1 ARMY DEPOT MAINTENANCE ENTERPRISE STRATEGIC PLAN April 2008 HQDA G-4 DALO-MNN
2 ARMY DEPOT MAINTENANCE ENTERPRISE STRATEGIC PLAN EXECUTIVE SUMMARY The critical role depot level maintenance plays in our national security strategy has never been more apparent. The requirement to rapidly reset the equipment of units redeploying from Iraq and Afghanistan has demonstrated the need for a Depot Maintenance Enterprise that is agile, effective, forward deployable, and able to surge. The mission of the Army s Depot Maintenance Enterprise (DME) is to provide the resources, skills and capabilities to sustain the life cycle readiness of the Warfighter s weapon systems and equipment worldwide in a reliable and efficient manner. The Depot Maintenance Enterprise consists of resource providers, acquisition and sustainment planners, and maintenance performers. Three key challenges face the Depot Maintenance Enterprise between now and 2025: 1. Supporting Reset/ARFORGEN The immediate challenge (FY09) is to continue to support an Army at war which requires the DME to reset equipment as quickly as possible so it is available for training the next deployers. To meet this challenge, maintenance providers have surged and have more than doubled output from pre-2003 levels. The DME is a major source of supply that fills materiel shortages within warfighting units. The DME must transform processes, programs and policies to ensure timely repair of Army equipment to address these shortages. The Army Campaign Plan requires the adaptation of processes to support the equipping and readiness goals of Army Force Generation (ARFORGEN). To meet these goals, DME planning must be tightly linked to ARFORGEN so that the Army s priorities inform depot maintenance production schedules. Also, DME processes must be transformed so that equipment spends less time in the sustainment base and more time in the hands of the warfighter. 2. Ensuring Core Capabilities are Established and Sustained The intermediate challenge (FY10 FY15) centers upon how the DME will ramp down current production levels while retaining the ability to meet surge requirements in the future. The Army s five primary organic depots will remain essential providers of reliable equipment to the Joint Warfighter. To ensure the depots are postured to perform this role, the Army must perform future core capability planning; the planning must incorporate the experience gained in resetting equipment redeployed from Iraq and Afghanistan; and the planning must inform current and future investments in the infrastructure and the workforce. 3. Ensuring Life Cycle Readiness The long-term challenge (through FY25) is modernizing the Enterprise s capabilities to keep current with technology so the DME can support the sustainment of future equipment and weapon systems. The DME must integrate Strategic and Life Cycle Management planning to provide efficient weapon system support and to ensure the sustainment base is effective. The transition of new weapon systems to the sustainment base must be efficient and timely. The DME must also pursue initiatives to provide life cycle readiness more efficiently. The application of Condition Based Maintenance strategies, where appropriate, can enhance efficiency and 2
3 effectiveness of the Army s maintenance program. Public-private partnership (PPP) initiatives, which capitalize on the technical excellence of organic and contractor capabilities, can increase the efficiency of the operations at Army depots and commercial facilities. The DME vision or end-state is a modern, reliable, cost effective and highly responsive enterprise that is flexible enough to meet Army requirements in both war and peacetime. Multiple activities must be initiated and integrated to successfully transform the DME s processes to support the Current and Future Force. The Depot Maintenance Corporate Board, which consists of the senior leaders of the DME, will provide the oversight and direction to enable successful transformation. The Depot Maintenance Execution Council, a working level group chartered by the Board, will organize action officer teams to implement the Board s direction. In light of these challenges and to effect the transformation of the depot maintenance business area, the Depot Maintenance Corporate Board has established three goals supported by nine objectives and detailed action plans. Goal Goal 1: ARFORGEN will drive depot maintenance operations Goal 2: Establish an effective sustainment base Goal 3: Plan and implement weapons system support efficiency initiatives Support to Vision Institutionalizes policy and process improvement Enables alignment of DME production to Army Priorities Minimizes risk Ensures depots are poised to meet future requirements and able to surge Ensures depots remain essential providers of reliable equipment to the Warfigther Minimizes burden on customers Improves readiness and availability of Army equipment Adds capacity at organic depots Reduces total cost of ownership Objectives Obj 1: Update policies and regulations governing depot maintenance priorities as required to support the transforming Army Obj 2: Establish processes resulting in depot production that supports high priority DARPL unit equipment needs Obj 3: Improve policy and procedures across the DME to identify core capabilities and workloads that must be programmed through the Future Years Defense Plan (FYDP) Obj 4: Improve and enforce policy and procedures that assess the impact of future Depot Source of Repair (DSOR) decisions and inserts the DME in the DSOR decision process Obj 5: Establish an integrated human capital plan that supports the depots current and future core capability requirements Obj 6: Update the infrastructure planning to support the depots current and future core capability requirements Obj 7: Use Condition Based Maintenance (CBM) to optimize the use of depot maintenance to extend the economic useful life of materiel based upon CBM derived strategies Obj 8: To optimize the Army s use of Public Private Partnerships (PPP), the U.S. Army Materiel Command (AMC) will continue or initiate strategies outlined in the U.S. Army Industrial Base Strategic Plan and AMC Partnership Program Business Development Plan Obj 9: Use Value Stream Analysis (VSA) to continuously improve depot maintenance processes and reduce repair cycle time 3
4 TABLE OF CONTENTS INTRODUCTION...5 CURRENT CHALLENGE (FY09)...9 SUPPORTING RESET/ARFORGEN...10 INTERMEDIATE CHALLENGE (FY09 - FY15)...12 ENSURING CORE CAPABILITIES ARE ESTABLISHED AND SUSTAINED...13 LONG TERM CHALLENGE (through FY25)...16 ENSURING LIFE CYCLE READINESS...16 DEPOT MAINTENANCE VALUE CHAIN AND METRICS...19 CONCLUSION AND WAY AHEAD...21 APPENDIX A ON-GOING INITIATIVES AND ACCOMPLISHMENTS...22 APPENDIX B GLOSSARY OF OPERATIONAL TERMS AND DEFINITIONS...24 APPENDIX C LIST OF ACRONYMS...27 APPENDIX D - REFERENCES...28 APPENDIX E REGULATORY ENVIRONMENT
5 ARMY DEPOT MAINTENANCE ENTERPRISE STRATEGIC PLAN INTRODUCTION The purpose of Army maintenance is to regenerate combat power and to preserve the capital investment in combat systems and equipment over time to enable training and provide the readiness to execute full spectrum operations. The critical role depot level maintenance plays in regenerating combat power has never been more apparent. The need to rapidly reset units redeploying from current and future contingency operations requires depot maintenance operations that are agile, effective, forward deployable, and able to surge. This Strategic Plan confirms the Army s intent to sustain a Depot Maintenance Enterprise (DME) with the robust capabilities needed to successfully perform this The mission of the Army s Depot Maintenance Enterprise is to provide the resources, skills and capabilities to sustain the life cycle readiness of the Warfighter s weapon systems and equipment worldwide in a reliable and efficient manner. The Depot Maintenance Enterprise vision is to maintain a DME that is modern, reliable, cost effective and highly responsive, yet flexible to meet Army s requirements in both peacetime and war. critical role in the future. It establishes a vision, mission statement, goals, objectives and metrics to ensure the Army Depot Maintenance Enterprise (DME) continues to accomplish its mission. It encompasses the Future Years Defense Plan (FYDP) for fiscal years 2008 through 2015 (FY08-15). The plan is in consonance with the Army Campaign Plan (ACP), the Industrial Base Strategic Plan, the DoD Depot Maintenance Strategic Plan and the Army Materiel Command s (AMC) Strategic Plan. How to Use this Plan The Army s Depot Maintenance Enterprise Strategic Plan should be used in conjunction with the U.S. Army Industrial Base Strategic Plan which is a strategic plan for the organic and commercial Industrial Bases, the Army Materiel Command Human Capital and Capital Investment Plans. The goals and objectives discussed in this plan are detailed in action plans that describe specific actions to implement the goals and objectives, assign accountability, and provide a timeline for their accomplishment. 5
6 Organizational Overview The Depot Maintenance Enterprise consists of resource providers, acquisition and sustainment planners, and maintenance performers. Their relationship and the roles they perform are described in Figure 1. OVERVIEW OF THE DEPOT MAINTENANCE ENTERPRISE Composition Resource Prioritizers and Providers Acquisition and Sustainment Planners Maintenance Performers Organization G3, G4, G8, Army Budget Office (ABO), Office of the Assistant Secretary of the Army (OASA(ALT)) Headquarters, United States Army Materiel Command (HQ, USAMC); Program Executive Officers (PEOs)/Program Managers (PMs); Life Cycle Management Commands (LCMCs) Depot workers and commercial contractors Roles and Responsibilities Prioritize Army requirements in line with ARFORGEN. Develop policies and defend and distribute resources to the Army Commands (ACOMs) Apply resources in accordance with Army priorities to effectively sustain the Army s weapons systems, software, and support structure Apply guidance from the planners to execute planned and programmed depot maintenance workloads Governance and Oversight: Figure 1. Overview of the Depot Maintenance Enterprise The Depot Maintenance Corporate Board (DMCB), comprised of key Army General Officers (GOs) and Senior Executive Service (SES) civilians and chaired by the Army Deputy Chief of Staff, G-4, provides strategic planning oversight and direction to the Army s depot level maintenance program. The DMCB provides corporate-level strategic direction and policy recommendations across the various elements of the Army in light of the role that depot maintenance plays as a critical component of overall force readiness and logistics transformation. Meeting on a quarterly basis, it will oversee the implementation of this strategic plan. The Depot Maintenance Execution Council (DMEC), operating at the Colonel (COL)/General Schedule 15 (GS-15) level as a sub-committee of the Depot Maintenance Corporate Board (DMCB), has the primary responsibility for day-to-day business management oversight of the DME such as tracking depot maintenance execution, resolving issues, and ensuring the program remains in statutory compliance. The DMEC fulfills the oversight and management functions necessary to improve the manner and method in which depot maintenance operations are executed. Meeting monthly, the DMEC will accomplish the objectives in this plan and report progress to the DMCB. 6
