Project Management for the Oil and Gas Industry
|
|
|
- Philip Bradford
- 9 years ago
- Views:
Transcription
1 Project Management for the Oil and Gas Industry Dr William Wallace MG-A1-engb 1/2016 (1051)
2 This course text is part of the learning content for this Edinburgh Business School course. In addition to this printed course text, you should also have access to the course website in this subject, which will provide you with more learning content, the Profiler software and past examination questions and answers. The content of this course text is updated from time to time, and all changes are reflected in the version of the text that appears on the accompanying website at Most updates are minor, and examination questions will avoid any new or significantly altered material for two years following publication of the relevant material on the website. You can check the version of the course text via the version release number to be found on the front page of the text, and compare this to the version number of the latest PDF version of the text on the website. If you are studying this course as part of a tutored programme, you should contact your Centre for further information on any changes. Full terms and conditions that apply to students on any of the Edinburgh Business School courses are available on the website and should have been notified to you either by Edinburgh Business School or by the centre or regional partner through whom you purchased your course. If this is not the case, please contact Edinburgh Business School at the address below: Edinburgh Business School Heriot-Watt University Edinburgh EH14 4AS United Kingdom Tel + 44 (0) Fax + 44 (0) [email protected] Website The courses are updated on a regular basis to take account of errors, omissions and recent developments. If you'd like to suggest a change to this course, please contact us: [email protected].
3 Project Management for the Oil and Gas Industry Dr William Wallace BSc (Hons), MSc, PhD DBA Programme Director and Senior Teaching Fellow, Edinburgh Business School (EBS), the Graduate School of Business at Heriot-Watt University. Dr William Wallace holds degrees from Leeds Metropolitan University (1981), Loughborough University (1983) and Heriot-Watt University (1987). He joined Edinburgh Business School in 2000 after 10 years project management experience in the UK public and private sectors. Dr Wallace is author of the EBS DBA texts Project Management and Alliances and Partnerships. He is joint author of Strategic Risk Management and Mergers and Acquisitions. He is also joint author of the EBS DBA texts Introduction to Business Research 1 3. He is Chair of the EBS DBA Research Committee and has successfully mentored and supervised numerous EBS DBA students.
4 First Published in Great Britain in Wallace 2014, The right of Dr William Wallace to be identified as Author of this Work has been asserted in accordance with the Copyright, Designs and Patents Act All rights reserved; no part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without the prior written permission of the Publishers. This book may not be lent, resold, hired out or otherwise disposed of by way of trade in any form of binding or cover other than that in which it is published, without the prior consent of the Publishers.
5 Contents Module 1 Introduction 1/1 1.1 Introduction 1/1 1.2 Course Rationale 1/1 1.3 Course Scope 1/2 1.4 Course Structure 1/4 1.5 Course Process Model 1/6 1.6 Default Standard Form of Contract 1/8 1.7 Default Government Policy and Regulatory Status 1/9 1.8 The Longitudinal Case Study and the Mini Case Studies 1/10 Learning Summary 1/11 Module 2 Projects and Project Management in the Oil and Gas Industry 2/1 2.1 Introduction 2/1 2.2 The Oil and Gas Industry Supply Chain 2/1 2.3 Projects in the Oil and Gas Industry 2/7 2.4 Project Management Practice in the Oil and Gas Industry 2/ Apwparent Weaknesses in Oil and Gas Project Management 2/18 Learning Summary 2/32 Module 3 Project Risk and Risk Interdependency 3/1 3.1 Introduction 3/1 3.2 Conditions of Certainty, Risk and Uncertainty in the Oil and Gas Industry 3/2 3.3 Risk Interdependency and Risk Interdependency Fields 3/ Enterprise-Wide Risk Management Systems 3/ Contractual and Non-Contractual Risk Allocation 3/33 Learning Summary 3/43 Module 4 Project Change Control 4/1 4.1 Introduction 4/1 4.2 The Concept of Contractual Change 4/2 4.3 Variation Orders and Change Notices 4/4 4.4 Valuing Variation Orders 4/ The Bill of Variations 4/ Change Disputes and Alternative Dispute Resolution 4/26 Learning Summary 4/34 Project Management for the Oil and Gas Industry Edinburgh Business School v
6 Contents Module 5 Contracts and Standard Forms of Contract 5/1 5.1 Introduction 5/1 5.2 Typical Contract Documents 5/2 5.3 Standard Forms of Contract 5/46 Learning Summary 5/54 Module 6 Claims and Claims Procedure 6/1 6.1 Introduction 6/1 6.2 The Concept of a Claim 6/2 6.3 Claims for an Extension of Time 6/8 6.4 Claims for Direct Loss and Expense 6/ Claim Categories 6/ Claims Procedure 6/ Example Claim for Direct Loss and Expense 6/30 Learning Summary 6/49 Module 7 Acceleration and Probabilistic Time Modelling 7/1 7.1 Introduction 7/1 7.2 The Concept of Acceleration 7/2 7.3 The Concept of Probabilistic Acceleration 7/5 7.4 Example PERT-Based Acceleration Calculation 7/ Example PERT-Based Acceleration Calculation with Damages 7/ Applicability of Probabilistic Time Modelling in the Oil and Gas Industry 7/25 Learning Summary 7/27 Module 8 Uncertainty, Contingencies and Scenario Planning 8/1 8.1 Introduction 8/1 8.2 Planning Under Conditions of Uncertainty 8/2 8.3 Scenario Planning 8/5 8.4 Contingencies and Contingency Planning 8/46 Learning Summary 8/57 Module 9 Longitudinal Case Study: Pentland Oil and Gas 9/1 Background and Requirements 9/1 9.1 Introduction 9/2 9.2 The Oil and Gas Industry 9/3 vi Edinburgh Business School Project Management for the Oil and Gas Industry
7 Contents 9.3 Pentland Oil and Gas: Extract from Annual Report 9/7 9.4 Pentland Oil and Gas: Chief Executive s Review 9/8 9.5 Pentland Oil and Gas: Company Portfolio 9/ Pentland Oil and Gas: The Board 9/ Pentland Oil and Gas: Financial Performance 9/ Pentland Oil and Gas: Income Statement and Balance Sheet 9/ Pentland Oil and Gas: Analyst s Report 9/ Exercises 9/ Solution Guidance 9/27 Appendix 1Appendix 1 Practice Final Examinations A1/1 Practice Final Examination 1 A1/1 Practice Final Examination 2 A1/6 Examination Answers A1/10 Appendix 2 Formula Sheet for Project Management for the Oil and Gas Industry A2/1 Index I/1 Project Management for the Oil and Gas Industry Edinburgh Business School vii
8
9 Module 1 Introduction Contents 1.1 Introduction... 1/1 1.2 Course Rationale... 1/1 1.3 Course Scope... 1/2 1.4 Course Structure... 1/4 1.5 Course Process Model... 1/6 1.6 Default Standard Form of Contract... 1/8 1.7 Default Government Policy and Regulatory Status... 1/9 1.8 The Longitudinal Case Study and the Mini Case Studies... 1/10 Learning Summary... 1/11 Learning Objectives By the time you have completed this module, you should understand: 1.1 Introduction the rationale for the design of the course; why the course is aligned with the upstream contractor perspective; the course structure and arrangement of modules; why a default standard form of contract is assumed; why a default statutory and regulatory position is assumed; the rationale for the longitudinal and mini case studies. This module acts as an introduction to the course. It provides an indication of the reasoning behind the design and structure of the course and summarises some of the assumptions and points of view adopted by the text. 1.2 Course Rationale The international oil and gas industry is undergoing a period of fundamental and rapid change. In 2008 Brent Crude reached $140 per barrel and in 2014 it was still trading at around $110 per barrel. By January 2015, however, the price had dropped to around $45 per barrel. This sudden and significant fall has had a profound and complex effect on the entire industry. Oil production areas such as the North Sea, for example, which is a mature basin with relatively high production costs, become much less attractive to investors as oil prices fall. There are numerous reasons for the fall in global oil prices. A substantial increase in production in the US and Canada (primarily from oil shale and oil sand reserves), Project Management for the Oil and Gas Industry Edinburgh Business School 1/1
