Micro Hydro Feasibility Study
|
|
|
- Vernon Dennis
- 10 years ago
- Views:
Transcription
1 Micro Hydro Feasibility Study Inter Hydro Technology October
2 2
3 Introduction Forest of Bowland AONB Micro Hydro Feasibility Study Inter Hydro Technology (IHT) have been commissioned to undertake a feasibility study for small-scale hydropower generation at sites within the Forest of Bowland Area of Outstanding Natural Beauty (AONB), as well as areas of the Ribble Valley and Lancaster and Pendle boroughs, which lie outside the AONB boundary. The project steering group have specified 30 sites for the study and a further 5 sites have been identified by IHT. The purpose of the study is to support local landowners, investors and community groups with a source of site-specific information on hydropower development. It is intended that this report shall also provide useful reference material for organisations required to assess new developments, such as Local Planning Authorities, the Environment Agency, Natural England and English Heritage, as well as other consultant bodies. The study is separated into two stages, representing different levels of detail. Stage 1 includes pre-feasibility detail and covers all 37 identified sites. Stage 2 includes full feasibility detail and is conducted on 5 out of the 37 sites, which have been identified as most favourable in terms of economic viability and suitability for development within a protected environment. This report is divided into the following sections: Section A presents general information relating to all hydropower developments Section B presents the results of the Stage 1 study for the total 37 sites Section C presents the results of the Stage 2 study For Stage 1 sites, a site visit has been conducted to identify preliminary locations for the major scheme structures, as well as potential access and construction issues. A desktop study, incorporating gauged hydrology data, has been used to determine the catchment area, annual rainfall and the annual flow duration within the river. A suitable turbine has been identified, and estimates have been made for power capacity, the annual energy production and the annual CO 2 offset amount. A budget development cost has been calculated, based on current equipment costs and an assessment of the required civil works. Finally, the annual generated electricity and simple payback period have been estimated. For Stage 2 sites, a comprehensive site assessment has been conducted, including a levelling survey and investigation of any existing hydraulic structures. The turbine type and performance have been verified. Details of the electricity export connections have been established. Estimates have been refined for budget costs, electricity output, revenue and simple payback. The Environment Agency has been approached to comment on outline agreement for development and an indication of environmental assessment requirements. Finally, recommendations for further work have been made, as well as contact details for companies providing suitable services to take each hydropower development forward. 3
4 Section A: General Information Hydropower All hydropower schemes depend first and foremost on determining the viability of a particular site. Fundamentally, the two primary requirements are a readily available fluid flow, in combination with an adequate vertical change in elevation, referred to as gross head. The hydraulic power available at a particular site is proportional to the product of flow and head. A waterfall or weir structure within a watercourse is a promising starting point for a hydropower feasibility study. Flow The flow rate within a watercourse can vary considerably depending on the frequency, intensity and volume of rainfall, as well as the catchment characteristics, such as size, topography and ground porosity. It is common to demonstrate the annual variance in flow at a particular point on a watercourse, using a flow duration curve (FDC), which plots flow against exceedance probability. Figure 1 shows a flow duration curve produced using LowFlows software. A particular notation is used to refer to FDC flow rates; e.g. Q95 refers to the flow rate which is exceeded 95% of the year. LowFlows is industry standard software used by the Environment Agency of England and Wales, as well as the Scottish Environment Protection Agency. Figure 1 Flow duration curve produced using LowFlows The variance in watercourse flow, in combination with the performance characteristic of the turbine, affects the annual energy production of a scheme. Further constraints can be applied by a variable abstraction regime specified by the relevant licensing authority, such as a hands-off flow (minimum flow remaining in the depleted reach of the watercourse) serving to protect the ecology. The performance characteristic of the turbine is dependent on the type of turbine, as well as the start-up flow rate and design flow rate. A steep flow duration curve indicates a flashy watercourse, where there is wide and frequent variation in flow. Conversely, a shallow curve demonstrates that flow rate is relatively consistent. This condition is good for a 4
