1 MSc Project Planning Dr Paul Brunn 4 th February 2009 Project Planning and Control Intro to General Methods Some simple examples How to plan and complete an MSc Dissertation project EPS Graduate Education MSc Project Planning and Control 1
2 What is a Masters Degree? Students will have shown originality in the application of knowledge, and they will understand how the boundaries of knowledge are advanced through research. They will be able to deal with complex issues both systematically and creatively, and they will show originality in tackling and solving problems. They will have the qualities needed for employment in circumstances requiring sound judgement, personal responsibility and initiative, in complex and unpredictable professional environments. Masters level qualification descriptor, Quality Assurance Agency, 2006 EPS Graduate Education MSc Project Planning and Control 2
3 What is a Masters Degree? Much more than passing exams! An individual project clearly demonstrates your ability to apply knowledge, do research, deal with complexity, show originality, sound judgement and initiative; while taking responsibility for your own work EPS Graduate Education MSc Project Planning and Control 3
4 What is a Masters Degree? The Project is your chance to demonstrate to potential employers that you can do more than just pass exams Therefore you need to show that you planned it properly and organised it s execution At interview it s your chance to talk about something that you really believe in and enjoyed doing EPS Graduate Education MSc Project Planning and Control 4
5 What are Projects? Projects (unlike Production) are one-off activities, with clearly defined start and end points There is always some uncertainty about their outcome because the task to be completed has (normally) never been done before because the detailed activities and resource requirements are, as yet, unclear EPS Graduate Education MSc Project Planning and Control 5
6 Project Planning and Control Normally there will be a compromise between time, quality and cost to achieve the agreed project objectives but this will depend on the precise definition of the project objectives Projects differ from Production in terms of the measures used to judge their success, for example:- Completion within budget -v- minimum cost Completion on time -v- ongoing profitability EPS Graduate Education MSc Project Planning and Control 6
7 Project Planning and Control Projects exist in, must take account of and will be affected by the environment in which they take place whereas production can, almost, exist in isolation from its environment Project management recognises and attempts to limit the effects of uncertainty production management tries to remove the causes of that uncertainty EPS Graduate Education MSc Project Planning and Control 7
8 Project Planning and Control The aim of all project planning is a successful project not a beautiful plan The plan is a tool to assist you to Prepare for the project Control the project It will change as circumstances change A good plan is for guidance, it is not written on tablets of stone EPS Graduate Education MSc Project Planning and Control 8
9 Project Planning and Control Planning - can be an individual activity assesses feasibility of an idea establishes cost, time, resource and quality constrains provides a plan upon which to base subsequent control of the project Control - must be a group activity involving all those involved in the project EPS Graduate Education MSc Project Planning and Control 9
10 Project Planning First - Define the AIMS & OBJECTIVES Then - Establish the CONSTRAINTS It is then possible to balance Cost Time Quality EPS Graduate Education MSc Project Planning and Control 10
11 For any project Project Planning List all activities Estimate time for each activity (assuming standard resources) Define sequences of actions (dependency) Calculate duration, resource requirements and costs Compare with external constraints Adjust/re-plan if necessary EPS Graduate Education MSc Project Planning and Control 11
12 Tools available:- Small projects Project Planning Draw a Gantt Chart (bar chart) More complex projects Critical Path Analysis (CPA) (or PERT) Computer based systems using CPA are available to simplify resource and time planning All require a thorough definition of project objectives and activities EPS Graduate Education MSc Project Planning and Control 12
13 Project Planning Gantt Charts (invented by Henry L Gantt ) Show sequences and dependencies Parallel activities Resource requirements/conflicts Total duration, critical path and float Used as intended can also be used to control the project since they can show progress against plan EPS Graduate Education MSc Project Planning and Control 13
14 Gantt Chart Example - Making Tea Fill Kettle Boil water Add tea to pot Pour on water Allow to "mash" Add milk to cups Pour tea Drink tea Time EPS Graduate Education MSc Project Planning and Control 14
15 Project Planning Critical path analysis (CPA) provides a pictorial representation of the whole project highlights critical path activities indicates position and quantity of float on non-critical activities resource utilisation data When controlling a project allows the effect of changes to be predicted EPS Graduate Education MSc Project Planning and Control 15
