Adoption of Risk Assessment Model
|
|
|
- Hannah Hines
- 10 years ago
- Views:
Transcription
1 The 14th Annual Management Conference January 9-11, 2013 Harrah s Hotel Las Vegas, NV Adoption of Assessment Model A more defensible safety profile Moderator: Speaker: Jim Keane General Manager Operations Safety, Inspection & Safety Management Division Port Authority of New York and New Jersey David J. Crowner, A.A.E. Senior Manager, Airfield Operations Seattle-Tacoma International Airport Port of Seattle / Crowner 2012
2 SMS, SRM and SRA Relationships Safety Assessment A 5-step process by which the results of risk analysis are used to make decisions. A multidiscipline review and documentation conducted by a panel of experts, of a safety analysis of a system or proposed system change. Safety Management - A core activity of SMS, uses a set of standard processes to proactively identify hazards, analyze and assess potential risks, and design appropriate risk mitigation strategies. Safety Management System - Systematic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures Port of Seattle / Crowner
3 SMS is like Weather Knowing Existing Conditions is Good You can make some assumptions of what may occur Anecdotal Historical Reviewing Temp, Dew point and barometric pressure as well as knowing clouds can help in drawing a general weather picture. Port of Seattle / Crowner 2012
4 But the Forecast is Meaningful Planning decision making Preparation Port of Seattle / Crowner 2012
5 ACI Recommended airport practices 5.14 recommends that aerodrome operators should move away from the simple monitoring of compliance with rules and regulations to the development of a safety management system. RISK Exposure HAZARD REACTIVE PROACTIVE PREDICTIVE SAFETY EFFICIENCY 139 Inspections FOD response Accident response Corrective actions Check Lists Accident Reporting Rules & Regulations EXISTING CONTROLS Accident Data Collection Trending & tracking Root Cause Analysis FOD Detection Safety Assessments Increased Awareness Advisory Circulars Gap Analysis EXPANDED CONTROLS Based Decisions Targeted Mitigation Measures Culture Shift toward prevention Continuous performance improvements Predictive Analytics Best Management Practices Exposure Adapted from Flight Safety Australia Nov-Dec 2007 by David Crowner Port of Seattle / Crowner 2012
6 ACI Recommended airport practices 5.14 recommends that aerodrome operators should move away from the simple monitoring of compliance with rules and regulations to the development of a safety management system. Exposure HAZARD REACTIVE PROACTIVE PREDICTIVE 139 Inspections FOD response Accident response Corrective actions Check Lists Accident Reporting Rules & Regulations EXISTING CONTROLS RISK SAFETY EFFICIENCY Accident Data Collection Trending & tracking Root Cause Analysis FOD Detection Safety Assessments Increased Awareness Advisory Circulars Gap Analysis EXPANDED CONTROLS Based Decisions Targeted Mitigation Measures Culture Shift toward prevention Continuous performance improvements Predictive Analytics Best Management Practices Exposure Adapted from Flight Safety Australia Nov-Dec 2007 by David Crowner Port of Seattle / Crowner 2012
7 ACI Recommended airport practices 5.14 recommends that aerodrome operators should move away from the simple monitoring of compliance with rules and regulations to the development of a safety management system. Exposure HAZARD REACTIVE PROACTIVE PREDICTIVE 139 Inspections FOD response Accident response Corrective actions Check Lists Accident Reporting Rules & Regulations EXISTING CONTROLS RISK SAFETY EFFICIENCY Accident Data Collection Trending & tracking Root Cause Analysis FOD Detection Safety Assessments Increased Awareness Advisory Circulars Gap Analysis EXPANDED CONTROLS Based Decisions Targeted Mitigation Measures Culture Shift toward prevention Continuous performance improvements Predictive Analytics Best Management Practices Exposure Adapted from Flight Safety Australia Nov-Dec 2007 by David Crowner Port of Seattle / Crowner 2012
8 Safety in a Nutshell Port of Seattle / Crowner
9 FAA s 4 SMS Components 9
10 FAA s 4 SMS Components 10
11 Not Reinventing the Wheel Score Cards Matrixes Root Cause Analysis Mgt & SMS Process Integration Reporting Process Software System Integration Emergency Plan Safety Reporting & Data Collection Expand into Non-Movement Incident/ Accident Reporting Integrated Information Information Sharing Software FOD Expand into Non-Movement 139 Self Inspection Internal Alerts/ Notifications Policy Technology Common Situational Awareness Wildlife Hazard Mgmt. Digital Flight Ops Info Mgmt. SMS Assurance Promotion People Hazard ID Safety Mgmt. Document Databases Dashboards NOTAMs Training System Monitoring Safety Assessment Practices Policies SOP/Gs ACM Chgs Hazard Reporting Individual Drivers/users Safety Cuture SMGCS Winter Ops. Plan Minimum Standards Qualified Employees Enforcement Promotion Safety Action Committee Just culture We are already safety focused Ongoing Evaluation Enhance Existing Establish New SWIM (System Wide Info Mgt.) Integration Assess existing practices Establish new practices Improve hazard communications Integrate people, processes, practices, and technology Port of Seattle / Crowner
12 We are expanding the wheel Score Cards Matrixes Root Cause Analysis Mgt & SMS Process Integration Reporting Process Software System Integration Emergency Plan Safety Reporting & Data Collection Expand into Non-Movement Incident/ Accident Reporting Integrated Information Information Sharing Software FOD Expand into Non-Movement 139 Self Inspection Internal Alerts/ Notifications Policy Technology Common Situational Awareness Wildlife Hazard Mgmt. Digital Flight Ops Info Mgmt. SMS Assurance Promotion People Hazard ID Safety Mgmt. Document Databases Dashboards NOTAMs Training System Monitoring Safety Assessment Practices Policies SOP/Gs ACM Chgs Hazard Reporting Individual Drivers/users Safety Cuture SMGCS Winter Ops. Plan Minimum Standards Qualified Employees Enforcement Promotion Safety Action Committee Just culture We are already safety focused Ongoing Evaluation Enhance Existing Establish New SWIM (System Wide Info Mgt.) Integration Assess existing practices Establish new practices Improve hazard communications Integrate people, processes, practices, and technology Port of Seattle / Crowner