5 hydropower scheme as it facilitates a high capacity factor ratio of average annual electrical energy production and theoretical annual electricity production were the scheme to operate at full power capacity continuously. The Environment Agency of England and Wales (EA) have published Good Practice Guidelines for Hydropower, which provides default acceptable values for turbine design flow and hands-off flow. These values are dependent on the length of the depleted reach of river and on the Base Flow Index (BFI). The BFI provides an indication of how widely flow in a watercourse varies and is estimated by the EA as the ratio of Q 95 and Q mean. Head Whereas gross head refers to the difference in elevation (in metres) between the intake and outfall, the net head refers to the head directly across the turbine. That is, the gross head minus any head losses. The vertical head difference may be the operational head on some machines where there is little or no conveyance channel or pipe between the abstraction and return points for the water. More typically however there will be a channel or pipe between these two points. Friction between the flowing water and the walls of the channel or pipeline result in a loss of head. The design of the scheme should result in less than ten per cent of the vertical head difference being lost to friction. 5
6 Electricity Generation Turbine Types As water passes through a hydraulic turbine, hydraulic power is transferred to shaft power by a prime mover, commonly referred to as a runner. The runner can incorporate blades, vanes or buckets, which are forced to rotate around a central axis. The runner shaft is coupled to a generator which converts shaft power into electrical power. There are a number of different designs of commercially available turbines, each with varying geometry and performance. It is well established convention to group these turbines into two main categories: impulse turbines and reaction turbines. These names are not particularly descriptive and the defining difference is that with an impulse turbine there is no change in static pressure across the runner. It is also a common feature of reaction turbine runners to be wholly immersed in the fluid flow, as opposed to an impulse turbine where a jet of fluid strikes the runner. There are, however, some turbine designs that do not fit comfortably within these categories, notably the classic water wheel. A list of commercially available turbines is included in Table 1. Turbine Selection Each turbine has a unique performance characteristic, which equates to the variance in efficiency of the machine when operating under different head and flow conditions. Selecting the optimum turbine type and power capacity for a specific site is an extensive process requiring comparison of the maximum annual net benefit (annual benefit minus annual cost) associated with a number of design variants. A complete evaluation would require determination of the capital costs, operational costs and borrowing costs associated with each variant where variation would cover many aspects including design flow, gross head and turbine type. At the feasibility stage, a simpler approach is taken to establish a good solution without incurring large design requirements. This approach is as follows: 1. Intake and outfall positions on the watercourse are selected using hydropower engineering experience to predict a suitable trade-off between maximising gross head across the scheme and avoiding undue capital costs. There are also additional costs from the potential project obstacles, including dealing with multiple landowners, working in sensitive habitats, and completing construction works within a short permitted in-river works period. 2. Plant power capacity is maximised by selecting the maximum design flow rate that can be expected to be licensed by the Environment Agency. This serves to exploit the well established rule that larger schemes benefit from scales of economy, thereby improving the cost per kilowatt installed capacity. Furthermore, within the range of the Environment Agency s good practice guidelines for design flow rate, maximising flow rate will invariably result in maximised annual average energy generation. 3. Once the head and design flow rate have been determined, the software HydrA, developed by the Institute of Hydrology, is used to identify turbine types with applicable efficiency characteristics under these site conditions. Figure 2 is produced using the HydrA software and shows the application range for several commercially available turbines. Using inputted catchment descriptors, HydrA produces a performance report showing the capacity and average annual energy production for each turbine type. The turbine type providing the most energy is selected as the basis for average annual revenue and capital cost estimates. 6
