Negotiations feedback for successful project preparation. ERANIS workshop, , Minsk

Size: px
Start display at page:

Download "Negotiations feedback for successful project preparation. ERANIS workshop, 27.11.2007, Minsk"

Transcription

1 Negotiations feedback for successful project preparation

2 Negotiations procedure Feedback from the Commission on the project plan issues that need to be explained in more detail Request to formulate Annex I from the proposal Request to fill in the Grant preparation forms (GPF) Negotiations meeting Contract

3 Nature of the negotiations prepare an ideal proposal for the Commission Workplan More detailed task descriptions More detailed deliverable descriptions Detailed overview of project results and connections between different results Implementation possibilities of project results and the market potential

4 Nature of the negotiations II Team overview People involved Main job functions in the project (refer to tasks) Availability of full time (%) Tomi Kauppinen WP4 Leader Research and development in WP 1, WP 2, WP 3, WP 4, WP5, WP6 50% Tuukka Ruotsalo WP4 Deputy leader Research and development in WP 1, WP 2, WP 3, WP 4, WP5, WP6 50% Eetu Mäkelä Research and development in WP 1, WP 2, WP 3, WP 4, WP5, WP6 20% Antti Nurminen Research and development in WP 1, WP 2, WP 3, WP 4, WP5, WP6 20% Eero Hyvönen Research and development in WP 1, WP 2, WP 3, WP 4, WP5, WP6 10%

5 Nature of the negotiations III Managem ent Technical consu ltant Professor Senior Researcher Researcher Post Doc / Researcher Engineer J:r researcher / PhD student Partner Partner Partner Partner Partner Partner Partner Partner

6 Problems within the negotiations 1. partners have sent the wrong cost model, which has to be changed. This will result in recalculating the entire budget 2. Partners have sent the wrong person-month rate, now they cannot support it with the cost categories of individual experts. 3. Partners will delay with everything

7 Contract Signature by Coordinator &Commission Accession of beneficiaries via Form A Later accession of beneficiaries via Form B Entry into force upon signature by Coordinator & Commission Consortium Agreement mandatory (except if excluded by Call)

8 Getting the money pre-financing Shall be transferred by the Commission not later then 45 days after the entry into force of the grant agreement The coordinator will distribute it to the partners when the partners have signed the Form A Accession to the contract. The amount of pre-financing will be determined within the negotiations. As a general rule it should be equivalent to 160 % of the average EU funding per period. 5 % of the pre-financing will be kept by the Commission to the Guarantee Fund. This will be returned to the Consortium with the final payment no need for financial guarantees! 10 % retention of the total payment will always be kept by the Commission until the last payment.

9 Project management Researchers Researchers Large Large enterprises enterprises SMEs SMEs Time Time horizon horizon 5-10 years 5-10 years weeks/months Indirect Indirect concern concern Best science Best technology Survival and competition Direct Directconcern concern Publications, next contract Best partners, deadlines Money, clients and shareholders

10 EU project management Low management hirachy due to virtual organisation Frequent monitoring, 3-6 month period Use of virtual workspaces (f.i. Delegation of the responsibilities to activity poles (work packages) Project Management Board meetings every 6 months Constant contact with project officer Review meetings hosted by the EC

11 Risk within international R&D projects Virtual organization, people do not subordinate directly to project coordinator Technological risks, R&D fails Financial risks, late payments, non-eligible payments Risks associated with partners people leave, death etc Market risks changing environment People do not communicate Risks associated with the EC project officer will change...

12 Project organization Project management board (Steering Committee): highest decision body representing all the partners Advisory Board: supporting body Project manager: responsible for entire project management and coordination Scientific coordinator Work package leaders: responsible for managing specific tasks

13 Managing risks Consortium Agreement Study carefully project contract with annexes Project handbook Project reporting guidelines Progress tracking efficient reporting within the consortium Timesheets

14 Timesheets Fix the time worked for a specific project Is filled on a daily basis for each month The aggregated time indicated on timesheets should more or less follow the effort indicated in Technical Annex A person months consists of ca working hours

15 Gantt table Project is managed in correspondence to Gantt table (activities vs time table) The Commission is interested in receiving deliverables on time, in accordance with Technical Annex

16

17 Consortium agreement The internal organization of the consortium including the decision making procedures Rules on dissemination and use and access rights The distribution of the EC financial contribution Penalties The settlement of internal dispute Confidentiality arrangements between the beneficiaries

