1 ABN Level Collins Street Melbourne Victoria 3000 Australia Tel: +61 (0) Fax: +61 (0) Website: QUARTERLY ACTIVITY REPORT TO 30 JUNE 2012 HIGHLIGHTS FOR THE QUARTER Operational Matters Processing of new Winchester 3D data acquired in WA-323-P and WA-330-P nearing completion Shell rig to drill the Palta-1 well in WA-384-P scheduled for Q and processing of newly acquired Tortilla 2D seismic survey data underway Processing of the new 3D seismic surveys in Southern Bonaparte Basin permits progressing Matuku prospect in PEP confirmed by OMV as a valid structural closure at the target levels, with estimated mean recoverable resource of approximately 65 million barrels Re-processing of 2D seismic data in PEP and PEP completed Corporate Activity Payment of fully franked in-specie Special Dividend of Cue Shares and Petrel Shares Appointment of independent non-executive Director No call on Partly Paid Shares before 31 March 2014 PERMIT INTERESTS HELD Octanex N.L. (ASX Code: OXX), in its own name and through its wholly-owned subsidiaries, currently holds working interests in 17 petroleum exploration permits and residual and royalty interests in three other such permits that are situated in the offshore basins of Australia and New Zealand. The Australian permits are concentrated on the Greater North West Shelf offshore from Western Australia in regions of moderate to intense exploration activity. In addition to the Australian based permits, Octanex holds interests in four strategically located permits in the offshore Taranaki Basin of New Zealand, a region of intense exploration activity see following Location Map of Portfolio of Permits. The policy underlying the management of the Octanex group s permits and related interests is one which, insofar as is practical and both legally and commercially expedient, does not differentiate between whether they are owned by Octanex N.L. directly, or indirectly through one or more of its wholly-owned subsidiaries. These interests and assets are all referred to in this report as being held by Octanex or the Company or the Octanex Group.

2 2 Location Map of the Octanex Group s Portfolio of Permits OPERATIONAL MATTERS Carnarvon Basin Interests WA-323-P & WA-330-P Dampier Sub-Basin These permits are held by a Joint Venture consisting of: Santos Offshore Pty Ltd 75% and Operator (subsidiary of Santos Limited) Octanex Group 25% WA-323-P and WA-330-P comprise a discrete project area for the exploration of 640 km² see the following WA-323-P & WA-330-P Location Map. The permits were each granted 5 year renewals in April A farmin agreement entered into with a subsidiary of Santos Limited (ASX Code: STO), Santos Offshore Pty Ltd (Santos), means the Octanex Group will be free carried in respect of its 25% interest in both permits through a 3D seismic survey across the permits, the first well in one of the permits and all other exploration costs for the two permits. In Q4 2011, Santos completed the new Winchester 3D seismic survey that acquired approximately 720 km² of new data within and adjacent to the permits. The data is undergoing processing that is currently scheduled to be completion in Q Santos has also entered into an assignment agreement in relation to the Ensco 109, a jack-up drilling rig. The rig is contracted to drill the farmin obligation well into the Winchester prospect from a yet to be determined location within the area of the WA-323-P permit. The rig slot assigned to Santos has the well currently scheduled to be drilled in Q

3 3 WA-323-P & WA-330-P Location Map WA-362-P &, WA-363-P Exmouth Plateau The WA-362-P and WA-363-P Joint Ventures both now consist of the following parties: Eni Australia Limited (Eni) % and Operator Octanex Group % These two permits, plus the further two Exmouth Plateau permits detailed in the following section, cover an aggregate area of approximately 26,830 km 2. The four permits are located on the northern margin of the Exmouth Plateau, km north-west of the Western Australian coastline see the following Location Map of Exmouth Plateau Permits. During Q4 2011, OMV Australia Pty Ltd (OMV) withdrew from both the WA-362-P and WA-363-P permits and their associated Joint Ventures. As a consequence, OMV s 40% interest in both permits was assigned to the Octanex Group (as to %) and Eni (as to %), increasing the two companies interests to the percentages detailed above. The Joint Venture of the Octanex Group and Eni lodged applications to renew both of WA-362-P and WA-363-P for 5 year terms. A regulatory requirement for the grant of a renewed term is that half of the original area of the permit be relinquished. If granted, the renewed WA-362-P and WA-363-P permits will be as displayed in the following map of the Areas Applied for Renewal WA-362-P and WA-363-P. The committed work programme in the first three years of both renewed terms calls for seabed coring and studies. This is then followed by a new 3D seismic survey and an exploration well in the last two years of each term.

4 4 Areas Applied for Renewal WA-362-P & WA-363 Location Map of Exmouth Plateau Permits

5 5 WA-386-P & WA-387-P Exmouth Plateau During the quarter and subsequent to the end of the quarter, OMV and Eni respectively gave notice of their withdrawal from the WA-386-P and WA-387-P permits and their associated Joint Ventures. These withdrawals will be effective from the expiry of the initial terms of both of the permits on 20 August As a consequence, and subject to the re-assignment of the OMV and Eni interests, the Octanex Group will hold a 100% participating interest in both permits. A review of the prospectivity of the two permits has been ongoing with a view to determining the best future exploration programmes. This review will determine the form of any renewal applications for WA-386-P and WA-387-P that may be made on the expiry of their initial terms in August WA-384-P, WA-385-P & WA-394-P Southern Exmouth Sub-Basin These three permits are located in the Southern Exmouth Sub-basin and the Octanex Group holds interests in them that consist of reversionary and residual interests, not working or participatory interests see the following Location Map.

