Quality and Safety Programme Fractured neck of femur services
|
|
|
- Marjory Atkinson
- 9 years ago
- Views:
Transcription
1 Quality and Safety Programme Fractured neck of femur services London quality standards February
2 Introduction The case for change for fractured neck of femur services in London demonstrates that there is a large variation in the service patients receive both within and between hospitals; these variations impact on patient experience and outcomes. The NHS in London must ensure that a whole-hospital approach is taken to ensure fractured neck of femur services are consistently delivered to a high quality and safe standard, across all providers, seven days per week. The rationale for this statement was founded on the following key themes: Timely operations have a significant impact upon mortality and complication rates. A number of acute providers in London failed to meet the national average and almost a third of hospitals were unable to carry out at least 20% of operations within two days of admission. The waiting times for some providers were significantly above the national average and the delays were attributable to a number of reasons including patients being medically unfit for surgery and low availability of theatre space. Delays to operations were found to increase significantly at the weekends in comparison to weekdays. Senior involvement in patient care is vital to improve patient outcomes. In London there is a lack of direct involvement of consultant orthopaedic surgeons, consultant orthogeriatricians and consultant anaesthetists. There is also stark variation in consultant presence between weekdays and weekends. Multi-disciplinary input into patient care is a vital component of recovery and rehabilitation of fractured neck of femur patients; however the provision of multi-disciplinary services including therapy, pharmacy and social services varies significantly across London, particularly at weekends. London quality standards have been developed to address the issues raised in the fractured neck of femur case for change and improve these services delivered in an acute setting. The development of the standards has been led by the clinical expert panel of the fractured neck of femur review and informed by wider stakeholder groups, including clinicians, commissioners, hospital managers and patients and the public through continued engagement during the review. The standards represent the minimum quality of care patients with a fractured neck of femur should expect to receive in every hospital in London. All standards apply to all seven days of the week. There should be no difference in the provision of emergency services during the week compared to those at the weekend. 2
3 Quality and Safety Programme: Fractured neck of femur pathway London quality standards Standard 1 All emergency fractured neck of femur operations to be prioritised on planned emergency lists and the operation undertaken within 24 hours of being admitted to hospital. The date, time and decision maker should be documented clearly in the patient s notes and any delays to emergency surgery and the reasons why recorded. DH (2011) NCEPOD (2004) The NCEPOD classification of Intervention. RCP (1989) 2 All emergency admissions for fractured neck of femur to be seen and assessed by an consultant orthopaedic surgeon, a consultant geriatrician/ physician and a consultant anaesthetist within 12 hours of the decision to admit or within 14 hours of the time of arrival at the hospital. 3 All patients to be considered for pre-operative optimisation by critical care and a decision documented. 4 All patients to be routinely offered fascia iliaca block (a localised anaesthetic) as soon as possible after admission in order to provide the patient with optimal dynamic analgesia and reduce the dose and side effects of opioid analgesia. RCS (2011) Emergency Surgery Standards for unscheduled care NCEPOD (2007) Emergency admissions: A journey in the right direction? Fractured neck of femur clinical expert panel Foss, N., et al. (2007) Fascia Iliaca Compartment Blockade for Acute Pain Control in Hip Fracture Patients. Anaesthesiology 2007;106: SIGN (2009) Management of hip fractures in older people. 3
