1 Exploration Systems Development NASA Advisory Council Meeting November 4,
2 Agenda ESD Overview Program Status 2
3 ESD Overview 3
4
5 SLS, Orion, and Ground Systems Beginning human exploration beyond LEO as soon as practicable helps secure our future in space. Space Launch System Orion Crewed Spacecraft Ground Systems Development & Operations
6 6
7 Orion Program Status 7
8 Orion Accomplishments A manufacturing development unit of Orion s heat shieldis beingbuilt at LockheedMartin s facilityin Denver Orion s most challenging parachute drop test to date a success in August in Yuma, Arizona First weld of Orion Exploration Mission-1- crew module pressure vessel Michoud Assembly Facility Pieces for the Orion spacecraft that will fly on EM-1 being prepared for welding at MAF The Orion Crew Module Adapter simulator arrives at Plum Brook Station Space Power Facility in Sandusky, Ohio
9 Launch Abort System Prime Contractor: Lockheed Martin Manufacturer Location: Denver, Colorado Status Abort Motor test article case complete Jettison Motor test article case assembly in process Attitude Control Motor re-designed controller Engineering Development Unit initial design complete Upcoming Milestones Attitude Control Motor hot fire test (HT-11) April 2016 Abort motor test article case July
10 Crew Module Prime Contractor: Lockheed Martin Manufacturer Location: Michoud Assembly Facility, Louisiana Operations & Checkout Facility, Kennedy Space Center, Florida Status First weld on EM-1 crew module September 2015 EM-1 crew module barrel final milling complete and all pressure vessel components at Michoud October 2015 Upcoming Milestones Closeout weld December 2015 On-dock at KSC January
11 Orion Avionics and Software Integrated Test Lab Prime Contractor: Lockheed Martin Manufacturer Location: Denver, Colorado Status NASA/Lockheed Martin Integrated Test Lab official opening at Lockheed Martin, Denver July 2015 Integrated Test Lab initial power on September 2015 Upcoming Milestones ESA avionics and electrical ground support equipment delivery April 2016 Command Module subsystem integration completion November 2016 Orion Integrated Test Lab (ITL) July
12 Service Module European Service Module (ESM) and Crew Module Adapter (CMA) ESM: International Partner: European Space Agency (ESA) ESA s Prime Contractor: Airbus Manufacturer Location: Bremen, Germany CMA: NASA Prime Contractor: Lockheed Martin Status ESM Structural Test Article being assembled and tested at Thales Alenia Space Italia (TASI). Upcoming Milestones ESM Structural Test Article testing in October 2015 at TASI. ESM structural test hardware ships to Plum Brook, Ohio November 2015 CMA ESM European Service Module (ESM) Structural Test Article during shock tap test at TASI. July
13 Fairings Prime Contractor: Lockheed Martin Manufacturer Location: Sunnyvale, California Status Early EM development test conducted using EFT-1 test fairings with no issues. Upcoming Milestones Critical Design Review December 2015 Assembly and build on track for on-time delivery early EM qualification test at Plum Brook in Sandusky, Ohio April 2017 First EM-1 Fairing Separation Test. June
14 SLS Program Status 14
15 Space Launch System Accomplishments Launch Vehicle Stage Adapter Test Article fabrication Booster Test Article in progress for second qualification firing RS-25 engine test conducted at Stennis Space Center Steel towers rising for new SLS test stand at Marshall Space Flight Ctr. SLS Core Stage hydrogen tank progress, Michoud Assembly Facility Pegasus barge completed, in dock at Stennis Space Center
16 Orion (OSA) and Launch Vehicle (LVSA) Stage Adapters Prime Contractor: OSA, MSFC Engineering; LVSA, Teledyne Brown Engineering Manufacturer Location: Marshall Space Flight Center Status: First OSA flew successfully on EFT-1 in December 2014 OSA EM-1 test article currently complete LVSA contract awarded to Teledyne Brown Engineering January 2014 OSA EM-1 rings and panels delivered August 2015 LVSA test article forward cone weld complete October 2015 Upcoming Milestones: LVSA: Test article scheduled for completion March 2016 OSA test article stage adapter being readied for structural testing at Marshall Space Flight Center. LVSA Vertical Weld Tool (VWT) forward basket tooling at Marshall Space Flight Center 16
17 Interim Cryogenic Propulsion Stage (ICPS) Prime Contractor: Boeing / United Launch Alliance Manufacturer Location: Decatur, Alabama Status: Production of EM-1 ICPS begins July 2015 ICPS flight software PDR August 2015 ICPS Structural Test Article handover to Boeing October 2015 Upcoming Milestones: Delivery of ICPS test article to MSFC October 2016 ICPS STA turnover to Boeing (above), October 2015, and EM-1 flight domes (below) September
18 Core Stage Prime Contractor: Boeing Manufacturer Location: NASA Michoud Assembly Facility, New Orleans, Louisiana Status: Foundations completed for new structural test stands at Marshall January 2015 Qualification rings completed, and 6 of 8 flight rings completed LOX (liquid oxygen) tank qualification barrels completed; EM-1 barrels in-work LH2 (liquid hydrogen) tank qualification and EM-1 flight barrels completed Engine section barrels completed Upcoming Milestones: Vertical Assembly Center (VAC) hand-over to NASA October 2015 Qualification (above) and EM-1 flight (below) production status First structural test stand complete July 2016 Core Stage structural testing to begin at Marshall February