6 6 The Company previously concluded an agreement with Shell Development (Australia) Pty Ltd (Shell) for the disposition to Shell of a 100% working interest in each of the WA-384-P, WA-385-P and WA- 394-P permits. Octanex holds residual rights in each of the permits in the form of discovery payments and royalties, as well as rights of reconveyance. Shell has a commitment to drill the Palta-1 well in WA-384-P prior to 20 August 2013, being the expiry date of the extended year-6 of the permit s initial term. Shell has contracted the semi-submersible rig, Noble Clyde Boudreaux, to drill the Palta-1 gas exploration well; with drilling currently scheduled to commence in Q It will be drilled in water depths of approximately 1350m and to a total depth of greater than 5000m. Shell has secured environmental approval for the well under the EPBC Act and is seeking final approvals to undertake the drilling activity. Just prior to the end of Q1 2012, Shell acquired the 783 km Tortilla 2D marine seismic survey in WA- 385-P. The survey was acquired off the North West Cape of Western Australia, largely within the area of the permit. The survey also acquired tie lines between the planned location for the Palta-1 well (to be drilled in WA-384-P to the north) and the previously drilled wells of Herdsman-1 and Pendock-1A to the south and Falcone-1A to the north-east. The acquisition of the Tortilla 2D survey was timed to avoid the humpback whale migration. As part of a range of management measures, Shell elected that the seismic survey would not come within a 10 km buffer zone to the outer boundary of the Ningaloo World Heritage Area. The Tortilla 2D survey is the final work commitment for the WA-385-P permit in the current term. Shell was initially required to make a decision by 21 February 2011 to commit to drill a well in WA- 394-P or re-assign a 100% interest in the permit to Octanex if no drilling commitment was made. Octanex agreed to defer Shell s requirement to drill a well until year-3 of any renewal of this permit, if and when renewed, on the basis that Shell applied to vary the Year 6 permit work programme. During the previous quarter, Shell was granted the variation and will carry out a trial reprocessing of 110 km of existing seismic data from within the WA-394-P permit. Southern Bonaparte Basin Interests Octanex holds interests in six petroleum exploration permits in the offshore Southern Bonaparte Basin. Those permits are WA-407-P, WA-420-P, WA-421-P, WA-422-P, WA-440-P and WA-441-P and they are displayed in the following Location Map of Southern Bonaparte Basin Permits. WA-407-P, WA-420-P, WA-421-P, WA-441-P & WA-440-P Southern Bonaparte Basin Octanex holds a 100% interest in four adjacent permits (WA-407-P, WA-420-P, WA-421-P and WA- 441-P) that encompass 232 graticular blocks and comprise approximately 18,950 km² in total in the Southern Bonaparte Basin. Octanex also holds a 100% interest in the WA-440-P permit that is situated south-east of the other four and is also within the Southern Bonaparte Basin. WA-440-P encompasses 52 graticular blocks and comprises approximately 4,310 km². These five permits are displayed in the Location Map. As detailed in the following section on the WA-422-P permit, Octanex farmed into and acquired a 60% interest in WA-422-P. That permit adjoins WA-420-P and WA-421-P (see the Location Map). During Q and Q1 2012, the Company acquired six new seismic surveys that fulfilled the Year 2 and 3 work programme commitments of their respective permits to acquire either new 2D or 3D data. One survey is located within each of the six permits detailed above. The 2D surveys acquired were the 959 km Kingfisher survey (in WA-421-P), the 653 km Hawk survey (in WA-441-P) and the 556 km Falcon survey (in WA-440-P) see the relevant survey grids in the Location Map of Southern Bonaparte Basin Seismic Surveys below. Processing of these three 2D surveys was completed during the quarter and interpretation work on each of them has commenced.

7 7 The 3D surveys acquired were the 426 km² Ascalon survey (in WA-407-P), the 501 km² Tamar survey (in WA-420-P) and the 331 km² Rissa survey (in WA-422-P) see the relevant polygons in the Location Map of Southern Bonaparte Basin Seismic Surveys below. Processing of two of the 3D surveys, Ascalon and Rissa, was completed during the quarter and delivery of the new data is imminent. As detailed below, the Tamar 3D survey is being processed in conjunction with two vintage 3D surveys that were acquired to the north; the Adventurer and Dunnart 3D surveys. The processed Tamar and integrated data is due for delivery during Q Location Map of Southern Bonaparte Basin Permits and Seismic Surveys The new 2D seismic data acquired by the Kingfisher survey, when combined with relevant preexisting and recently reprocessed 2D data, are expected to provide coverage of a play concept over an area of some 2,500 km² within the WA-421-P and WA-420-P permits. The play extends from WA- 420-P into WA-421-P and the new Tamar 3D survey shot in WA-420-P was acquired to further evaluate what is an extensive play type.

8 8 The Kingfisher and Tamar surveys are linked in their endeavour to identify potential oil and gas targets, based on a play concept where the inferred source of the hydrocarbons is the Sahul Syncline. The interpreted migration pathway is along the Tamar Nose structural high in WA-420-P and into the north-eastern corner of the WA-421-P permit. The Tamar Nose is a north-east/south-west trending structural high that extends down into the Sahul Syncline source kitchen, and is seen as a natural focus for hydrocarbons migrating towards the southern Londonderry High. The Tamar survey area is located on the Tamar Nose, which is only lightly covered by vintage 2D seismic surveying that is not presently sufficient to define trap closures. Three of the four wells drilled on the Tamar Nose have oil shows, while the fourth well, Tamar-1 drilled in 1979, was not located on a valid trap. To the north of the Tamar 3D survey area are two 3D seismic surveys; the Adventurer 3D and the Dunnart 3D. These vintage 3D surveys are expected to benefit from modern reprocessing of this data that Octanex plans to carry out as an adjunct to the newly acquired Tamar 3D data. Together, the two (reprocessed) vintage 3D surveys and the new Tamar 3D survey will constitute 3D seismic coverage of an exploration area of over 1200 km², most of which is contained within WA-420-P. The target sandstone reservoirs of the Tamar 3D survey are the Early Cretaceous to Late Jurassic, Sandpiper Sandstone, the Late Jurassic Elang Formation and the Middle Jurassic Plover Formation. The Sandpiper Sandstone and Elang Formation/Plover Formation reservoirs are separated by the Late Jurassic Frigate Shale sealing marine claystones. The Hawk 2D survey was acquired over leads in the north-western and central part of the WA-441-P permit. Interpretation of vintage 2D seismic data in the area of the survey indicated the presence of targets draped over basement topography. The Hawk survey was designed to identify whether these leads may form closed traps. The Falcon 2D survey was acquired over leads in the north-eastern part of the WA-440-P permit where interpretation of vintage 2D seismic data in the area of the survey has defined several structural leads. As with the Hawk survey, the Falcon survey was designed to identify whether these leads may form closed traps. The Ascalon 3D survey area is located on a north-east structural trend between the Saratoga-1 and Ascalon-1 gas discovery wells in the western sector of the WA-407-P permit. The objective of the survey is to enable more precise mapping of the Early Cretaceous Sandpiper Formation sandstone play and the deeper Late Permian, Tern and Cape Hay sandstone plays of the Hyland Bay Formation. Although gas was discovered in the Early Cretaceous Sandpiper sandstone in Saratoga-1, there is the possibility that oil may be present in the leads defined on vintage 2D in the Ascalon 3D survey area as, unlike the Saratoga discovery, they are not located directly over the main structural fault that would have provided a conduit for gas to reach the Early Cretaceous Sandpiper Formation. The Late Permian is a gas play. WA-422-P Southern Bonaparte Basin The Joint Venture for the permit consists of: Goldsborough Energy Pty Ltd (subsidiary of Octanex N.L.) National Oil Corporation Pty Ltd % Ultragas Pty Ltd 9.375% Ultragas Resources Pty Ltd 3.125% (subsidiary of Ultragas Pty Ltd) % and Operator In Q3 2011, Octanex acquired a 60% interest in this permit, which comprises approximately 4,605 km² in the Southern Bonaparte Basin, as displayed in the Location Map above.

