Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation. July 2015

Size: px
Start display at page:

Download "Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation. July 2015"

Transcription

1 Energy Management System (EMS) 3.0 Implementation Overview for BRP Consultation July 2015

2 Background Energy Management System EMS - Used by System Controllers to monitor, control and optimize the performance of the power system (used in grid operations) - The last EMS upgrade project ran from 2006 to 2009 and included both the EMS application (Alstom suite) and the underpinning infrastructure. Much of the infrastructure was purchased in 2007 and is now over six years old. - To ensure the continued reliability of grid operations, it has now become critical to refresh the EMS system in its entirety 2

3 EMS System - EMS is a system, multi-faceted and distributed across multiple servers inclusive of: o SCADA Data Acquisition (and outbound controls), Calculations, Tagging, Notes, LSSI o Generation Balancing (Automatic Generation Control), Reserves Calculation, Dynamic Scheduling, Wind Power Ramp Management (WPRM) o Network Applications State Estimation, Contingency Analysis, Voltage Stability Analysis, Power System studies o Core Services User Interface, Alarm, Inter-system connectivity, Security 3

4 EMS System - Key Statistics: o AESO power system model contains approximately data points, including information collected from over 1200 substations through 85 different data providers. o Data collected every 2s to 30s (depending on criticality); AESO is adopting high-speed data acquisition (30/s) through phasor measurement technology - Incorporates environments to support modeling, development, testing, and training (including scenario simulation) - EMS facilitates the market to operate in the least constrained manner possible 4

5 Problem Statement - The EMS application and associated infrastructure are end of life. Vendor support ceases Growing risk of security breaches and operational impacts - Current system is not CIP compliant 5

6 EMS Program Approach Current Status: Definition Phase (85% complete) Decision to proceed with Implementation Go-Live June 2017 Validation Definition Implementation Sustainment Technical Assessment Evaluation of environment Opportunity identification Decision to move to Definition Phase Requirements Detailed design Cost Schedule Planning and Management Application Infrastructure Testing Training Deployment Decommission Evergreen Lifecycle management to optimize operational costs 6

7 Options 1. Do Nothing (not viable) No vendor support Increase risks: security, reliability Non-compliance penalties 2. Hardware enhancement and patching of EMS 2.5 (defer upgrade) Compliance may be achieved (short-term), residual security risk and no vendor support More analysis required for patching and virtualization 3. Implement EMS 3.0 (preferred option) Higher initial cost, vendor support Regulatory compliance 7

8 Implementation Phase Objectives - Optimize system reliability, security and performance - Reduce risk to grid management - Maximum period of vendor support coverage - Implement EMS Lifecycle Management Plan to manage operations, enhancements and upgrades - Ensure EMS system is fully CIP compliant 8

9 Proposed Solution - Upgrade current system: Alstom EMS 2.5 to New on New new software version on new infrastructure - Ensure Like for Like functionality with the existing system, but with room for growth - Implement EMS Lifecycle Management Plan 9

10 Implementation Deliverables 10

11 Scope - Application upgrade to EMS Infrastructure replacement: servers, storage, network, security and monitoring - Testing: 10 months duration hours of parallel testing - Training: End users and operational support team - EMS 2.5 decommissioning - Life-cycle Management Plan Target Complete: Q Estimated budget: $31.7M (Excludes capitalized borrowing costs) 11

12 Implementation Budget ($31.7M) $20 $17.2 $15 $10 $5 $8.2 $6.3 $ Total program cost: $39M (Definition Phase: $7.3M) Costs will be allocated between energy market and transmission and will be recovered post program completion. 12

13 EMS Implementation Timelines Pre-FAT: Pre-Factory Acceptance testing FAT: Factory Acceptance testing SAT: Site Acceptance testing 13

14 Program Risks and Mitigations Key Risks Mitigations Schedule and implementation delays possible Detailed, fit-for-purpose program management and governance structure implemented Solution delivery: large and complex project Extensive Definition Phase conducted Vendor ability to deliver Overall schedule and CIP compliance Hybrid staff augmentation Adapted program governance Comprehensive test strategy New on New parallel approach Rigorous vendor management practices Advance the Alstom development work and associated infrastructure required 14

15 External Stakeholders Impact - No stakeholder impact expected - No impact to the market and SCADA/controls 15

16 Proposed Next Steps - Present the business case and the results of the stakeholder consultation to AESO Audit Committee and Board of Directors for approval - Commence the Implementation Phase Oct 1 st