10 coupled with a general refusal by the established producers to cut production, has led to a huge increase in global supply. This has coincided with a long-term reduction in demand from the US and Western Europe as a consequence of energysaving and emission control strategies. In addition, there has been slow growth in demand from the biggest emerging economies. All these factors have resulted in demand falling well behind production. Under such circumstances the industry faces considerable challenges. Oilfields that were profitable at $100 per barrel may not be profitable at $50 per barrel. Breakeven and payback periods lengthen and business plans have to be re-evaluated. Governments, state-owned oil and gas producers, private sector producers, service companies and other players in the industry find profits squeezed because their businesses ultimately depend on the sale price of the product. As prices fall and profits diminish, everyone in the chain has to cut costs. The best way to achieve this without affecting performance is to increase efficiency, and the best way to increase efficiency in a project-based industry is to manage projects more effectively; in other words, to make effective use of project management as a discipline. In an environment of low prices, there has never been a greater need for effective project management in the oil and gas industry, whether for exploration projects, drilling projects, refining projects, or sales and marketing projects. Additionally, in the longer term, and irrespective of short-term volatility in global oil and gas prices, it is likely that the levels of complexity and risk in all parts of the industry will increase further. The majority of the world s oil and gas fields have now been discovered, and it is unlikely that any significant new finds will ever be made. There is still a large sector based on exploration and the analysis of new fields, but as existing fields mature and are depleted there will inevitably be a growing emphasis on enhanced extraction methods, such as gas lift and horizontal drilling, and on the development of smaller and more challenging fields. In addition, an increasing proportion of the world s oil reserves will become concentrated in just a few countries, which are likely to be members of OPEC (the Organisation of Petroleum Exporting Countries), meaning the influence of that organisation will grow. In summary, as the industry finds itself based on a diminishing number of reserves in a smaller number of countries that are part of an increasingly powerful cartel, it follows that overall levels of competition, risk and uncertainty are likely to increase. It is suggested, therefore, that effective project management in the oil and gas industry is essential in both the short and the long term. The industry is projectbased, and it faces new and multifaceted challenges on an unprecedented scale. The aim of this course is to develop knowledge and understanding of the primary applied project management skills that are most likely to help practising project managers address these challenges. 1.3 Course Scope The international oil and gas industry is huge, and the energy derived from its outputs effectively drives civilisation. It is difficult to imagine, at present, how our 1/2 Edinburgh Business School Project Management for the Oil and Gas Industry
11 society could operate in anything like its current form without these two key hydrocarbon fossil fuels. The industry includes a panorama of subindustries, from field exploration to supply of gas to domestic dwellings and supply of the petrol that a driver buys at a petrol station. The oil and gas supply chain is often considered to comprise two sectors: upstream and downstream (discussed in more detail in Section 2.2). For now we can consider the sectors as shown below. These definitions are used loosely and there are no hard-and-fast categorisations. Upstream. The processes involved in getting the oil and gas out of the ground. Example upstream projects include mapping a reservoir, drilling and completing a well, and developing an entire oilfield. Downstream. The processes involved in getting the oil and gas from the point of production to the point of use. Example downstream projects include constructing a pipeline, building a refinery, and setting up an onshore storage facility. The characteristics of an individual oil and gas project, therefore, will depend on its position within the supply chain. A project to analyse a new oil reservoir will be very different from a project to build a new petrol station in an urban area. Although the basic project management applications of time planning and control, cost planning and control, and quality management, etc. will be standard, the characteristics of the projects will vary. It is necessary, therefore, to limit the scope of this course to one part of the supply chain. For this course the scope will be limited to upstream projects. This does not mean the content is not applicable to downstream projects. It simply means that the case studies and examples developed in support of the course text are based on the upstream sector. Some example oil and gas projects are considered in more detail in Section 2.2. The industry is also populated by a number of organisation types. The upstream sector involves client governments, state-owned production companies, private sector exploration specialists, private sector oil and gas producers, supply companies, subcontractors, etc. A typical project to drill an oil well might involve a client government, a service company that drills and lines the well, subcontracted drilling and support specialists, nominated and domestic subcontractors and suppliers, and government bodies, etc. It follows that the requirements to manage the project effectively vary considerably depending upon which point of view is considered. For example, the client s risk profile will be entirely different from that of the drilling contractor. The client is likely to be very much concerned with the eventual sale price of the oil, because this will determine the economic viability of the project. The drilling contractor, however, is unlikely to share this concern: the contractor simply drills the well and then moves on to the next job. Because of the diversity of the organisations in the industry, it is necessary to further limit the scope of this course to the perspective of one of the main parties involved in upstream projects. For this course the perspective adopted will be that of the contractor. In order to ensure, however, that the course is of equal interest to all parties in the supply chain, the emphasis on the upstream contractor is balanced by examples from the client perspective at each stage of the supply chain. Throughout the text there are Client Perspective features that develop the subject matter from the Project Management for the Oil and Gas Industry Edinburgh Business School 1/3