19 Solid Rocket Boosters Prime Contractor: Orbital ATK Manufacturer Location: Promontory, Utah Status: Successful test firing of Qualification Motor-1 demonstrated 5-segment solid rocket motor to high temperature operation conditions March 2015 Completed the QM-2 aft segment propellant casting May 2015 EM-1 booster aft skirt and nose cone refurbishment begins August 2015 Upcoming Milestones: QM-2 Q3 FY16 Aft Segment Cast for Second SLS Booster Qualification Test. March
20 RS-25 Engines Prime Contractor: Aerojet Rocketdyne Manufacturer Location: Canoga Park, California Status: Engine adaptation hot-fire testing February 2015 through the summer 2017 Engineering Model 1 Controller to the Software Integration Laboratory (SIL) July 2015 Engineers at Marshall Space Flight Center are developing and testing 3-D printing technologies to reduce cost of engine parts Upcoming Milestones: RS-25 production restart contract signing November 2015 Next RS-25 hot firing Q2 FY16 Seven successful tests of RS-25 E0525 completed in
21 SLS Software and Avionics Prime Contractor: Boeing, Orbital ATK Manufacturer Location: Huntsville, Alabama and Clearfield, Utah Status: Booster avionics system was shipped to Marshall from Orbital ATK s Avionics Lab in Clearfield, Utah February 2015 Completed Testing of Release 11 of the avionics software September 2015 Upcoming Milestones: Flight Imaging Launch Monitoring Real-Time System (FILMRS) for cameras to Software Integration Test Facility June 2016 The Software Integration Test Facility (SITF) at Marshall Space Flight Center First Light kickoff began the facility integration testing and checkout. SLS Core Stage will use the SITF to perform vehicle-level avionics verification. January
22 GSDO Program Status 22
23 Ground Systems Development & Operations Accomplishments Platform H is the newest platform to be delivered to the VAB at KSC Simulation tests in Firing Room 4 at the Launch Control Complex at KSC ICPS Umbilical arm guided into vertical position at the LETF at KSC Ribbon cutting for Small Class Vehicle Launch Pad 39C Modifications complete to Mobile Launcher base and tower structure at KSC
24 Ground Systems Prime Contractor: Multiple Manufacturer Location: Multiple Status: Umbilical testing in the Launch Equipment Test Facility (LETF) is well underway Mobile Launcher structural modifications are complete and ready to start Ground Support Equipment installation after contract award in August 11 different construction contracts are in-work on various modifications at Launch Pad 39B, including flame trench and sound suppression system Crawler-transporter gearbox refurbishment and hydraulic lift cylinder upgrades are going well Vehicle Assembly Building High Bay 3 platform construction is ~30% complete with second pair of platforms on-site Multi-Payload Processing Facility modifications and ground support equipment installations are ~80% complete Aft Skirt Electrical Umbilical Structural Test completed Mobile Launcher ground support equipment installation contract awarded Launch Pad 39B flame trench refurbishment construction begun (ongoing) Upcoming Milestones: Complete Multi-Payload Processing Facility (MPPF) phase 2 facility GSE installation 2 nd Qtr 2016 Mobile Launcher structural modifications are complete. July
25 Cross Program Integration 25
26 CSI Technical Performance and Accomplishments Recent Major Cross-Program Accomplishments Completed SLS CDR (July) Completed Landing and Recovery Trade Study (July) Completed Integrated MRB Face-to-Face at KSC (July) Developed ITL high level test objectives for SLS and GSDO (July) Conducted SLS/GSDO OMRS familiarization sessions (over 150 in attendance) Conducted Integrated Medical Model TIM and CE review (July) Held Range Safety ITT Face-to-Face with 45 th Space Wing on Range Safety Flight Ops concepts (July) Completed Orion CDR (October) Near-term forward work Respond to Design-to-Synch RFA s from the SRB (16 of 21 remain open) Preparation, review, and approval of products for GSDO CDR (kickoff in October) Complete Level 1 Requirements Update (Block 1B, 2B and secondary payloads) Planning and preparation for Build-to-Sync 26
27 Cross-Program Integration Team Top Technical Issues Hydrogen Burn Off Igniter (HBOI)/Hydrogen Pop loads on the SLS core stage Concern over GH2 build up prior to RS-25 ignition All HBOI tests for downdraft and crosswind have been completed and correlated with computational fluid dynamics models. HBOIs will be canted 6 degrees upward to counter downdraft effect. Crosswinds did not require any changed in HBOI position GSDO assessing the impact of vertically staggering the nozzles to counter the effect of water (rooster tail) on HBOI particles (while maintaining 6 degree upward cant) Expected to close the issue after this assessment (11/2) Integrated Test Lab Capacity/throughput Concern that there may not be sufficient testing time available to test Orion software as well as the cross-program tests required Significant progress on re-planning resulted in significant reductions in over-subscription Orion Program plan includes off-loading ITL testing to other Orion avionics labs and approved adding additional assets to minimize over subscription Review/approve Orion testing plans for pre and post DD-250 at Vehicle Integration Control Board (11/30/15) Complete Integrated Schedule for Cross-Program Integrated Testing (IAS ITT) (11/30/15) Integrated Avionics System ITT to coordinate response to NESC recommendations (12/20/15) Finalize verification requirements compliance matrix details and close issue (12/20/15) 27
