1 Renewable Energy A solid network for a solid business 2008
2 The environment is now recognized as a fundamental commercial issue affecting all businesses and industry sectors, amongst which the energy sector is most directly affected.
3 Introduction Most of the countries are aiming to significantly increase the share of energy generated by renewable sources. In particular, the EU member states, have set more challenging targets than other countries in the region by the so called 3x20% objectives established in March 2007 (20% of greenhouse gas reduction, 20% of renewable energy share in final energy consumption, and increase of the energy efficiency by 20% by the year 2020). We at CMS Cameron McKenna are continuously expanding our capabilities to work with clients to create sustainable energy supplies from renewable energy sources (RES), and to this end we have brought together a team of energy, projects, banking and environmental legal experts to provide a comprehensive advice on a range of issues, including, legal and regulatory framework affecting renewable energy, development of renewable energy projects, emissions trading, CDM, CCS and JI projects. CMS Cameron McKenna is the founding member of CMS, with well-established full-service offices in eight key business centres of Central and Eastern Europe. CMS aims to be the leading organisation of independent European law and tax firms of choice for organisations based in, or looking to move into, Europe. We are committed to quality, the interests of our clients, and the development of our people. CMS Cameron McKenna in Central and Eastern Europe is unique for its combination of local knowledge and international experience, which means that we can address both domestic and cross-border issues. We build strong, long term relationships, instead of just focusing on one-time transactions. Our partners are "hands on", very approachable and accessible. Finally, our clients praise our pro-active approach to alerting them to issues that their businesses might have to face. Below we would like to present a snapshot of the factors affecting renewable generation projects, which would be of particular interest to investors, developers and lenders in the individual CEE countries where we are present. We would be happy if this document provides you with answers to some of the questions you might have about the investment climate in the renewable sectors of the region. Our focus is on providing efficient, commercial legal and tax solutions aimed at helping you achieve your business objectives. CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
4 SWOT analysis of Bulgarian market Strengths Significant RES potential especially water, wind, solar and biomas. 12 years PPA are available and there is an obligatory offtake by the National Electricity Company (NEC) or electricity distribution companies, and grid connection. EU funds available for such projects. National target for RES to increase over the years (8% by 2010, 12% by 2015 and 20% by 2020). Preferential offtake price. Independent regulatory body (SEWRC). Green certificates are likely to be introduced after Special support by the investment support legislation. Weaknessess Bureaucratic and slow procedures multiple entities involved in decision-making process and as counter-parties; Ministry of Economy and Energy, SEWRC, Energy Efficiency Agency, National Electricity Company, electricity distribution companies, etc. Increasing costs of land (wind projects); slow developments of the biomas and PV opportunities. Unwillingness to undertake interconnections, mainly by NEC; investments by the electricity distribution companies are only supported partially by the SEWRC (Energy Regulator). Opportunities New Law on renewable and alternative energy sources and bio fuel (2007) and Ordinances (pending). New Energy Efficiency Act expected later in Availability of EU structural and cohesion funds. Privatization of some mid-sized hydro power plants expected in Threats The national transmission grid needs significant upgrades to support all the announced RES capacities that are to be built over the next years. Lack of effective cooperation and streamlined administrative procedures. Likelihood of change in the support mechanisms for RES after Ecological considerations many projects were delayed and even cancelled for ecological considerations migration of birds, Natura 2000 Program, etc. Environmental Impact Permit is required.
5 Key assignments Advising Iberdrola Renovables on the acquisition of a 74MW wind farm project in northern Bulgaria. This the first wind farm acquisition project of Iberdrola Renovables in Bulgaria. Advising one of the world's biggest manufacturers and suppliers of products, installations and services in the renewable energy sector and a leading renewable energy producer with respect to its operations in Bulgaria, including agreements with landowners in Bulgaria for the installation of wind masts and regulatory services. Advised PCC DEG Renewables on the acquisition of two hydro power plants. Work included advice on the prolongation of two water use permits under the Bulgarian Law on Waters, legal due diligence, etc. Advising leading international renewable company Econcern regarding their business activities in Bulgaria and helping in drafting agreements and rebranding issues Assisting SG Renewables, a subsidiary of our client SG Engineering, on their existing projects; providing them with regulatory, employment advice, etc. Kostadin Sirleshtov Sofia T E [email protected] Elitsa Ivanova Sofia T E elitsa.ivanova@@cms-cmck.com Clients consider the practice exceptionally good, particularly the response times. Legal CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
6 SWOT analysis of Czech market Strengths Specific legislation on the promotion of the production of electricity from RES entered into force on 1 August Entitlement to connect energy production facilities from RES to the transmission or distribution system. Guaranteed return on each unit of electricity produced from RES for a period of 15 years after commissioning. Tax incentives income tax and real estate tax exemptions for RES. Weaknessess Limited potential of RES caused by the natural conditions prevailing in the Czech Republic. Slow and bureaucratic procedure (many involved parties). Protests of municipalities and/or residents against certain renewable projects. Long-term orientation at the traditional energy sources (coal and nuclear) in the Czech Republic. Opportunities Low share of electricity generation currently produced through the use of renewable energy (4.7 % in 2007) compared with the national indicative targets of 8% for 2010 and 13% for Support of RES from State programmes and EU funds. Increasing small end-users (namely households) favouring use of electricity from RES. Non-consolidated market in renewable projects. Threats Inconsistency in manner of determination of purchase price of electricity from RES by the Energy Regulatory Office. Stricter conditions relating to the connection of electricity generation facilities using RES to the transmission or distribution system. Delay or cancellation of renewable projects due to environmental considerations (e.g. Natura 2000).
