Managing & Recycling Construction & Demolition Waste Project Prequalification Documents
|
|
|
- Imogene Tate
- 9 years ago
- Views:
Transcription
1 1 Housing & Building National Research Center Managing & Recycling Construction & Demolition Waste Prequalification Documents objective : The project aims to create a managerial system to recycle construction and demolition waste in New Cairo City so that such waste would be transformed from being an environmental and economic burden to become a building and construction resource. In addition, this project will guarantee the nonpileup of waste and avoid the negative effect that this has on the environment and the community. This project will be implemented so that the waste recycling operations would be managed starting from collecting, transporting, assorting and classifying the waste till the processes of recycling the construction and demolition waste or transporting the non-recyclable waste to their designated landfills. components : Planning the land allocated for the project includes the following : 1. The place designated for collecting the construction and demolition mixed waste. 2. A place for assorting the construction and demolition waste. 3. A place for storing the assorted waste until its sale or transport to the landfill or the recycling plant. 4. Spaces designated for the roads required for transporting inside the project. 5. A place for building the construction and demolition waste recycling plant. 6. A place for burying the waste. main data : - Name of project : Managing & Recycling Construction & Demolition Waste in New Cairo City - Owner : Urban Communities Authority. - Consultant : The Housing & Building National Research Center
2 2 Data required to start and operate the project : * The quantity of waste resulting from the works of construction and demolition in New Cairo City was determined and classified, and the rates of each type of waste was also determined according to what was received from New Cairo City Agency (Enclosure 1 Agency Letter) as follows : - Quantity of waste generated daily : 2,784 cu.m./day mixed + quantity of soil drilling outcome that is not fit for use = 2,802 cu.m./day - The mixed waste includes several materials at different rates such as : 0.1% lumber, 90% brick's fragments, 4% gypsum, 0.8% ceramic, 0.1% plastic pipes and 5% other materials. - The location and the surface area of the land allocated for the project pursuant to the enclosures received from New Cairo City Agency amounts to 292 feddans (Enclosure 2 : The Map). * working term : Pursuant to studying the layout of the construction and demolition waste management plant, the term targeted for the project is 15 years. It was assumed by the committee pursuant to the presumptive production life of the equipment used in the project. * The distance to the project's location from the Agency : km.
3 3 Tasks, qualifications and experiences required from investors applying for the process of managing and recycling the construction and demolition waste : The following part indicates the investor's tasks and the qualifications requested of him : Qualifications & experiences required from the applying investors : 1. Prequalification in construction and demolition waste management projects supported by documents. 2. Prequalification in the field of operating and managing recycling plants supported by documents. 3. Knowledge of the environmental conditions in Egypt. 4. The containment of the administrative chart of the investor to workers and qualified technical cadres, provided that their number would be commensurate with the volume and nature of works. In addition, they must be efficient and specialized in a manner that qualifies them to carry out the following works : - Managing the construction and demolition waste. - Assorting the construction and demolition waste - Recycling the construction and demolition waste - Burying the non-recyclable waste. 5. The ability to provide a training program for the labor used in this field. 6. The ability to build a recycling plant including the buildings, equipment and testing laboratories that it requires. 7. The ability of provide vehicles and equipment to carry out the works entrusted thereto. 8. The ability to provide guarding for the work site so that the contractor shall be responsible solely for protecting and safeguarding the plant from damage.
4 4 Qualification documents : 1. Name of company, its address, telephone and fax numbers and address (Form 1). 2. Tax register/tax card (Form 1). 3. Financial data : - Financial position (Form 2). - Volume of assets. - Sources of finance (Form 3). - Cash flow statements for a period of 3 preceding years. - Names of banks dealt with (Form 4). - Submitting the workers insurance coverage documents. 4. Technical data : - The organization chart of company. - The period of experience in the same type of projects. - Similar completed projects in the last 5 years, if any (Form 5). - Similar in process projects, if any (Form 6). - The workers in the project and their resumes (Form 7). - A statement including the names and data of the subcontractors dealt with in similar project in the last 5 years, if any. - The training plan for the local labor. - A schedule that indicates the responsibilities with regards to the implementation of the works entrusted to him, mentioning the experience and efficiency of the officials in charge of each task. - A statement of the final products expected from the recycling process. - Submitting a statement of the volume and kinds of equipment used; together with indicating the extent of their suitability technically and environmentally, their rate of depreciation and the nature of their ownership (Form 8). - The equipment maintenance plan; together with determining the nature of those in charge of the maintenance process. - The landfill's quality plan and the waste recycling plant. - The industrial security plan. - The environmental conditions. - A statement of the lawsuits and disputes during the last five year (Form 9).