28 CPIT Top Technical Issues Closed Since Last Quarter ) Crew recovery in allotted 2 hr timeframe for nominal mission may not be possible Completed Landing and Recovery Trade for as soon as possible crew recovery in July Final recommendations approved by JICB ESD, Safety & Mission Assurance, Chief Engineer, Crew Office, Health & Medical, Orion, GSDO and DOD team Multiple methods of recovery available for crew (helicopter, ribbed boat, LPD) Method selected will depend on crew health, location of landing zone, sea state, weather, etc. Issue closed. Off-nominal recovery still in work. (8/5/15) SLS ICPS Micrometeoroid and Orbital Debris (MMOD) on EM-1 Updated ORDEM 3.0 models drive ICPS MMOD to be a large contribution to overall mission LOV. Trade Study completed. Result was to recommend performing the trans-lunar injection (TLI) burn on Rev 1 instead of Rev 2. Other options were either too performance limiting or had schedule impacts. Risk significantly reduced with Rev 1 TLI. Orion performed an assessment of subsystem impacts to on-orbit checkout time prior to committing to TLI and feels it can be accomplished. ECB accepted Rev 1 TLI. Issue closed for EM-1 (10/2/15) 28
29 CPIT Top Technical Issues Closed Since Last Quarter (continued) Collet Vibration Test Failure Premature disengagement during Orion vibration qualification test Boeing tested and was able to reproduce the failure. Design fix was implemented on the test hardware to confirm suitability. Alteration resulted in hardware passing vibe. Fix to be implemented on final design of flight hardware. Issue closed (10/23/15) 29
30 30 Elevated Interdependencies No Elevated Interdependencies at this time The team has managed Interdependencies through normal business processes and raised internally within Program management as needed to resolve minor issues
31 ESD Top Concerns 31
32 ESD Top Concerns Concern Integrated avionics and software V&V, Integrated Test Lab capacity, distributed V&V process, emulator performance, agile software development process productively metrics and crossprogram interdependencies. Integrated T&V plan involving distributed multi-site activities such as structural dynamics testing, environmental test, and functional check out leading to integrated flight certification traceable to requirements closure and COFR with sufficient resources and test. Funding uncertainty impacts to program/cross-program technical integration, interfaces, EM-2 (EUS) mission definition and content, interdependencies management, ground infrastructure, and efficiency of program planning and implementation. Schedule threats related to integrated critical path: CM and ESA service module, core stage delivery for green run, readiness of ground software to support final system integration. GSDO mobile launch outfitting and V&V including ground system control software/ground Flight Application Software (GFAS) and dependencies on cross-program flight/ground hardware interfaces and software. Ground processing first flight learning curve. Orion ESA Service Module (ESM) prop system redundancy and associated impacts on schedule/cdr completion. CM/ESM structural analysis and environmental T&V planning and resource availability for parallel O&C/GRC work, flight computer processor throughput, preparations for CM outfitting at O&C. SLS preparation for and implementation of post VAC ATP welding and assembly operations at MAF through green run test. SLS ascent acoustic loads analysis. Interim Cryogenic Propulsion Stage (ICPS) safety analysis to support EM-1. Decision on EUS for EM-2. Complete re-planning of contract activities. Long term productions and operations sustainability at the rate of 1 flight per year after EM-2 by reducing cost. Mission planning for EM-2 and beyond including on ramp for low-cost opportunities for development tech objectives and capability enhancements. On-orbit Micro Meteoroid and Orbital Debris (MMOD) exposure risk and related mission planning. Current Status Improving: Integrated Avionics Software-Integrated Technical Team (IAS ITT) F2F; metrics for schedule threat analysis in-work. Improving: CDRs data informing T&V, Enterprise V&V Team (EVVT) Focus Planning In Work, T&V resources a watch item. FY 2016 appropriations anticipated to help provide some near term definition. Funding uncertainty remains a watch item. VAC completed ATP, CM PV will deliver on time. ESA SM (see next 3 items). Improving: ML contract awarded, GFAST re-plan complete, final Orion/SLS dependency agreements in work. Orion T&V plan to be completed by March ERB, ESA CDR delay until April (but holding delivery), ESM redundancy issues being resolved, T&V resources a watch item. Improving: VAC ATP complete, post-atp operations in work. ICPS Structural Test Article delivered, EUS decision by late December, contract re-planning in work. P&O Study as part of PPBE to further identify cost reduction opportunities, numerous program efforts also in work. Dedicated mission planning team established. In-work: MMOD environment, vehicle susceptibility, and EM-2 mission profile being evaluated. 32