7 Table 1 Commercially available hydraulic turbines Forest of Bowland AONB Micro Hydro Feasibility Study Type Pelton Wheel Description Impulse turbine named after early developer, Lester Pelton. Utilises one or more high velocity jets directed tangentially onto runner buckets. Turgo Cross-flow Francis Impulse turbine that utilises a high velocity jet imparted at an angle to the face of the runner. In comparison to the Pelton Wheel, this orientation allows for a larger jet and higher rotary speed; however, efficiency is reduced. Impulse turbine, also known as a Banki or Michell turbine, where the water jet crosses through the runner vanes twice. A draft tube creates sub-atmospheric pressure in the runner housing. The cross-flow can achieve higher running speeds than the other impulse type turbines. Mixed-flow reaction turbine with flow entering the runner in the radial direction and leaving in the axial direction. Propeller Axial-flow reaction machine with fixed runner blades. Kaplan Axial-flow reaction machine with adjustable runner blades and guide vanes allowing improvement of part-flow efficiency. Semi-Kaplan Axial-flow reaction machine with adjustable runner blades and fixed guide vanes. Archimedes Screw Fish friendly turbine which turns slowly and generally requires the addition of a gearbox to increase generator shaft speed. Water Wheel Classical design developed from early industrial application and generally requires the addition of a gearbox to increase the generator shaft speed. 7
8 Figure 2 Application range for common turbine designs (excluding Archimedes screw and waterwheels not strictly turbines in this sense) It is important to note that maximising annual net financial benefit, within the limits of appropriate environmental consideration, is not always the most suitable approach for turbine selection. If a project concerns the restoration of an existing water mill, then the aesthetics of the solution may dictate that a waterwheel is used rather than any other turbine type. Run-of-river schemes (i.e. negligible water storage capacity) may have to make use of turbines that pose less of a risk to fish populations. Often there will be more than one turbine type that could be used, quite justifiably, on a particular project. Annual Carbon Dioxide Offset To calculate the annual amount of carbon dioxide offset by the production of hydropower generated electricity, it has been assumed that the demand for grid electricity is reduced by the amount generated by the scheme. It is also assumed that hydropower generated electricity incurs no carbon dioxide cost. Consequently, the annual offset amount is equal to the annual energy output multiplied by the carbon dioxide emission from the UK national grid per kwh of electricity used at the point of final consumption (i.e. electricity grid transmission and distribution losses are included). Based on the most current greenhouse gas conversion factors published by the Department for Energy and Climate Change (DECC), this is equal to kg CO 2eq per kwh. 8
9 Revenue and Feed-In Tariffs Revenue values are based on the annual energy output, in kwh, calculated using HydrA for each site under consideration. For individuals, communities and businesses interested in generating their own electricity from small-scale hydropower, the government has increased potential revenue and improved the rate of return on investment through the Feed-in Tariffs scheme (FITs). The government believes the scheme, launched on 1 April 2010, will trigger a revolution of smallscale electricity by providing clean energy cash back. This cash back will predominantly be in the form of two guaranteed tariffs, although additional value can be achieved: Guaranteed Generation Tariff: This tariff is received regardless of whether the electricity is used on site, or exported to the grid. The size of the generation tariff is dependent on the rated power capacity of the scheme, details of which are provided in Table 2 Guaranteed Export Tariff: If the electricity is exported off site, then the generator can choose to receive an export tariff of 3p/kWh, or sell the electricity on the open market (typically 4.5p/kWh as of early 2011). Generators can choose annually whether to accept the 3p/kWh price floor, or negotiate an alternative tariff with energy suppliers Additional Value (On site usage): If the electricity is used on site, then import costs are offset, which can typically be much larger than the achievable export tariff Additional Value (Levy Exemption Certificates): The Climate Change Levy (CCL) is a charge on nondomestic supply of electricity, at a current rate of 0.47p/kWh. The Climate Change Levy (General) Regulations 2001 provide for an exemption from this levy for renewable electricity. Renewables Levy Exemption Certificates (Renewables LECs) are electronic certificates, issued monthly by OFGEM to accredited generating stations for each Megawatt/hour (MWh) of renewable source electricity generated. These