16 Critical Path Analysis Define activities & their duration Specify dependencies Draw network (each activity starts and finishes at a node) - (adjust if necessary to meet all constraints) Forward pass - calculate time for each path Find critical path - defines earliest finish Backward pass - calculate float on each activity Check dates - re-plan if necessary Allocate resources (critical path first) Use float to help allocate remaining resources EPS Graduate Education MSc Project Planning and Control 16
17 Project Control You can t control a project that hasn t been planned! Things will happen so fast that it is not possible to plan as you go along If circumstances change it may be necessary to re-plan but... It is much easier and quicker to change a plan that already exists EPS Graduate Education MSc Project Planning and Control 17
18 Project Control Control of all projects uses these steps: Plan Publish Measure Compare Correct (if necessary re-plan) EPS Graduate Education MSc Project Planning and Control 18
19 Project Control Project Control Technical Execution of project tasks The two activities require different skills but are often confused Project Planning and Control is an iterative process Project plans are regularly revised and updated as more information comes to light EPS Graduate Education MSc Project Planning and Control 19
20 Project Control CPA diagram (or a simple bar chart) is a good method for both planning and publishing the overall plan (a picture is worth a thousand words) Measure progress in time, job or cost units. Show completed activities on the CPA diagram or bar chart This highlights activities behind time EPS Graduate Education MSc Project Planning and Control 20
21 Project Control Measure regularly and compare planned with actual Use float to make corrections if necessary, without changing the plan Early feedback on problems is essential Set regular milestones to divide up large activities and thus get feedback on progress sooner than their end date EPS Graduate Education MSc Project Planning and Control 21
22 Progress Measures Cost related:- Total spend Expenditure under or over budget Overtime charges Cash flow Price changes Time related:- Activities not started or finished on time Time and Quality related:- Changes in project scope Test results (i.e. commissioning particular pieces of equipment) Performance milestones built into project plan Complaints EPS Graduate Education MSc Project Planning and Control 22
23 Project Control Mechanical charts are useful when regularly re-planning Regular updating is essential the difference between useful information and excuses is when they arrive Computer based systems can quickly and easily re-draw the CP diagram and indicate any changes in critical path EPS Graduate Education MSc Project Planning and Control 23
24 Practical Project Planning Typical maintenance tasks Power station shut down New product introduction Take-over bid etc. Thousands of activities, hundreds of people, tens of weeks duration Computer systems (Microsoft Project etc.) handle the clerical aspects but do not do the planning! (Date conversion, recalculation, resource allocation, data-base facilities and financial control etc.) Normally large projects aim for a reasonably good, feasible solution rather than an optimum one. EPS Graduate Education MSc Project Planning and Control 24
25 Planning and Controlling an MSc Dissertation Project What is special about an MSc Dissertation project? Timescale Limited resources The supervisor EPS Graduate Education MSc Project Planning and Control 25
26 MSc Dissertation - Fulltime Timescale Normally five person-months One month intro. Three months work. One month writing up A hard deadline in September (Check exactly when!) No opportunity to trade resources for time or quality But objectives can be adjusted.. MSc Dissertations - Resources Often very limited! Plan to rely only on yourself and the equipment etc. that your supervisor has guaranteed Don t let others side-track you EPS Graduate Education MSc Project Planning and Control 26
27 MSc Dissertations They are all different but they are all the same in several key respects:- All adopt the same basic format A clear statement of the project aims All require a literature review A description of the work undertaken and the results achieved A discussion of the relevance of the work A summary of the conclusions EPS Graduate Education MSc Project Planning and Control 27
28 MSc Dissertation - Planning A Normal MSc Dissertation 6 Write up Dissertation 5 Analyse Data / Results 4 Gather Data 3 Design Experiments 2 Literature Survey 1 Define Project Aims A B C May June July Aug Sept EPS Graduate Education MSc Project Planning and Control 28
29 MSc Dissertations All require that the writer shows that they have planned the work (so a plan [bar chart] is useful) The discussions benefit from a section showing how the actual project differed from the actual plan (this is a good place to discuss what went wrong and/or better than expected) EPS Graduate Education MSc Project Planning and Control 29