33
IAC-15-D2.1 NASA S SPACE LAUNCH SYSTEM PROGRAM UPDATE. Todd May NASA Marshall Space Flight Center, USA, [email protected]
IAC-15-D2.1 NASA S SPACE LAUNCH SYSTEM PROGRAM UPDATE Todd May NASA Marshall Space Flight Center, USA, [email protected] Garry Lyles NASA Space Launch System, USA, [email protected] Hardware and software
SpaceLoft XL Sub-Orbital Launch Vehicle
SpaceLoft XL Sub-Orbital Launch Vehicle The SpaceLoft XL is UP Aerospace s workhorse space launch vehicle -- ideal for significant-size payloads and multiple, simultaneous-customer operations. SpaceLoft
SPACE LAUNCH SYSTEM PROGRAM (SLSP) INTEGRATED LOGISTICS SUPPORT PLAN (ILSP)
SLS-PLAN-025 VERSION 1 National Aeronautics and Space Administration RELEASE DATE: APRIL 15, 2013 SPACE LAUNCH SYSTEM PROGRAM (SLSP) INTEGRATED LOGISTICS SUPPORT PLAN (ILSP) Release Date: April 15, 2013
Firing Room Remote Application Software Development
Firing Room Remote Application Software Development Kan Liu 1 NASA Kennedy Space Center, Kennedy Space Center, FL 32899 The Engineering and Technology Directorate (NE) at National Aeronautics and Space
BUILDING TRANSATLANTIC PARTNERSHIPS IN SPACE EXPLORATION THE MPCV-SM STUDY
BUILDING TRANSATLANTIC PARTNERSHIPS IN SPACE EXPLORATION THE MPCV-SM STUDY Following the approval of the ESA ISS Exploitation Declaration for the ISS lifetime at the ESA Council Meeting in March 2011,
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HUMAN CAPITAL PLAN FOR MISSION EXECUTION, TRANSITION, AND RETIREMENT OF THE SPACE SHUTTLE PROGRAM
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HUMAN CAPITAL PLAN FOR MISSION EXECUTION, TRANSITION, AND RETIREMENT OF THE SPACE SHUTTLE PROGRAM April 14, 2006 1 4/14//2006 EXECUTIVE SUMMARY NASA has prepared
The Space Shuttle: Teacher s Guide
The Space Shuttle: Teacher s Guide Grade Level: 6-8 Curriculum Focus: Astronomy/Space Lesson Duration: Two class periods Program Description This video, divided into four segments, explores scientists'
Space Launch System Status Briefing to NAC Space Operations Committee
National Aeronautics and Space Administration Space Launch System Status Briefing to NAC Space Operations Committee 8 February 2011 Background In response to direction in Section 309 of the NASA Authorization
Information Technology Management Marshall Space Flight Center
Information Technology Management Marshall Space Flight Center Jonathan Pettus January 31, 2013 NASA Around the Country Glenn Research Center Aeronautics and Spacecraft Technology Cleveland, Ohio Ames
Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment
Fleet Ballistic Missile Eastern Range Operations Supporting Navy Testing and Deployment Lockheed Martin Space Systems Company Test & Support Systems Engineering Pier Road, Hanger Y Mail Drop: MRL 156 Cape
Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release
Overview of the Orbiting Carbon Observatory (OCO) Mishap Investigation Results For Public Release SUMMARY The Orbiting Carbon Observatory was a National Aeronautics and Space Administration satellite mission
Space Shuttle Mission SPACE SHUTTLE SYSTEM. Operation. Luca d Agostino, Dipartimento di Ingegneria Aerospaziale, Università di Pisa, 2010/11.
Space Shuttle Mission SPACE SHUTTLE SYSTEM Operation SPACE SHUTTLE SYSTEM Operation The flight plan and operation of the Space Shuttle differs markedly from that of the now-familiar launch procedures and
ESA s Data Management System for the Russian Segment of the International Space Station
iss data management system ESA s Data Management System for the Russian Segment of the International Space Station J. Graf, C. Reimers & A. Errington ESA Directorate of Manned Spaceflight and Microgravity,
Christie Price Subcontract Administrator Lockheed Martin Corporation 12257 South Wadsworth Blvd. Littleton, CO 80125
Functional Area 1 - Research and Development Support ISYS provides research and development, thermal design, analysis, research, planning and development support for the Thermal Protection System of the
NASA ISS Research Academy and Pre-Application Meeting. Erin Beck Mission Integrator [email protected] August 4, 2010
NASA ISS Research Academy and Pre-Application Meeting Erin Beck Mission Integrator [email protected] SpaceX Overview Founded in mid-2002 with the singular goal of providing highly reliable, low cost
Lessons Learned during the Refurbishment and Testing of an Observatory after Longterm
Lessons Learned during the Refurbishment and Testing of an Observatory after Longterm Storage GSFC 2015 John Hawk, Sharon Peabody, and Richard Stavely NASA Goddard Space Flight Center Background The Triana
Shuttle Variations And Derivatives That Never Happened - An Historical Review
Shuttle Variations And Derivatives That Never Happened - An Historical Review Carl F. Ehrlich, Jr. * Consultant, Calabasas, CA 91302 James A. Martin The Boeing Company, Huntington Beach, CA 92647 While
NASA AEROSPACE SAFETY ADVISORY PANEL National Aeronautics and Space Administration Washington, DC 20546 VADM Joseph W. Dyer USN (Ret.