17 Comments/questions?

Agenda Report. April 8, 2013. Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department

Agenda Report. April 8, 2013. Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department Agenda Report April 8, 2013 TO: Honorable Mayor and City Council THROUGH: Finance Committee (April 8, 2013) FROM: SUBJECT: Water and Power Department AUTHORIZATION TO ENTER INTO CONTRACTS WITH DESIGNATED

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission

More information

CA/NV AWWA SCADA Seminar SCADA Master Planning. Presented by: Philip Gaberdiel Cell: 818-843-1855 ext. 8435 phil.gaberdiel@we-inc.

CA/NV AWWA SCADA Seminar SCADA Master Planning. Presented by: Philip Gaberdiel Cell: 818-843-1855 ext. 8435 phil.gaberdiel@we-inc. CA/NV AWWA SCADA Seminar SCADA Master Planning Presented by: Philip Gaberdiel Cell: 818-843-1855 ext. 8435 phil.gaberdiel@we-inc.com Presentation Outline SCADA Master Plan Goals and Objectives SCADA Master

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, 2015 Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission

More information

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions. Electric Grid Operations San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions Electric Grid Operations Director Electric Grid Operations: Responsible for overall transmission system operations

More information

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist SCADA The Heart of an Energy Management System Presented by: Doug Van Slyke SCADA Specialist What is SCADA/EMS? SCADA: Supervisory Control and Data Acquisition Retrieves data and alarms from remote sites

More information

Peter Overgaauw. Solution Consultant. Did you know?

Peter Overgaauw. Solution Consultant. Did you know? Peter Overgaauw Solution Consultant Virtualisatie in de procesindustrie. 3 November 2013 Did you know? For every dollar spent on a physical machine, approximately 6-8 dollars is spent maintaining it. This

More information

How to Integrate NERC s Requirements in an Ongoing Automation and Integration Project Framework

How to Integrate NERC s Requirements in an Ongoing Automation and Integration Project Framework How to Integrate NERC s Requirements in an Ongoing Automation and Integration Project Framework Jacques Benoit, Cooper Power Systems Inc., Energy Automations Solutions - Cybectec Robert O Reilly, Cooper

More information

License management service

License management service License management service Service definition License Management Service is a service provided by HP Software Licensing & Management Solutions, which allows enterprise customers to effectively monitor

More information

Cyber Security focus in ABB: a Key issue. 03 Luglio 2014, Roma 1 Conferenza Nazionale Cyber Security Marco Biancardi, ABB SpA, Power System Division

Cyber Security focus in ABB: a Key issue. 03 Luglio 2014, Roma 1 Conferenza Nazionale Cyber Security Marco Biancardi, ABB SpA, Power System Division Cyber Security focus in ABB: a Key issue 03 Luglio 2014, Roma 1 Conferenza Nazionale Cyber Security Marco Biancardi, ABB SpA, Power System Division Cyber Security in ABB Agenda ABB introduction ABB Cyber

More information

Validating Enterprise Systems: A Practical Guide

Validating Enterprise Systems: A Practical Guide Table of Contents Validating Enterprise Systems: A Practical Guide Foreword 1 Introduction The Need for Guidance on Compliant Enterprise Systems What is an Enterprise System The Need to Validate Enterprise

More information

InForm On Demand Single Trial Services Description

InForm On Demand Single Trial Services Description InForm On Demand Single Trial Services Description Version 7.0 Effective Date: 0 25-Sep-2014 This is the Services Description for Oracle InForm On Demand Single Trial ( Schedule ) to Your Study Order for

More information

RISK MANAGEMENT AND COMPLIANCE

RISK MANAGEMENT AND COMPLIANCE RISK MANAGEMENT AND COMPLIANCE Contents 1. Risk management system... 2 1.1 Legislation... 2 1.2 Guidance... 3 1.3 Risk management policy... 4 1.4 Risk management process... 4 1.5 Risk register... 8 1.6

More information

CONTROL SYSTEM VENDOR CYBER SECURITY TRENDS INTERIM REPORT

CONTROL SYSTEM VENDOR CYBER SECURITY TRENDS INTERIM REPORT Energy Research and Development Division FINAL PROJECT REPORT CONTROL SYSTEM VENDOR CYBER SECURITY TRENDS INTERIM REPORT Prepared for: Prepared by: California Energy Commission KEMA, Inc. MAY 2014 CEC

More information

Trusting the Data: Analytics and Visualization. Copyr i ght 2014 O SIs oft, LLC.