13 Adding a Safety Assessment Function Incident/ Accident Reporting 139 Self Inspection Emergency Plan Integrated Information Internal Alerts/ Notifications Software Information Sharing Safety Reporting & Data Collection Wildlife Hazard Mgmt. Digital Flight Ops Info Technology Policy Assurance FOD Training Mgmt. SMS NOTAMs Promotion People Safety Cuture Common Situational Awareness Databases System Monitoring Dashboards Hazard ID Safety Case SMGCS ATO SRM Winter Ops. Plan Practices Policies SOP/Gs Safety Assessment ARP SRM Enforcement Minimum Standards Operational Safety We are already safety focused Ongoing Evaluation Enhance Existing Establish New SWIM (System Wide Info Mgt.) Integration Assess existing practices Establish new practices Improve hazard communications Integrate people, processes, practices, and technology Port of Seattle / Crowner
14 Safety Management Safety Management (SRM) uses a set of standard processes to proactively identify hazards, analyze and assess potential risks, and design appropriate risk mitigation strategies. At the core of a SMS is the ability to collect information on hazards, identify and quantify the associated risks through severity and likelihood and determine the corrective action (if any). A tool to make more defensible safety decisions 14
15 SRA Application A Functional Perspective Port of Seattle / Crowner
16 Simple Safety Analysis Internal/informal Port of Seattle / Crowner 2012
17 Safety Assessment Panel Internal/External & Formal Port of Seattle / Crowner 2012
18 Got? Port of Seattle / Crowner 2012
19 SRM, SRA, and FAA Compliance Overview of FAA Order Desk Reference Construction AC Forms SAS SRA Report CSPP Compliance Doc Project Proposal Summary sms4airports / Port of Seattle
20 Safety Assessment Screening (SAS) Form 1 Airport Signs Here sms4airports / Port of Seattle
21 Our Interpretation of FAA Process sms4airports / Port of Seattle 2012
22 SRA Triggers: a. Development of and updates to airport planning, environmental, engineering, construction, operations, and maintenance standards published in ACs. b. FAA review of new or revised ALPs. c. Construction project coordination, review, or approval for Federally obligated airports, including CSPPs. Or projects which are located on-airfield of P-139 Airports *(currently only Large Hubs) d. Approval of Part 150 Noise Compatibility Program measures that could affect aviation safety (such as noise abatement departure procedures). e. Approval of requests for project-specific Modifications of Standards (excludes AC 150/ ). f. Non-construction changes, including runway and taxiway designations, airfield pavement marking and signage (excluding normal maintenance), runway categories (design aircraft), and in coordination with other LOBs for planned approach or departure procedure changes. g. Modification or update to any action that could represent a material change from a previous SRM review or Safety Assessment. h. FAA decisions on operational or safety-related issues (complex airfield projects, complex planning study alternative analysis, etc.) sms4airports / Port of Seattle 2012
23 Actions and Information Sharing Non-Construction: Issue Affects NAS ATO Resubmit f. Non-construction changes, including runway and taxiway designations, airfield pavement marking and signage (excluding normal maintenance), runway categories (design aircraft), and in coordination with other LOBs for planned approach or departure procedure changes. Form 7460 Form 7480 OE/AAA Assessment (7460) Objections No Yes Revise Proposal Marking and Signage Changes Airport Certification Manual Change WHMP, SMS SMGCS, Changes To SRA Panel SAS - 1 sms4airports / Port of Seattle
24 Actions and Information Sharing Construction: OE/AAA Assessment (7460) If Panel is required, include panel facilitation in Scope c. Construction project coordination, review, or approval for Federally obligated airports, including CSPPs. Or projects which are located on-airfield of P-139 Airports *(currently only Large Hubs) Project Scope Development and Predesign Plans and Specifications 25-70% AC F Draft CSPP FAA SMS Desk Ref Project Proposal Summary CONSTRUCTION How Contractor Will apply Construction Safety Phasing Plan (CSPP) Contractor Safety Plan Compliance Doc. No < 6-months prior SAS - 1 ARP SMS Desk Ref Par 3, Sec Draft CSPP Master Plan or ALP Update sms4airports / Port of Seattle 2012 Alternatives from Master Plan Comparative Safety Assessment Operational Safety Assessment 24
25 Actions and Information Sharing Post SAS: Revise Proposal ARP SMS Overview IDLE FAA Course ARP SRM Facilitation, IDLE Consult with ARP Mgr & Regional SMS Required Training Facilitator Hired? ARP Regional Office and Airport Sponsor Select Panel Members Pre-meeting Logistics ARP SMS Desk Ref Par 2, Sec 6.3 Project SOW SRM/ SRA Panel Needed? No Yes Airport Funded Panel FAA Funded Panel Airport Coordinates with Facilitator Conduct SRA Pre-meeting Documentation SAS - 1 System Safety Impact Checklist No further SRM Requirement Complete and Submit SAS Form No FAA Facilitates Conduct SRA 1 Describe System 2 Identify Hazards 3 Analyze 4 Assess 5 Mitigate FAA Order sms4airports / Port of Seattle 2012 The Proposed Action may: a. Deviate from applicable FAA standards b. Increase aviation safety risks, with existing controls in-place c. Affect aviation operations with existing controls in-place d. Affect navigational aids e. Impact TERPS surfaces f. Other safety Impact: 150 NCP or NEMs approval NCP includes: Preferential runway systems Use of flight procedures Noise abatement takeoff and landing procedures or Do not include the use of flight procedures Will be implemented landside or off-airport, such as: Land Use controls Noise monitoring and acoustical treatments FAA SMS Desk Ref Yes Yes No further SRM Review is required Airport Signs SAS-1 Attach to SAS 1 Complete SRMD/ Safety Assessment (SRA) Report Airport Review and Approval Airport Legal Review and Approval Sign off Report 25