12 client s point of view. This approach allows the reader to gain an understanding of both points of view in the context of a single application. 1.4 Course Structure The course was developed in conjunction with the oil and gas industry, and the main areas covered are included in direct response to feedback from the industry. While researching the background to the course, the author spent some time visiting company offices and drilling sites and talking to people at all levels, from site operatives to senior managers. This research suggested a number of common areas in which oil and gas companies could improve their internal project management systems to maximum effect and where a course like this could be of greatest value. These common areas for improvement are summarised here and explored in more detail in Section Possible Areas for Improvement Area 1: Risk. This includes risk interdependency, risk management and contractual risk allocation. Most people in the industry are familiar with the concept of risk and understand how to identify and respond to simple and obvious risks. The problem arises when people have to start thinking about risk interdependency (how risks interact with each other). In addition, there seems to be minimal understanding of how risks are allocated in contracts and what impact a contract has on the risk profile of the organisation. Area 2: Change. This includes the management of change and the impact of change on risk and cost. There seems to be a perception within the industry that organisations operate under such consistently high levels of change that any kind of change control system will inevitably struggle. Significant time delays and cost increases resulting from both internal change (for example, a domestic subcontractor default) and external change (for example, a change in world oil price) are perceived to be a standard consequence of working in the industry and best managed by accepting them and including them within the overall risk premium for the contract. Area 3: Contracts. This includes contracts and procurement, including standard forms and both nominated and domestic subcontracts. There is a common perception that the contracts used in the industry are unnecessarily complicated and outdated and tend to have evolved unsystematically over many years. They are often developed by individual client organisations and governments and can be inflexible and difficult to apply. There is also a lack of understanding of contracts and a lack of contract administration expertise and experience within the industry. Area 4: Disputes and claims. Disputes and how to handle them represent a common problem area. Negotiation skills and conflict resolution seem to be underdeveloped in the industry, and there appears to be a heavy imbalance of power towards the client. Claims and recoveries by contractors as a result of client-induced delays and cost increases are rare. There is also an industry-wide 1/4 Edinburgh Business School Project Management for the Oil and Gas Industry
13 attitude that prevents contractors from challenging clients in areas that require dispute resolution. If disputes do occur, there seems to be an absence of the kind of dispute resolution systems that are widely used in other industries. Area 5: Probabilistic planning and control. A general inability to plan under conditions of change and high variability is a common problem area. Most oil and gas organisations are familiar with deterministic time planning and control but are less familiar with probabilistic time planning and control. Deterministic planning and control is appropriate for an activity such as building a supply road or laying a pipeline but is less appropriate for drilling a well. The time required to complete a well depends on so many variables that traditional deterministic approaches are inadequate. The solution is to use probabilistic tools and techniques, but many oil and gas organisations are either unaware of such tools or choose not to use them on any significant scale. Area 6: Uncertainty. This includes the range of conditions that can be classified as uncertainty, together with typical responses, such as dayworks, contingencies and general management reserves. Oil and gas projects are affected by high levels of change and risk, and as a result there can be a considerable amount of uncertainty within a company s risk profile. Organisations in the industry appear to have good control systems for uncertainty in some areas, such as health and safety, but not in others, such as cost planning and control, and time planning and control. As a result, both the identification of uncertainties and the responses put in place tend to be less than optimal The Corresponding Modules of the Course Text The course structure is specifically designed to address these areas for improvement, as shown below. It should be noted that Module 2 (Projects and Project Management in the Oil and Gas Industry) establishes the course in the context of the industry. Module 9 (Longitudinal Case Study: Pentland Oil and Gas) develops understanding by direct application of the knowledge developed from the course. These modules, therefore, do not correspond to the individual areas for improvement listed above. Module 3: Project Risk and Risk Interdependency (Area 1). This module examines risk interdependency and introduces the idea of developing enterprisewide systems for risk management based on full risk interdependency field analysis, whereby the impact of a change in one risk is fully modelled in terms of its effects on the overall risk profile of the organisation. Module 4: Project Change Control (Area 2). This module details the internal and external sources of change and the standard contractual provisions for change. It considers the mechanism for change notices and variation orders within contracts and examines some of the rules and procedures for recording and valuing contractual changes. Module 5: Contracts and Standard Forms of Contract (Area 3). This module summarises the contract documents likely to be encountered on large projects, from the bill of quantities to the contract specification, and discusses the structure and format of each together with its individual function. It also Project Management for the Oil and Gas Industry Edinburgh Business School 1/5
14 introduces some basic contract theory and provides some definitions. It goes on to introduce the concept of the standard conditions of contract and then lists some example clauses and terms and conditions from standard forms to illustrate their potential application in the oil and gas industry. The module examines sample clauses on a range of issues from certification and payments to suspension of the works by the contractor or client. Module 6: Claims and Claims Procedure (Area 4). This module examines the concept of claims and establishes typical processes and procedures to be followed in the event of a claim. The module presents the likely grounds for a claim (from both the contractor and client perspective) and details force majeure, relevant events, heads of claim, and preparation and submission of a claim. Module 7: Acceleration and Probabilistic Time Modelling (Area 5). This module introduces the idea of probabilistic time estimating and trade-offs. Oil and gas projects by their nature tend to be probabilistic rather than deterministic, with any trade-off calculations based on windows of likely times rather than absolute deterministic values. The module includes a number of worked examples to illustrate the calculations. Module 8: Uncertainty, Contingencies and Scenario Planning (Area 6). This module reinforces the concept of residual risk and considers typical areas of uncertainty in oil and gas projects. It also covers some typical uncertainty responses such as scenario planning and contingency analysis and planning. The course structure is summarised in the course process model in the next section. 