Trusting the Data: Analytics and Visualization. Copyr i ght 2014 O SIs oft, LLC. Trusting the Data: Analytics and Visualization Presented by John Juna About us Electric Delivery Company Providing service to approximately 3.8 million customers across Northern Illinois Manages 90,000

More information

1. No objection - although Edmonton meetings are always appreciated.

1. No objection - although Edmonton meetings are always appreciated. Stakeholder Comment and AESO Replies Matrix AESO Consultation 2013 Budget Review Process: Meeting September 14, 2012 - AESO s Draft Business Initiatives for 2013 The AESO is asking market participants

More information

Energy Management Systems (EMS)

Energy Management Systems (EMS) Energy Management Systems (EMS) Introduction Abstract This talk deals with the role of an Energy Management System (EMS) in the overall Smart Grid. Why an EMS is needed will be discussed and its importance

More information

Systems Operation Department

Systems Operation Department August 8, 2012 TRANSMISSION FUNCTION EMPLOYEES: Systems Operation Department General Manager Directs the activities of the of the System Operation Department including formulation of personnel issues,

More information

Outage Management System Implementation. Status Report

Outage Management System Implementation. Status Report OVERVIEW Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) is submitting this status report to the Massachusetts Department of Public Utilities ( DPU ) on its progress regarding

More information

2015 PROJECT ROADMAP. Bill Pettitt. April 16, 2015. Manager, Business Solutions, IESO

2015 PROJECT ROADMAP. Bill Pettitt. April 16, 2015. Manager, Business Solutions, IESO 2015 PROJECT ROADMAP Bill Pettitt Manager, Business Solutions, IESO April 16, 2015 Roadmap 2 Meter Data Management Replacement Replace the current Wholesale Meter Data Management application Participants

More information

i-pcgrid Workshop 2015 Cyber Security for Substation Automation The Jagged Line between Utility and Vendors

i-pcgrid Workshop 2015 Cyber Security for Substation Automation The Jagged Line between Utility and Vendors March 25-27, 2014 Steven A. Kunsman i-pcgrid Workshop 2015 Cyber Security for Substation Automation The Jagged Line between Utility and Vendors ABB Inc. March 26, 2015 Slide 1 Cyber Security for Substation

More information

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior Memo To: AESO Board From: Vice-President, Finance Date: October 29, 2015 Subject: AESO 2016 Busines Plan Enclosed is the AESO 2016 Business Plan (Business Plan). This document was prepared by AESO Management

More information

SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT

SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT Applications Development Project Sample WBS Management and support Provide project management Provide quality control Conduct meetings and reviews Materials and supplies Travel and living costs Miscellaneous

More information

BELL LABS ADVISORY SERVICE FOR SMART GRID NETWORK TRANSFORMATION STRATEGIC PLANNING FOR THE MODERNIZATION OF UTILITY COMMUNICATIONS NETWORKS

BELL LABS ADVISORY SERVICE FOR SMART GRID NETWORK TRANSFORMATION STRATEGIC PLANNING FOR THE MODERNIZATION OF UTILITY COMMUNICATIONS NETWORKS BELL LABS ADVISORY SERVICE FOR SMART GRID NETWORK TRANSFORMATION STRATEGIC PLANNING FOR THE MODERNIZATION OF UTILITY COMMUNICATIONS NETWORKS APPLICATION NOTE SUMMARY Bell Labs Advisory Service for Smart

More information

Cyber Security of the Smart Grid

Cyber Security of the Smart Grid Cyber Security of the Smart Grid Design Document May 12-21 11/4/11 Group Members John Majzner Daniel Kosac Kyle Slinger Jeremy Deberg Team Advisor Manimaran Govindarasu Graduate Students Adam Hahnad Siddharth

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

Managed Services Overview

Managed Services Overview Managed Services Overview Today s IT environments are extremely complex and challenging, especially for heterogeneous environments that require a myriad of skills to manage the IT lifecycle. From procurement