7 Key assignments Advising a strategic investor on the proposed investment in the first ever wind farm project in the Czech Republic. Work includes due diligence, structural advice as well as advice on the new regulatory framework. Advising a potential strategic investor on the proposed investment in the first major wind farm project in the Czech Republic. The work included: due diligence, advice on transaction structure as well as advice on the new regulatory framework. A global US-based power company on regulatory review of Czech renewable energy rules. Radim Kotlaba Prague T E [email protected] They have a splendid record of success, and provide immaculate service across the board. Chambers Europe 2008 CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
8 SWOT analysis of Hungarian market Strengths The share of renewable energy only adds up to 3.6 percent of total electricity generation which is below the economically exploitable potential. Hungarian government plans to raise this ratio up to 13% by Mandatory off-take obligations and favourable feed-in prices. Due to the vast agricultural areas of Hungary there is a considerable potential in biomass based electricity generation. Weaknessess Concerns about the dispatchability of the uniform Hungarian grid prevent the proliferation of wind energy generation. Of the 600MW wind generation capacity expected to be licensed, 330MW has been licensed already. Grid operators are often unsupportive of renewable electricity generators when it comes to grid connection. No special VAT or other tax relief is awarded to renewable investments. Environmental consciousness is still rather modest in Hungary compared to Western European standards. Opportunities Local authorities try to be cooperative when it comes to renewable energy generation initiatives. Hungary has a significant, yet fairly unexploited, potential in electricity generation from geothermal energy, biomass and biogas sources. A regime of green certificates will substitute the current regime of mandatory off-take, which is a more market oriented tool. EU structural and cohesion funds are available. Competition for generation licences is likely to become more transparent in the close future. Renewable energy comprises the smallest market share in Hungary. Threats The regulations regarding renewable energy frequently change and these changes are sometimes disadvantageous. The technical capacity of the Hungarian electricity grid needs some upgrading for the development of wind and solar electricity generation facilities
9 Key assignments Advised Pannonpower in relation to the construction of a new bio (chopped wood) fuelled power plant in the city of Pécs (turnkey EPC contract, long term wood supply contracts, etc) and in connection with financing of the project. Advised Iberdrola Renovables on the acquisition and development of two wind parks (Mistral and Vento) in Hungary. Advised a major global energy company in relation to renewable energy facilities, including conductung diligence exercise regarding a wind farm project in Western Hungary. Advised Investkredit on the financing of a wind park in Hungary. Advising a major energy provider on financing a bioethanol power station and biofuel plant on limited recourse basis. Advised OTP Bank on a facilities agreement and security agreements relating to the development of a biodiesel plant in Slovakia. Carrying out a due diligence exercise for Babcock & Brown in connection with various wind farm projects in Hungary. Advising Raiffeisen Energy Services Ltd. on the acquisition of Hungarowind, a Hungarian company constructing and operating wind parks. Advised on two other wind park projects in Hungary Robert Hayhurst Budapest T E [email protected] Balázs Varszeghi Budapest T E [email protected] Péter Simon Budapest T E [email protected] "The added value of the firm is the way in which their partners contribute to the deal, they become part of it and don t just wait at the sideline to draft the documents Chambers Europe CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
10 SWOT analysis of Polish market Strengths Significant RES potential (especially in relation to wind, biomass, biogas). Obligation on electricity suppliers to end-use customers to annually redeem documents certifying generation of electricity from RES (the green certificates ). Obligation on suppliers of last resort to purchase all electricity generated by RES connected to the electricity grid within the area of operation of the relevant supplier of last resort. Until 2010, RES only cover half of their actual grid interconnection costs; after 2010 this will only apply to RES of less than 5MW. Electricity generated from RES is exempt from excise tax. Transmission priority for energy produced from RES. Various exemptions for smaller RES (under 5MW), such as exemption from registration fees, stamp duties and annual generation licence fees. Weaknessess Time consuming procedures of acquiring relevant permits and administrative decisions. Lack of local zoning plans. Lack of clarity with relation to long term leases of land. Opposition to RES projects - issues related to NATURA 2000 (governmental list vs. shadow list prepared by the NGOs). Difficulties with obtaining inter-connection. Opportunities RES developers enjoy other benefits, such as subsidies from local environmental funds to finance their projects and low-interest loans available from the National Fund for Environmental Protection and Water Economy as well as the Bank for Environmental Protection. Several RES investments are being currently implemented and numerous other projects are in the pipeline. Presence of several active local developers. Threats New provisions regarding the Environmental Impact Assessment procedure and participation by public and ecological organisations in proceedings related to the issuance of environmental decisions required for the construction of generation facilities. Shortage of investment in development of the grid infrastructure. Extensive final list of protected NATURA 2000 sites. Protests from local inhabitants, especially in relation to wind projects.
