1 DESIGN RECOMMENDATIONS AND CRITERIA FOR EMERGENCY OPERATIONS CENTERS Michigan State Police Emergency Management Division February 2003
2 The purpose of this guidance is to help local jurisdictions improve emergency preparedness and management by ensuring that their Emergency Operations Centers (EOCs) have facility, decision support and telecommunications capabilities that provide flexibility, sustainability, security, survivability and interoperability. While it is recognized that each jurisdiction has unique needs and wants, the Emergency Management Division has developed basic requirements that all EOC s should meet in order to provide Survivable Crisis Management (SCM) capability. These guidelines will not preclude the jurisdiction from constructing any facility. However, most sources of available federal financial aid is usually dependent upon meeting minimum standards as described here. Specific federal programs may include additional or modified requirements. Emergency operations centers are essential for the effective direction, control, and coordination of emergency response efforts. Self-assessments shall consider the following characteristics in determining EOC needs and when submitting proposals for EOC projects: Flexibility scale operations and adapt operational space to the all hazards event (e.g., have sufficient space, equipment, furniture, administrative supplies, telecommunications, computer support, etc., available to satisfy mission requirements. Sustainability support operations for extended duration; e.g., be able to sustain operations 24 hours a day/seven days a week during all emergency situations without interruption; to the extent practical, be located in a place that is not a high-risk area for known hazards such as flood zone, other natural hazard, nuclear power plant, hazardous material sites, etc. Security guard against potential risks and protect operations from the unauthorized disclosure of sensitive information, e.g., have sufficient security and structural integrity to protect the facility, its occupants, and communications equipment and systems from relevant threats and hazards. Survivability sustain the effects of a realized potential risk and continue operations from the EOC or a fully-capable alternate location, e.g., have an alternate EOC that can be activated and used if the primary is destroyed, damaged, or not accessible. Interoperability share common principles of operations and exchange routine and time-sensitive information with other EOCs, e.g., be able to communicate with local government EOCs, emergency response teams at or near an incident site, state EOC. 1
3 A. LOCATION The EOC must be constructed in a location that will minimize the effects of any local hazards, cannot be in the 100 year flood plain, or change or alter listed or nationally designated historic sites or structures. It should also be located close to government offices or give easy access to agency representatives. B. SIZE The EOC must be sized to handle the maximum anticipated staff that would be called in the event of a major disaster. A minimum of 50 square feet per person is required (80 square feet preferred) including restrooms, etc. C. DESIGN CRITERIA The facility must be designed and built to comply with the Michigan Building Code This code addresses local hazards, high winds, snow loads, Americans with Disabilities Act (ADA) requirements, etc. D. ROOMS/SPACE The EOC must contain the following spaces/rooms to provide adequate working room: 1. Day-to-day office space for EMD Director and staff, including secretary/receptionist if applicable. 2. Meeting/lead agency/executive room. 3. Communications Room for radio/telephone and support equipment. 4. Operations room for emergency coordination. 5. Restrooms. 6. Mechanical/electrical switch room. 7. Kitchen/break area. 8. Storage area for maps, procedures, publications, supplies, etc. 2
4 E. OPERATIONS ROOM The Operations Room, where agency representatives will assemble, must provide the essential elements that will be needed during a disaster. It must be large enough to provide sufficient space for one or two representatives from each planned agency based on the list developed during the planning process. The Operations Room must also incorporate the following features: 1. Telephone lines and logs. 2. Status display capability (manual or video with large format). Maps Charts Logs 3. Computer, Internet, and network needs for automatic data processing square feet per person. F. COMMUNICATIONS During a disaster the, EOC must be able to communicate with the responders in the field. These communication capabilities must include: 1. Telephone lines for each agency and other levels of government planned in the Operations Room (such that each agency has telephone access). 2. Telephone lines for other support areas (Director s office, secretary, executives, etc.). 3. Adequate analog phone lines for computer modems. 4. FAX line and machine. 5. Local Area Network (LAN)or Wide Area Network (WAN) system if applicable. 6. Weather monitoring capability. 7. Access to Emergency Alert System (EAS). 8. Capability to activate local warning systems. 9. Electromagnetic protection for facility and antenna (lightning). 10. A Communications Room adjacent to the Operations Room sized to accommodate the maximum staff expected, including space for amateur radio. 11. Radios with frequencies to communicate with field personnel (police, fire, parks, highways, health, school transportation systems, hospitals, public works, utilities, Red Cross, the state and other counties, etc.). 12. Radio tower to support radio equipment (may be remotely located). 3
