BUILDING CODE COMMISSION

Size: px
Start display at page:

Download "BUILDING CODE COMMISSION"

Transcription

1 Ruling No Application No BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article of Regulation 403, as amended by O. Reg. 22/98, 102/98, 122/98, 152/99, 278/99, 593/99, 597/99, 205/00 and 283/01 (the Ontario Building Code ). AND IN THE MATTER OF an application by Dave de Sylva, Del Ridge Homes Inc., for the resolution of a dispute with Shelly Switzer, Chief Building Official, Town of Milton, to determine whether the prefinished hardwood flooring proposed for the kitchen of a single detached residential building provides sufficiency of compliance with Article of the Ontario Building Code at 319 Malick Street, Milton, Ontario. APPLICANT RESPONDENT PANEL PLACE Dave de Sylva Del Ridge Homes Inc. Markham, Ontario Shelly Switzer Chief Building Official Town of Milton Kenneth Peaker, Chair Fred Barkhouse Donald Pratt Toronto, Ontario DATE OF HEARING August 8, 2002 DATE OF RULING August 8, 2002 APPEARANCES Dave de Sylva Del Ridge Homes Inc. Markham, Ontario The Applicant Shelly Switzer Chief Building Official Town of Milton The Respondent

2 -2- RULING 1. The Applicant Dave de Sylva, Del Ridge Homes Inc., has received a building permit under the Building Code Act, S.O. 1992, c. 23, as amended, and is constructing a residential dwelling unit at 319 Malick Street, Milton, Ontario. 2. Description of Construction The Applicant is constructing a single detached dwelling having a Group C occupancy classification. The structure has a building area of m 2 and a building height of two storeys. The construction in dispute involves the type of finished flooring proposed for the kitchen of the dwelling. The proposed kitchen flooring will be comprised of prefinished oak planks having a factory applied urethane finish to the top of the wood strip. The sides, ends and bottom of the hardwood strips are left unfinished. Asphalt paper or wax paper is proposed for use between the hardwood product and the subfloor. The paper is designed to protect the hardwood from moisture penetration originating from beneath the subfloor and additionally, protects the subfloor should water permeate from above. 3. Dispute The issue at dispute between the Applicant and Respondent is whether the prefinished hardwood flooring proposed for the kitchen of a single detached dwelling provides sufficiency of compliance with Article of the Ontario Building Code (OBC). This Article of the Code deals with water resistance and finished floor coverings. It provides a list of acceptable water resistant finished floorings for bathrooms, kitchens, public entrance halls, laundry and general storage areas. The list includes felted-synthetic-fibre floor coverings, concrete, terrazzo, ceramic tile and mastic.... It also states that other types of flooring are permitted provided that they offer a similar degree of water resistence. It is proposed in this instance that the kitchen floor in a residential dwelling be covered with a prefinished hardwood product. While not specifically listed in Article , the Applicant contends that this type of flooring will provide a similar degree of water resistence within a kitchen environment and, therefore, sufficiency of compliance with Article will be achieved. 4. Provisions of the Ontario Building Code Article Water Resistence (1) Finished flooring in bathrooms, kitchens, public entrance halls, laundry and general storage areas shall consist of resilient flooring, felted-synthetic-fibre floor coverings, concrete, terrazzo, ceramic tile, mastic or other types of flooring providing similar degrees of water resistance. (See Appendix A.)