9 9 The Company s wholly-owned subsidiary, Goldsborough Energy Pty Ltd (Goldsborough), holds the 60% interest and has become the Operator for the permit. The interest was acquired through a farmin arrangement and the transfer of the interest has received the necessary regulatory approvals. Under the terms of the farmin agreement, the Company agreed to conduct, at its cost, a new 3D seismic survey within the WA-422-P permit and meet the costs of reprocessing existing 2D seismic data. The Rissa 3D seismic survey (mentioned in the previous section) fulfilled the seismic acquisition obligation of the farmin agreement, with acquisition completed during the previous quarter. The Rissa 3D survey area is located on the northern end of the Londonderry High, which is seen as a potential natural focus for oil migration. To the north of the Rissa survey area there are several oil fields (Kuda Tasi, Coralina, Laminaria, Jahal/Buffalo and Kitan); while the presence of residual oil columns in exploration wells within and to the south of the survey area indicates the existence of an oil migration route through the survey area. Leads identified on vintage 2D seismic data possess similar west to east oriented horsts and tilted fault blocks to those in the oil discoveries to the north of the Rissa survey area. The poor resolution of the vintage 2D restricts clear definition of trap closure and cross fault seal juxtaposition. Hence there was a need to acquire a modern 3D seismic dataset to better resolve the leads within the Rissa survey area at the target reservoirs of the Early Cretaceous Sandpiper sandstones and Jurassic Elang and Plover formations. Browse Basin Interests WA-342-P Browse Basin This permit is held by the Cornea Joint Venture which consists of the following interests: Coldron Group % Moby Oil & Gas Limited (ASX Code: MOG) % Octanex Group % Cornea Petroleum Pty Ltd % Cornea Oil & Gas Pty Ltd 8.500% Auralandia N.L % The Operator of the Cornea Joint Venture is now Cornea Resources Pty Ltd. On 4 January 2011, the Joint Venture was granted a renewal of the WA-342-P permit for a 5 year term see the WA-342-P Location Map below. The committed work programme in the first three years of the renewed term calls for studies and an exploration well; followed by reprocessing of 3D seismic and further studies in the last two years of the term The studies in relation to the permit and the Cornea structure continue, as do discussions with potential farminees.

10 10 WA-342-P Location Map Taranaki Basin Interests As displayed in the following Taranaki Basin Permit Location Map, the Company holds interests in four petroleum exploration permits in the offshore Taranaki Basin, namely PEP 51906, PEP 52593, PEP and PEP Octanex s interests in the offshore Taranaki Basin covers over 7000 km² in New Zealand s premier oil producing basin. The group subsidiary, Octanex NZ Limited, holds the interests in the four permits. PEP TARANAKI BASIN The PEP Joint Venture consists of: OMV New Zealand Limited (OMV) 65% and Operator Octanex Group 35% The PEP permit covers an area of 1,613 km² and is adjacent to three producing fields; the Maui gas/condensate field to the east (which has been in production since 1979), the Tui oil field to the north-east (which has been producing since 2008) and the Maari/Manaia fields to the south (which commenced production in 2009) see the Location Map below. The Company previously entered into a farmin agreement with OMV under which it assigned a 65% participating interest in PEP to OMV; with Octanex retaining a 35% participating interest. Part of the farmin terms were that OMV agreed to acquire and meet the costs of the acquisition, processing, mapping and interpretation of a new 270 km² 3D seismic survey over the Matuku structure within PEP The Matuku 3D programme was completed in 2011, with mapping and interpretation of the data completed in Q

11 11 Taranaki Basin Permit Location Map As a result of the work done on the new 3D data, OMV advised Octanex during the quarter that its mapping of Matuku confirmed it as a valid structural closure at the target levels, with estimated mean recoverable resource, if there are hydrocarbons in the Matuku prospect, of approximately 65 million barrels. In conjunction with the mapping and interpretation of the Matuku 3D data, OMV has undertaken a variety of studies including basin modelling, vitrinite reflectance analysis and a wide-ranging assessment of the potential for adequate reservoir within the area of the Matuku prospect. The central outcome from the mapping, interpretation and related studies that confirmed the prospect is that OMV commenced well planning and the acquisition of the long lead time items required for a well. Prior to the end of the quarter, OMV commenced actively seeking a suitable rig in order to drill Matuku-1 and, if a rig can be secured, the current objective is for drilling to commence in the first half of 2013.