More information

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network

More information

Software as a Service: Guiding Principles

Software as a Service: Guiding Principles Software as a Service: Guiding Principles As the Office of Information Technology (OIT) works in partnership with colleges and business units across the University, its common goals are to: substantially

More information

Evolution of Control for the Smart Transmission Grid

Evolution of Control for the Smart Transmission Grid Evolution of Control for the Smart Transmission Grid Anjan Bose Washington State University Pullman, WA SCE Smart Grid Research Symposium California Institute Of Technology October, 2011 The Past (before

More information

Key Initiatives September 29, 2015 RC Users Group

Key Initiatives September 29, 2015 RC Users Group Key Initiatives September 29, 2015 RC Users Group Data Sharing Michelle Mizumori Data Sharing Developing revised Universal Data Sharing Agreement (UDSA) Major Changes from previous UDSA: o Addition of

More information

Clinical Risk Management: Agile Development Implementation Guidance

Clinical Risk Management: Agile Development Implementation Guidance Document filename: Directorate / Programme Document Reference NPFIT-FNT-TO-TOCLNSA-1306.02 CRM Agile Development Implementation Guidance v1.0 Solution Design Standards and Assurance Project Clinical Risk

More information

future data and infrastructure

future data and infrastructure White Paper Smart Grid Security: Preparing for the Standards-Based Future without Neglecting the Needs of Today Are you prepared for future data and infrastructure security challenges? Steve Chasko Principal

More information

IT SERVICE PROVIDER ASSESSMENT

IT SERVICE PROVIDER ASSESSMENT IT SERVICE PROVIDER ASSESSMENT PURPOSE The purpose of this document is to provide guidance to assess and evaluate risks related to the engagement of an IT service provider. Refer to the IT Service Provider

More information

Security Touchpoints When Acquiring Software. Dr Carsten Huth Nadim Barsoum Dawid Sroka

Security Touchpoints When Acquiring Software. Dr Carsten Huth Nadim Barsoum Dawid Sroka Security Touchpoints When Acquiring Software Dr Carsten Huth Nadim Barsoum Dawid Sroka 2 Topics Context Problem Definition SDLC and Security Touchpoints Acquisition Process Conclusions 3 Acknowledgement

More information

Statement of Work For Sunt Community Physicians

Statement of Work For Sunt Community Physicians Statement of Work For Sunt Community Physicians Between: and: Sunt Community Physicians Wildcat Software Solutions, LLC Prepared by: Kazi Russell Effective Date: March 18, 2015 Under Contract #: SCP-Lab1-2015

More information

Risk Management, Equipment Protection, Monitoring and Incidence Response, Policy/Planning, and Access/Audit

Risk Management, Equipment Protection, Monitoring and Incidence Response, Policy/Planning, and Access/Audit Page 1 of 10 Events Partners Careers Contact Facebook Twitter LinkedIn Pike Research Search search... Home About Research Consulting Blog Newsroom Media My Pike Logout Overview Smart Energy Clean Transportation

More information

IT Environments Management

IT Environments Management IT Environments Management IT Environments Management is probably one of the most misunderstood concepts in terms of the part it plays within the IT Organisation as a whole, especially its contribution

More information

Implementation Plan for Version 5 CIP Cyber Security Standards

Implementation Plan for Version 5 CIP Cyber Security Standards Implementation Plan for Version 5 CIP Cyber Security Standards April 10September 11, 2012 Prerequisite Approvals All Version 5 CIP Cyber Security Standards and the proposed additions, modifications, and

More information

Substation Automation Systems. We are exceptional grid stability PSGuard Wide Area Monitoring System

Substation Automation Systems. We are exceptional grid stability PSGuard Wide Area Monitoring System Substation Automation Systems We are exceptional grid stability PSGuard Wide Area Monitoring System We are exceptional grid stability PSGuard Wide Area Monitoring System 2 We are exceptional grid stability

More information

Clarity Infrastructure Management helps network operators to plan and document the change to their networks

Clarity Infrastructure Management helps network operators to plan and document the change to their networks Clarity Infrastructure Management helps network operators to plan and document the change to their networks clarity.com 2 Clarity Simplifying Operations Cost effective and timely network rollouts or upgrades

More information

Cyber Security and Privacy - Program 183

Cyber Security and Privacy - Program 183 Program Program Overview Cyber/physical security and data privacy have become critical priorities for electric utilities. The evolving electric sector is increasingly dependent on information technology