5 5 - A statement of the legal entity of the bidder and the documents evidencing its legal position. - A statement of the relevant contracts throughout the last five years, if any (mentioning the contracts that include waste recycling), which includes : * A description of the contract and a detail of the roles and responsibilities of the contractor's establishment. * The term of the contract and its value. * When and where were the services implemented. * A confirmation that the abovementioned services were implemented and completed in a right way (reception minutes). - The final product marketing and sale plan in addition to mentioning the clients targeted to purchase the product (if any). - Feasibility studies for previous projects (Form 10). Tasks entrusted to investor applying for project : 1. The collection of the generated mixed waste from the construction or demolition site or those thrown randomly in the City (if the investor is in charge of transportation). 2. Transporting the mixed waste to the construction and demolition waste management plant (if the investor is in charge of transportation). 3. Planning the construction and demolition waste management plant and determining the surface areas, passages and the waste storage places before and after assortment. 4. The compliance with the rate of moving the waste from the city streets and their collection places as determined by the Urban Communities Authority (if the investor is in charge of transportation). 5. Assorting the waste, determining the assortment and processing locations and placing a sticker indicating the kind and data of the waste on each container. 6. Training the labor on the different phases of the waste management system. 7. Confining and documenting the quantities of collected and assorted waste periodically (by weight). 8. Confining and documenting the quantities of waste transported for burial periodically (by weight). 9. Confining and documenting the quantities of recyclable waste periodically (by weight). 10. Processing and testing the waste after assorting it.
6 6 11. Transporting the recyclable waste to the waste recycling plant. 12. Transporting the non-recyclable waste to the landfills. 13. Managing the construction and demolition waste management plant with regards to regulating the waste entry and assortment works and disposing of it to its finally destination as indicated in the flow chart. 14. Building, operating and managing the waste recycling plant. 15. Testing the final products resulting from waste recycling. 16. Submitting reports of the technical specifications of the recycled final product ratified by a governmental entity. 17. Marketing the final products resulting from the recycling process. 18. Providing the required guarding for the project site including all its components. 19. Building, operating and managing the landfill for the safe burial of the non-recyclable waste. Applying investors qualification invitation book : In order for the contractor to be able to word the above requests and submit the required information and data, a book was prepared that includes the required forms so that the investor could seek its assistance. All submitted data must be supported by signed and authenticated documents. The enclosed forms include the following : - Form 1 : Introduction of Company - Form 2 : General Experiences Register - Form 3 : Financial Solvency - Form 4 : Data on Banks Dealt With - Form 5 : Similar s Completed During Last 5 Years - Form 6 : Similar In-Process s - Form 7 : Workers Data - Form 8 : Equipment Data - Form 9 : Litigation - Form 10 : Previous s Feasibility Studies (Feasibility studies for previous projects in which the investor is in charge of the waste transport process and others for projects in which the investor is not in charge of the waste transport process).
7 7 Form 1 Introduction of Company Name of company/contractor :... Address of head office :... Tel. no. :... Fax. no. :... Telex. no. :... address :... Tax Card no. :... Commercial Register no. :... Name of executive officer :... Post of executive officer :... Phone no. of executive officer :... Executive officer empowerment no. (power of attorney) :... Executive officer address :... If the applying organization is a member of a group, kindly submit an explanation of the company s organization chart including the names and addresses recorded for all companies of the group.
8 8 Form 2 General Experiences Register Name of individual or partner in a joint project applicant :... Year Volume of Work Corresponding Value
9 9 Form 3 Financial Solvency Sources of Finance Sum EGP
10 10 Form 4 Data On Banks Dealt With Bank :... Address :... Tel. no. :... Fax. no. :... Telex. no. :... Name & post of communication officer :...