18 Role of the coordinator Acts as the interface to the Commission Receive payments from the Commission Distribute payments to the Consortium Responsible for the financial management of the project Responsible for delivering the work Large role on WP leaders review the reports to verify consistency with the project tasks before transmitting them to the Commission; monitor the compliance by beneficiaries with their obligations under this grant agreement. Notify the Commission of the financial distribution

19 Role of the partner To maintain proper records To prepare and submit reports To carry out the work of the project To make appropriate internal arrangements consistent with the provision of Grant Agreement to ensure the efficient implementation of the project

20 Reporting to the European Commission After each 12 month and in the end of the project The periodic activity report The periodic management report The periodic report on the distribution of the Community s contribution (Coordinator) + several questionnaires by the Coordinator

21 Periodic activity report I Section 1 Project objectives and major achievements during the reporting period (Coordinator) general project objectives, show the project s current relation to the state-of-the-art Summarise the objectives for the reporting period, work performed, contractors involved and the main achievements in the period If applicable, comment on the most important problems during the period including the corrective actions undertaken

22 Periodic activity report II Section 2 Workpackage progress of the period For each workpackage, present information under the following headings: Workpackage objectives and starting point of work at beginning of reporting period Progress towards objectives tasks worked on and achievements made with reference to planned objectives, identify contractors involved Deviations from the project workprogramme, and corrective actions taken/suggested: identify the nature and the reason for the problem, identify contractors involved List of deliverables, including due date and actual/foreseen submission date List of milestones, including due date and actual/foreseen achievement date

23 Periodic activity report III Section 3 Consortium management (Coordinator) This section should summarise the status of the project, its management and follow-up activities, including information on: Consortium management tasks and their achievement; problems which have occurred and how they were solved Contractors: Comments regarding contributions, changes in responsibilities and changes to consortium itself, if any Project timetable and status, including an updated, frontlined barchart. Clarify changes and impact on the planned milestones, if any The section should also provide short comments and information on co-ordination activities in the period, such as communication between partners, project meetings, possible co-operation with other projects/programmes etc.

24 Plan for using and disseminating the knowledge - Section 1 - Exploitable knowledge and its Use This section will only present exploitable results, defined as knowledge What the exploitable result is (functionality, purpose, innovation etc.); Partner(s) involved in the exploitation, role and activities How the result might be exploited (products, processes) - directly (spin offs etc) or indirectly (licensing) on an individual basis or as a consortium/group of partners; Further additional research and development work, including need for further collaboration Intellectual Property Rights protection measures (patents, design rights, database rights, plant varieties, etc include references and details); Any commercial contacts already taken, demonstrations given to potential licensees and/or investors and any comments received (market requirements, potential etc.); Where possible, also include any other potential impact from the exploitation of the result (socio-economic impact).

25 Exploitable knowledge and its Use II

26 Plan for using and disseminating the knowledge Section 2 Dissemination of knowledge The overview table should be accompanied by a short description for each major activity (conference, exhibition, etc.) having taken place or planned since the last report.

27 Periodic management report I Section 1 - Justification of major cost items and resources A brief description of the work performed by each contractor during the period. Explanatory note on any major cost items such as important equipment purchases, major travel costs, large consumable items etc., justifying their necessity to the project. A tabular overview of budgeted costs and actual costs, by contractor and by major cost item including personnel (see Appendix 2, Table 3). For AC contractors, a tabular overview of all resources employed on the project and a global estimate of all costs. (own resources)

28

29 Periodic management report II A tabular overview of budgeted. The budgeted personmonths should normally be taken from Annex I to the contract. For AC contractors, in addition estimate the number of person-months of permanent staff working on the project (FP6) A summary explanation of the impact of major deviations from cost budget and from person-month budget, with reference to Section 2 Workpackage progress of the accompanying Periodic activity report where the reasons for deviation from plan have been explained.

30

31 Periodic management report II Section 2 Form C Financial statement per activity for the contractual reporting period, to be completed by each contractor Declaration of eligible costs Declaration of receipts Declaration of interest generated Request for the EC financial contribution Audit certificates Conversion rates reporting in Euro Contractor s certificate

32 Periodic management report II Section 3 Summary financial report Include a summary report of total (direct + indirect) costs in euros as claimed by each contractor and activity type, for the reporting period (i.e. a summary of the individual contractor s Form C information).