3 -3-5. Applicant s Position The Applicant submitted that, while it is recognized that the subject application applies to only one property, the issue of hardwood floors for kitchens could have a far reaching impact. In fact, for this particular subdivision alone, a number of requests for hardwood flooring in the kitchen have been received from prospective purchasers. Other municipalities, he argued, already accept its use for this area and approve of the installation. Some, however, will permit hardwood in kitchens only if the owner signs a waiver that indemnifies the municipality, the builder and the New Home Warranty Program from any responsibility if water damage should occur. This type of waiver has been offered in this case but the municipality has chosen not to accept the proposal. In respect to the appropriateness of using hardwood flooring in the kitchen of a dwelling, the Applicant submitted that the Code provision in dispute was written out of concern for permeability of the finished flooring and prospective damage to the subfloor from water penetration. He argued that the prefinished hardwood plank being proposed for use is not a permeable material. He suggested that the only area of concern could be at the plank joints and stated that these areas are tightly connected. He argued that material such as ceramic tile was also jointed and that the masonry used in that application could shrink, letting water through to the subfloor. The key to ensuring that the flooring functions as designed is to provide quality hardwood product install as per the manufacturers specifications. The Applicant submitted that based on permeability tests conducted for the proposed prefinished hardwood, he was confident that the product would perform as desired when used in the kitchen of a detached dwelling. The factory applied finish, he submitted, would exclude water vapour. In addition, if installed as recommended by the manufacturer and by using either asphalt paper or wax paper between the hardwood flooring and the subfloor, he submitted that a similar degree of water resistance will be offered when compared to Code specified products. 6. Respondent s Position The Respondent submitted that, as a municipal official, his mandate is to enforce the Ontario Building Code. In this respect, he argued, he had no luxury to accept the waiver or release from responsibility being offered by the Applicant. He advised the Commission that the National Building Code (NBC) would permit the type of prefinished hardwood flooring anticipated in this application however, an impermeable layer would be required between the subfloor and installed product. He further submitted that, if the Commission were to rule in favour of allowing hardwood flooring in kitchens, he would be more comfortable accepting the ruling if a similar condition were imposed in respect to installation. In summation, the Respondent submitted that in his interpretation of Article , hardwood flooring is not a permitted material for installation in the kitchen of a residential dwelling. He, therefore, looks to the Commission for a ruling on whether the flooring will achieve sufficiency of compliance with the provisions of the OBC. 7. Commission Ruling It is the decision of the Building Code Commission that the proposed prefinished hardwood flooring in the kitchen of a single detached residential building provides sufficiency of compliance with Article of the Ontario Building Code 319 Malick Street, Milton, Ontario, on condition that:

4 -4- a) The product must be supplied with a urethane finish having a minimum of seven (7) coats applied under factory conditions. b) The flooring must be installed in accordance with the manufacturers recommendations. 8. Reasons i) This application is restricted to the kitchen only of a Group C residential dwelling constructed under Part 9 of the Ontario Building Code. The use of prefinished hardwood flooring in bathrooms, laundry areas, etc., where the incidence of standing water may be more frequent, has not been considered. ii) When considering the conditions imposed in this decision, the type of flooring anticipated for use in the kitchen, will provide a similar degree of water resistence as that anticipated by Article

5 Dated at Toronto this 8 th day in the month of August in the year 2002 for application number Kenneth Peaker, Chair Fred Barkhouse Donald Pratt

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING Appendix C Moisture Guidelines Determining moisture content is an essential part of quality control within the flooring installation process. Flooring

More information

Ontario s 2012 Building Code Division B, Part 9 (Ontario Regulation 332/12)

Ontario s 2012 Building Code Division B, Part 9 (Ontario Regulation 332/12) Ontario s 2012 Building Code Division B, Part 9 (Ontario Regulation 332/12) Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the

More information

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards. Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and

More information

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh Accessory Apartment Construction Guide For Single Detached Dwelling and Semi-Detached Dwellings that have been in existence for at least five (5) years Notes: Buildings that are less than five (5) years

More information

Controlling the Transmission of Impact Sound through Floors

Controlling the Transmission of Impact Sound through Floors Construction Technology Update No. 35 Controlling the Transmission of Impact Sound through Floors by A.C.C. Warnock This Update presents guidelines for controlling the transmission of impact sound through

More information

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully

More information

Ministry of the Environment Decree. on housing design

Ministry of the Environment Decree. on housing design G1 THE NATIONAL BUILDING CODE OF FINLAND Housing Design Regulations and Guidelines 2005 Ministry of the Environment Decree on housing design adopted in Helsinki on the 1 st of October 2004 In accordance

More information

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1. APPENDIX B PHOTOLOG Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1. Photo 2: This photograph shows layered floor tile and

More information

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY)

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) THE ARMSTRONG LIFETIME LIMITED RESIDENTIAL WARRANTY FOR: Abingdon Adiamo Clear Creek Caliber Granville

More information

Vinyl Composition Tile Installation System

Vinyl Composition Tile Installation System Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION

More information

100% WATERPROOF INNOVATIVE DURABLE COMFORTABLE. COREtec Plus represents the next revolution in luxury