More information

Panel Session: Lessons Learned in Smart Grid Cybersecurity

Panel Session: Lessons Learned in Smart Grid Cybersecurity PNNL-SA-91587 Panel Session: Lessons Learned in Smart Grid Cybersecurity TCIPG Industry Workshop Jeff Dagle, PE Chief Electrical Engineer Advanced Power and Energy Systems Pacific Northwest National Laboratory

More information

Take an Enterprise Approach to E-Discovery. Streamline Discovery and Control Review Cost Using a Central, Secure E-Discovery Cloud Platform

Take an Enterprise Approach to E-Discovery. Streamline Discovery and Control Review Cost Using a Central, Secure E-Discovery Cloud Platform Take an Enterprise Approach to E-Discovery Streamline Discovery and Control Review Cost Using a Central, Secure E-Discovery Cloud Platform A Smarter Approach Catalyst s e-discovery cloud platform provides

More information

ISACA North Dallas Chapter

ISACA North Dallas Chapter ISACA rth Dallas Chapter Business Continuity Planning Observations of Critical Infrastructure Environments Ron Blume, P.E. Ron.blume@dyonyx.com 214-280-8925 Focus of Discussion Business Impact Analysis

More information

Hybrid processing of SCADA and synchronized phasor measurements for tracking network state

Hybrid processing of SCADA and synchronized phasor measurements for tracking network state IEEE PES General Meeting, Denver, USA, July 2015 1 Hybrid processing of SCADA and synchronized phasor measurements for tracking network state Boris Alcaide-Moreno Claudio Fuerte-Esquivel Universidad Michoacana

More information

eguide: Designing a Continuous Response Architecture 5 Steps For Windows Server 2003 End of Life Success

eguide: Designing a Continuous Response Architecture 5 Steps For Windows Server 2003 End of Life Success : Designing a Continuous Response Architecture 5 Steps For Windows Server 2003 End of Life Success FAST FACTS Over 10 Million Windows Server 2003 Devices Still In Use Less Than 250 Days To Windows Server

More information

CONTENTS. List of Tables List of Figures

CONTENTS. List of Tables List of Figures Prelims 13/3/06 9:11 pm Page iii CONTENTS List of Tables List of Figures ix xi 1 Introduction 1 1.1 The Need for Guidance on ERP System Validation 1 1.2 The Need to Validate ERP Systems 3 1.3 The ERP Implementation

More information

COMMON CORPORATE COSTS CAPITAL - INFORMATION TECHNOLOGY

COMMON CORPORATE COSTS CAPITAL - INFORMATION TECHNOLOGY Updated: 0-0-0 EB-0-0 Tab Page of COMMON CORPORATE COSTS CAPITAL - INFORMATION TECHNOLOGY.0 OVERVIEW 0 Information Technology ( IT ) refers to computer systems (hardware, software and applications) that

More information

Cyber Security Presentation. Ontario Energy Board Smart Grid Advisory Committee. Doug Westlund CEO, N-Dimension Solutions Inc.

Cyber Security Presentation. Ontario Energy Board Smart Grid Advisory Committee. Doug Westlund CEO, N-Dimension Solutions Inc. Cyber Security Presentation Ontario Energy Board Smart Grid Advisory Committee Doug Westlund CEO, N-Dimension Solutions Inc. October 1, 2013 Cyber Security Protection for Critical Infrastructure Assets

More information

State of Oregon. State of Oregon 1

State of Oregon. State of Oregon 1 State of Oregon State of Oregon 1 Table of Contents 1. Introduction...1 2. Information Asset Management...2 3. Communication Operations...7 3.3 Workstation Management... 7 3.9 Log management... 11 4. Information

More information

A Big Data Platform to Support a Modernized Electric Grid

A Big Data Platform to Support a Modernized Electric Grid A Big Data Platform to Support a Modernized Electric Grid Renewable Database: Integrating, sharing, and analyzing timeseries data Matt Shawver 1 Modernized Grid Modernized Grid: New Information Systems

More information

Summary of CIP Version 5 Standards

Summary of CIP Version 5 Standards Summary of CIP Version 5 Standards In Version 5 of the Critical Infrastructure Protection ( CIP ) Reliability Standards ( CIP Version 5 Standards ), the existing versions of CIP-002 through CIP-009 have

