1 Pavement Asset Management Guidance Section 3: Inventory and Data Management December 2014
2 Document Information Title Author Description Pavement Asset Management Guidance, Section 3: Inventory and Data Management Paul Hardy, exp consulting This section recommends the inventory data that road authorities should hold. It provides guidance on data collection methods and states how the data should be updated and validated. Document History Version Status Author Checked Changes from Previous Version 1.0 Published PH CM / MMcN December
3 3 Inventory and Data Management This section recommends the inventory data that road authorities should hold. It provides guidance on data collection methods and states how the data should be updated and validated. 3.1 Asset Register and Inventory Data The list of assets that an organisation owns is usually referred to as its asset register. Section 1: Road Asset Register of this guidance sets out how a road asset register should be categorised. The asset register is broken down into asset types to enable an understanding of an asset s value and the funding needs that it generates. Appropriate inventory data is required, to enable estimation of costs and other forward planning activities. Inventory data is the record of specific attributes of an asset that is held, in order to enable reporting and management of the asset. This relationship is illustrated in the table below. The asset register should identify the road assets held in charge, or not, by the road authority. Table 3.1: Asset Register and Inventory Data Asset Register Inventory Data Asset Asset Asset Component Sub- Inventory (to be held for each Group Type component segment or sub-component) Length Roadway Regional Roads Road Name and Road Segment XSP (Crosssectional position) / Width Traffic Impact Number Surface type Surface material specification Number lane Material source Date of last resurfacing Environment (urban, rural, etc.) Construction type Surface treatment type * Date of last surface treatment * * Optional data. These tiers of detail enable a road authority to report on their assets in a number of different ways, as shown in the example here for National Primary Roads: 5,230 km on National Primary Roads; 9,287,250 m 2 of HRA surfacing on National Primary Roads; 5% of the National Primary Roads resurfaced last year, equivalent to a 20-year return period; 24m per annum is required on average to maintain the current condition. December
4 3.2 Inventory Data A robust inventory is essential for good pavement asset management. It should be sufficiently reliable to enable it to be used to support the development of maintenance programmes and the prediction of the funding needed to achieve stated condition targets / standards. Recommendation: Road authorities should maintain the following inventory data as a minimum for each road segment (or sub-component / XSP *). * Where desired, road authorities should hold their inventory data for each sub-component. Table 3.2: Minimum Roadway Inventory Data Road Name and Number Length Roadway width Road Classification Road Impact Number Surface type Surface material specification Material source Date of last resurfacing Environment Construction type Surface treatment type * Date of last surface treatment * Contractor * Cost * GIS * * Optional data e.g. N1, R101 Segment length The average width (to calculate area of the segment) National, Regional, Local, etc. Impact Number for Roadworks Control HRA / DBM / Concrete / SMA / Surface Dressing / Other Material specification Supplier details including quarry Date (year) when last resurfaced Urban, rural, etc. Flexible / rigid / composite Slurry seal / High-friction surfacing Date surface treatment laid Name and contact details of contractor that laid the last resurfacing The total cost of the resurfacing scheme Co-ordinates of a polygon of the area Network Reference: All data collected should be referenced to a common location reference, i.e. a base network comprising of the roads schedule broken into segments, as described in Section 2: Network Referencing of this guidance. XSP: the cross-sectional position. Road Name and Number: Road name from Street Gazetteer (English and Irish), road number from road schedule. December
5 Length: The length (in km) of road in each class is available from the roads schedule. It should be updated annually as a minimum. Further updates are appropriate, if significant additions have been made to the network, e.g. the taking in charge of large new estates. Care should be taken to check that lengths held in the road schedule are correct and that segments do not, for example, extend into the middle of a junction. Roadway width: The average width (in metres) of each segment should be recorded. Where widths are not known, estimated default values should be used. The PMS should be capable of recording an average width for each road segment from which a surface area can be computed. Roadway width is defined as between kerbs on urban roads and to the edge of wearing course on rural roads. Road Classification: the class of the road national, regional, local, etc. Road Impact Number: A number given to each road according to its importance as a strategic traffic route. Surface type: The surface type for each road segment should be recorded. Where a segment comprises more than one surface type, the type covering the majority of the segment should be recorded. If the road segment is long (>500m) consideration should be given to creating two new segments. This should only be undertaken where the different surface type is likely to be retained into the future, i.e. future maintenance works are not likely to treat the whole of the existing segment with the same material. The surface type should be recorded using a standardised code, for example: HRA: Hot rolled asphalt SD: Surface dressing Conc: Concrete Mod: Modular paving Surface material specification: For each length of surfacing the details of the material specification should be recorded (e.g. Dense Asphalt Concrete Surface Course (to Clause 909 & 912). Material sources: Details of where the stone came from for the surfacing material, i.e. the quarry. This data is useful if early life failures are experienced and a road authority wants to understand the risk of further failures from materials from the same source. December
6 Date of last resurfacing (year): The year in which the last resurfacing was undertaken should be recorded for each segment. It is accepted that this data will only be readily available for recent years. As a minimum, road authorities should record this data from now on. An effort to populate historical data, such as from work contracts from the last number of years worth of contract records, would assist greatly to make this data useful in assisting the planning of works. Environment: Each road segment should be identified as being in either an urban or rural environment. The definition of urban is a road with a speed limit of 50 km/h or less. Construction Type: The form of construction of the road, flexible, rigid or composite. Surface treatment type: Some road authorities may have significant areas that have been treated with a surface treatment, typically either a slurry seal or high-friction coating (for example on approaches to a traffic signal). Some of these treatments have significant lower expected lives than the wearing course surfaces that surround them. Where significant quantities exist, the road authority may wish to store a record of these areas to aid maintenance programme development. Note: this data items is considered optional in terms of this guidance. Date of last surface treatment: Where road authorities choose to record surface treatments the date (year) when it was laid should be recorded. Contractor: Where works have been carried out by contractor, the name and contact details of the contractor who laid the last resurfacing or treatment on each segment can be recorded. Cost: The total cost of the resurfacing scheme can be recorded. The cost should be spread over the relevant road segments pro rata, based upon the length of each segment. December