11 Key assignments Advising UPC on the development of a number of wind farms located in northern Poland. Advised a UK-based developer on Project Komarowo - the development of a 60MW wind farm located in the north-western part of Poland. Advised an international private investor on lease agreements and on title issues regarding several prospective wind farm sites in northern Poland. Assisted REG on developing, on a project finance basis, a 50 MW wind farm in northern Poland. Advising AES in connection with wind farm projects, in particular advising on Polish legislation affecting renewable energy projects and carrying out due diligence of a number of prospective wind projects. Advising a Czech-based international renewable energy company, being a major regional investor, on potential acquisition of a majority share, and development jointly with a local partner, of a wind farm project in north-western Poland. Advising a world leader in renewable energy on the potential acquisition and development of wind farm projects in the northern and western Poland. Advising a major international renewable energy company on the potential acquisition and development of a wind farm project in western Poland. Advising a UK-based international renewable energy company in connection with a wind farm project. Advising an Austria-based renewable energy company operating in CEE on the acquisition and development of a biomass CHP. Advising a renewable energy company on potential acquisition and development of wind farm projects..providing legal services to a major Western utility in relation to the acquisition and development, and potential acquisition and development of wind farm projects in Poland. Advising a major Germany-based international renewable energy company in connection with implementation of waste incineration plant projects. Karolina Siedlik Warsaw T E [email protected] Tomasz Pyrkowski Warsaw T E [email protected] The firm has developed expertise in renewable energy sources and emissions trading and is also recognised for housing probably the best environmental law group in town. Chambers Global 2007 CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
12 SWOT analysis of Romanian market Strengths High RES potential (especially wind and biomass). National target for RES is steadily increasing (33% by 2010, 35% by 2015 and 38% by 2020). Combined compulsory quotas and trading of green certificates support mechanism (1 MW = 1 green certificate) until Each electricity supplier is obliged to acquire, every year, a specified number of green certificates. Defaulting suppliers are liable to the TSO for the maximum value of the remaining (not acquired) certificates multiplied by two. Generation from RES may qualify for priority dispatch on the Day Ahead Market subject to obtaining a priority dispatch certificate. Operators may benefit from special promotion systems for RES (e.g. accelerated depreciation of investments in renewable energy sources). Weaknessess Time consuming procedures for obtaining the necessary authorizations, licenses and permits. High costs of the land (if the investor intends to enter into Land Purchase and Sale Agreements with private owners). There are no consistent supporting mechanisms or subsidies for the cost of interconnection to the grid. Opportunities Availability of state aid for investors (a legal entity registered in Romania is a pre-requisite for filing an application with the relevant authorities). New legislation regarding the promoting system for RES providing for following: - Extension of term of the support mechanism (combined compulsory quotas and green certificates) until New energy facilities may benefit of the supporting mechanism for a 15 year term from the start of operation. - Increased value of the green certificates. - From 2008 until 2015 a E-RES generator that qualifies for supporting mechanism shall receive 2 green certificates/1mw and starting 2016, 1 green certificate/1mw. Threats Little clarity on the term and costs of mandatory public consultations for obtaining the environmental approval in case of NATURA 2000 sites. The national transmission grid needs an upgrade to support all the announced RES capacities that are to be built over the coming years. Lack of effective cooperation and streamlined administrative procedures. CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2007
13 Key assignments Advised Iberdrola Energias Renovables on its acquisition of various wind farm developments in Romania totalling over 1,000 MW. Advised UPC in their initiatives for capturing land for wind farm development of up to 500 MW in Romania and on permitting and renewable energy legal framework. Advising a leading Austrian renewable energy bank lender on the Romanian renewable energy legal framework on an ongoing basis. Advising Enercap Capital Partners on its acquisition of a wind farm development in Romania. John Fitzpatrick Bucharest T E [email protected] Simon Dayes Bucharest T E [email protected] Loredana Mihailescu Bucharest T E [email protected] Profound international and domestic knowledge. Chambers Global CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