More information

Template K Implementation Requirements Instructions for RFP Response RFP #

Template K Implementation Requirements Instructions for RFP Response RFP # Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship

More information

AESO 2014 Business Plan and Budget Proposal

AESO 2014 Business Plan and Budget Proposal AESO 2014 Business Plan and Budget Proposal November 1, 2013 Table of Contents Section 1 Section 2 Section 3 Board Decision Items Executive Summary Stakeholder Presentations to the AESO Board Stakeholder

More information

Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid

Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid Executive summary Most utilities struggle to organize information about their distribution network assets. Operations,

More information

Information Technology Strategic Plan 2013 9/23/2013

Information Technology Strategic Plan 2013 9/23/2013 Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of

More information

Cloud Computing Thunder and Lightning on Your Horizon?

Cloud Computing Thunder and Lightning on Your Horizon? Cloud Computing Thunder and Lightning on Your Horizon? Overview As organizations automate more and more of their manual processes, the Internet is increasingly becoming an important tool in the delivery

More information

Halton Regional Police Service Public Agenda Recommendation Report

Halton Regional Police Service Public Agenda Recommendation Report Halton Regional Police Service Public Agenda Recommendation Report To: Chairman and Police Service Board Members From: Chief Stephen J. Tanner Subject: SINGLE SOURCE BUCHANAN TECHNOLOGIES Report #: P15-5-CPS-R-01

More information

Quick guide: Implementing an IT solution

Quick guide: Implementing an IT solution Quick guide: Implementing an IT solution This Quick Guide is part of a series of information products aimed to assist small to medium sized businesses purchasing an Information Technology (IT) solution.

More information

Asset management guidelines

Asset management guidelines Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential

More information

The date the initiative has been given approval to proceed. This excludes any initiatives in start-up or concept stage.

The date the initiative has been given approval to proceed. This excludes any initiatives in start-up or concept stage. Data glossary This glossary provides definitions of the terms related to data collection for this site. It has been provided so that interested parties can quickly and easily check the terms as they encounter

More information

Dr. Raheem Beyah Georgia Tech. Cyber-Physical Modeling & Simulation for Situational Awareness (CYMSA)

Dr. Raheem Beyah Georgia Tech. Cyber-Physical Modeling & Simulation for Situational Awareness (CYMSA) Seth Walters Dr. Sakis Meliopoulos Dr. Santiago Grijalva Dr. Raheem Beyah Georgia Tech Cyber-Physical Modeling & Simulation for Situational Awareness (CYMSA) Cybersecurity for Energy Delivery Systems Peer

More information

Opportunities to Overcome Key Challenges

Opportunities to Overcome Key Challenges The Electricity Transmission System Opportunities to Overcome Key Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia

More information

Institute for Business Continuity Training 1623 Military Road, # 377 Niagara Falls, NY 14304-1745

Institute for Business Continuity Training 1623 Military Road, # 377 Niagara Falls, NY 14304-1745 ECP - 601: Effective Business Continuity Management: ISO 22301 This 3-day course provides an intensive, hands-on workshop covering all major aspects for the design of an effective Business Continuity Plan

More information

Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four

Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four Data Handling in University Business Impact Analysis ( BIA ) Agenda Overview Terminologies Performing

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

November 2009 QBR Follow Ups

November 2009 QBR Follow Ups November 2009 QBR Follow Ups Page 1 Power Financial Highlights How much (in total) did CGS outages cost BPA in FY 2009? An analysis was performed assuming that CGS would return to full power on June 13th

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

Can You Really Support Business Continuity Requirements?

Can You Really Support Business Continuity Requirements? Can You Really Support Business Continuity Requirements? Intelligent N+X Redundancy, Placement Affinities, & Future Proofing in the Virtualized Data Center BACKGROUND One of the significant gains provided

More information

WANT TO SLASH DOWNTIME? FOCUS ON YOUR SERVER OPERATING SYSTEM

WANT TO SLASH DOWNTIME? FOCUS ON YOUR SERVER OPERATING SYSTEM WANT TO SLASH DOWNTIME? FOCUS ON YOUR SERVER OPERATING SYSTEM Ask any IT executive their biggest day-to-day fear, and they ll likely tell you something about reducing or even eliminating downtime. Not

More information

Datacenter Migration Think, Plan, Execute

Datacenter Migration Think, Plan, Execute Datacenter Migration Think, Plan, Execute Datacenter migration is often regarded as a purely technical, almost trivial side-project, to be delivered by existing IT staff alongside their day jobs. With