7 Table 3.3: Minimum Footway Inventory Data Network Reference Footway Hierarchy Length Width or area Surface Type Surface material specification Date of last resurfacing Environment Surface treatment type * Date of last surface treatment * Contractor * Cost * GIS * * Optional data Road number, segment number, cross-sectional position Hierarchy, i.e. 1, 2, 3, 4 (see below) Segment length Width (sufficient to calculate area) or area from GIS DBM, HRA, concrete, modular paving Material specification Date (year) when last resurfaced Urban, rural, etc. Slurry seal Date surface treatment laid Name and contact details of contractor that laid the last resurfacing The total cost of the resurfacing scheme Co-ordinates of a polygon of the area Footways Functional Hierarchy Most road authorities manage their footways recognising that those in particular locations warrant a higher level of attention. It is appropriate to maintain footways in high use areas such as shopping centres) and areas where they are used by more vulnerable users, e.g. hospitals, schools and care homes, to a higher standard than other footways on the network. The below provides a recommended hierarchy for footways. Table 3.4: Footway Hierarchy 1 Primary Walking Routes Urban shopping areas, business areas and main pedestrian routes. 2 Secondary Walking Routes Linking access footways between primary walking routes and local footways. 3 Local Footways Footways associated with low use roads, residential streets. Recommendation: Road authorities should establish a functional hierarchy for their footways by allocating each footway to a category, such as in Table 3.4. December
8 Storing Inventory Data Inventory data should be stored using an appropriate computer software system. It is anticipated that most road authorities will store their inventory data in the MapRoad system. The base network comprises a series of interconnecting road segments. These are stored in the road asset management software system used by the council. Recommendation: Road authorities should store their inventory data in an appropriate software system capable of storing (as a minimum) the data shown in Table 3.2. Absence of an appropriate software system should not prevent a road authority from collecting data. It should however be noted that difficulties may be encountered in subsequently transferring the data to a software system. However, much can be learned from the data that is collected and the experience of using it with management of the asset. Any Geographic Information System (GIS) software could be used to store asset and inventory data in the absence of a PMS system. The key to being able to interrogate pavement asset data effectively is to be able to relate all the data stored to a common location reference. The most common way of doing this is to relate all items to the base network as described above. Some road authorities may choose to store some of their data in the form of polygons. For example, a major city may choose to polygonise their footway network for the purposes of matching condition surveys to differing material types. Authorities may also decide to use polygons in data collection to get an accurate area of the asset type. For the majority of road authorities, data stored as a line with attributes attached to them will be acceptable. For urban networks there may be a desire to hold a more detailed map-based representation and therefore polygons may be favoured. Urban authorities will have to balance the benefits of having accurate maps of the areas of pavement against the cost of maintaining data in this format. 3.3 Assessment of Data Quality To enable assessment of the quality of road inventory data, a simple method of assessment is provided below. It is recommended that data quality be reviewed, at least annually. More frequent data quality checks may be appropriate, where a road authority discovers that its data is unreliable, to the extent that it is not considered appropriate to use it for planning maintenance works and / or estimating costs. Recommendation: Road authorities should assess their inventory data annually using the method described in Section 3.3. December
9 Data confidence should be recorded for each of the following items: Roadway inventory: Width Surface type Date of last resurfacing Construction type Footway inventory: Length Width Surface type Pavement Asset Management Guidance The source of the data held for each of the items above for each road segment shall be entered into the PMS using the following table. The PMS will then ascribe the confidence level shown to each individual data item for each segment. Table 3.5: Basis of data Confidence Factor Actual / field measurement, e.g. tape measurement recorded width 1.00 Desktop measurement, e.g. from Ordnance Survey mapping 0.75 Estimate / default, e.g. local engineers estimate or default value for road class 0.50 Nil, no data held 0.00 For each road class, the quantity by length of data recorded on each basis shall be calculated by the PMS, as shown in the example below based on a 100 km of road. Table 3.6: Source of Data Example (width of roadway) Length (km) Actual / Field Measurement Field measurements of 250 segments total length 50 km. 50 km Desktop Measurement Width for area not measured on site, where reasonable 30 km quality mapping exists. Widths taken-off for 30 km worth. Estimate / Default Average estimated width for the road class entered for 20 km remaining segments totalling 20 km. Nil No Data 0 km December
10 This method can then be used to create an assessment of data confidence for each item and overall assessment for the class of road, by multiplying the length of road from each source with the relevant confidence factor. Using the example above, the overall confidence level for width is calculated as: [(50 x 1.0) + (30 x 0.75) + (20 x 0.5)] Confidence level for width = 100 = 83% An overall confidence level for each class of road can then be computed, by calculating the average confidence level for the items of data required, as shown in the example below: Table 3.7 Road Class Data Item Confidence Level Regional roads Width 83% Surface Type 30% Date of Resurfacing 30% Construction Type 30% Data confidence for regional roads 43% 3.4 Data Collection Many road authorities will have a need to collect additional data. A number of methods are available for the collection of inventory data. The most common methods are described below together with an assessment of the advantages and disadvantages of each method. Walked Inspector Data Collection Inventory data can be collected using existing resources, who are trained to capture relevant details during their normal inspection activities. Advantages: Using existing resources to collect data means that the data collection exercise can be integrated into other inspections. Whilst this will slow inspections down, it takes far less time than undertaking a separate, dedicated walked data collection exercise. A significant advantage of collecting missing data with inspectors is the fact that the inspectors will be trained to record asset data. The subsequent upkeep of the data, when changes are made to the asset as a result of maintenance works, etc. can then be similarly undertaken, avoiding the need to repeatedly undertake or procure data collecting surveys. December