5 G. EMERGENCY POWER An emergency electrical power generator must be provided which is large enough to power the EOC and all facilities (HVAC, radios, elevator, computer systems, etc.), and is permanently wired with automatic start and transfer. It should be located so that noise or fumes do not interfere with the EOC and include a self-contained fuel system with a minimum four-day reserve. H. OPERATING PROCEDURES/AGREEMENTS It is mandatory that Standard Operating Procedures (SOP's) for managing the EOC during disaster activation be developed. In addition, when the EOC is located in a multiple use facility, such as a county jail, it is necessary that a Memorandum of Understanding (MOU) be developed and agreed to among the agencies using the facilities. The MOU should be explicit in outlining the use of the EOC, installation of antenna, and who bears the charges when the EOC is activated. I. PLANNING The first step in developing a new EOC is planning. Careful attention to detail will make execution of the project much easier. 1. Identify needs how will the facility be used? 2. Design for dual use the EOC is ideal for meetings and training. 3. Locate away from hazards, such as: Technological and nuclear facilities HAZMAT Railroads Highways Airfield landing paths Flood plains Pipelines High voltage power lines 4. Consider how the facility will be secured during activation. 5. Determine maximum staff size (see Suggested EOC Disaster Staff chart below). 6. Consider co-locating with 911 communications center or county jail. 7. If locating in an existing building, consider using basement or interior spaces. 8. Consider including showers in the restrooms. 9. Consider separate and adequate space for media assembly and briefing. 10. Develop a list of agency personnel that will staff the EOC during emergencies. 11. Consider a computer floor to facilitate reconfiguration of Operations Room. 12. Plan for an interruption of domestic water supply. 13. Consider fiber optics throughout the agency and/or connected to outside agencies. 4
6 I. PLANNING continued 14. Acquire a local radio frequency for disaster coordination. Become the jurisdiction s advocate for frequency coordination. 15. Consideration should be given to including the Operations Room with the following features: weather radar and other GIS high ceiling column free video status/shelter, etc. logs video tapes local TV/CNN 16. An additional transfer switch should be considered, so that additional generators can be plugged into the system. 17. When considering automation, the Emergency Management Division has developed the following guidelines for computer specifications. These guidelines are subject to change due to the ever-changing computer industry: Intel 800 MHz Pentium CPU with 256K or higher internal cache 256 MB RAM 20 GB Hard Drive min. 3.5 Diskette Drive 16 MB min. video card 56K Baud Fax/Data Modem or 10/100 MB Ethernet Card CD-ROM Drive (48x) SVGA 15 Graphics Monitor 5
7 Emergency Management Director Chief Executive(s) Public Information Officer Communication & Warning Officer State Liaison Radio Operators Telephone Attendants Disaster Assessment Officer Police Liaison Fire Liaison Public Works Liaison Shelter Operations Liaison Welfare Liaison Medical & Health Liaison Message Controller Messengers and Plotters Resource Officer Security Officer Suggested EOC Response Staff 6
8 The chart below gives some examples of Allowable and Non-Allowable Costs that would be considered in funding EOC construction. Refer to the allowable funding categories of the particular grant being pursued. Allowable Costs Design fees Excavations for construction Building shell construction and interior finishing Modifications to existing building Antenna and towers Heating, ventilating, and air conditioning equipment Display equipment for Operations Room Furniture for Operations Room Radio/communication equipment Emergency generator Kitchen/break room equipment Non-Allowable Costs Plumbing, electric Antenna and towers Landscaping Parking lots Construction of non-ema space Space less than 50 sq. ft. per person Equipment designed for daily non-ema use Maintenance Land purchase Demolition 7
EOC Assessment Checklist
EOC Assessment Checklist INTRODUCTION The following checklist will assist State and local governments in performing the initial assessment of the hazards, vulnerabilities, and resultant risk to their existing
Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.