7 In addition, the DMEC will measure performance against the metrics discussed in this plan, assess the program s overall performance and periodically report its conclusions to the DMCB. The DMCB will provide guidance, direction, and resources to ensure the program s continuous improvement. An overview of the DME governance structure is depicted in Figure 2. DME GOVERNANCE STRUCTURE Governing Body Depot Maintenance Corporate Board (DMCB) Meeting Frequency: Quarterly Depot Maintenance Executive Council (DMEC) Meeting Frequency: Monthly Composition Chair: Army Deputy Chief of Staff, G4 Members: Key Army General Officers (GOs) and Senior Executive (SES) civilians to include Army Reserves and National Guard Chair: AMC Chief of Depot Maintenance and Arsenals Members: Colonels (COLs) and General Schedule 15 (GS- 15s) Roles and Responsibilities Provides strategic planning oversight and direction to the DME Provides corporate-level strategic direction and policy recommendations across the various elements of the Army in light of the role that depot maintenance plays as a critical component of overall force readiness and logistics transformation Provides guidance, direction and resources to ensure continuous improvement of DME metrics Operates as a sub-committee of the DMCB Has primary responsibility for day-to-day business management oversight of the DME Fulfills the oversight and management functions necessary to improve the manner and method by which depot maintenance operations are executed Measures performance against metrics, assesses overall performance, and reports conclusions to the DMCB Ensures that the Depot Maintenance Program remains in statutory compliance Figure 2: Depot Maintenance Enterprise Governance Structure Customers and Stakeholders: The DME exists to serve our ultimate customer, the Warfighter, by providing reliable and affordable equipment and weapons systems. Our stakeholders also have a vested interest in depot maintenance operations. Our stakeholders seek to ensure that depot level maintenance operations are operating in alignment with Army materiel priorities. A listing of our customers and stakeholders is depicted in Figure 3. 7
8 Customers Ultimate Customers Warfighter Foreign Governments Intermediate Customers funding owners and funding streams to include: Supply system / DLA Life Cycle Management Commands (LCMCs) PEOs PMs National Guard Bureau (NGB) United States Army Reserve (USAR) Stakeholders AMC CG G4 AMC HQ G8 AMC Major Subordinate MACOMs Commands Maintenance Battalions American People OASA(ALT) Chief of Staff of the Army OEMs Combatant Commanders Office of the Secretary of Congress Defense (OSD) Contractors Office of Management and Department of the Army Budget Depot Maintenance Caucus Other Services Depots President of the United DMCB Membership States DME (we are our own customer) Secretary of the Army DOD Soldier GAO SSO Item Managers Taxpayers JCS Vendors G3 Figure 3: Depot Maintenance Enterprise Customers and Stakeholders More than a stakeholder, Congress is a partner in effecting many of the transformational changes detailed in this plan. For example, Congressional support is required to provide the resources for many of DME s programs such as capital investments and military construction projects. Organic Base The Army s government-owned and operated depots are crucial depot level maintenance providers within the DME that support not only Army, but also Joint depot level maintenance capability requirements. The Army s depot system is a proven critical strategic asset that must be managed to ensure it is capable to efficiently and effectively accomplish peacetime workloads while remaining postured to surge in response to maintenance requirements generated by full spectrum operations. Red River Bradley MLRS Anniston Combat Vehicles Artillery Small Arms TACOM - TANK-AUTOMOTIVE AND ARMAMENTS COMMAND WARREN, MI CECOM - COMMUNICATIONS- ELECTRONICS COMMAND FORT MONMOUTH, NJ Tobyhanna Corpus Christi Rotary Wing Aircraft AMCOM - AVIATION AND MISSILE COMMAND HUNTSVILLE, AL Communications- Electronics Letterkenny DoD Tactical Missiles Fire Control DEPOTS Red River Aniston Tobyhanna Letterkenny Corpus Christi Figure 4: Army Materiel Command Life Cycle Management Commands and Depots 8
9 Commercial Base The Organic base and the Commercial base share a common purpose and customer. In light of the current OPTEMPO, leveraging the capabilities of both creates a synergy that is critical to our success. The combined infrastructure and scalability of organic and commercial facilities provide the DME with skilled labor, supply chain management approaches, and capacity to respond to the high-demand dictated by today s Army depot level maintenance requirements. The Industrial Base Strategic Plan sets forth several initiatives targeted to strengthen both the organic and commercial base operations. CURRENT CHALLENGE (FY09) The Army Campaign Plan (ACP) directs planning, preparation, and execution of Army transformation and Service Title 10 activities. The ACP establishes Campaign Objectives and supporting Major Objectives to accomplish each of the four Army Imperatives. The Depot Maintenance Enterprise supports the Army Imperative to Reset Forces to Rebuild Readiness and for Future Deployments and Contingencies. As seen in Figure 5, DME output in terms of repaired, rebuilt, and overhauled equipment is at record levels. Output levels have nearly doubled since 2003 levels and have not been this high since the Vietnam War. An increase in workload has created a need for an increase in the human capital assets supporting the DME. To meet the increase in workload, depots are utilizing their Human Capital Plans to augment the current workforce with contractor field teams and temporary government employees, increasing overtime, and working multiple shifts. In response to the readiness needs of the operational Army, the DME has utilized mobile teams to provide in-theater, depot-level maintenance support. These Forward Repair Activities (FRA) provide depot-level maintenance and repair-level support and services for weapon systems, commodities, single systems, and major end items. SHOOT/MOVE Small Arms, Bradleys, Abrams, Artillery, Tactical Wheeled Vehicles FY01-FY03 FY03 Avg Base Prog Only 6,556 FY04 FY05 FY06 Comparison * FY08 FY FY07 Projections and 08 15,160 19,252 33,037 56,422 >36, % M1 (Recap/Reset) M2 (Reset) HMMWV (Recap/Reset) , , , >7, % 250% N/A COMMUNICATE 15,186 24,442 28,500 30,517 59,072 >49, % Other Generators, MHE, Chem-Bio, Surveillance 7,007 10,355 13,150 19,325 35,465 >16, % FY01-FY03 Data * FY08 Data will be finalized Base Program Only with FY08 DA FRAGO Figure 5: Supplemental Depot Maintenance - Fiscal Year Quantity Comparisons 1 1 Quantities and Projections accurate as of 29 February
10 Army Force Generation (ARFORGEN) The purpose of ARFORGEN is to provide combatant commanders and civil authorities with trained and ready units, task organized in modular expeditionary forces tailored to Joint mission requirements. ARFORGEN establishes an operational readiness cycle through which units will progress. The structured progression will result in increased readiness as units move through the Reset/Train, Ready, and Available force pools. The Army Chief of Staff stated, We will implement the Army Force Generation model by 2011 to manage preparation of forces for employment and improve predictability for soldiers and families. In order to implement ARFORGEN, the Army must adapt necessary policies, regulations, procedures, capacity and capabilities in the Generating Force to support the Operating Force. Depot Maintenance restores reliability to equipment required by the Operating Force. DME planning must be tightly linked to ARFORGEN so that the Army s priorities inform depot maintenance production schedules. Also, DME processes must be transformed so that equipment spends less time in the sustainment base and more time in the hands of the Warfighter. SUPPORTING RESET/ARFORGEN The ACP requires the adaptation of processes to support the equipping and readiness goals of ARFORGEN. To remain effective in the achievement of these goals, DME planning should be based on ARFORGEN so that the sustainment base is accurately providing for Army s priorities. Management tools that guide depot maintenance operations and align depot maintenance planning and programming with ARFORGEN must be developed. The DME has established two objectives to ensure depot maintenance operations become aligned with ARFORGEN. First, policies, regulations, and resource guidance governing depot maintenance must be updated. Second, processes must be transformed. Improvements in communications and information flows will enable the DME planners to provide timely guidance so that the maintenance providers can produce what the Army needs when it needs it. Improvements in asset visibility will enable all DME stakeholders to measure the effectiveness of the enterprise. The depot maintenance community s efforts to improve asset visibility and information flows will be synchronized with the larger effort to establish and maintain a 360 degree enterprise view of readiness. Value stream mapping is a powerful tool that will be used to capture the current depot maintenance processes from requirements generation to maintenance performed. Laying out this complicated network of processes will reveal numerous opportunities for improvement. Improvements may include results such as reduced costs, increased productivity, reduced turnaround time, or increased performance. Reset is a relatively new paradigm for depot maintenance. The real challenge with Rest is linking the equipment needs of the operational Army as it goes through ARFORGEN with our sustainment base production capabilities. Reset differs from traditional overhauls in that there are different scopes of work for certain pieces of equipment, based 10
11 upon the history and usage of the equipment. Thus, the DME is transforming processes, programs, and policies with these ideals in mind to ensure timely repair of Army equipment. Goal 1: ARFORGEN will drive depot maintenance operations The assignment of priorities to the equipment within the depot maintenance program determines the allocation of scarce resources. Goal 1 seeks to put the mechanisms in place to ensure that the Army DME is resourcing and executing to support what the Army needs most. Resource availability does not support 100% readiness of all equipment, so risk must be accepted and requirements must be prioritized to determine where to allocate resources so that the best equipment readiness for the Army can be achieved. A process for prioritization of depot maintenance Program Objective Memorandum (POM) requirements has been in existence for some time; however, this process is outdated and does not reflect the Army s priorities as outlined in the Dynamic Army Resourcing Priorities List (DARPL). The depot maintenance priority schema was last updated in Since that time, the ACP directed the adaptation of processes to support the ARFORGEN strategy and to support equipping and readiness goals for units in accordance with the DARPL. The overarching metric of materiel availability is directly affected by the policy and processes that the DME uses to provide the Army with equipment. Materiel availability is currently being measured; however the current metric is based on schedule variance of depot production, and this may not necessarily reflect the true needs of the Army. By establishing depot production processes that support DARPL unit equipment needs, the DME will inherently support the high priority needs of the Army. This will allow the materiel availability metric to more accurately reflect the Army s condition. IMPROVE Objectives 1 and 2 will provide the depot maintenance program with POLICY the requisite policy and processes that will enable the program to support the ARFORGEN strategy. These two objectives create a IMPROVE continuous loop of improving the policy and improving the PROCESSES processes which will allow the DME to remain relevant and to evolve as the Army evolves. Additionally, the ACP objective of providing a 360 degree view of logistics readiness is supported by providing leadership a common view from which to make executive decisions. Objective 1. Update policies and regulations governing depot maintenance priorities as required to support the transforming Army 1.1. Update Resource Formulation Guidance to ensure program funding supports the ARFORGEN strategy 1.2. Update Army Regulation 750-1, Army Materiel Maintenance Policy to enable the program to support the ARFORGEN strategy 11