11 Disadvantages: Initial data collection using this method can be time consuming and can slow the inspections down. If a regime of inspections is not currently in place, the collection of the data will be sporadic and would require some additional inspections to be undertaken, to ensure that the asset is fully surveyed. Relative Cost: This method of data collection for inventory is the cheapest and most viable method available in the long run. Once inspectors are trained-in and capable of using suitable data collection devices, the additional cost is low. Some investment may be required in computer hardware (hand-held data-capture devices) and associated software. This investment can usually be justified by staff time savings of handling hard-copy data from inspections, although an appropriate software system to store and analyse the resulting data is required, in order to make this exercise fully justified. Walked Data Collection Inventory data can be collected using existing resources, who are trained to capture relevant details as a separate surveying exercise. Advantages: Collection of data using a walked additional survey, by existing resources, has the advantage of the data being captured by people who may subsequently use it. A walked survey allows all data to be captured. Using existing resources to collect the data means that they are trained in the process of data capture and can then subsequently assist with the upkeep of data. Disadvantages: Depending upon the amount of data that is missing, collecting data by additional survey can be time consuming and costly. If the data required is only pavement data, then the survey can require a lot of walking to collect a relatively modest amount of data. Relative Cost: The cost of a survey of this nature is highly dependent upon the items of data being captured and the capability of the staff chosen to undertake it. This can be a comparatively expensive method of data capture. If no inventory data is held, it may be appropriate to undertake a full inventory survey and get a complete base inventory and follow this up with maintenance of the data by 'walked inspector data collection'. Topographical Surveys This method involves the use of topographic survey methods to accurately locate inventory data. This would typically comprise the collection of point items, lines and polygons for each of the asset types collected. December
12 Advantages: This method provides a high level of accuracy for location. Where detailed records of areas are required, it provides polygon data which can be presented in graphical format that better reflects reality than line data. Disadvantages: The level of accuracy that topographical surveys provide is not required for many road asset items. The data, once collected, has then to be managed by others and collection via this method does not assist in creating a resource capable of keeping the data up to date. Relative Cost: The relative cost of a topographical survey can be high, but may be warranted if there is a specific need for collecting of accurate area information. Digital Video Capture This method involves using specialist vehicle-mounted digital video equipment to capture data. The survey is undertaken, by driving the vehicle around the survey route. Data is then taken-off, either automatically for some items using sophisticated software or by an operator subsequently viewing the videos and digitising the data required. Advantages: This method provides a record that can be replayed and reviewed. It is comparatively safe, as it is undertaken from a vehicle. Large amounts of data can be relatively rapidly collected. Disadvantages: In some instances, the video capture may miss items that are obscured by parked vehicles and other obstructions. Vehicle-based Condition Surveys This method involves using data, usually a video, collected during vehicle-based condition surveys, as a source of inventory data. Surveys such as the UK SCANNER condition surveys will typically collect video data. It is similar to the method above, but would generally not apply such sophisticated video technology. Advantages: This method takes advantage of data that is already available, from a survey that has been paid for. Disadvantages: Taking data from a video relies on the image being good enough, to discern things like changes in surface and where the edge of pavement is. A vehicle-based condition survey will only be available for some roads, typically national and regional roads. This survey might not provide geo-referenced co-ordinates or measurements and if that were the case, it would be of limited use for inventory capture. December
13 Relative Cost: The relative cost is low. The additional survey cost should be nil. The cost lies in the activity in taking-off data from the videos. Aerial Photography This method uses aerial photographs as a means of identifying areas and location of assets. This method is rarely used for road asset management data collection. Using Existing Mapping This method uses existing mapping to determine areas of road. Advantage: This can be a cheap source of some basic area data. Disadvantages: The accuracy of the mapping may not be suitable to enable its use for many areas. The method cannot be used to capture material type and is likely to only be used in combination with other surveys. Relative Cost: The relative cost is low. LiDAR Light Detection and Ranging is a method of survey that is capable of measuring the height of the ground surface, in large areas, to a high degree of accuracy. The technology is not new, but the relatively recent technology improvements have provided a step change in accuracy, over the last few years. The high resolution and accuracy of the LiDAR datasets can be used to identify and geo-reference road assets. Advantages and Disadvantages: Dublin City Council has recently carried out a pilot data collection exercise using this method. A case study outlining their experience is included in Appendix 3.a. Relative Cost: The cost of this form of survey is difficult to state. Very few have been undertaken for the purposes envisaged by this guidance. Prices are likely to change if a market emerges for its use. Pavement or Road Asset Data Collection It should be noted that many inventory data collection exercises involve collecting a range of inventory items on a range of assets, i.e. it is typical for a road authority to want to collect information on signs and road markings, safety fences, etc. in addition to pavement data. The extent of the data being collected, in terms of the range of items, can significantly affect the method chosen for collection of data. December