100% WATERPROOF INNOVATIVE DURABLE COMFORTABLE. COREtec Plus represents the next revolution in luxury 03 COREtec Plus represents the next revolution in luxury vinyl flooring. This entirely new category of vinyl is a great alternative to glue down LVT, solid locking LVT, or laminate flooring. With a wide

More information

WOODLINE PARQUETRY 25 Year Warranty

WOODLINE PARQUETRY 25 Year Warranty WOODLINE PARQUETRY 25 Year Warranty LIFE TIME STRUCTURAL WARRANTY WOODLINE PARQUETRY offers you a Lifetime Structural Warranty. WOODLINE PARQUETRY warrants that, under normal residential conditions and

More information

Installation System. Existing Resilient Sheet Floors

Installation System. Existing Resilient Sheet Floors Vinyl Composition Tile Installation System Product Adhesive/Full Spread Adhesive/Tile-On Comment Imperial Texture MultiColor RAVE Stonetex Companion Square Feature Tile/Strips ARTEFFECTS SAFETY ZONE Vinyl

More information

Ontario Association of Fire Chiefs Position Paper Residential Fire Sprinklers

Ontario Association of Fire Chiefs Position Paper Residential Fire Sprinklers Ontario Association of Fire Chiefs Position Paper Residential Fire Sprinklers The Ontario Association of Fire Chiefs (OAFC) supports changes to the Ontario Building Code to require that all new residential

More information

Small Business Permit Service

Small Business Permit Service Small Business Permit Service Building Permit Requirements For a Unit Finish or Interior Alteration Industrial, Commercial or Institutional Occupancies Building Permit Application The following documents

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

Simpson Engineering A state licensed engineering firm F-1607

Simpson Engineering A state licensed engineering firm F-1607 Simpson Engineering A state licensed engineering firm F-1607 4126 Allencrest 13901 Midway Lane, Dallas, Road, Texas Ste.102-136 75244 Telephone: 214-351-1637 Dallas, - Fax: TX 214-351-1639 75244-4388 Telephone:

More information

CHAPTER 3 MOISTURE TESTING

CHAPTER 3 MOISTURE TESTING CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the

More information

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING BUILDING CODEACT, 1992 RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING Pursuant to clause 29(l)(b) of the Building Code Act, 1992. as amended, the Director of the Building and Development Branch

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Basement Development Construction requirements for the development of basements in residential dwellings.

Basement Development Construction requirements for the development of basements in residential dwellings. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Basement Development Construction requirements for the development of basements in residential dwellings. June 2009 contents GENERAL INFORMATION 3 BUILDING

More information

0800 30 50 90 www.bamboodirect.co.nz

0800 30 50 90 www.bamboodirect.co.nz Guide To Bamboo Flooring 1. Frequently Asked Questions 2. Installation Tips 3. Maintaining your Bamboo Floor 4. Why Bamboo Direct? COPYRIGHT 2009 BAMBOO DIRECT Frequently Asked Questions 1. Are Bamboo

More information

RESIDENTIAL HARDWOOD WARRANTIES

RESIDENTIAL HARDWOOD WARRANTIES RESIDENTIAL HARDWOOD WARRANTIES Limited Warranties for Prefinished Solid and Engineered Hardwood Floors Manufacturing Defects Century Flooring* ("Century") hereby warrants to the original buyer ("Buyer"),

More information

A HOMEOWNERS GUIDE TO BUILDING PERMITS

A HOMEOWNERS GUIDE TO BUILDING PERMITS A HOMEOWNERS GUIDE TO BUILDING PERMITS As a homeowner, you may find that you have outgrown your present home. Renovation is today s answer to moving, and can include anything from adding a room, fixing

More information

FOR PRICING INFORMATION CALL 502.554.9442

FOR PRICING INFORMATION CALL 502.554.9442 3413 Donald Drive FOR PRICING INFORMATION CALL 502.554.9442 For More Information: 3413DonaldDrive.com Opportunity Knocks! This completely move-in ready ranch with a partially finished basement could be

More information

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING

INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING Introduction Laminate flooring is designed to be a floating floor that may be installed over virtually any type of sub floor. It is not nailed or glued to

More information

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home!