CITY OF HOUSTON Office of Emergency Management October 2004 Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations. Houston is exposed
Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all hospitals. These criteria will
CEMP Criteria for Residential Treatment Facilities
CEMP Criteria for Residential Treatment Facilities Lee County Emergency Management The following minimum criteria are to be used when Comprehensive Emergency Management Plans (CEMP) for all Residential
Emergency Management Planning Criteria For Residential Treatment Facilities
Emergency Management Planning Criteria For Residential Treatment Facilities The following minimum criteria are to be used for Comprehensive Emergency Management Plans (CEMP) for Therapeutic Group Homes
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS The following criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all ambulatory surgical
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR ADULT DAY CARE FACILITIES
The following criteria are to be used for the development of Comprehensive Emergency Management Plans (CEMP) for Adult Day Care (ADC). The criteria will serve as a recommended plan format for the CEMP,
CROSS-REFERENCE FOR COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RESIDENTIAL TREATMENT CENTERS FOR CHILDREN AND ADOLESCENTS
CROSS-REFERENCE FOR COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RESIDENTIAL TREATMENT CENTERS FOR CHILDREN AND ADOLESCENTS (Based upon AHCA Criteria dated July 2006) The document below is the cross-reference
THE VIRTUAL EMERGENCY OPERATIONS CENTER: AN INTERNET APPROACH TO EMERGENCY MANAGEMENT WORK
THE VIRTUAL EMERGENCY OPERATIONS CENTER: AN INTERNET APPROACH TO EMERGENCY MANAGEMENT WORK by Walter G. Green III, Ph.D., VaPEM Assistant Professor of Emergency Management University of Richmond A Paper
How To Handle An Emergency
Company Name Address Telephone Contact Name Title Last Revision Date Policy and Organizational Statements Identify the goals and objectives for the emergency response plan. Define what your emergency response
NURSING HOME STATUE RULE CRITERIA
NURSING HOME STATUE RULE CRITERIA Page 1 of 11 Nursing Homes Statutory Reference 8 400.23 (2)(g), Florida Statutes Rules; criteria; Nursing Home Advisory Committee; evaluation and rating system; fee for
ADULT DAY CARE CENTER
ADULT DAY CARE CENTER STATUTE RULE CRITERIA Current until changed by State Legislature or AHCA Adult Day Care Centers Statutory Reference 1 400.562, Florida Statutes Rules establishing standards. (1) The
PUBLIC SAFETY FIRE. Functional Coordinator: Fire Chiefs
Option for Public Safety or Tasks can be combined with Law Enforcement depending on jurisdiction PUBLIC SAFETY FIRE Functional Coordinator: Fire Chiefs Purpose This function provides procedures for preparedness,
Emergency Management Planning Criteria for Nursing Home Facilities (Criteria)
Emergency Management Planning Criteria for Nursing Home Facilities (Criteria) The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing
AMBULATORY SURGICAL CENTERS (Based upon AHCA Form # 3130-2003 JUL 94)
(Based upon AHCA Form # 3130-2003 JUL 94) The document below is the cross-reference used by Palm Beach County Division of Emergency Management for the annual review and re-certification of your CEMP. Review
ANNEX 9. PUBLIC INFORMATION AND WARNING
ANNEX 9. PUBLIC INFORMATION AND WARNING Rapid dissemination of warning and emergency information about an imminent or occurring emergency is critical to protecting life, safety, and health during an emergency.