certificates can be used by generators with non-domestic import requirements to offset their CCL bill; alternatively, they can be sold to an electricity supplier or established trading company Table 2 Feed in Tariff Payment Rate Table (Source: DECC, August 2011) Hydropower Rated Capacity [kw] Generation Tariff [p/kwh] 0 to to to to 5000 (2-5 MW) 4.7 For hydropower, both the generation and export tariffs are guaranteed for 20 years and are not subject to the devaluation measures applied to other renewable energy generation. Both tariffs are index-linked to the retail price index. The Government says that while the tariff levels are designed to give a rate of return from 5-8%, the benefit of index linking may yield a nominal return considered to be from 7-10%. However, the exact rate of return is highly site specific. Source of the Cashback Licensed Electricity Suppliers with more than 50,000 domestic customers are mandated to join the FIT scheme (Mandatory FIT Licensees). Other licensed electricity suppliers can elect to join the scheme and become Voluntary FIT Licensees. They are collectively known as FIT Licensees. 9
10 FIT Licensees are obliged to purchase renewable energy from FIT accredited generators. The price paid for the electricity is greater than the price that the suppliers can sell on the market (typically 12p/kWh). Consequently, the expected result is that a proportion of the deficit will be passed to consumers through a general increase in energy bills. Income Tax The Finance Act of 2007 outlined the current income tax exemptions for domestic micro generation. In the 2009 Pre- Budget Report, the Chancellor stated, households who use renewable technology to generate electricity mainly for their own use will not be subject to income tax on feed-in tariffs. This will save households paying the basic rate of tax 180 in 2010 (based on an average income of 900 in 2010). Eligibility for FITs In order to receive FITs support, hydropower schemes must achieve accreditation, which demonstrates compliance with a rigorous set of standards designed to ensure reliable performance and consumer protection. The route to accreditation is dependent on the rated capacity: Less than 50kW: Projects must use products and installers certified under the Micro generation Certification Scheme (MCS) administered by Gemserv. Certified products and installers are listed on the MCS website More than 50kW: Projects are accredited by OFGEM through a process called 'ROO-FIT', which is based on that used in the Renewables Obligation. OFGEM requires the system design and details to be submitted online for their approval Once the hydropower plant has been commissioned the installer will register the scheme on the central FIT register, administered by OFGEM, and the generator will then receive a certificate confirming FIT compliance. The generator then provides the certificate to their chosen FIT Licensee (electricity supplier). Once the FIT Licensee has crossreferenced the certificate with the central FIT register, payments can be made at intervals determined with the generator. Future of FITs In the October 2010 full spending review, the new Government accepted that any changes to the Feed-In Tariffs scheme could be damaging. It has therefore made no changes to the legislation, or to the tariff levels. The first review of the scheme will still be undertaken in 2012, to take effect from April In a statement about this future review the Government have said: Feed-In Tariffs will be refocused on the most cost-effective technologies saving 40 million in The changes will be implemented at the first scheduled review of tariffs unless higher than expected deployment requires an early review. In effect, this means that the Government have reserved the right to make an early cut of tariffs if the uptake is greater than expected. This is not particularly helpful, but it means that the best course of action for a potential developer is to proceed with FIT accreditation as soon as possible. 10
11 Budget Development Cost Even for small scale hydropower schemes, it is common for a bespoke turbine to be manufactured based on site-specific design and at the feasibility stage it is too early to produce a complete specification of the system required. However, a budget development cost estimate is produced for each scheme, based on guideline prices from suppliers and information on recent installations. The costs can be grouped into three main categories 1) civil works, 2) mechanical and electrical equipment, and 3) professional fees. A breakdown of the potential component costs is presented in Table 3. This is not an exhaustive breakdown and not every scheme will require all components. For example, a very low head scheme may have no requirement for a pipeline. The preliminaries, in the list of civil works, include on site management, welfare facilities, site maintenance, plant equipment, and personnel transport. Part of the preliminaries cost include the application for an abstraction