1 ISRO/ISAC/HTS/RFP/Pre-Bid/Q&A/2016/01 ISRO Ka-Band HTS Satellite Procurement RFP Tender Enquiry RFP No. IGSE for procurement of ISRO Ka HTS Pre-bid Meeting Questions & Answers February 2016 ISRO SATELLITE CENTRE

2 ISRO/ISAC/HTS/RFP/Pre-Bid/Q&A/2016/01 Contents Set-1 Bidder-1 Page 1-3 Set-2 Bidder-2 Page 4-8 Set-3 Bidder-3 Page 9-15 Set-4 Bidder-4 Page Set-5 Bidder-5 Page 25 Annexure#1 List of Scheduled Banks Page February 2016 ISRO SATELLITE CENTRE

3 SET-1 Question 1: What is the ground satellite control system that will be used for Ka HTS-1 and 2? (e.g. EPOCH, Hifly, etc) Answer 1: Ref. Schedule F Clause 1 according to which the Contractor shall provide RTS (Real Time Software), GCS (Ground Control Software), DSS (Dynamic Satellite Simulator) and OOS (Orbital Operations Software) for controlling satellite from the Customer's SCC. However, the Ground Station M&C (Monitoring and Control) software shall be provided by ISRO; ICD shall be provided for this by ISRO so as to interface with the Contractor provided other software. Question 2: Will ISRO be able to provide the same ground system to the contractor for satellite to ground compatibility testing, etc? Answer 2: Please elaborate on the various testing requirements and time frame. However, it appears feasible to provide ground system to contractor for satellite to ground compatibility testing. Question 3: The following items are to be clarified at the site survey a. Floor plan of the assembly and test area b. The crane capacity available for assembly and testing c. Specification of Vibration table (Table size, vibration frequency range, maximum vibration load, maximum tilting moment, method of vibration control, etc.) d. Specification of Thermal Vacuum Chamber (size of the chamber, operational vacuum level, temperature control method, etc.) e. Specification of Acoustic chamber (operational acoustic profile, chamber size, acoustic level control accuracy, etc.) f. Specification of CATR (compact antenna test range), or equivalent facility (measurement frequency range, method of measurement, etc.) g. Specification of Mass Property Measurement Equipment (maximum allowable mass, CG measurement range/accuracy, MOI measurement range/accuracy, etc.) h. Is office area for the contractor s personnel available in the same premises? i. Will ISRO be able to support the contractor by providing items such as office areas, tables, chairs, high speed internet connection, etc. for AIT at ISRO facilities? Answer 3(a to g): All of the above questions have been clarified during in the presentations made by ISRO and subsequent Site visit to the satisfaction of the vendor. A copy of ISRO (Contractor) presentations on Spacecraft Assembly Integration and Testing facilities (Integration, Checkout, Clean room, Alignment, MGSE & EGSE etc.) and Spacecraft Environmental Testing Facilitates (THVAC, Vibration, CATF, EMI/EMC tests etc.) is also uploaded on ISRO web site for reference. Answer 3( h ) : It shall preferably be available in the same campus. 1

4 Answer 3( i) : A office with basic infrastructure and facilities shall be made available to the vendor. However specific electronic systems / equipments and facilities shall be arranged by the Vendor. Question4: Is the AIT facility provided for Ka HTS-2 AIT considered to be used free of charge by IRO? Answer 4: The AIT facility and manpower provided for Ka HTS-2 integration and testing shall be considered free of charge by ISRO. Vendor to ensure that its usage cost is not considered in the commercial proposal. Question 5: Can AIT for Ka HTS-2 partially be conducted at ISRO s facilities, if not all AIT tasks? Answer 5: ISRO envisages all AIT activities including payload panel level integration to be carried out at ISRO premises in India. ISRO prefers HTS-2 payload panel integration to be done at SAC, Ahmadabad and overall spacecraft AIT to be carried out at ISITE, Bangalore. ISRO will ensure that its facilities will be augmented to meet HTS-2 AIT and vendor should specify changes/augmentation required if any. If some training / certification of manpower required the same shall be indicated in the response. Question 6: Typically what are the types of engineers expected to be stationed at ISRO s premise? What is the role of each member? Answer 6: Vendor to specify. The engineers at ISRO premises shall be responsible for the activities being performed on ISRO HTS 2. Question 7: Will the bidder be able to propose the price with Japanese Yen? Answer 7: As per RFP the quotation shall preferably be in USD, however Japanese Yen is also acceptable. Question 8: Will the bidder be able to request some contractual conditions, which are not specified in Schedule G, Commercial & Contractual Requirement? Answer 8: The baseline contractual conditions are already provided in the RFP. The vendor may enumerate conditions, which shall be subjected to review and decisions accordingly. It shall not be binding on the customer i.e. ISRO to accept these conditions. 2

5 Question 9: Will ISRO intend to make the down selection (selecting 2 or 3 bidders who passed through technical criteria) to request BAFO (Best and Final Offer) before the final selection? Answer 9: Technical evaluation shall be carried out by contractor of all the quotations. The commercial bid of all the parties who qualify technically will be opened. The selection shall be for the lowest quotation. BAFO may be asked from the vendor with technically suitable lowest quotation. 3

6 SET-2 RFP Process / General Question 1: Could you please clarify questions and answers process? Are questions and answers exchanged with one bidder transmitted to other bidders? Answer 1: Affirmative. All questions and answers exchanged with one bidder shall be shared with other bidders. A consolidated list of all the questions and answers will be posted on ISRO web site at the end of pre bid meetings. However the identity of all the bidders will be masked. Satellite / General Question 2: Can we assume 55 E (as per instruction during EOI process) as the selected orbital position to run a beam layout optimization and performance evaluation? Answer 2: For reference performance calculation and beam layout optimization the assumed orbital slot for HTS-1 shall be taken closer to Indian longitudes and for HTS-2 it shall be taken farther from the Indian longitudes within the specified GEO orbital slot range as per given in RFP. However final beam layout optimization shall be done at the time of contract finalization. Question 3: Can we assume the two satellites are of an identical design (same frequency plan, beams layout, gateways position)? Else what are the differences expected? Answer 3: Two satellites HTS-1 and HTS-2 are functionally equivalent or almost identical. The TT&C and Control systems of HTS-1 and HTS-2 shall be designed such that they can be operated from same GEO slot in collocated configuration. Further details on communication payload spectrum shall be provided at the time of signing of the contract which will define the final orbital operations strategy. Question 4: For the option with four steerable beams, could you please confirm that the main mission is reduced to 86 beams in a fixed manner i.e. there is no need to have in-orbit flexibility to select for example 86 fixed beams and 4 steerable beams or 88 fixed beams and no steerable beam or any intermediate configuration. Answer 4: As given in RFP roving or steerable beams derive spectrum from user beams (88 beams reduced to 86) in predefined configuration. No addition spectrum is to be considered for this purpose. User beams can be either selected as 86 fixed spot beams and 4 steerable beams (2 user beams to be sacrificed will be predefined) or 88 fixed beams and no steerable beam without any in orbit flexibility of an intermediate configuration. 4

7 Communication Payload Question 5: Can we assume that the following frequency bands are to be used for User and Gateway to establish the design and compute performances? User side: GHz Tx and GHz Rx GW side : GHz Tx and GHz Rx Answer 5: Further details on communication payload spectrum allocation for HTS-1 and HTS-2 and operational orbital slot shall be shared at the time of signing of contract. Vendor can make assumption for reference performance calculation and beam layout optimization as long as assumed user and hub beam spectrum is line with this RFP. Question 6: Can the gateway bandwidth be increased above the 1GHz limit specified in the RFP to reduce the number of gateways and the number of repeater units (HPAs in particular) and in turn price reduction on both Space and Ground segments? For example 1.5GHz for GW as defined below: User side: GHz Tx and GHz Rx (unchanged with respect to above) GW side: ghz Tx and GHz Rx (1.5GHz band supported to decrease the number of gateways) Answer 6: Further details on communication payload spectrum allocation for HTS-1 and HTS-2 and operational orbital slot shall be finalized at the time of signing of contract. Vendor should consider user and hub beam spectrum availability as specified in this RFP. Question 7: Does the 75 dbw hub EIRP specified in Table 1.5a correspond to the full 1 GHz bandwidth in one polarization or to a single carrier? Answer 7: The 75 dbw Hub EIRP specified in Table 1.5a corresponds to 250 MHz bandwidth in one polarization for a single beam, aggregate EIRP available to the carrires after back-off in a multi-carrier scenario. This includes BPE and ULPC margin of 9 db. Platform Question 8: The TCR is required to operate in Ku-band while the Payload is Ka-band. For price optimization (less hardware on-board), would it be possible to envisage other bands like C-band or Ka-band for the TC&R or should we stick to Ku band only for the TC&R? Answer 8: As given in RFP Schedule-B Chapter2 TCR shall be in Ku-band. Ka-band or C band TCR can be proposed as an alternate or backup option separately if vendor feels so but not as the only or main option. 5

8 AIT Question 9: Could you please send us detailed specifications and layout of AIT facilities to be used in INDIA for AIT of second satellite? Answer 9: This has been clarified during detailed presentation made to the vendor during pre bid meetings and subsequent Site visit. A copy of ISRO (Contractor) presentations on Spacecraft Assembly Integration and Testing facilities (Integration, Checkout, Clean room, Alignment, MGSE & EGSE etc.) and Spacecraft Environmental Testing Facilitates (THVAC, Vibration, CATF, EMI/EMC tests etc.) is also uploaded on ISRO web site for reference. Question 10: Could you please confirm the AIT facility in INDIA will be made available to manufacturer at no cost? Answer 10: The AIT facility provided for Ka HTS-2 integration and testing shall be considered free of charge by ISRO. Vendor to ensure that its usage cost is not considered in the commercial proposal. Question 11: Could you please confirm expected starting date of construction for second satellite? Answer 11: Ka HTS-2 FMCR shall be conducted 6 months after HTS-1 FMCR completion or 42 months after the signing of contract (if FMCR of HTS-1 is completed in less than 36 months).vendor shall provide a plan of activities to be followed for HTS 2 in line with this delivery schedule. Commercial & Contractual (Schedule G) Section 4.2 Price Bid: The contractor shall provide the price bid in the format enclosed in Annexure-1 of this schedule. This part shall indicate the Price in FE (Preferably in US Dollar) (with detailed break-up of applicable taxes and duties if applicable). Question 12: Could you please clarify the meaning of FE? Answer 12: FE means Foreign Exchange. Question 13: Can we propose a Price in a basket of currencies made of Euro plus US Dollars plus Canadian Dollars and British Pound Sterling? Answer 13: The proposal shall be in one currency, preferably in US dollars. currencies is not permitted. Mix of 6