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home! STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION Now offered for a limited period of time, free solar with each home! ENERGY EFFICIENT ITEMS BUILD IN YOUR HOME 50 Gal Energy Star Hot Water Heaters with

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish P10 This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different):

More information

Government Charges and Fees on New Homes in the Greater Toronto Area

Government Charges and Fees on New Homes in the Greater Toronto Area Government Charges and Fees on New Homes in the Greater Toronto Area REVISED FINAL REPORT July 23, 2013 Homes in the Greater Toronto Area Prepared for: Building Industry and Land Development Association

More information

How To Design An Hvac Design For A Stick Built Home

How To Design An Hvac Design For A Stick Built Home LEGALETT HVAC DESIGN FEE SCHEDULE (revised April 17, 2012) Background In the past Legalett has simply supplied warm floors for comfortable living. However, 2012 Building Code changes in Ontario make it

More information

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011)

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011) Technical Guide Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 19 th Jan 2011) ASSESSMENT OF DAMAGE Prior to any assessments or repairs being commenced, a licensed

More information

DECISION/DIRECTION NOTE

DECISION/DIRECTION NOTE DECISION/DIRECTION NOTE Title: Proposed rezoning new residential zone PDE file MPA1500006 150 Stavanger Drive Date Prepared: April 12, 2016 Report To: Chair and Members, Planning and Development Committee

More information

Corporate Report. Recommendation That Council approve the formation of the 2015 Master Fire Planning Committee; and

Corporate Report. Recommendation That Council approve the formation of the 2015 Master Fire Planning Committee; and Corporate Report Report from Fire and Emergency Management Services, Fire Chief Date of Report: October 20, 2015 Date of Meeting: November 16, 2015 Report Number: FEM-310-2015 File: 68.13.11 Subject: Master

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

What you need to know about. Smoke alarms for residential buildings

What you need to know about. Smoke alarms for residential buildings What you need to know about Smoke alarms for residential buildings Are s compulsory? Smoke alarms are compulsory and must be installed in residential buildings on or near the ceiling of every storey. What

More information

Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered

Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2 Engineered Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered Thank you for choosing IndusParquet ½" Engineered Hardwood Flooring. Protect your investment; review and adhere to the flooring

More information

ONLINE VERSION. The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 ONLINE VERSION

ONLINE VERSION. The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 ONLINE VERSION The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 E1 E2 E3 E4 E Protection against sound from other parts of the building and adjoining buildings Protection against

More information

Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the edges raised.

Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the edges raised. BEHAVIOR OF FLOORING If it s not marked NOFMA, it s not certified. Cupping and Crowning Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the

More information

BUILDING APPLICATION CHECK LIST

BUILDING APPLICATION CHECK LIST TOWNSHIP OF NORTH FRONTENAC BUILDING DEPARTMENT P.O. Box 97, Plevna, Ontario K0H 2M0 Telephone: (613) 479-2231 or 1-800-234-3953, Fax: (613) 479-2352, or www.northfrontenac.ca George Gorrie, Chief Building

More information

Installation Instructions for staple/nail down applications

Installation Instructions for staple/nail down applications Installation Instructions for staple/nail down applications General Notes Inspect all materials carefully before installation. Warranties do not cover materials with visible defects once they are installed.

More information

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1

More information

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings Note: This information addresses complex issues in a summary fashion. Consideration should be given to the official version of the

More information

Practice Note 2006-27

Practice Note 2006-27 Practice Note Self-Contained smoke alarms to existing buildings This updates the previous Practice Note 2005-27 issued May 2005. Reference to the BCA in this Practice Note means Volume One and Volume Two

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products

ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products THE ARMSTRONG LIFETIME LIMITED RESIDENTIAL WARRANTY FOR: Abingdon Adiamo Clear Creek

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to [email protected] by October 10 th, 2012 with the subject line

More information

NEW HOME BUYER PROTECTION (GENERAL) REGULATION

NEW HOME BUYER PROTECTION (GENERAL) REGULATION Province of Alberta NEW HOME BUYER PROTECTION ACT NEW HOME BUYER PROTECTION (GENERAL) REGULATION Alberta Regulation 211/2013 With amendments up to and including Alberta Regulation 31/2015 Office Consolidation

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Practice Note 2014-01

Practice Note 2014-01 Practice Note 2014-01 Multi-Storey Residential Buildings Warranty Insurance Exemption This updates the previous Practice Note 2012-01 issued May 2012 Reference to the BCA Volume One in this Practice Note

More information

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name: STATE OF CALIFORNIA RESIDENTIAL ALTERATIONS - RE-ROOF CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name: CALIFORNIA ENERGY COMMISSION CF-1R-ALT-01-E (Page 1 of 2) Date Prepared: A.