1.5 Course Process Model The course structure and rationale for the learning outcomes are summarised in the course process model, shown in Figure 1.1. Module 2 establishes the unique characteristics of the oil and gas industry supply chain and describes the types of projects that exist within it and how project management operates in the industry. The module also lists some project management weaknesses observed in oil and gas companies that form the basis of the subject-specific modules that follow. In other words the course is designed to generate leaning outcomes that offer real potential for oil and gas companies to improve their project management skills in known deficit areas and thus increase competitive advantage. Module 3 develops the concept of risk interdependency, which was covered in the Project Management course, and introduces, and emphasises the value of, enterprise-wide risk management systems in the oil and gas industry. Projects are all about change, and change generates risk. Effective change control is, therefore, a prerequisite for effective enterprise-wide risk management. 1/6 Edinburgh Business School Project Management for the Oil and Gas Industry
15 Figure 1.1 Course process model Module 4 explores the various drivers of change and examines contractual options for managing change. The module develops an understanding of the standard mechanism for contractual change and how it can be managed and all associated costs recovered. The principal mechanism for recovering the costs associated with contractual change is contractual claims procedure, the application of which is controlled by rigid contractual terms and conditions. Module 5 details some typical contract documents and some standard forms of contract. It considers both generic and industry-specific standard forms, especially in the context of claims and claims procedure. Project Management for the Oil and Gas Industry Edinburgh Business School 1/7
16 Module 6 develops an understanding of claims procedure under standard forms of contract and underlines the importance of claims as the main mechanism for the recovery of increased costs and time delays resulting from contractual change. It examines the processes and procedures involved in initiating, assembling and successfully concluding claims for an extension of time and direct loss and expense. Module 7 builds on the PERT theory presented in Project Management by introducing the concept of probabilistic time estimating and trade-offs. This directly addresses a classic oil and gas company weakness: that of a lack of probabilistic time planning and control. The module demonstrates how PERT trade-offs offer an ideal solution for the probabilistic time planning and control of variable-duration activities, such as drilling oil and gas wells. Effective application of this technique can significantly reduce a number of interdependent time-based risks, such as late rig transfer damages and downtime losses. Module 8 stresses that risk can be managed only within limits and that there will always be uncertainties, especially in the oil and gas industry. The module also underscores the importance of managing uncertainty within whatever control limits apply. It then develops an understanding of scenario planning, a technique used by one or two major oil and gas companies but not in use throughout the industry. 1.6 Default Standard Form of Contract Most readers will be aware that the oil and gas industry is characterised by a range of contract types, from land acquisition contracts prior to exploration to long-term supply contracts for refined products. Most will also be aware that issues such as risk profiling and change control depend very much on the type of contract used. It is necessary, therefore, for the course text to focus on a single assumed or default contract type. This could be any contract from a client-specific one written by a client government to a standardised nominated subcontract agreement. It is not viable to design the course around a single bespoke or client pro forma contract. It is more appropriate to refer to a standard form of contract that is widely recognised and easily obtainable, even if it is not commonly used in the oil and gas industry. For this reason the course assumes the general approach of a practitioner working to a standard form of contract produced by the International Federation of Consulting Engineers (FIDIC). FIDIC ( was founded in 1913, and its membership has grown to cover more than 80 countries. It produces possibly the best-known and most internationally recognised set of standard forms of contract, which are widely used across a range of industries. FIDIC produces a large number of standard forms of contract in numerous formats. One of the most widely used in the construction industry is the Conditions of Contract for Construction (First Edition 1999) for Building and Engineering Works Designed by the Employer. This is available in hard copy or as an electronic download. The hard copy version has a white cover and features a stylised red hemisphere. For this reason it is sometimes referred to as the Red Book. 1/8 Edinburgh Business School Project Management for the Oil and Gas Industry
17 Further details are available at: Note: when the course text refers to standard forms of contract the FIDIC Red Book is considered a typical example. There are other centralised bodies that produce standard forms of contract, and FIDIC itself produces many other forms of contract and other types of documentation. It is not necessary to read or learn any of the terms or conditions contained within any standard forms of contract for this course. It is simply necessary to read and understand the principles discussed in the text and to remain aware that these are developed along the general practice guidelines that a project manager might follow when working on a project using the FIDIC Red Book or similar as the standard form of contract to engage a contractor. 1.7 Default Government Policy and Regulatory Status Most people who work in the oil and gas industry know that government policy and the actions of national and international regulators can have a considerable impact on how projects are awarded and managed. However, these influences are, by definition, specific to the countries and governments concerned. Consider the case of the UK North Sea oil and gas industry. The relevant UK government department is the Department of Energy and Climate Change (DECC). The DECC is a ministerial department (headed by a cabinet minister) and has a number of responsibilities, including energy security, sustainability, demand reduction and waste management. The DECC has its own strategic objectives and governance policies that do not apply in other countries. More information can be found at: department-of-energy-climate-change. Overall health and safety is regulated by the UK government s Health and Safety Executive (HSE) ( The UK also has a number of nongovernmental health and safety action groups, such as the Helicopter Safety Steering Group (HSSG) ( Emergency response coordination interests include the Operators Cooperative Emergency Services (OCES) and Emergency Preparedness Offshore Liaison (EPOL) ( In addition, government policy and regulatory controls tend to change over time. For example, in February 2014 the UK government announced plans to establish a new North Sea oil and gas regulator to promote the full exploitation of North Sea oil and gas reserves over the coming decades. The strategic objectives are to ensure that producers are encouraged to access as many hard-to-reach reserves as possible and to ensure that all existing production reserves are depleted as much as possible before the fields are decommissioned. The decision was made in response to the recommendations of the Wood Review, commissioned by the UK government in 2013 and released in February 2014 ( Other future developments could include new EU controls on the regulation of offshore safety, although there is opposition to this proposal from parts of the UK Project Management for the Oil and Gas Industry Edinburgh Business School 1/9