11 11 Form 5 Similar s Completed During Last 5 Years Ser. Name of Starting Date Ending Date Location Value Owner Description Delay Fines
12 12 Form 6 Similar In-Process s Ser. Name of Duration Starting Date Expected Ending Date Achievement % Location Value Owner Description
13 13 Form 7 Company Workers Data Ser. Post Qualifications Number Total number of workers
14 14 Form 8 Equipment Data Ser. Name of Equipment Property of Equipment Equipment Status Number
15 15 Form 9 Litigation Applicants, including the partners in a joint project should provide information on the date of any cases of litigation or arbitration resulting from the contracts implemented during the last five years or that are in the implementation process. A separate paper should be used for each partner in a joint project. Year In Favor or Against Applicant Name of Client, Reason for Litigation & Subject Matter of Dispute Sum of Dispute (Or Equivalence in EGP)
16 16 Form 10 Previous s Feasibility Studies
SUBCONTRACTOR PRE-QUALIFICATION APPLICATION
APPLICATION SUBCONTRACTOR IDENTITY Date Submitted Company Name Complete Address Phone Number Contact Name Federal Tax ID # DUNS # Fax Number Email Address NAICS Code States Registered to do Business Include
North American Development Bank. Model Prequalification Document: Prequalification of Contractors
North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried
Architects and Engineers Professional Liability Proposal Form
Notice:Statement pursuant to Section 25(5) of the Insurance Act (Cap 142) or any amendments thereof; You are to disclose in this application, fully and faithfully, all the facts which you know or ought
Contractor s Estimation of Cost and Bidding Strategy. Construction Project Management_Kumar Neeraj Jha
1 Contractor s Estimation of Cost and Bidding Strategy Contents 1.1 Contractor s estimation and bidding process 1.2 Bidding models 1.3 Determination of optimum mark-up level 1.4 Bidding and estimation
GENERAL CONTRACTOR QUALIFICATION STATEMENT PACKAGE FOR VICTOR VALLEY COMMUNITY COLLEGE
GENERAL CONTRACTOR QUALIFICATION STATEMENT PACKAGE FOR VICTOR VALLEY COMMUNITY COLLEGE ASBESTOS ABATEMENT and DEMOLITION Music Building VICTOR VALLEY COMMUNITY COLLEGE DISTRICT CONTRACTOR'S STATEMENT OF
WASTE SERVICES & DISPOSAL AGREEMENT. By: By: Name: Name: Title: Title:
WASTE SERVICES & DISPOSAL AGREEMENT COMPANY: CUSTOMER: By: By: Name: Name: Date Date Title: Title: Effective Date of Agreement: Initial Term: Contract No. This Waste & Disposal Services Agreement, consisting
STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)
STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT (Works, Heavy Equipment, Supply and Installation Contracts) Table of Contents Page INTRODUCTION 3 SECTION I - Invitation for prequalification... 4 SECTION
LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 & 126)
t NATIONAL ENVIRONMENTAL COVERAGE CORP. of the South LLC 2065 FIRST STREET, SUITE 201 SLIDELL, LA 70458 (504) 781-6808 FAX (504) 781-6562 LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 &
QUALIFICATION OF SUB-CONTRACTORS FOR FIRE DETECTION AND ALARM SYSTEM FOR CFC STANBIC BANK REF: 2014/15-06
QUALIFICATION OF SUB-CONTRACTORS FOR FIRE DETECTION AND ALARM SYSTEM FOR CFC STANBIC BANK REF: 2014/15-06. TABLE OF CONTENTS Part 1: General Instructions Section I Company Profile Section II Financial
REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District
Introduction: REQUEST FOR STATEMENT OF INTEREST AND QUALIFICATIONS (SOIQ) FOR ARCHITECTURAL SERVICES Provo City School District Pursuant to Utah Code Ann. 63G-6-701, it is the policy of the Provo City
Official English translation of the investment law. In the Name of God, Most Gracious, Most Merciful. In the Name of the People
Official English translation of the investment law In the Name of God, Most Gracious, Most Merciful In the Name of the People President s Office - Kurdistan Region - Iraq Pursuant to legislation by the
Incomplete submissions will be declined
MOLD CONSULTANTS APPLICATION REQUIREMENTS 1. Contractors & Consultants application - complete all questions in full. 2. Special attention should be paid to question 9. Please list your estimated gross
7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
Business Plans & Financial Statements
Business Plans & Financial Statements Prepared by Dr. Merle Rhoades, Director Small Business Development Center Morgan Community College Agritourism Spring, 2008 BUSINESS PLANS A tool to lead you down
INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16
INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:
SUBCONTRACTOR S QUALIFICATION STATEMENT. Give complete answers to the following questions (attach additional pages if necessary).