30 MSc Dissertations - Discussions A Normal MSc Dissertation 6 Write up Dissertation 5 Analyse Data / Results 4 Gather Data 3 Design Experiments 2 Literature Survey 1 Define Project Aims May June July Aug Sept EPS Graduate Education MSc Project Planning and Control 30
31 MSc Dissertation - Planning Define the objectives - in conjunction with your supervisor List the tasks and their approximate durations - check your guesstimates with your supervisor Show your supervisor that the original project is not possible - on a bar chart! Replan to something more sensible EPS Graduate Education MSc Project Planning and Control 31
32 MSc Dissertations - Supervisors Probably the most important part of your project is choosing the right supervisor for you Get to know them It is up to you to manage your supervisor effectively - they are all busy people who have other things to do as well as supervise your MSc project EPS Graduate Education MSc Project Planning and Control 32
33 MSc Dissertations - Supervisors Trust your supervisor and use them to check that the plan for your project is sensible (include some holiday, time off, allowances for problems etc.) Tell them as soon as the project drops behind plan (as it will) Discuss how to get back onto schedule - only change the plan when necessary EPS Graduate Education MSc Project Planning and Control 33
34 MSc Dissertations - Supervisors Most supervisors will read through and comment on draft chapters of your dissertation but don t leave it all to the last few days my experience is one chapter a week is all I can manage comfortably So if there are 8-10 chapters in most dissertations.. EPS Graduate Education MSc Project Planning and Control 34
35 And finally.. If all else fails, read the instructions! MSc Regulations are available at:- medialibrary/tlao/pgt-regulationsjune2007.pdf EPS Graduate Education MSc Project Planning and Control 35
Leaving Certificate Technology. Project Management. Teacher Notes
Leaving Certificate Technology Project Management Teacher Notes 1 Project Management This is the first of three key topics that form Project and Quality Management in the Technology Syllabus core. These
More informationChapter 2: Project Time Management
Chapter 2: Project Time Management Learning Objectives o o o o Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules.
More information5. Creating a Gantt Chart
5. Creating a Gantt Chart Whilst the network diagram is a useful way to describe how tasks are linked to each other, the Gantt chart is used to display the schedule of a project. The Gantt chart is the
More informationRetained Fire Fighters Union. Introduction to PRINCE2 Project Management
Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type
More informationPearson Education Limited 2003
156 Activities Activity 9.1 (PP. 357 358) [Project planning exercise] You are required to construct a project plan for the following information system development project. Your objective is to schedule
More informationESKIPM2(SQA Unit Code- F9CX 04) Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
More informationScheduling Glossary Activity. A component of work performed during the course of a project.
Scheduling Glossary Activity. A component of work performed during the course of a project. Activity Attributes. Multiple attributes associated with each schedule activity that can be included within the
More informationESKIPM3 Project management software
Overview This is the ability to use a software application that plans, organises and monitors completion of the component tasks within a project in logical sequence, given constraints of people and resource
More informationCritical Path Analysis & PERT Charts (taken from www.business.com.
Critical Path Analysis & PERT Charts (taken from www.business.com. - Planning and scheduling more complex projects Critical Path Analysis and PERT are powerful tools that help you to schedule and manage
More informationUse project management tools
Use project management tools Overview Using project management tools play a large role in all phases of a project - in planning, implementation, and evaluation. This resource will give you a basic understanding
More informationMicrosoft Project 2010
Tutorial 1: Planning a Project Microsoft Project 2010 In Tutorial Section 1.1 you will: Learn project management terminology Understand the benefits of project management Explore the Project 2010 window
More informationIn initial planning phases In monitoring and execution phases
Project management What is it? Project management is a framework for a range of tools for helping plan and implement development and change projects. A range of tools exist, including: Gantt charts (bar
More informationGoals of the Unit. spm - 2014 adolfo villafiorita - introduction to software project management
Project Scheduling Goals of the Unit Making the WBS into a schedule Understanding dependencies between activities Learning the Critical Path technique Learning how to level resources!2 Initiate Plan Execute
More informationpm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
More informationNotes on the Critical Path Method for project planning and management.