9 Question 14: Can we propose a Price in Euro? Answer 14: Yes it can be proposed in Euro. Section 5 Payment Terms / Advance Payment /Bank Guarantee: The Contractor shall clearly bring out the payment terms in their proposal. Advance payment, required if any, shall be against the milestone events of the contractual progress and should be safeguarded with an equivalent amount of bank guarantee. The contractor shall identify such milestones while proposing the advance payment terms. Typical milestones are listed in Annexure-2 for reference. Question 15: Do we have to understand that only the payment at signing of the contract will be considered as an advance payment subject to the advance payment guarantee, and other milestones payment like Spacecraft EQSR, PDR, CDR, TVAC completion, FMCR, etc won t be considered as advance payments? or, alternatively all milestones payments prior to FMCR are considered as advance payments and are all subject to the advance payment guarantee? Answer 15: Payments made at the time of signing of the contract will be considered as Advance payment subject to advance payment bank guarantee. Other milestone payments will be against identified verifiable milestones/deliverables acceptable to ISRO. For such milestone payments, Bank guarantee will not be applicable only in respect of established or reputed vendors. However it may be noted that such milestone payments shall not exceed 60% of the total contract value. It may also be noted that the final details regarding milestone payments and BG shall be worked out during contract finalization Question 16: Assuming a price of 100 with a payment of 20 in January 2016 (advance payment at contract signature), 25 in July 2016, 25 in December 2016 and 30 in July 2017 (FMCR) could you please confirm how the 11% per annum interest will be loaded and what will be associated impact onto the price of 100? Answer 16: The loading shall be taken from the date on which the respective payments have been made. Section 7 Security Deposit Question 17: Could you please provide the list of Scheduled Bank? Answer 17: List of scheduled banks is enclosed in Annexure-1. Question 18: Can the Guarantees be issued directly by International Banks registered in Europe or such Guarantees need to be re-issued locally by India registered local Banks? Answer 18: Yes the guarantees can be issued directly by International Banks registered in Europe provided they are part of the scheduled bank list. 7

10 Section 24 Arbitration Further terms and conditions and detailed mechanisms on arbitration shall be worked out jointly by ISRO and the selected bidder at the time of finalizing the contract. Question 19: Can we propose further terms and conditions using our own draft contract? Answer 19: The baseline terms and conditions are proposed in the RFP document. Vendor can suggest additional terms and conditions. These conditions shall be reviewed by ISRO but cannot be binding on ISRO. However, Arbitration shall be as per Arbitration and Conciliation Act, 1996 or any re-enactment or modification thereof. Question 20: Would ISRO consider contracting: i) Under terms and conditions governed by a neutral law, (i.e. contract neither governed by the laws of contractor s country or the laws of customer s country)? ii) With an arbitration place located in a neutral country? Answer 20: Kindly refer schedule G item 24 on page G-12 of RFP which clearly indicates that the arbitration shall be carried out in accordance with the rules of Arbitration of the Indian council of Arbitration and the award made in pursuance there of shall be binding on the parties It may be noted that the arbitration proceedings would be subject to the provisions of the Arbitration & Conciliation Act, 1996 and the Rules framed there under or any re-enactment or modification thereof. 8

11 SET-3 Question 1: Ref: Schedule A, Clause 2, The date of FMCR completion is considered as ship date with a schedule of less than 36 months for first satellite and 6 months after for the second satellite. Also defined is 6 months from launch to handover. Launch Base (LB) operation is not covered in the above schedule. Please confirm. Answer 1: The FMCR completion date is considered as ready for shipment date. The shipment will however take place on a subsequent suitable date. A period of six months is provided from Launch date to in orbit delivery of spacecraft post successful completion of IOT. From FMCR completion till launch base activities are not part of this schedule. Question 2: Ref: Schedule A, Clause 2, ISRO to define the ITU coordinated UL/DL requirements of co-located satellites. Answer 2: Further clarifications on ITU coordinated orbital slots shall be provided at the time of finalization of the contract. Question 3: Ref: Schedule E, Clause 2.1 Sea Launch is not currently being marketed; still it is a requirement as candidate launch vehicle for compatibility? Answer 3: If the sea launch is not being marketed a suitable paper from the launcher agency or otherwise to this effect may kindly be provided in the response. Question 4: Ref: Schedule F, Clause 3, please provide ISRO TT&C stations and locations to be considered available for LEOP operations. Answer 4: Schedule F, Clause 3, refers to Master Control Facility at Hassan as ISRO TT&C station to be considered as Prime SCC for LEOP operations. The location coordinates of Hassan are N and E. Back up SCC is Master Control Facility at Bhopal; location coordinates of Bhopal are N and E 9

12 Question 5: Ref: Schedule F, Clause 5.7, two separate Training Courses means same training material to be covered at two separate times Please confirm. Please specify the location of training Contractor or customer site. Answer 5: There is no Schedule F clause 5.7 in the RFP. Kindly provide us with correct reference number to respond accordingly. However it may be noted that the details of training are provided in Schedule F Clause 2 page F-5 according to which the contractor shall submit a proposal for training programme. This has to be approved by the customer. Indicative training course details are given below: Two Training courses for HTS-1 and one for HTS-2. For HTS-1, the training material is expected to be different for the two courses. Schedule can be proposed by Contractor (maybe at T-9 and T-4 months for HTS-1 and at T-4 months for HTS-2, T being FMCR). Location of training Customer Site (Satellite Control Centre) Question 6: Ref: Schedule F, Clause 1.1, item e states Specific Orbital Operations S/W (Orbops) spec. to be provided. Answer 6: Orbital Operations Software has to be provided for operations by the Contractor. The module definitions, interface details & specifications also need to be provided Question 7: Ref: Schedule F, Clause 13 under Warranty states: DSS, SSL provided H/W, SW and Operational Tools Satellite Life 15 years and Spacecraft and allied materials - FMCR + 18 months. Please confirm item 2 above includes item 1 or two separate requirements. Answer 7: There is no Schedule F clause 13. However we think you are referring to Schedule G Clause 13 on Page G-9. If this is correct then the response is as follows. It may be noted that a nominal period of 18 months is kept for completion of post FMCR launch and in orbit operations (six months) followed by one year of in orbit warranty. The warranty money will be released post completion of this period. If the post FMCR period to IOT completion period is less than six months, the overall period of 18 months shall reduce accordingly. The overall 15 years of spacecraft life includes only one year of in orbit warranty period. Question 8: Ref: Schedule D, Please provide link to Detailed ISRO Requirement to Product Assurance. Answer 8: ISRO has uploaded detailed requirement to HTS Product Assurance Document, ISRO/ISAC/HTS/RFP/PA/001 Issue 1, and Revision 0 dated December 2015 on its website. 10

13 Question 9: Since HTS-1 & HTS-2 are identical, following Reviews will be held for HTS Program Kickoff/SRR 2. Equipment Qualification Status Review (EQSR) EDC+3 months 3. Preliminary Design Review (PDR) EDC+5 months 4. Critical Design Review (CDR) EDC+13 months 5. Mission Design Reviews (2) if HTS-2 is on a different L/V and/or any major changes to HTS-1 mission design Answer 9: We understand this is for information to us. The same may kindly be brought out in the response to RFP document. Question 10: Vendor would like clarification on the restrictions set forth in Section 21 (Integrity) of Schedule G (Commercial and Contractual Requirements). Vendor intends to utilize a full time temporary employee who is based in India and working exclusively for vendor to assist us with the RFP. He will be paid through a local temporary employment agency on a flat fee monthly basis. Neither the individual nor the agency will receive fees, commissions or brokerage contingent on the outcome of the RFP. Please confirm this arrangement is acceptable and not in violation of the integrity provision of the RFP. Answer 10: Only full time company employees working exclusively for the bidder can participate and/or assist in bidding process against this RFP. Question 11: Schedule B, on pages 9 and 10, it says spectrum in FWD and RTN link shall be available as split bands. Can ISRO clarify how many segments will be present? Can Vendor assume that the segments are at least 500 MHz band? The bandwidths and locations within the band will affect the repeater design (LNA count, number of LOs etc.) and can affect the cost and mass of the spacecraft. Can SSL assume a set of frequencies and create a design based on this assumption? Confirm that Vendor should use a forward to return user bandwidth ratio of 2:1 as is commonly done on other HTS programs? Answer 11: Further details on communication payload spectrum allocation for HTS-1 and HTS-2 and operational orbital slot shall be provided at the time of signing of contract. Vendor can make assumption for the best case (continuous) and worst case (split band) spectrum allocation with associated implication on the overall configuration. ISRO has not specified any forward and return user bandwidth ratio. Vendor can make assumption for the optimal configuration as long as overall user and hub spectrum is in line with this RFP. 11

14 Question 12: Schedule B, please clarify following: 1. What hub and user terminal XPD values to use in capacity calculations. 2. Do the rain fade values given in Table 1-5b include cloud, scintillation, rain depolarization and atmospheric attenuation? Please confirm that the rain fade values to be used are constant across the entire coverage area. Answer 12: The hub and user terminal XPI/XPD values assumed for capacity calculation are Hub Terminal = 30 db and User Terminal = 20 db. The rain fade values given in Table 1-5b include all atmospheric attenuation listed above. For capacity estimation, constant values of rain fade are to be used over entire coverage area. Question 13: Please confirm whether a price needs to be provided for the Options (steerable spots, encryption) requested and can these be ROM (Rough order of Magnitude) prices? Answer 13: The prices quoted shall be firm and fixed price. However in case of optional configurations, the prices shall be mentioned separately. Question 14: Is there intent to operate both the spacecrafts (HTS1 and 2) at the same time from the same collocated or different orbital slots? Co-location impacts will need to be assessed in that case. Please clarify. Answer 14: The TT&C and Control systems of HTS-1 and HTS-2 shall be designed such that they can be operated from same GEO slot in collocated configuration. Further details on communication payload spectrum allocation shall be provided at the time of signing of contract which will define the final orbital operations strategy. Question 15: Section 1.1 (of Schedule F), please clarify if deliverable Satellite Control System (SCS), consisting of RTS, Off-line Satellite Control Software, and Orbital Operations Software are required for Primary Satellite Control Center (SCC) and also Backup SCC. If so, please provide geographical locations of Primary SCC and Backup SCC. Answer 15: Refer Answer 4 for geographical locations of Prime & Back up SCC. The deliverable SCS Software should be in a multi mission Satellite concept, with a provision to select any of the two Satellites, so that the Satellites can be operated from MCF, Hassan or MCF, Bhopal simultaneously. It is preferable that the provision exists to enable control of one Satellite from each SCC also that is, one from Prime SCC and the other from Backup SCC. However, if it involves a costing factor to deliver at both SCCs, separate costs can be projected for one / two. 12

15 Question 16: Section 1.1 (of Schedule E), please clarify that the deliverable SCS must be capable of supporting both ISRO Ka HTS Satellites simultaneously. Answer 16: Affirmative. Question 17: Please clarify if Master Control Facility, Hassan will be used for bus In Orbit Test (IOT) and payload IOT. Assumption SSL provides necessary IOT Test Equipment. Answer 17: Master Control Facility at Hassan or Bhopal would be used for bus In Orbit Test (IOT) and payload IOT (IOT Test Equipment and related Software to be provided by the Vendor (Ref. Schedule F Clause 1). Question 18: Please clarify if the deliverable Operations Tools and Software are required to support each of the two Ka HTS satellites, and whether the tools must be delivered to both Primary SCC and Backup SCC. Answer 18: Affirmative. The deliverable Operations Tools and Software should be in a multi mission Satellite concept, with a provision to select any of the two Satellites, so that the Satellites can be operated from MCF, Hassan or MCF, Bhopal simultaneously. It is preferable that the provision exists to enable control of one Satellite from each SCC also that is, one from Prime SCC and the other from Backup SCC. However, if it involves a costing factor to deliver at both SCCs, separate costs can be projected for one / two. Question 19: Section 5, item d (Schedule A) please clarify requirements for Communication Performance Tool. Answer 19: Communication Performance Tool shall be capable of predicting the performance degradation due to payload redundancy path selection. Question 20: Vendor will load Xenon, if required, for all vendor satellites, including HTS-1 satellite, at AIT Facility prior to shipment to Launch Base. Can we assume ISRO will provide Xenon at ISRO facility for HTS-2 satellite? Answer 20: ISRO also procures Xenon from international suppliers as other vendors do. ISRO can support such requirement subjected to test and acceptance by the vendor. If the Xenon provided by ISRO does not qualify to the specifications of vendor then the vendor shall make alternate arrangements. The intention to procure Xenon from ISRO and corresponding cost reduction shall be specified in response to the RFP. 13