18 oil and gas industry because of concern it may undermine the UK-specific approaches that have evolved over years of hard-won experience. These government bodies, regulators, regulations and policies are all UK-specific and are not relevant to operations in other countries. A detailed understanding of UK North Sea government policy would be of little interest or relevance to a practitioner in, say, Trinidad and Tobago, where entirely different government and regulatory policies and procedures apply. This course, therefore, does not consider government or regulator policy and procedures in the context of oil and gas project management. The primary reasons are that (a) these influences are country-specific and of limited value or relevance to those working in other countries and (b) in many countries they are constantly changing. It is accepted that government and regulator influences on oil and gas project management are considerable and important, but for the reasons given above they are not considered in any detail in this course. The course does, however, assume a general default position on general government policy and regulatory status based on the UK North Sea industry. This default position is assumed as a basis for some of the case studies for illustrative purposes only. 1.8 The Longitudinal Case Study and the Mini Case Studies The course contains a longitudinal case study and a number of mini case studies. The case studies are designed to help students develop a greater understanding of the theory covered in the text. As with Project Management, this course attempts to develop both knowledge (theory) and understanding (application). The case studies are designed to give an idea of how some of the theory in the course text might be applied in real life The Longitudinal Case Study The longitudinal case study occupies a full module in the text and is based on a realworld project. It is designed to develop detailed applied understanding of the theory developed in the course text. The longitudinal case study (Module 9) concerns an international company that starts out as a field exploration and development specialist and eventually makes the transition to producer. The case study presents the various stages of the transition process, which is, in effect, a strategic project. The case study develops an understanding of the phases of the transition and of how a project might be managed in a similar scenario in the real world The Mini Case Studies The mini case studies are interspersed throughout the course so as to be relevant to the adjacent text. They are designed to encourage the reader to think about the theory and especially about its real-world application. The mini case studies are designed to develop background applied thought and consideration rather than detailed applied understanding. They all feature one or 1/10 Edinburgh Business School Project Management for the Oil and Gas Industry
19 two short questions on the case study text. The reader needs to think about the content of the mini case study only in the context of the rest of the course text to be able to answer the questions. There is no need for additional background reading. Learning Summary This module has introduced the course and established the rationale for the course content and structure. The module has made it clear that the course was developed systematically following a period of research within the oil and gas industry. The course structure reflects the areas for improvement that were identified during that research. Given recent and longer-term changes in the oil and gas industry, there is an increasing need for effective project management. Given the size and complexity of the oil and gas supply chain, the course focuses primarily on (a) the upstream sector and (b) the contractor s perspective. This focus is balanced by the use of Client Perspective features where appropriate and by the use of downstream examples and case studies. The structure of the course reflects the main areas of concern identified by the industry during the background research. The course assumes a default standard form of contract, which is the FIDIC Conditions of Contract for Construction (First Edition) 1999 for Building and Engineering Works Designed by the Employer. For illustrative purposes the course assumes a default position on government policy and regulatory status based on the UK North Sea industry. The course contains a number of mini case studies and one longitudinal case study. These are designed to facilitate application and to allow the reader to develop both knowledge and understanding of the subject areas covered within the course text. It should be noted that other perspectives, sectors of the supply chain, standard forms of contract and default government positions could have been adopted. The development of the course would be different in each case, but the general principles would be largely unchanged. Module 2 considers the oil and gas industry supply chain and some of the many project types that exist within it, ranging from reservoir survey projects to petrol station site acquisition projects. It goes on to consider the nature of project management in the oil and gas industry and discusses some of the outcomes of the background research carried out as part of the development of this course. Some areas in which oil and gas companies could improve their approach to project management are discussed. Project Management for the Oil and Gas Industry Edinburgh Business School 1/11
Oil and Gas Steve Oliver
English for Global Industries Oil and Gas Steve Oliver Contents Sections 1 Oil and Gas 2 Working on a Rig 3 Drilling Operations 4 Geological and Geophysical Operations 5 Producing and Delivering Units
CCS Roadmap. The regulatory framework
The regulatory framework April 2012 The regulatory framework We are: Ensuring that the CCS Commercialisation Programme provides practical experience with the regulatory framework and that the framework
Project Management. Synopsis. 1. Introduction. Learning Objectives. Sections. Learning Summary
Synopsis Project Management 1. Introduction By the time you have completed Module 1 you should understand: what is meant by a project; the concept of project management; how project management can be structured
Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas
Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas Industry Solutions Managing the complexity of major capital projects in today s oil and gas
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations
Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations December 2011 Contents Contents... i Introduction... 1 Executive Summary... 1 Background...