26 Lingering Questions: If a Panel is deemed necessary? ARP SMS Overview IDLE FAA Course ARP SRM Facilitation, IDLE Consult with ARP Mgr & Regional SMS Required Training How can I include in Scope of Work ahead of determination of Panel decision How soon after submission to FAA will I know if a panel will be needed Can a Consultant facilitate their own SRA panel? Can another airport facilitate a panel for another airport Peer to Peer facilitation What if I can t get everyone together at same time. FAA Availability and commitment to process? What if ATO or ARP or other FAA agency disagrees with outcome Will FAA respect the process? Airport Funded Panel FAA Funded Panel FAA Facilitates Facilitator Hired? Airport Coordinates with Facilitator Conduct SRA Attach to SAS 1 ARP Regional Office and Airport Sponsor Select Panel Members Conduct SRA 1 Describe System 2 Identify Hazards 3 Analyze 4 Assess 5 Mitigate Complete SRMD/ Safety Assessment (SRA) Report Airport Review and Approval Airport Legal Review and Approval Sign off Report Mitigation Actions Pre-meeting Logistics Pre-meeting Documentation FAA Order Monitor Mitigation Actions Port of Seattle / Crowner 2012
27 Lingering Questions: If a Panel is deemed necessary? - continued How long does the SAS-1/2 /OEAAA review take? What is the Timeline/deadline? Lead times for FAA participation? Will FAA coordinate panel attendance internally (including ATO) or is Airport expected to coordinate? What is the appeal process Our Legal departments may have to review before we sign. What if FAA is Assigned Mitigation (Action) Items in the SRA? Port of Seattle / Crowner 2012
28 Lingering Questions: Will the FAA Pay for Panel Costs? How (what mechanism) will FAA pay/reimburse (AIP/PFC) What if project is simply located on airport or is a non AIP or PFC project? What if ATO Initiates SRA? Will FAA cover resulting Mitigation Costs Why does ATO refer to processes differently then ARP? When can we expect the SMS regulations to be final and adopted. Port of Seattle / Crowner 2012
29 More Questions: How many Safety evaluations are there how/where/when do they fit in process? OE/AAA SAS 1, 2, 3 Preliminary Hazard Assessment Comparative Safety Assessment Operational Safety Assessment System Safety Impact FAA Checklist CSPP OE/AAAE Review Plans & Specifications MASTER PLAN ALP UPDATE PART 150 NOISE COMPATABILITY STUDY PROJECT NOT ON ALP OR IN MASTER PLAN Sign SAS Strategic Assessment SRA Evaluates Projects and components of projects from a safety perspective What Why Not Currently Addressed Project Proposal Summary Presumed NONE Action Triggers System Safety Impact checklist issue Construction Assessment SRA Evaluates construction Safety issues How Project Formulation List of Alternatives FAA Initial Project Airspace Review Project Scope Development and Predesign Draft CSPP FAA ARP SAS-1 Review Aspects of PARTALLY CSPP Previously Evaluated Changes or new aspects of CSPP Yes Min 60 Days, or 9 months, or 2 years, or 3 years Negative Impacts to Existing Facilities or FAA Projects No FAA CSPP OE/AAAE Review Revise Proposal Objections Yes NO SPCD Sign SAS ALL CSPP Mitigation Elements Port of Seattle / Crowner 2012
30 Avoidance is best safety measure: Port of Seattle / Crowner 2012
31 SRA Process 5 STEPS 1. Describe the System 2. Identify Hazards 3. Analyze the Monitor the System 4. Assess the 5. Mitigate the
32 SRA Preparation Be Appropriately Trained and Knowledgeable Meet with Regional ARP/ ATO/SMS Coordinators Align Objectives and Priorities ARP SMS Overview IDLE FAA Course ARP SRM Facilitation, IDLE Know Subject Matter (Airport Ops, 150 Noise, Master Plan) SRA Processes Facilitation Techniques Scope of Work CSA, PHA, OSA Review Issues of Concern FAA LOB Alignment Panel Members FAA Availability, Scheduling, and Coordination Reach Consensus on: Deliverables Agenda Panel Participants Schedule, Format, Resources, Timelines Assignments and Expectations Identify Lead Agency and Personnel (Who will Sign the SAS-1) Meet with Airport Applicable Issues of Concern Panel Members Airport Staff Availability and Scheduling Coordination Overall SRA and Logistics sms4airports / Port of Seattle
33 SRA Preparation Logistics Review and Determine Existing Controls Prepare Preliminary Assessment of Hazards Frame the Day Location and Room Layout Lunch Provided or Not Duration (4 or 8 hours) One Day or Two Prepare and Assemble Reference Packet Advisory Circulars Desk Reference Appendix G FAR Part 139, 77, 150 ACM, SMGCS Plan, WHMP Rules and Regs. / Policies Min Standards / BMPs Quick List of Potential Hazards / Consequences to Assist in Prompting Discussion Overview of subject /issue statement Ground Rules Look Ahead, Don t Jump Ahead Conflict is Good, but Keep it Civil Park Your B.M.W. Understanding of Terms Hazard, Cause, Consequence Keep it Credible Quantitate vs. Qualitative data Applicable Advisory Circulars Statistics / Data Previous SRA Findings Supporting or Refuting Articles or Documents sms4airports / Port of Seattle 2012 Set Agenda and Assign Tasks Packet Preparations Introductions Presenters Introductions SRM / SMS / SRA Relationship Frame the Day Note Taker / Scribe 33
34 Frame the Day Objectives House rules Park your B.M.W. Please no sidebars; wait for breaks listen and appreciate others; wait until outside before trashing someone No cell phones Tension is good but keep it civil consider qualitative over quantitative data Look ahead don t jump ahead think in terms of credible risks No computers (unless retrieving data) Roles and Responsibilities Process understanding and adherence (respect the process) 34
35 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
36 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
37 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
38 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
39 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
40 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