12 12 Under the terms of the Farmin Agreement between Octanex and OMV, OMV must commit to the drilling of a well within PEP by 19 November 2012, or reassign its 65% participating interest to Octanex. If OMV makes that drilling commitment, it will then meet 100% of the costs of drilling the well. OMV has not yet made this drilling commitment. The studies undertaken by OMV indicate that the Matuku prospect is robust. It has a perceived low risk associated with the existence of the structure, presence of suitable reservoir rock and adequacy of seal. OMV s basin modelling studies further suggest the presence of a substantial source kitchen (within the Kahurangi Trough to the immediate south and west of the prospect) that is mature for the generation of oil. PEP TARANAKI BASIN The PEP Joint Venture consists of: OMV New Zealand Limited (OMV) 65% and Operator Octanex Group 35% PEP adjoins the western boundary of PEP see the Location Map above. It covers an area of 1,146 km² and has an extensive grid of 2D seismic data of various vintages covering the southern, western and north-eastern sections of the permit area. Based on previous successful drilling results in areas close to PEP 53537, the Kapuni Group plays are seen to be the most prospective for the permit, although possible targets in the Moki Formation will also be analysed. The work programme commitments for the initial period of PEP are to undertake geological studies, reprocess 400 km of existing 2D seismic data and acquire 100 km of new 2D seismic data and 18 km² of new 3D seismic data. In conjunction with the Matuku 3D seismic survey in PEP and PEP 53537, the seismic vessel carried out the 2D seismic survey in PEP required under the work programme. Processing of all the new data was completed in Q and detailed interpretation and mapping is ongoing in conjunction with the newly reprocessed data. The initial phase of that interpretation work was completed early in the quarter. PEP TARANAKI BASIN Octanex holds a 100% interest in PEP The permit covers an area of over 3,500 km² and, like PEP and PEP 53537, is located in the offshore Taranaki Basin see the Location Map above. The Company acquired all relevant available seismic data across the area of the permit and reprocessing of this existing seismic data was completed in Interpretation and mapping of the reprocessed data was undertaken and completed during the quarter. The outcome of this work will determine whether the Company will commit to the next phase of the work obligations, which entails the acquisition of new seismic data. Leads have been identified within PEP and further studies are underway in relation to them, with the objective of identifying potential source, migration paths and the presence of adequate reservoir sequences that may onlap and drape the structural high that is a feature of this permit. Under the terms of the PEP permit, by 1 April 2013 the Company can either surrender the permit or commit to acquire, process and interpret a minimum of 2,250 km of new 2D seismic data. Alternatively, the Company can surrender a minimum of 25% of the permit area and commit to acquire, process and interpret a minimum of 1,750 km of new 2D seismic data. By not later than 1 April 2014, the Company must either commit to drill a well in the permit area or surrender the permit.

13 13 PEP TARANAKI BASIN Octanex holds a 100% interest in PEP The permit covers an area of 853 km² and is located in the offshore Taranaki Basin, lying between the PEP and PEP permits (in which the Company holds 35% and 100% interests respectively), and is immediately adjacent to the north of the Tui oil field see the Permit Location Map above. The permit is covered by an extensive grid of 2D seismic data of various vintages. However, despite its location adjacent to the producing Tui oil field, there has been little modern 3D seismic data acquired within the permit area to date; apart from approximately 40 km² of Tui 3D ingress seismic in the south of the permit. There have been two wells drilled within the permit area, Takapou-1 and Kopuwai-1, both of which encountered oil shows. Under the terms of the permit and by 19 March 2013, the Company must reprocess and interpret existing 2D seismic data from within and immediately adjacent to the permit and carry out various geotechnical studies. PEP is being explored as a combined area with PEP and reprocessing of more than 2000 km of existing 2D data from within and adjacent to both permits has been completed. Detailed interpretation and mapping of the newly reprocessed data was then completed during the quarter. Following the reprocessing and studies, the Company can either surrender the permit or commit to acquire, process and interpret a minimum of 250 km² of new 3D seismic data by 19 March Should Octanex carry out the new 3D seismic survey then it must either commit to and drill a well in the permit area by 19 March 2015 or surrender the permit. Outcomes from the work undertaken to date indicates the presence of two attractive leads within PEP A potential depth closure has been identified in the south-east corner of the permit that is interpreted to be within the extend of the Kapuni F Sand. It is located updip from the Taranui-1 well, which sampled oil in the overlying Kapuni D Sand. The second lead has been identified at the top North Cape Sand, to the north of Takapou-1. The locations of Taranui-1 and Takapou-1 are shown in the Location Map. As a result of the encouragement obtained from the identification of the updip Taranui lead, late in the quarter Octanex initiated the reprocessing of an additional 700 km of existing 2D data. The objective of this reprocessing work is to better assess the adequacy and extent of the structural closures so far identified in PEP Leads have also been identified within PEP Further studies are underway in relation to these leads, with the objective of identifying potential source, migration paths and the presence of adequate reservoir sequences that may onlap and drape the structural high that is a feature of this permit. If the results obtained from the additional reprocessed data and studies in this permit and PEP are encouraging, Octanex will look to acquiring new 3D and 2D seismic programmes in PEP and PEP respectively. The commitment to such programmes will first require a suitable seismic vessel to be located. CORPORATE MATTERS In-specie Special Dividend During the quarter, on 10 April, the Company paid a fully franked Special Dividend by way of an inspecie distribution of shares in Cue Energy Resources Limited and Petrel Energy Limited or their equivalent value in cash. Appointment of a Director During the quarter, on 16 May, the Company announced the appointment of Mr David C Coombes as an independent non-executive Director of the Company. Mr Coombes is a commercial and corporate lawyer with 40 years experience in private practice as a partner in Melbourne law firms. He is currently a partner in Gadens Lawyers.

14 14 Partly Paid Shares During the quarter the Directors advised that, pursuant to the Company s Constitution and with respect to the partly paid shares (ASX code: OXXCB), they had resolved that no call will be made on these shares before 31 March 2014 on account of the unpaid amount of 10 cents per share. The date and amounts of any call or calls that may be made thereafter will be made in accordance with the Constitution, the Corporations Act 2001 and the ASX Listing Rules, as applicable from time to time. By Order of the Board J G Tuohy Company Secretary Melbourne, Australia 27 July 2012 Risk Factors Various statements in this release constitute statements relating to intentions, future acts and events. Such statements are generally classified as forward looking statements and involve known and unknown risks, expectations, uncertainties and other important factors that could cause those future acts, events and circumstances to differ from the way or manner in which they are expressly or impliedly portrayed in this report. Furthermore, exploration for oil and gas is speculative, expensive and subject to a wide range of risks. Summaries of some of the risks inherent in an investment in Octanex N.L. are set out in the Company s latest disclosure document (being the prospectus dated 24 September 2010 in support of the Company s one for four rights issue as lodged with the Australian Securities and Investments Commission). Individual investors should consider these matters in light of their personal circumstances (including financial and taxation affairs) and seek professional advice from their accountant, lawyer or other professional adviser as to the suitability for them of an investment in the Company.