The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry
The world s leading sustainability consultancy Sustainable Solutions for the Oil and Gas Industry The oil and gas industry currently faces the greatest environmental, health and safety challenges in its
Delivering for the future
Dragon Oil Delivering for the future ANNUAL REPORT 2014 Principal Risks The Board and management are committed to an effective and proactive approach to risk management as a tool to enhance shareholder
Global Oil and Gas Capital Expenditure Outlook 2010: National Oil Companies (NOCs) to Drive Investment
Global Oil and Gas Capital Expenditure Outlook 21: GlobalData s new report Global Oil and Gas Capital Expenditure Outlook 21: National Oil Companies (NOCs) to Drive Investment provides in-depth analysis
Introduction to Oil & Gas Industry, Accounting & Financial Statement Analysis. Copyright by Wall Street Prep, Inc. All rights reserved 1
Introduction to Oil & Gas Industry, Accounting & Financial Statement Analysis Copyright by Wall Street Prep, Inc. All rights reserved 1 A number of distinct yet interconnected sectors There are a number
1. The purpose of this paper is to discuss the assessment of whether a contract contains a lease and does not discuss:
IASB Agenda ref 3A STAFF PAPER May 2014 REG FASB IASB Meeting Project Paper topic Leases Definition of a Lease CONTACT(S) Sarah Geisman [email protected] +44 (0)20 7246 6464 Patrina Buchanan [email protected]
Sourcing critical oil field services for shale plays in a tightening supply market
Sourcing critical oil field services for shale plays in a tightening supply market Successful operators are responding to the market by adopting a more strategic view of the role of their supply management
Project Finance in the Oil and Gas Industry
Book early and SAVE 10% www.clariontraining.com/energy A three-day practical applied training course for Oil and Gas Industry Professionals Get to grips with financial and economic techniques, sources
Procurement Capability Standards
IPAA PROFESSIONAL CAPABILITIES PROJECT Procurement Capability Standards Definition Professional Role Procurement is the process of acquiring goods and/or services. It can include: identifying a procurement
The Total Tax Contribution of the UK Oil & Gas industry
www.pwc.co.uk The Total Tax Contribution of the UK Oil & Gas industry Report prepared for Oil & Gas UK February 2012 Contents Foreword 1 Purpose and outline of the study 2 The contribution of the oil and
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9
NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 A G U I D E T O A I M U K TA X B E N E F I T S 2 AIM Note for Mining, Oil and Gas Companies Contents Introduction 1 Companies to which this Note
Integrated Oil Companies
Integrated Oil Companies Loretta Bu Zhou Fang Suvayan Roy Patrick He Artur Shikhaleev Yang Zeng 1 Key Questions 2 Upstream, Midstream, Downstream, Equipment and Services Companies THE OIL SUPPLY CHAIN
TEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
Nominated Subcontractors on International Projects: Approaches to Risk Allocation
Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.
Strategic Planning for the Oil and Gas Industry
Strategic Planning for the Oil and Gas Industry Craig Robinson Alex Scott PO-A1-engb 1/2011 (1049) This course text is part of the learning content for this Edinburgh Business School course. In addition
Guidance on Arrangements to Support Operational Continuity in Resolution. Consultative Document
Guidance on Arrangements to Support Operational Continuity in Resolution Consultative Document 3 November 2015 ii The Financial Stability Board ( FSB ) is seeking comments on its Consultative Document
The FIDIC Suite of Contracts
Less well know FIDIC contracts are also available such as the Turquoise Book for Dredging and Reclamation Works published in January 2006 and the White Book model services agreement published in October
Polish Financial Supervision Authority. Guidelines
Polish Financial Supervision Authority Guidelines on the Management of Information Technology and ICT Environment Security for Insurance and Reinsurance Undertakings Warsaw, 16 December 2014 Table of Contents
The Role of Predictive Analytics in Asset Optimization for the Oil and Gas Industry
The Role of Predictive Analytics in Asset Optimization for the Oil and Gas Industry WHITE PAPER Sponsored by: Tessella Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.935.4400 F.508.988.7881
SPECIALIST INSURANCE SERVICES
SPECIALIST INSURANCE SERVICES energy WWW.PRICEFORBES.COM contents about us...5 our approach...6 five steps to service delivery...8 upstream & Mid-stream operations...13 downstream operations...14 claims...15
Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION
EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially
The Energy (including renewables) growth sector is defined by the Standard Industrialisation Classification (SIC) 2007 codes:
Growth Sector Briefing Energy (including renewables) Office of the Chief Economic Adviser, Scottish Government February 2015 Growth Sector Definition Scotland s Energy (including renewables) sector was
Business-critical Insurance
Business-critical Insurance Identifying those insurances that support the business and its strategy Guide 2015 Contents Introduction... 4 Categories of insurance... 5 Determining which insurance covers
Certificate Programs in. Program Requirements
IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: [email protected] Copyright International Human
Transparency Market Research
Transparency Market Research Subsea Manifolds Market - Global Industry Analysis, Size, Share, Growth, Trends, and Forecast 2014-2020 Published Date 27-Feb-2015 81 Page Report Buy Now Request Sample Press
Oil & Gas UK I N D E X. December 2009
Oil & Gas UK I N D E X December 09 THE OIL & GAS UK INDEX 1 Summary The Oil & Gas UK Index The Oil & Gas UK Index is a new quarterly index which measures changes in activity and business confidence across
How To Design A Project
Introduction to Procurement Why is procurement important? Client needs are unique and consequently each project meeting those needs has unique characteristics. This means that achieving the right project
AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 -
AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - THE EXPERIENCED The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering application abilities,
How To Account For Construction Contracts In Hong Kong Kongsong Accounting Standard 11
HKAS 11 Issued October 2004Revised March 2010 Hong Kong Accounting Standard 11 Construction Contracts COPYRIGHT Copyright 2011 Hong Kong Institute of Certified Public Accountants This Hong Kong Financial
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CIC/AppInsp The Construction Industry Council - Association of Consultant Approved Inspectors contract for the appointment of an approved inspector
Construction Contracts
STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.
NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS
NAS 13 NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS CONTENTS Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources
Appendix 25 Content of a Competent Person s Report for Petroleum Reserves and Resources (See rule 18.20) The Competent Person s Report for Petroleum Reserves and Resources must include the following: 1.
