Plan for presentasjonen RFID segmenter
Norway: Impact of forest recreation monitoring surveys on policy and legislation in Norway
Norway: Impact of forest recreation monitoring surveys on policy and legislation in Norway The first national survey on participation in outdoor recreation in Norway was conducted in 1970. In the period
Revolusjonen COPYRIGHT NOTICE
Revolusjonen COPYRIGHT NOTICE The creative work in this presentation is protected by copyright. Redistribution or commercial use 2003: Facemash Dating? 2004: THEFACEBOOK.COM 2004: Facebook.com 25/8-2011:736
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
Managing risks for lay-up of OSVs and Rigs
MARITIME ADVISORY Managing risks for lay-up of OSVs and Rigs 2015.10 1 DNV GL 2013 2014.03.05 SAFER, SMARTER, GREENER Lay-ups are cyclical, just like the industry 2 Managing risks of lay-up of OSVs and
Fargen i et pixel. Agenda for mine 13 minutter 23.04.2013. The Norwegian Colour and Visual Computing Laboratory
Fargen i et pixel Professor Jon Y. Hardeberg The Norwegian Colour and Visual Computing Laboratory Faculty of Computer Science and Media Technology Gjøvik University College, Gjøvik, Norway [email protected]
Flood damage survey after major flood in Norway 2013 cooperation between the insurance business and a government agency
Flood damage survey after major flood in Norway 2013 cooperation between the insurance business and a government agency Hallvard Berg 1, Mia Ebeltoft 2 & Jørgen Nielsen 3 1 Norwegian Water Resources and
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences Daniela M. Arellano Acosta Environment Agency/ Water Commission, Academy of Science, CUBA Water
M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
ISA108 Intelligent Device Management (IDM)
ISA108 Intelligent Device Management (IDM) Intelligent Digital Devices - Have Self-Diagnostics and More Eight-channel two-wire temperature transmitter Intelligent two-wire on/off valve 2 Fully integrated
Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency
Real-time Monitoring Platform to Improve the Drinking Water Network Efficiency SUMMARY Recent advances in real-time water sensing technology have enabled new opportunities for improved assessment and management
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Jon Olaf Olaussen. Associate professor at Trondheim Business School, Trondheim, Norway
Curriculum vitae, Jan 2011 Jon Olaf Olaussen Date of birth 23.01 1974 Nationality Norwegian Marital status Married, 2 children Address Myrveien 12, N-7550 Hommelvik, Norway Telephone (+47) 735 59 933 /
Hvordan påvirker Cloud dine integrasjonsbehov?
Hvordan påvirker Cloud dine integrasjonsbehov? Rune Nygård, Oracle 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 8
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH
LIFECYCLE MANAGEMENT OF UTILITY ASSETS A PRACTICAL APPROACH Dr. Petros Kolovopoulos (Hydro-Comp Enterprises Ltd, Cyprus), Dr Dinos Constantinides (Hydro-Comp Enterprises Ltd, Cyprus) Key words: Asset Management,
XenDesktop Workshop. Hva, Hvordan.? The best desktop virtualization solution is now even better
powered by XenDesktop Workshop. Hva, Hvordan.? The best desktop virtualization solution is now even better Stian A. Petersen Løsnings Arkitekt [email protected] Commaxx Denne workshop er basert på følgende:
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Securing software systems in the health care domain
Securing software systems in the health care domain Monika Katrin Kosmo Master of Science in Communication Technology Submission date: June 2014 Supervisor: Poul Einar Heegaard, ITEM Co-supervisor: Karin
Applicant. Project Owner. Project administrator. Project manager. Page: 1
Page: 1 Applicant Project Owner Institution / company (Norwegian name) METEOROLOGISK INSTITUTT Faculty Institute Department Address Postboks 43 BLINDERN Postal code 0313 City Country E-mail Website OSLO
INCIDENT RESPONSE MANAGEMENT PLAN DECEMBER 2015
INCIDENT RESPONSE MANAGEMENT PLAN DECEMBER 2015 DOCUMENT CONTROL Document Controller: Resilience Coordinator Date of last update: December 2015 Date of next update: December 2016 HPRM reference: HW2007-900/27/9.009
PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT
PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT Eur Ing Steve Mustard, Product Manager, LogicaCMG Dr Mark Thornton, Solutions Director, Helveta Abstract Supervisory Control And
Ny postlov i Norge New postal regulations in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015
Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 < Norge skal innordne seg EU s postdirektiv og dette vil få konsekvenser for Posten Norge mht postnummeradministrasjon, postadresser
Curriculum Vitae. NINA MALTERUD +47 91696212 [email protected] www.ninamalterud.no. Born in Oslo 1951
Curriculum Vitae NINA MALTERUD +47 91696212 [email protected] www.ninamalterud.no Born in Oslo 1951 EDUCATION 1971 1974 Ceramics at National College of Art and Design (SHKS), Oslo 1981 82 Evening Course in Journalism
R&D for Innovation in the Public Sector in Norway - Overview and Experiences. Trond Knudsen Research Council of Norway
R&D for Innovation in the Public Sector in Norway - Overview and Experiences Trond Knudsen Research Council of Norway Motivation - Broad Impact Meet the increase in services and quality, control growth:
European Journal of Social Work, 1468-2664, First published on 17 December 2010
1 COVER SHEET Authors Sissel Seim and Tor Slettebø Full title Collective Participation in Child Protection Services: Partnership or Tokenism? Kollektiv brukermedvirkning i barnevernet: partnerskap eller
SCADA and Security Are they Mutually Exclusive? Terry M. Draper, PE, PMP
SCADA and Security Are they Mutually Exclusive? Terry M. Draper, PE, PMP Today s Topics SCADA Overview SCADA System vs. IT Systems Risk Factors Threats Potential Vulnerabilities Specific Considerations
ActionPhoto International
360 Panoramic Guide a new visualisation and communication tool Per Erik Berger Managing Director ActionPhoto International AS action-photo.no Agenda What is a 360 Panoramic Guide? Example Bideford Dolphin.