The Emergency Operations Plan provides guidance for managing emergency communications resources.
Emergency Support Function #2 - Communication ESF # 2 Primary Agency Office of Emergency Preparedness Information Technology University Relations 911 Centers Secondary/Support Agencies Law Enforcement
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH DOCUMENTS YOU WILL NEED 1. Building Permit Residential Basement Finish Package 2. Contractors copy of state and business license ADDITIONAL FORMS YOU MAY NEED
CURRENT ISSUES IN LOCAL EMERGENCY MANAGEMENT. Alan S. Harris, Emergency Manager Seminole County Office of Emergency Management
CURRENT ISSUES IN LOCAL EMERGENCY MANAGEMENT Alan S. Harris, Emergency Manager Seminole County Office of Emergency Management 1 The Basics All-Hazards Approach to Planning State of Florida is vulnerable
BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS
DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE
EMERGENCY MANAGEMENT ORGANIZATION
VI. EMERGENCY MANAGEMENT ORGANIZATION General 1. The overall responsibility for emergency preparedness rests with government on all levels, including all agencies of state, county and city in coordination
It also provides guidance for rapid alerting and warning to key officials and the general public of a potential or occurring emergency or disaster.
Emergency Support Function #2 Communications ESF Coordinator: Information Technology Department Support Agencies: Tucson Fire Department Parks and Recreation Department Tucson Police Department Tucson
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
D Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
RISD Hurricane Preparedness
RISD Hurricane Preparedness Hurricane It is the policy of RISD to view each hurricane threat as an extremely hazardous condition. As such, our goal is to minimize the risk to personnel consistent with
REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES
REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES Joint City-County Planning Commission of Barren County, Kentucky 126 East Public Square City Hall Glasgow, KY 42141 A. PURPOSE:
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form)
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (Company) FAC. TYPE: ASC STATE RULE: 59A-5, F.A.C CONTACT PERSON:
BRYN MAWR COLLEGE EMERGENCY RESPONSE PLAN Revised 3/17/08 (abridged)
BRYN MAWR COLLEGE EMERGENCY RESPONSE PLAN Revised 3/17/08 (abridged) This document is a synopsis of the planning and preparation the College has undertaken to handle emergencies in a professional, efficient,
*****IMPORTANT SUBMITTAL INFORMATION*****
The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing Homes. The criteria serve as the required plan format for the CEMP, and will
AMBULATORY SURGICAL CENTERS
AMBULATORY SURGICAL CENTERS STATUTE RULE CRITERIA Current until changed by State Legislature or AHCA Hospitals and Ambulatory Surgical Centers Statutory Reference 3 395.1055 (1)(c), Florida Statutes Rules
Hospital Emergency Operations Plan
Hospital Emergency Operations Plan I-1 Emergency Management Plan I PURPOSE The mission of University Hospital of Brooklyn (UHB) is to improve the health of the people of Kings County by providing cost-effective,
Emergency Management Planning Criteria for Hospital Facilities (State Criteria Form)
Emergency Management Planning Criteria for Hospital Facilities (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (Company) ST. LIC. NO.: FIELD (Lic. #) FAC. TYPE: Hospital STATE RULE: 59A-3.078
9,940 SF Office Building
204 East Rhapsody Drive, San Antonio, Texas 78216 BUILDING SIZE 9,940 Sq. Ft. (According to Bexar Appraisal District) LAND SIZE 0.6862 Acre or 29,890 Sq. Ft. (According to Bexar Appraisal District) BUILDING
Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54
ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS Item #: 1, 4, 46, 53, 54 II. PURPOSE The purpose of this annex is to describe the organization, operational concepts and responsibilities
MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS
CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this
ANNEX B COMMUNICATIONS
ANNEX B COMMUNICATIONS APPROVAL & IMPLEMENTATION Annex B Communications This emergency management plan is hereby approved. This plan is effective immediately and supersedes all previous editions. Jeff
I. PURPOSE II. SITUATION AND ASSUMPTIONS
I. PURPOSE This annex describes the processes for providing reliable and effective communications among organizations participating in an emergency operation. This Annex is designed to support the City
HOSPITALS STATUTE RULE CRITERIA. Current until changed by State Legislature or AHCA
HOSPITALS STATUTE RULE CRITERIA Current until changed by State Legislature or AHCA Hospitals and Ambulatory Surgical Centers Statutory Reference' 395.1055 (1)(c), Florida Statutes Rules and Enforcement.