Global Oil & Gas Suite
IHS ENERGY Global Oil & Gas Suite Comprehensive analysis and insight on upstream opportunities, risk, infrastructure dynamics, and downstream markets Global Oil & Gas Suite Make optimal decisions about
Contract pricing disputes
Ted Greeno Caroline Kehoe Herbert Smith LLP 1. Introduction Contract pricing disputes in the energy industries typically arise in the context of long-term contracts under which an initial price agreed
Management School. MSc/PG Dip/PG Cert. Energy Management. University of Stirling Management School
Management School MSc/PG Dip/PG Cert Energy Management University of Stirling Management School The MSc Energy Management develops the knowledge and analytical skills needed to equip students for a successful
Chartered Engineer. Go back to www.iop.org to choose an alternative status. Write your professional review report
Chartered Engineer Start your journey Chartered Engineers are characterised by their ability to develop appropriate solutions to engineering problems, using new or existing technologies, through innovation,
Corporate Governance Guidelines
Corporate Governance Guidelines 1. Introduction Entra ASA ( Entra ), and together with its subsidiaries, ( the group ) will be subject to the reporting requirements on corporate governance set out in 3
THE MISSING LINKS IN INVESTMENT ANALYSIS A PORTFOLIO MANAGEMENT STRATEGY TO MAKE INVESTMENTS WORK
THE MISSING LINKS IN INVESTMENT ANALYSIS A PORTFOLIO MANAGEMENT STRATEGY TO MAKE INVESTMENTS WORK MICHAEL HEPINSTALL DANIEL LYONS MARK PELLERIN Confronted with tighter profit margins and greater risks,
Oil Gas expo 2015 is comprised of 13 Main tracks and 131 sub tracks designed to offer comprehensive sessions that address current issues.
OMICS Group cordially invites participants from all over the world to attend International Conference and Expo on Oil and Gas, scheduled during November, 16-18, 2015 at Dubai, UAE mainly focused on the
THE UNITED REPUBLIC OF TANZANIA MODEL PSA ADDENDUM FOR NATURAL GAS
THE UNITED REPUBLIC OF TANZANIA MODEL PSA ADDENDUM FOR NATURAL GAS Addendum to Existing PSA between GOT, TPDC and Contractor ABC For Deep sea Operations 1 MODEL PSA ADDENDUM FOR NATURAL GAS For Deep sea
Introduction to Business Research 3
Introduction to Business Research 3 Research Methodology, Data Collection and Analysis, Results and Conclusions Dr William Wallace Frances Pfab LS-A3 1/2012 (1025) This course text is part of the learning
PRIMAVERA TRANSFORMING THE OIL AND GAS INDUSTRIES
PRIMAVERA TRANSFORMING THE OIL AND GAS INDUSTRIES Providing End-to-End Insights for Portfolio- Wide Success: Primavera Solutions for Oil and Gas BENEFITS Identify and select the best exploration, production,
UNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
Energy Act 2013 CHAPTER 32. Explanatory Notes have been produced to assist in the understanding of this Act and are available separately
Energy Act 2013 CHAPTER 32 Explanatory Notes have been produced to assist in the understanding of this Act and are available separately Energy Act 2013 CHAPTER 32 CONTENTS PART 1 DECARBONISATION 1 Decarbonisation
Price developments on the EU retail markets for electricity and gas 1998 2011
Price developments on the EU retail markets for electricity and gas 1998 2011 The Market Observatory for Energy has analysed price developments on the retail markets for electricity and natural gas (domestic
Enterprise Risk Management
Enterprise Risk Management Topic Gateway Series No. 49 1 Prepared by Jasmin Harvey and Technical Information Service July 2008 About Topic Gateways Topic Gateways are intended as a refresher or introduction
Oil Market Outlook. March 2016. Compiled by Dr Jeremy Wakeford
Oil Market Outlook March 2016 Compiled by Dr Jeremy Wakeford Highlights Oil prices have remained very weak in recent months, with the Brent benchmark averaging $31/bbl in January and $32/bbl in February
INTEGRATED RISK MANAGEMENT SOLUTIONS
INTEGRATED RISK MANAGEMENT SOLUTIONS OUR SERVICES RPS Integrated Risk Management Solutions provides specialist HSE & Risk Management consultancy services to the energy industry and other major hazard industries.