1 SUBCONTRACTOR S QUALIFICATION STATEMENT Submitted to: B.C. Construction Co., Inc. 385 Main Street Wakefield, MA 01880 For consideration with regard to: (Name of Project) Date: Give complete answers to
ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS 7 Court Street, Room 210 Belmont, NY 14813-1078 Telephone: 585-268-9230 Fax: 585-268-9648 NOTICE TO BIDDERS
ALLEGANY COUNTY DEPARTMENT OF PUBLIC WORKS 7 Court Street, Room 210 Belmont, NY 14813-1078 Telephone: 585-268-9230 Fax: 585-268-9648 NOTICE TO BIDDERS Allegany County will receive sealed bids until 10:00
MIDDLESEX COUNTY UTILITIES AUTHORITY REQUEST FOR QUALIFICATIONS FOR PROVIDING SERVICES AS THE AUTHORITY S HEALTH & SAFETY CONSULTANT 2016
MIDDLESEX COUNTY UTILITIES AUTHORITY REQUEST FOR QUALIFICATIONS FOR PROVIDING SERVICES AS THE AUTHORITY S HEALTH & SAFETY CONSULTANT 2016 DEADLINE: 11:00 AM ON NOVEMBER 6, 2015 This REQUEST FOR QUALIFICATIONS
15-213. Procurement practices of school districts and charter schools; definitions
ARIZONA AUTHORITY 15-213. Procurement practices of school districts and charter schools; definitions A. The state board of education shall adopt rules prescribing procurement practices for all school districts
Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant
Minnesota Power PRE QUALIFICATION QUESTIONNAIRE Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant December 1, 2014 CONTRACTOR s NAME: Project Description: Minnesota Power is developing,
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
INDUSTRIAL INSPECTORATE ACT CAP. 180 L.F.N. 1990 ACT CAP I8 L.F.N. 2004. 1. Establishment and composition of Industrial Inspectorate Division.
Visit http://www.jewngr.wordpress.com for more downloads INDUSTRIAL INSPECTORATE ACT CAP. 180 L.F.N. 1990 ACT CAP I8 L.F.N. 2004 ARRANGEMENT OF SECTIONS Section 1. Establishment and composition of Industrial
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request
The Public Procurement Rules, 2064 (2007)
The Public Procurement Rules, 2064 (2007) Date of Publication in Nepal Gazette: 2064-5-3 B.S. (20 August 2007 A.D.) Amendment 1.Public Procurement (First Amendment) Regulation, 2065 (2008) 2065-8-9 (24
Construction Surety Bonds
Construction Surety Bonds September 17, 2014 Presented by: Walt Caldwell [email protected] What is a Surety Bond An instrument where one party (Surety) guarantees the obligations of a second party
CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:
CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled.
CHAPTER 19. Accounting for Income Taxes 6, 7, 13 2, 3, 4, 5, 6, 7, 9 14, 16, 17, 18,
CHAPTER 19 Accounting for Income Taxes ASSIGNMENT CLASSIFICATION TABLE Topics 1. Reconcile pretax financial income with taxable income. 2. Identify temporary and permanent differences. 3. Determine deferred
California Department of Public Health Drinking Water Program. TMF Assessment Form. ASSESSMENT TYPE: Funding Project New System Change of Ownership
California Department of Public Health Drinking Water Program TMF Assessment Form ASSESSMENT TYPE: Funding Project New System Change of Ownership WATER SYSTEM CLASSIFICATION: Community Water System Nontransient
ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS
ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS The purpose of City Code 11-4-2150-11-4-2190 is to reduce the potential risk of harm to the public's health, safety and welfare
School Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
General Form of Factoring Agreement regarding the Assignment of Accounts Receivable
General Form of Factoring Agreement regarding the Assignment of Accounts Receivable Agreement made on the (date), between (Name of Factor), a corporation organized and existing under the laws of the state
Directive No. SIB/1/1994
Directive No. SIB/1/1994 LICENSING AND SUPERVISION OF INSURANCE BUSINESS Issuing Authority These Directives are issued by the National Bank of Ethiopia pursuant to the authority vested in it by Article
SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM
SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM BRIEF This Supplier Pre Qualification Questionnaire is provided for the following project types of ALARGAN PROJECTS: 1) Supply of Construction Materials 2)
QUOTE OPENING MEETING: Sealed Quotes will be opened at 9:00 a.m (eastern standard time) on Wednesday, May 1, 2013 at the County of Muskegon.