41 Analyze risk - Severity 1 - People 2 COOP Continuity of Operations 3 - Environmental 4 Perception/Reputation Facility, Infrastructure, Operations Minimal 5 4 Major 3 Hazardous 2 Catastrophic 1 No to slight injury; not recordable Recordable injury, first aid required No to 1 day lost work time Aid required, no transport Reportable injury Lost work time 2 days to 1 week Aid required, transported Mass Casualty Incident (MCI) or 5 to 10 injuries/transports Injury resulting in lost work time more than 1 week MCI or 10 or more injuries/transports Fatalities or fatal injury Does not result in disruptive event; does not threaten life or property No impact to normal operations Can be classified as a NIMS Incident Resources involved but not overwhelmed disruption to normal operations Can be classified as a NIMS Incident Resources significantly impacted Major disruption to normal operations Can be classified as a NIMS Disaster Resources overwhelmed; local and regional mutual aid is required Threatens damage to life and/or property Significant disruption to normal operations Can be classified as a NIMS Catastrophe Airport and mutual aid resources are overwhelmed Federal response Air carrier operations suspended No environmental impact; no hazardous product/materials Non Reportable - Minimal volume of hazardous material and location and/or conditions allow for containment. Reportable Minimal volume of hazardous material Location and/or conditions do not allow for containment Reportable Significant volume of hazardous product/material Location and/or conditions allow for containment Requires substantial response Significant volume of hazardous product/material Location and/or conditions do not allow containment Long-term impact Requires substantial response and mitigation No loss of public confidence May be lowered, but public finds situation acceptable Significantly lowered with high profile media coverage Shaken to the point where significant numbers of the public will not fly on a particular aircraft or airline Shaken to the point where significant numbers of the public do not use the airport
42 Analyze risk - Likelihood Likelihood Classification Chart Frequent A Probable B Remote C Extremely Remote D Extremely Improbable E Likely to occur once a day or multiple times per week Expected to occur continuously within the system Likely to occur multiple times per year or once per month Expected to occur regularly within the system Likely to occur once a year or to occur multiple times within 5 years Occurrence is unlikely but possible Likely to occur once in every 5 years or to occur multiple times within 10 years Occurrence is conceivable but highly unlikely Likely to occur only once in 10 to 100 years Occurrence is almost impossible Lik E E Im
43 e times per in the system r or once per e system ur multiple ASSESS RISK Severity and likelihood are used to determine associated risk using predictive risk matrix. Likelihood Severity Frequent A Probable B Minimal 5 Matrix 4 Major 3 Hazardous 2 Catastrophic 1 or to occur unlikely 0 years Remote C Extremely Remote D Extremely Improbable E High Medium
44 Which Matrix? Airline (Example from AC A) Airport FAA ARP / FAA ATO 44 Port of Seattle / Crowner 2012
45 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
46 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
47 TREAT THE RISK Mitigation Plan Identify actions, controls or other measures to reduce the likelihood of consequences associated with a hazard. Reduce the predicted risk level to medium or low
48 Assess The Describe System Winter Operations Communications and Information Dissemination Current winter weather issues/concerns Incidents/Accidents Current winter communications procedures Number of RW excursions/incursions (total & during winter operations) Identify Hazards Analyze Assess Treat # Hazard 1 Stale information Not all information is available for pilots due to stale information - runway excursion 2 Relevant information (information needs to be relevant to the users) Reduced efficiency Assessment Severity Likelihood Result 1 - people Catastrophi c 2 - Coop 4 Reputation 3 Passur fails Reduced efficiency 2 - Coop 4 Reputation Extremely Improbable Remote Extremely Remote Medium High Mitigation 1- Build a Gap (BAG) to conduct an assessment of the runway and a friction test if necessary. 2- Implement a single pass operations configuration for runway snow clearance 1- Review system capabilities to make possible modifications and customizations 2- Develop a Standard Operating Procedure (SOP) for data validation 1- Contingency plans are in place based on past practice but plans need to be documented. SOP or SOG (memorialize the plan) 2- Schedule and arrange table top exercise(s) to educate and train staff on alternative plans 3- Mitigate emergency of a snow event through planning and training (see above) Residual (if any) Medium
49 SRA Recommendations: Choose diverse but complementary panel members Facilitator should be independent of issue(s) but understand the subject (Can the FAA be independent of the issue?) Allow for conflicting positions but guide discussion back to consensus Keep consequences credible Be faithful to the process Describe System Monitor Solutions SRA 5 Steps Identify Hazards Analyze Assess Treat Port of Seattle / Crowner
50 Although SMS requires integration: No SMS alignment within FAA ATO and Airports Who s on first to initiate & perform SRAs/SRMs No common language/reference SMS & Safety Enhancements to 139 NPRMs not coordinated No provisions or process to share data across hazard databases No requirement for Airlines or ground handlers to report hazards/incidents to Airport No protection from Public Information statues
51 Is FAA Ready, Willing, and Able? ATO and Airport SRAs / SRMs - conflicting and overlapping assignments, roles, and responsibilities. Will FAA defer safety to the SRA process in lieu of their intuition or expert opinion. FAA ARP does not have sufficient staff or resources to support participation or facilitation of SRAs, including their review, and approval. No comprehensive method exists to ensure continuity of findings among airport SRAs or their associated mitigation(s). 51
52 RECOMMENDATIONS: Airports are Change Agents and should lead all Safety efforts based upon FAA established guidelines. Airports should utilize existing methods to require SMS compliance and data sharing: Minimum Standards for 3rd party ground handlers Contracts and Leases/Use Agreements Align Airport, Airline, Ground Hander programs and requirements (ISAGO?). Ensure continuity between databases. Provide benchmark SRA protocols to minimize redundant efforts. Reactive (Past) Proactive (Present) Proactive (Future)
53 SEA s Safety Management Efforts Formal SRAs: Movement/Non-movement area configuration for taxiway Alpha Winter operations communications and Information dissemination Runway 16-34C planning and design hotspot mitigation Consistency of ramp markings Wildlife Hazard Management Plan at SEA Preliminary Hazard Assessments: Dual Taxilanes around North Satellite Cargo 2 group VI aircraft use Lighted X placement RWY 16L closure Port of Seattle / Crowner