16 Question 21: Provide clarification for Realization Plan (Schedule A, Section 4.1), this is same as AIT plan. Answer 21: Spacecraft Realization Plan means overall Project Management Plan which also include AIT plan as its component. Question 22: Satellite Storage and Safe Keeping (Schedule A, Section 12), Storage will not be more than 2 years; under Propulsion Storage Life (Schedule B, Section 7.2.4), The Propulsion System shall have a minimum storage life on the ground of 4 years. Clarify. Answer 22: The Schedule A, Section 12 refers to the situation of delay post FMCR. The propulsion system components specification is with ref to their availability without any issues on ground prior to shipment for a period of 4 years. Question 23: In case of the usage of Electric Propulsion System for SK manoeuvres, a backup option with Chemical Propulsion shall be provided? (Schedule B, Section 6.4.3). Please clarify. Answer 23: If EPS is being planned for Station Keeping, then it is preferable that the bus design also caters to the usage of remaining Chemical Propulsion for Station Keeping. Question 24: Relocation (Schedule B, Section 9.3.1, 2nd para) - S/C design shall support a minimum of two relocations, a drift velocity of 2deg/day during design life. Under propulsion Budget (Schedule B, Section 9.4, 2nd para c & d)- 2deg/day IOT slot to Operational slot, one relocation 1deg/day during mid propellant life. Movement from IOT slot to Operational slot is considered as one drift. Answer 24: Affirmative. Provision in the Propellant budget should be made for at least one drift at 2deg/day and another at 1deg/day (which would mean accounting ~18m/s totally for relocation). Question 25: Schedule B, Section 9.4 gives assumptions to go with Prop budget for 15 yrs. Schedule B, Section under Propulsion Subsystem - 15 yrs. in orbit with a margin of minimum one year for performance dispersion, except for the LAM, pressurant tanks and associated lines for which operational life shall be one month after final pressurization in orbit. Please clarify. Answer 25: Operational Mission life targeted is 15 years, including any dispersions as well as contingencies, with a margin of additional one year. 14

17 Question 26: ISRO is planning to use same Launch Vehicle for HTS-1 and HTS-2 or different one. Answer 26: ISRO will finalize launch vehicle at appropriate time (Ref: Schedule E, Clause 2.1). Launch vehicles for HTS-1 and HTS-2 might be same or different. General Query: Please let us know if you need any clarification. If possible, Vendor is willing to support a face to face clarification meeting with appropriate ISRO authorities in India. Please provide us the schedule based on availability. Answer: ISRO has conducted pre bid meetings with all the interested parties for face to face clarifications in response to this RFP. 15

18 SET-4 Question 1: Schedule A SOW Section III Program Management and Realization Milestones. The Program Management Plan is it requested as part of the Bidder Proposal? The CDRL is missing in the Customer RFP SOW. Do you expect that Bidder shall propose its standard in the Proposal? Answer 1: Vendor can propose his Contract Data Requirement List which will be discussed and agreed upon at the time of contract finalization. Vendor should ensure that proposed CDRL meets all the requirements specified in HTS RFP Schedules. Question 2: Do you have the final orbital location for performance calculation? Answer 2: For reference performance calculation and beam layout optimization the assumed orbital slot for HTS-1 shall be taken closer to Indian longitudes and for HTS-2 it shall be taken farther from the Indian longitudes within the specified GEO orbital slot range as given in RFP. Final orbital location will be defined at the time of signing of the contract. Question 3: Concerning the HTS-2 satellite schedule, what is the customer required master schedule in order to optimize resources management between the two satellites on both sides? If the HTS-1 launch is successful, do you intend to wait some time before launching HTS-2? Answer 3: ISRO Ka HTS-2 FMCR shall be conducted 6 months after HTS-1 FMCR completion or 42 months after the signing of contract (if FMCR of HTS-1 is completed in less than 36 months). Schedule A section 12 refers to spacecraft storage requirements specified in RFP. ISRO plans to operate both HTS-1 and HTS-2 simultaneously. Question 4: General questions: Statement of compliance for commercial and contractual requirements refers to schedule G. Is there any legal commercial and contractual requirement for this type of procurement contract by ISRO beyond those mentioned in schedule G? Answer 4: Commercial and Contractual requirements specified in RFP are general in nature. Before signing of the contract draft will be prepared and approved by both the parties. Question 5: Schedule G $ 5. In case of advance payment requested the bids are evaluated by suitably loading 11% p.a. or any applicable rate in time at the time of advancing. Could you clarify whether the interest calculation is only applicable in the evaluation of bids and not applied by the Government of India on the payments of the contractor during the execution of the contract? Answer 5: Yes. The interest calculation shall be applied only for the evaluation of bids. 16

19 Question 6: Schedule G $ 6. Could you clarify if prices to be provided by the candidates in the bid submission exclude any estimates for direct or indirect taxes payable under Indian Tax Regulations? Exemption of customs duties for the benefit of ISRO is mentioned for HTS-2. Customs Duty Exemption Certificate is only applicable for HTS-2 satellite or also any equipment/tools delivered and required in the execution of the contract? What is the customs duties status for HTS-1? Do you confirm ISAC is the entity to provide CDEC? Answer 6: In respect of HTS-2, Basic prices and taxes (if any) shall be indicated separately. The CDEC and necessary required documents shall be provided by ISRO to clear the HTS-2 subsystems and allied equipments and tools. In respect to HTS-1, since all the activities are carried out outside India, no Custom Duty is applicable. No CDEC is required for HTS-1. ISAC is the entity to issue CDEC. Question 7: Schedule G $ 7. Could you clarify if Scheduled Bank is a bank with operations based in India? And what is the current list of Scheduled Bank able to issue such guarantees to foreign entity? Could you clarify whether the guarantee is valid for up to (60) days after the date of completion of Flight Module Completion Review of HTS-2 Spacecraft? Answer 7: The list of scheduled bank is enclosed in Annexure-1. The guarantee for the two spacecrafts shall run separately. As per Schedule G, item 7 on page G-7 of the RFP the guarantee is applicable for both HTS-1 and HTS-2 separately till 60 days after the date of completion of Flight Module Completion Review Question 8: Schedule G $ 15. Cancellation of the contract by ISRO/ISAC no financial implications on either side is stated. Does it mean that the contractor is paid of all works done plus reasonable profit at the time of cancellation? Answer 8: The Vendor shall propose his terms and conditions which shall be reviewed by ISRO. However these terms and conditions are not binding on ISRO. It may be noted that these conditions shall be finalised to mutual satisfaction during contract finalization. Question 9: Schedule G $ 21. No company shall be employed to participate in any contract resulting from this RFP. Would it mean that Contractor is not authorized to subcontract in India part of the work including works to be performed in India? Answer 9: Any dependency on any sub-contractor shall be managed by the prime contractor and should not have any bearing whatsoever on customer and the performance of the final contract. 17

20 Question 10: Schedule G $ 23. The contractor at no point can claim any right on the spacecraft. From what point in time the transfer of title on the satellite may occur respectively for HTS1 and HTS2? Could you clarify that the contractor shall operate on its own up to IOT review (IOAR) and under customer instructions beyond that milestone? For which duration shall contractor operate the satellite(s) under customer instructions? Is it an option for customer or these services are in the contract baseline? Answer 10: The transfer of title shall take place at Launch site just prior to launch separately for HTS-1 and HTS-2. However the exact details/modalities shall be worked out during the contract finalization. Question 11: Schedule G $ 24. Arbitration is made in accordance with the Rules of Arbitration of the Indian Council of Arbitration. Is ICA same entity than the ICADR referred to in bank guarantee format (Annexure 3)? Answer 11: Kindly ignore the existing format. The new format will be made available at the time of Contract finalization. Question 12: (a) Schedule G Annexure 3. Could you clarify if this advance bank guarantee is to be issued by a Nationalised/Scheduled Bank? (b) Could you clarify whether the guarantee is valid for up to (3) months after the completion of Flight Module Completion Review of HTS-2 Spacecraft? (c) Could you clarify if the second definition of Contractor is to be deleted? Answer 12: (a) The list of scheduled banks is enclosed in Annexure-1. (b) Affirmative, the guarantee is valid for up to (3) months after the completion of Flight Module Completion Review of HTS-2 spacecraft (c) Kindly ignore the existing format. The new format will be made available at the time of Contract finalization. Question 13: (a) Schedule G $ Annexure 4. The Security deposit amounts to 10% of the contract price. Could you clarify if this amount to be considered as the maximum cap of liability of the Contractor? (b) The security is valid two months beyond Contract completion date. Could you clarify if the validity is up to EDA + 36 months + 2 months for HTS1 and EDA + 42 months + 2 months for HTS2? (c) Could you clarify that the guarantee may be issued in the currency of the Contract and not only in Rupees? Answer 13: (a) No, security deposit amounts to 10% of the contract price cannot be considered as the maximum cap of liability of the Contractor. (b) Affirmative, the security is valid two months beyond Contract completion date. (c) The guarantee may be issued in the currency of the Contract and not only in Rupees. 18

21 Question 14: Will it be convenient for ISRO to refer to RUGD 758 in the various formats of bank guarantees? Answer 14: ISRO defined and approved formats only shall be used. Question 15: Would it be convenient for ISRO to refer to ICC incoterm 2010 in the contract to ease the shipments? Answer 15: Affirmative, ISRO agrees to suggestion to refer to ICC incoterm 2010 in the contract to ease the shipments. Question 16: Schedule G $ Annexure 5. Could you clarify which payment upon FMCR Milestone achievement constitutes Final Payment? Could you clarify whether the performance (warranty) guarantee is furnished upon completion of the FMCR of HTS-2 Spacecraft or the FMCR of HTS-1 Spacecraft? Note: 2 FMCR, since 2 spacecraft, warranty period? Answer 16: Payments made at the time of signing of the contract will be considered as Advance payment. All the other milestone payments will be against identified verifiable milestones/deliverables acceptable to ISRO. It may be noted that all the payments as well as performance guarantee for HTS-1 and HTS-2 shall run separately. It may also be noted that the final details regarding milestone payments and BG shall be worked out during contract finalization. Question 17: In the frame of Competency absorption plan, Can you clarify your expectation in term of duration of presence at Vendors location. Do you intend to have continuous residence during more than 1 year? Answer 17: As indicated in RFP about 25 engineers shall be stationed at the Vendors location based on the requirement of activities. These engineers / executives shall be working in the sliding window mode where some engineers may go out and new may join. It is also possible that some of the key members may stay for more than one year. Question 18: Can you also clarify at which point of integration you expect to receive the second satellite in India. Answer 18: All the AIT activities including payload panel assembly shall be carried out in India. The Vendor shall make a proposal in line with this requirement. 19