12 Objective 2. Establish processes resulting in depot production that support high priority DARPL unit equipment needs 2.1. Conduct a Rapid Improvement Event on POM requirements prioritization process 2.2. Conduct value stream analysis of depot production scheduling process 2.3. Identify opportunities for continuous process improvement events Establish processes to support Sustainment Base objectives within 360 Degree Readiness INTERMEDIATE CHALLENGE (FY09 - FY15) The Army s equipment deployed to Iraq and Afghanistan has been subjected to an increased OPTEMPO in a harsh environment. Congress has provided supplemental funding to repair this equipment as it returns from Operation Iraqi Freedom and Operation Enduring Freedom so that it is available for future deployments. Supplemental funding has enabled the Army s targeted fleets of equipment to achieve high readiness levels at prescribed maintenance standards. As an offset, resources have been reduced to the depot maintenance base program for a large number of equipment that remains in the continental United States. Although the Army maintains near term readiness of deployed units, we accept risk to the readiness of our CONUS-based equipment as a result of the shift of priorities to these targeted assets. When supplemental funding is terminated, we are projecting that the base program resourcing shall be inadequate to sustain the readiness levels of the Army s equipment fleets for future contingencies. Sufficient base program resources are the Depot Maintenance Enterprise s key center of gravity. Without sufficient resource levels, the end-state of a modern, reliable, efficient enterprise that meets the Army s needs in both war and peacetime shall not be achieved. With sufficient resource levels, Army equipment fleets can be maintained to high readiness levels at prescribed maintenance standards. Army maintenance depots can surge to support contingency operations and operate efficiently during peacetime. 12
13 Funding Mitigates Risk of Declining Fleet Readiness FY08 Supp 77% Base 23% $ Acceptable Risk Level FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 Base Funding Supplemental Figure 6: Depot Maintenance Base & Supplemental Funding Profile As a result of GWOT, the number of non-programs of record has increased to meet wartime requirements, and sustainment strategies for these programs must now be developed after the weapons system has been fielded. ENSURING CORE CAPABILITIES ARE ESTABLISHED AND SUSTAINED The Army s five organic depots will remain essential providers of reliable equipment to the Joint Warfighter. To ensure the depots are postured to perform this role, the Army must perform future core capability planning; the planning must incorporate the experience gained in resetting equipment redeployed from Iraq and Afghanistan; and the planning must inform current and future investments in the infrastructure and the workforce. By allocating sufficient workload to the depots, the Army enables them to operate efficiently and to sustain those core capabilities and skill sets needed to support any operational contingency. The Army must strengthen policy, procedures and oversight to ensure the depots continue to receive the workloads and resources necessary to sustain the core capabilities needed to support the Warfighter. The Army s self assessment of the current environment has identified factors affecting depot sourcing decisions. Interpretation of the core logistics capabilities determination statute, Title 10, United States Code, Section 2464, is inconsistent; The core depot assessment and source of repair analysis processes are hard to navigate and time consuming 13
14 Goal 2: Establish an effective sustainment base A viable depot level maintenance core capability owned and operated by the government is essential to our National Military Strategy. The Army is committed to a depot maintenance infrastructure that is resourced to sustain current and future core capability requirements. Core capability is sustained when critical skill sets are used in the execution of funded workload. To ensure this occurs, the Army requires processes to identify current and future workloads and to acquire the skilled workforce and production equipment and facilities necessary to execute the workloads. The Army Material Command has developed a Human Capital plan that sets forth innovative strategies to ensure the blended DME workforce possesses the right skills, knowledge, and abilities to meet future core capability requirements while maintaining flexibility. The ACP identifies ARFORGEN as the system for providing the required forces for the combatant commanders. Therefore, ARFORGEN should be the basis of core depot analysis in order for the DME to be most effectively postured to support equipment returning from theater. In January 2008, the DMCB directed the revision of the core process aligning institutional Army processes with operating Army requirements. As a result, the DME s capital investment plan and human capital plan will also need to be modified to support the revised core results. As of June 2007, the combined reported population for all Army organic facilities was 20,518, and of this population, there is an average of 37% (or 7,390) eligible for retirement within the next five years. To fill this manpower gap, various forms of recruitment to be used include: the Student Educational Employment Program (SEEP); the Student Temporary Employee Program (STEP); the Student Career Experience Program (SCEP); Army Materiel Command Fellows Program; Always a Soldier Program; Recruitment/Retention/Relocation Bonuses (up to 25% of base pay) The structure of the depot workforce is dependent upon the mission and workload of the specific depots. The need for personnel transformation is driven by the mission of Army. The DME experiences changes in mission and functions as the strategic environment of the nation and Army changes. In addition, continued implementation of work center improvements based on LEAN and SIX-SIGMA and the onset of new partnerships with private industry impact workforce structure. It is critical that organic facilities are flexible and maintain the capacity to surge to support contingency situations. Army depots strategically leverage public private partnerships, temporary employees, and contract field team hires to maintain operable manpower levels for new workload and surge workload in support of theater operations. 14
15 Objective 3. Improve policy and procedures across the DME to identify core capabilities and workload that must be programmed through the Future Years Defense Program (FYDP) 3.1. Update Army Regulations , Integrated Logistics Support, and 750-1, Army Materiel Maintenance Policy 3.2. Perform core capabilities analysis of funded workload in the POM Objective 4. Improve and enforce policies and procedures that assess impact of future Depot Source of Repair (DSOR) decisions and inserts the DME in the DSOR decision process 4.1. Update Army Regulations , Integrated Logistics Support, and 750-1, Army Materiel Maintenance Policy 4.2. Provide recommended policy and process changes to improve DSOR decisions to the DMCB for approval Objective 5. Objective 6. Establish an integrated human capital plan that supports the depots current and future core capability requirements. Update the infrastructure planning to support the depots current and future core capability requirements 6.1. Identify military construction projects required to modernize organic depots 6.2. Update the Capital Investment Plan (CIP) 15
16 LONG TERM CHALLENGE (through FY25) ENSURING LIFE CYCLE READINESS The DME must integrate Strategic and Life Cycle Management planning to provide efficient weapon system support and attain an effective sustainment base. The transition of new weapon systems to the sustainment base must be efficient and timely. The DME must also pursue initiatives to provide life cycle readiness more efficiently. The application of Condition Based Maintenance strategies, where appropriate, can enhance efficiency and effectiveness of the Army s maintenance program. Public-private partnership (PPP) initiatives, which capitalize on the technical excellence of organic and contractor capabilities, can increase the efficiency of the operations at Army depots and commercial facilities. Army maintenance is founded on the principle that the useful service life of Army equipment is achieved when the item is operated within its intended purpose and parameters and is maintained in accordance with its designed or engineered specifications. Depot level maintenance is a key enabler of the latter by sustaining the readiness of equipment throughout its life cycle. When an equipment item reaches its useful service life, the Army will replace it through new procurement or recapitalize it to extend the service life of the equipment. Depot maintenance operations also include the recapitalization of aging equipment. The DME must pursue initiatives to provide more efficient life cycle readiness. Opportunities for improvement exist throughout the entire Depot Maintenance Enterprise. While using Lean Six Sigma (LSS) and value stream analysis to identify process improvement opportunities, the Army will continue to optimize two initiatives that are generating efficiencies today: The Condition Based Maintenance (CBM) Strategy Public Private Partnerships (PPP) CBM and PPP offer the Army the opportunity to achieve the highest possible return on its capital assets/investments. For CBM, the return is increased availability and reliability of weapon systems and equipment; for PPP, the return is reduced ownership costs of government facilities and other support infrastructure and sustainment of core capabilities. CBM is a proactive equipment maintenance capability that uses system health indicators to predict functional failures ahead of the event. The benefits of CBM include: (1) an increase in materiel availability as both Non-Mission Capable-Supply time and overall inspection hours are reduced; and (2) an increase in materiel reliability as product improvement efforts are better measured by usage and failure data. The DME has a CBM Roadmap that provides a strategy for accomplishing equipment maintenance only when necessary. By allowing the environment and the usage profile to determine when maintenance is needed, CBM will reduce the cost of sustainment. The depot level maintenance program may experience significant changes as CBM is 16