4 Standard 5 All patients to have their operation carried out under the direct supervision of a consultant surgeon and consultant anaesthetist; early referral for anaesthetic assessment is made to optimise peri-operative care. 6 All patients to be under the joint care of a consultant orthopaedic surgeon and a consultant geriatrician 7 All patients to be seen and reviewed by a consultant and their team during twice daily ward rounds for the pre-operative period and for 48 hours post-operation. RCS (2011) Emergency Surgery Standards for unscheduled care. 8 When on-take consultants and their teams should be freed from all other elective and clinical commitments. 9 All patients admitted with a fractured neck of femur to be continually assessed using the National Early Warning System (NEWS). The NEWS competency based escalation trigger protocol should be used for all patients. In addition, consultant involvement for patients considered high risk should be within one hour. RCS (2011) Emergency Surgery Standards for unscheduled care. NCEPOD (2004) The NCEPOD classification of Intervention. DH (2010) Review of early warning systems in the NHS. RCP (2012) National Early Warning Score NCEPOD (2012) Time to intervene? 4
5 Standard 10 A clear and comprehensive multi-disciplinary assessment of each patient s health, nutritional, nursing and social needs should be completed within 24 hours of admission. This assessment should produce an individualised care plan which includes referrals for further specialist assessment and treatment: physiotherapy, occupational therapy, pharmacy, pain management and dietetics. Early referral to social services should take place to facilitate timely discharge. BGS (2007) The care of patients with fragility fracture. NHFD (2011) The National Hip fracture Database National Report All admitted patients to have discharge planning and an estimated discharge date as part of their management plan as soon as possible and no later than 24 hours post-admission. Discharge planning to include multidisciplinary rehabilitation. Patients to be discharged to a named GP. 12 Consultant-led communication and information to be provided to patients and to include the provision of patient information leaflets. 13 Patient experience data to be captured, recorded and routinely analysed and acted on. Review of data is a permanent item on the trust board agenda and findings are disseminated. NCEPOD (2007) Emergency admissions: A journey in the right direction? Adult emergency services standards Adult emergency services standards 5
Effective Approaches in Urgent and Emergency Care. Priorities within Acute Hospitals
Effective Approaches in Urgent and Emergency Care Paper 1 Priorities within Acute Hospitals When people are taken to hospital as an emergency, they want prompt, safe and effective treatment that alleviates
Quality Improvement Project Enhanced Recovery and Rehabilitation for Fracture Neck of Femur
Quality Improvement Project Enhanced Recovery and Rehabilitation for Fracture Neck of Femur Borders General Hospital Implementing Enhanced Recovery in Process Outcomes Food for thought Orthopaedics Summarise
Anaesthetics, Pain Relief & Critical Care Services Follow-Up Study REGIONAL REPORT. Performance Review Unit
Anaesthetics, Pain Relief & Critical Care Services Follow-Up Study REGIONAL REPORT Performance Review Unit CONTENTS page I INTRODUCTION... 2 II PRE-OPERATIVEASSESSMENT... 4 III ANAESTHETIC STAFFING AND
National Clinical Programmes
National Clinical Programmes Section 3 Background information on the National Clinical Programmes Mission, Vision and Objectives July 2011 V0. 6_ 4 th July, 2011 1 National Clinical Programmes: Mission
Acute care toolkit 2
Acute care toolkit 2 High-quality acute care October 2011 Consultant physicians are at the forefront of delivering care to patients presenting to hospital with medical emergencies. Delivering this care
Hip replacements: Getting it right first time
Report by the Comptroller and Auditor General NHS Executive Hip replacements: Getting it right first time Ordered by the House of Commons to be printed 17 April 2000 LONDON: The Stationery Office 0.00
Future hospital: Caring for medical patients. Extract: Recommendations
Future hospital: Caring for medical patients Extract: Recommendations Future hospital: caring for medical patients Achieving the future hospital vision 50 recommendations The recommendations from Future
Patient Access Policy
Patient Access Policy NON-CLINICAL POLICY ACE 522 Version Number: 2 Policy Owner: Lead Director: Assistant Director of Operations Director of Operations Date Approved: Approved By: Management Executive
National Clinical Programme in Surgery (NCPS) Care Pathway for the Management of Day Case Laparoscopic Cholecystectomy
National Clinical Programme in Surgery (NCPS) Care Pathway for the Management of Day Case Consultant Surgeon DRAFT VERSION 0.5 090415 Table of Contents 1.0 Purpose... 3 2.0 Scope... 3 3.0 Responsibility...