33 Certification of costs A certificate on the financial statements shall be submitted for claims of interim payments and final payments when the amount of the Community financial contribution claimed by a beneficiary under the form of reimbursement of costs is equal to or superior to EUR , when cumulated with all previous payments for which a certificate on the financial statements has not been submitted. Certificates on the financial statements shall certify that the costs claimed and the receipts declared during the period for which they are provided, as well as the declaration of the interest yielded by the pre-financing meet the conditions required by this grant agreement

34 Certification of costs

35 Certification of costs The Commission may, at its sole discretion, accept at the request of a beneficiary, that it submits a certificate on the methodology for the calculation of costs, which it used to prepare its claims with regard to both personnel and indirect costs, and the related control systems. This certificate must be forwarded in the form of a detailed description verified as factual by its external auditor (Form E - Annex VII). When this certificate is accepted by the Commission, the requirement to provide an intermediate certificate on the financial statements for claims of interim payments shall be waived.

36 Timing of reports Art II.7. Reports and deliverables All reports and deliverables shall be submitted within 45 days following the end of the respective reporting period Art II.8. - Evaluation and Approval of Reports and deliverables The Commission undertakes to evaluate all other reports within 45 days of receipt. The absence of the response from the Commission within 45 days shall not imply approval by the Commission. The Commission may reject these reports even after the time limit for payment. The payment shall be made within 45 days from the acceptance of reports

37 Review meeting annual assessment of the results The review will assess the following: the degree of fulfilment of the project work plan for the period the degree of fulfilment of the deliverables the necessity of the resources that the contractors have employed the management aspects of the project the likelihood to achieve the results aimed at by the project the planning of the next period the plan for using and disseminating the knowledge

38 Thank you!

Project reporting in FP6

Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research or Innovation Projects, Coordination Actions, Specific Support Actions, Co-operative Research Projects and Collective

More information

Project reports and reviews in FP6

Project reports and reviews in FP6 Project reports and reviews in FP6 Zoe Ketselidou IST Operations NCP meeting Brussels, 8 March 2005 Periodic reporting At the end of each reporting period 1. Periodic activity report (overview of progress)

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

Project management in FP7. Gorgias Garofalakis ETAT S.A.

Project management in FP7. Gorgias Garofalakis ETAT S.A. Project management in FP7 Gorgias Garofalakis ETAT S.A. The whole process EU FP7 Project Project idea Proposal writing Evaluation Negotiations Project implementation Contact with partners after the evaluation

More information

MANUAL FOR THE EURO-HEALTHY

MANUAL FOR THE EURO-HEALTHY MANUAL FOR THE EURO-HEALTHY INTERNAL AND PERIODIC PROJECT MONITORING AND REPORTING Coimbra, May, 2015 EURO-HEALTHY project has received funding from the European Union s Horizon 2020 research and innovation

More information

Administrative + Management Aspects. EU - Framework Programme 7. Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.

Administrative + Management Aspects. EU - Framework Programme 7. Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05. Administrative + Management Aspects EU - Framework Programme 7 Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.2008 Dr. Jürgen Ertel Department Program Planing and Management Head of Project

More information

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi)

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) Version 1.0 9 June 2015 HISTORY OF CHANGES Version Publication date Changes 1.0 09.06.2015 Initial version 1 EUROPEAN COMMISSION

More information

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for Accompanying Measures implemented as Specific Support Action This document can be found on the INTERNET at the following

More information

Administrative forms (Part A) Project proposal (Part B)

Administrative forms (Part A) Project proposal (Part B) Ref. Ares(2015)2346168-04/06/2015 Project Grants (HP-PJ) Administrative forms (Part A) Project proposal (Part B) Version 2.0 05 June 2015 Disclaimer This document is aimed at informing potential applicants

More information

Frequently asked questions. FP7 Financial Guide

Frequently asked questions. FP7 Financial Guide Frequently asked questions FP7 Financial Guide Budgetary matters Eligible costs of a project What are the criteria for determining whether the costs of a project are eligible? First of all, costs must

More information

Guide for ERC Grant Holders Part II

Guide for ERC Grant Holders Part II EUROPEAN RESEARCH COUNCIL Guide for ERC Grant Holders Part II Reference Manual on Financial Management and Administration of the ERC Grants Starting and advanced grants Version 1-24/06/2008 Disclaimer:

More information

FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues

FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues Maria Samara, Administrative

More information

Reporting transnational access and service activity costs. Version May 2011

Reporting transnational access and service activity costs. Version May 2011 Reporting transnational access and service activity costs Version May 2011 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are not

More information

Guide to Financial Issues for Cleansky GAPs

Guide to Financial Issues for Cleansky GAPs Guide to Financial Issues for Cleansky GAPs Version of 16/01/2012 adopted by the Commission and subsequently adapted for the Clean Sky Joint Undertaking on 08/05/2012 Disclaimer This guide is aimed at