Direkte elektrisk røroppvarming
Extending the life of the fields Direkte elektrisk røroppvarming Siemens 27. mars 2014 Stig Indrebø Principle engineer ( hentet foiler fra Atle Børnes, Statoil fra nettet) 2014 Aker Solutions Slide 1 March
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
SAKSTITTEL: 2010 Gjennomgang av SMR som Nasjonal institusjon for menneskerettigheter i Norge. FORSLAG TIL VEDTAK: <Utformes evt.
Til Styret ved Norsk senter for menneskerettigheter Fra Direktøren Sakstype: Diskusjons-/vedtakssak Møtesaksnr.: Møtenr. 1/2010 Møtedato: 18.03.10 Notatdato: 11.03.10 Arkivsaksnr.: Saksbehandler: Kristin
APPENDIX G-Emergency Response Plan Template
APPENDIX G-Emergency Response Plan Template BSDW-ERP Template 10/04 EMERGENCY RESPONSE PLAN WATER SECTOR Public Water System Name: PWSID No: Physical Address: City: State: Zip Code: General Phone Number:
Ground-Source Heat Pump Systems in NORWAY
IEA HPP Annex 29 (2004-2006) Ground-Source Heat Pumps Overcoming Market and Technical Barriers Ground-Source Heat Pump Systems in NORWAY Jørn Stene NORWAY [email protected] 1 Outline The Norwegian heat
Nordic Master in Didactics of Mathematics
Nordic Master in Didactics of Mathematics NORDIMA Barbro Grevholm Seminar i Bergen den 7-8 september 2011 Nordic Master in Didactics of Mathematics Project number NMP-2009/10730 The Master Consortium consists
Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations
Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations 2 One Solution for Monitoring, Control or Both There are many ways to improve the efficiency and reliability of your
WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods
WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods NEIGHBORHOOD MEETING Wednesday, February 10, 2016 6:00 7:00 p.m. Childsplay, 900 S. Mitchell Drive, Tempe, AZ Neighborhood Meeting Welcome,
Lars H. Gulbrandsen. CV, May 2009
Lars H. Gulbrandsen CV, May 2009 Address Johan Castbergsvei 56, 0673 Oslo, Norway Place of work Fridtjof Nansen Institute, P.O.Box 326, 1326 Lysaker, Norway Telephone (+47) 6711 1932 (work), (+47) 2232
Experiences from Norway. Barthold Vonen Nordland Hospital Trust
Experiences from Norway Barthold Vonen Nordland Hospital Trust Overview Short background on Norway s work in JA PaSQ with regard to the checklist Experiences from Nordland Hospital Trust Use of the WHO
Routine Maintenance and Inspection
THE CORPORATION OF THE VILLAGE OF WARFIELD POLICY TITLE: Sanitary Sewer Operations POLICY: #5435 PURPOSE: This policy is to provide the Village of Warfield s procedures for maintaining its sanitary sewer
ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008
ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater INFLOW AND INFILTRATION CUSTOMER OUTREACH
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
Matematisk modellering av CO 2 -lagring MatMoRA
Matematisk modellering av CO 2 -lagring MatMoRA H. K. Dahle, J. M. Nordbotten, K.-A. Lie University of Bergen Centre for Integrated Petroleum Research SINTEF ICT CLIMIT-dagene 2010, Oslo 12.-13. oktober
NORWEGIAN DIRECTORATE FOR CIVIL PROTECTION (DSB)
English [2] NORWEGIAN DIRECTORATE FOR CIVIL PROTECTION (DSB) DSB s responsibilities regarding civil protection cover national, regional and local preparedness and emergency planning, fire and electrical
ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN
Darkhan Wastewater Management Project (RRP MON 37697) ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN A. Introduction 1. The capacity development technical assistance