NASA AEROSPACE SAFETY ADVISORY PANEL National Aeronautics and Space Administration Washington, DC 20546 VADM Joseph W. Dyer USN (Ret.), Chair February 11, 2013 Mr. Charles F. Bolden, Jr. Administrator
Software Requirements Management
Software Requirements Management Space Shuttle Lessons Learned #3377 1/27/2011 Hal Turner NASA Kennedy Space Center NE-C1 Application and Simulation Software Engineering [email protected] (321)
WikiLeaks Document Release
WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RS21606 NASAs Space Shuttle Columbia: Synopsis of the Report of the Columbia Accident Investigation Board Marcia S. Smith,
NDIA CMMI Technology Conference and User Group NASA Experience with CMM and CMMI
NDIA CMMI Technology Conference and User Group NASA Experience with CMM and CMMI November, 2010 John C. Kelly & Tim Crumbley Office of Chief Engineer Outline NASA s experience with CMMI model NASA s CMMI
Core Capabilities and Services
National Aeronautics and Space Administration Marshall Space Flight Center Core Capabilities and Services Launching the Future of Science and Exploration Director s Letter From the Director Marshall Space
NASA JOHNSON SPACE CENTER SPACE SHUTTLE PROGRAM TACIT KNOWLEDGE CAPTURE PROJECT ORAL HISTORY TRANSCRIPT
NASA JOHNSON SPACE CENTER SPACE SHUTTLE PROGRAM TACIT KNOWLEDGE CAPTURE PROJECT ORAL HISTORY TRANSCRIPT DONALD S. NOAH INTERVIEWED BY REBECCA WRIGHT JOHNSON SPACE CENTER JULY 9, 2008 WRIGHT: Today is July
Atlas Emergency Detection System (EDS)
Atlas Emergency Detection System (EDS) Jeff A. Patton 1 United Launch Alliance, Littleton, Colorado, 80127-7005 [Abstract] The Atlas Expendable Launch Vehicle Program has been studying safe abort requirements
Space Flight Project Work Breakdown Structure
APPENDIX G. (WBS) Space Flight Project Work Breakdown Structure G.1 Introduction G.1.1 The Project Work Breakdown Structure (WBS) is a key element of project management. The purpose of a WBS is to divide
Lunar Program Industry Briefing
Lunar Program Industry Briefing Altair Overview Clinton Dorris Deputy Manager, Altair Project Office Altair Lunar Lander 4 crew to and from the surface Seven days on the surface Lunar outpost crew rotation
System Engineering: A Traditional Discipline in a Non-traditional Organization
System Engineering: A Traditional Discipline in a Non-traditional Organization Corporate Overview Founded with the singular goal of providing highly reliable space transportation Tech-style Organization
Ms. Sally Ericsson Program Associate Director Office of Management and Budget New Executive Office Building Washington, DC 20503. Dear Ms.
National Aeronautics and Space Administration Office of the Administrator Washington. DC 20546-0001 April 7, 2011 Ms. Sally Ericsson Program Associate Director Office of Management and Budget New Executive
MISSION OPERATIONS DIRECTORATE FLIGHT DIRECTOR OFFICE. STS-106/ISS 2A.2b/ INCREMENT 0C-2
MISSION OPERATIONS DIRECTORATE FLIGHT DIRECTOR OFFICE STS-106/ISS 2A.2b/ INCREMENT 0C-2 FLIGHT READINESS REVIEW August 29, 2000 DA8/P. L. Engelauf ISS Increment Operations Increment 0C The period from
SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010. SpaceX
SpaceX Overview Tom Markusic Director, McGregor Rocket Development Facility 27 July, 2010 SpaceX Vehicles Falcon 1 Falcon 9 Dragon Spacecraft 2 SpaceX Overview Founded in mid-2002 with the singular goal
History of the Titan Centaur Launch Vehicle
History of the Titan Centaur Launch Vehicle The Centaur program began in 1958 with its first successful flight on 27 November 1963. The unique Centaur design is the first liquid oxygen and liquid hydrogen
Genetic Algorithm Optimization of a Cost Competitive Hybrid Rocket Booster
Genetic Algorithm Optimization of a Cost Competitive Rocket Booster George Story NASA MSFC Huntsville, Al www.nasa.gov Overview attributes are typically touted as to why hybrids should be pursued. Handling,
Aerospace Engineering: Space Stream Overview
Aerospace Engineering: Space Stream Overview Dept. of Aerospace Engineering Ryerson University Winter 2011 Department of Aerospace Engineering 1 The Space-stream at a Glance Builds on strong aerospace
A VALUE PROPOSITION FOR LUNAR ARCHITECTURES UTILIZING ON-ORBIT PROPELLANT REFUELING
A VALUE PROPOSITION FOR LUNAR ARCHITECTURES UTILIZING ON-ORBIT PROPELLANT REFUELING By James Jay Young In Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy in the School of
Position Descriptions. Aerospace