Community Rehabilitation Beds. Questions and Answers
Patient Information Leaflet Community Rehabilitation Beds Questions and Answers Produced by: Community Rehabilitation Date: March 2014 Review due date: March 2017 1 PARTNERSHIP IN CARE INDEPENDENT NURSING
Guildford and Waverley Programme NHS Surrey Board 4 August 2009
Guildford and Waverley Programme NHS Surrey Board 4 August 2009 Agenda The proposed consultant led clinical model of care Mr Edward Palfrey, Medical Director, Frimley Park Investment in Cranleigh, then
A&E Recovery & Improvement Plan
Engagement and Patient Experience Committee (A Sub-Committee of NHS Southwark CCG Governing Body) ENCLOSURE B A&E Recovery & Improvement Plan DATE OF MEETING: September 2013 CCG DIRECTOR RESPONSIBLE: Tamsin
Update on Discharges from University Hospital Southampton. Southampton City Council Health Overview and Scrutiny Panel
Update on Discharges from University Hospital Southampton Southampton City Council Health Overview and Scrutiny Panel Every day approximately 10% of the patients discharged from University Hospitals Southampton
Early Supported Discharge (in the context of Stroke Rehabilitation in the Community)
Early Supported Discharge (in the context of Stroke Rehabilitation in the Community) Gold Standard Framework This document was produced with reference to national standards for best practice (e.g. NICE
The Newcastle upon Tyne Hospitals NHS Foundation Trust. National Early Warning Score (NEWS) Policy
The Newcastle upon Tyne Hospitals NHS Foundation Trust National Early Warning Score (NEWS) Policy Version.: 1.0 Effective From: 3 December 2014 Expiry Date: 3 December 2016 Date Ratified: 1 September 2014
Sue Woodward Chair PLG RCS Eng
Sue Woodward Chair PLG RCS Eng Day / Short Stay Surgery Patient Perceptions Patient Responsibilities Patient Concerns Patient Benefits Surgeon and the teams Responsibilities Hospital Benefits Patient
Enhanced Recovery and CQUIN The Wirral Way
Enhanced Recovery and CQUIN The Wirral Way Sheena Hennell Commissioning Manager Wendy Lewis Enhanced Recovery Programme Lead Wirral University Teaching Hospital & Advancing Quality Alliance (AQuA) Wirral
Progress on the System Sustainability Programme. Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014
Agenda Item: 9.1 Subject: Presented by: Progress on the System Sustainability Programme Dr Sue Crossman, Chief Officer Submitted to: NHS West Norfolk CCG Governing Body, 31 July 2014 Purpose of Paper:
Evolving New Practices in Hip & Knee Arthroplasty: It Takes A Team! CCHSE National Healthcare Leadership Conference June 11-12, 2007 Toronto
Evolving New Practices in Hip & Knee Arthroplasty: It Takes A Team! CCHSE National Healthcare Leadership Conference June 11-12, 2007 Toronto Focus of Presentation Toronto Central LHIN is developing a new
NHS National Waiting Times Centre Board. [email protected]
NHS Board Contact Email NHS National Waiting Times Centre Board Julie Carter [email protected] Title Category Background/ context National Waiting Times Centre Board Rehabilitation Department
BMI Werndale Hospital Quality Accounts April 2013 to March 2014
BMI Werndale Hospital Quality Accounts April 2013 to March 2014 Chief Executive s Statement Welcome to our Quality Accounts 2014, the fifth year we have published this data. The information presented here
Manifesto for Acquired Brain Injury Rehabilitation
Manifesto for Acquired Brain Injury Rehabilitation For further information please contact: Chloë Hayward UKABIF Executive Director PO Box 355 Plymouth PL3 4WD Tel: 01752 601318 Email: [email protected]
Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation
Health Informatics Unit Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation April 2011 Funded by: Acknowledgements This project was funded by the Academy of
Total knee replacement: The enhanced recovery programme