54 SEA Benefits -The Internal Sell Formalizes safety program Ensures regulatory compliance Reduces risks Hold staff and tenants accountable for safety performance Establishes safety performance goals Facilitates safety ownership through participation A safer workplace is a result of identifying hazards and eliminating or reducing the risk to an acceptable level A safer environment = Improved opportunities = Increased revenue Port of Seattle / Crowner
55 Our Successes: 787-SAFE phone number established Rules and Regs. changed S.AF.E program ISAGO certification required for all applicable GSPs FOD assignments/walks conducted ABM ramp cleaning contracted ADM SMS ASR activities assigned Safety Newsletters published NPRM comments delivered GAO briefing completed Completed 4 SRAs Port of Seattle / Crowner
56 SEA Safety Promotion Efforts Safety Catch Award 787-Safe Bumper and Phone Stickers Safe Operations Card (SOC) SMS Quick Reference Guide Quarterly Newsletter Port of Seattle / Crowner
57 Final Thoughts Strongly Support SMS initiative Safe Does not Equal Free SMS What is your safety forecast? is coming to Part 139 airports makes good business sense reinforces and enhances existing safety objectives is the Standard of Care 57
FAA Office of Airports Safety Management System (SMS)
Federal Aviation Administration Office of Airports FAA Office of Airports Safety Management System (SMS) Desk Reference Version 1.0 June 1, 2012 Michael J. O Donnell Director, Airport Safety and Standards
Dallas/Fort Worth International Airport SMS Safety Risk Management Airport Early Implementation
Dallas/Fort Worth International Airport SMS Safety Risk Management Airport Early Implementation ACI-NA 15 th Annual Risk Management Conference January 13, 2014 Paul Martinez DFW Airport, VP Operations
Safety Risk Management (SRM) Under the FAA Office of Airports Safety Management System (SMS)
FAA Airports ARP SOP 4.00 Effective Date: September 1, 2014 Standard Operating Procedure (SOP) Safety Risk Management (SRM) Under the FAA Office of Airports Safety Management System (SMS) A. PURPOSE This
Air Traffic Organization Safety Management System Manual - Version 2.1
SMS Resources Each Service Unit has a designated Safety Manager and Safety Engineer(s) who can provide additional guidance regarding the Air Traffic Organization (ATO) Safety Management System (SMS). As
Airport Safety and Construction Management Under The FAA
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:
1.0 Safety Management System
1.0 Safety Management System 1 Scope and Applicability 1 1.1 Purpose....................................................................... 1 1.2 Scope.........................................................................
How To Manage Safety Risk In Aviation
4 AVIATION RISK MANAGEMENT AN INTRODUCTION Civil AVIATION AuthORITy of New Zealand BOOKLET FOUR PUBLISHED: JUNE 2013 Preface The Civil Aviation Authority (CAA) published Advisory Circular AC00-4 Safety
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. Air Traffic Organization Policy
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Air Traffic Organization Policy ORDER JO 1000.37A SUBJ: Air Traffic Organization Safety Management System Effective Date: 5/30/14 The mission
MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION. International Civil Aviation Organisation
MODEL REGULATION SAFETY MANAGEMENT SYSTEM REGULATION 1 SAFETY MANAGEMENT SYSTEM REGULATION TABLE OF CONTENTS 1. INTRODUCATION... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. GENERAL... 4 5. APPLICABILITY...
Aviation Safety Policy. Aviation Safety (AVS) Safety Management System Requirements
Aviation Safety Policy ORDER VS 8000.367A Effective Date: 11/30/2012 SUBJ: Aviation Safety (AVS) Safety Management System Requirements 1. This order provides requirements to be met by AVS and AVS services/offices
ADVISORY CIRCULAR ON SAFETY RISK ASSESSMENT AND MITIGATION
Page 1 of 14 1. PURPOSE This Advisory Circular (AC) provides guidance to service providers on safety risk assessment and mitigation. 2. REFERENCES Civil Aviation (SMS) Regulations Other related Tanzania
The need for Safety Intelligence based on European safety data analysis
The need for Safety Intelligence based on European safety data analysis Rachel Daeschler Head of Safety Intelligence and Performance OPTICS Workshop, 29 April 2015 Content Introduction to EASA Safety Intelligence
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
Airport Safety Management Systems and New Technologies
Airport Safety Management Systems and New Technologies Presented to: By: Eduardo Angeles, FAA Associate Administrator for Airports Date: Overview Safety Management Systems (SMS) Runway Incursions and Excursion
PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.
International Civil Aviation Organization HLSC/15-WP/3 21/11/14 WORKING PAPER SECOND HIGH-LEV VEL SAFETY CONFERENCE 2015 (HLSC 2015) PLANNIN G FOR GLOBAL AVIATION SAFETY IMPROVEMENT Montréal, 2 to 5 February
InFO Information for Operators
InFO Information for Operators U.S. Department InFO 07015 of Transportation DATE: 7/3/2007 Federal Aviation Administration Flight Standards Service Washington, DC http://www.faa.gov/other_visit/aviation_industry/airline_operators/airline_safety/info
CHAPTER 8. FEDERALLY-LISTED ENDANGERED OR THREATENED SPECIES
1. INTRODUCTION AND DEFINITIONS. CHAPTER 8. FEDERALLY-LISTED ENDANGERED OR THREATENED SPECIES a. General. The Biotic Resources chapter in Appendix A of Order 1050.1E combines information on Federally-listed
12.0 SAFETY AND SECURITY
12.0 SAFETY AND SECURITY 12.0 SAFETY AND SECURITY Key points The development plan within this Master Plan: Will improve airfield safety by reducing the towed aircraft runway crossings and other airfield
San Francisco International Airport Enterprise Risk Management
San Francisco International Airport Enterprise Risk Management Mike Warren Airport Risk Manager WHAT IS ENTERPRISE RISK MANAGEMENT (ERM) It is a comprehensive program that focuses on a continuous and sustainable
RISK MANAGEMENT PLAN E6-608 SUNSHINE COAST AIRPORT EXPANSION PROJECT TABLES CONTENTS. 6.1 Introduction...609 6.1.1 Hazard and risk...