14 SWOT analysis of Russian market Strengths Huge RES potential especially water, wind, tidal, geothermal and biomass. Eastern Siberian part of the Russian Federation has a huge hydro potential and perfect geographical conditions for developing large hydro generating schemes - 5 to 7 months of freezing-over allows to minimize the output of CH4 from reservoirs into the atmosphere Capacity and production of all new projects will participate in the competitive Wholesale Electricity Market, which will be fully liberalised by Weaknessess Bureaucratic and slow procedures. Increasing construction costs. Complicated land (wind projects) and water use permits (hydro). Too many parties involved in the decision making process and as counterparts to the investors Ministry of Energy, Ministry of Natural Resources, Ministry of Economy, Ministry of Regional Development, Federal Grid Company, System Operator, electricity distribution companies, etc. Opportunities The State is today an active investor in the power industry, providing for financing of the infrastructure part of new projects out of the Investment Fund The program for development of small hydro-power held by biggest Russian hydro generating company (RusHydro) potential projects are identified and undergoing pre-design studies for construction of small HPP in partnership with external investors. Additional legislation to the Federal Law # 35 On Electricity (Amendment # 250 to the Federal Law #35) regarding usage of renewable energy sources is in the process of negotiations. The new legislation will take into consideration the experience of the EU ( the 2020 targets and CO2 emissions). The new legislation will determine national targets and the mechanism for construction of 59 GW of installed capacity by 2020 from RES, with 32 power plants of large, medium and small size: wind (about 20 GW), bio energy sources (approximately 5 GW), geothermal (0,3 GW), tidal (0,8 GW) and other RES. Opportunities (con t) New Law on renewable and alternative energy sources will establish the markup in determining the price of electric power generated using RES on the wholesale and retail markets. Threats The national transmission grid needs significant upgrades to support all the announced RES capacities that are to be built over the next years. Lack of effective cooperation and streamlined administrative procedures. Opposition to construction of hydro schemes because of flooding, etc CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2007
15 Key assignments Advising a major international energy company on a renewable project in Southern Russia. Advising HydroOGK on the project for the completion of Boguchanskaya hydropower station. OJSC UK Volzhskiy Hydroenergy Cascade on varied aspects of the involvement of hydro generation companies in the proposed ancillary services market in Russia (the project s now completed). Advising Iberdrola Renovables on a renewable energy project in Krasnodar (Sounthern Russia). Natalia Kozyrenko Moscow T E [email protected] Jack Neushloss Moscow T E [email protected] The lawyers are well plugged in, commented one client; they know what is going on and they can act on it. Chambers Europe 2008 CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
16 SWOT analysis of Ukrainian market Strengths The green tariff law has recently been adopted by the parliament. This law: (i) permits the sale of renewable electricity directly to end-consumers or regional suppliers at contractual prices; and (ii) obliges wholesale electricity market ("WEM") to buy at the green tariff (double wholesale electricity tariff, set by NERC) the remaining electricity, which has not been sold to consumers or regional distributors. The Government's target set for generation from RES is 19% of total generation by Pursuant to the Complex Wind Farms Construction Programme adopted in 1997, the total capacity of wind power generation in Ukraine is supposed to reach 1990 MW by 2010, while in the meantime it is around 100MW. Equipment for non-traditional and renewable energy sources is exempt from the Ukrainian VAT or import duties. Weaknessess The local experience in renewable energy projects is not sufficient. The lack of technology experience in Ukraine makes the technology investment cycle long and as a result early technology development must be subsidised during early adoption, well ahead of commercialisation. So far, there are no special VAT benefits for sales of alternative energy or special corporate profit tax treatment for power generation out of the RES and the existing incentives (green certificates) for the consumers to purchase this type of electricity are not working yet. The wind energy tariff calculated by the producer, is approved and checked as to its compliance to the statutory calculation methodology by the National Electricity Regulation Commission (NERC), which creates an uncertainty as to whether the investment would be approved by NERC. Opportunities The RES market is in its nascent stages. According to the recent legislation, state and municipal land plots, that are to be used for construction and operation of power stations and electric grids, shall be leased or sold without the auction. The Government's targeted capacity of wind power generation in Ukraine is not likely to be reached by the State by 2010 without relying on the help of investors. The state and local authorities seem to be very cooperative, when it comes to renewable energy generation initiatives, especially, given the fact that some regions of Ukraine still suffer from a lack of electricity. Threats All the tax preferences and privileges remain dormant in Ukraine due to the absence of an implementation procedure and effective law on mechanisms that would support RES. The lack of incentives, adequate regulatory framework and gaps in the current Ukrainian legislation on electricity retard the development of renewable energy in Ukraine.