14 By far, the most cost effective method of maintaining an inventory of pavement assets is to integrate the collection of the relevant data into normal operating practices, i.e. to make collection of the data part of what happens normally, when works are undertaken on the asset. However, this method does rely upon staff accepting the need to collect data and to do so accurately and diligently. As noted previously, this method may not be immediately available to some road authorities. As an example, where no data currently exists, road authorities should populate their systems with estimated widths, based upon local knowledge of the network. It is expected that in doing so, local standard default widths will be used for groups of roads. The systems should record that these are default widths and be capable of reporting the percentage of road by length, for which a default width is currently used. Over time, road authorities should plan to progressively update this data, until such time a full record of measured road widths exists. The most practical way of doing this is to measure the road width, whenever a road is inspected and then update the data in the system with the result. Cost-effective data collection is almost always facilitated by the use of hand-held data collection devices (DCDs), or in some instances, the use of tablet computers. Further information on types of data collection devices and the basic requirements of the data collection device is included in Appendix 3.b. Currently, most road authorities do not have a full inventory of their pavement assets. Resource constraints mean that for most road authorities, contracted-in data collection exercises are unlikely to be feasible. The most major consideration when selecting a method of data capture should be one of sustainability, i.e. will this method assist the road authority to get into a position whereby it is able to sustain an up-to-date set of data. December
15 3.5 Data Management It is essential that road authorities maintain their inventory, to ensure that it is accurate and up to date. Authorities should record the data about its road assets, as described in Section 3.4 and document the methods used to maintain and improve this data as below. Plans for improving the standard of data held should be based on the following principles: 1. Creation of an asset register and inventory database. 2. Collection of inventory data will be a priority. 3. Updating asset data shall be carried out by road authority staff, as part of their normal duties. 4. Data will be collected electronically, wherever possible. 5. Data collected by third parties* will be validated by the road authority, prior to acceptance. 6. All data will be stored against a common location reference. * A third party may, for example, be data collection contractor, a contractor supplying asconstructed data records or a utility operator applying for a licence. It is preferential for the engineers / inspectors supervising the works to have access to and the ability to update the inventory database directly, in the field. The use of hand-held data collection devices for the engineers / inspectors is recommended. This would only be possible with an asset management system. Responsibility It is recommended that an individual is identified to be responsible for ensuring the reliability of the inventory data, an Information Manager. It may be appropriate for this person to be responsible for all road asset data, including other data types, e.g. condition data, inspection records, etc. The Information Manager should be responsible for ensuring that data held is current, to acceptable levels of accuracy and that progress is made on data improvement actions. He / she should report on the quality of the data held, to an appropriate manager, on at least an annual basis. Where other data types are involved, a more frequent reporting regime may be appropriate. It may be appropriate to also appoint specific GIS technicians who are responsible for collating all data on their allocated asset group or data type. The GIS technicians should ensure that the data management procedures are adhered to, check that the targeted standards of data are met in terms of completeness of the data sets and their accuracy. Where standards are not being met or data procedures are not being adhered to, the GIS technicians are required to report the deficiencies to the Information Manager. These responsibilities will usually be executed via undertaking or arranging sample checking of the data. December
16 3.6 Data Management Procedures Road authorities should document specific data management procedures, to ensure that the inventory is updated. Specific procedures will need to be created to reflect the resource levels, organisation structure and management methods of each road authority. It is however expected that the following procedures will be required, as a minimum. New Assets Contractor- or Council-built This section refers to assets that are commissioned by the council itself and built by a contractor or by the council s own construction resources. A specific procedure should be developed. It is likely to include reference to: Confirm scheme list for the year. Confirm completion of each project / scheme and hand-over into maintenance. Advise maintenance department to commence inspections and routine maintenance. Delivery of as-constructed drawings. Creation of data from as-built drawings and input into asset register / inventory databases. 1 Validate a sample of the data on site to check for accuracy. Update roads schedule / asset register and data inventory. The contractor should deliver the as-constructed drawings, in a format specified in the road authority s tender documents. New Assets Taking In Charge For assets that are built by private developers and subsequently put up for taking in charge by the council, a specific procedure should be developed. It is likely to include reference to: Confirmation of taking in charge from the appropriate department. Advise maintenance department to commence inspections and routine maintenance. Delivery of as-constructed drawings from the developer. Creation of data from as-constructed drawings and input into the asset register and inventory databases. Validate a sample of the data on-site, to check for accuracy. Delivery of as-constructed drawings from the work section responsible for confirming completion of works. Input of data into the database (PMS or other road asset management software system). 1 Most as-built drawings will be delivered in a drawing file format, e.g. a CAD drawing. This cannot be easily converted into data for uploading into a pavement management or road asset software system. The data usually has to be extracted from the drawing manually, by a technician taking-off relevant details, then manually entering them into the inventory database. Alternatively, the council may be able to specify delivery of asset data in an appropriate format, for uploading into the council s systems. This applies to contractor- or council-built assets and taking in charge. December
17 Major Maintenance and Resurfacing A specific procedure should be developed. It is likely to include reference to: Confirmation of the completion of individual schemes. Delivery of as-constructed drawings from the work section responsible for confirming completion of works. Creation of data from as-constructed drawings and input into the asset register and inventory databases. Creation of data from as-constructed drawings and input into the database (PMS). Validation of a sample of the data on-site, to check accuracy of the records supplied. Creation of data from as-constructed drawings and input into the database. Routine and Minor Maintenance and Reactive Repair It is not expected that the asset inventory will include records of routine minor maintenance and reactive repairs. These records should be collected and stored in accordance with the guidance given in Section 4: Routine Maintenance Management of this guidance. Removal Removal of assets is relatively rare, however a procedure should be outlined, if it is considered that this may happen and asset records will require updating, to remove assets. Updating Timing The timing of the updating of inventory should be specified, for example: Table 3.8: Inventory Updating Timing Type New Assets Council-built New Assets Taking in Charge Major maintenance and resurfacing Removals Timing Within 3 months of completion Within 3 months of taking in charge Annually updated in November Within 3 months of confirmation of order 3.6 Data Improvement Road authorities should record their data improvement actions for roadways. This should refer to the assessment of existing inventory data, as detailed in Section 3.3 above. Improvement actions should focus on a small number of achievable targeted improvements, as illustrated in the example below. December