Position Descriptions Aerospace Aerospace Engineering? Aeromechanics / Flight Control / Flight Qualities Engineer Predict, analyze, and verify air vehicle flight dynamics including aircraft aerodynamics,
NASA and Flowserve Collaboration Launches New Valve Technology
NASA and Flowserve Collaboration Launches New Valve Technology At the Stennis Space Center near Bay Saint Louis, Mississippi, NASA engineers had a problem. At the Stennis Space Center near Bay Saint Louis,
Enhancing Human Spaceflight Safety Through Spacecraft Survivability Engineering
AIAA SPACE 2009 Conference & Exposition 14-17 September 2009, Pasadena, California AIAA 2009-6523 Enhancing Human Spaceflight Safety Through Spacecraft Survivability Engineering Meghan S. Buchanan 1 and
Modular Approach to Launch Vehicle Design Based on a Common Core Element
AIAA SPACE 21 Conference & Exposition 3 August - 2 September 21, Anaheim, California AIAA 21-864 Modular Approach to Launch Vehicle Design Based on a Common Core Element Dennis M. Creech 1 Jacobs Engineering
Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS
Dr. Celal Sami Tüfekci & Erdem Demircioğlu Turksat AS 10 September 2008 Prague, Czech Republic Agenda Short company introduction Turksat s satellite design and R&D goals Outline Turksat s satellite design
Doing Business with NASA at the John C. Stennis Space Center, MS
Doing Business with NASA at the John C. Stennis Space Center, MS Name: Robert E. Watts Title: Small Business Specialist Center: John C. Stennis Space Center (SSC) Date: February 18, 2014 Serves as NASA
Aircraft & Defense Vehicle Simulation Lab
Understanding Advanced System Integration Labs: -Centric System Integration This paper examines how successful aerospace and defense organizations are changing their processes to apply simulationbased
NASA Independent Review Team Orb 3 Accident Investigation Report
National Aeronautics and Space Administration NASA Independent Review Team Orb 3 Accident Investigation Report Executive Summary Date of Event: October 28, 2014 Date of Report: October 9, 2015 1 NASA Independent
HOW TO BUILD A NANORACKS PAYLOAD: NANOLABS
HOW TO BUILD A NANORACKS PAYLOAD: NANOLABS WELCOME TO NANORACKS We started NanoRacks to create a commercial environment for economical space utilization. It is vital to have a cost-efficient means to utilize
Launch Services Program (LSP) Advisory Services Plan
National Aeronautics and Space Administration John F. Kennedy Space Center, Florida Launch Services Program LSP-PLN-326.01 Launch Services Program (LSP) Advisory Services Plan EXECUTIVE SUMMARY: This Advisory
The Boeing Company Strategic Missile & Defense Systems
The Boeing Company Strategic Missile & Defense Systems Brad Bruce November 8, 2011 Boeing Business Units How SM&DS Fits Organizationally Boeing BDS Network & Space Systems Boeing Defense, Space & Security
INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE
PREFERRED RELIABILITY PRACTICES PRACTICE NO. PD-ED-1228 PAGE 1 OF 6 INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE Practice: To produce high quality, reliable software, use Independent Verification
Naval Research Laboratory Automated Ground Operations
Naval Research Laboratory Automated Ground Operations Patricia Klein May 2010 [email protected] (202) 767-6636 Briefing is UNCLASS 1 AGENDA BP overview and missions What is AGO? Automated Ground
CONSTRUCTION AND ENVIRONMENTAL COMPLIANCE AND
CONSTRUCTION AND ENVIRONMENTAL COMPLIANCE AND RESTORATION Actual Estimate Notional Budget Authority (in $ millions) FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2013 President's Budget Request
engineering is out of this world
Light but Strong A Lesson in Engineering EP-2013-09-107-MSFC engineering is out of this world National Aeronautics and Space Administration Light but Strong teacher notes Next Generation Science Standards:
June VV 05. Sentinel-2A LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) 294C
LOGOTYPE TONS MONOCHROME 294C June 2015 VV 05 LOGOTYPE COMPLET (SYMBOLE ET TYPOGRAPHIE) FIFTH VEGA LAUNCH FROM THE GUIANA SPACE CENTER, AT THE SERVICE OF EUROPE'S COPERNICUS PROGRAM On the fifth Vega mission
UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 7 R-1 Line #261
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems
How Rockets Work Newton s Laws of Motion
How Rockets Work Whether flying a small model rocket or launching a giant cargo rocket to Mars, the principles of how rockets work are exactly the same. Understanding and applying these principles means
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