17 implemented. As CBM generates actual equipment usage, failure, and condition data, sustainment strategies will evolve, which will result in changes in annual depot maintenance workload quantities. In addition, individual depot tasks and scopes of work will change as CBM data pinpoints specific causes of equipment reliability issues. Public-private partnerships, which capitalize on the technical excellence of organic and contractor capabilities, can increase the efficiency of Army depot maintenance operations. Both public and private depot-level entities possess complementary capabilities that, when effectively integrated, offer the best value life cycle support to Warfighters. By integrating the strengths of the public and private sectors, the improvements to depot operations realized through the various types of public-private partnerships will reduce a weapon system s total mean down time and ownership costs. Goal 3: Plan and implement weapons system support efficiency initiatives It is the intent of Goal 3 to reduce the burden on the customer. Consequently, as the customer experiences a better, faster DME, the Army will incur cost savings from improved business processes. Embracing condition based maintenance strategies will improve the readiness and availability of Army equipment. Critical failures can be prevented and reliability will improve. The implementation of CBM will be reflected in the materiel available to Army units. Ownership cost will decrease as critical failures are anticipated and repair cycle time reduced. The Army s initial experience with CBM has revealed the great potential for improving total life cycle systems management. To pursue this opportunity, the Army will establish the requisite policy and governance structures to accelerate the implementation of CBM across its many fleets of equipment, where appropriate. Likewise, the Army s more extensive experience with Public-Private Partnerships has also proven the value of pursuing future opportunities for efficiencies by combining the competitive advantages of the organic depots and the commercial sector. Additional initiatives that can generate depot maintenance management process efficiencies will be identified through the use of value stream analysis and implemented through the use of LSS techniques. Objective 7. Employ Condition Based Maintenance (CBM) to optimize the use of depot maintenance to extend the economic life of materiel based upon CBM derived strategies 7.1. Publish and implement the CBM roadmap that documents roles and responsibilities of Army organizations and stakeholders involved in planning, programming, budgeting, and executing CBM strategies 7.2. Update Army Regulations , Integrated Logistics Support, and 750-1, Army Materiel Maintenance Policy Objective 8. To optimize the Army s use of Public Private Partnerships (PPP), the US Army Materiel Command (AMC) will continue or initiate strategies outlined in the US Army Industrial Base Strategic Plan and AMC Partnership Program Business Development Plan 17
18 Objective 9. Use Value Stream Analysis to continuously improve depot maintenance processes and reduce repair cycle time 9.1. Conduct value stream analysis of depot maintenance corporate information management processes 9.2. Identify opportunities for continuous process improvement events 9.3. Use 360 Degree Readiness to identify data elements needed to manage the Sustainment Base 18
19 DEPOT MAINTENANCE VALUE CHAIN AND METRICS Inputs Resources to apply in support of some activity/goal Activities/ Processes Application of inputs in a purposeful way Outputs Products resulting from activities Intermediate Results Initial results or value stemming from outputs Outcomes Final results as compared to intended purpose Requirements Repair Parts Funding Industrial Capability Carcasses Overhaul, rebuild, upgrade, repair, manufacturing, technical support, systems integration, product support integration Deployment Software Support / TMDE Public-Private Partnerships Life Cycle Support Overhauled, Upgraded, and Rebuilt Equipment Weapon System Capability Improvement Communications Ability to surge Product Improvement Customer Service Schedule/Timeliness Quality Cost Warfighter weapon and equipment life cycle readiness is sustained: Availability Reliability Affordability Figure 7: Depot Maintenance Enterprise Value Chain In accordance with the goals and objectives of this Materiel Materiel plan and with the desired outcomes we seek to Reliability Availability achieve for our customers and stakeholders, DME has established four overarching performance metrics to gauge our impact and assess our performance. Two DME metrics, Materiel Ownership Cost Repair Cycle Time Availability and Materiel Reliability, measure the DME s contribution to life cycle weapon system readiness. The other two metrics, Ownership Cost and Mean Down Time, measure the efficiency of the Army s depot maintenance processes. Together, these metrics provide a common picture of DME ability to support desired materiel readiness outcomes at least cost. Materiel Availability The success of the Army s Force Generation process depends on the timely filling of unit equipment shortfalls. Shortages or late receipt of equipment can adversely impact a unit s ability to train and execute its assigned mission. Depot maintenance output and new procurement provide highly reliable and safe equipment to the Army s and other Service s operational units. Therefore, the depot maintenance performers ability to achieve planned production schedules is essential to sustaining materiel readiness levels. Performance measurement in support of this metric currently is in place for the Army s five organic depots. Data on scheduled and actual production is tracked on a monthly 19
20 basis. Reports highlight which systems are on/ahead of schedule, which systems are behind, and production scheduled to be completed in the next fiscal year. AMC has initiated action to capture similar data on equipment repaired by commercial contractors. Materiel Reliability The primary outcome of a depot maintenance program is sustained or improved reliability of weapon systems or equipment. Reliability is the return on the depot maintenance investment. Reliable equipment results in consistent performance, a reduction in field maintenance requirements, and an increase in war fighter confidence. Together, materiel availability and reliability, contribute to unit readiness. A performance measure is currently being established for this metric. Data on Quality Deficiency Reports for depot products is now being tracked at the Army corporate level. This measure will provide an initial indication of the performance trend of an equipment item after it has been processed through depot maintenance. More definitive information on equipment performance and reliability will become available as the Army expands its efforts in the area of Condition Based Maintenance (CBM) which is one of the key components under Objective 7 of this plan. Ownership Cost While materiel availability and reliability are two outcomes of the depot maintenance process, ownership cost provides insight into the efficiency of the process. A performance measure is currently being established for this metric. Data on the direct costs and the overhead costs of the Army s five organic depots are now being tracked at the Army corporate level. Repair Cycle Time A second efficiency metric is repair cycle time. While ownership cost is a measure of the amount of dollars input into the process to achieve the outcomes of availability and reliability, repair cycle time (RCT) is an input measure of time required to achieve the dual outcomes. The RCT starts with the induction of an item into the depot repair line and ends when the item is completed and handed over to the supply system for distribution. Over the last few years, the depots have reduced the RCT for several of the items they produce. They have accomplished this through the successful application of LSS to depot operations. Continued emphasis on LSS will generate additional reductions in cycle times. The processes prior to depot induction offer additional opportunities to improve operational efficiency. Improvements in planning the annual depot maintenance program can result in the more timely identification and turn-in of assets to the depots. Improvements in planning can also better align depot inductions with ARFORGEN unit equipment needs. The Army s emphasis on process improvement efforts are documented in Objectives 2 and 9 of this plan. 20
21 360 Degree Readiness 360 Degree Readiness is how we intend to measure ourselves in the future and will enable a more holistic view of DME performance and operations. 360 Degree Readiness is the capability to see, assess, and synchronize the Army s Corporate Enterprise Assets in support of Warfighting Operating Forces. Thus, when fully implemented, 360 Degree Readiness will provide increased visibility of how the Army resources are being spent for readiness in supply, training, procurement, and maintenance. The 360 Degree Readiness goal of monitoring Sustainment Base Production is to ensure the sustainment base is performing as planned to support the National Military Strategy, ARFORGEN, and Grow the Army requirements. The overarching metrics of materiel availability and materiel reliability directly relate to this by measuring how the Army provides reliable equipment in time to meet ARFORGEN schedules. CONCLUSION AND WAY AHEAD DME leadership has committed to an iterative strategic planning process. The goals and objectives discussed in this plan are detailed in action plans that describe specific actions to implement the goals and objectives, assign accountability, and provide a timeline for accomplishment. While the planning horizon for this plan is through 2025, action plans will be reviewed on an annual basis and the DMCB will monitor drivers of change that indicate the need to review and update this DME strategic plan. Drivers include significant changes in direction as detailed in a new Quadrennial Defense Review, or changes in the environment such as budget increases or decreases, changes in leadership, and accomplishment of the goals and objectives. Additionally, the DMCB will use the metrics described in this plan to measure and evaluate performance in the organic depots. As these measures are deployed and implemented, and as trend data is collected, information gleaned from this data may suggest new or changed goals, objectives, and action plans. The DMCB will remain flexible and open to these changes as these opportunities arise. 21