More information

50 BARNETT CH #209 Dollard-Des Ormeaux, H9G 3C7

50 BARNETT CH #209 Dollard-Des Ormeaux, H9G 3C7 Tel. (514) 235-4595 http//www.davidfarha.com Residential - detailed Off. (514) 697-4460 Fax (514) 697-2097 Listing Status Asking Price Broker's decl. Seller's decl. 1407472 Active No BC No Address 213,900

More information

Fiberglass-Reinforced Sheet Flooring Installation System

Fiberglass-Reinforced Sheet Flooring Installation System Fiberglass-Reinforced Sheet Flooring Installation System Product Adhesive Comments Residential Use Only CushionStep Value Good Better Best FlexStep Duality Premium Premium Plus Modified loose lay method

More information

How To Install Hardwood Flooring

How To Install Hardwood Flooring phone: 1.855.Ludaire e-mail: [email protected] Solid Flooring Installation Instructions These Instructions and Guidelines are for the typical installation of ¾ Pre-finished Solid Hardwood Flooring manufactured

More information

Contemporary Kitchens & Blissful Bathrooms

Contemporary Kitchens & Blissful Bathrooms THE PERFECT FLOOR FOR Contemporary Kitchens & Blissful Bathrooms TORLYS EverWood & EverTile Premier KITCHENS & BATHROOMS EASY TO MAINTAIN EASY TO MAINTAIN EASY TO M WATERPR DENT RES Warm Waterproof Dent

More information

Guidelines for Remodeling and Additions with Respect to On-site Wastewater Treatment Systems

Guidelines for Remodeling and Additions with Respect to On-site Wastewater Treatment Systems PURPOSE Guidelines for Remodeling and Additions with Respect to On-site Wastewater Treatment Systems The Sonoma County Permit and Resource Management Department (PRMD) Well and Septic Division strives

More information

Division 9. SignaFlor Pad and Pour Flooring System

Division 9. SignaFlor Pad and Pour Flooring System Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions

More information

Columbia flooring will resist fading from exposure to sunlight or artificial light.

Columbia flooring will resist fading from exposure to sunlight or artificial light. LIMITED LIFETIME WARRANTY AND MAINTENANCE FOR RESIDENTIAL USE Columbia is so confident in the design and durability of our Columbia flooring products and accessories, that we back them with a Limited Lifetime

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

How To Build A Two Hour Firewall In Calgary

How To Build A Two Hour Firewall In Calgary BUILDING CODE INTERPRETATION February 2008 06-BCI-005-R1 Page 1 of 6 TWO-HOUR FIREWALLS BACKGROUND Historically, firewalls used to subdivide buildings into smaller units have been built using one of two

More information

Building Permit Application

Building Permit Application Building Permit Application Front of Yonge Township Office 1514 County Road 2, P.O. Box 130 Mallorytown ON, K0E 1R0 Tel: 613-923-2251 Fax: 613-923-2421 [email protected] www.mallorytown.ca Last Updated

More information

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

County of San Diego, Planning & Development Services SECOND DWELLING UNIT County of San Diego, Planning & Development Services ZONING DIVISION The Zoning Ordinance, Section 6156.x, allows the addition of a second dwelling unit to those properties zoned to allow the Family Residential

More information

fire separating walls #2

fire separating walls #2 210108 fire separating walls #2 ISSUE BSA has identified a number of instances of defective fire separating walls in duplexes, town houses and multi-residential complexes. The system of fire separating

More information

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator PROPOSAL Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator Brandon Andrade, Project Coordinator t. 416.652.6424 f. 416.652.3234 May 1 st, 2012 Craig Mottram

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

2012-01. Multi-storey residential buildings - warranty insurance exemption. This updates the previous Practice Note 2006-01 issued June 2006

2012-01. Multi-storey residential buildings - warranty insurance exemption. This updates the previous Practice Note 2006-01 issued June 2006 Multi-storey residential buildings - warranty insurance exemption This updates the previous Practice Note 2006-01 issued June 2006 2012-01 Reference to the BCA Volume One in this Practice Note means Volume