COUNTY OF MUSKEGON REQUEST FOR QUOTES (RFQ) FOR PROFESSIONAL REAL ESTATE SERVICES The County of Muskegon, through its County Administration Department, Office of Grant Services, is seeking contractors
COUNTY ASSEMBLY OF MARSABIT P.O.BOX 29 MARSABIT
COUNTY ASSEMBLY OF MARSABIT P.O.BOX 29 MARSABIT PREQUALIFICATION OF BIDDERS FOR PROVISION OF OFFICE MEDICAL INSURANCE SERVICES FOR THE FINANCIAL YEAR 2014-2015 BIDER S NAME:. CATEGORY NO:.. MBT/CA/50/2014-2015
Regulations for the Novartis Direct Share Purchase Plan
Regulations for the Novartis Direct Share Purchase Plan Novartis International AG 4002 Basel Switzerland 11/2013, Novartis International AG 1 Regulations for the Novartis Direct Share Purchase Plan 1 What
NAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
INVITATION FOR WRITTEN QUOTES SCRAP METAL RECYCLING SERVICES
INVITATION FOR WRITTEN QUOTES SCRAP METAL RECYCLING SERVICES The Roanoke Valley Resource Authority is requesting written quotes for the scrap metal recycling services at the Tinker Creek Transfer Station
BIO MEDICAL WASTE MANAGEMENT
Bio Medical Waste Management MODULE 5 BIO MEDICAL WASTE MANAGEMENT 5.1 INTRODUCTION Bio medical waste (BMW) may be defined as any solid, fluid or liquid waste material including its container and any other
Architects and Engineers Professional Liability Proposal Form
AIG Insurance Hong Kong Limited Architects and Engineers Professional Liability Proposal Form I. Applicant Details Name of Insured: Address(es): Web Site Address: Establishment Date: II. Business Activities
The CITY OF BAYONNE is soliciting responses/proposals to the City's RFQ/RFP for the provision of the following professional services:
NOTICE POSTED: December 11, 2014 DUE DATE: January 5, 2015 @ 10:00 a.m. prevailing time PUBLIC READING: All responses/proposals will be opened at the City Council Chambers on January 6, 2015 @ 10:00 a.m.
Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services
Executive Office for Administration & Finance Request for Qualifications For Construction Management Services Massachusetts State Project (Project Number) (Full Project Name and Location), Massachusetts
WATER UTILITY REFERENCE MANUAL
Utility Plant and Accumulated Depreciation Capitalization Policy Costs are capitalized in the utility plant accounts, rather than being expensed in the current year, if: the service life is more than one
HOW TO DO BUSINESS WITH THE STATE OF ALASKA
State of Alaska Department of Administration Division of General Services HOW TO DO BUSINESS WITH THE STATE OF ALASKA REVISED AUGUST 2013 PREPARED BY THE DIVISION OF GENERAL SERVICES, PURCHASING SECTION:
Due Diligence Checklist for the Purchase of a Local Retail Business (No Intellectual Property) 1 I. FINANCE/TAX
Due Diligence Checklist for the Purchase of a Local Retail Business (No Intellectual Property) 1 I. FINANCE/TAX 1. Financial Matters. 1.1 Seller s year end financial statements for the past 5 years and
SECTION EIGHT BONDING REQUIREMENTS
SECTION EIGHT BONDING REQUIREMENTS 8-00 BONDING REQUIREMENTS 8-01 No building permit for any construction in the subdivision shall be issued nor any lot within the subdivision conveyed until a bond has
The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors
108 Accounting Standard (AS) 7 (revised 2002) Construction Contracts Contents OBJECTIVE SCOPE Paragraph 1 DEFINITIONS 2-5 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 6-9 CONTRACT REVENUE 10-14 CONTRACT
HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM
HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1 June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM This addendum consists of the following clarification: 1. Addendum #1 is attached and
Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11.