E6 Summary & Management Framework RISK MANAGEMENT PLAN CONTENTS TABLES 6.1 Introduction...609 6.1.1 Hazard and risk...609 6.2 assessment...609 6.2.1 Approach...609 6.2.2 register...609 6.2.3 Change in
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS. April 2008 1
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS April 2008 1 Contents 1 Introduction 3 2 Management Systems 2.1 Management Systems Introduction 3 2.2 Quality Management System
Info NEWS MEDIA GUIDE
Info Office of Public Affairs Miami-Dade Aviation Department P.O. Box 592075 Miami, Florida 33159 Phone: (305) 876-7017 Fax: (305) 869-1270 www.iflymia.com NEWS MEDIA GUIDE Table of Contents Introduction.............................
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
Version: 3.0. Effective From: 19/06/2014
Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016
FAA Familiarization Briefing
FAA Familiarization Briefing Presented by: Kathryn Vernon Presented to: Regional Administrator Northwest Mountain Region Oregon Congressional Staff Presented on: March 13, 2015 FAA Statistics National
Safety Bulletin Newsletter
From the Captain s Seat Follow Instructions Chief Pilot: John Walter Instructions are important to us for many reasons: to keep us from getting hurt, or maybe just for our own good. As soon as we are able
Safety Management Challenges for Aviation Cyber Physical Systems
Safety Management Challenges for Aviation Cyber Physical Systems Prof. R. John Hansman & Roland Weibel MIT International Center for Air Transportation [email protected], [email protected] Challenges Target Level
Aerodrome Advisory Circular
Aerodrome Advisory Circular AC(AD) NO-13 Integration of International Aviation Security (AVSEC) Measures into Designs and Constructions of New Facilities and alterations to Existing Facilities. CIVIL AVIATION
Martha s Vineyard Airport Master Plan. Workshop December 6, 2012
Workshop December 6, 2012 Runway 15/33 Martha s Vineyard Airport Master Plan Airport Overview Runway 6/24 Business Park Terminal and Apron Workshop Agenda Agenda Introductions Master Plan 101 Recent Airport
Annex to Decision 2013/008/R
Annex to Decision 2013/008/R Annex to Decision 2012/007/R of the Executive Director of the Agency of 19 April 2012, on Acceptable means of compliance and guidance material to Commission Regulation (EU)
Emergency Guidebook for General Aviation Airports. A Guidebook for Municipal Airport Managers
Emergency Guidebook for General Aviation Airports A Guidebook for Municipal Airport Managers Emergency Guidebook for General Aviation Airports Published by: Minnesota Airport Technical Assistance Program
Subject: Safety Management Systems for Date: 1/8/15 AC No: 120-92B Aviation Service Providers Initiated by: AFS-900 Change:
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Safety Management Systems for Date: 1/8/15 AC No: 120-92B Aviation Service Providers Initiated by: AFS-900 Change:
Old Phase Description New Phase Description
Prologue This amendment of The FAA and Industry Guide to Product Certification (CPI Guide) incorporates changes based on lessons learned and supports the broader use of this guide by providing additional
Core Infrastructure Risk Management Plan
SHIRE OF MOUNT MAGNET Roads and Buildings Core Infrastructure Risk Management Plan Version 1 May 2013 AM4SRRC Document Control Asset Management for Small, Rural or Remote Communities Document ID: 59_280_110211
airsight Company Profile
airsight Company Profile Company Consulting Training Software Consulting Innovative consulting services based on in-depth knowledge for various aviation aspects Training Expert know-how on aviationspecific
To All Users: Air Traffic Organization Safety and Technical Training
To All Users: The Safety Management System (SMS) Manual version 4.0 will be effective on September 1, 2014. Continue to adhere to SMS Manual version 2.1 through August 31, 2014. For inquiries, contact
ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, 29 30 November 2011
International Civil Aviation Organization ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, 29 30 November 2011 Eduardo Chacin Regional Officer
Safety Excellence Matrix
Safety Excellence Matrix 1 = Performance just meets minimum standards 2 = Performance is satisfactory got the basics 3 = Performance is good going beyond the norm 4 = Performance is very good best practice
Risk In the Value Stream at United Airlines. Mike Quiello
Risk In the Value Stream at United Airlines Presented by: Mike Quiello VP Corporate Safety, Security, Quality and Environment 1 Agenda Overview Risks Systems/Tools Performance Summary 2 United Airlines
Safety Risk Management, Assurance, and Promotion: A Hazard Management System for Budget-Constrained Airports 1
Available online at http://docs.lib.purdue.edu/jate Journal of Aviation Technology and Engineering 1:1 (2011) 2 10 DOI: 10.5703/1288284314630 Safety Risk Management, Assurance, and Promotion: A Hazard
Springdale Fire Department Policy & Procedures Manual Volume 2 Operations Section 203 Fire Operations 203.20 City Airport Emergency Plan
Springdale Fire Department Policy & Procedures Manual Volume 2 Operations Section 203 Fire Operations 203.20 City Airport Emergency Plan In order to better protect the lives and property on and around
Implementation of a Quality Management System for Aeronautical Information Services -1-
Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management
Security Management Systems (SEMS) for Air Transport Operators. Executive Summary
Security Management Systems (SEMS) for Air Transport Operators Executive Summary March 2011 Security Management Systems (SeMS) for Air Transport Operators Introduction and Scope Executive Summary In early
AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF
AVIATION INVESTIGATION REPORT A06F0014 MISALIGNED TAKE-OFF AIR CANADA AIRBUS A319-114 C-FYKR LAS VEGAS, NEVADA 30 JANUARY 2006 The Transportation Safety Board of Canada (TSB) investigated this occurrence
140.01.3 REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM
SA-CATS 140 Safety management system List of technical standards 140.01.3 REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM 1. Minimum standards for the safety management system 140.01.3 REQUIREMENTS OF A SAFETY
TENDER FOR IT INTEGRATION AT THE BVI AIRPORTS AUTHORITY
TENDER FOR IT INTEGRATION AT THE BVI AIRPORTS AUTHORITY Background BVI Airport Authority is presently owns and operates 3 airports in British Virgin Islands by providing passengers a safe and secure gateway
2.27.1 States shall establish a State safety programme, in order to achieve an acceptable level of safety in civil aviation.