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

Section 4: Architectural Design

Section 4: Architectural Design Section 4: Architectural Design 4.1 Design Flexibility and Compatibility...3 4.2 Moisture Protection...3 4.3 Surface Treatments...6 4.4 Exterior Surface Treatments...6 4.5 Interior Surface Treatments...8

More information

Analysis II Façade Redesign: Architectural Precast Panels

Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed

More information

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 2 nd Feb 2013)

Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 2 nd Feb 2013) Technical Guide Guide to Assessment and Repair of Flood Damaged Timber and Timber Framed Houses (Revised 2 nd Feb 2013) ASSESSMENT OF DAMAGE Prior to any assessments or repairs being commenced, a licensed

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT ` WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building No. Street City Zip Date of Inspection Number of Pages 1142 ARBOR VISTA WY. SAN JOSE 95126 10/28/2013 9 125 SOUTH CAPITOL AVENUE SAN JOSE,

More information

ENGINEERED FLOORING INSTALLATION

ENGINEERED FLOORING INSTALLATION ENGINEERED FLOORING INSTALLATION ATTENTION! INSTALLER/OWNER RESPONSIBILITIES Beautiful hardwood floors are a product of nature and, therefore, they will show variations in color, grain, texture, and appearance.

More information

Convenient Bayridge Location

Convenient Bayridge Location Convenient Bayridge Location 1034 Hudson Drive $299,900. Original price: $299,900 MLS area: 37 MLS#: 15601777 BG#: 1034h. Features * huge oak country kitchen Lower level big screen TV rm (24 x 13 ) 4 +

More information

Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System

Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System Technical Data wedi Subliner Dry Waterproofing Shower and Wet Area System General Product Description Waterproof, thin-layer, crack

More information

Hardwood Flooring. Urbania Flooring

Hardwood Flooring. Urbania Flooring Engineered Hardwood Flooring Installation Guide for Urbania Flooring BEFORE STARTING THE INSTALATION - Please take the time to read and ensure that you understand the information contained in this document.

More information

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP CONTENTS 1. Site address... 3 2. Background... 4 3. Scope of work... 4 4. General conditions... 5 4.1 Materials,

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

New Home Walk-Through Package

New Home Walk-Through Package New Home Walk-Through Package Carrying out a Successful Walk-through Before Closing John MacDonald Architect inc. The Courtyard @ Bonnie Stuart, 141 Whitney Place Suite 101, Kitchener, ON. N2G 2X8 New

More information

The Optimum Basement Wall

The Optimum Basement Wall The Optimum Basement Wall Solutions to the Wet Blanket Basement Problem February 27 th, 2014 1 Adapting to Change! We ve made significant advances in water management. Customers no longer accept that musty

More information

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls. Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them

More information

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like! uality using advanced building technology UICK uality innovative progressive sustainable any design, any shape, any colour, anywhere you like! 2 NicheQ is an award winning progressive and innovative builder

More information

Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions

Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions Thank you for choosing ARK Floors Exotic Hardwood Flooring. In order to meet warranty

More information

The Florida Building Code

The Florida Building Code The Florida Building Code Florida s Response to Hurricane Risk Rick Dixon Florida Building Commission Florida Building Commission Architect Structural Engineer Mechanical Engineer Fire Protection Engineer

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

Triarch Products Over Various Interior Substrates

Triarch Products Over Various Interior Substrates Triarch products work well over a variety of substrates, both for interior and exterior settings. This document will only discuss interior substrates and is not intended to be a technical discussion of

More information

Residential Adjustments. Overview 4.1

Residential Adjustments. Overview 4.1 Overview 4.1 Summary This chapter contains an overview of residential structural components, quality of construction, main dwellings, and construction types. It also provides adjustments such as wall height,

More information

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

How To Level A Subfloor

How To Level A Subfloor Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse

More information

Installation for Wood Flooring

Installation for Wood Flooring Installation for Wood Flooring Tarkett wood flooring offers a beautiful variety of options from species and colour, to plank widths and finishes. We developed enhanced locking system, T-lock, and the best

More information

P r o j e c t C a s e S t u d y

P r o j e c t C a s e S t u d y P r o j e c t C a s e S t u d y Mangrove Place Project: Mangrove Place Start Date: 2009 Completion Date: Ongoing Location: Al Reem Island, Abu Dhabi, UAE Industry: Residential Developer: Luxury Real Estate

More information