H.R. 702 A bill to adapt to changing crude oil market conditions
CONGRESSIONAL BUDGET OFFICE COST ESTIMATE September 29, 2015 H.R. 702 A bill to adapt to changing crude oil market conditions As reported by the House Committee on Energy and Commerce on September 25,
TOUCHSTONE ANNOUNCES 2015 THIRD QUARTER RESULTS AND ELIMINATION OF NET DEBT; UPDATES TRINIDAD ACQUISITION
TOUCHSTONE ANNOUNCES 2015 THIRD QUARTER RESULTS AND ELIMINATION OF NET DEBT; UPDATES TRINIDAD ACQUISITION Calgary, Alberta November 13, 2015 Touchstone Exploration Inc. ( Touchstone or the Company ) (TSX:
A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division
A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose
Our financing of the energy sector
RBS Sustainability Briefing Our financing of the energy sector rbs.com/sustainable RBS Sustainability Briefing About this document RBS is a UK-based banking and financial services company, headquartered
FIDIC Capacity Building. A Major Role for FIDIC in the Consulting Engineering Industry
FIDIC Capacity Building A Major Role for FIDIC in the Consulting Engineering Industry FIDIC Capacity Building A Major Role for FIDIC in the Consulting Engineering Industry FIDIC Capacity Building The
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
BES 6001 Issue 3 Guidance Document
BES 6001 Issue 3 Guidance Document This guide is intended to give an understanding of BES6001:2014 Framework Standard for Responsible Sourcing. It is not a controlled document. 3.2.1 Responsible Sourcing
Degree/ Higher Education Jobs:
Ohio s Natural Gas and Crude Oil Industry Degree/ Higher Jobs Job Title Degree/ Higher Jobs: for field positions may require 2 to 4 year, or higher degrees that are industry specific and/ or technical
The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors
108 Accounting Standard (AS) 7 (revised 2002) Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT
AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised
Course Brochure. New York. Doha
Course Brochure LONDON New York Dubai Hong Kong Singapore Johannesburg Doha Aberdeen abuja kuala lumpur Table of contents Background page 3 Oil & Gas Faculty pages 5-8 Mining Faculty pages 9-11 Public
Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review
Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a
Preliminary information on UK and Scotland. UK Environmental Law Association: making the law work for a better environment
UKELA s response to Milieu consultants questionnaire on the effectiveness of the Recommendation 2014/70/EU on exploration and production of hydrocarbons (such as shale gas) using high- volume hydraulic
MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY
GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management
Construction Contracts
Compiled Accounting Standard AASB 111 Construction Contracts This compiled Standard applies to annual reporting periods beginning on or after 1 January 2009 that end on or after 30 June 2009. Early application
Infosys Oil and Gas Practice
Infosys Oil and Gas Practice Legacy systems and technologies hamper production at unconventional oil and gas basins and inhibit productivity at conventional energy reserves. The steep cost of exploration,
Investing in renewable technologies CfD contract terms and strike prices
Investing in renewable technologies CfD contract terms and strike prices December 2013 Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium,
BT s supply chain carbon emissions a report on the approach and methodology
BT s supply chain carbon emissions a report on the approach and methodology April 2015 1 BT s supply chain emissions metrics approach and methodology 1 Are supply chain emissions really the essential,
How To Understand And Understand The Concept Of Business Architecture
WHITE PAPER Business Architecture: Dispelling Ten Common Myths William Ulrich, TSG, Inc. Whynde Kuehn, S2E Consulting Inc. Business Architecture: An Evolving Discipline B usiness architecture is a maturing
Outsourcing: key legal issues and contractual protections
Page 1 Outsourcing: key legal issues and contractual protections Paul Jones May 2009 Introduction As the economic climate becomes more challenging, organisations in all sectors are looking to drive efficiencies
Power Trading and Retail System. empowering. smarter trading. across the energy value chain. Smart energy. Powering progress
Power Trading and Retail System empowering smarter trading across the energy value chain Smart energy. Powering progress In today s turbulent and increasingly complex energy markets, Atos Worldgrid PTRS
Tapping the benefits of business analytics and optimization
IBM Sales and Distribution Chemicals and Petroleum White Paper Tapping the benefits of business analytics and optimization A rich source of intelligence for the chemicals and petroleum industries 2 Tapping
REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])
65 REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan]) (See also General Regulations) Any publication based on work approved for a higher degree should
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4
International Accounting Standard 11 Construction Contracts
International Accounting Standard 11 Construction Contracts Objective The objective of this Standard is to prescribe the accounting treatment of revenue and costs associated with construction contracts.
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
Financial Services Guidance Note Outsourcing
Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14
BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES GOVERNMENT ACCOUNTING SECTION DEPARTMENT OF FINANCE MARCH 2004 Risk Management Guidance CONTENTS Pages List of guidelines on risk management
T4 Case study - TOPCIMA. Strategic Analysis. YJ Oil and Gas. Nick Best
T4 Case study - TOPCIMA Strategic Analysis YJ Oil and Gas Nick Best with www.astranti.com Welcome Welcome to Nick Best s T4 Case Study strategic analysis For those of you who don t know me, I ve tutored
Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program
Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program 458 برنامج إدارة العقود الھندسية وعقود التشييد المتكامل معتمد عالميا 10 October
Cyber Security Consultancy Standard. Version 0.2 Crown Copyright 2015 All Rights Reserved. Page 1 of 13
Cyber Security Consultancy Standard Version 0.2 Crown Copyright 2015 All Rights Reserved Page 1 of 13 Contents 1. Overview... 3 2. Assessment approach... 4 3. Requirements... 5 3.1 Service description...
Unconventional oil and gas: outlook, risks, and potential
20140519_SBC_International Energy Forum - Paper_v05 Unconventional oil and gas: outlook, risks, and potential May 2014 Moscow Table of Contents KEY INSIGHTS... 2 1. UNCONVENTIONAL RESOURCES ARE SIZEABLE
NOTICE 158 OF 2014 FINANCIAL SERVICES BOARD REGISTRAR OF LONG-TERM INSURANCE AND SHORT-TERM INSURANCE
STAATSKOERANT, 19 DESEMBER 2014 No. 38357 3 BOARD NOTICE NOTICE 158 OF 2014 FINANCIAL SERVICES BOARD REGISTRAR OF LONG-TERM INSURANCE AND SHORT-TERM INSURANCE LONG-TERM INSURANCE ACT, 1998 (ACT NO. 52
energy JLT Specialty Limited Demand Different
energy JLT Specialty Limited Demand Different JLT Specialty Limited Putting clients first JLT Specialty s Energy Division is recognised as a leading energy broker worldwide. In 2012, JLT Group placed more
Support across the value chain. Expertise for Offshore Renewables Projects. rpsgroup.com/downstream
Downstream Consultancy Support across the value chain Expertise for Offshore Renewables Projects rpsgroup.com/downstream 2 Downstream Consultancy RPS Energy a global energy consultancy n RPS Energy is
Management of Radioactive Waste & Materials Inventory Data
Management of Radioactive Waste & Materials Inventory Data Critical Enabler Contents Executive Summary... 3 1. Introduction... 4 2. Inventory Data Users... 5 3. Current Situation... 7 3.1 Management of
Measured development Construction and Engineering Training Supplement Guide
Construction and Engineering Training Supplement Guide Welcome Eversheds is the law firm behind some of the world s most ambitious construction and engineering projects. We have one of the biggest teams
Module 1: Introduction to Industrial Energy Management
Module 1: Introduction to Industrial Energy Management Organisations that successfully manage energy have business processes to plan, monitor, and control energy use, just as they do for other corporate