15 Appendix 5B Mining exploration entity quarterly report Appendix 5B Rule 5.3 Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity OCTANEX N.L. ABN Quarter ended ( current quarter ) JUNE 2012 Consolidated statement of cash flows Cash flows related to operating activities 1.1 Receipts from joint venture participant Current quarter $A 000 Year to date (12 months) $A Payments for (a) exploration and evaluation (1,148) (b) development (12,897) (c) production (d) administration (335) (1,324) 1.3 Dividends received 1.4 Interest and other items of a similar nature received 187 1, Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other Net Operating Cash Flows (1,296) (13,117) Cash flows related to investing activities 1.8 Payment for purchases of: (a)prospects (b)equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a)prospects (b)equity investments (c)other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other Cash from Acquired Company (362) (380) Net investing cash flows (287) (185) 1.13 Total operating and investing cash flows (carried forward) (1,583) (13,302) + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 1

16 Appendix 5B Mining exploration entity quarterly report 1.13 Total operating and investing cash flows (brought forward) (1,583) (13,302) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 93 7, Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid (94) (9,022) 1.19 Share issue costs Net financing cash flows (1) (1,410) Net decrease in cash held (1,584) (14,712) 1.20 Cash at beginning of quarter/year to date 18,085 31, Exchange rate adjustments to item Cash at end of quarter 16,501 16,501 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current quarter $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest + See chapter 19 for defined terms. Appendix 5B Page 2 30/9/2001

17 Appendix 5B Mining exploration entity quarterly report Financing facilities available Add notes as necessary for an understanding of the position. 3.1 Loan facilities Amount available $A 000 Amount used $A Credit standby arrangements Estimated cash outflows for next quarter $A Exploration and evaluation Development 4.3 Production 4.4 Administration 350 Total 950 Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter $A 000 Previous quarter $A Cash on hand and at bank Deposits at call 15,723 17, Bank overdraft Other (provide details) - Total: cash at end of quarter (item 1.22) 16,501 18,085 Changes in interests in mining tenements 6.1 Interests in mining tenements relinquished, reduced or lapsed Tenement reference Nature of interest (note (2)) See Activity Report Section Interest at beginning of quarter Interest at end of quarter 6.2 Interests in mining tenements acquired or increased See Activity Report Section + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 3

18 Appendix 5B Mining exploration entity quarterly report Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks, redemptions Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) Total number Number quoted Issue price per security (see note 3) (cents) 152,127,398 74,278,910 33,000, ,999 (922,999) 152,127,398 74,278, ,999 (922,999) 500, cents - 25 cents 25 cents Exercise price 45 cents Amount paid up per security (see note 3) (cents) - 15 cents - 25 cents 15 cents Expiry date 30/09/ See chapter 19 for defined terms. Appendix 5B Page 4 30/9/2001

19 Appendix 5B Mining exploration entity quarterly report Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5). 2 This statement does give a true and fair view of the matters disclosed. Sign here:... Date: 27/07/12 (Company Secretary) Print name: J.G. TUOHY Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities. The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. + See chapter 19 for defined terms. 30/9/2001 Appendix 5B Page 5

For personal use only

For personal use only Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 68 073 914 191 31 December 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 68 073 914 191 31 December 2015 Appendix 5B Rule 5.3 Name of entity AUSTRALIAN MINES LIMITED AUZ ABN Quarter ended (current quarter ) 68 073 914 191 31 December 2015 Consolidated statement of cash flows Cash flows related to operating

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 44 009 163 919 31 December 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 44 009 163 919 31 December 2015 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 126 379 646 31 December 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 126 379 646 31 December 2015 Appendix 5B.Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity AVANCO RESOURCES LIMITED ABN Quarter ended ( current ) 85 126 379 646 31 December 2015 Consolidated

More information

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name

More information

Appendix 5B. Mining exploration entity and oil and gas exploration

Appendix 5B. Mining exploration entity and oil and gas exploration Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

More information

For personal use only

For personal use only Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity WOLF PETROLEUM LIMITED ABN Quarter ended ( current quarter ) 35 116 249 060 31 MARCH 2014 Consolidated

More information

For personal use only

For personal use only Appendix 5B Mining exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Vital Metals Ltd ABN Quarter ended (

More information

Appendix 5B. Quarter ended ( current quarter ) 51 153 918 257 31 December 2013

Appendix 5B. Quarter ended ( current quarter ) 51 153 918 257 31 December 2013 Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HIGHFIELD RESOURCES LIMITED ABN Quarter ended ( current quarter ) 51 153 918 257

More information

Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. 94 106 641 963 30 Sept 2015

Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. 94 106 641 963 30 Sept 2015 Appendix 5B Mining exploration entity ly report Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Crusader Resources Limited ABN

More information

Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 December 2015. Net Operating Cash Flows (568) (1,210)

Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 December 2015. Net Operating Cash Flows (568) (1,210) Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN Quarter ended ( current ) 68 064 120 896

More information

Appendix 5B. RNI NL and its controlled entities. Quarter ended ( current quarter ) 77 085 806 284 30 Jun 2016

Appendix 5B. RNI NL and its controlled entities. Quarter ended ( current quarter ) 77 085 806 284 30 Jun 2016 Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity RNI NL and its controlled entities ABN Quarter ended ( current quarter ) 77 085 806

More information

Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 March 2015. Net Operating Cash Flows (512) (2,380)

Appendix 5B. Quarter ended ( current quarter ) 68 064 120 896 31 March 2015. Net Operating Cash Flows (512) (2,380) Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity GLOBAL PETROLEUM LIMITED ABN 68 064 120 896 31 March 2015 Quarter ended

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 38 119 047 693 30 September 2011

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 38 119 047 693 30 September 2011 Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity COPPER RANGE LIMITED ABN Quarter ended ( current quarter ) 38 119 047 693 30 September

More information

* Excluding unspent cash deposited by the Company in Joint Venture accounts

* Excluding unspent cash deposited by the Company in Joint Venture accounts Quarterly Report For the period ended 30 September 2015 HIGHLIGHTS Closing cash of $6.2 million* Completion of MZ1 deep water exploration well offshore Morocco and postwell evaluation is underway ahead

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 65 094 206 292 30 June 2013

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 65 094 206 292 30 June 2013 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity

More information

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity

More information

Appendix 5B Mining exploration entity quarterly report

Appendix 5B Mining exploration entity quarterly report Name of entity Appendix 5B SEGUE RESOURCES LTD Rule 5.3 ABN Quarter ended ("current quarter") 49 112 609 846 31 December 2015 Consolidated statement of cash flows Cash flows related to operating activities

More information

QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED

QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED 21 st January 2016 QUARTERLY ACTIVITES AND CASH FLOW REPORT PERIOD ENDED 31 st DECEMBER 2015 CONTACTS: Collin Vost Telephone: 08 6436 2350 ISSUED CAPITAL: 2,225,337,344 Ordinary Shares Directors: Collin