EMERGENCY PROCEDURES Revised July 2007. Do Not Remove
ROANE STATE COMMUNITY COLLEGE EMERGENCY PROCEDURES Revised July 2007 The Department of Public Safety EMERGENCY (Police, Fire or Ambulance): 911 Do Not Remove MEDICAL EMERGENCY ON CAMPUS Minor Injuries/Illnesses
DRAFT AFTER ACTION REPORT/IMPROVEMENT PLAN
f[note for Template: Text found in this document that is highlighted and bracketed is included to provide instruction or to indicate a location to input text. All text that is not highlighted is to be
EMERGENCY PREPAREDNESS TEMPLATE
EMERGENCY PREPAREDNESS TEMPLATE *This template is designed to help facilities keep track of emergency preparedness information. The fields can be typed in online or the form can be printed out and done
EMERGENCY MANAGEMENT PLANNING & COMPLIANCE REVIEW CRITERIA FOR NURSING HOMES [FL RULE CHAPTER 59A-4.126 F.A.C]
EMERGENCY MANAGEMENT PLANNING & COMPLIANCE REVIEW CRITERIA FOR NURSING HOMES [FL RULE CHAPTER 59A-4.126 F.A.C] Notice: Facilities must submit their plans with the appropriate page numbers shown in the
E Functional Annex Damage Assessment
E Functional Annex Damage Assessment Approved (September 14, 2004) This page left blank intentionally Table of Contents 1 Purpose... 3 2 Situation and Assumptions... 3 2.1 Situation... 3 2.2 Assumptions...
Datacenter Assessment
The Netmagic team has compiled this Checklist to help you evaluate, compare and select datacenter facilities to meet your hosting, business continuity and disaster recovery needs. Based on industry best
Draft 8/1/05 SYSTEM First Rev. 8/9/05 2 nd Rev. 8/30/05 EMERGENCY OPERATIONS PLAN
Draft 8/1/05 SYSTEM First Rev. 8/9/05 2 nd Rev. 8/30/05 EMERGENCY OPERATIONS PLAN I. INTRODUCTION A. PURPOSE - The University of Hawaii System Emergency Operations Plan (EOP) provides procedures for managing
Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT
Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE Sec. 58.1. Division D-O occupancies. 58.2. Separation and mixed occupancy. OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM
MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS
MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively
All Emergency Operations Plan Le Parc Condominium. 4951 Gulf Shore Blvd N. Naples, FL 34103
All Emergency Operations Plan Le Parc Condominium 4951 Gulf Shore Blvd N. Naples, FL 34103 Revised June 2014 All Emergency Operations Plan for Le Parc Condominium 4951 Gulf Shore Blvd N., Naples, FL 34103
Emergency Response Network in Your Community. Paul Haley Emergency Management Coordinator City of Trenton
Emergency Response Network in Your Community Paul Haley Emergency Management Coordinator City of Trenton Your Local Emergency Management Support What we are going to cover Objectives Questions anytime
Table of Contents ESF-12-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 2 Purpose... 3 Situations and Assumptions... 4 Direction and
NFPA 1616 Mass Evacuation and Sheltering. Starting a Standard 101 NFPA 1616 5/1/2014. Orlando P. Hernandez. Dean Larson. NFPA must follow ANSI rules
NFPA 1616 Mass Evacuation and Sheltering Orlando P. Hernandez Dean Larson Starting a Standard 101 NFPA must follow ANSI rules For writing For revising standards Important Balanced representation on technical
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES
TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812
TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property
Performs the Federal coordination role for supporting the energy requirements associated with National Special Security Events.