E90 Engineering Design Notes on the Critical Path Method for project planning and management. CPM models any project by a network of blocks or circles called NODES that are connected by lines called ARROWS.
More informationProject Planning With IT
Unit 17: Project Planning With IT Unit code: QCF Level 3: Credit value: 10 Guided learning hours: 60 Aim and purpose Y/601/7321 BTEC National The aim of this unit is to ensure learners understand the processes
More informationEXAM EXEMPLAR QUESTIONS
Level 6 Professional Diploma in Procurement and Supply PD5 - Programme and project management EXAM EXEMPLAR QUESTIONS QUESTIONS AND INDICATIVE ANSWER CONTENT Page 1 of 10 QUALIFICATIONS 2013 QUESTIONS
More informationBasic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort
Basic s Project Scheduling and Tracking The process of building a schedule for any case study helps really understand how it s done. The basic idea is to get across to break the software project into well-defined
More informationWork Breakdown Structure (WBS)
Work Breakdown Structure (WBS) The building blocks of a schedule start with a Work Breakdown Structure (WBS). The WBS is a hierarchical reflection of all the work in the project in terms of deliverables.
More informationProject Time Management
Project Time Management Plan Schedule Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.
More informationExample Gantt Chart. PERT charts...) (Later, but next, Source: http://www.nan.go.th/nanpoc/svg/chartdirector/doc/cdphpd oc/images/gantt.
PERT and Gantt Example Gantt Chart (Later, but next, PERT charts...) Source: http://www.nan.go.th/nanpoc/svg/chartdirector/doc/cdphpd oc/images/gantt.png PERT Charts Acronym for: Program Evaluation and
More informationSoftware Application: Information System Elements. Project Management in Information Technology (IT) Projects. Project Scheduling basics
Software Application: Information System Elements Project Scheduling Basics Working With Resources Fine Tuning the Project Managing the Project Project Presentations Project Management in Information Technology
More informationChapter 9 Computer Scheduling Projects should be scheduled one byte at a time
Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time Computer Scheduling Critical path method (CPM) requires numerous computations to determine activity start and finish dates,
More informationProject Planning and Scheduling
Project Planning and Scheduling MFS606 Project Planning Preliminary Coordination Detailed Task Description Objectives Budgeting Scheduling Project Status Monitoring When, What, Who Project Termination
More informationChapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072
Chapter 6: Project Time Management King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072 Learning Objectives Understand the importance of project schedules Define
More informationCollege of Engineering and Applied Science University of Wisconsin -- Milwaukee
Edward A. Beimborn and W. Anthony Garvey College of Engineering and Applied Science University of Wisconsin -- Milwaukee The Blob Chart:: A Simplified Method of Allocating Resources over Time Edward Beimborn
More informationSOFTWARE PROJECT MANAGEMENT
SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development
More informationImportance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects
Project Time Management Chapter 6 Importance of Project Schedules Managers often cite delivering projects on time as one of their biggest challenges Time has the least amount of flexibility; it passes
More informationWORK PROGRAM GUIDELINES
Project Managed Change Program WORK PROGRAM GUIDELINES JABATAN KERJA RAYA MALAYSIA Cawangan Pengurusan Projek Kompleks (PROKOM) Ibu Pejabat JKR Malaysia 2 Document Ownership Section No Section Amendment
More informationProject and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi
Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 9 Basic Scheduling with A-O-A Networks Today we are going to be talking
More informationNE-50413B Mastering Microsoft Project 2010
NE-50413B Mastering Microsoft Project 2010 Summary Duration Vendor 3 Days Microsoft Audience This course is intended for both novice and experienced Project Managers and project support personnel who need
More informationTime Management. Part 5 Schedule Development. Richard Boser
Time Management Part 5 Schedule Development Richard Boser 6.5 Schedule Development Inputs Organizational Process Assets Scope Statement Activity List Activity Attributes Network Diagrams Resource Req ms
More information(Refer Slide Time: 01:52)
Software Engineering Prof. N. L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture - 2 Introduction to Software Engineering Challenges, Process Models etc (Part 2) This
More informationPLANNING FOR YOUR PROJECT
PLANNING FOR YOUR PROJECT This tool kit has been designed to provide an introduction to planning. It will help you to think about the reasons behind why you should plan, what to plan and the variations
More informationModule 11. Software Project Planning. Version 2 CSE IIT, Kharagpur
Module 11 Software Project Planning Lesson 29 Staffing Level Estimation and Scheduling Specific Instructional Objectives At the end of this lesson the student would be able to: Identify why careful planning
More informationInformation Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu
Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of project schedules and good project time management Define activities as the basis for developing project
More informationadded to the task, using Project, it will automatically calculate the schedule each time a new resource is added.