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 108 476 384 30 September 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 108 476 384 30 September 2015 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Aurelia Metals

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

Appendix 5B. Mining exploration entity quarterly report LACONIA RESOURCES LIMITED 29 137 984 297 31 DECEMBER 2015

Appendix 5B. Mining exploration entity quarterly report LACONIA RESOURCES LIMITED 29 137 984 297 31 DECEMBER 2015 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity LACONIA RESOURCES LIMITED ABN Quarter ended ( current quarter ) 29 137

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Rule

More information

For personal use only

For personal use only Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity THE CARAJAS COPPER COMPANY LIMITED ABN Quarter ended ( current quarter ) 88 076 390 451 30 SEPTEMBER

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 46 168 910 978 31 December 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 46 168 910 978 31 December 2015 Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity TIAN POH RESOURCES LIMITED ABN Quarter ended ( current ) 46 168 910 978

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B. Mining exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01,

More information

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10. Quarter ended ( current quarter )

Appendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10. Quarter ended ( current quarter ) Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity

More information

For personal use only

For personal use only For personal use only 29 April 2011 Report on activities for the Quarter ended 31 March 2011 Highlights Africa: Morocco Tarfaya Offshore Block Awarded Tarfaya 2D and 3D seismic reprocessing contract to

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 March 2014

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 March 2014 Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity THE WATERBERG COAL COMPANY LIMITED ABN Quarter ended ( current ) 64 065 480 453 31 March 2014

More information

ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015

ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015 ASX ANNOUNCEMENT 31 JULY 2015 JUNE 2015 QUARTERLY REPORT The Directors of Odyssey Energy Limited ( Odyssey or Company ) are pleased to present the June 2015 ly report. Highlights during, and subsequent

More information

For personal use only

For personal use only Rule 5.3 Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Enterprise Metals Limited ABN Quarter ended ( current quarter

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,

More information

For personal use only

For personal use only Rule 5.5 Introduced 01/07/96 origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity EQUUS MINING LIMITED ABN Quarter ended ( current ) 44 065 212 679 31 December

More information

APPENDIX 5B Mining exploration entity quarterly report

APPENDIX 5B Mining exploration entity quarterly report 1 of 5 APPENDIX 5B Mining exploration entity quarterly report TORO ENERGY LTD Quarter ended ABN. 48 117 127 590 June 2015 Consolidated statement of cash flows (Note 6.0) Cash flows related to operating

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 December 2013

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 64 065 480 453 31 December 2013 The Waterberg Coal Company Limited (formerly Range River Gold Limited) (Incorporated in Australia) (Registration number ABN 64 065 480 453) ASX: WCC JSE: WCC ISIN: AU000000WCC9 ( WCC or the Company ) Appendix

More information

Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. Quarter ended ( current quarter ) 94 106 641 963 31 Dec 2015

Appendix 5B. Mining exploration entity quarterly report. Crusader Resources Limited. Quarter ended ( current quarter ) 94 106 641 963 31 Dec 2015 Mining exploration entity ly report Appendix 5B Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/05/2013 Name of entity Crusader Resources

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 70 121 539 375 31 DECEMBER 2015

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 70 121 539 375 31 DECEMBER 2015 Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8

More information

Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned

Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned FOR THE QUARTER ENDED 31 December 2015 Swala Energy Limited ACN 161 989 546 Level 4, 21 Kintail Road Applecross WA 6153 Australia TEL +61 (0) 8 6270 4700 FAX +61 (0) 8 6314 4675 EML info@swalaenergy.com

More information

QUARTERLY ACTIVITIES AND CASH FLOW REPORT. PERIOD ENDED 31 March 2015

QUARTERLY ACTIVITIES AND CASH FLOW REPORT. PERIOD ENDED 31 March 2015 30 April 2015 QUARTERLY ACTIVITIES AND CASH FLOW REPORT PERIOD ENDED 31 March 2015 Baraka Energy & Resources Limited Contacts: Collin Vost Issued Capital: 2,225,337,344 Ordinary Shares Telephone: 08 6436

More information

QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015

QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 QUARTERLY REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 KIHABE ZINC LEAD SILVER PROJECT BOTSWANA On 11 November 2015, the Company received an email from the Assistant Permanent Secretary, Ministry of Minerals

More information

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 003 257 556 30 September 2013

Appendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) 85 003 257 556 30 September 2013 Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity MILLENNIUM MINERALS LIMITED ABN Quarter ended ( current ) 85 003 257 556 30 September

More information

Appendix 5B. Quarter ended ( current quarter )

Appendix 5B. Quarter ended ( current quarter ) Appendix 5B Rule 5.5 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity WPG Resources Ltd ABN Quarter ended ( current quarter ) 51

More information

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report

Appendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

More information

Appendix 5B Mining exploration entity quarterly report

Appendix 5B Mining exploration entity quarterly report Appendix 5B Rule 5.3 Name of entity YILGARN GOLD LIMITED ABN Quarter ended ("current quarter") 34 002 527 906 31 December 2004 Consolidated statement of cash flows Cash flows related to operating activities

More information

Cue Energy Resources Limited A.B.N. 45 066 383 971

Cue Energy Resources Limited A.B.N. 45 066 383 971 Cue Energy Resources Limited A.B.N. 45 066 383 971 Level 21 114 William Street Melbourne Victoria 3000 Australia Telephone: (03) 9670 8668 Facsimile: (03) 9670 8661 Email: mail@cuenrg.com.au Website: www.cuenrg.com.au

More information

Appendix 5B. Mining exploration entity quarterly report

Appendix 5B. Mining exploration entity quarterly report Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian Bauxite Limited ABN Quarter ended ( current ) 14 139 494 885

More information

March 2015 Quarterly Activity Report and Appendix 5B

March 2015 Quarterly Activity Report and Appendix 5B ABN 90 118 710 508 Ground Floor 1 Havelock Street West Perth WA 6000 t: +61 8 9488 5220 f: +61 8 324 2400 www.citation.net.au info@citation.net.au 30 April 2015 ASX Announcement March 2015 Quarterly Activity

More information

Johnnycake (EPM 18986) - background

Johnnycake (EPM 18986) - background Forte Consolidated Limited QUARTERLY REPORT 1 October 2015 to 31 December 2015 ASX: FRC Forte Consolidated Limited ABN 37 148 168 825 Board of Directors Chairman Executive Director John Terpu Non-Executive