More information

EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL. [title of the project] Grant Agreement No ICT PSP GRANT AGREEMENT

EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL. [title of the project] Grant Agreement No ICT PSP GRANT AGREEMENT EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL [title of the project] Grant Agreement No ICT PSP GRANT AGREEMENT Version 3, 20/01/2012 GRANT AGREEMENT NO The European Union ( the

More information

PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6

PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 PRIORITY 2 INFORMATION SOCIETY TECHNOLOGIES (IST) FREQUENTLY ASKED QUESTIONS on Project management in FP6 March 2005 Evolution of the consortium 1. If a sum has been allocated within the budget for new

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 28/02/2011 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

GUIDE FOR APPLICANTS

GUIDE FOR APPLICANTS European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO)

EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO) EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY (REA) Director H2020 1 MODEL GRANT AGREEMENT FOR MARIE SKŁODOWSKA-CURIE INDIVIDUAL FELLOWSHIPS 2 (MSC-IF MONO) Introductory remark MSC-IF Mono deviates from

More information

Full-Cost Accounting and Certification Modalities in FP7

Full-Cost Accounting and Certification Modalities in FP7 Prague, 30 March 2009 Full-Cost Accounting and Certification Modalities in FP7 Philippe Coenjaarts European Commission DG Research Overview of presentation Accountability context FP7 Accounting modalities

More information

Fifth Annual report Guidelines

Fifth Annual report Guidelines 1 www.seadatanet.org Fifth Annual report Guidelines The annual report includes : - scientific and technical report - financial report 1. Scientific and technical Report If not yet done: send the requested

More information

Model Grant Agreement

Model Grant Agreement HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with

More information

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr Proposal Negotiation a guide Constantine Vaitsas, vaitsas@help-forward.gr Presentation Outline Proposal Time Scale Negotiation Process Legal Negotiations Financial Negotiations Technical Negotiations NEF

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 3/10/2014 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Updated 26/06/2012 Table of contents Q1: FOR CATEGORIES A-C (1-2 AS OF WP2011), WHICH AMOUNT HAS TO BE DECLARED IN THE FORM C

More information

The TIPS project is supported by the European Commission through the Seventh Framework Programme for Research and Technological Development /

The TIPS project is supported by the European Commission through the Seventh Framework Programme for Research and Technological Development / FP7 Requirements for your Project's Exploitation Plan Ulrich BOES URSIT Ltd., Bulgaria Outline Goal of the presentation Summarise the exploitation requirements of FP7 Outline Definitions Official documents

More information

RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS

RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS Innovative Medicines Initiative IMI-GB-DEC-2012-12 RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS OUTLINE 1. Definitions 2. Participation in an IMI JU collaborative project 2.1 General provisions

More information

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Guidance notes and templates for Project Technical Review involving Independent Expert(s) Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions Version 18/12/2007 Disclaimer

More information

D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E

D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E D 1.1 Document identifier: V-Must.net - D1.1 Definition of quality control procedure V.1.1 Due Date of Delivery to EC End of Month

More information

ARTEMIS-ED-21-09. Guidance notes and templates for Project Technical Review involving independent expert(s)

ARTEMIS-ED-21-09. Guidance notes and templates for Project Technical Review involving independent expert(s) Guidance notes and templates for Project Technical Review involving independent expert(s) 1 CONTENTS 1 INTRODUCTION... 3 2 THE PROJECT REVIEW PROCESS... 3 3 MANDATE OF THE INDEPENDENT EXPERT(S)... 5 3.1

More information

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor

The Terms of Reference should be completed by the Beneficiary and be agreed with the Auditor ANNEX V-A FORM - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED UNDER A ERC GRANT AGREEMENT

More information

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Guidance notes and templates for Project Technical Review involving Independent Expert(s) Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects (CP), Networks of Excellence, Coordination and Support Actions (CSA), CP-CSA, ERA-NET,

More information

Guillem Bernat (RAPITA) Communication, Deliverable, Dissemination, Publication, Reporting

Guillem Bernat (RAPITA) Communication, Deliverable, Dissemination, Publication, Reporting D5.2 Project Handbook Document Information Contract Number 249100 Project Website Contractual Deadline Dissemination Level Nature Author Contributors Reviewer Keywords www.proartis-project.eu PM04 Public

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

Model Grant Agreement

Model Grant Agreement HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with

More information

Version 0.3 25 September 2014

Version 0.3 25 September 2014 Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the

More information

Proposal template and GUIDE FOR APPLICANTS (updated by FIspace)

Proposal template and GUIDE FOR APPLICANTS (updated by FIspace) European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2E Network Management Table of contents Fact Sheet 2E 0. Introduction... 1 1. Roles and responsibilities of Lead and Project Partners... 2 2. The legal framework...