National Aeronautics and Space Administration Stennis Space Center, MS 39529-6000 JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION (1) Agency and Contracting Activity National Aeronautics and Space
Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In-Situ Fabrication
Regolith-Derived Heat Shield for Planetary Body Entry and Descent System with In-Situ Fabrication Michael D. Hogue, NASA Kennedy Space Center Robert P. Mueller, NASA Kennedy Space Center Laurent Sibille,
Doing Business with NASA at the John C. Stennis Space Center, MS
National Aeronautics and Space Administration Doing Business with NASA at the John C. Stennis Space Center, MS Name: Robert E. Watts Title: Small Business Specialist Date: January 4, 2016 www.nasa.gov
International Space Station Carbon Dioxide Removal Assembly (ISS CDRA) Concepts and Advancements
2005-01-2892 International Space Station Carbon Dioxide Removal Assembly (ISS CDRA) Concepts and Advancements Dina El Sherif Honeywell International, Torrance CA 90504 James C. Knox NASA Marshall Space
SPACE OPERATIONS, INC. Executive Summary October 2013
SPACE OPERATIONS, INC. Executive Summary October 2013 Point of Contact Craig Russell Chief Executive Officer Space Operations, Inc. 2903 Wall Triana Highway, Suite 5 Huntsville, AL 35824-1529 Office: (256)
SJT / SJM / SJP Large Vertical Pumps
SJT / SJM / SJP Large Vertical Pumps The Heart of Your Process SJT, SJM, SJP Large Vertical Pumps Product Overview SJT Turbine Ns 1800 < 5000 nq 35 < 110 SJM Mixed Flow Ns 5800 < 8300 nq 113 < 161 SJP
NASA Technology Roadmap Update Overview
National Aeronautics and Space Administration NASA Technology Roadmap Update Overview NASA Advisory Committee Technology, Innovation, and Engineering Committee Meeting December 4, 2014 Faith Chandler NASA
How Long Do You Need To Achieve Your Scientific Objectives?
How Long Do You Need To Achieve Your Scientific Objectives? Time seconds minutes days/weeks months Drop Towers/Drop Tubes KC-135 Parabolic Flights Balloons* Sounding Rockets Alternate Carriers* Shuttle
tal OFFICE OF THE SECRETARY OF DEFENSE Col. Paul E. Worthrnan, SAF-SS, 4C1000 SUBJECT: Public Affairs Guidance for MOL
RELEASE 1 JULY 2015 rgrrrmr tal WHEN WITH ATTACHMENTS OFFICE OF THE SECRETARY OF DEFENSE 21 October 1965 MEMO FOR Col. Paul E. Worthrnan, SAF-SS, 4C1000 SUBJECT: Public Affairs Guidance for MOL Request
Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES
ADVANCED TECHNOLOGIES Space Launchers Mastering technologies of cryogenic tanks and associated equipment www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES Air Liquide and Space Since the beginning
Mars Sample Return Campaign: An Overview. Dr. Firouz Naderi Associate Director NASA s JPL
Mars Sample Return Campaign: An Overview Dr. Firouz Naderi Associate Director NASA s JPL 1 Why Sample Return? Why Now? Compelling Science Informed Landing Site Selection International Interest Good Engineering
Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014
Congresso della SAIT Museo della Scienza e della Tecnologia di Milano 15 Maggio 2014 Francesca Esposito INAF Osservatorio Astronomico di Capodimonte (Napoli) ExoMars Mission The ExoMars Program is carried
AIRCRAFT WORK BREAKDOWN STRUCTURE (WBS) LEVELS (FROM MILITARY SPECIFICATION 881)
Appendix C AIRCRAFT WORK BREAKDOWN STRUCTURE (WBS) LEVELS (FROM MILITARY SPECIFICATION 881) Level 1 Level 2 Level 3 Aircraft System Air Vehicle (AV) System Engineering/ Program Management Airframe Propulsion
Boeing CAPPS RFID Asset Tracking System The Boeing Company Kennedy Space Center
Boeing CAPPS RFID Asset Tracking System The Boeing Company Kennedy Space Center Philip A. Lintereur Manager Fluids, Avionics & Propulsion Systems Agenda RFID Quick Overview Project Scope & Schedule Integration
Space Launchers. Mastering technologies of cryogenic tanks and associated equipment. www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES
Space Launchers Mastering technologies of cryogenic tanks and associated equipment www.airliquideadvancedtechnologies.com ADVANCED TECHNOLOGIES Air Liquide and Space Since the beginning of cryogenic launchers
Capital Budget Summary
Capital Budget Summary WA01 Department of State Police State-owned Capital Improvement Program ($ in Millions) Projects Prior Auth. 2015 Request 2016 2017 2018 2019 Beyond CIP Tactical Services Facility
Technologies for Re-entry Vehicles. SHEFEX and REX FreeFlyer, DLR s Re-Entry Program. Hendrik Weihs. Folie 1. Vortrag > Autor > Dokumentname > Datum