More information

For personal use only

For personal use only 1 QUARTERLY REPORT Atlantic Limited (ASX: ATI; Atlantic or the Company) is pleased to present its report for the ended 31 December 2010. HIGHLIGHTS WINDIMURRA Major sales agreement signed for 100% of ferrovanadium

More information

Activities Report & Cash Flow Statement For the 3 months ending 30 September 2015

Activities Report & Cash Flow Statement For the 3 months ending 30 September 2015 Activities Report & Cash Flow Statement For the 3 months ending 30 September 2015 Page 1 Quarterly Activities and Cash Flow Statement For the 3 months ending 30 September 2015 (Period) Red Gum Resources

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014 Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: info@hamptonhill.com.au

More information

JUNE 2015 QUARTERLY REPORT

JUNE 2015 QUARTERLY REPORT ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 31 JULY 2015 JUNE 2015 QUARTERLY REPORT WCP Resources Limited ( WCP or Company ) presents its June 2015 quarterly report. Highlights during the quarter

More information

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name

More information

September 2010 Quarterly Report

September 2010 Quarterly Report September 2010 Quarterly Report 25th October 2010 Corporate Details ASX Code: RCO Issued Capital: 52,714,183 Shares 2,950,000 Options @ 40c, 31/3/2011 (Unlisted) 510,000 Options @ 42c, 31/3/2011 (Unlisted)

More information

DECEMBER 2015 QUARTERLY ACTIVITIES REPORT

DECEMBER 2015 QUARTERLY ACTIVITIES REPORT 29 January 2016 DECEMBER 2015 QUARTERLY ACTIVITIES REPORT CORPORATE On the 14 December 2015, Namibian Copper NL (ASX Code: NCO) (Namibian Copper or the Company) announced that the Company had entered into

More information

Appendix 4C. Quarterly report for entities admitted on the basis of commitments BIOTRON LIMITED. Quarter ended ( current quarter )

Appendix 4C. Quarterly report for entities admitted on the basis of commitments BIOTRON LIMITED. Quarter ended ( current quarter ) Appendix 4C Rule 4.7B Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Quarterly report for entities admitted on the basis of commitments Name of entity BIOTRON LIMITED ABN Quarter ended ( current

More information

MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT

MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT QUARTERLY REPORT December 2015 December Quarterly Report Exploration Activities Report Quarter ended 31 st December 2015 During the December, MGT Resources Limited (MGT, ASX:MGS) worked towards finalising

More information

December 2015 Quarterly Report

December 2015 Quarterly Report December 2015 Quarterly Report 29 January 2016 The downward spiral in oil prices coupled with ongoing industrial action in Bass Strait continues to impact receipts from the Weeks Royalty interest. Income

More information

For personal use only

For personal use only December 2015 Quarterly Activities Report Rumble Resources Ltd (ASX: RTR) ( Rumble or the Company ) is pleased to provide an update of the Company s activities during the December 2015. Rumble Resources

More information

September 2015 Quarterly Report

September 2015 Quarterly Report September 2015 Quarterly Report 30 October 2015 The effects of industrial action on the Weeks Royalty in Bass Strait diminished through the with petroleum production moving back to more normal levels.

More information

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval

More information

Report for the Quarter Ended 31 December 2015

Report for the Quarter Ended 31 December 2015 Report for the Quarter Ended 31 December 2015 ASX: KIS Market Capitalisation $13.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 7.5 cents Share Price Board of Directors Johann

More information

September 2015 Quarterly Activities Report

September 2015 Quarterly Activities Report ASX RELEASE 31 OCT 2015 September 2015 Quarterly Activities Report Expansion of Premier JV Gold Mine to 40,000ozpa production rate on track and future production growth plans advanced Highlights Production

More information

Quarterly Activities Report For the quarter to 31 December 2015

Quarterly Activities Report For the quarter to 31 December 2015 Tawana Resources NL (Incorporated in Australia) (Registration number ACN 085 166 721) Share code on the JSE Limited: TAW ISIN: AU000000TAW7 Share code on the Australian Stock Exchange Limited: TAW ISIN:

More information

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012 Metals Finance Limited (ASX: MFC) is pleased to provide its Quarterly Activities Report for the three month period ending 31 May 2012. HIGHLIGHTS Separate

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming

More information

Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter )

Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter ) Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity 1Page Limited ABN Quarter ended ( current

More information

ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015

ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015 ASX ANNOUNCEMENT 29 th January 2016 ASX: PML QUARTERLY ACTIVITIES REPORT FOR DECEMBER 2015 HIGHLIGHTS Parmelia Resources entered into conditional agreement to acquire Veriluma Pty Ltd. Parmelia and Veriluma

More information

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current

More information

December 2015 Quarterly Report & Appendix 5B

December 2015 Quarterly Report & Appendix 5B December 2015 Quarterly Report & Appendix 5B 29 January 2016 Highlights: Completed the R1 workover program for all five Glenaras wells. Commenced testing of the R1 seam at Glenaras, with initial gas desorption

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing ASX Announcement 29 January 2016 ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2015 The 31 December 2015 capped off what has been an exceptional year for Metals of Africa Limited (ASX: MTA) ( the Company

More information

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015 FOR THE PERIOD ENDING 30 JUNE 2015 30 July 2015 ASX Code: AGS No. of pages: 11 QUARTERLY REPORT FOR THE PERIOD ENDED 30 JUNE 2015 DETAILS OF ANNOUNCEMENT Quarterly Activity Report for the period ending

More information

For personal use only

For personal use only For persal use ly Mining explorati entity and oil and gas explorati entity ly report Rule 5.5 Mining explorati entity and oil and gas explorati entity ly report Introduced 01/07/96 Origin Appendix 8 Amended

More information

Report for the Quarter Ended 30 September 2015

Report for the Quarter Ended 30 September 2015 Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann

More information

Quarterly report for entities admitted on the basis of commitments

Quarterly report for entities admitted on the basis of commitments Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity Papyrus Australia Limited ABN Quarter ended

More information

Quarterly Activities Report - for the period ended 31 December 2015

Quarterly Activities Report - for the period ended 31 December 2015 ASX Release: 27 January 2016 Quarterly Activities Report - for the period ended 31 December 2015 ASX Code: WRM Issued Securities Shares: 271.9 million Options: 7 million Cash on hand (31 Dec 2015) $0.4M

More information

DECEMBER 2015 QUARTERLY REPORT

DECEMBER 2015 QUARTERLY REPORT NEWS RELEASE 29 JANUARY 2016 DECEMBER 2015 QUARTERLY REPORT Prairie Mining Limited is pleased to present its quarterly report for the period ending 31 December 2015. Highlights during, and subsequent to,

More information

Quarterly Report. For the Quarter Ended 30 June 2004. Vulcan is maintaining its low cost exposure to West Australian gold exploration.