Mechanical Contractor Pre-Qualification Packet SPSC N180 Computer Data Room Phase II Project No. CP 159313 Notice No. Notice 13-11 Issued by Department of Facilities Management Delivery address: Research
1. Purpose. 2. Scope of Procurement Authority.
Rules Governing Procurement of Goods, Services, Insurance, and Construction by a Public Institution of Higher Education of the Commonwealth of Virginia Governed by Subchapter 3 of the Restructured Higher
The CITY OF BAYONNE is soliciting responses/proposals for the provision of the following professional services:
NOTICE POSTED: Decmber 23, 2014 DUE DATE: January 6, 2015 @ 10:00 a.m. prevailing time PUBLIC READING: All responses/proposals will be opened at the City Council Chambers on January 7, 2015 @ 10:00 a.m.
This client-architect agreement is published by the Namibia institute of architects and is copyrighted
CLIENT- ARCHITECT AGREEMENT This client-architect agreement is published by the Namibia institute of architects and is copyrighted EDITION: ** ARTICLES OF AGREEMENT SCHEDULE OF FEES DEFINITIONS STANDARD
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
International Accounting Standard 11 Construction Contracts
International Accounting Standard 11 Construction Contracts Objective The objective of this Standard is to prescribe the accounting treatment of revenue and costs associated with construction contracts.
THE AUTHORITY S BOARD OF DIRECTORS DECISION NO. (25/R) OF 2008 CONCERNING MARGIN TRADING
THE AUTHORITY S BOARD OF DIRECTORS DECISION NO. (25/R) OF 2008 CONCERNING MARGIN TRADING The President of the Board of Directors of the Emirates Securities and Commodities Authority, Having considered
Ipx!up!hfu!uif Dsfeju!zpv!Eftfswf
Ipx!up!hfu!uif Dsfeju!zpv!Eftfswf Credit is the lifeblood of South Louisiana business, especially for the smaller firm. It helps the small business owner get started, obtain equipment, build inventory,
Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program
Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program 458 برنامج إدارة العقود الھندسية وعقود التشييد المتكامل معتمد عالميا 10 October
CPA DUE DILIGENCE CHECKLIST FOR THE SALE AND ACQUISITION OF A BUSINESS
Law Offices of Robert A. Briskin, a Professional Corporation 1901 Avenue of the Stars, Suite 1700, Los Angeles, California 90067 Certified Specialist - Taxation Law Telephone (310) 201-0507 The State Bar
FERN [Food Establishments Recycling Nutrients] FERN facilitates composting and recycling of restaurant waste
FERN Food Establishments Recycling Nutrients UN ESCWA Regional Mapping and Policy Guidelines of Green Productive Sectors in the Arab Region FERN facilitates composting and recycling of restaurant waste
REQUEST FOR QUALIFICATIONS FOR FY 2015 MAJOR PLANT REHABILITATION PROJECT FOR ENCINA WASTEWATER AUTHORITY S ENCINA WATER POLLUTION CONTROL FACILITY
REQUEST FOR QUALIFICATIONS FOR FY 2015 MAJOR PLANT REHABILITATION PROJECT FOR ENCINA WASTEWATER AUTHORITY S ENCINA WATER POLLUTION CONTROL FACILITY Ref: Admin.15 12265a September 23, 2015 Qualifications
Senate AN ACT CONCERNING GENERAL CONTRACTOR LIABILITY FOR WAGES AND WORKERS' COMPENSATION.
Senate General Assembly File No. 354 January Session, 2015 Substitute Senate Bill No. 1039 Senate, April 1, 2015 The Committee on Labor and Public Employees reported through SEN. GOMES of the 23rd Dist.,
Policy measures for the prevention and minimization of hazardous wastes
WASTE AND WASTE MANAGEMENT PROGRESS AND ACHEIVEMENTS Policy measures for the prevention and minimization of hazardous wastes 1. At the international level, Mongolia joined The Basel Convention on the Control
Contractors Pollution Liability Project-Specific Insurance Policies
Illinois Union Insurance Company Contractors Pollution Liability Project-Specific Insurance Policies Occurrence-Based Coverage Application Instructions: Please type or print clearly. Answer ALL questions
Policy Number: 3-803 Policy Name: Bidding and Source Selection Procedures
Page 1 3-803 Bidding and Source Selection Procedures A. Definitions In ABOR Policies 3-803 (Bidding and Source Selection Procedures) and 3-804 (Professional Services and Construction Services Procurement):
APPLICATION FOR ARCHITECTS & ENGINEERS AND DESIGN/BUILD PROFESSIONAL LIABILITY INSURANCE
APPLICATION FOR ARCHITECTS & ENGINEERS AND DESIGN/BUILD PROFESSIONAL LIABILITY INSURANCE This is an Application for a claims made and reported policy. Please read the entire Application carefully before
Solicitation 2013-9. Emergency Disaster Cleanup Services. Bid designation: Public. Lehi City
Solicitation 2013-9 Emergency Disaster Cleanup Services Bid designation: Public Lehi City 11/4/2013 4:51 PM p. 1 Bid Number 2013-9 Bid Title Emergency Disaster Cleanup Services Emergency Disaster Cleanup
NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS
NAS 13 NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS CONTENTS Paragraphs OBJECTIVE SCOPE 1 2 DEFINITIONS 3 6 COMBINING AND SEGMENTING CONSTRUCTION CONTRACTS 7 10 CONTRACT REVENUE 11 15 CONTRACT
Guidelines and Good Use Practices for the Use of Seed Applied Products and of Treated Seed (May 2014)
Guidelines and Good Use Practices for the Use of Seed Applied Products and of Treated Seed (May 2014) Prepared by the Seed Applied Technologies Committee (SAT-Com) of the International Seed Federation
PRELOAN ENGINEERING SERVICE CONTRACT TELEPHONE SYSTEM DESIGN
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB control number.