22 Question 19: A part of the 25 engineers that will follow the Competency absorption plan, do you intend to have an additional AIT specific training for your team in Vendors location? Answer 19: The engineers of ISRO team in general shall be well versed with the nominal AIT activities. However to meet the quality requirements of the Vendor if some of the engineers need any specialised training, ISRO shall support such activities. The activities shall however be defined by the Vendor. Question 20: In the frame of Transfer of Technology, engineers are foreseen to have a course in Vendors facilities and then, follow the integration of the first model. We understand that some of them will be dedicated to AIT activities and will be used as test leaders on the second model integrated in India. Could you give us the number of these persons and associated specialities? Answer 20: The engineers of ISRO team in general shall be well versed with the nominal AIT activities. However to meet the quality requirements of the Vendor if some of the engineers need any specialised training, ISRO shall support such activities. The activities and number of engineers shall however be defined by the Vendor. Question 21: Could you provide information about ISRO facilities: Crane capacities, Thermal Vacuum (TV) chamber: diameter and length and associated GSEs (if any), Shaker: max load and associated GSEs (if any), Acoustic chamber: size, range Compact Antenna Test Range (CATR): size, max load capacity and associated GSEs (if any). Answer 21: Detailed presentations were made to the Vendor. A copy of the presentations is uploaded on the website. Question 22: Among the 25 ISRO engineers that will be stationed in Vendors premises, can we assume that some of them will be dedicated to satellite on orbit operations and will participate to satellite operation procedure validation? Answer 22: Affirmative. The engineers shall be deployed in the sliding window mode where necessary engineers shall be available to support the activities. Question 23: As per Vendor understanding, Schedule F Ground control System delivery includes: - Delivery of Real Time Software - Delivery of Orbital operations software specifications for Space bus VENDOR understands that the Orbital operation software is developed by the Customer with VENDOR provided software specification and VENDOR provided test cases. Please confirm 20

23 Answer 23: Ref. Schedule F Clause1 according to which the Contractor shall provide RTS (Real Time Software), GCS (Ground Control Software), DSS (Dynamic Satellite Simulator) and OOS (Orbital Operations Software) for controlling the satellite from Customer's SCC. However, the Ground Station M&C (Monitoring and Control) Software shall be provided by ISRO; ICD shall be provided for this by ISRO so as to interface with the Contractor provided other Software. Question 24: In Schedule F, it seems that all the Ground control System is delivered in on one unique site in India (no backup site). Please confirm. Answer 24: Schedule F, Clause 3, refers to Master Control Facility at Hassan as ISRO TT&C station to be considered as Prime SCC for LEOP operations. The location coordinates of Hassan are N and E.Back up SCC is Master Control Facility at Bhopal; location coordinates of Bhopal are N and E. Question 25: Real time Software interfaces: 1) VENDOR assumes that RTS/ Baseband interface is standard Cortex interface. Please confirm 2) VENDOR assumes that RTS/ DSS interface is standard Cortex interface. Please confirm 3) VENDOR assumes that Orbital Operation software is provided by the Customer. Could you please provide interface description document for Orbops/RTS interface? 4) VENDOR assumes no interface between RTS and TT&C station Monitoring and Control System. Please confirm Answer 25: 1) Affirmative 2) Affirmative, standard Cortex protocols are followed. 3) Refer Answer to PR02 (OOS & RTS Software shall be provided by Contractor) 4) It depends on the way the Satellite functions. We presume Interface is expected to be there for any uplink required from remote stations (like beacon uplink from unmanned stations). Please clarify. Question 26: In exhibit B 2.5, it is required to deliver a TCR suitcase including engineering model of on board TCR equipment. Is a solution based on a Reversed Baseband unit (STS from Zodiac) acceptable instead? Answer 26: Requirement is to have a unit which is 1:1 electrically equivalent to onboard system, so as to enable checking of all TCR functions. The TMTC need not be full-fledged and the representative set of TMTC can be decided at a later stage by mutual consent of both customer and contractor. 21

24 Question 27: SCHEDULE-B/Chapter KA-BAND BEACON - Please clarify, if each Ka-band Beacon transmitters shall be single frequency or dual frequencies: "one beacon source at TBD and TBD GHz" is confusing with respect to "each transmitter shall have unique frequency". Answer 27: It is envisaged that spacecraft will be equipped with two active beacons operating at two different frequencies separated by at least one MHz with different polarizations. Each beacon will have one cold redundant chain for respective frequency and polarizations. Question 28: SCHEDULE-B/Chapter KA-BAND BEACON - Please clarify the meaning of "Each transmitter shall [ ] comprise of two redundant chains", e.g. what "redundant chains" stands for? Answer 28: Same as Answer 27. Question 29: SCHEDULE-B/Chapter KA-BAND BEACON - With respect to the wording "Each transmitter shall have different polarization", do ISRO intend to operate the 2 Beacon transmitters simultaneously or not, each one on its dedicated horn polarization? Answer 29: Same as Answer 27. Question 30: SCHEDULE-B Chapter PAYLOAD PERFORMANCE SPECIFICATIONS Table 1.4b- Wideband receive response rejection - Would it be acceptable for ISRO to relax the transmit band rejection at 100dB instead of 130dB? 100dB of rejection combined with antenna Tx/Rx isolation is sufficient to not saturate the LNA nor degrade its performance. In addition, LNA will provide rejection of transmit band. Answer 30: TX/RX isolation excluding antenna is required to be 130 db. The budget for same may be provided in the response factoring PSF and LNA isolation and also isolation available from any other unit (e.g. down converter) in receive chain. Question 31: SCHEDULE-B/Chapter ALC MODE SPECIFICATIONS- OPCA - As the HPA will be operated in back-off, would it be acceptable for ISRO to offset the OPCA range from [-12;+3] db IBO to [-13;+2] db IBO to benefit from off the shelf unit heritage? Answer 31: Baseline OPCA range specified is [-12 to +3] db IBO, however [-13to +2] db IBO range is also acceptable since the overall 15dB range remains same in both the options. 22

25 Question 32: SCHEDULE-B/Chapter KA-BAND BEACON SPECIFICATIONS/Table Would it be acceptable for ISRO to relax the Cross Polarization Discrimination (XPD) to 25dB instead of 30dB in case of circular polarization? Answer 32: Baseline XPD specification is 30dB. Vendor should support deviation if any with adequate technical analysis and associated impact on system performance. This shall be reviewed and appropriate decision will be taken at the time evaluation. Question 33: SCHEDULE-B/Chapter SPECIFICATIONS OF IOT-HORN/Table Would it be acceptable for ISRO to relax the Cross Polarization Discrimination (XPD) to 25dB instead of 30dB in case of circular polarization? Answer 33: Baseline XPD specification is 30dB. Vendor should support deviation if any with adequate technical analysis and associated impact on system performance. This shall be reviewed and appropriate decision will be taken at the time evaluation. Question 34: SCHEDULE-B/Chapter SPECIFICATIONS OF IOT-HORN/Table Would it be acceptable for ISRO to relax the Transmit antenna gain of IOT horn to benefit from off the shelf unit heritage? Answer 34: Baseline specification of IOT horn gain is as per the Schedule-B Table 1.7. Vendor should support deviation in gain if any with adequate technical analysis and associated impact on system IOT capability. This shall be reviewed and appropriate decision will be taken at the time evaluation. Question 35: SCHEDULE-B/Chapter OPTIONAL CONFIGURATION - Please clarify if the hub spectrum of 500MHz for the 4 steerable beams shall be the same as for the nominal configuration, e.g. within the nominal 1GHz Hub spectrum or if we can add 500MHz to the nominal 1GHz Hub spectrum (1.5GHz of total Hub spectrum for Nominal + Option)? Answer 35: As given in RFP roving or steerable beams derive spectrum from user beams (88 beams reduced to 86) in predefined configuration. No addition spectrum is to be considered for this purpose. Question 36: SCHEDULE-B/Chapter OPTIONAL CONFIGURATION/Table Would it be acceptable for ISRO to relax the Cross Polarization Discrimination (XPD) to 25dB instead of 30dB? Answer 36: Baseline XPD specification is 30dB. Vendor should support deviation if any with adequate technical analysis and associated impact on system performance. This shall be reviewed and appropriate decision will be taken at the time evaluation. 23

26 Question 37: SCHEDULE-B/Chapter 2 TELEMETRY, COMMAND AND RANGING (TCR) SYSTEM - Would ISRO consider, a Ka-band TCR design instead of Ku, which would allow to propose a cost efficient design? Answer 37: As given in RFP Schedule-B Chapter2 TCR shall be in Ku-band. Ka-band TCR can be proposed as an alternate or backup option separately if Vendor feels so but not as the only or main option. Question 38: SCHEDULE-B/Chapter ANTENNA AXIAL RATIO - Would it be acceptable for ISRO to relax the Cross Polarization Discrimination (XPD) to 25dB instead of 30dB in case of circular polarization? Answer 38: Baseline XPD specification is 30dB. Vendor should support deviation if any with adequate technical analysis and associated impact on system performance. This shall be reviewed and appropriate decision will be taken at the time evaluation. Question 39: SCHEDULE-B/Chapter ANTENNA AXIAL RATIO - Would it be acceptable for ISRO to relax the Cross Polarization Discrimination (XPD) to 25dB instead of 30dB in case of circular polarization? Answer 39: Baseline XPD specification is 30dB. Vendor should support deviation if any with adequate technical analysis and associated impact on system performance. This shall be reviewed and appropriate decision will be taken at the time evaluation. Question 40: SCHEDULE-B/Chapter EFFECTIVE ISOTROPIC RADIATED POWER (EIRP) - Would ISRO consider a TM EIRP figures reduction for On-orbit operation (15dBW) and Omni operation (0dBW) to benefit from off the shelf unit heritage and cost efficient design? Answer 40: Baseline TM EIRP for on orbit operations is 15dB and for transfer orbit Omni operations 0dB. Vendor should support deviation if any with note on its impact on system performance i.e. reduction in the available link margin. This shall be reviewed and appropriate decision will be taken at the time evaluation. 24

27 SET-5 Question 1: Reference to RFP No. ISRO/ISAC/HTS/RFP/001/06 for ISRO Ka-HTS Spacecraft, could you please inform us if there is a pre-bid conference for this RFP? If not, we would like to schedule a time to meet with ISRO to discuss clarifications. Answer 1: ISRO has conducted pre bid meetings with all the interested parties for face to face clarifications in response to this RFP. Question 2: Would ISRO consider alternate models like procuring satellite capacity as a service rather than the satellites? Answer 2: The present RFP is for procurement of spacecrafts with one spacecraft being developed at Vendors site and the second one at ISRO premises in India. The scope of present RFP shall not be changed. Question 3: Would ISRO consider alternate business models with risk/revenue sharing where 50 or 100Gbps of satellite capacity (rather than the satellite) and the corresponding ground network are provisioned in India? Answer 3: This is a separate topic and is not envisaged in the scope of present RFP. Question 4: Would ISRO be willing to look at co-owning a satellite or satellites, where the said satellite or satellites could have higher capacity than 100 Gbps, but 50 Gbps or 100 Gbps could be dedicated for use over India? Answer 4: This is a separate topic and is not envisaged in the scope of present RFP. 25