Quarterly Report. For the Quarter Ended 30 June 2004. Vulcan is maintaining its low cost exposure to West Australian gold exploration. Quarterly Report For the Quarter Ended 30 June 2004 Vulcan is maintaining its low cost exposure to West Australian gold exploration. Yerilla Joint Venture (Sons of Gwalia earning 75%) Sons of Gwalia are

More information

Cue Energy Resources Limited A.B.N. 45 066 383 971

Cue Energy Resources Limited A.B.N. 45 066 383 971 Cue Energy Resources Limited A.B.N. 45 066 383 971 Level 21 114 William Street Melbourne Victoria 3000 Australia Telephone: (03) 9670 8668 Facsimile: (03) 9670 8661 Email: mail@cuenrg.com.au Website: www.cuenrg.com.au

More information

For personal use only

For personal use only Rule 4.7B Quarterly report for entities admitted on the basis of commitments Name of entity Cordlife Ltd ABN Quarter ended ( current quarter ) 48 108 051 529 30 June 2011 Consolidated statement of cash

More information

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include: Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights

More information

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015. Successful Share Issue Raises A$5.6 Million Metro Mining Limited (ASX:MMI) Quarterly Activities Report September 2015 Highlights Successful Share Issue Raises A$5.6 Million Successful Share Issue raises A$5.6 Million Non-binding bauxite Off-Take

More information

HORSE WELL GOLD PROJECT W.A

HORSE WELL GOLD PROJECT W.A December 2015 Quarterly Activities Report ABN 20 109 361 195 ASX Release 29 January 2016 Alloy Resources Ltd Suite 6, 7 The Esplanade Mount Pleasant WA 6153 Tel: +61 8 9316 9100 Fax: +61 8 9315 5475 Email:

More information

Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter ) 58 009 213 754 31 DECEMBER 2015

Appendix 4C. Quarterly report for entities admitted on the basis of commitments. Quarter ended ( current quarter ) 58 009 213 754 31 DECEMBER 2015 Appendix 4C Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity AGENIX LIMITED ABN Quarter ended ( current

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 30 th April 2014 & Working Capital Update ADG Global Supply (ASX: ADQ) has today released its cash flow report for the period ending 31 March 2014. For the quarter, ADG experienced an

More information

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015 ASX ANNOUNCEMENT MEDIA RELEASE 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS RC drilling identified wide mineralised gold zones north of original Namdini

More information

For personal use only

For personal use only ASX RELEASE 21 March 2012 Market Update February 2012 The Report on Cash Flows for the month of February 2012, provided in accordance with Listing Rule 4.7B(d), is attached. Debt Facility The Company confirms

More information

Quarterly Report For the 3 Months ended December 2015

Quarterly Report For the 3 Months ended December 2015 Quarterly Report For the 3 Months ended December 2015 This Quarterly Report updates activities undertaken during the period 1 October 2015 to 31 December 2015. OVERVIEW During the period, NuCoal continued

More information

For personal use only

For personal use only Antilles Oil and Gas NL ACN 111 823 762 HALF YEAR REPORT 30 June 2015 The information contained in this document should be read in conjunction with Antilles Oil and Gas NL s annual report for the year

More information

WHL ENERGY SEPTEMBER 2011 QUARTERLY ACTIVITIES REPORT

WHL ENERGY SEPTEMBER 2011 QUARTERLY ACTIVITIES REPORT WHL Energy Ltd ABN: 25 113 326 524 Level 2, 22 Delhi St, West Perth, WA 6005 P.O. Box 1042, West Perth Western Australia 6872 T: +61 8 6500 0271 F: +61 8 9321 5212 www.whlenergy.com ASX/MEDIA RELEASE 31

More information

Falcon Minerals Ltd ACN 009 256 535 Company Announcement

Falcon Minerals Ltd ACN 009 256 535 Company Announcement Falcon Minerals Ltd ACN 009 256 535 Company Announcement First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Date: 30 April

More information

For personal use only

For personal use only Rule 4.7B Quarterly report for entities admitted on the basis of commitments Introduced 31/03/00 Amended 30/09/01, 24/10/05, 17/12/10 Name of entity Norwood Systems Limited ABN Quarter ended ( current

More information

QUARTERLY CASH FLOW REPORT. Please find attached Sterling Plantations Limited s quarterly cash flow report for the quarter ended 30 September 2015.

QUARTERLY CASH FLOW REPORT. Please find attached Sterling Plantations Limited s quarterly cash flow report for the quarter ended 30 September 2015. 23 October 2015 The Manager Company Announcements Office Australian Securities Exchange Exchange Plaza 2 The Esplanade PERTH WA 6000 By: elodgement (ASX code SBI) QUARTERLY CASH FLOW REPORT Please find

More information

For personal use only

For personal use only TZ Limited ABN 26 073 979 272 27 April 2016 Lodged by ASX Online The Manager Company Announcement Office ASX Limited Level 4, 20 Bridge Street Sydney, NSW 2000 Dear Sir/Madam SHAREHOLDER UPDATE & UPDATED

More information

RENOUNCEABLE RIGHTS ISSUE, BRIDGING LOAN FACILITY, and APPENDIX 4C Gage Roads Brewing Co Limited (ASX Code: GRB)

RENOUNCEABLE RIGHTS ISSUE, BRIDGING LOAN FACILITY, and APPENDIX 4C Gage Roads Brewing Co Limited (ASX Code: GRB) 31 October 2008 Company Announcements Office Australian Stock Exchange Exchange Centre 20 Bridge Street SYDNEY NSW 2000 RENOUNCEABLE RIGHTS ISSUE, BRIDGING LOAN FACILITY, and APPENDIX 4C Gage Roads Brewing

More information

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015

QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 STRATEGIC MINERALS CORPORATION N.L. 29th January 2016 ASX Release ASX Code: SMC QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDED 31 st December 2015 WOOLGAR GOLD PROJECT QUEENSLAND (100% SMC) Highlights

More information