ESF Coordinator: Energy Primary Agency: Energy Support Agencies: Agriculture Commerce Defense Homeland Security the Interior Labor State Transportation Environmental Protection Agency Nuclear Regulatory
Implementation Date: May 5, 2009. Table of Contents. Section Description Page. 1.0 Description 1. 2.0 Initial Response 2
Recommended by Emergency Preparedness Committee: April 21, 2009 Recommended by President s Council: May 1, 2009 Approved by Executive Committee: May 5, 2009 NAIT Procedures CS1.2.6 Flood Implementation
ESF-9 LAW ENFORCEMENT
ESF-9 LAW ENFORCEMENT CONTENTS PAGE I. PURPOSE ESF 9.1 II. SITUATIONS AND ASSUMPTIONS ESF 9.1 A. Situations ESF 9.1 B. Assumptions ESF 9.1 III. CONCEPT OF OPERATIONS ESF 9.2 A. General ESF 9.2 B. Operational
Emergency Management Planning Criteria for Assisted Living Facilities (State Criteria Form)
Emergency Management Planning Criteria for Assisted Living Facilities (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (ALF Company) ST. LIC. NO.: FIELD (Lic. #) FAC. TYPE: ALF STATE RULE:
MAJOR PLANNING CONSIDERATIONS CHECKLIST
MAJOR PLANNING CONSIDERATIONS CHECKLIST The following checklist is provided as a guide to assure that relevant considerations are identified in the emergency management planning process. Use the blank
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms U.S. Department of the Interior Bureau of Indian Affairs Division of Safety and Risk Management Introduction
SUBJECT CAN: 2-108. Temporary Systems, Utilities and Equipment. Effective: 4/09/2013. CODE SECTION 2010 California Building Code (CBC)
Facilities Development Division Office of Statewide Health Planning and Development 400 R Street, Suite 200 Sacramento, CA 95811 (916) 440-8300 700 N. Alameda Street, Suite 2-500 Los Angeles, CA 90012
OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN
OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN Last Edit 2/8/2011 OVERVIEW This document provides a management framework for responding to incidents that may threaten the health and safety of
ON-SITE INCIDENT MANAGEMENT
ON-SITE INCIDENT MANAGEMENT Capability Definition Onsite Incident is the capability to effectively direct and control incident activities by using the Incident Command System (ICS) consistent with the
PSEG Site ESP Application Part 5, Emergency Plan
SECTION 7 EMERGENCY COMMUNICATIONS 1.0 The Plan provides for establishing communications on a continuous (24 - hours per day) basis with the following organizations: 1) The State of New Jersey 2) The State
Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc
By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER
DIVISION OF EMERGENCY MANAGEMENT
DIVISION OF EMERGENCY MANAGEMENT PROGRAM DESCRIPTION The Florida Division of Emergency Management (DEM) is responsible for maintaining a comprehensive statewide program of emergency management. In addition,
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
Emergency Support Function 14 Long-Term Community Recovery and Mitigation
ESF Coordinator: Grant County Emergency Management Primary Agencies: Grant County Emergency Management Grant County Assessor s Office Grant County Public Works Grant County Building Department Support
USER GUIDE. Access to the Server is via the following webpage: www.admin.airgoosignage.co.uk
USER GUIDE The A+K Airgoo Digital Signage MicroPlayer is a totally new generation of product with wireless capabilities and innovative features. It is designed to operate with our Digital Signage Server
Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee
Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update July 16, 2015 Policy Committee FEMA Map Update Costal Analysis and mapping study by FEMA in 2009 Changes
POINT UNIVERSITY CAMPUS SECURITY Emergency Response Plan
POINT UNIVERSITY CAMPUS SECURITY Emergency Response Plan Introduction The Point University Emergency Response Plan establishes guidelines for campus-wide communication, service coordination and safety