28 Annexure#1 List of Scheduled Banks 26

29 THE SECOND SCHEDULE TO THE RESERVE BANK OF INDIA ACT, 1934 [Sections 2(e) and 42] SCHEDULED BANKS STATE CO-OPERATIVE BANKS Andhra Pradesh State Co-operative Bank Ltd. Hyderabad Bihar State Co-operative Bank Ltd., Bihar Goa State Co-operative Bank Ltd., Panaji Gujarat State Co-operative Bank Ltd., Ahmedabad Haryana State Co-operative Apex Bank Ltd., Chandigarh Karnataka State Co-operative Apex Bank Ltd., Bangalore Kerala State Co-operative Bank Ltd., Thiruvananthapuram Madhya Pradesh Rajya Sahakari Bank Maryadit, Bhopal Maharashtra State Co-operative Bank Ltd., Mumbai Orissa State Co-operative Bank Ltd., Bhubaneswar Pondicherry State Co-operative Bank Ltd. Pondicherry Punjab State Co-operative Bank Ltd., Chandigarh Rajasthan State Co-operative Bank Ltd., Jaipur Tamil Nadu State Apex Co-operative Bank Ltd., Chennai Uttar Pradesh Co-operative Bank Ltd., Lucknow West Bengal State Co-operative Bank Ltd., Kolkata 27

30 Urban Co-operative Banks A P Mahesh Co-operative Urban Bank Ltd., Hyderabad Abhyudaya Co-operative Bank Ltd., Mumbai Ahmedabad Mercantile Co-operative Bank Ltd., Ahmedabad Akola Janata Commercial Co-operative Bank Ltd., Akola Amanath Co-operative Bank Ltd., Bangalore Bassein Catholic Co-operative Bank Limited, Vasai Bharat Co-operative Bank (Mumbai) Ltd., Mumbai Bharati Sahakari Bank Ltd., Pune Bombay Mercantile Co-operative Bank Limited, Mumbai Charminar Co-operative Urban Bank Ltd., Hyderabad Citizen Credit Co-operative Bank Ltd., Mumbai Dombivli Nagari Sahakari Bank Ltd., Dombivli Greater Bombay Co-operative Bank Limited, Mumbai Indian Mercantile Co-operative Bank Ltd., Lucknow Jalgaon Janata Sahakari Bank Ltd., Jalgaon Janakalyan Sahakari Bank Ltd., Mumbai Janalaxmi Cooperative Bank Ltd., Nashik Janata Sahakari Bank Ltd., Pune Kallappanna Awade Ichalkaranji Janata Sahakari Bank Ltd., Ichalkaranji Kalupur Commercial Co-operative Bank Ltd., Ahmedabad. Kalyan Janata Sahakari Bank Ltd., Kalyan Kapol Cooperative Bank Ltd., Mumbai Karad Urban Co-operative Bank Ltd., Karad Madhavapura Mercantile Co-operative Bank Ltd., Ahmedabad Mahanagar Co-operative Bank Ltd., Mumbai Mapusa Urban Co-operative Bank of Goa Ltd., Mapusa Mehsana Urban Co-operative Bank Ltd., Mehsana N K G S B Co-operative Bank Ltd., Mumbai Nagar Urban Co-operative Bank Ltd., Ahmednagar Nagpur Nagrik Sahakari Bank Ltd., Nagpur New India Co-operative Bank Ltd., Mumbai Nutan Nagrik Sahakari Bank Ltd., Ahmedabad Parsik Janata Sahakari Bank Ltd., Thane Pravara Sahakari Bank Ltd., Loni Punjab & Maharashtra Co-operative Bank Ltd., Mumbai Rajkot Nagrik Sahakari Bank Ltd., Rajkot Rupee Co-operative Bank Ltd., Pune Sangli Urban Co-operative Bank Ltd., Sangli Saraswat Co-operative Bank Ltd., Mumbai Sardar Bhiladwala Pardi People's Co-operative Bank Ltd., Killa Pardi Shikshak Sahakari Bank Ltd., Nagpur Solapur Janata Sahakari Bank Ltd., Solapur Surat People's Co-operative Bank Ltd., Surat Thane Bharat Sahakari Bank Ltd., Thane Thane Janata Sahakari Bank Ltd., Thane The Akola Urban Co-operative Bank Ltd., Akola The Cosmos Co-operative Bank Ltd., Pune The Goa Urban Co-operative Bank Ltd., Panaji The Khamgaon Urban Co-operative Bank Ltd., Khamgaon The Nasik Merchant's Co-operative Bank Ltd., Nasik The Shamrao Vithal Co-operative Bank Ltd., Mumbai The Zoroastrian Co-operative Bank Ltd., Mumbai Vasavi Co-operative Urban Bank Limited, Hyderabad 28

31 State Bank of India State Bank of Bikaner & Jaipur State Bank of Hyderabad State Bank of Indore State Bank of Mysore State Bank of Patiala State Bank of Saurashtra State Bank of Travancore Allahabad Bank Andhra Bank Bank of Baroda Bank of India Bank of Maharashtra Canara Bank Central Bank of India Corporation Bank Dena Bank Indian Bank Indian Overseas Bank Oriental Bank of Commerce Punjab National Bank Punjab and Sind Bank Syndicate Bank UCO Bank Union Bank of India United Bank of India Vijaya Bank SBI AND ASSOCIATES NATIONALISED BANKS OTHER PUBLIC SECTOR BANKS Industrial Development Bank of India Ltd. PRIVATE SECTOR BANKS Bank of Rajasthan Ltd. Catholic Syrian Bank Ltd. City Union Bank Ltd. Development Credit Bank Ltd. Dhanalakshmi Bank Ltd. Federal Bank Ltd. HDFC Bank Ltd. ICICI Bank Ltd. IndusInd Bank Ltd. ING Vysya Bank Ltd. Jammu and Kashmir Bank Ltd. Karnataka Bank Ltd. Karur Vysya Bank Ltd. Kotak Mahindra Bank Ltd. Lakshmi Vilas Bank Ltd. Nainital Bank Ltd. Ratnakar Bank Ltd. SBI Commercial International Bank Ltd. South Indian Bank Ltd. Tamilnad Mercantile Bank Ltd. Axis Bank Ltd. Yes Bank Ltd. 29

32 FOREIGN BANKS ABN Amro Bank N.V. Abu Dhabi Commercial Bank Ltd. American Express Banking Corporation Antwerp Diamond Bank N.V. Arab Bangladesh Bank Bank International Indonesia Bank of America Bank of Bahrain and Kuwait B.S.C. Bank of Ceylon Bank of Nova Scotia Bank of Tokyo Mitsubishi Ltd. Barclays Bank Plc. BNP Paribas China Trust Commercial Bank Shinhan Bank Citi Bank N.A. Calyon Bank Deutsche Bank DBS Bank Ltd. The Hongkong and Shanghai Banking Corporation Ltd. J.P. Morgan Chase Bank N.A. Krung Thai Bank Public Company Ltd. Mashreq Bank p.s.c. Mizuho Corporate Bank Ltd. Oman International Bank S.A.O.G. Societe Generale Sonali Bank Standard Chartered Bank State Bank of Mauritius Ltd. 30

33 GRAMIN BANKS Andhra Pradesh Grameen Vikas Bank, Warangal (Andhra Pradesh) Andhra Pragathi Grameena Bank, Kadapa (Andhra Pradesh) Aryavart Gramin Bank, Lucknow (Uttar Pradesh) Arunachal Pradesh Rural Bank, Naharlagun (Arunachal Pradesh) Assam Gramin Vikas Bank, Guwahati (Assam) Baitarani Gramya Bank, Baripada (Orissa) Ballia Kshetriya Gramin Bank, Ballia (Uttar Pradesh) Bangiya Gramin Vikash Bank, Berhampore (West Bengal) Baroda Gujarat Gramin Bank, Bharuch (Gujarat) Baroda Rajasthan Gramin Bank, Ajmer (Rajasthan) Baroda Uttar Pradesh Gramin Bank, Rae Bareli (Uttar Pradesh) Bihar Kshetriya Gramin Bank, Monghyr (Bihar) Cauvery Kalpatharu Grameena Bank, Mysore (Karnataka) Chaitanya Godavari Grameena Bank (Andhra Pradesh) Chhattisgarh Gramin Bank, Raipur (Chhattisgarh) Chikmagalur-Kodaga Grameena Bank, Chikmagalur (Karnataka) Deccan Grameena Bank, Dilsukhnagar (Hyderabad) Dena Gujarat Gramin Bank, Gandhinagar (Gujarat) Durg-Rajnandgaon Gramin Bank, Rajnandgaon (Chhattisgarh) Ellaquai Dehati Bank, Srinagar (Jammu and Kashmir) Etawah Kshetriya Gramin Bank, Etawah (Uttar Pradesh) Faridkot Bhatinda Kshetriya Gramin Bank, Bhatinda (Punjab) Gurgaon Gramin Bank, Gurgaon (Haryana) Hadoti Kshetriya Gramin Bank, Kota (Rajasthan) Haryana Gramin Bank, Rohtak (Haryana) Himachal Gramin Bank, Mandi (Himachal Pradesh) Jaipur Thar Gramin Bank, Jaipur (Rajasthan) Jammu Rural Bank, Jammu Jhabua-Dhar Kshetriya Gramin Bank, Jhabua (Madhya Pradesh) Jharkhand Gramin Bank, Ranchi (Jharkhand) Kalinga Gramya Bank, Cuttack (Orissa) Kamraz Rural Bank, Sopore (Jammu and Kashmir) Karnatka Vikas Gramin Bank, Dharwad (Karnataka) Kashi Gomti Samyut Gramin Bank, Varanasi (Uttar Pradesh) Khasi J Bank, Shillong (Meghalaya) Krishna Grameena Bank, Gulbarga (Karnataka) Kshetriya Kisan Gramin Bank, Mainpuri (Uttar Pradesh) Langpi Dehangi Rural Bank, Dhiphu (Assam) Lucknow Kshetriya Gramin Bank, Sitapur (Uttar Pradesh) Madhya Bharath Gramin Bank, Sagar (Madhya Pradesh) Madhya Bihar Gramin Bank, Patna (Bihar) Mahakaushal Kshetriya Gramin Bank, Jabalpur (Madhya Pradesh) Maharashtra Godavari Gramin Bank (Maharashtra) Malwa Gramin Bank, Sangrur (Punjab) Marwar Ganganagar Bikaner Gramin Bank, Pali (Rajasthan) Manipur Rural Bank, Imphal (Manipur) Marathwada Gramin Bank, Nanded (Maharashtra) Mewar Aanchalik Gramin Bank, Udaipur (Rajasthan) Mizoram Rural Bank, Aizawl (Mizoram) Nagaland Rural Bank, Kohima (Nagaland) Nainital Almora Kshetriya Gramin Bank, Nainital (Uttaranchal) Narmada Malwa Gramin Bank, Indore (Madhya Pradesh) Neelachal Gramya Bank (Orissa) North Malabar Gramin Bank, Kannur (Kerala) Pallavan Grama Bank, Salem (Tamil Nadu) 31