22 Appendix A On-going Initiatives and Accomplishments 360 Degree Readiness Army Campaign Plan major objective 7-1 is to maintain 360 enterprise views of equipment readiness. Army G-4 is developing a construct that provides visibility and understanding of Army level readiness indicators for Senior Army leaders to make informed decisions. These indicators are intended to effectively shape Army Force Generation and influence budget processes in support of the ACP and National Military Strategy (NMS). As part of this initiative, a Sustainment Base Production Team has been assembled to generate an indicator to keep the sustainment base on track with producing what the Army needs given the current operational environment. Lean Six Sigma The Army has seen significant improvements in efficiency and effectiveness using continuous process improvement tools in the manufacturing arena as well as in the organizational Army. In 2007, 12 Shingo prizes (the Nobel Prize in manufacturing) were awarded to Army depots. Continuous process improvement is an ongoing initiative that allows Army depots to better contribute to the readiness of the Warfighter by improving materiel costs, performance, and schedule. It is an initiative of the Army Industrial Base Strategic Plan to build Lean Six Sigma practices into the culture of the organic industrial base. The Army Depot Maintenance Strategic Plan intends to be consistent with this initiative. Public-Private Partnerships (PPP) The Industrial Base Strategic Plan proposes to establish partnering offices at each organic site that will facilitate public and private partners to engage in partnership discussions. Providing clear guidance for partnering, streamlining the partnership approval process, creating incentives that encourage partnering, and deploying partnership training will increase the understanding of partnerships and make their employment uncomplicated so that the maximum benefit can be garnered. Condition Based Maintenance (CBM) - In order to incorporate CBM strategies into its culture, the Army has developed a roadmap to identify capability gaps and gap solutions. It describes the need for change, universal impact, and CBM requirements. Moving forward, an implementation plan which includes metrics will be developed to incorporate CBM into the Army s inventory. Resource Formulation Guidance - Resource Formulation Guidance is published for preceding each POM to give operating agencies guidance to assist in the development of their overall requirements. This document is an appropriate vehicle to use to communicate current Army initiatives to all levels of the depot maintenance community so that they can be planned and programmed into depot maintenance requirements through future years. Value stream mapping AMC conducted a major value stream mapping effort in support of the Army Campaign Plan to include the depot maintenance process. HQDA G4 intends to expand upon the AMC effort by conducting a value stream analysis of the 22
23 planning process for depot maintenance production scheduling. AMC generated maps include: Base OMA Funded Depot Maintenance Execution Map Base OMA Funded Depot Maintenance Planning Process CCIR Depot Initiated Depot Maintenance Drilldown Process CCIR LCMC Initiated Depot Maintenance Drilldown Process CCSS Parts Materiel Requirements Planning Drilldown Process Direct Customer Depot Maintenance Planning Process Workforce Planning In 2006, HQAMC solicited individual workforce plans from each organic Army facility. It was evident in their responses that there was no clear plan to prepare the future workforce. As a result, each organic Army facility is now required to prepare a Strategic Staffing Plan to include trend data and an action plan to get to the projected future state. 23
24 Appendix B Glossary of Operational Terms and Definitions Capital Investment Program Plan: A comprehensive, 16-year plan for the modernization or replacement of depot facilities and infrastructure, and consists of each depot s capital improvement requirements and the projected funding or expenditures. (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) Condition Based Maintenance: A maintenance strategy that is derived from an RCM analysis. CBM encompasses a set of maintenance processes and capabilities derived from real-time assessment of weapon system condition obtained from embedded sensors and/or external test and measurements using portable equipment. The goal of CBM is to perform maintenance only upon evidence of need. (Army Regulation ) Core competencies: Those core logistics-related depot-level maintenance capabilities that serve as the Department s necessary ready and controlled source of technical ability, expertise, and resources. Core competencies are the set of depot-level maintenance capabilities necessary to enable the armed forces to fulfill the strategic and contingency plans prepared by the Joint Chiefs of Staff and for which the Military Departments believe the DoD should be a recognized leader in the national technology and industrial base. Core competencies ensure that DoD depot-level maintenance activities are prepared to and actually do execute depot-level maintenance in an effective, efficient, and timely manner. (DUSD L&MR memo 30 Jan 2002) Depot-level maintenance activity: A specific DoD-owned and operated facility established, equipped, and staffed to carry out depot-level maintenance. DoD depot-level maintenance activities accomplish a wide range of depot-level maintenance processes including overhaul, conversion, activation, inactivation, renovation, analytical rework, repair, modifications and upgrades, inspection, manufacturing, reclamation, storage, software support, calibration, and technical assistance. Field-level maintenance sites authorized to accomplish a specific depot-level repair or a narrow range of such repairs or maintenance are not depot-level maintenance activities. (DUSD L&MR memo 30 Jan 2002) Depot-level maintenance and repair: Maintenance or repair requiring overhaul, upgrading, or rebuilding of parts, assemblies or subassemblies and the testing and reclamation of equipment as necessary regardless of the source of funds for the maintenance or repair or the location at which the maintenance or repair is performed. (Title 10 U.S.C. Section 2460) Depot-level maintenance entails materiel maintenance requiring the major repair, overhaul, or complete rebuilding of weapon systems, end items, parts, assemblies, and subassemblies; manufacture of parts; technical assistance; and testing. (DoD Maintenance Long-Term Strategy Report to Congress) Depot Maintenance: That maintenance performed on materiel requiring major overhaul or a complete rebuild of parts, assemblies, subassemblies, and end-items, including the manufacture of parts, modifications, testing, and reclamation as required. Depot 24
25 maintenance serves to support lower categories of maintenance by providing technical assistance and performing that maintenance beyond their responsibility. Depot maintenance provides stocks of serviceable equipment by using more extensive facilities for repair than are available in lower level maintenance activities. (U.S. Department of Defense, Department of Defense Dictionary of Military and Associated Terms, Joint Pub (Washington: Government Printing Office, March 23, 1994.)) Life Cycle Management: The coordination of activities related to a given piece of equipment from conception to disposal Manufacturing: Total system and component manufacturing from prototyping to full installation, including engineering, machining, sheet metal, welding, finishing, plating, painting, cable manufacturing, as well as mechanical, electrical, and electronic assembly (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) National Maintenance Program Site: Providers across the Army and Guard (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) Overhaul, rebuild, upgrade and repair: A full range of maintenance support services, including overhaul, rebuild, modification, conversion, repair and testing (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) Performance-Based Logistics (PBL): An integrated acquisition and logistics process for buying weapon system capability that delineates outcome performance goals of weapon systems, ensures that responsibilities are assigned, provides incentives for attaining these goals, and facilitates the overall life cycle management of system reliability, supportability, and total ownership costs. Depot-level maintenance may be a part of life cycle management requirements. (DUSD L&MR memo 30 Jan 2002) Public-private partnership: An agreement between an organic depot maintenance activity and one or more private industry or other entity to perform work or utilize facilities and equipment. Depot capabilities that can be covered by such agreements include manufacturing, repair and technical services. (Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) An agreement between a government entity and one or more private industry, or other, entities to perform work or utilize facilities and equipment (US Army Materiel Command s Army Public-Private Partnership of the Organic Base, Working Copy as of 21 Sept 04 citing DUSD(L&MR) memo dtd 30 Jan 2002) An agreement between an organic depot maintenance activity and one or more private industry or other entities to perform work or utilize facilities and equipment (DUSD L&MR memo 30 Jan 2002) 25
26 Readiness: The ability of forces, units, weapon systems, or equipments to deliver the outputs for which they were designed (includes the ability to deploy and employ without unacceptable delays). (U.S. Department of Defense, Department of Defense Dictionary of Military and Associated Terms, Joint Pub (Washington: Government Printing Office, March 23, 1994), p. 237.) Recap: The rebuild and selected upgrade of systems to ensure operational readiness bring the equipment a near zero time/zero mile condition, and enhance system capability. Rebuild restores equipment and inserts new technology where practical to improve reliability and maintainability. Rebuild results in the system retaining its model designation. Selected upgrade adds warfighting capability to address current system shortcomings. The result of selected upgrade is a new model, a new life and improved warfighting capability. Repair Cycle time: The period of time from when the equipment is received by the Depot to when it is returned to the supply system Reset: Restores key combat systems to the 10/20 standard condition our equipment was in when it deployed with our soldiers and is specifically being driven by planned unit rotations into the Iraqi theater of operations. Depot level reset includes overhaul and depot level repairs as well as restoring the equipment to a 10/20 status. Systems integration: Capabilities that typically include development of new prototype systems or downsizing of existing systems (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) Technical Assistance: Worldwide technical assistance, system fielding, and depot maintenance support, including the deployment of activities (such as USAMC s Logistics Support Element) to support contingency operations such as OEF and OIF and natural disaster relief missions (Report to Congress, Department of Defense, Depot Maintenance Long-Term Strategy, November 2004) 26