More information

Tyson Jarrett CIP Enforcement Analyst. Best Practices for Security Patch Management October 24, 2013 Anaheim, CA

Tyson Jarrett CIP Enforcement Analyst. Best Practices for Security Patch Management October 24, 2013 Anaheim, CA Tyson Jarrett CIP Enforcement Analyst Best Practices for Security Patch Management October 24, 2013 Anaheim, CA A little about me Graduated from the University of Utah with a Masters in Information Systems

More information

OCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Security CLASS FAMILY DESCRIPTION:

OCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Security CLASS FAMILY DESCRIPTION: OCCUPATIONAL GROUP: Information Technology CLASS FAMILY: Security CLASS FAMILY DESCRIPTION: This family of positions provides security and monitoring for the transmission of information in voice, data,

More information

Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0

Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0 Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0 Contents MITEL PROFESSIONAL SERVICES DELIVERY METHODOLOGY... 2 CUSTOMER NEEDS... 2 ENGAGING

More information

NERC CIP Tools and Techniques

NERC CIP Tools and Techniques NERC CIP Tools and Techniques Supplemental Project - Introduction Webcast Scott Sternfeld, Project Manager Smart Grid Substation & Cyber Security Research Labs ssternfeld@epri.com (843) 619-0050 October

More information

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery ABB North America Substation Automation Systems Innovative solutions for reliable and optimized power delivery Substation Automation Systems Advanced substation automation, protection and control solutions

More information

Technology Risk Management

Technology Risk Management 1 Monetary Authority of Singapore Technology Risk Guidelines & Notices New Requirements for Financial Services Industry Mark Ames Director, Seminar Program ISACA Singapore 2 MAS Supervisory Framework Impact

More information

INFORMATION TECHNOLOGY PROGRAM DESCRIPTIONS OPERATIONAL INVESTMENTS

INFORMATION TECHNOLOGY PROGRAM DESCRIPTIONS OPERATIONAL INVESTMENTS EB-0-0 Exhibit D Schedule - Page of INFORMATION TECHNOLOGY PROGRAM DESCRIPTIONS OPERATIONAL INVESTMENTS SCADA SECURITY, GOVERNANCE AND OPERATIONS Program Overview Within THESL s operations, there is a

More information

SaaS Adoption Lifecycle in Life-Sciences Companies

SaaS Adoption Lifecycle in Life-Sciences Companies www.arisglobal.com A White Paper Presented By ArisGlobal SaaS Adoption Lifecycle in Life-Sciences Companies by Achal Verma, Associate Director - Program Delivery, Cloud Services Abstract With increasing

More information

Identity & Access Management Case Study & Lessons Learned. Prepared by Tariq Jan

Identity & Access Management Case Study & Lessons Learned. Prepared by Tariq Jan Identity & Access Management Case Study & Lessons Learned Prepared by Tariq Jan Investment Bank Case Study Top 5 leading global financial services firm $116 billion in revenue $2 trillion in assets 220k

More information

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Despite Steps Taken to Increase Electronic Returns, Unresolved Modernized e-file System Risks Will Delay the Retirement of the Legacy e-file System and

More information

INTRODUCTION. Page 1 of 16

INTRODUCTION. Page 1 of 16 INTRODUCTION CALIFORNIA STATE TEACHERS RETIREMENT SYSTEM REQUEST FOR QUOTE JAMA LICENSING AND SERVICES RFQ NUMBER 201204 Offer Due Date: July 23, 2013, 2:00 p.m. Pacific Time (PT) The California State

More information

The Firewall Audit Checklist Six Best Practices for Simplifying Firewall Compliance and Risk Mitigation

The Firewall Audit Checklist Six Best Practices for Simplifying Firewall Compliance and Risk Mitigation The Firewall Audit Checklist Six Best Practices for Simplifying Firewall Compliance and Risk Mitigation Copyright, AlgoSec Inc. All rights reserved The Need to Ensure Continuous Compliance Regulations

More information

Publication 805-A Revision: Certification and Accreditation

Publication 805-A Revision: Certification and Accreditation Postal Bulletin 22358 (3-7-13) Policies, Procedures, and Forms Updates Publication 805-A Revision: Certification and Accreditation Effective immediately, the January 2013 edition of Publication 805-A,

More information

Effective Use of Assessments for Cyber Security Risk Mitigation

Effective Use of Assessments for Cyber Security Risk Mitigation White Paper Effective Use of Assessments for Cyber Security Risk Mitigation Executive Summary Managing risk related to cyber security vulnerabilities is a requirement for today s modern systems that use

More information

Begin with the end in mind

Begin with the end in mind Begin with the end in mind Is your business vision driving your software purchases? Or is it the other way around? Organisations can be paying 25-35% too much for software, support and maintenance costs.