17 Key assignments Advising European private equity investors on various issues of the wind power plant, which would be one of the first privately owned in Ukraine. The work included: advice on regulatory, tax and real estate issues. Advising a UK company on a wind farm project to be developed by the JV with a local partner. Christina Maciw Kyiv T E [email protected] Vitaliy Radchenko Kyiv T E [email protected] Inna Saakova Kyiv T E [email protected] With a strong dedication to the CEE market, the firm benefits from an extensive network and the new team provides the firm with a particular strength in energy and oil. Chambers and Partners 2008 CMS Cameron McKenna LLP, Mitre House, 160 Aldersgate Street, London EC1A 4DD CMS Cameron McKenna LLP 2008
18 Contacts For further information on issues raised in this material, please contact the individual contributors, or alternatively: Andrzej Blach Head of CEE Energy & Projects T +44 (0) E [email protected] Vivek Gambhir CEE and Emerging Markets T +44 (0) E [email protected]
19 In conclusion, CMS Cameron McKenna is providing its clients with expert, commercially focused advice something which most firms claim to do but many fail to deliver External industry report
20 CMS Cameron McKenna s free on-line information service To register for Law-Now on-line go to our home page Advokátska kancelária JUDr. Jaroslav Ružička in association with CMS Cameron McKenna v.o.s. and CMS Reich-Rohrwig Hainz Rechtsanwälte GmbH, Kapitulská Bratislava Slovakia T F CMS Cameron McKenna SCA S-Park 11-15, Tipografilor Street B3 - B4, 4th Floor District 1, Bucharest Romania T T F F Ormai és Társai CMS Cameron McKenna LLP Ybl Palace Karolyi Mihaly utca 12 H-1053 Budapest Hungary T F CMS Cameron McKenna LLC 6th Floor 38 Volodymyrska St. Kyiv, Ukraine T F CMS Cameron McKenna LLP Kesco House Korobeynikov per. 1, Bldg. 1A Moscow Russian Federation T F CMS Cameron McKenna v.o.s. Palladium Na Poříčí 1079/3a Prague 1 Czech Republic T F CMS Cameron McKenna Landmark Centre 14 Tsar Osvoboditel Blvd. Floor Sofia Bulgaria T F CMS Cameron McKenna Dariusz Greszta Spółka komandytowa Warsaw Financial Centre XVIII Floor ul.emilii Plater Warsaw Poland T F CMS Cameron McKenna LLP is a limited liability partnership registered in England and Wales. It is able to provide international legal services to clients utilising, where appropriate, the services of its associated international offices and/or member firms of the CMS alliance. The associated international offices of CMS Cameron McKenna LLP are separate and distinct from it. CMS Cameron McKenna LLP and its associated offices are members of CMS, the alliance of independent European law firms. Alliance firms are legal entities which are separate and distinct from CMS Cameron McKenna LLP and its associated international offices. CMS offices and associated offices worldwide: Amsterdam, Berlin, Brussels, London, Madrid, Paris, Rome, Vienna, Zurich, Aberdeen, Algiers, Antwerp, Arnhem, Beijing, Belgrade, Bratislava, Bristol, Bucharest, Budapest, Buenos Aires, Casablanca, Cologne, Dresden, Dusseldorf, Edinburgh, Frankfurt, Hamburg, Kyiv, Leipzig, Ljubljana, Lyon, Marbella, Milan, Montevideo, Moscow, Munich, New York, Prague, Sao Paulo, Sarajevo, Seville, Shanghai, Sofia, Strasbourg, Stuttgart, Utrecht, Warsaw and Zagreb. The members of CMS are in association with The Levant Lawyers with offices in Beirut, Abu Dhabi, Dubai and Kuwait. CMS Cameron McKenna LLP 2008
CEE Insurance Services
CMS_LawTax_CMYK_28-100.eps CEE Insurance Services Supporting your business in Central and Eastern Europe 2010 Focus on the Insurance sector The insurance market across CEE is ever-evolving, which means
The CMS REMIT healthcheck
CMS_LawTax_CMYK_28-100.eps The CMS REMIT healthcheck Market abuse, reporting and registration framework for the EU energy market February 2013 Background The EU Regulation on Energy Market Integrity and
CMS Hotel Group contacts
CMS Adonnino Ascoli & Cavasola Scamoni CMS Albiñana & Suárez de Lezo CMS Bureau Francis Lefebvre CMS Cameron McKenna CMS DeBacker CMS Derks Star Busmann CMS von Erlach Henrici CMS Hasche Sigle CMS Reich-Rohrwig
Information Technology
Information Technology www.cms-hs.com Our expertise in the IT sector Experience and industry knowledge you can rely on The information and communications age is witnessing the rapid emergence of new content
CMS_LawTax_CMYK_28-100.eps. Leading in European M&A. CMS Corporate / M&A
CMS_LawTax_CMYK_28-100.eps Leading in European M&A CMS Corporate / M&A 2013 Top rankings No. 1 CEE Bloomberg year-end 2012 Germany Thomson Reuters year-end 2012, Mergermarket Q1/2013 No. 2 France Magazine
Passionate about Medical Devices
Passionate about Medical Devices 2008 Central and Eastern Europe Law Firm of the Year. PLC Which Lawyer 2007 Client-based solutions At CMS Cameron McKenna we work hard to be a truly client focused law
Office Rents map EUROPE, MIDDLE EAST AND AFRICA. Accelerating success.