Safety Management SARPs (Extract) ANNEX 11 - ATS (Amdt 47B) Chapter 2 2.27 Safety management 2.27.1 States shall establish a State safety programme, in order to achieve an acceptable level of safety in
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
6 th Edition. FLYHT Aerospace Solutions And IOSA Compliance
6 th Edition FLYHT Aerospace Solutions And IOSA Compliance Please Note: All the material below are ISARPs that have been copied directly from the IOSA Standards manual, and are areas where our FLYHT solutions
Policy 10.105: Enterprise Risk Management Policy
Name: Responsibility: Complements: Enterprise Risk Management Framework Coordinator, Enterprise Risk Management Policy 10.105: Enterprise Risk Management Policy Date: November 2006 Revision Date(s): January
Developing and Maintaining Your Airport Property Map Lessons from St. Louis
Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority
(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission.
13-1-171 DEFINITIONS. (A) Terms not otherwise defined in this article have the meaning prescribed by applicable aviation law, including Federal Aviation Administration Advisory Circular 150/5390-2A (Heliport
Los Angeles International Airport North Airfield Assessment
Appendix H-3 LAX SPECIFIC PLAN AMENDMENT STUDY REPORT Los Angeles International Airport North Airfield Assessment May 2007 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
A Risk Management Standard
A Risk Management Standard Introduction This Risk Management Standard is the result of work by a team drawn from the major risk management organisations in the UK, including the Institute of Risk management
Subject: Establishment of a Safety Management System (SMS)
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDARJUNG AIRPORT, NEW DELHI 11 0 003 CIVIL AVIATION REQUIREMENTS SERIES 'C' PART I 20 TH JULY 2010 EFFECTIVE:
Risk Management Procedure
Purpose of this document Develop and document procedures and work instructions for Risk Management to cover the project Stages set out in the Project Process Map. The purpose of this procedure is to identify
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013
NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013 Effective Date: 14 July 2013 ANA Department Telephone: +971 0 2 4054507 General Civil Aviation Authority Telefax: +971 0 2 4054406 P.O. Box 6558
The Berkeley Group LLC
WINGMAN STANDARD AUDIT REPORT by The Berkeley Group LLC Dba Name: NV Jets Operating Certificate # 9TBA565M Onsite Evaluation July 22-24, 2015 The Wingman Standard, Revision 3.0 ICAO Document 9859, Third
USDA/APHIS/WS Safety Review. 3.1 Aviation
3.1 Aviation Safety Initiatives in Place Prior to Review The current Aviation Operations and Safety program began with the Aviation Safety and Operations Review of 1998, initiated because of a series of
Appendix 2 to Chapter 7 GUIDANCE ON THE DEVELOPMENT OF AN SMS GAP ANALYSIS FOR SERVICE PROVIDERS
Appendix 2 to Chapter 7 GUIDANCE ON THE DEVELOPMENT OF AN SMS GAP ANALYSIS FOR SERVICE PROVIDERS Gap analysis The implementation of an SMS requires a service provider to conduct an analysis of its system
Business Continuity (Policy & Procedure)
Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity
MASTER PLAN PREPARATION
Located in the East Valley of the Phoenix Metropolitan Area, Phoenix-Mesa Gateway Airport is a former military airfield that has successfully made the transition to a full service commercial passenger
Safety Management System (SMS) Pilot Project Participants and Voluntary Implementation of Service provider SMS Programs
FAA: SMS Implementation Guide Revision 3 SAFETY MANAGEMENT SYSTEM (SMS) IMPLEMENTATION GUIDE For: Safety Management System (SMS) Pilot Project Participants and Voluntary Implementation of Service provider
For: Safety Management System (SMS) Pilot Project Participants and Voluntary Implementation of SMS Programs
SAFETY MANAGEMENT SYSTEM (SMS) FRAMEWORK For: Safety Management System (SMS) Pilot Project Participants and Voluntary Implementation of SMS Programs Federal Aviation Administration Flight Standards Service
Direct Approach Consulting Inc.
Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument
WHICH AIR TRAFFIC CONTROLLER TO CONTACT
WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.
Analytics That Allow You To See Beyond The Cloud. By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business
Analytics That Allow You To See Beyond The Cloud By Alex Huang, Ph.D., Head of Aviation Analytics Services, The Weather Company, an IBM Business Table of Contents 3 Ways Predictive Airport Analytics Could
ESF-9 LAW ENFORCEMENT
ESF-9 LAW ENFORCEMENT CONTENTS PAGE I. PURPOSE ESF 9.1 II. SITUATIONS AND ASSUMPTIONS ESF 9.1 A. Situations ESF 9.1 B. Assumptions ESF 9.1 III. CONCEPT OF OPERATIONS ESF 9.2 A. General ESF 9.2 B. Operational
Airport and Aviation Funding Programs
Chapter 7 Airport and Aviation Funding Programs Airports and aviation projects across the nation benefit from many funding sources including the federal, state, and local units of government. Some improvement
Safety Management System (SMS) Manual Santa Maria Public Airport
(SMS) Manual April, 2008 i Table of Contents Section Page Introduction... iii Copyright... iv Control of SMS Documents... iv Record of Amendments... iv 1. Safety Policy and objectives... 1 1.1 The Need
PROJECT RISK MANAGEMENT
PROJECT RISK MANAGEMENT DEFINITION OF A RISK OR RISK EVENT: A discrete occurrence that may affect the project for good or bad. DEFINITION OF A PROBLEM OR UNCERTAINTY: An uncommon state of nature, characterized
CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION BOOK 1 TRAFFIC ACCIDENTS
CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION 1. General Accident Statistics 3 2. Promotion of Traffic Safety Policy and Accident Trends 3 3. The Future Direction of Traffic Safety Measures
Air Medical Transport Planning Good planning can save lives. Planning for air medical transport
Chapter 1 2 15 Air Medical Transport Planning Good planning can save lives. Planning for air medical transport is important to maximize efficiency and safety; it helps create the best care for patients.