More information

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Marcela Groholova Research Executive Agency Overview 1. EU contribution 2. Eligible costs 3. Cost categories 4. Parental and maternity

More information

Research proposal (Part B)

Research proposal (Part B) Research and Innovation Actions (RIA) Innovation Actions (IA) Research proposal (Part B) Version 1.1 3 November 2014 Disclaimer This document is aimed at informing potential applicants for Horizon 2020

More information

FP7 Project reporting. FP7 INCO National Contact Points Meeting 9 June 2010 - Athens Anne Mandenoff - European Commission - RTD A.

FP7 Project reporting. FP7 INCO National Contact Points Meeting 9 June 2010 - Athens Anne Mandenoff - European Commission - RTD A. FP7 Project reporting FP7 INCO National Contact Points Meeting 9 June 2010 - Athens Anne Mandenoff - European Commission - RTD A.6 Reference documents 1 Model grant agreement - Grant Agreement (GA): Article

More information

Guidelines for reporting. for Transnational Access. implemented as. Specific Support Action

Guidelines for reporting. for Transnational Access. implemented as. Specific Support Action SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for implemented as Specific Support Action This document can be found on the INTERNET at the following address: http://www.cordis.lu/fp6/infrastructures.htm

More information

VELLA (Contract Number: 036469)

VELLA (Contract Number: 036469) VELLA (Contract Number: 036469) PERIODIC MANAGEMENT REPORT (PMR-N : 2) Author(s): G. Benamati, ENEA S. De Grandis, ENEA Reporting period: e.g.: 01/10/20076-30/09/2008 Date of issue of this report : 15/12/2008

More information

H2020 rules for participation, new instruments, evaluation criteria

H2020 rules for participation, new instruments, evaluation criteria H2020 rules for participation, new instruments, evaluation criteria Disclaimer : H2020 Regulations are not yet adopted by the legislator. Any information contained in this presentation is legally not binding

More information

SPECIFIC AGREEMENT No./.. 1 ON A GRANT FOR AN ACTION

SPECIFIC AGREEMENT No./.. 1 ON A GRANT FOR AN ACTION ANNEX II MODEL SPECIFIC GRANT AGREEMENT FOR AN ACTION SPECIFIC AGREEMENT No./.. 1 ON A GRANT FOR AN ACTION This specific agreement ("the agreement") is concluded between: The European Union ("the Union"),

More information

Research and Innovation Staff Exchange Frequently Asked Questions (FAQs)

Research and Innovation Staff Exchange Frequently Asked Questions (FAQs) Research and Innovation Staff Exchange Frequently Asked Questions (FAQs) Contents General Aspects... 2 Partnership... 3 Eligible Participants... 3 The essential nature of the participation must be endorsed

More information

Proposal template (technical annex) Health, demographic change and wellbeing Two-stage Research and Innovation actions Innovation actions

Proposal template (technical annex) Health, demographic change and wellbeing Two-stage Research and Innovation actions Innovation actions Proposal template (technical annex) Health, demographic change and wellbeing Two-stage Research and Innovation actions Innovation actions Note: This is for information only. The definitive templates to

More information

Sustaining Ethical Aquatic Trade. Management

Sustaining Ethical Aquatic Trade. Management Sustaining Ethical Aquatic Trade Management Theme 2 Food, Agriculture and Fisheries, and Biotechnology Improving the sustainability of food chains Why the EU supports this type of research Why is sustainability

More information

Guide for ERC Grant Holders PART I

Guide for ERC Grant Holders PART I EUROPEAN RESEARCH COUNCIL Guide for ERC Grant Holders PART I GENERAL GUIDANCE NOTES Starting and advanced grants Version 1 24/06/2008 Disclaimer: This Guide aims to assist grant holders, whether individual

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines. These guidelines complement and should be considered in conjunction with the FP7 Guide on Financial Issues which is available for download at ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf.