Communications Systems Used in the USA TARNS. Chris Hill, Meteorologist in Charge (ret) National Weather Service Seattle, Washington, USA
Communications Systems Used in the USA TARNS Chris Hill, Meteorologist in Charge (ret) National Weather Service Seattle, Washington, USA Washington Faces Many Non-Weather Hazards Earthquakes Tsunamis Terrorism
Mt. San Antonio College Campus Emergency Response and Evacuation Plan
Mt. San Antonio College Campus Emergency Response and Evacuation Plan The Mt. SAC Board of Trustees is committed to providing a safe and secure campus work and learning environment for students, employees,
ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning
Understanding the Hospital Planning, Design, and Construction Process Introduction California s acute care hospitals are an essential health care resource that serve a wide range of patients during times
FOR EXISTING 254-FOOT COMMUNICATIONS TOWER 16700 Skyline Drive La Habra Heights California
MASTER PLAN FOR EXISTING 254-FOOT COMMUNICATIONS TOWER 16700 Skyline Drive La Habra Heights California PROPERTY OWNER: Coast Community College District 1370 Adams Avenue Costa Mesa, CA 92626 Attn: Richard
Department of Public Safety, Division of Homeland Security and Emergency Management. Emergency Alert System Survey
Department of Public Safety, Division of Homeland Security and Emergency Management Emergency Alert System Survey Prepared on 6/24/2011 Introduction In July of 2010 the Minnesota Department of Public Safety,
DEPARTMENT OF PLANNING AND DEVELOPMENT
DEPARTMENT OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FOR NON-RESIDENTIAL DEVELOPMENT Property Owner Telephone Street/P.O. Box City State ZIP Agent (if any) Relationship to Property
Using Industrial Ethernet Switches to Assure Maximum Uptime White Paper
Six Best Practices for Effective Wind Farm Operation Using Industrial Ethernet Switches to Assure Maximum Uptime White Paper Six Best Practices for Effective Wind Farm Operation Using Industrial Ethernet
BS5839 Part 1:2002 Overview
BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire
Maryland Emergency Operations Plan
Maryland Emergency Operations Plan Purpose The purpose of the Maryland Emergency Operations Plan (EOP) is to outline an approach and designate responsibilities intended to minimize the consequences of
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
Before the Federal Communications Commission Washington, D.C. 20554 ) ) ) ) ) ) ORDER. Adopted: September 17, 2015 Released: September 17, 2015
Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of STATE OF MICHIGAN Request for Waiver of Section 90.179(a of the Commission s Rules ORDER Adopted: September 17, 2015
SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES
1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee
UNION COLLEGE INCIDENT RESPONSE PLAN
UNION COLLEGE INCIDENT RESPONSE PLAN The college is committed to supporting the safety and welfare of all its students, faculty, staff and visitors. It also consists of academic, research and other facilities,
Single Family Residential Basement Finish
How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete
Hazard Identification and Risk Assessment
Wildfires Risk Assessment This plan is an update of the 2004 City of Redmond Hazard Mitigation Plan (HMP). Although it is an update, this document has been redesigned so that it looks, feels, and reads
Idaho State Alert & Warning System
ISAWS to the Idaho Bureau of Homeland Security s Idaho s mass notification and public warning system providing alerts and warnings to Idahoans in regard to emergency situations and disasters. ISAWSIntroduction
ADMINISTRATIVE CODE CHAPTER 1
CHAPTER 1 ADMINISTRATIVE CODE SECTION 101 TITLE AND SCOPE 101.1 Title. This document is The North Carolina Administrative Code and Policies, hereinafter known as this code. Any references to International