34 Pandyan Grama Bank, Virudhunagar (Tamil Nadu) Paschim Banga Gramin Bank, Howrah (West Bengal) Parvatiya Gramin Bank, Chamba (Himachal Pradesh) Pragathi Gramin Bank, Bellary (Karnataka) Prathama Bank, Moradabad (Uttar Pradesh) Puduvai Bharthiar Grama Bank (Pondicherry) Punjab Gramin Bank, Kapurthala (Punjab) Purvanchal Gramin Bank, Gorakhpur (Uttar Pradesh) Rajasthan Gramin Bank, Alwar (Rajasthan) Ratnagiri Sindhudurg Gramin Bank, Ratnagiri (Maharashtra) Rewa-Sidhi Gramin Bank, Rewa (Madhya Pradesh) Rushikulya Gramya Bank, Berhampur (Orissa) Samastipur Kshetriya Gramin Bank, Samastipur (Bihar) Saptagiri Grameena Bank, Chitoor (Andhra Pradesh) Sarva UP Gramin Bank (Uttar Pradesh) Satpura Narmada Kshetriya Gramin Bank, Chhindwara (Madhya Pradesh) Saurashtra Gramin Bank, Rajkot (Gujarat) Sharda Gramin Bank, Satna (M.P.) Shreyas Gramin Bank, Aligarh (Uttar Pradesh) Solapur Gramin Bank, Solapur (Maharashtra) South Malabar Gramin Bank (Kerala) Surguja Kshetriya Gramin Bank, Ambikapur (Chhattisgarh) Tripura Gramin Bank, Agartala (Tripura) Triveni Kshetriya Gramin Bank, Orai (Uttar Pradesh) Utkal Gramya Bank, Bolangir (Orissa) Uttaranchal Gramin Bank, Dehradun (Uttaranchal) Uttar Banga Kshetriya Gramin Bank, Cooch-Behar (West Bengal) Uttar Bihar Kshetriya Gramin Bank, Muzaffarpur (Bihar) Vananchal Gramin Bank, Dhumka (Jharkhand) Vidharbha Kshetriya Gramin Bank, Akola (Maharashtra) Vidisha-Bhopal Kshetriya Gramin Bank, Vidisha (Masdhya Pradesh) Visveshwaraya Grameen Bank, Mandya (Karnataka) Wainganga Kshetriya Gramin Bank, Chandrapur (Maharashtra) 32

STANDARDS TO ACCESS AND OPERATE SATELLITE SERVICES

STANDARDS TO ACCESS AND OPERATE SATELLITE SERVICES STANDARDS TO ACCESS AND OPERATE SATELLITE SERVICES INDEX I. Scope... 3 II. Bandwidth and Power Standards... 3 A. Bandwidth (BW) Allocation and Measurement... 3 1. Bandwidth of a digital carrier per customer....

More information

C1 SATELLITE PAYLOAD INFORMATION

C1 SATELLITE PAYLOAD INFORMATION C1 SATELLITE PAYLOAD INFORMATION CONTENTS PAGE NO. 1.0 Introduction 1 1.1 Satellite System Management 2 2.0 The Optus C1 Satellite 2 2.1 Basic Satellite Summary Commercial Payload 2 2.2 Ku-Band Communications

More information

Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS

Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS 10 September 2008 Prague, Czech Republic Agenda Short company introduction Turksat s satellite design and R&D goals Outline Turksat s satellite design

More information

Chapter 4 Solution to Problems

Chapter 4 Solution to Problems Chapter 4 Solution to Problems Question #1. A C-band earth station has an antenna with a transmit gain of 54 db. The transmitter output power is set to 100 W at a frequency of 6.100 GHz. The signal is

More information

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05

allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05 Corrigendum for the Tender for Web Based Project Monitoring Tool & MIS System Bidders Clarification Sl. Clause /Page no Tender Clause Clarification Sought Clarification No. 1 Page No:4 No consortium Consortium

More information

GALILEO In-Orbit Testing (IOT) Services

GALILEO In-Orbit Testing (IOT) Services GALILEO In-Orbit Testing (IOT) Services GALILEO IOV Phase Full Motion C-Band Antenna System & Transmission Equipment for In Orbit Testing (IOT) Mission May, 11th 2009 The GALILEO Program The GALILEO Program

More information

102 26-m Antenna Subnet Telecommunications Interfaces

102 26-m Antenna Subnet Telecommunications Interfaces DSMS Telecommunications Link Design Handbook 26-m Antenna Subnet Telecommunications Interfaces Effective November 30, 2000 Document Owner: Approved by: Released by: [Signature on file in TMOD Library]

More information

DEMONSTRATIONS OF NEW TELECOMMUNICATION SERVICES USING STENTOR SATELLITE

DEMONSTRATIONS OF NEW TELECOMMUNICATION SERVICES USING STENTOR SATELLITE DEMONSAIONS OF NEW ELECOMMUNICAION SEVICES USING SENO SAELLIE Philippe aizonville, Claude Lerr, Dominique Bergès, Joel Blazy, Jean-Pierre Bucau, Louis Fourcade Centre National d Etudes Spatiales 18 avenue

More information

Optimized and Integrated Management of Communications Satellite Transponders

Optimized and Integrated Management of Communications Satellite Transponders Optimized and Integrated Management of Communications Satellite Transponders A. Pablo Honold 1, and Luis Navarro 2 GMV Tres Cantos (Madrid) E-28760 Spain www.gmv.com The management of communications satellite

More information

C1 Satellite. Payload Information

C1 Satellite. Payload Information C1 Satellite Payload Information C1 Satellite Payload Information Contents Page No. 1. Introduction 4 1.1 Satellite System Management 4 2. The Optus C1 Satellite 5 2.1 Basic Satellite Summary Commercial

More information

IT Project: System Implementation Project Template Description

IT Project: System Implementation Project Template Description 2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation

More information

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Ground Floor, Block A, Vishwakarma Government Engineering College Campus Visat-Gandhinagar Highway, Chandkheda, Ahmedabad-382424. Fax No. +91 79 2397 2583 Website:

More information

Inmarsat & Global Xpress

Inmarsat & Global Xpress Inmarsat & Global Xpress Global Mobile Broadband Laura Roberti [email protected] Bangkok, 19 th September 2014 Inmarsat in L-band: an overview Worldwide coverage Land, sea, and air mobile services,

More information

Separating Fact from Fiction: HTS Ka- and Ku- Band for Mission Critical SATCOM

Separating Fact from Fiction: HTS Ka- and Ku- Band for Mission Critical SATCOM Home Separating Fact from Fiction: HTS Ka- and Ku- Band for Mission Critical SATCOM Ben Pawling, Harris CapRock and Keith Olds, Harris Government Communications August 14, 2013 Whether for enterprise,

More information

Satellite technology

Satellite technology Satellite technology Overview What is a satellite? The key elements of orbital position Satellite manufacturers and design The components of a satellite: payload and bus Digital versus analogue How do

More information

BR Workshop on the efficient use of the spectrum/orbit resource (Geneva, 6 May 2009)

BR Workshop on the efficient use of the spectrum/orbit resource (Geneva, 6 May 2009) BR Workshop on the efficient use of the spectrum/orbit resource (Geneva, 6 May 2009) Spectrum inefficiencies resulting from the claimed use of steerable beams, multiple beams or large coverage area beams

More information

Frequencies for Mars Local High-Rate Links

Frequencies for Mars Local High-Rate Links IPN Progress Report 42-153 May 15, 2003 Frequencies for Mars Local High-Rate Links D. Hansen, 1 M. Sue, 1 T. Peng, 2 and F. Manshadi 2 This article considers the options for frequency choice for high-data-rate

More information

Communication Satellite Systems Trends and Network Aspects

Communication Satellite Systems Trends and Network Aspects Communication Satellite Systems Trends and Network Aspects Paul Anderson Communication Architectures Department The Aerospace Corporation [email protected] http://www.aero.org/ Lee Center, Caltech

More information

RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157

RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157 RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY ADB/ICB/CGSP/2013/0157 ADB/ICB/CGSP/2013/0157 No. Question or Clarification

More information

Financial Results For the six months to 30 June 2014

Financial Results For the six months to 30 June 2014 Financial Results For the six months to 30 June 2014 25 July 2014 Key developments - H1 2014 Robust revenue and EBITDA growth with video as core Strong Europe and International performance North America

More information

MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

MANTON CONSOLIDATED SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS MANTON CONSOLIDATED SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 16, 2010 1 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF MANTON

More information

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries

Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA Pre-Bid Queries The pre-bid meeting for clarifications on the Re-Tender RFP for Providing Dedicated Web Hosting Services for IBA was held

More information

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS

NEGAUNEE PUBLIC SCHOOLS. REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS. On a PERFORMANCE CONTRACTING BASIS NEGAUNEE PUBLIC SCHOOLS REQUEST for PROPOSALS ENERGY SAVING CAPITAL IMPROVEMENT PROJECTS On a PERFORMANCE CONTRACTING BASIS July 26, 2010 NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF NEGAUNEE

More information

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING 4887 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING Expressions of Interest will be received at the Information Counter, Main Floor, Richmond City Hall, addressed to the

More information

City of New Rochelle New York. REQUEST FOR PROPOSAL Specification No. 5044

City of New Rochelle New York. REQUEST FOR PROPOSAL Specification No. 5044 Department of Finance Tel (914) 654-2072 515 North Avenue Fax (914) 654-2344 New Rochelle, NY 10801 Howard Rattner Commissioner Mark Zulli Risk/Purchasing Manager City of New Rochelle New York REQUEST

More information

ETL Systems. RSSC Dubna July 2014. Global Leaders in Satellite RF Engineering & Custom Build ROUTE AMPLIFY SPLIT SWITCH

ETL Systems. RSSC Dubna July 2014. Global Leaders in Satellite RF Engineering & Custom Build ROUTE AMPLIFY SPLIT SWITCH ETL Systems RSSC Dubna July 2014 Global Leaders in Satellite RF Engineering & Custom Build Heritage Custom Build & Design Specialist RF equipment for 25 years 80% International Sales 75 staff in 3 global

More information

RECOMMENDATION ITU-R S.524-5. (Questions ITU-R 48/4 and ITU-R 70/4)

RECOMMENDATION ITU-R S.524-5. (Questions ITU-R 48/4 and ITU-R 70/4) Rec. ITU-R S.524-5 1 RECOMMENDATION ITU-R S.524-5 MAXIMUM PERMISSIBLE LEVELS OF OFF-AXIS e.i.r.p. DENSITY FROM EARTH STATIONS IN THE FIXED-SATELLITE SERVICE TRANSMITTING IN THE 6 AND 14 GHz FREQUENCY BANDS

More information

Not All Bands Are Created Equal

Not All Bands Are Created Equal Harris CapRock White Paper Not All Bands Are Created Equal A Closer Look at Ka & Ku High Throughput Satellites INTRODUCTION The advent of high-throughput satellites (HTS) enables network service providers

More information

System Engineering Data Repository

System Engineering Data Repository System Data Repository 09:00 data in the MBSE life-cycle 09:20 EGS-CC in the system context 09:40 Conceptual Modelling and ECSS 10:00 ecascade 10:20 A snapshot of systems engineering data management in

More information

Generally the topology of the required VSAT network will be star as all applications are located in Abidjan.

Generally the topology of the required VSAT network will be star as all applications are located in Abidjan. SECOND SET OF RESPONSES TO CLARIFICATIONS REQUEST FOR PROPOSAL FOR FOR IMPLEMENTATION OF A HUB STATION AND BROADBAND VSAT WAN CONNECTIVITY- ADB/ICB/CGSP/2013/0157 No Question or Clarification Requested.

More information

LIMITED TENDER FOR DESIGN, DEVELOPMENT AND IMPLEMENTATION OF WEBSITE FOR NON TIMBER FOREST PRODUCE (NTFP)

LIMITED TENDER FOR DESIGN, DEVELOPMENT AND IMPLEMENTATION OF WEBSITE FOR NON TIMBER FOREST PRODUCE (NTFP) Tribal Cooperative Marketing Development Federation of India Ltd.(TRIFED) (Ministry of Tribal affairs, Govt. of India), NCUI Building, 2 nd Floor, 3, Siri Institutional Area, August Kranti Marg, New Delhi-110016.