More information

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY

More information

GRANT AGREEMENT. NUMBER 674463 i2d

GRANT AGREEMENT. NUMBER 674463 i2d EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME) Director GRANT AGREEMENT NUMBER 674463 i2d This Agreement ( the Agreement ) is between the following parties: on the

More information

IGLO Training Session Module 5

IGLO Training Session Module 5 PROJECT MANAGEMENT LEGAL ISSUES IGLO Training Session Module 5 vanovaj@tc.cz +420 234 006 150 Reporting on project results (Foreground) Changes in project implementation Possible disputes within project

More information

Project deliverables and reviews

Project deliverables and reviews Project deliverables and reviews Angelo Marino REA.S.3 3 May 2012 Reporting requirements Periodic report (within 60 days after end of each reporting period) Final report (within 60 days after end of project)

More information

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 1 Table of Content 2 1. GENERAL PROVISIONS This document contains supplementary information to the

More information

DRAFT AGENDA DAY 1 (10:00 16:00)

DRAFT AGENDA DAY 1 (10:00 16:00) DAY 1 (10:00 16:00) How to Coordinate and Manage your R&I Project? Essential project management and coordination tools and hints; How to coordinate and manage your project; Dealing with the partners; Motivation

More information

Factsheet: Rules under Horizon 2020

Factsheet: Rules under Horizon 2020 23 October 2013 Factsheet: Rules under Horizon 2020 The Horizon 2020 Framework Programme represents a radically new and comprehensive approach to the EU's research and innovation funding policies. The

More information

Explanatory note on: IMT / Grant / Reports / Budget

Explanatory note on: IMT / Grant / Reports / Budget Explanatory note on: IMT / Grant / Reports / Budget 1. IMT AND REPORTING (ANNUAL REPORTS) 2 Justification of major cost items and resources 2 Working time to be charged to the project and Time sheets 3

More information

Horizon 2020. Proposal template for: H2020 Widespread 2014 1 Teaming

Horizon 2020. Proposal template for: H2020 Widespread 2014 1 Teaming Horizon 2020 Proposal template for: H2020 Widespread 2014 1 Teaming Framework Partnership Agreement (FPA) and Coordination and support action (CSA) 1 This proposal template has been designed to ensure

More information

EMPIR Reporting Guidelines Part 0 Guide to the parts

EMPIR Reporting Guidelines Part 0 Guide to the parts Part 0 Guide to the parts EMPIR Reporting Guidelines Part 0 Guide to the parts EURAMET MSU, Hampton Road, Teddington, Middlesex, TW11 0LW, UK Phone: +44 20 8943 6666 Email: msu@npl.co.uk msu.euramet.org

More information

European Academy for Education and Social Research - A Review

European Academy for Education and Social Research - A Review FUNDING OPPORTUNITIES 2014-2020; LEARNING BY DOING METHODOLOGY: DEVELOP YOUR OWN PROJECT PROPOSALS WITH THE GUIDANCE OF EC EXPERTS Accelerator sessions dates: September 8 th - September 13 th ; November

More information

EUROSTARS Consortium Agreement Skeleton

EUROSTARS Consortium Agreement Skeleton Aim Higher EUROSTARS Consortium IMPORTANT NOTICE The aim of this Skeleton is to sum up the main items for the drafting of a consortium agreement between participants of the same Eurostars project. The

More information

How to write proposal section 3: IMPLEMENTATION? 26.06.2014 The Hague Christiane Kummer Pt-Juelich

How to write proposal section 3: IMPLEMENTATION? 26.06.2014 The Hague Christiane Kummer Pt-Juelich How to write proposal section 3:? 26.06.2014 The Hague Christiane Kummer Pt-Juelich Research Proposal (Part B) - Structure Stage 1 1. Excellence 2. Impact 3. Implementation 3.1 Work plan Work packages,

More information

Checklist for a Coordination Agreement for Coordinated Calls (Option 2)

Checklist for a Coordination Agreement for Coordinated Calls (Option 2) Checklist for a Coordination Agreement for Coordinated Calls (Option 2) 01/04/08 Note There are two different types of coordinated calls: one where the result is a joint project, i.e. the third country

More information

Proposal template (Technical annex) Research and Innovation actions

Proposal template (Technical annex) Research and Innovation actions Proposal template (Technical annex) Research and Innovation actions Please follow the structure of this template when preparing your proposal. It has been designed to ensure that the important aspects

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

Guide for Applicants COSME calls for proposals 2015

Guide for Applicants COSME calls for proposals 2015 Guide for Applicants COSME calls for proposals 2015 CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 Consortium coordinator... 4

More information

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS ALESSANDRO PRISTER PROGRAMME MANAGER ER, SJU ER CALL COORDINATOR List of topics covered Call

More information

South East Europe (SEE) Implementation Manual

South East Europe (SEE) Implementation Manual South East Europe (SEE) Implementation Manual Version 5.0 Date of approval (v1.2): 8 th May 2009 1 st amendment (v2.1): 7th July 2009 2 nd amendment (v3.1): 21 st January 2011 3 rd amendment (v3.2): 27