18 Table 3.9: Data Improvement Actions Inventory Data Deficiency Action Target Completion Date Roadways Accurate road widths are only held for 25% of the network Surface types are held for less than 10% of the network Estimated widths to be measured from Ordnance Survey digital maps Last 3 years resurfacing records to be entered onto the MapRoad system e.g. December 2014 e.g. December Audit, Validation and Reporting Road authorities should record the methods used to audit and validate data. Desktop Audits It is recommended that road authorities programme an appropriate regime of desktop audits of the data held in their systems and databases. The timing of these audits should be dictated by either time (a set frequency) and / or the level of activity, i.e. an additional check may be warranted if there have been a lot of changes to the assets, over a period of time. A minimum frequency of quarterly audits is recommended. Desktop audits should be able to test the full database for logic. If the audit is to check that new records have been added, it is recommended that a check is undertaken on 10% of the records. If this check fails to meet the specified standard of, say 98%, the sample should be extended by 10%. If the standard is then met, then the audit is considered to comply. If the data does not meet the standard, appropriate corrective actions should be programmed. The actions may include collection of data, in areas where records are suspect, staff re-training, or amending data management procedures, to ensure the procedures are adhered to. Desktop audits should examine items including, but not limited to: Checking if data from known changes (e.g. specific schemes) has been loaded. Checking if superseded assets have been removed. Checking if there are duplicate items in the databases for locations and / or asset types. A specified level of accuracy and completeness should be documented in this plan and corrective actions instigated, when data quality does not meet the required standard. Validation of Third Party Data It is recommended that where any data is collected by a third party, for the council, that the method of validating this data prior to acceptance is recorded separately. December
19 Field Validation In order to validate data held within the database, a regime of sample field survey checks shall be carried out. These will take a randomly selected sample of data and check it against the physical assets. It is recommended that this exercise is carried out every two years, on a minimum sample of 5% of the network by length. Appropriate corrective actions should be documented, for where the data does not fall within the required accuracy (95%). Reporting on Data Quality It is recommended that a reporting regime is included, that reports the result of audits and progresses completing data improvements to an appropriate management forum. 3.8 Other Asset Data A wide range of data is required, in order to effectively manage pavement assets. The careful management of all of these data sets is required. Asset data is required to enable: - Monitoring and reporting on the condition of the road network. - Assessment of the expected lives of individual assets or asset components. - The assessment of current and the development of future levels of service. - The measurement and reporting of asset performance, using appropriate indicators. - The modelling of future maintenance options and investment strategies. - The development schemes and forward works programmes. - The identification of future budget requirements. - Asset valuation and financial reporting. This section of the guidance deals solely with inventory data, i.e. the number, location, size, type, age and components that make up each asset. Data management principles, described above, should be applied equally to maintaining the quality of other asset data that may typically include: - Condition: comprising measurement and observational rating of the condition of elements of the asset, derived from either physical testing or visual inspection. - Inspection: comprising details of the safety inspection regime and records of inspection results and actions initiated. - Use: comprising details of the use of assets, in the form of data such as traffic counts, heavy vehicle routes, etc. and third party use such as utility openings that affect the operation and maintenance needs of the network. - Cost: enabling the comparison of unit costs, price benchmarking and effective estimating. - Safety: collision statistics and location of collision-prone locations, etc. - Customer: comprising of data on complaints, queries and requests for service, data relating to customer satisfaction surveys. December
20 Appendix 3.a: Dublin City Council Inventory Data Collection Case Study Background Dublin City Council embarked upon a project to introduce a Transport Asset Management System to support the management of the city s road infrastructure. An assessment of data early in the project identified a need to collect inventory data. Specifically, there was a priority need to collect detailed inventory for the central business area. Procurement The council chose to obtain this data using an external surveying contractor, as adequate resources were not available in-house to carry out this survey. A tender was drawn up and advertised. Two suitably-qualified tenders were received. A contractor was subsequently appointed with a tender price of just over 40,000. The tender document comprised of a description of the data to be collected, the accuracy required and the specific items of data to be collected. A separate document, Guide Manual for Asset Inventory Survey was supplied to the successful contractor upon appointment. This contained photographic examples of the assets and their attributes that were to be collected. Scope The survey covered the central business area of Dublin, an area that comprises of 114 km of streets. Data for the following assets was collected: Roadway Street-name plates Footway Cycle stands Kerbs Bollards Traffic islands Public lighting Anti-skid surfacing Unsignalised pedestrian crossings Cycle tracks Signalised pedestrian crossings Road markings Pedestrian-crossing signal poles Pedestrian guardrails Fibre-optic chamber covers Traffic signs Traffic-calming features For each asset, up to five attributes were collected. A combination of lines, points and polygons were required. All were to be referenced to the road segment. December