More information

Procurement of Hosted Exchange Email Services by Commissionerate of Municipal Administration, Chennai

Procurement of Hosted Exchange Email Services by Commissionerate of Municipal Administration, Chennai Explanation for Queries Received Assignment Title: Procurement of Hosted Exchange Email Services by Commissionerate of Municipal Administration, Chennai Reference No: CMA/ 56898 /ITC/2009 # Document Reference

More information

KIZUNA (WINDS) (Wideband InterNetworking engineering test and Demonstration Satellite) (Launched by H-IIA F14)

KIZUNA (WINDS) (Wideband InterNetworking engineering test and Demonstration Satellite) (Launched by H-IIA F14) KIZUNA (WINDS) (Wideband InterNetworking engineering test and Demonstration Satellite) (Launched by H-IIA F14) WINDS Project Team, Office of Space Applications Japan Aerospace Exploration Agency Objectives

More information

Rocket Science Made Simple

Rocket Science Made Simple Rocket Science Made Simple Satellite Connectivity For Aviation Explained George Nicola 1 and Michele Franci 2 Inmarsat, London, EC1Y 1AX, United Kingdom Any satellite communication system is required to

More information

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR

INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR INDIAN INSTITUTE OF TECHNOLOGY GANDHINAGAR Ground Floor, Block A, Vishwakarma Government Engineering College Campus Visat-Gandhinagar Highway, Chandkheda, Ahmedabad-382424. Tel/Fax No. +91 79 2397 2583

More information

(RFP) PURCHASE OF BLADE SERVER

(RFP) PURCHASE OF BLADE SERVER REQUEST FOR PROPOSAL (RFP) FOR PURCHASE OF BLADE SERVER Controller of Defence Accounts, Secunderabad Ministry of Defence, Government of India Name of the Department: Summary Sheet Defence Accounts Department,

More information

Overview of LEO Satellite Systems

Overview of LEO Satellite Systems Overview of LEO Satellite Systems Christopher Redding Institute for Telecommunication Sciences National Telecommunications and Information Administration Boulder, CO credding@its. @its.bldrdoc.gov 1999

More information

Amendment 1 - Annexure 5 (C) Technical Criteria

Amendment 1 - Annexure 5 (C) Technical Criteria 1 - Annexure 5 (C) Technical Criteria S. Eligibility Criteria Documents required Complied Y/N Formatted: Heading 2, Indent: Left: 0", Hanging: 0.4" C) Technical Criteria (Experience and other Technical

More information

TATA INSTITUTE OF FUNDAMENTAL RESEARCH Homi Bhabha Road, Colaba, Mumbai 400 005. A Deemed University

TATA INSTITUTE OF FUNDAMENTAL RESEARCH Homi Bhabha Road, Colaba, Mumbai 400 005. A Deemed University Homi Bhabha Road, Colaba, Mumbai 400 005. A Deemed University Telephone : +91-22-2278 2890/2886/2887/2595 Email : [email protected] Website : www.tifr.res.in : [email protected] : [email protected] PUBLIC

More information

Evolution of Satellite Communication Systems

Evolution of Satellite Communication Systems Mathieu DERVIN Brussels, 6th May 2015 Brussels, May 2015 Agenda I. From Sputnik to wideband satellite services: The key technological evolutions II. Increase the satellite system capacity: A global system

More information

Please furnish your quotation for the services mentioned in the enclosed quotation form. Your quotation should fulfill the following conditions: -

Please furnish your quotation for the services mentioned in the enclosed quotation form. Your quotation should fulfill the following conditions: - PRASAR BHARATI (INDIA S PUBLIC SERVICE BROADCASTER) DOORDARSHAN NEWS: TOWER-B, DOORDARSHAN BHAWAN, NEW DELHI-110001 ----------------------------------------------- AN INVITATION FOR TENDER For Development

More information

Satellite Communication Systems. mgr inż. Krzysztof Włostowski Instytut Telekomunikacji PW [email protected]

Satellite Communication Systems. mgr inż. Krzysztof Włostowski Instytut Telekomunikacji PW chrisk@tele.pw.edu.pl Satellite Communication Systems mgr inż. Krzysztof Włostowski Instytut Telekomunikacji PW [email protected] Satellite Communication Satellite Communication combines the missile and microwave technologies

More information

Fernando Aguado-Agelet University of Vigo - INTA

Fernando Aguado-Agelet University of Vigo - INTA Fernando Aguado-Agelet University of Vigo - INTA August 10th 2008 2008 Cubesat Summer Developer s Workshop 1 Project Presentation GENERAL DESCRIPTION University of Vigo: Leader Spanish university in R+D

More information

Financial Results For the nine months to 30 September 2012

Financial Results For the nine months to 30 September 2012 Financial Results For the nine months to 30 September 2012 9 November 2012 YTD Q3 2012 Highlights Revenue of EUR 1,359.6 million, up 6.1% (+1.6% at constant FX) Strong YTD progress (EUR 92 million) offset

More information

Re-Tender. for. Supply and Installation of the. Student Biometric Attendance System. Indian Institute of Technology Jodhpur

Re-Tender. for. Supply and Installation of the. Student Biometric Attendance System. Indian Institute of Technology Jodhpur Re-Tender for Supply and Installation of the Student Biometric Attendance System at Indian Institute of Technology Jodhpur NIT No. : IITJ/SPS/CC/2014-15/1/57 NIT Issue Date : 26 November 2014 Last Date

More information

www.turksat.com TURKSAT A.S. Turksat, one of the leading operators in the satellite communication business, offers flexible solutions by providing its customers with cable and wireless broadcasting,

More information

www.aticourses.com Boost Your Skills with On-Site Courses Tailored to Your Needs

www.aticourses.com Boost Your Skills with On-Site Courses Tailored to Your Needs Boost Your Skills with On-Site Courses Tailored to Your Needs www.aticourses.com The Applied Technology Institute specializes in training programs for technical professionals. Our courses keep you current

More information

Spacecraft Operations Course

Spacecraft Operations Course , DLR Spacecraft Operations Course Course Content The following subjects and topics will be addressed during the Spacecraft Operations Course Table of Content Spacecraft Operations Course, DLR TABLE OF

More information

RFP-00118 ADDENDUM NO. 1

RFP-00118 ADDENDUM NO. 1 INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,

More information

MITSUBISHI ELECTRIC ANNOUNCES THE SUCCESSFUL DEVELOPMENT OF AN AIRBORNE Ku-BAND ANTENNA SUBSYSTEM FOR SATELLITE COMMUNICATIONS

MITSUBISHI ELECTRIC ANNOUNCES THE SUCCESSFUL DEVELOPMENT OF AN AIRBORNE Ku-BAND ANTENNA SUBSYSTEM FOR SATELLITE COMMUNICATIONS FOR IMMEDIATE RELEASE No. 2330 Product Inquiries: Media Contact: Yutaka Kamada Oliver Cox Mitsubishi Electric Corporation Mitsubishi Electric Corporation Tel: +81-3-3218-2391 Tel: +81-3-3218-2346 [email protected]

More information

Es hail-2 Satellite AMSAT Payload

Es hail-2 Satellite AMSAT Payload Es hail-2 Satellite AMSAT Payload Table of Content Es hail-2 Overview AMSAT High Level Requirements Frequency Band Selection AMSAT Technical Solution Es hail-2 Payloads 2x AMSAT transponders covering the

More information

From. Head, Computer Centre. PEC University of Technology Chandigarh. Memo No. PEC/CC/15/225-235 Dated: Chandigarh the: December 09, 2015

From. Head, Computer Centre. PEC University of Technology Chandigarh. Memo No. PEC/CC/15/225-235 Dated: Chandigarh the: December 09, 2015 P a g e 1 From Head, Computer Centre PEC University of Technology Chandigarh To Memo No. PEC/CC/15/225-235 Dated: Chandigarh the: December 09, 2015 Subject: Quotations for providing 32 MBPS (1:1) Internet

More information

Tender No: NEDA/Comp/ RMS/2015-16 Dated: 03/11/2015

Tender No: NEDA/Comp/ RMS/2015-16 Dated: 03/11/2015 Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) (Deptt. of Additional Sources of Energy, Govt. of U.P.) Vibhuti Khand, Gomti Nagar, Lucknow, U. P. Tender No: NEDA/Comp/ RMS/25-16 Dated:

More information

How To Build A Data Backup System In Town Of Trumbull

How To Build A Data Backup System In Town Of Trumbull TOWN OF TRUMBULL, CONNECTICUT GENERAL INSTRUCTIONS TO BIDDERS The Town of Trumbull, Connecticut (hereinafter referred to as Town), through the Office of the Purchasing Agent, will accept sealed bids from

More information

THE EUTELSAT QUANTUM CLASS SATELLITE

THE EUTELSAT QUANTUM CLASS SATELLITE THE EUTELSAT QUANTUM CLASS SATELLITE SATCOM Security Industry/Agencies Workshop 25 June 2015 Hector Fenech Director of Future satellite Systems European Commission WHAT EUTELSAT QUANTUM BRINGS To clients

More information

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank

Request For Proposal (RFP) for Empanelment of IT Consultants for Bank RFP Reference No : OBC/HO/DIT/RFP-CONS/03 / 2010-11 Request For Proposal (RFP) for Empanelment of IT Consultants for Bank Oriental Bank of Commerce Department of Information Technology Head Office New

More information

Prof.& Head, Department of Computer Science & Engineering PEC University of Technology Chandigarh

Prof.& Head, Department of Computer Science & Engineering PEC University of Technology Chandigarh From Prof.& Head, Department of Computer Science & Engineering PEC University of Technology Chandigarh To Memo No. PEC/CSE/ Dated: Chandigarh the: Subject: Quotations for providing Internet leased line

More information

SECTION C EMPLOYER S REQUIREMENTS/SPECIFICATION

SECTION C EMPLOYER S REQUIREMENTS/SPECIFICATION EMPLOYER S REQUIREMENTS/SPECIFICATION Table of Contents C/ 1 Introduction and Overview... 2 1.1 Statement of Confidentiality... 2 1.2 Mission and Overview... 2 1.3 Purpose of the RFP... 3 1.4 Tenderer

More information

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts) STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT (Works, Heavy Equipment, Supply and Installation Contracts) Table of Contents Page INTRODUCTION 3 SECTION I - Invitation for prequalification... 4 SECTION

More information

SATELLITE ACCESS PROCEDURES

SATELLITE ACCESS PROCEDURES SATELLITE ACCESS PROCEDURES Date: 13 May 2014 (v1.0) REVISION HISTORY DOCUMENT TITLE SES Satellite Access Procedures CURRENT REVISION 1 REVISIONS Nº DESCRIPTION Date 1 Initial release 13.05.2014 PROPRIETARY

More information

ANNEXURE - I MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1

ANNEXURE - I MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1 MPD/EPC/TIC/201-15 NR logo web application development dated: 20.03.2014 Page 1 PREFACE The Rubber Board a statutory Body under the Ministry of Commerce & Industry, Govt. of India, for the development

More information

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM PROPOSALS REQUESTED BY THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM The Town of Old Orchard Beach will receive sealed bids for an IP based phone system. The project

More information

How To Improve The Humano-Uganda Satellite Network

How To Improve The Humano-Uganda Satellite Network Regarding manner of submission: an original and 5 copies of the proposal are requested. Is this just for the technical component or for the pricing component as well? A) Both Who are the persons we have