More information

IMI2 MANUAL FOR SUBMISSION,

IMI2 MANUAL FOR SUBMISSION, Innovative Medicines Initiative IMI2 MANUAL FOR SUBMISSION, EVALUATION AND GRANT AWARD Innovative Medicines Initiative IMI/INT/2014-01783 Postal mail: IMI JU, TO 56, Office 6/5 1049 Brussels version 26

More information

GUIDELINES FOR PREPARING PROJECT REPORTS (may be downloaded from www.cordis.lu/ist/fethome.htm or www.cordis.lu/ist/fetusef.htm)

GUIDELINES FOR PREPARING PROJECT REPORTS (may be downloaded from www.cordis.lu/ist/fethome.htm or www.cordis.lu/ist/fetusef.htm) THE FIFTH FRAMEWORK PROGRAMME The Fifth Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period 1998 to 2002. INFORMATION

More information

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS Innovative Training Networks (ITN) Call: H2020-MSCA-ITN-2015 PART B PROPOSAL ACRONYM This proposal is to be evaluated as: [ETN] [EID] [EJD] [delete as appropriate]

More information

Guide for Applicants. Call for Proposal:

Guide for Applicants. Call for Proposal: Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.

More information

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco

More information

The Eurostars Programme

The Eurostars Programme The Eurostars Programme TM funding excellence in innovation Guidelines for applicants Publication date: 29 June 2009 Version: 9.0 The Eurostars Programme is a joint initiative of EUREKA and the European

More information

Intellectual Property in FP7 projects

Intellectual Property in FP7 projects Intellectual Property in P7 projects IGLO training, russels, 25 th ebruary 2010 Stéphane eslier IPR Helpdesk - University of Alicante IPR-Helpdesk is a constituent part of the IP Awareness and Enforcement:

More information

Frequently Asked Questions version 3.0 09.09.2014

Frequently Asked Questions version 3.0 09.09.2014 EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME) Department A - Operations Unit A1 - COSME Frequently Asked Questions version 3.0 09.09.2014 COS-WP2014-2-05- Call for

More information

EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS

EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS 1 INTRODUCTION 1. Aim of the Evaluation Guide The aim of the Evaluation Guide is: - to identify

More information

Issues and Recommendations following feedback from and discussion among EARTO members

Issues and Recommendations following feedback from and discussion among EARTO members Contracting and Financial Management in FP7 Research for SME Associations Research for SMEs Issues and Recommendations following feedback from and discussion among EARTO members The FP7 SME instruments

More information

Guidelines for applicants for the 2nd Transnational Call for Proposals (full-proposal phase)

Guidelines for applicants for the 2nd Transnational Call for Proposals (full-proposal phase) SUSFOOD - An FP7 ERA-NET on Sustainable Food Production and Consumption Guidelines for applicants for the 2nd Transnational Call for Proposals (full-proposal phase) Closing date for full-proposals: August

More information

Frequently Asked Questions

Frequently Asked Questions SME Instrument Frequently Asked Questions Contents FOR APPLICANTS A. Eligibility and type of SMEs targeted... 2 B. Preparing your application and submitting your proposal... 4 C. Evaluation of your proposal...

More information

Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase)

Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase) SUSFOOD - An FP7 ERA-NET on Sustainable Food Production and Consumption Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase) Closing date for pre-proposals: 03 May

More information

FP7 Project Reporting Tool Quick guide for beneficiaries

FP7 Project Reporting Tool Quick guide for beneficiaries EUROPEAN COMMISSION DIRECTORATE-GENERAL RESEARCH FP7 Project Reporting Tool Quick guide for beneficiaries European Commission DG RTD R4 Page 1 of 14 Visit the Participant Portal The Participant Portal

More information

SPECIFIC PROGRAMME "CRIMINAL JUSTICE" (2007-2013) CALL FOR PROPOSALS JUST/2012/JPEN/AG/EJT Action grants

SPECIFIC PROGRAMME CRIMINAL JUSTICE (2007-2013) CALL FOR PROPOSALS JUST/2012/JPEN/AG/EJT Action grants EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "CRIMINAL JUSTICE" (2007-2013) CALL FOR PROPOSALS JUST/2012/JPEN/AG/EJT Action grants 1. INTRODUCTION On 12 February 2007, the Council

More information

Project Management in H2020 Projects. Gorazd Weiss, Centre for Social Innovation (ZSI), Austria