27 Appendix C List of Acronyms ABO Army Budget Office ACOM Army Command ACP Army Campaign Plan AMC Army Materiel Command ARFORGEN Army Force Generations ARPL Army Resourcing Priorities List CBM Capabilities Based Maintenance CCIR Commander s Critical Information Requirements CCSS Commodity Command Standard Systems CG Commanding General CITE Centers of Industrial and Technical Excellence DARPL Dynamic Army Resourcing Priorities List DLA Defense Logistics Agency DMCB Depot Maintenance Corporate Board DME Depot Maintenance Enterprise DMEC Depot Maintenance Executive Council DOD Department of Defense DSOR Depot Source of Repair FYDP Future Years Defense Plan/Program GAO General Accounting Office GO General Officer GWOT Global War on Terror HQ Headquarters IBSP Industrial Base Strategic Plan JCS Joint Chiefs of Staff LCMC Life Cycle Management Command LSS Lean Six Sigma MACOM Major Command NMS National Military Strategy NGB National Guard Bureau OASA(ALT) Office of the Assistant Secretary of the Army (Acquisition, Logistics, & Technology) OMA Operations & Maintenance, Army OEM Original Equipment Manufacturer OPTEMPO Operational Tempo OSD Office of the Secretary of Defense PPP Public Private Partnerships PEO Program Executive Officer PM Program Manager POM Program Operating Memorandum QDR Quadrennial Defense Review RCT Repair Cycle Time SES Senior Executive Service SSO Synchronization Support Officer TMDE Test, Measurement, and Diagnostic Equipment USAR United States Army Reserve USC United States Code VSA Value Stream Analysis 27
28 Appendix D - References AMC Partnership Program Business Development Plan Army Campaign Plan Army Industrial Base Strategic Plan Army Materiel Command Strategic Plan and Vision: 2015 Army Materiel Command Human Capital Plan Army Materiel Command Capital Investment Plan DoD Depot Maintenance Strategic Plan National Military Strategy Quadrennial Defense Review 2007 Army Green Book 28
29 Appendix E Regulatory Environment Title 10 U.S.C Rule Title 10 United States Code 2466 dictates the limitations on performance of depot-level maintenance. Specifically, it establishes a 50 percent limit on contracting for depot maintenance for each military department and Defense Agency. In addition, compliance must be reported annually to Congress and audited by the General Accounting Office. 10 U.S.C 2474 Designates depots as Centers of Industrial and Technical Excellence (CITE) and sets rules for public-private partnerships. Army Regulations and Army Regulation 750-1, Army Materiel Maintenance Policy, is the standing Army regulation on materiel maintenance management. This is the guide by which Army maintenance operations are conducted. It is continuously revised so that it accurately reflects the needs of the Army. Army Regulation , Integrated Logistics Support, is the standing Army regulation that ensures core requirements for Army Materiel are analyzed early in the life cycle to allow for proper maintenance planning in preparation for efficient sustainment throughout its life cycle. A complete listing of regulations governing depot maintenance can be found in Figure 8. Regulations United States Code, Title 10 Section 2464, Core Logistics Capabilities Section 2460, Definition of Depot-Level Maintenance Section 2466, Limitations on Performance of Depot-Level Maintenance of Materiel Section 2472, Prohibition on management of depot employees by end strength Section 2474, Centers of Industrial and Technical Excellence: Designation; Public-Private Partnerships DoD DoD Directive , Maintenance of Military Materiel, 31 MAR 2004 DoD H, Depot Maintenance Capacity and Utilization Measurement Handbook, 10 MAR 2007 DoD Instruction , Depot Maintenance Core Capabilities Determination Process, 5 JAN 2007 DoDI , Serialized Item Management, 26 DEC 2006 DEPSECDEF Depot Maintenance Production Workforce Memo, 12 OCT 2001 DoD R, Vol. 6, Chapter 14 (Depot Maintenance Reporting) Military Services Joint Depot Maintenance Program, 31 MAR 1999 AMC-R , Headquarters US Army Materiel Command OPNAVIST A, Office of the Chief of Naval Operations MCO P B, Headquarters US Marine Corps DLAD , Headquarters Defense Logistics Agency AR 750-1, Army Materiel Maintenance Policy, 20 SEP 2007 AR 750-6, Army Equipment Safety and Maintenance Notification System, 31 OCT 2006 AR , Maintenance of Supplies and Equipment, 24 FEB 2006 Figure 8: Regulations Governing the Depot Maintenance Enterprise 29
DEFENSE LOGISTICS. Army Should Track Financial Benefits Realized from its Logistics Modernization Program. Report to Congressional Requesters
United States Government Accountability Office Report to Congressional Requesters November 2013 DEFENSE LOGISTICS Army Should Track Financial Benefits Realized from its Logistics Modernization Program
Army Supply Chain: Delivering the Future to the Warfighter
Army Supply Chain: Delivering the Future to the Warfighter Logistics Supporting Activity Life Cycle Logistics Tools Workshop 8 March 2010 Army Transformation Demands SC Transformation Seven years of conflict
Appendix D Logistics Support Element MISSION ORGANIZATION
Logistics Support Element Effective force projection logistics require a seamless logistics system operating across the strategic, operational, and tactical levels. Elements from CONUS and the theater
Defense Acquisition Review Journal
Defense Acquisition Review Journal 18 Image designed by Jim Elmore Joint Attack Munition Systems (JAMS) JOINT ATTACK MUNITION SYSTEMS (JAMS) PROJECT OFFICE IMPROVING SUPPORT TO THE WARFIGHTER Barry Beavers
GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved
GAO United States Government Accountability Office Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate July 2011 AIR FORCE WORKING CAPITAL FUND Budgeting
DEFENSE ACQUISITION WORKFORCE
United States Government Accountability Office Report to Congressional Committees December 2015 DEFENSE ACQUISITION WORKFORCE Actions Needed to Guide Planning Efforts and Improve Workforce Capability GAO-16-80
PM UAS Fleet Management (Depot Maintenance) OCT 19, 2011
PM UAS Fleet Management (Depot Maintenance) OCT 19, 2011 Presented to the DOD Maintenance Symposium by Mr. Ed Ward PM UAS, Fleet Manager Topics UAS Fleet (Family of Systems) UAS Life Cycle Support Concept
Army Regulation 702 11. Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED
Army Regulation 702 11 Product Assurance Army Quality Program Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED SUMMARY of CHANGE AR 702 11 Army Quality Program This major
Statement. Mr. Paul A. Brinkley Deputy Under Secretary of Defense for Business Transformation. Before
Statement of Mr. Paul A. Brinkley Deputy Under Secretary of Defense for Business Transformation Before THE UNITED STATES SENATE ARMED SERVICES COMMITTEE (SUBCOMMITTEE ON READINESS AND MANAGEMENT SUPPORT)
ENTERPRISE COMPUTING ENVIRONMENT. Creating connections THROUGH SERVICE & WORKFORCE EXCELLENCE
ITA Strategic Plan FY 2011 - FY 2016 U.S. Army Information Technology Agency REALIZING The DoD ENTERPRISE COMPUTING ENVIRONMENT Creating connections THROUGH SERVICE & WORKFORCE EXCELLENCE Provide Quality
Statement of. Vice Admiral William A. Brown, United States Navy. Deputy Commander, United States Transportation Command
Statement of Vice Admiral William A. Brown, United States Navy Deputy Commander, United States Transportation Command Before the House Armed Services Committee Subcommittee on Seapower and Projection Forces
AIR FORCE WORKING CAPITAL FUND. Actions Needed to Manage Cash Balances to Required Levels
United States Government Accountability Office Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate July 2014 AIR FORCE WORKING CAPITAL FUND Actions
JOINT STATEMENT COMMISSION ON WARTIME CONTRACTING
JOINT STATEMENT COMMISSION ON WARTIME CONTRACTING TOTAL FORCE POLICY, THE QDR, AND OTHER DEFENSE OPERATIONAL PLANNING: WHY DOES PLANNING FOR CONTRACTORS CONTINUE TO LAG? JULY 12, 2010 Chairman Thibault,
UNITED STATES AIR FORCE. Air Force Product Support Enterprise Vision
UNITED STATES AIR FORCE Air Force Product Support Enterprise Vision July 2013 Foreword Product Support is a set of functions and products that enables operational capability and readiness of systems, subsystems,
Improvement Needed for Inventory Management Practices on the T700 Technical, Engineering, and Logistical Services and Supplies Contract
Inspector General U.S. Department of Defense Report No. DODIG-2015-050 DECEMBER 10, 2014 Improvement Needed for Inventory Management Practices on the T700 Technical, Engineering, and Logistical Services
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 7045.14 January 25, 2013 USD(C) SUBJECT: The Planning, Programming, Budgeting, and Execution (PPBE) Process References: See Enclosure 1 1. PURPOSE. This Directive:
Ogden Air Logistics Center
Ogden Air Logistics Center Air Logistics Center Support Proposal for USAF Training Systems 309 th Software Maintenance Group Hill A.F.B. Utah Kenny Bennett [email protected] 801.775.2740 Misty
DOD MANUFACTURING ARSENALS. Actions Needed to Identify and Sustain Critical Capabilities
United States Government Accountability Office Report to Congressional Addressees November 2015 DOD MANUFACTURING ARSENALS Actions Needed to Identify and Sustain Critical Capabilities GAO-16-86 November
Department of Defense INSTRUCTION. Implementation and Management of the DoD-Wide Continuous Process Improvement/Lean Six Sigma (CPI/LSS) Program
Department of Defense INSTRUCTION NUMBER 5010.43 July 17, 2009 DCMO SUBJECT: Implementation and Management of the DoD-Wide Continuous Process Improvement/Lean Six Sigma (CPI/LSS) Program References: See
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 4140.25 June 25, 2015 USD(AT&L) SUBJECT: DoD Management Policy for Energy Commodities and Related Services References: See Enclosure 1 1. PURPOSE. This instruction:
OPNAVINST 3000.15A USFF/CNO N3/N5 10 Nov 2014
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3000.15A USFF/CNO N3/N5 OPNAV INSTRUCTION 3000.15A From: Chief of Naval Operations
GAO MILITARY AIRLIFT. DOD Should Take Steps to Strengthen Management of the Civil Reserve Air Fleet Program. Report to Congressional Committees
GAO United States Government Accountability Office Report to Congressional Committees September 2009 MILITARY AIRLIFT DOD Should Take Steps to Strengthen Management of the Civil Reserve Air Fleet Program
Table of Contents TABLE OF CONTENTS Letter from the Under Secretary of Defense... 4 Executive Summary... 5 Introduction... 7 Approach... 9 Assumptions... 9 Vision... 11 Goal One... 12 Objectives... 12
MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES
MEMORANDUM FOR THE HEADS OF DEPARTMENTS AND AGENCIES FROM: SUBJECT: Peter R. Orszag Director Managing the Multi-Sector Workforce Federal agencies use both federal employees and private sector contractors
ABBREVIATIONS AND ACRONYMS
ABBREVIATIONS AND ACRONYMS ABF Asset Balance File ADP Automated Data Processing AFMIS Army Food Management Information AMC Army Materiel Command AMDF Army Master Data File AN/ASN-86 Inertial Navigation
Defense Business Systems Investment Management Process Guidance. June 2012
Defense Business Systems Investment Management Process Guidance June 2012 Executive Summary Section 901 of the Fiscal Year 2012 National Defense Authorization Act (FY2012 NDAA), now codified at Title 10
UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 9 R-1 Line #139
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST
CECOM Campaign Plan FY2013 2015 THE CRITICAL LINK
CECOM Campaign Plan FY2013 2015 THE CRITICAL LINK Contents Overview Purpose Commander s Intent Vision Mission What We Do Where We Are Future Operating Environment & Impact on CECOM Army, AMC and CECOM
Department of Defense Fiscal Year (FY) 2016 President's Budget Submission
Department of Defense Fiscal Year (FY) 2016 President's Budget Submission February 2015 Defense Contract Management Agency Defense Wide Justification Book Volume 5 of 5 Research,, Test & Evaluation, Defense-Wide
Working Capital Fund. "Transforming to Meet the Nation's Needs"
Working Capital Fund "Transforming to Meet the Nation's Needs" United States Army Annual Financial Statement Fiscal Year 2001 Working Capital Fund Overview 27 Organization..................................