More information

NATIONAL REMOTE SENSNG CENTRE (ISRO, Department of Space, Govt. of India) nrsc

NATIONAL REMOTE SENSNG CENTRE (ISRO, Department of Space, Govt. of India) nrsc nrsc NATIONAL REMOTE SENSNG CENTRE (ISRO, Department of Space, Govt. of India) Balanagar, Hyderabad 500 037 Expression of Interest (EOI) for Engaging reputed geospatial industry on preparation of Large

More information

State of the Satellite Industry Report June 2013

State of the Satellite Industry Report June 2013 State of the Satellite Industry Report June 2013 Sponsored by the Prepared by The Satellite Industry Association: 18 Years as the Voice of the U.S. Satellite Industry SIA MEMBER COMPANIES 2 Study Overview

More information

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing Expression of Interest (EOI) Empanelment of Vendors for Load Testing IDBI Bank proposes to invite response to EOI for the empanelment of vendors for Load Testing of Bank s various applications. The last

More information

TENDER NOTICE FOR SOCIAL MEDIA MONITORING SERVICES (TWITTER) FOR THE EXTERNAL PUBLICITY AND PUBLIC DIPLOMACY DIVISION, MINISTRY OF EXTERNAL AFFAIRS

TENDER NOTICE FOR SOCIAL MEDIA MONITORING SERVICES (TWITTER) FOR THE EXTERNAL PUBLICITY AND PUBLIC DIPLOMACY DIVISION, MINISTRY OF EXTERNAL AFFAIRS TENDER NOTICE FOR SOCIAL MEDIA MONITORING SERVICES (TWITTER) FOR THE EXTERNAL PUBLICITY AND PUBLIC DIPLOMACY DIVISION, MINISTRY OF EXTERNAL AFFAIRS THROUGH ADVERTISED TENDER TENDER NOTICE External Publicity

More information

भ रत य गक स थ न र पड़

भ रत य गक स थ न र पड़ भ रत य गक स थ न र पड़ INDIAN INSTITUTE OF TECHNOLOGY ROPAR न गल र ड, पनगर, प ज ब-140001/Nangal Road, Rupnagar, Punjab-140001 Ph. 01881-242105, e-mail: [email protected] ---------------------------------------------------------------------------------------------------------------------

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

White paper. Reverse e-auctions. A Recipe for Success

White paper. Reverse e-auctions. A Recipe for Success White paper s A Recipe for Success Executive Summary Enterprises and organizations whether small, medium or large have used s with varied degrees of success in the strategic sourcing cycle. While some

More information

Expression of Interest (EOI) For. End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank

Expression of Interest (EOI) For. End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank Expression of Interest (EOI) For End to End Solution For Enterprise Data Warehouse Solution In Punjab National Bank PUNJAB NATIONAL BANK INFORMATION TECHNOLOGY DIVISION HEAD OFFICE, 5 SANSAD MARG, NEW

More information

Criteria for Flight Project Critical Milestone Reviews

Criteria for Flight Project Critical Milestone Reviews Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority

More information

INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS

INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS INVITATION FOR TENDER AND INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS Proposal for SERC Network Accessible Storage Tender No. SERC/2015/05 dt.29.1.2016 Supercomputer Education and Research Centre

More information

Company Name Query Response. Systems Pvt. Ltd. the Bid in spite of neither being an ISO 9001:2008 nor a CMMI L3 certified company with a valid

Company Name Query Response. Systems Pvt. Ltd. the Bid in spite of neither being an ISO 9001:2008 nor a CMMI L3 certified company with a valid Following are the queries received from different companies with regard to the RFP for School Quality Assessment and Accreditation Management Solution : Company Name Query Response Orion India 1. Can Orion

More information

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest. Clarifications/Responses for Notice Inviting Tender From Companies/Agencies for Hiring Four Dedicated Servers (3 - Linux & 1 - Windows) Sr. No. Page No. Clause in Tender Clarification/Suggestion Sought

More information

Expression of Interest (EOI) For. Enterprise Content Management Solution (ECM)

Expression of Interest (EOI) For. Enterprise Content Management Solution (ECM) Expression of Interest (EOI) For Enterprise Content Management Solution (ECM) The last date for submission : August 8, 2014 by 03:00 PM. For details please visit Bank's website at www.idbi.com Page 1 of

More information

Attenuation (amplitude of the wave loses strength thereby the signal power) Refraction Reflection Shadowing Scattering Diffraction

Attenuation (amplitude of the wave loses strength thereby the signal power) Refraction Reflection Shadowing Scattering Diffraction Wireless Physical Layer Q1. Is it possible to transmit a digital signal, e.g., coded as square wave as used inside a computer, using radio transmission without any loss? Why? It is not possible to transmit

More information

TENDER DOCUMENT FOR DIGITIZATION OF PUBLICATIONS OF BIS

TENDER DOCUMENT FOR DIGITIZATION OF PUBLICATIONS OF BIS TENDER DOCUMENT FOR DIGITIZATION OF PUBLICATIONS OF BIS Bureau of Indian Standards (BIS), the National standards body of India, working under the aegis of Ministry of Consumer Affairs and Public Distribution,

More information

CONTENTS. Satellite Fleet. Türksat 2A. Türksat 3A. Türksat 4A. Türksat 4B. Türksat VSAT

CONTENTS. Satellite Fleet. Türksat 2A. Türksat 3A. Türksat 4A. Türksat 4B. Türksat VSAT www.turksat.com TURKSAT A.S. Turksat, one of the leading operators in the satellite communication business, offers flexible solutions by providing its customers with cable and wireless broadcasting, high-speed

More information

Satellite Basics. Benefits of Satellite

Satellite Basics. Benefits of Satellite Satellite Basics Benefits of Satellite People need access to enterprise-class, high-speed voice, video and data applications wherever they happen to be. Satellite connectivity has the power to drive communications

More information

LISA Pathfinder SUMMARY

LISA Pathfinder SUMMARY Page 2 of 36 SUMMARY This document defines the Independent Software Verification and Validation requirements for the Implementation Phase of the LISA Pathfinder project. Page 3 of 36 TABLE OF CONTENTS

More information

PROTECTION OF THE BROADCASTING SERVICE FROM BROADCASTING SATELLITE SERVICE TRANSMISSIONS IN THE BAND 620 790 MHz

PROTECTION OF THE BROADCASTING SERVICE FROM BROADCASTING SATELLITE SERVICE TRANSMISSIONS IN THE BAND 620 790 MHz Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) PROTECTION OF THE BROADCASTING SERVICE FROM BROADCASTING SATELLITE SERVICE

More information

E- NOTICE INVITING QUOTATION FOR HANDLING AND FORWARDING OF MEDICINESAND MEDICALEQUIPMENT FOR HAJ -2016

E- NOTICE INVITING QUOTATION FOR HANDLING AND FORWARDING OF MEDICINESAND MEDICALEQUIPMENT FOR HAJ -2016 ~~ Government of India Ministry of ExternaL Affairs (Haj Division) E- NOTICE INVITING QUOTATION FOR HANDLING AND FORWARDING OF MEDICINESAND MEDICALEQUIPMENT FOR HAJ -2016 Tender No: M/Haj/1183/09/2016

More information

REQUEST FOR PROPOSAL RFP 2009-041

REQUEST FOR PROPOSAL RFP 2009-041 REQUEST FOR PROPOSAL RFP 2009-041 SUBJECT: Purchase of (1) Video Conferencing system & Terms of Reference for services related to video conferences gateway (H.320 H.323) Secretariat of the Convention on

More information

SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010

SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010 SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010 1.0 Scope of Tender These specifications and conditions detail the basic requirements for

More information

3-5 Ka-band High Power Multi-port Amplifier (MPA)

3-5 Ka-band High Power Multi-port Amplifier (MPA) 3-5 Ka-band High Power Multi-port Amplifier (MPA) KURODA Tomonori, SHIMADA Masaaki, OGAWA Yasuo, HOSODA Ikuo, KATAKAMI Kanji, MOTOHASHI Yasuo, NAKAZAWA Minoru, and KITAHARA Masaki Ka-band High Power Multi-port

More information

INVITATION FOR TENDER FOR WEB DESIGN AND DEVELOPMENT

INVITATION FOR TENDER FOR WEB DESIGN AND DEVELOPMENT INVITATION FOR TENDER FOR WEB DESIGN AND DEVELOPMENT Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers / agency or their

More information

Empanelment of Vendors for Load Testing

Empanelment of Vendors for Load Testing Expression of Interest (EOI) Empanelment of Vendors for Load Testing IDBI Bank proposes to invite response to EOI for the empanelment of vendors for Load Testing of Bank s various applications. The last

More information

Oracle Financial Services Applications

Oracle Financial Services Applications Small Industries Development Bank of India REQUEST FOR PROPOSAL FOR RENEWAL OF ANNUAL TECHNICAL SUPPORT (ATS) Oracle Financial Services Applications (ALM & FTP components) Tender No.: 400/2012/815/BYO/ISD

More information

INTRODUCTION TO COMMUNICATION SYSTEMS AND TRANSMISSION MEDIA

INTRODUCTION TO COMMUNICATION SYSTEMS AND TRANSMISSION MEDIA COMM.ENG INTRODUCTION TO COMMUNICATION SYSTEMS AND TRANSMISSION MEDIA 9/6/2014 LECTURES 1 Objectives To give a background on Communication system components and channels (media) A distinction between analogue

More information

Tender Document for Procurement of Internet Bandwidth

Tender Document for Procurement of Internet Bandwidth Tender Document for Procurement of Internet Bandwidth Ramanujan Computing Centre Anna University, Chennai - 600 025. REQUEST FOR PROPOSAL OBJECTIVE OF THIS RFP This RFP (Request for Proposal) is issued

More information

TWO-WAY INTERNET OVER ipstar USING ADVANCED ERROR CORRECTION AND DYNAMIC LINKS

TWO-WAY INTERNET OVER ipstar USING ADVANCED ERROR CORRECTION AND DYNAMIC LINKS AIAA-2002-1944 TWO-WAY INTERNET OVER ipstar USING ADVANCED ERROR CORRECTION AND DYNAMIC LINKS William Thesling*, Mark Vanderaar*, Mark Thompson**, Peter Hamilton**, Paiboon Panuwattanawong*** and Richard

More information

CITY OF MARTINSVILLE REQUEST FOR PROPOSALS UTILITY BILL PRINTING & MAILING SERVICES SEPTEMBER 22, 2015

CITY OF MARTINSVILLE REQUEST FOR PROPOSALS UTILITY BILL PRINTING & MAILING SERVICES SEPTEMBER 22, 2015 CITY OF MARTINSVILLE REQUEST FOR PROPOSALS UTILITY BILL PRINTING & MAILING SERVICES SEPTEMBER 22, 2015 The City of Martinsville is seeking proposals from qualified contractors to provide Bill Printing

More information

Automatic Carrier-in-Carrier Power Control: Increased Link Margin and Availability in Carrier-in-Carrier Links

Automatic Carrier-in-Carrier Power Control: Increased Link Margin and Availability in Carrier-in-Carrier Links 2114 West 7 th Street Tempe, AZ 85281 USA Voice +1.480.333.2200 E-mail [email protected] Web www.comtechefdata.com Automatic Carrier-in-Carrier Power Control: Increased Link Margin and Availability

More information