Project Management in H2020 Projects. Gorazd Weiss, Centre for Social Innovation (ZSI), Austria Project Management in H2020 Projects Gorazd Weiss, Centre for Social Innovation (ZSI), Austria Outline Project management Project Time Management Project Management structure Roles of project participants

More information

Horizon 2020 Annotated Model Grant Agreements

Horizon 2020 Annotated Model Grant Agreements Horizon 2020 Annotated Model Grant Agreements General Model Grant Agreement and specific Model Grant Agreements (ERC, SME Instrument, ERA-NET Cofund, PCP-PPI Cofund, EJP Cofund, Framework Partnerships

More information

MCA Financial Statement (Form C) for Multi-Partner Contracts

MCA Financial Statement (Form C) for Multi-Partner Contracts EUROPEAN COMMISSION RESEARCH DG HUMAN RESOURCES AND MOBILITY MCA Financial Statement (Form C) for Multi-Partner Contracts Project No: 33481 Project Acronym: ELSA Project Full Name: European Leadership

More information

Guidelines for Applicants

Guidelines for Applicants Guidelines for Applicants CORNET 19 th Call for Proposals Opening National and Regional Programmes for transnational Collective Research between SME Associations and Research Organisations. Closing date:

More information

Guidelines for Applicants

Guidelines for Applicants Guidelines for Applicants CORNET 21 st Call for Proposals Combining national and regional programmes for international Collective Research for the benefit of SMEs. Closing date: 30 st of March 2016, 12

More information

Guidelines for Industrial PhD In force as of 9 March 2015

Guidelines for Industrial PhD In force as of 9 March 2015 Guidelines for Industrial PhD In force as of 9 March 2015 Contents 1. What is an Industrial PhD?... 1 2. General conditions... 3 3. Entry requirements... 4 4. Application... 7 5. Decision on applications...

More information

Model Grant Agreement FINANCIAL ISSUES. Communication Campaign, Prague, 28 April 2015

Model Grant Agreement FINANCIAL ISSUES. Communication Campaign, Prague, 28 April 2015 HORIZON HORIZON 2020 2020 Model Grant Agreement FINANCIAL ISSUES Communication Campaign, Prague, 28 April 2015 Table of Contents 1. FP7 : Lessons learned 2. H2020: Model Grant Agreement 3. Cost Categories

More information

Horizon 2020 Secure Societies

Horizon 2020 Secure Societies Horizon 2020 Secure Societies Angelo MARINO Head of Unit, Security Research European Commission Research Executive Agency NOT LEGALLY BINDING 2013 Where we come from: FP7-Security R&D (2007-2013): EUR

More information

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS

FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS FP7 GRANT AGREEMENT ANNEX VII - FORM D - TERMS OF REFERENCE FOR THE CERTIFICATE OF FINANCIAL STATEMENTS TABLE OF CONTENTS TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS CLAIMED

More information

Scheduling and Review of Project Activities

Scheduling and Review of Project Activities Project Implementation Manual Scheduling and Review of Project Activities 1. INTRODUCTION 2. UNDERSTANDING CONTRACTUAL OBBLIGATIONS 3. PLANNING, MONITORING & AUDITING 4. PROCUREMENT 5. REPORTING 1.1 Purpose

More information

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT

SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT SME INSTRUMENT PHASE 1 - FINAL REPORT SME Instrument Phase 1 FINAL REPORT Grant Agreement number: Acronym: Title: Type of the action: SME Instrument Phase 1 Date of latest version of Annex I against which

More information

EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal

EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) PROCESSING OPERATIONS OF APPLICANTS DATA 1. Online services on the Participant Portal The Participant Portal offers online electronic services

More information

Act on Investment Firms 26.7.1996/579

Act on Investment Firms 26.7.1996/579 Please note: This is an unofficial translation. Amendments up to 135/2007 included, May 2007. Act on Investment Firms 26.7.1996/579 CHAPTER 1 General provisions Section 1 Scope of application This Act

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: projects funded in the 2007-2011 Work Programmes calls

More information

How To Host A Research Chair In Oman

How To Host A Research Chair In Oman Research chair Grant Program Policy & Regulation The Research Council Sultanate of Oman 1 This document has been released by the Research Council on xx xxxx 200x. It is the first version. Subsequent versions

More information

How To Make A Proposal For A Project In European Media

How To Make A Proposal For A Project In European Media EUROPEAN COMMISSION Directorate-General for Education and Culture Culture and Creativity Creative Europe programme MEDIA CALL FOR PROPOSALS EAC/S16/2014 Fostering European integration through culture by

More information