Department of Human Resources
Workforce Services Workforce Policy and Planning Department Management/ Human Resource Information Systems Employee Relations Employment Compensation and Workforce Analysis Employee Benefits Organizational
INFLUENCING AND OPTIMIZING BUDGETS AND SPENDING
INFLUENCING AND OPTIMIZING BUDGETS AND SPENDING By: Major General (MG) Karen Dyson & Morteza Anvari Major General Karen E. Dyson serves as the Director of the Army Budget in the Office of the Assistant
DOD BUSINESS SYSTEMS MODERNIZATION. Additional Action Needed to Achieve Intended Outcomes
United States Government Accountability Office Report to Congressional Committees July 2015 DOD BUSINESS SYSTEMS MODERNIZATION Additional Action Needed to Achieve Intended Outcomes GAO-15-627 July 2015
GAO DEFENSE INVENTORY. Defense Logistics Agency Needs to Expand on Efforts to More Effectively Manage Spare Parts. Report to Congressional Requesters
GAO United States Government Accountability Office Report to Congressional Requesters May 2010 DEFENSE INVENTORY Defense Logistics Agency Needs to Expand on Efforts to More Effectively Manage Spare Parts
DoD Base Realignment and Closure
DoD Base Realignment and Closure BRAC Rounds (BRAC 1988, 1991, 1993, 1995 & 2005) Executive Summary Fiscal Year (FY) 2015 Budget Estimates Program Year 2015 Justification Data Submitted to Congress March
Department of Defense INSTRUCTION. DoD Civilian Personnel Management System: Volume 250, Civilian Strategic Human Capital Planning (SHCP)
Department of Defense INSTRUCTION NUMBER 1400.25, Volume 250 November 18, 2008 USD(P&R) SUBJECT: DoD Civilian Personnel Management System: Volume 250, Civilian Strategic Human Capital Planning (SHCP) References:
ARMY WORKING CAPITAL FUND FISCAL YEAR 2016 BUDGET ESTIMATES
ARMY WORKING CAPITAL FUND FISCAL YEAR 2016 BUDGET ESTIMATES SUBMITTED TO CONGRESS FEBRUARY 2015 This Page Intentionally Left Blank Table of Contents ARMY OVERVIEW Background 1 AWCF Activity Groups 5 Budget
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5105.64 January 10, 2013 DA&M SUBJECT: Defense Contract Management Agency (DCMA) References: See Enclosure 1 1. PURPOSE. Pursuant to the authority vested in the Secretary
Information Technology
September 11, 2002 Information Technology The Defense Advanced Research Projects Agency s Transition of Advanced Information Technology Programs (D-2002-146) Department of Defense Office of the Inspector
GAO MILITARY EDUCATION. Improved Oversight and Management Needed for DOD s Fellowship and Training-with-Industry Programs
GAO United States Government Accountability Office Report to Congressional Committees April 2012 MILITARY EDUCATION Improved Oversight and Management Needed for DOD s Fellowship and Training-with-Industry
GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices
GAO United States Government Accountability Office Report to Congressional Addressees March 2013 MAJOR AUTOMATED INFORMATION SYSTEMS Selected Defense Programs Need to Implement Key Acquisition Practices
U.S. Nuclear Regulatory Commission. Plan of Action Strategic Workforce Planning
U.S. Nuclear Regulatory Commission Plan of Action Strategic Workforce Planning January 19, 2001 Strategic Workforce Planning Plan of Action January 19, 2001 Content Overview This plan of action outlines
VA Office of Inspector General
VA Office of Inspector General OFFICE OF AUDITS AND EVALUATIONS Department of Veterans Affairs Audit of Office of Information Technology s Strategic Human Capital Management October 29, 2012 11-00324-20
STATEMENT BY DAVID DEVRIES PRINCIPAL DEPUTY DEPARTMENT OF DEFENSE CHIEF INFORMATION OFFICER BEFORE THE
STATEMENT BY DAVID DEVRIES PRINCIPAL DEPUTY DEPARTMENT OF DEFENSE CHIEF INFORMATION OFFICER BEFORE THE HOUSE OVERSIGHT AND GOVERNMENT REFORM COMMITTEE S INFORMATION TECHNOLOGY SUBCOMMITTEE AND THE VETERANS
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 4151.19 January 9, 2014 USD(AT&L) SUBJECT: Serialized Item Management (SIM) for Life-Cycle Management of Materiel References: See Enclosure 1 1. PURPOSE. In accordance
FACT SHEET. General Information about the Defense Contract Management Agency
FACT SHEET General Information about the Defense Contract Management Agency Mission: We are the independent eyes and ears of DoD and its partners, delivering actionable acquisition insight from the factory
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5000.01 May 12, 2003 Certified Current as of November 20, 2007 SUBJECT: The Defense Acquisition System USD(AT&L) References: (a) DoD Directive 5000.1, The Defense
DEFENSE BUSINESS SYSTEMS. Further Refinements Needed to Guide the Investment Management Process
United States Government Accountability Office Report to Congressional Committees May 2014 DEFENSE BUSINESS SYSTEMS Further Refinements Needed to Guide the Investment Management Process GAO-14-486 May
GAO. DEFENSE INFRASTRUCTURE Funding Risks in Services 1999 Central Training Programs
GAO United States General Accounting Office Report to the Chairman, Committee on the Budget, House of Representatives February 1999 DEFENSE INFRASTRUCTURE Funding Risks in Services 1999 Central Training
Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment
Inspector General U.S. Department of Defense Report No. DODIG 2015 008 OCTOBER 23, 2014 Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment INTEGRITY EFFICIENCY ACCOUNTABILITY
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 3204.01 August 20, 2014 USD(AT&L) SUBJECT: DoD Policy for Oversight of Independent Research and Development (IR&D) References: See Enclosure 1 1. PURPOSE. This
ARMY WORKING CAPITAL FUND FISCAL YEAR (FY) 2015 BUDGET ESTIMATES
ARMY WORKING CAPITAL FUND FISCAL YEAR (FY) 2015 BUDGET ESTIMATES SUBMITTED TO CONGRESS MARCH 2014 This Page Intentionally Left Blank Errata Sheet Department of the Army Army Working Capital Fund Minimum
Department of Defense INSTRUCTION. DoD and Department of Veterans Affairs (VA) Health Care Resource Sharing Program
Department of Defense INSTRUCTION NUMBER 6010.23 January 23, 2012 Incorporating Change 1, Effective October 3, 2013 USD(P&R) SUBJECT: DoD and Department of Veterans Affairs (VA) Health Care Resource Sharing
Defense Contract Management Agency Operation Enduring Freedom/Operation New Dawn Operation and Maintenance, Defense-Wide
I. Description of Operations Financed: The DCMA maintains a presence in theater to support the Army s Logistics Civil Augmentation Program (LOGCAP) and Air Force Contract Augmentation Program (AFCAP),
Software Reprogramming Policy for Electronic Warfare and Target Sensing Systems
Army Regulation 525 15 Military Operations Software Reprogramming Policy for Electronic Warfare and Target Sensing Systems Headquarters Department of the Army Washington, DC 23 July 2010 UNCLASSIFIED SUMMARY
ARMY WORKING CAPITAL FUND FISCAL YEAR (FY) 2014 BUDGET ESTIMATES
ARMY WORKING CAPITAL FUND FISCAL YEAR (FY) 2014 BUDGET ESTIMATES SUBMITTED TO CONGRESS APRIL 2013 This Page Intentionally Left Blank Table of Contents ARMY OVERVIEW Background 1 AWCF Activity Groups 5
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 8140.01 August 11, 2015 DoD CIO SUBJECT: Cyberspace Workforce Management References: See Enclosure 1 1. PURPOSE. This directive: a. Reissues and renumbers DoD Directive
DoD Strategy for Defending Networks, Systems, and Data
DoD Strategy for Defending Networks, Systems, and Data November 13, 2013 Department DoDD of Defense Chief Information Officer DoD Strategy for Defending Networks, Systems, and Data Introduction In July
International cooperation in defense acquisition programs is an important but complex undertaking.