More information

The City of Information Technology Improvement Program (CIP), 2014

The City of Information Technology Improvement Program (CIP), 2014 Information Technology Overview The (DoIT) builds, manages, and maintains City government information technology infrastructure including radio, data, communications, and computer networks. DoIT also manages

More information

SUMMARY OF CAPITAL EXPENDITURES

SUMMARY OF CAPITAL EXPENDITURES Filed: May, EB--00 Page of SUMMARY OF CAPITAL EXPENDITURES.0 SUMMARY OF CAPITAL BUDGET The proposed capital expenditures result from a rigorous business planning and work prioritization process that reflects

More information

APS Solar Partner Program

APS Solar Partner Program APS Solar Partner Program Sanket Adhikari, APS Integrating PV in Distribution Grids: Solutions and Technologies Workshop NREL, Golden, CO October 22 & 23, 2015 Agenda Overview SPP Use Cases, Feeders Inverters

More information

Automating NERC CIP Compliance for EMS. Walter Sikora 2010 EMS Users Conference

Automating NERC CIP Compliance for EMS. Walter Sikora 2010 EMS Users Conference Automating NERC CIP Compliance for EMS Walter Sikora 2010 EMS Users Conference What do we fear? Thieves / Extortionists Enemies/Terrorists Stuxnet Malware Hacker 2025 Accidents / Mistakes 9/21/2010 # 2

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

Pennsylvania Summer Reliability

Pennsylvania Summer Reliability A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured

More information

AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES

AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES Final Report Prepared by Dr Janet Tweedie & Dr Julie West June 2010 Produced for AGIMO by

More information

Strategic Compliance & Securing the Cloud. Annalea Sharack-Ilg, CISSP, AMBCI Technical Director of Information Security

Strategic Compliance & Securing the Cloud. Annalea Sharack-Ilg, CISSP, AMBCI Technical Director of Information Security Strategic Compliance & Securing the Cloud Annalea Sharack-Ilg, CISSP, AMBCI Technical Director of Information Security Complexity and Challenges 2 Complexity and Challenges Compliance Regulatory entities

More information

Dundalk Institute of Technology Change Control Procedure

Dundalk Institute of Technology Change Control Procedure Dundalk Institute of Technology Change Control Procedure 1 Revision History Date of this revision: 07 Dec 2015 Date of next revision: 07 Dec-2016 Revision Number v1.0.1 Revision Summary of Changes Date

More information

Software Asset Management High Risk, High Reward

Software Asset Management High Risk, High Reward Software Asset Management High Risk, High Reward January 2014 Andy Deas adeas@deloitte.com Travis Markowitz tmarkowitz@deloitte.com Eli Black eliblack@deloitte.com Contents What is Software Asset Management

More information

Vendor Management for Critical Access Hospitals

Vendor Management for Critical Access Hospitals Vendor Management for Critical Access Hospitals Provided By: The National Learning Consortium (NLC) Developed By: Health Information Technology Research Center (HITRC) Carolyn P. Hartley, MLA, CHP National

More information

Washtenaw County Geographic Information System Strategic Plan

Washtenaw County Geographic Information System Strategic Plan Washtenaw County Geographic Information System Strategic Plan April 1999 1 Table of Contents Vision, Goals, and Strategies. 3 GIS Timeline 1999-2002. 8 GIS Timeline 1999-2010. 9 Washtenaw County GIS Program

More information

10-Step ICD-10 Planning Guide for Chiropractors

10-Step ICD-10 Planning Guide for Chiropractors 10-Step ICD-10 Planning Guide for Chiropractors ICD-10 Education is necessary till Oct 1st. -Pick a Team Leader Consider: Articles, Should test ICD-10 readiness: -Explain ICD-10 Goals Websites, Webinars,

More information