21 Specification The accuracy of the survey was specified as ±500mm. Data was required in a GIS format. It was suggested in the tender that the contractor use hand-held data-capture devices, however, the precise method of survey was left for the tenderers to propose. The winning tender proposed the use of LiDAR technology. Photographs were required of all traffic signs and street-name plates. Contract The contract was awarded in February The successful contractor LandScope Engineering Ltd. proposed the use LiDAR as the survey method. This entailed using mobile mapping technology to gather high accuracy point cloud data and photographic imagery which essentially provided geo-referenced imagery, from which asset data could then be extracted. Survey works commenced in March 2011 and site data collection was completed over two days of site work. The data extraction phase then took place in the office and the data was subsequently supplied on 1 st September Output The results have been loaded in the council s GIS system and can be displayed and interrogated in map form, as illustrated in the screen shots below. The results are displayed as lines, points or polygons. Images 3.1 and 3.2 Lessons Learnt The questions (in bold italics) were posed to Dublin City Council following their inventory survey. The answers supplied are given below. December
22 Where you happy with the results? In general, we were happy with the results for all the assets, except the footway material-type. We had requested footway material-type as an attribute to be surveyed, but found that in a considerable number of cases, concrete paving slabs were labelled as granite paving slabs and vice versa. This was due to the fact that it was difficult to differentiate between these materials by desk-top data extraction from the LiDAR and imagery. We carried out some quality assurance (QA) checks on site and found that the footway material type had an accuracy of 70%. Our in-house surveyors carried out topographical surveys at three random locations within the inventory survey area and on comparison of results we found the accuracy of the locations of the assets was within ±500mm as specified. Did the data meet the quality you required? On the whole, yes, but we were disappointed with the footway material type attribute, as outlined above. We are also found that the resolution on some of the street-name plate photographs was not clear enough to read the street name. Did it load easily into the corporate GIS system? Yes, we had no problems loading the data as we had specified that the data must be in an Access database viewable in GeoMedia. If you have to procure another survey what might you do differently? If possible get a contractor who had experience of using LiDAR imagery for extraction of similar data previously. Specify that we receive intermediate results during the survey and organise that we carry out our own QA at these stages to alert us earlier to any problems. Specify clearly whether we wish the assets or asset sub-sets to be represented as a point, line or polygon, e.g. for road markings we would specify a polygon for a yellow box and a line for double yellow line. Specify photographs of all assets to be recorded and for them to be spatially linked (we only specified photographs for street-name plates and traffic signs). Specify that the contractor has to carry out a validation process, to demonstrate the reliability of the data. Ensure that we have sufficient in-house resources available to carry out QA audits on the data, as soon as it is received. We would also need to address in future contracts how we could improve the turnaround, between the survey and delivery of the data, as there was a seven month delay in this contract. Was the LiDAR approach beneficial? Yes, in that it is hugely cost effective, in comparison with having to collect all the required asset locations and attributes on site. December
23 Appendix 3.b: Data-capture Devices The table below describes the items that should be considered, when deciding on the type of data collection device (DCD) that a road authority should procure. A range of DCDs are available and each authority will need to determine what devices best meet their needs. Table 3.10: Criteria for Evaluating Data-capture Devices Asset data to be collected Survey Method Type of Inventory Data Input method Location Accuracy GPS accuracy Physical characteristics Surveyor skills and experience Compatibility Cost What data is to be collected, i.e. inventory, condition, combination of both and / or maintenance history. Whether that is by walked survey, using hand-held DCDs or a driven survey using vehicle-mounted GPS units. Whether this is point (e.g. gully), point / line (gully and pipework) or point / line / level (gully, pipework and grate level). By electronic map (point / line drawn on pre-loaded electronic maps by stylus) or accurate location by GPS and attributes added via drop-down menu. Approximate position location only (map) or full X, Y & Z co-ordinates. Standard or DGPS (Differential Global Positioning System) to <1m accuracy, a particular consideration for built-up urban areas. Weight, screen size, screen visibility in bright light, robustness, battery life, additional features, e.g. camera. Degree of road infrastructure understanding and level of computer literacy required. How the base data will be uploaded onto DCD and survey data subsequently uploaded into a road authority s asset management / GIS systems. Purchase and ongoing supplier support and costs. It is recommended, that road authorities have a documented understanding of data collection needs, prior to evaluating DCDs. In addition, when trialling the use of data-capture devices, it is important to ensure that this is sufficiently detailed and long enough to thoroughly test each unit being evaluated to include the: Loading of asset management software (if applicable) onto the DCD. Surveying in the field, including use of GPS. Uploading of data from the DCD onto an authority s asset management / GIS systems. Recommendation: It is recommended that road authorities carry out comprehensive trials of DCD equipment are undertaken prior to purchasing. December
Environment Committee 11 January 2016
Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition
Highway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE (RMO) John McCarthy Senior Advisor Department of Transport, Tourism and Sport
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE (RMO) John McCarthy Senior Advisor Department of Transport, Tourism and Sport MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE
Cost-Effective Collection of a Network-Level Asset Inventory. Michael Nieminen, Roadware
Cost-Effective Collection of a Network-Level Asset Inventory Michael Nieminen, Roadware Introduction This presentation is about using a mobile vehicle to collect roadway asset (feature) data. Asset/Feature
APPENDIX A: ASSET INFORMATION STRATEGY
APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Monitoring Highway Assets with Remote Technology
Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile
Managing Linear Assets with Ventyx Ellipse
A Ventyx Whitepaper: Managing Linear Assets with Ventyx Ellipse Discover How Ventyx solutions Uniquely Meet the Requirements for Linear Asset Management Copyright 2012 Ventyx, An ABB Company. All rights
Asset Management-Roads / Highways Integrated Road Asset Management System-IRAMS. Abhay Kimmatkar Jt. Managing Director
Asset Management-Roads / Highways Integrated Road Asset Management System-IRAMS Abhay Kimmatkar Jt. Managing Director CORPORATE OFFICE Nagpur GIS CENTERS Nagpur Mumbai Hyderabad Lucknow DOMESTIC OFFICES
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
Before applying for a Road Opening Licence, please read and understand the following information.