H U M A N C A P I T A L I N I T I A T I V E S New Career Path Recognizes Global Scope of Acquisitions International Acquisition Career Path Duane Tripp Roy Wood International cooperation in defense acquisition
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5105.77 October 30, 2015 DCMO SUBJECT: National Guard Bureau (NGB) References: See Enclosure 1 1. PURPOSE. Pursuant to the authority vested in the Secretary of Defense
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 3115.12 August 24, 2010 USD(I) SUBJECT: Open Source Intelligence (OSINT) References: See Enclosure 1 1. PURPOSE. This Instruction: a. Establishes policy, assigns
APPENDIX J INFORMATION TECHNOLOGY MANAGEMENT GOALS
APPENDIX J INFORMATION TECHNOLOGY MANAGEMENT GOALS Section 5123 of the Clinger-Cohen Act requires that the Department establish goals for improving the efficiency and effectiveness of agency operations
bñåéêéí=ñêçã=íüé== mêçåééçáåöë= çñ=íüé= péåçåç=^ååì~ä=^åèìáëáíáçå= oéëé~êåü=póãéçëáìã=
NPS-PM-05-027 bñåéêéíñêçãíüé mêçåééçáåöë çñíüé péåçåç^ååì~ä^åèìáëáíáçå oéëé~êåüpóãéçëáìã THE NEW JOINT CAPABILITIES INTEGRATION DEVELOPMENT SYSTEM (JCIDS) AND ITS POTENTIAL IMPACTS UPON DEFENSE PROGRAM
Maintenance Operations. April 2014
ATP 4-33 Maintenance Operations April 2014 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. Headquarters, Department of the Army This publication is available at Army Knowledge
Testimony. Patrick J. Fitzgerald Director, Defense Contract Audit Agency. before the. Commission on Wartime Contracting In Iraq and Afghanistan
Testimony of Patrick J. Fitzgerald Director, Defense Contract Audit Agency before the Commission on Wartime Contracting In Iraq and Afghanistan The Contingency Acquisition Workforce: What Is Needed and
Army Foundry Intelligence Training Program
Army Regulation 350 32 Training Army Foundry Intelligence Training Program Headquarters Department of the Army Washington, DC 2 June 2015 UNCLASSIFIED SUMMARY of CHANGE AR 350 32 Army Foundry Intelligence
Executive Office of the President. Office of Management and Budget. Fiscal Year 2015 Budget
Fiscal Year 2015 Budget Mission Statement and Background The (OMB) assists the President in the development and execution of his policies and programs and in meeting certain requirements in law such as
WHITE PAPER APRIL 2012. Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives
WHITE PAPER APRIL 2012 Leading an Implementation Campaign to Address the Convergence of Healthcare Reform Initiatives New healthcare reforms have created an unprecedented impact on hospital systems operations.
WEAPONS ACQUISITION REFORM
GAO United States Government Accountability Office Report to the Committee on Armed Services, U.S. Senate September 2011 WEAPONS ACQUISITION REFORM Actions Needed to Address Systems Engineering and Developmental
Fact Sheet: Building the First Link to the Force of the Future
Fact Sheet: Building the First Link to the Force of the Future On his first day in office, Secretary Carter announced his goal to build the Force of the Future in order for the Department of Defense to
UNITED STATES ARMY MATERIEL COMMAND
UNITED STATES ARMY MATERIEL COMMAND Academia Day March 2015- Huntsville, Alabama Creating A Passion for Federal Service THE UNITED STATES ARMY IS A FORTUNE 100 COMPANY (RANKED WITH BEST BUY AND DISNEY)
DOD DIRECTIVE 4715.21 CLIMATE CHANGE ADAPTATION AND RESILIENCE
DOD DIRECTIVE 4715.21 CLIMATE CHANGE ADAPTATION AND RESILIENCE Originating Component: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics Effective: January 14, 2016 Releasability:
Supply Inventory Management
December 6, 2002 Supply Inventory Management Accountability and Control of Materiel at the Naval Air Depot, North Island (D-2003-033) Department of Defense Office of the Inspector General Quality Integrity
DEFENSE ACQUISITION STRUCTURES AND CAPABILITIES REVIEW
DEFENSE ACQUISITION STRUCTURES AND CAPABILITIES REVIEW REPORT JUNE 2007 PURSUANT TO SECTION 814, NATIONAL DEFENSE AUTHORIZATION ACT, FISCAL YEAR 2006 DEFENSE ACQUISITION STRUCTURES AND CAPABILITIES REVIEW
Department of Defense INSTRUCTION. SUBJECT: Depot Maintenance Core Capabilities Determination Process
Department of Defense INSTRUCTION NUMBER 4151.20 January 5, 2007 USD(AT&L) SUBJECT: Depot Maintenance Core Capabilities Determination Process References: (a) DoD Directive 4151.18, Maintenance of Military
NAVAL AVIATION ENTERPRISE
NAVAL AVIATION ENTERPRISE Naval aviation has advanced from a limited activity covering anti-submarine defense to one of widespread application as an integral part of a homogeneous fleet. This development
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5144.02 November 21, 2014 DCMO SUBJECT: DoD Chief Information Officer (DoD CIO) References: See Enclosure 1. PURPOSE. Under the authority vested in the Secretary
April 17, 2006. Human Capital. Report on the DoD Acquisition Workforce Count (D-2006-073) Department of Defense Office of Inspector General
April 17, 2006 Human Capital Report on the DoD Acquisition Workforce Count (D-2006-073) Department of Defense Office of Inspector General Quality Integrity Accountability Additional Copies To obtain additional
Duty Descriptions AS OF: 5/27/2006
Duty Descriptions AS OF: 5/27/2006 Introduction Duty Description Pamphlet by ArmyToolbag.com The purpose of this pamphlet is to compile various duty descriptions for NCOERs and OERs. This is a work in
WORKFORCE AND SUCCESSION PLANNING
2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps Workforce Management Office NOAA 1/1/2012 Table of contents Introduction... 3 Workforce Planning... 3 Step 1:
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 7045.20 September 25, 2008 USD(P) SUBJECT: Capability Portfolio Management References: See Enclosure 1 1. PURPOSE. This Directive: a. Establishes policy and assigns
Operational Energy Strategy: Implementation Plan
Operational Energy Strategy: Implementation Plan Department of Defense March 2012 Preparation of this report/study cost the Department of Defense 2011 - a 2012. total of approximately Generated $240,000
Position Classification Flysheet for Logistics Management Series, GS-0346
Position Classification Flysheet for Logistics Management Series, GS-0346 Table of Contents SERIES DEFINITION... 2 SERIES COVERAGE... 2 EXCLUSIONS... 4 DISTINGUISHING BETWEEN LOGISTICS MANAGEMENT AND OTHER
In today s acquisition environment,
4 The Challenges of Being Agile in DoD William Broadus In today s acquisition environment, it no longer is unusual for your program to award a product or service development contract in which the vendor
U.S. Department of Justice. Mission First...Linking Strategy to Success
U.S. Department of Justice Mission First...Linking Strategy to Success Department of Justice Human Capital Strategic Plan 2007-2012 Table of Contents Foreword.......................................................................1
UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 16 R-1 Line #145
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST
DLA Corporate Intern Program
DLA Corporate Intern Program The Program is a 2-year corporate training program designed to train entry-level personnel for subsequent advancement to the journey-level in professional, administrative,
Department of Defense MANUAL. DoD Integrated Materiel Management (IMM) for Consumable Items: Reporting, Auditing, and Financial Management
Department of Defense MANUAL NUMBER 4140.26-M, Volume 5 September 24, 2010 USD(AT&L) SUBJECT: DoD Integrated Materiel Management (IMM) for Consumable Items: Reporting, Auditing, and Financial Management
Defense Contract Management Agency (DCMA)
Fiscal Year 2011 Budget Estimates Defense Contract Management Agency (DCMA) February 2010 DCMA 87 DEFENSE CONTRACT MANAGEMENT AGENCY (This page intentionally left blank.) DCMA 88 DEFENSE CONTRACT MANAGEMENT
Army Civilian Senior Service College Fellowship Military Equivalent Education (MEL) 1 Application. DAU Board of Visitors May 17, 2011
Army Civilian Senior Service College Fellowship Military Equivalent Education (MEL) 1 Application DAU Board of Visitors May 17, 2011 Agenda Army Civilian Senior Service College Fellowship Program Approval
Encl: (1) Surface Warfare Tactical Requirement Group Membership
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5420.113 N9 OPNAV INSTRUCTION 5420.113 From: Chief of Naval Operations Subj: SURFACE
FACT SHEET. General Information About the Defense Contract Management Agency
FACT SHEET General Information About the Defense Contract Management Agency Mission: We provide Contract Administration Services to the Department of Defense Acquisition Enterprise and its partners to
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 4715.1E March 19, 2005 USD(AT&L) SUBJECT: Environment, Safety, and Occupational Health (ESOH) References: (a) DoD Directive 4715.1, Environmental Security, February
Corpus Christi Army Depot Excels With AS9100 and AS9110 Registration.
Corpus Christi Army Depot Excels With AS9100 and AS9110 Registration. The Corpus Christi Army Depot Corpus Christi Army Depot (CCAD) is the world s largest helicopter repair facility. With over 4,000 employees,
Office of Inspector General Department of Defense FY 2012 FY 2017 Strategic Plan
Office of Inspector General Department of Defense FY 2012 FY 2017 Strategic Plan May 22, 2015 Revision The Department of Defense Office of Inspector General is an independent agency established by the
STATEMENT BY MAJOR GENERAL JUDD H. LYONS ACTING DIRECTOR, ARMY NATIONAL GUARD BEFORE THE U.S. HOUSE OF REPRESENTATIVES APPROPRIATIONS COMMITTEE
STATEMENT BY MAJOR GENERAL JUDD H. LYONS ACTING DIRECTOR, ARMY NATIONAL GUARD BEFORE THE U.S. HOUSE OF REPRESENTATIVES APPROPRIATIONS COMMITTEE SUBCOMMITTEE ON DEFENSE FIRST SESSION, 114 TH CONGRESS ON