INFORMATION FOR PATIENTS Total knee replacement: The enhanced recovery programme Aim This leaflet aims to explain the enhanced recovery programme after total knee replacement surgery, and outline what
The English NHS payment system: reforms to support efficiency and integrated care
The English NHS payment system: reforms to support efficiency and integrated care Anita Charlesworth Chief Economist 7 th April 2014 The NHS Payment System following the 2012 Health and Social Care Act
Southwark Clinical Commissioning Group Lambeth Clinical Commissioning Group
Getting the Vision Right: A multi-disciplinary approach to providing integrated care for respiratory patients Dr Noel Baxter, GP NHS Southwark CCG Dr Irem Patel, Integrated Consultant Respiratory Physician
Measuring quality along care pathways
Measuring quality along care pathways Sarah Jonas, Clinical Fellow, The King s Fund Veena Raleigh, Senior Fellow, The King s Fund Catherine Foot, Senior Fellow, The King s Fund James Mountford, Director
The third report from the Patient Safety Observatory. Slips, trips and falls in hospital PSO/3 SUMMARY
The third report from the Patient Safety Observatory Slips, trips and falls in hospital PSO/3 Patient falls have both human and financial costs. For individual patients, the consequences can range from
Standards for Children s Surgery. Children s Surgical Forum
s for Children s Surgery Children s Surgical Forum 2013 Endorsed by The Association of Paediatric Anaesthetists of Great Britain and Ireland The Association of Surgeons of Great Britain and Ireland The
Capacity Manager. Seamless Pathways of Care Test duration Mar 2013 Mar 2015 Author/Lead. Paula Tate Contact details
Capacity Manager Workstream Seamless Pathways of Care Test duration Mar 2013 Mar 2015 Author/Lead Paula Tate Contact details [email protected] Contents tick Comments 1 Test of Change Proposal 2 PMP 3
Care Closer to Home. The Gateway, Middlesbrough: A New Integrated Health, Social Care & Housing Pathway
Case Study 111 Care Closer to Home. The Gateway, Middlesbrough: A New Integrated Health, Social Care & Housing Pathway This case study sets out the economic, health and social benefits of Keiro s service
Patient Access User Manual
Patient Access User Manual Table of Contents. 1 Summary 7 2 Key Principles 7 3 Corporate Roles and Responsibilities 9 4 National Access Targets and Standards 10 4.1 Referral to Treatment (RTT) Standard
BriefingPaper. Towards faster treatment: reducing attendance and waits at emergency departments ACCESS TO HEALTH CARE OCTOBER 2005
ACCESS TO HEALTH CARE OCTOBER 2005 BriefingPaper Towards faster treatment: reducing attendance and waits at emergency departments Key messages based on a literature review which investigated the organisational
non-msk Out-patient Physiotherapy VHK 1200 In-patient Physiotherapy VHK
Axis Title no.of patients Item 5.3 1. Access / Performance Clinical governance report Therapies and Rehab July 215 Physiotherapy New : Review = 1:3 New : Review = 1:3.5 In-patient Physiotherapy VHK 5 4
Policy Document Control Page. Title: Protocol for Mental Health Inpatient Service Users who require care in the Pennine Acute Hospital
Policy Document Control Page Title: Protocol for Mental Health Inpatient Service Users who require care in the Pennine Acute Hospital Version: 5 Reference Number: CL25 Supersedes Supersedes: Protocol for
Division of Cancer Surgery Information Guide
Division of Cancer Surgery Information Guide Professor Sandy Heriot Director - Division Cancer Surgery Professor Michael Henderson Deputy Director Division Cancer Surgery Executive Sponsor Education and
Functional recovery of hip fracture patients
Functional recovery of hip fracture patients Lauren Beaupre July 7, 2011 ABSTRACT Hip fractures are common in the older population and are associated with loss of independence as well as high morbidity