Office Rents map EUROPE, MIDDLE EAST AND AFRICA Accelerating success. FINLAND EMEA Office Rents H2 212 NORWAY Oslo 38.3 5.4% 7.% 295, SWEDEN Stockholm 44.7 4.5% 3.% 5, Tallinn 13.4 44,2 21. 5.25% 1.% 12,
CMS_LawTax_Negative_28-100.ep. CMS European M & A Study 2015. Seventh Edition
CMS_LawTax_Negative_28-100.ep CMS European M & A Study 2015 Seventh Edition Table of contents Introduction 3 Purchase price adjustment 8 Earn-out 11 De minimis 14 Basket 15 Liability caps 18 Warranty &
Leading M&A practice across CEE
Leading M&A practice across CEE 2014 They have an excellent network and a deep understanding of how to do business in Central and Eastern Europe. Real Deals Its extensive CEE network is second to none...
Corporate Governance in the People s Republic of China
Corporate Governance in the People s Republic of China Legal Basis As yet, there are no special laws on corporate governance in the PRC. In practice, corporate governance issues play a much less important
CMS_LawTax_CMYK_28-100.eps. Insurance: Coverage defences in Europe
CMS_LawTax_CMYK_28-100.eps Insurance: Coverage defences in Europe January 2013 Contents Introduction 6 Austria 7 Belgium 9 Bulgaria 10 Croatia 11 Czech Republic 12 England & Wales 13 France 14 Germany
Employee inventor rewards survey
CMS_LawTax_CMYK_28-100.eps Employee inventor rewards survey www.cmslegal.com/patentswithoutborders August 2014 Table of contents Introduction... 3 The results at a glance... 4 Rewards for inventors...
Insurance & Financial Institutions. The Italian Experience
Insurance & Financial Institutions The Italian Experience January 2010 FACTS & FIGURES 53 offices 47 cities 27 countries 600 partners More than 2400 total lawyers Approximately 4600 total staff 2 CMS Adonnino
Renewable energy sources penetration in most of BSEC countries
Renewable energy sources penetration in most of BSEC countries Prof. Dimitrios MAVRAKIS Director Energy Policy and Development Centre (KEPA) National and Kapodistrian University of Athens Energy Policy
Energy Efficiency and Renewable Energy Sources in Sweden
Energy Efficiency and Renewable Energy Sources in Sweden Swedish Energy Agency www.stem.se Yelena Varasteh [email protected] Slovakia, 24-25 April 2006 Total energy supply in Sweden in 2004 Total
CMS_LawTax_CMYK_28-100.eps. Transfer Pricing. A strategic approach for global business performance
CMS_LawTax_CMYK_28-100.eps Transfer Pricing A strategic approach for global business performance June 2015 As shown by the recent works at G20, OECD, European or UN level, multinational enterprises (MNEs)
BULGARIA COUNTRY PROFILE 19
BULGARIA COUNTRY PROFILE 19 Overview Bulgaria has a population of approximately 7.64 million with a GDP of USD 49,900 million. i The total primary energy supply in 2007 was 20.23 Mtoe (million tons of
Contracts for Difference: an EMR CfD Primer
Contracts for Difference: an EMR CfD Primer 1 Briefing note October 2015 Contracts for Difference: an EMR CfD Primer This primer briefing is the first in a series of briefings describing the principal
Turkey Promulgates Renewable Energy Regulations
September 28, 2011 Turkey Promulgates Renewable Energy Regulations Turkey's Ministry of Energy and Natural Sources (the "Ministry of Energy") and Energy Market Regulatory Authority ("EMRA") promulgated
2. Place of renewable energy in the context of developing global energy at present stage
Renewable Energy Strategy to promote an enhanced investment climate for renewable energy technologies for submission to national and regional authorities in participating CIS countries 1. Introduction
The River Devoll Project
EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile
Brand Management Services
Brand Management Services About Bird & Bird Since 1898 Bird & Bird has led the way in protecting the ideas that have made some of the world s greatest brands successful. It s the firm s excellence in client
Examples for financing of biogas projects in Italy
IEE Project BiogasIN Examples for financing of biogas projects in Italy D.3.2., WP3 - Henning Hahn, Dominik Rutz, Erik Ferber, Franz Kirchmayer - November 2010 Contents 1. Introduction... 3 2. Basics of
Passive infrastructure sharing
Passive infrastructure sharing 2 Why sharing? Passive infrastructure sharing started with mobile phone towers. Mobile network operators allowed each other to hang antennas on their mast sites, resulting
Success story: Feed-In Tariffs Support renewable energy in Germany
Success story: Feed-In Tariffs Support renewable energy in Germany This document will show how this success story has been brought about and is made up of the following sections: 1. What is a Feed-In Tariff?
SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines
Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy
VESI JA ENERGIA VIENTITUOTTEENA Fortum Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy Fortum s strategy relies strongly in Hydro Mission Fortum s purpose is to create energy that improves
RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS
RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS Ieva Kuodė Ministry of Energy of the Republic of Lithuania SOLINVEST 2015-06-02 RES TARGETS BY 2020 23% the share of energy from renewable
Renewable Energy Promotion Policies in Chinese Taipei
Renewable Energy Promotion Policies in Chinese Taipei Bureau of Energy, Ministry of Economic Affairs Chinese Taipei November 12, 2014 RE for CT - 1 Current Development of Renewables in Chinese Taipei RE
Security of electricity supply
Security of electricity supply Definitions, roles & responsibilities and experiences within the EU Thomas Barth Chairman of Energy Policy & Generation Committee EURELECTRIC Outline Security of Supply a
Milliman Insurance in the CEE Region. Actuarial & Consulting Services in Central and Eastern Europe
Actuarial & Consulting Services in Central and Eastern Europe Actuarial and Consulting Services in Central and Eastern Europe The developing insurance markets in Central and Eastern Europe continue to
Options for financing biogas plants
IEE Project BiogasIN Options for financing biogas plants D.5.5, WP 5 Dominik Rutz Erik Ferber WIP Renewable Energies Sylvensteinstr. 2 81369 Munich, Germany February 2011 Contents 1. Introduction... 3
Norwegian position on the proposed EU framework for climate and energy policies towards 2030
Norwegian position on the proposed EU framework for climate and energy policies towards 2030 The EU plays an important role as a global leader in climate policy and has a fundamental interest in strengthening
Contracts for Difference - the new support regime for low carbon generation
Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have
NEW DECISIONS OF THE BULGARIAN ENERGY REGULATOR HIGHER ELECTRICITY PRICES FOR THE BUSINESS AND LOWER REVENUES FOR THE RENEWABLES
NEW DECISIONS OF THE BULGARIAN ENERGY REGULATOR HIGHER ELECTRICITY PRICES FOR THE BUSINESS AND LOWER REVENUES FOR THE RENEWABLES INTRODUCTION On 31 July 2015 the Bulgarian Energy and Water Regulatory Commission
Overview on DHC pricing and regulations in Europe-
Overview on DHC pricing and regulations in Europe- Challenges and need of development Birgitta Resvik, Corporate Relations Sweden, Vice President, Fortum Our geographical presence today Nr 3 Nr 1 Nr 1
Household Energy Price Index for Europe. February 5th 2015. January Prices Just Released
Household Energy Price Index for Europe February 5th 2015 January Prices Just Released The most up-to-date picture of European household electricity and gas prices: VaasaETT and two leading European energy
DANISH DISTRICT ENERGY PLANNING EXPERIENCE
MOWAT ENERGY, A RESEARCH HUB AT THE MOWAT CENTRE, AT THE REQUEST OF THE ONTARIO MINISTRY OF ENERGY FUTURE INNOVATION IN ENERGY PLANNING: A SPECIAL SESSION TO ADVISE ON ONTARIO S LONG-TERM ENERGY FUTURE
Power Generation. Lilian Macleod Power Supply Manager National Grid
Power Generation Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. This text box and image can
Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs
Renewable Energy Promotion Policies in Taiwan Bureau of Energy Ministry of Economic Affairs October 2015 1 Outline Current Development of Renewables in Taiwan Taiwan s New Renewable Energy Policy 2 Current
Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis
Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy
CMS_LawTax_CMYK_28-100.eps. Private Equity
CMS_LawTax_CMYK_28-100.eps Private Equity Private Equity group CMS Cameron McKenna has a longstanding and close relationship with the private equity industry, domestically and across Europe. Our specialists
Luxembourg Doing deals in the Grand Duchy, an English lawyer's perspective
Luxembourg Doing deals in the Grand Duchy, an English lawyer's perspective Tom Whelan (Partner, Hogan Lovells International LLP) Erin Anderson (Senior Associate, Hogan Lovells International LLP), Camille
How To Manage A Senior Insurance Manager
Senior insurance managers regime The New Individual Accountability Regime II January 2015 Senior insurer managers regime In scope Senior managers All firms within Solvency II Insurers ISPVs Lloyd s Managing
The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for
ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential
ESBI Carbon Solutions Partnering with Countries to Achieve their Full Carbon Credit Potential ESB International ESB International (ESBI) is a growing international energy company and one of Europe s leading