CIVIL AVIATION ADVISORY PUBLICATION CAAP 50 SAFETY MANAGEMENT SYSTEM ( SMS )
CIVIL AVIATION ADVISORY PUBLICATION CAAP 50 (Issued January 2011) SAFETY MANAGEMENT SYSTEM ( SMS ) GUIDANCE INFORMATION REGARDING THE SAFETY MANAGEMENT SYSTEM OF OPERATORS AND ORGANSATIONS REQUIRED TO
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010
WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN CITY OF WATSONVILLE, SANTA CRUZ COUNTY, CALIFORNIA CHAPTER 3. AVIATION FORECASTS REVISED APRIL 2010 TABLE OF CONTENTS WATSONVILLE MUNICIPAL AIRPORT MASTER PLAN
How To Write A National Cybersecurity Act
ROCKEFELLER SNOWE CYBERSECURITY ACT SUBSTITUTE AMENDMENT FOR S.773 March 17, 2010 BACKGROUND & WHY THIS LEGISLATION IS IMPORTANT: Our nation is at risk. The networks that American families and businesses
IT Project Management Methodology. Project Risk Management Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Risk Management Guide Version 0.3 Project Risk Management Support Guide version 0.3 Page 1 Version Date Author
Best Practices Defined:
Workers Compensation Fund AIHA/ANSI Z-10-2005 Standard for Occupational Health and Safety Management Systems Presented by Objectives: Best Practices Defined Outline and Review the Z-10 Standard Auditing
Mauro Calvano. About Aviation Safety Management Systems
Mauro Calvano About Aviation Safety Management Systems January 2003 1 INTRODUCTION In order to be aware of the factors that are driving the accident rate during the last decade, we must identify the hazards
Safety Management System
Safety Management System 2 Contents 1. What is SMS? 3 2. Why was SMS developed? 3 3. What are the components of SMS? 4 4. How is SMS organized at Fraport? 5 5. How Does SMS Define Itself In Relation to
Unmanned Aircraft Systems (UAS)
Unmanned Aircraft Systems (UAS) UAS 101 Presented to: Airports Consultant Council Technical Workshop Presented by: Victoria Wei, Deputy Director Airport Planning and Programming Date: July 16, 2015 FAA
Risk Management & Assessment at UQ
Risk Management & Assessment at UQ Course Overview: This training module has been developed for workers at the University of Queensland, and forms part of the OH&S training program at UQ. The aim of this
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise 4. Embedding
Corporate risk register
EXECUTIVE BOARD EB133/10 133rd Session 17 May 2013 Provisional agenda item 7.3 Corporate risk register Organization-wide strategic risk management in WHO Report by the Secretariat 1. This report is submitted
Tauranga, Bay of Plenty
19/12 720 NZZC Tauranga Aerodrome Airshow and Restricted Area NZR286 Effective: 28 to 29 JAN 12 PORTAVEX 2012 and CLAIC OF THE KY will be held at Tauranga AD during the period 27 to 29 JAN 12. This event
Advisory Circular Updates Airport Planning and Environmental Division (APP-400)
Advisory Circular Updates Airport Planning and Environmental Division (APP-400) Danielle J. Rinsler, AICP Kent Duffy FAA Office of Airports December 11, 2013 Advisory Circular Update Context As of 2012,
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW Operational Test Period #2 to Evaluate the Feasibility of Changing Runway Configurations at Two Times during the Day at Boston-Logan Airport FAA Order 7400.2 Appendix
Part 150: Records of Approval
Part 150: Records of Approval Boca Raton Airport, Florida Approved on 6/28/02 The approvals listed herein include approvals of actions that the airport recommends be taken by the Federal Aviation Administration
Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker
Safety Risk Impact Analysis of an ATC Runway Incursion Alert System Sybert Stroeve, Henk Blom, Bert Bakker EUROCONTROL Safety R&D Seminar, Barcelona, Spain, 25-27 October 2006 Contents Motivation Example
GUIDANCE ON ORGANISATIONAL STRUCTURES
Safety Management System and Safety Culture Working Group (SMS WG) GUIDANCE ON ORGANISATIONAL STRUCTURES Authors: Stephen Clark, NATS Valerie Gray, UK CAA Peter Sorensen, IATA - 1 - EXECUTIVE SUMMARY This
Performance-based Navigation and Data Quality
ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright
5.0. Program Management Measures. Program Management Measures 5.0
5.0 5.0 Philadelphia International Airport FAR Part 150 Report Prepared by: DMJM Aviation AECOM In association with: Wyle Portfolio Associates, Inc. 5-1 5. 5.1 Introduction relate to the oversight and
Aerodrome Emergency Planning00000000000000000 SAFETY MANAGEMENT SYSTEMS FOR AERODROMES
Advisory Circular Aerodrome Emergency Planning00000000000000000 AC 139-16(1) JANUARY 2013 SAFETY MANAGEMENT SYSTEMS FOR AERODROMES CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory
Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1)
Oregon s Land Use Planning & Air Space Analysis (FAA 7560-1) 836.035 Effect of statute on airport zoning. ORS 836.005 to 836.120, 836.200, 836.205, 836.215, 836.220 and 836.240 do not limit any right,