Post discharge tariffs in the English NHS
Post discharge tariffs in the English NHS Martin Campbell Department of Health 4th June 2013 Contents Rationale and objectives Non payment for avoidable readmissions Development of post discharge tariffs
Discharge to Assess: South Warwickshire NHS Foundation Trust
Discharge to Assess: South Warwickshire NHS Foundation Trust The Discharge to Assess (D2A) service enables patients to be discharged earlier from acute inpatient wards by co-ordinating care in alternative
Case study: Pennine MSK Partnership
Case study: Pennine MSK Partnership Dr Alan Nye is a GP in Oldham, GPSI in Rheumatology, Director of Pennine MSK Partnership, Associate Medical Director of NHS Direct and Associate Medical Director of
Clinical Audit Procedure for NHS-LA and CNST Casenote Audit
Clinical Audit Procedure for NHS-LA and CNST Casenote Audit NHS Litigation Authority (NHS-LA) Risk Management Standards for Acute Trusts Pilot Clinical Negligence Scheme for Trusts (CNST) Maternity Clinical
Premier Orthopaedic Pathway. Physiotherapy after dynamic hip screw (DHS)
Premier Orthopaedic Pathway Physiotherapy after dynamic hip screw (DHS) The surgery After a fractured hip a dynamic hip screw (DHS) is used to hold the bones in place while the fracture heals. It allows
Inpatient rehabilitation services for the frail elderly
Inpatient rehabilitation services for the frail elderly Vale of York CCG and City of York Council are looking to work with York Hospitals NHS Foundation Trust to improve inpatient rehabilitation care for
CALVARY HEALTH CARE SYDNEY DAY REHABILITATION UNIT (DRU) JEREMEY HORNE
CALVARY HEALTH CARE SYDNEY DAY REHABILITATION UNIT (DRU) JEREMEY HORNE DAY REHABILITATION UNIT OVERVIEW What is a DRU Minimum requirements Calvary Day Rehabilitation Admission Criteria Type of Patients
GP Round Up Introduction by Alistair Flowerdew Medical Director
GP Round Up Issue 55 October 2014 Contents GP Round Up Introduction by Alistair Flowerdew Medical Director... 1 Observation ward opens in Emergency Department... 2 Orthopaedic Elective Centre to open in
W40 Total prosthetic replacement of knee joint using cement
Bedfordshire and Hertfordshire Priorities Forum statement Number: 33 Subject: Referral criteria for patients from primary care presenting with knee pain due to ostoarthritis, and clinical threshold for
Delivering Local Health Care
Delivering Local Health Care Accelerating the pace of change Delivering Local Integrated Care Accelerating the Pace of Change WG 17711 Digital ISBN 978 1 0496 0 Crown copyright 2013 2 Contents Joint foreword
Improving Emergency Care in England
Improving Emergency Care in England REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1075 Session 2003-2004: 13 October 2004 LONDON: The Stationery Office 11.25 Ordered by the House of Commons to be printed
Coventry and Warwickshire Repatriation Programme
NHS Arden Commissioning Support Unit Coventry and Warwickshire Repatriation Programme Large-scale service redesign and innovation to benefit patients Arden Commissioning Support Unit worked with Coventry
Patient Access Policy
Patient Access Policy SECTION 1 - INTRODUCTION AND OVERVIEW 1.1. Introduction The principles and definitions of the 18 week target count the referral to treatment (RTT) waiting times in totality. Spire
OT service design for new emergency care - how we can support integrated practice
OT service design for new emergency care - how we can support integrated practice Barbara Kemp Clinical Lead for Occupational Therapy Northumbria Healthcare Foundation Trust #theotshow #theotshowselfie
Fife NHS Board Activity NHS FIFE. Report to the Board 24 February 2015 ACTIVITY REPORT
1 AIM OF THE REPORT NHS FIFE Report to the Board 24 February 2015 ACTIVITY REPORT This report provides a snapshot of the range of activity that underpins the achievement of key National Targets and National