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
Emerging market for Green Certificates
Emerging market for Green Certificates Dr Marianne OSTERKORN, Director of REEEP Dr Xavier LEMAIRE, SERN/REEEP CONTENT 1. What is a certificate system? 2. How certificates system works 3. What are the benefits
SFC proposes amendments to regulation of automated trading services guidelines
SFC proposes amendments to regulation of automated trading services guidelines 1 Briefing note December 2015 SFC proposes amendments to regulation of automated trading services guidelines On 20 November
THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE. Ole Odgaard Denmark
Workshop on Best Practices in Policies and Measures, 11 13 April 2000, Copenhagen THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE Ole Odgaard Denmark Abstract: The
Electricity in Egypt
T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity
Analysis of the EU Renewable Directive by a TIMES-Norway
Analysis of the EU Renewable Directive by a TIMES-Norway NorRen Summer School Arne Lind Institute for Energy Technology 07.08.2012 Outline The EU Renewable Directive (RES) Definition Targets Implications
Life, Pensions & Longevity Risk. CMS Cameron McKenna s team
Life, Pensions & Longevity Risk CMS Cameron McKenna s team 2014 Introduction...3 CMS...4 Life, Pensions & Longevity Risk team...5 Distinct approach...6 Experience and credentials...7 Key contacts...9...
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority
Germany's energy transition: Status quo and Challenges.
Ulrich Benterbusch Germany's energy transition: Status quo and Challenges. 2 nd Session Group of Experts on Renewable Energy, UNECE, Geneva 1 Agenda. Energy transition: Status quo and official goals. German
PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation
Nuclear power development in Poland - we need decision today Hanna Trojanowska Director of International Affairs and New Technologies Department PGE Polska Grupa Energetyczna S.A. Organisation of the Polish
Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency
RENEWABLE ENERGY INDUSTRIAL ENERGY EFFICIENCY BUILDING ENERGY EFFICIENCY Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency A RANGE OF FINANCIAL SUPPORT
Why don t law firms listen?
Why don t law firms listen? The challenge of getting client service right November 2006 Listen. Times are changing. The legal landscape is shifting. The role of General Counsel has evolved in recent years
Our global Product Liability group
Our global Product Liability group 2014 www.allenovery.com 2 Sources say: Extremely impressive; the response times are incredible and the advice is well thought out. Chambers 2014 They are on top of the
Economic Analysis of the Renewable Energy Policies in the European Union
6th International Conference on Industrial Engineering and Industrial Management. XVI Congreso de Ingeniería de Organización. Vigo, July 18-20, 2012 Economic Analysis of the Renewable Energy Policies in
Foratom event 29 April 2015
Foratom event 29 April 2015 New nuclear in the UK and Electricity Market Reform Colin Parker Head of European Liaison - EDF Energy 1 April 2015 EDF Energy plc. All rights reserved. EDF Energy A UK energy
Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi
Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi 1 Policy and law What is the government policy and legislative framework for the electricity sector? The electricity sector in is governed by the
Ship Finance Practice. Covering ship finance from every perspective. www.allenovery.com
Ship Finance Practice Covering ship finance from every perspective 2 Ship Finance Practice Why Allen & Overy? A pre-eminent ship finance practice Our international ship finance practice holds a premier
DISCLOSURE NOTES. How the accounts are presented. Generation
DISCLOSURE NOTES As a result of changes in SSE s management and reporting structure in 2011/12 and in the interests of improved transparency, SSE s financial statements for the year ending March 2012 were
Polish support schemes for renewable and cogeneration sources
Polish support schemes for renewable and cogeneration sources Introduction Ever since the Energy Law came into force, i.e. since 1997, country legislator saw the need to support renewable energy sources
Poland must fully transpose the Third Energy Package Directives without further delay to liberalise the electricity and gas markets.
Poland Key Issues + With regard to electricity, coal is still the main source of fuel for power generation. Poland's generating capacity is ageing, and the country needs better incentives for investment