Chapter 3 Effort Driven Task Type By now, you will be getting sick of my repetition of the effort driven formula: Resource Units X Duration = Work I make no apologies, as it needs to be engraved in the
More informationProject planning and scheduling
Project planning and scheduling Project Planning Mel Rosso-Llopart (rosso@cs.cmu.edu) Version 1.1 Carnegie Mellon, 2005 1 Objectives 1. Introduce project planning 2. Examine the stages of project planning:
More informationBasic Project Management & Planning
Basic Project Management & Planning Dr. David K. Potter Director & Don Pether Chair in Engineering and Management em4a03@mcmaster.ca 1 What is Project Management? A set of principles, methods, tools, and
More informationMastering Microsoft Project 2010
Mastering Microsoft Project 2010 Duration: 2 days Course Description This two-day instructor-led course provides students with the knowledge and skills to plan and manage projects using Microsoft Project
More informationProject Management Process
Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project
More informationLearning Objectives. Learning Objectives (continued) Importance of Project Schedules
Chapter 6: Project Time Management Information Technology Project Management, Fifth Edition Learning Objectives Understand the importance of project schedules and good project time management Define activities
More information2012 Medical Science programmes - Master in Engineering and Project Management
2012 MSc in Engineering PROGRAMME SPECIFICATION This document describes the aims and the module details of the Masters in Engineering (EM) in the Department of Electronics at the University of York U.K.
More informationPriori ty ... ... ...
.Maintenance Scheduling Maintenance scheduling is the process by which jobs are matched with resources (crafts) and sequenced to be executed at certain points in time. The maintenance schedule can be prepared
More informationGraphical Project Planning Techniques: An Overview of Gantt, PERT, and CPM Charts Prepared for groups in ECE480 1/6/02, D. Grover
Introduction/Purpose Graphical Project Planning Techniques: An Overview of Gantt, PERT, and CPM Charts Prepared for groups in ECE480 1/6/02, D. Grover The purpose of this brief tutorial is to present an
More informationAn Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan
An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan Of interest to students of Paper P5 Integrated Management. Increasingly, there seems to be a greater recognition of the
More informationTable of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose
1 2 Author s Preface The Medialogist s Guide to Project Time Management is developed in compliance with the 9 th semester Medialogy report The Medialogist s Guide to Project Time Management Introducing
More informationLECTURE 5: SOFTWARE PROJECT MANAGEMENT. Software Engineering Mike Wooldridge
LECTURE 5: SOFTWARE PROJECT MANAGEMENT Mike Wooldridge 1 Introduction The software crisis of the 1960s and 1970s was so called because of a string of high profile software project failures: over budget,
More informationLecture 6: Project Time Management By: Prof. Lili Saghafi. Information Technology Project Management, Fifth Edition
Lecture 6: Project Time Management By: Prof. Lili Saghafi Information Technology Project Management, Fifth Edition Learning Objectives 2 Understand the importance of project schedules and good project
More informationSystems Analysis and Design
Systems Analysis and Design Slides adapted from Jeffrey A. Hoffer, University of Dayton Joey F. George, Florida State University Joseph S. Valacich, Washington State University Modern Systems Analysis
More information02 Project planning. There are two approaches to identifying the components of a project: productbased and work- or activity-based.