Intensive Rehabilitation Service & Community Treatment Team
Intensive Rehabilitation Service & Community Treatment Team Caroline O Donnell Integrated Care Director North East London Foundation Trust Carol White Deputy Integrated Care Director North East London
Substance misuse and behavioural addictions
Substance misuse and behavioural addictions Information about our services for primary healthcare professionals PROVIDING QUALITY INSPIRING INNOVATION DELIVERING VALUE Our substance misuse and behavioural
Discharge Information Information for patients This leaflet is intended to help you, your carer, relatives and friends understand and prepare for
Discharge Information Information for patients This leaflet is intended to help you, your carer, relatives and friends understand and prepare for your discharge or transfer from hospital. Healthcare professionals
ADVANCED NURSE PRACTICE KAREN HERTZ UK
ADVANCED NURSE PRACTICE KAREN HERTZ UK THE INTERNATIONAL COUNCIL OF NURSES, Definition of a Nurse Practitioner/Advanced Practice Nurse aimed to facilitate a common understanding and guide further development
PROMS: Patient Reported Outcome Measures. The Role, Use & Impact of PROMs on Nursing in the English NHS
POLICY AND INTERNATIONAL DEPARTMENT Policy Briefing 1/11 PROMS: Patient Reported Outcome Measures The Role, Use & Impact of PROMs on Nursing in the English NHS Patient Reported Outcomes Measures (PRO or
National Network for Burn Care. National Burn Care Standards
National Network for Burn are National Burn are Standards Revised January 2013 To be reviewed April 2015 National Network for Burn are (NNB) National Burn are Standards ontents Introduction 4 sing the
Your admission for day surgery
Royal Berkshire NHS Foundation Trust London Road Reading Berkshire RG1 5AN 0118 322 5111 (switchboard) West Berkshire Community Hospital London Road, Benham Hill Thatcham Berkshire RG18 3AS 01635 273300
Inpatient and Outpatient. Waiting Times & Patients Access Policy
Inpatient and Outpatient Waiting Times & Patients Access Policy Authors Piers Young Author s Job Title Interim Planned Care Programme Lead Department Surgery Version number Version 14 Ratifying Committee
SECTION B THE SERVICES COMMUNITY STROKE REHABILITATION SPECIFICATION 20XX/YY
SECTION B THE SERVICES COMMUNITY STROKE REHABILITATION SPECIFICATION 20XX/YY SECTION B PART 1 - SERVICE SPECIFICATIONS Service specification number Service Commissioner Lead Provider Lead Period Date of
Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version
Policy No: RM64 Version: 4.0 Name of Policy: Use of the National Early Warning Score System in Adult Patients Policy Effective From: 30/07/2015 Date Ratified 27/07/2015 Ratified Resuscitation and Deterioration
Your local specialist mental health services
Your local specialist mental health services Primary Care Liaison Service B&NES Primary Care Mental Health Liaison service is a short-term support service to help people with mental health difficulties
Enhanced recovery programme after TKA through multi-disciplinary collaboration
Enhanced recovery programme after TKA through multi-disciplinary collaboration ChanPK(1), ChiuKY(1), FungYK(6), YeungSS(7), NgT(8), ChanMT(5), LamR(4), WongNY(3), ChoiYY(3), ChanCW(2), NgFY(1), YanCH(1)
NHS LANARKSHIRE ACUTE DIVISION SUBSTANCE MISUSE NURSE LIAISON SERVICE ANNUAL REPORT 2009-2010
NHS LANARKSHIRE ACUTE DIVISION SUBSTANCE MISUSE NURSE LIAISON SERVICE ANNUAL REPORT 2009-2010 PI/Annual Report 2009/10 1 CONTENTS Executive summary Background Partnership Working Brief Interventions Performance
Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary)
Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Together we are better Foreword by the Director of Nursing
Receive the July 2015 report of the Chief Clinical Officer