Technologies for Re-entry Vehicles SHEFEX and REX FreeFlyer, DLR s Re-Entry Program Hendrik Weihs Folie 1 DLR`s Re-Entry Program, Why? Re-entry or return technology respectively, is a strategic key competence
Space Technology Mission Directorate
National Aeronautics and Space Administration Space Technology Mission Directorate ASEB Meeting Presented by: Mr. Stephen Jurczyk Associate Administrator, STMD April 21,2015 www.nasa.gov/spacetech Space
Space Exploration - Merit Badge Workbook Page. 2 of 11
c. Benefits related to Earth resources, technology, and new products. d. International relations and cooperation. 2. Design a collector s card, with a picture on the front and information on the back,
LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure
LNG as Ship Fuel Effects on Ship Design, Operations and Supporting Infrastructure New Technologies for the Marine Highway TRB Marine Highways Committee (AW010(1)) January 14, 2013 LNG as a Ship s Fuel
PERSONNEL REQUIREMENTS FOR RADIO FREQUENCY SPACE TO GROUND RESEARCH
PERSONNEL REQUIREMENTS FOR RADIO FREQUENCY SPACE TO GROUND RESEARCH The following paragraphs set forth the Government's minimum desired requirements deemed necessary to perform the tasks set forth in the
Commercial Crew Transportation System Certification Requirements for NASA Low Earth Orbit Missions
National Aeronautics and Space Administration CCTS Certification Requirements Commercial Crew Transportation System Certification Requirements for NASA Low Earth Orbit Missions ESMD-CCTSCR-12.10 Revision-Basic
ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C240.03 IDENTIFY PARTS OF A ROCKET PREPARATION
ROYAL CANADIAN AIR CADETS PROFICIENCY LEVEL TWO INSTRUCTIONAL GUIDE SECTION 6 EO C240.03 IDENTIFY PARTS OF A ROCKET Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery
Engineering & Testing Services. Hydraulic Fitting Design and Hydro-Mechanical Testing
Engineering & Testing Services Hydraulic Fitting Design and Hydro-Mechanical Testing Aerofit, Inc. APT Laboratory 1425 South Acacia Avenue Fullerton, CA 92831 Main: 714-521-5060 Fax: 714-535-9862 Our Company
IAC-04-V.4.03 DELTA IV LAUNCH VEHICLE GROWTH OPTIONS TO SUPPORT NASA S SPACE EXPLORATION VISION
IAC-04-V.4.03 DELTA IV LAUNCH VEHICLE GROWTH OPTIONS TO SUPPORT NASA S SPACE EXPLORATION VISION Frank A. Slazer Director, NASA/Civil Space Business Development [email protected] Robert J. Sirko
European Seminar on Technologies from Space Exploration Interests and expectations of NEREUS districts and local clusters LOMBARDIA AEROSPACE CLUSTER SECTOR PROFILE Snapshot of Lombardia Aerospace Cluster
Appendix B: Work Breakdown Structure (WBS)
: Work Breakdown Structure (WBS) B.1. Introduction The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. In accordance with
Goddard Procedures and Guidelines
Goddard Procedures and Guidelines DIRECTIVE NO. APPROVED BY Signature: Original signed by NAME: A. V. Diaz TITLE: Director Responsible Office: Title: Code 300 / Office of Systems Safety and Mission Assurance,
Medals and Major Awards: 1993 - NASA Exceptional Achievement Medal
Name: Dale Curtis Ferguson Telephone: AFRL 505-846-1566 Birthplace: Dayton, Ohio, USA Title: Principal Physicist, AFRL RVBXR, Lead for Spacecraft Charging Science and Technology, Capability Area Technical
National Aeronautics and Space Administration SPACE LAUNCH SYSTEM A CASE FOR SMALL BUSINESS
National Aeronautics and Space Administration SPACE LAUNCH SYSTEM A CASE FOR SMALL BUSINESS TABLE OF CONTENTS ii Office of Small Business Programs (OP) Vision and Mission Statements 1 Message from the
Developing Metrics in Systems Integration (ISS Program COTS Integration Model)
Developing Metrics in Systems Integration (ISS Program COTS Integration Model) Kathryn Lueders COTS Integration Manager International Space Station Program August 22, 2007 System Integration Challenges
AIR AMBULANCE POLICY
Virginia Beach Department of Emergency Medical Services CASS # 201.02.00 Index # Operations AIR AMBULANCE POLICY PURPOSE: The purpose of this policy is to establish a standard process for activation of
CalMod Design-Build Electrification Services
SECTION 01800 SYSTEMS INTEGRATION AND INTEGRATOR REQUIREMENTS PART 1 GENERAL DESCRIPTION A. This section specifies the system-wide integration requirements for the Caltrain Electrification system, i.e.
Saturn V Stage I (S-IC) Overview
Saturn V Stage I (S-IC) Overview Objectives Become familiar with the Saturn V Stage I (S-IC) major structural components: Forward Skirt Oxidizer Tank Intertank Fuel Tank Thrust Structure Gain a general