C H A P T E R T W O 02 Project planning LEARNING OUTCOMES When you have completed this chapter you should be able to demonstrate an understanding of the following: project deliverables and intermediate
More informationProject Time Management
Project Time Management By Augsburg College 1 Learning Objectives Understand the importance of project schedules and good project time management Define activities as the basis for developing project schedules
More informationThe work breakdown structure can be illustrated in a block diagram:
1 Project Management Tools for Project Management Work Breakdown Structure A complex project is made manageable by first breaking it down into individual components in a hierarchical structure, known as
More informationCSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012
King Saud University College of Computer & Information Sciences Department of Computer Science CSC 443: IT Project Management Midterm 1 exam - Spring semester 2011-2012 March 21 st, 2012 1- Decomposing
More informationProject Management Glossary
Project Management Glossary THE VOCABULARY OF ACHIEVEMENT RON BLACK THE MENTOR GROUP WWW.RONBLACK.COM 800-381-8686 This glossary is an excerpt from Ron Black s book, The Complete Idiot s Guide to Project
More informationCRITICAL PATH METHOD (CPM) SCHEDULES
96 CRITICAL PATH METHOD (CPM) SCHEDULES How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access.) 1 Objectives Learn to read, understand, and use CPM schedules (without
More informationDevising new Software Project Risk Management Model: MARUNA
Devising new Software Project Risk Management Model: MARUNA Bekim Fetaji South East European University, Computer Sciences, Ilindenska bb, 00 Tetovo, Macedonia Abstract The focus of this research is the
More informationThe management of the projects with MS Project
The management of the projects with MS Project Author: AgimDerguti 1 What is Microsoft Project? Microsoft Project is a project management software program developed and sold by Microsoft Designed to assist
More informationTime Management II. http://lbgeeks.com/gitc/pmtime.php. June 5, 2008. Copyright 2008, Jason Paul Kazarian. All rights reserved.
Time Management II http://lbgeeks.com/gitc/pmtime.php June 5, 2008 Copyright 2008, Jason Paul Kazarian. All rights reserved. Page 1 Outline Scheduling Methods Finding the Critical Path Scheduling Documentation
More informationThis is Project Time Management, chapter 8 from the book Beginning Project Management (index.html) (v. 1.0).
This is Project Time Management, chapter 8 from the book Beginning Project Management (index.html) (v. 1.0). This book is licensed under a Creative Commons by-nc-sa 3.0 (http://creativecommons.org/licenses/by-nc-sa/
More informationTIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT. Hazar Hamad Hussain *
TIME MANAGEMENT TOOLS AND TECHNIQUES FOR PROJECT MANAGEMENT Hazar Hamad Hussain * 1. Introduction The definition of Project as a temporary endeavor... refers that project has to be done within a limited
More informationMastering Microsoft Project 2010 50413B; 3 days, Instructor-led
Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Course Description This three-day instructor-led course provides students with the knowledge and skills plan and manage projects using Microsoft
More informationScheduling is a DRAG
Scheduling is a DRAG Better project management does not mean making schedules longer but rather making projects shorter. By William R. Duncan and Stephen A. Devaux Most organizations have realized that
More informationBUSINESS OCR LEVEL 3 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS BUSINESS PROJECT MANAGEMENT CERTIFICATE/DIPLOMA IN K/502/5459 LEVEL 3 UNIT 18
Cambridge TECHNICALS OCR LEVEL 3 CAMBRIDGE TECHNICAL CERTIFICATE/DIPLOMA IN BUSINESS BUSINESS PROJECT MANAGEMENT K/502/5459 LEVEL 3 UNIT 18 GUIDED LEARNING HOURS: 60 UNIT CREDIT VALUE: 10 BUSINESS PROJECT
More informationScope management can be defined as controlling what is and what is not a part of the project.