Sept 2012 Before applying for a Road Opening Licence, please read and understand the following information. What is a Road Opening Licence? A Road Opening Licence (ROL) is a licence that allows the holder
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
Principles of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26
Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain
www.nams.au.com National Asset Management Strategy Australia
DEVELOPMENT OF A ROAD ASSET REGISTER USING DIGITAL VIDEO TECHNOLOGY DUNGOG SHIRE COUNCIL Matt Ryeland, mailto:[email protected] Senior Technical Officer, Management Services. Cardno Terry Wilson,
15 th UPDEA CONGRESS THEME: GEOGRAPHIC INFORMATION SYSTEM: ECG S EXPERIENCE ABSTRACT. PATRICE AFENYO, Electricity Company of Ghana
15 th UPDEA CONGRESS THEME: GEOGRAPHIC INFORMATION SYSTEM: ECG S EXPERIENCE Author: PATRICE AFENYO, Electricity Company of Ghana ABSTRACT GIS (Geographic Information System) is an integrated system of
Highway Infrastructure Asset Management Strategy
Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...
CGAM022.1/12/10. Asset Management Improvement Strategy 2010
Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
GUIDELINES FOR WORKING ON ROADS
GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................
Slough Borough Council. Highway Asset Management Strategy
Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand
SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)
SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council
AMS Asset Management Redkite Asset Management System When only the best will do.
Defects AMS Asset Management Redkite Asset Management System When only the best will do. Redkite Systems Ltd 2014 AMS Overview You ll wonder how you managed without it! What can I record on Redkite AMS?
Review of Best Practice in Road Crash Database and Analysis System Design Blair Turner ARRB Group Ltd email: [email protected].
Blair ARRB Group Ltd email: [email protected] Abstract Crash databases are an essential tool in analysing crash risk. Databases allow analysis of trends as well as the identification of high crash
Monitoring and evaluation of walking and cycling (draft)
Sustrans Design Manual Chapter 16 Monitoring and evaluation of walking and cycling (draft) November 2014 September 2014 1 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.
Plymouth Council & Asset Management
Plymouth Council & Asset Management Plymouth City Council is committed to improving the condition of its carriageways and has demonstrated this graphically by pledging to spend 20m over and above any DfT/central
www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT
AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract
ROAD/ROUTE SURVEY AND CLEARANCE
ROAD/ROUTE SURVEY AND CLEARANCE 1. GENERAL INTRODUCTION 1.1 The purpose of this Road/Route Survey and Clearance Chapter is to define the minimum standards and procedures for Road/Route Survey and Clearance
Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL
-- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal
GIS DATA CAPTURE APPLICATIONS MANDLI COMMUNICATIONS http://www.mandli.com
GIS DATA CAPTURE APPLICATIONS MANDLI COMMUNICATIONS http://www.mandli.com Mandli Communications is a leader in specialized digital imaging equipment. Since 1983, the company has produced a range of imaging,
HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings
HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning
ASSET MANAGEMENT STRATEGY
ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework
IP-S3 HD1. Compact, High-Density 3D Mobile Mapping System
IP-S3 HD1 Compact, High-Density 3D Mobile Mapping System Integrated, turnkey solution Ultra-compact design Multiple lasers minimize scanning shades Unparalleled ease-of-use No user calibration required
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Feeder Roads
GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Stephen Yao FIATORNU, Ghana Key words: SUMMARY With the development of GIS technology, network transportation
ethekwini Metropolitan Municipality s
ethekwini Metropolitan Municipality s integrated approach to pavement asset management INTRODUCTION Recent asset management legislation has holistically incorporated a host of previously stand-alone principles
Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks
Pavement Engineering & Asset Management Meeting the requirements of our existing & future diverse road networks 3 Introduction Pavement Engineering Services Jean Lefebvre (UK) are able to provide analysis
Specialised Data Specifications
Version 4.6.0 26 01 March 2015 SPECIALISED DATA SPECIFICATION have been created to document standards for specific types of spatial data that have requirements that may differ from, or be additional, to
Item: 16 Page: 5. 1. Purpose
Item: 16 Page: 5 1. Purpose 1.1 Improving Choice in Verification of Building Standards. A Scottish Government consultation on the introduction of the National House Building Council (NHBC) for the verification
Guide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program
Guide to the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program Program Conducted by Texas A&M Transportation Institute In Cooperation with the Texas Department of Transportation
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
Jersey Safety Council. End Users Scaffolding Seminar
Jersey Safety Council End Users Scaffolding Seminar The Jersey Safety Council Who we are The Jersey Safety Council is an independent body part funded by the States of Jersey made up of local business people
Scrim And Texture Data Collection Contract Management S Chamberlain
Scrim And Texture Data Collection Contract Management S Chamberlain Introduction Transit New Zealand (Transit) has been successfully managing SCRIM and texture data collection through external suppliers
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY
HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE. Stephen Flynn Chartered Engineer Road Management Office
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE Stephen Flynn Chartered Engineer Road Management Office Injuries Board Statistics 2009 Apx. 33M Public Liability Claims in 2009 Apx. 1400 awards.
Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell
Road Asset Management vs Pavement Management A new Paradigm Arthur Taute Stewart Russell Contents Background Definitions Improvements over PMS TMH22 elements Conclusions BACKGROUND Municipal AMS GRAP17
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,
Performance Monitoring
7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5
Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.
This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution
Version No: 2 Date: 27 July 2015. Data Quality Policy. Assistant Chief Executive. Planning & Performance. Data Quality Policy
Version No: 2 Date: 27 July 2015 Data Quality Policy Assistant Chief Executive Planning & Performance Data Quality Policy Contents 1. Summary Statement 2. Context 3. Purpose 4. Scope 5. Detail of the policy
Project Acronym: CRM ACCORD Version: 2 Contact: Joanne Child, Doncaster College Date: 30 April 2010. JISC Final Report CRM ACCORD
Project Acronym: CRM ACCORD JISC Final Report CRM ACCORD Page 1 of 22 Document title: JISC Final Report Last updated: April 2007 Table of Contents Acknowledgements... 3 Executive Summary... 4 Background...
Quick Guide: Managing ICT Risk for Business
Quick Guide: Managing ICT Risk for Business This Quick Guide is one of a series of information products aimed at helping small to medium sized enterprises identify and manage risks when assessing, buying
10.0 ASSET MANAGEMENT PRACTICES. Table of Contents
10.0 ASSET MANAGEMENT PRACTICES Table of Contents 10.0 ASSET MANAGEMENT PRACTICES... 119 10.1 Current Asset Management Practices... 120 10.2 Asset Management Processes... 120 10.2.1 Attribute data collection
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
maintenance of CCTV surveillance systems code of practice
maintenance of CCTV surveillance systems code of practice Issue 3 January 2015 For other information please contact: British Security Industry Association t: 0845 389 3889 f: 0845 389 0761 e: [email protected]
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management
Hampshire s Highway Asset Management Strategy 1 Implementing Effective Asset Management 1.1 Hampshire County Council recognises the importance of the highway infrastructure in the context of the well being
OUTPUT: RURAL ROAD ASSET MANAGEMENT
Rural Roads Improvement Project II (RRP CAM 42334) OUTPUT: RURAL ROAD ASSET MANAGEMENT A. Introduction 1. The Project. The Royal Government of Cambodia (the Government) has requested for a loan from Asian
1. Overview 2. Field Service Management Components 3. Joining the dots 4. Filling in the gaps 5. Implementing end-to-end Service Management
1. Overview 2. Field Service Management Components 3. Joining the dots 4. Filling in the gaps 5. Implementing end-to-end Service Management End-to-end service management encompasses a wide variety of tasks
Highway Asset Management Strategy
Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers
Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4
Star Rating and Investment Plans: Road Survey and Coding Specification
Star Rating and Investment Plans: Road Survey and Coding Specification PRINT WARNING printed copies of this document or parts thereof should not be relied upon as a current reference document. Always refer
Mobile works management and asset data
Mobile works management and asset data KERNMOBILE KernMobile is a leading software company, known for its unique, flexible mobile platform used by local government, utilities and contractors alike. Field
The Key Performance Indicator Evaluation Process (KPI Process)
The Key Performance Indicator Evaluation Process (KPI Process) Aims Continuous improvement Quantitative and qualitative consultant, contractor and supply chain evaluation Identification and commendation
The complete provider for. Gauging Products and Measurement Systems
The complete provider for Gauging Products and Measurement Systems The Gauging Requirement Effective clearance assessment is something that concerns all railways and demands for significantly increased
Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 2014
for Inspecting and Certifying Buildings and Works Building Control Regulations 2014 February, 2014 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1 1.3 Application
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
NHS LANARKSHIRE HEALTH RECORDS POLICY Management and Maintenance, Security, Storage, Distribution and Retention of Health Records
NHS LANARKSHIRE HEALTH RECORDS POLICY Management and Maintenance, Security, Storage, Distribution and Retention of Health Records Author: Responsible Lead Executive Director: Endorsing Body: Governance
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
11. Managing our Transport Assets
11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate
ROADING ASSET MANAGEMENT PLAN
ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA. Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz Contents Introduction Methodology Pavement Management System
ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD
ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers
GEOGRAPHIC INFORMATION SYSTEM ECG S EXPERIENCE
UPDEA 15 TH CONGRESS, JUNE 2005, ACCRA-GHANA GEOGRAPHIC INFORMATION SYSTEM ECG S EXPERIENCE Presented By: Ing Patrice Afenyo In This Presentation.. ECG Brief Components of a GIS Why ECG Needs GIS Our Approach
In 2005, the City of Pasadena, CA, USA, with the support of consultants,
Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.