QBS USER S GUIDE THE PROCESS FOR SELECTION
QBS USER S GUIDE THE PROCESS FOR SELECTION OF PROFESSIONAL SERVICES Qualifications Based Selection (QBS) is the preferred system for the selection of professional services. QBS is a negotiated procurement
State of North Carolina Prequalification Form for Prime Contractor
Pursuant to the statute, this form gathers information about the contractors seeking to qualify for the work and provides a general format for the prequalification criteria. Completing this questionnaire
THE REGULATORY FRAMEWORK FOR SOLID MINERALS DEVELOPMENT IN NIGERIA
1 THE REGULATORY FRAMEWORK FOR SOLID MINERALS DEVELOPMENT IN NIGERIA Gbite Adeniji [email protected] June 20, 2008 INTRODUCTION I FEATURES OF A MINING PROJECT 2 Activity Duration Cost (USD) Greenfield
STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS
STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS Section I. Purpose The purpose of these Guidelines is to describe the methods and procedures governing the use, awarding,
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
Construction Contracts
STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List At their Board meeting of August 21, 2013, the Trustees of the
NYSDEC Environmental Education
NYSDEC Environmental Education Where is Away? For Students in Grades 5 through 8 A 45- minute program designed to introduce the basics of where garbage goes, and how reduction of the waste stream is beneficial.
100 North Senate Avenue, Indianapolis, IN 46204 Phone: (317) 308-3103 Toll Free: (800) 451-6027
GUIDANCE OLQ GENERAL ID #003-02-SW INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF LAND QUALITY ASBESTOS HANDLING AND DISPOSAL REQUIREMENTS www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly
How To Get Construction Procurement Services
Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team
Commercial Bin and Cart Request - New LSI Customer
Commercial Bin and Cart Request - New LSI Customer Account# Customer Name: SITE ADDRESS: Street City State, Zip Code Phone Number Requested delivery date: Email BIN COLLECTION SERVICE - 1YD - 7YD (check
PREQUALIFICATION QUESTIONNAIRE
PREQUALIFICATION QUESTIONNAIRE BAW&G/WHW/JWF/172861.2 Revision Date: 01-14/14 1 Contractor Prequalification Package CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears on license) Partnership
ORDINANCE NO.------- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
ORDINANCE NO.------- An ordinance authorizing the award of one design-build contract for the decommissioning, disablement, demolition and removal of Scattergood Generating Station Unit 3 pursuant to a
Business Plan. Recycling Project
Business Plan Recycling Project Prepared by Sustainable Environmental Technologies For Makana Municipality Contact Mark Horan - [email protected] Tel. 046 603 8834 Cell. 072 186 7518 Shirley Horan - [email protected]
भ रत ह व इल क ट र कल स ललल ट ड
भ रत ह व इल क ट र कल स ललल ट ड Bharat Heavy Electricals Limited क ष त र य पररच लन प रभ ग (.), नई द ल ल Regional Operation Division (HQ), New Delhi ववपणन/Marketing Ref. No. : ROD-HQ/Cons./15-16/MPPKVVCL/NIT-114
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR A New High School Competition Gym RFP No. 052015-036 PROPOSALS ARE DUE 10:00