Scope Management Scope management can be defined as controlling what is and what is not a part of the project. According to the 2004 PMBOK scope management: Includes the processes required to ensure that
More informationNetworks, Gantt charts and Critical Paths Robin Beaumont Date: 18/12/2001 14:00. Contents 1. LEARNING OUTCOMES CHECK LIST FOR THE SESSION..
Robin Beaumont Date: 18/12/2001 14:00 Contents 1. LEARNING OUTCOMES CHECK LIST FOR THE SESSION.. 2 2. INTRODUCTION... 3 3. THE GANTT CHART... 3 4. MAIN PROJECT PHASES... 4 5. ACTIVITIES AND EVENTS...5
More information11.1 What is Project Management? Object-Oriented Software Engineering Practical Software Development using UML and Java. What is Project Management?
11.1 What is Project Management? Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 11: Managing the Software Process Project management encompasses all the
More informationTest Fragen + Antworten. October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003
Test Fragen + Antworten October 2004 Project Management Wilhelm F. Neuhäuser IBM Corporation 2003 Question 1 All the following Statements about a WBS are true except that it a. Provides a framework for
More informationProject Planning, Scheduling and Control: Assignment 2 D. U. Singer Hospital Products Corp.
Project Planning, Scheduling and Control: Assignment 2 D. U. Singer Hospital Products Corp. Code for Course: MBL45-5 Assignment Number: 2 Student number: 75-163-3 Group Code Number: BOT1 Table of Contents
More informationPMP Exam Preparation Answer Key
Chapter 2 Answers 1) d) They are all of equal importance unless otherwise stated The Triple Constraint of Project Management is that Scope, Time, and Cost are all equal unless otherwise defined as such.
More informationHuman-Readable BPMN Diagrams
Human-Readable BPMN Diagrams Refactoring OMG s E-Mail Voting Example Thomas Allweyer V 1.1 1 The E-Mail Voting Process Model The Object Management Group (OMG) has published a useful non-normative document
More informationProject Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
More informationFigure out the early start and early finish. Early start. Early finish
Figure out the early start and early finish oming up with the float for each activity is useful, but you can actually do better! When you have a long critical path, but the other paths in your network
More informationBCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS. BCS Level 5 Diploma in IT APRIL 2013 IT PROJECT MANAGEMENT EXAMINERS REPORT
BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 5 Diploma in IT APRIL 2013 IT PROJECT MANAGEMENT EAMINERS REPORT Section A A1 a) Name FOUR criteria by which a project can
More informationNFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
More informationMetadata-Based Project Management System. A Case Study at M-Files Corporation. Iulia Adomnita
Metadata-Based Project Management System. A Case Study at M-Files Corporation Iulia Adomnita University of Tampere School of Information Sciences Computer Science M.Sc. Thesis Supervisors: Timo Poranen,
More informationManaging Projects. With. MinuteMan Project Management Software
Managing Projects With MinuteMan Project Management Software Copyright 2011 by MinuteMan Systems Introduction This is a brief introduction to the use of Project Management Software to help you organize
More informationReview on Using Packages to Enhance the Teaching of Critical Path Networks
Review on Using Packages to Enhance the Teaching of Critical Path Networks Harry S Ku Abstract The aim of this paper is to review a published paper, Using computer software packages to enhance the teaching
More informationGeneral Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.
Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60
More informationAdministration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by
Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones
More informationWriting Reports BJECTIVES ONTENTS. By the end of this section you should be able to :
Writing Reports By the end of this section you should be able to : O BJECTIVES Understand the purposes of a report Plan a report Understand the structure of a report Collect information for your report
More informationProject Time Management an essential element to project success
Project Time Management an essential element to project success Abstract This paper discusses the reasons behind the necessity to apply sound Project Time Management principles and processes to projects
More informationSoftware Project Scheduling. - Introduction - Project scheduling - Task network - Timeline chart - Earned value analysis
Software Project Scheduling - Introduction - Project scheduling - Task network - Timeline chart - Earned value analysis Eight Reasons for Late Software Delivery An unrealistic deadline established by someone
More informationThe roots of project management
The roots of project management In this session of project management we are going to introduce the nature of project working and introduce some of the basic concepts involved with projects. In particular
More informationSection Five Learning Module D:
Section Five Learning Module D: the Project 5.1 Module D: Objectives At the conclusion of this module you will be able to: implement a project plan; keep control of a project plan; effectively review a
More informationOVERVIEW. Microsoft Project terms and definitions
PROJECT 2003 DISCLAIMER: This reference guide is meant for experienced Microsoft Project users. It provides a list of quick tips and shortcuts for familiar features. This guide does NOT replace training
More informationPM: Project management software
This is the ability to use a software application that plans, organises and monitors completion of the component within a in logical sequence, given constraints of people and resource availability. This
More informationThe principles, processes, tools and techniques of project management
Unit 34: Plan and manage a project. 341 The principles, processes, tools and techniques of project management An industrial project, big or small, must be managed effectively to ensure the project s objectives
More information8. Project Time Management
8. Project Time Management Project Time Management closely coordinated Two basic approaches -bottom-up (analytical) -top-down (expert judgement) Processes required to ensure timely completion of the project
More informationScheduling. Anne Banks Pidduck Adapted from John Musser
Scheduling Anne Banks Pidduck Adapted from John Musser 1 Today Network Fundamentals Gantt Charts PERT/CPM Techniques 2 WBS Types: Process, product, hybrid Formats: Outline or graphical organization chart
More informationScheduling Resources and Costs
Student Version CHAPTER EIGHT Scheduling Resources and Costs McGraw-Hill/Irwin Copyright 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Gannt Chart Developed by Henry Gannt in 1916 is used
More informationProject Time Management
CHAPTER 8 Project Time Management The project scope identifies the objectives of the project, what activities will be performed, and some of the activities that are not included in the project. The scope
More informationPlug IT In 5 Project management
Plug IT In 5 Project management PLUG IT IN OUTLINE PI5.1 Project management for information systems projects PI5.2 The project management process PI5.3 The project management body of knowledge LEARNING
More informationThe Project Planning Process Group
3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity
More informationIMCPM04 Project Scheduling and Cost Control. Course Outline
IMCPM04 Project Scheduling and Cost Control Course Outline January 2012 Project Scheduling and Cost Control Course Aim Project Scheduling and Cost Control is a five-day (5 day) course which provides participants
More informationSoftware Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010)
Software Development & Education Center Microsoft Office 2010 (Microsoft Project 2010) Mastering Microsoft Project 2010 About This Course This three-day instructor-led course provides students with the
More informationMATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.
DESCRIPTION: '108-01, Start and Progress of Work, is hereby amended to require that the Contractor furnish and participate in a computerized CPM (critical path method) network scheduling system. The purpose
More informationResearch Skills. Advanced MSc and PhD Students. http://www.cs.bham.ac.uk/~jxb/rs.html. Lecture 15 Work Management.
Research Skills Advanced MSc and PhD Students http://www.cs.bham.ac.uk/~jxb/rs.html Lecture 15 Work Management Andrea Soltoggio http://www.cs.bham.ac.uk/~aqs A. Soltoggio, 2007 Work management This lecture
More informationMastering Microsoft Project 2013
Course 55054: Mastering Microsoft Project 2013 Page 1 of 9 Mastering Microsoft Project 2013 Course 55054: 2 days; Instructor-Led Introduction This two-day, instructor-led course is intended for individuals
More informationCONTENTS 1. INTRODUCTION 1 2. EQUALITY 1. - Part-time posts 1 - Equality proofing JESP scores 1 3. CABINET OFFICE ROLE 1 4. TRADE UNION ROLE 2
JESP Job Evaluation for Senior Posts Good Practice Guide March 2008 CONTENTS Page 1. INTRODUCTION 1 2. EQUALITY 1 - Part-time posts 1 - Equality proofing JESP scores 1 3. CABINET OFFICE ROLE 1 4. TRADE
More information