Governing Body Meeting Agenda Item: 8 Date: 7 July 2015 Author: Clinical Lead: CCG Director/Manager: Dr Mary Backhouse Chief Clinical Officer Chief Clinical Officer s Report to Governing Body Recommendations
Accessing Outpatient, Inpatient and Day Case Services in Acute Hospitals in Ireland
Accessing Outpatient, Inpatient and Day Case Services in Acute Hospitals in Ireland January 2014 an ciste náisiúnta um cheannach cóireála the national treatment purchase fund Contents Introduction 2 Accessing
THE STATE OF HEALTH CARE AND ADULT SOCIAL CARE IN ENGLAND 2014/15
15 October 2015 THE STATE OF HEALTH CARE AND ADULT SOCIAL CARE IN ENGLAND 2014/15 This briefing summarises today s publication of the Care Quality Commission s annual State of Health and Adult Social Care
Patient Information. Patient Diary for Gynaecological Laparoscopic Surgery on the Enhanced Recovery Programme. Here to help. Respond Deliver & Enable
Here to help Our Health Information Centre (HIC) provides advice and information on a wide range of health-related topics. We also offer: Services for people with disabilities. Information in large print,
Alternatives to Hospital: Models of Integrated Care
Alternatives to Hospital: Models of Integrated Care Tom Bowen The Balance of Care Group www.balanceofcare.com IMA Health 2007, London, UK 2 April 2007 Projects taking whole systems approach Sheffield Designed
Guidelines for the Operation of Burn Centers
C h a p t e r 1 4 Guidelines for the Operation of Burn Centers............................................................. Each year in the United States, burn injuries result in more than 500,000 hospital
WP6: Costing and pricing of acute hospital services in England. Centre for Health Economics, York, UK
WP6: Costing and pricing of acute hospital services in England Centre for Health Economics, York, UK Contents Structure of NHS The flow of funds Types of contract Hospital contracts before 2004 Tariff
Guidance on competencies for management of Cancer Pain in adults
Guidance on competencies for management of Cancer Pain in adults Endorsed by: Contents Introduction A: Core competencies for practitioners in Pain Medicine B: Competencies for practitioners in Pain Medicine
RNOH Physiotherapy Department (020 8909 5820) Rehabilitation guidelines for patients undergoing spinal surgery
RNOH Physiotherapy Department (020 8909 5820) Rehabilitation guidelines for patients undergoing spinal surgery As a specialist orthopaedic hospital, we recognise that our broad and often complex patient
Patient Choice Strategy
Patient Choice Strategy Page 1 of 14 Contents Page 1 Background 4 2 Putting Patients and the Public at the Heart of Health and 5 Healthcare in West Lancashire 3 Where are we now and where do we need to
ENHANCEMENT OF ACUTE SERVICE IN KCC ON CLINICAL PATHWAY FOR GERIATRIC HIP FRACTURE. Elaine Wong WY Queen Elizabeth Hospital 7 May 2012
ENHANCEMENT OF ACUTE SERVICE IN KCC ON CLINICAL PATHWAY FOR GERIATRIC HIP FRACTURE Elaine Wong WY Queen Elizabeth Hospital 7 May 2012 BACKGROUND In KCC, there are around 800 cases admitted for geriatric
Care plans which are individualised and person centred
The Right Care: creating dementia friendly hospitals Care plans which are individualised and person centred Good practice for better care 1 Care plans which are individualised and person centred Section
Coordinated Care Planning and Clinical Pathways for Patients/Consumers
Contents 1 Definitions... 2 Risk Screening... 2 Assessment... 2 Approved Clinical Pathway... 2 Plan of Care... 2 Continuum of Service/Care... 2 Needs... 2 2 Clinical Pathways... 3 3 Plans of care... 3
Wiltshire Wide Capacity Management and System Resilience 2015/16 Briefing for Wiltshire Health and Wellbeing Board November 2015
Wiltshire Wide Capacity Management and System Resilience 2015/16 Briefing for Wiltshire Health and Wellbeing Board November 2015 1.0 Overview The aim of the document is to provide an update on the approaches