license to the Environment Agency. These charges will total less than 500. The costs to apply for planning permission will vary widely Civil Works Table 3 Development Budget Cost components Mechanical and Electrical Equipment Professional Fees Preliminaries Temporary Works Access Track and Bridge Site Storage Compound Intake Header Tank Pipeline Turbine Platform Powerhouse Outfall Installation of M&E Electrical Cabling Remedial Works Turbine Gearbox and Coupling Generator Control System Electrical Protection Sluice Gate Coarse Screen Emergency Brake Remote Monitoring System Delivery Installation Commissioning Testing Feasibility Study Detailed Design Control of CDM Regulations Construction Drawings Licence Applications Planning Application Tendering Contractual Negotiations Project Management. 11
12 Consultation bodies: Planning Permission and Licensing The Environment Agency The Environment Agency aims to ensure that hydropower schemes include appropriate measures to protect the local environment and comply with environmental and other legislation. For any scheme the Environment Agency need to consider: Abstraction agreement needs to be reached on the amount of water that a scheme can take from a river to flow through a hydropower turbine Impoundment - any new or raised weir will change the water levels and flows in the river. These changes need to be agreed Flood risk the Environment Agency need to give consent to any works in or near rivers that have the potential to increase flood risk Fish passage - many schemes require a fish pass to allow fish to pass safely up and down the river It is recommended that the latest Environment Agency Good Practice Guidelines are followed for any development, and these can be found at The Environment Agency has a Pre-application Enquiry system in place which helps to ensure that they have all the information necessary. The pre-application enquiry forms can be found at Planning It is recommended that the relevant Local Planning Authority is contacted to determine the likelihood of the proposed development receiving planning permission. As far as planning permission is concerned, the key features of a small hydro scheme include: a water intake above a weir or behind a dam a pipe or channel to take water to the turbine a turbine, generator and electrical connection an outflow, where the water returns to the watercourse These elements raise a number of important planning issues and planning permission will usually be needed. The elements of a small-scale hydro electricity scheme create potential impacts on landscape and visual amenity, nature conservation, and the water regime. Some form of environmental assessment is essential when it comes to applying for planning permission and environmental licenses. Under the Town and Country Planning (Assessment of Environmental Effects) Regulations 1988, the planning application for any development that the planning authority considers likely to have a significant impact on the environment must be accompanied by an Environmental Statement. An ecologist will be able to advise on the extent of environmental investigation required e.g. an Environmental Statement, Impact Assessment or Appraisal. This document provides an assessment of the project s likely environmental effects, together with any design, construction, operational and decommissioning measures that are to be taken to minimise them. It would typically cover such issues as flora, fauna, noise levels, traffic, land use, archaeology, recreation, landscape, and air and water quality. Building Regulations Building regulations will normally apply to aspects of the installation of a small scale hydro facility. For example work associated with the electrical installation. It is advisable to contact an engineer who can provide the necessary advice. 12
13 Section B: Stage 1 Studies 1. Waddow weir 2. Roughlee weir 3. Clough Bottom farm 4. Chipping Mill 5. Kirk Mill, Chipping 6. Backsbottom farm 7. Abbeystead reservoir 8. Whalley weir 9. Primrose mill, Clitheroe 10. Skerton weir 11. Higherford Mill 12. Hurst Green Bobbin Mill 13. Littlemoor Mill, Clitheroe 14. Low Mill, Caton 15. Gresgarth Mill, Caton 16. Slaidburn sawmill 17. Stonyhurst College 18. Castle Mill farm, Quernmore 19. Langden Intake 20. Hareden Intake 21. Greendale Mill, Grindleton 22. Earby Youth Hostel 23. Millhouses, Wray 24. Willow Mill, Caton 25. Lappet Mill, Calder Vale 26. Oakenclough paper mill 27. Black Moss reservoir 28. Hougher Fall farm, Longridge 29. County Brook Mill, Foulridge 30. Ribblesdale Park, Gisburn 31. Gilberton farm, Tarnbrook 32. Bank House Fly Fishery 33. Calder Intake 34. Marshaw old watercourse 35. Crossgill village weir 36. Holden Clough village weir 37. Ogden reservoir 13
14 14
15 Section C: Stage 2 Studies 1. Higherford Mill, Barrowford 2. Waddow Weir, Waddington 3. Primrose Lodge, Clitheroe 4. Abbeystead Reservoir 5. Skerton weir, Lancaster 15
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
What are the Benefits?
Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro
Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid
Cronfa Amaethyddol Ewrop ar gyfer Datblygu Gwledig: Ewrop yn Buddsoddi mewn Ardaloedd Gwledig The European Agricultural Fund for Rural Development: Europe Investing in Rural Areas Micro-hydro Power Introduction
A LAYMAN S GUIDE TO SMALL HYDRO SCHEMES IN SCOTLAND
A LAYMAN S GUIDE TO SMALL HYDRO SCHEMES IN SCOTLAND David J T McKenzie CA March 2007 1 GENERAL INFORMATION ABOUT HYDRO TECHNOLOGY General Hydro electric schemes are the largest contributor of electricity
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist
Hydropower: A closer look at Archimedes Screws Dr Peter Walker APEM Senior Aquatic Scientist Why am I here? To talk about Archimedes screw hydropower Topics covered: A brief, general overview of hydropower
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada
An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting
A GUIDE TO UK MINI-HYDRO DEVELOPMENTS
The British Hydropower Association A GUIDE TO UK MINI-HYDRO DEVELOPMENTS The British Hydropower Association All rights reserved. No part of this document may be reproduced, stored in a retrieval system,
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM Dumitru Dan POP 1, Vasile Simion CRĂCIUN, Liviu Neamţ, Radu Tîrnovan, Teodor VAIDA Technical University of Cluj Napoca, [email protected]
Hydro Power Projections Report. Jennifer Palmer
Hydro Power Projections Report Jennifer Palmer Abstract- The purpose of this report is to assess the current and future role of hydro power in the UK energy supply market. The historical trends and barriers
SMALL HYDRO PROJECT ANALYSIS
Training Module SPEAKER S NOTES SMALL HYDRO PROJECT ANALYSIS CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides) for this training module
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
Feed in Tariffs for Microgeneration. Jos Mister Energy Saving Trust
Feed in Tariffs for Microgeneration Jos Mister Energy Saving Trust Funding and Finance Feed in Tariffs Clean Energy Cashback April 2010 Renewable Heat Incentive April 2011 Business support Enhanced Capital
KEYWORDS Micro hydro turbine, Turbine testing, Cross flow turbine
DEVELOPMENT OF COST EFFECTIVE TURBINE FOR HILLY AREAS [Blank line 11 pt] A. Tamil Chandran, Senior Research Engineer Fluid Control Research Institute, Kanjikode west, Plalakkad, Kerala, India [email protected]
Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan
Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small
Hydroelectric Power (3 Semester Hours)
ECET 3811 Hydroelectric Power (3 Semester Hours) I. Course Overview: Hydroelectric power is a form of hydropower which exploits the movement of water to generate electricity. Hydroelectricity is a well-established
e-factsheet Feed-in Tariffs what we have to offer
e-factsheet Feed-in Tariffs what we have to offer 2 of 12 Feed-in Tariffs (FITs) make renewable generation more financially rewarding for smaller installations and help reduce the UK s carbon emissions.
e7/ppa Workshop on Renewable Energy - TEST ANSWER -
e7/ppa Workshop on Renewable Energy - TEST ANSWER - NAME UTILITY 1 Question 1: Give two kinds of gases that cause the global warming. Most serious Green house gas. CO 2 (Carbon dioxide), CH 4 (Methane),
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational
MICRO HYDRO FOR THE FARM AND HOME
MICRO HYDRO FOR THE FARM AND HOME How much can I expect to save? This depends entirely on the available flow, available head (fall) and the duration that the flow is available. Some farms struggle to maintain
MICRO-HYDRO POWER. Technical
MICRO-HYDRO POWER Introduction Water power can be harnessed in many ways; tidal flows can be utilised to produce power by building a barrage across an estuary and releasing water in a controlled manner
CHAPTER 3 RESEARCH DESIGN
CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.
Western Australian Feed-In Tariff Discussion Paper
Western Australian Feed-In Tariff Discussion Paper OVERVIEW In September 2008, the incoming State Government announced its intention to introduce a feed-in tariff as part of the Liberal Plan for Environmental
FOCUS: ENERGY & ENVIRONMENT
T: +44 (0) 1628 471119; E: [email protected] W: www.e-mel.co.uk FOCUS: ENERGY & ENVIRONMENT Micro Hydro the saviour of for a country of waterways? European Management Education & Learning (e-mel) LLP
Small-Micro Hydro Facilitation & Innovative Technologies in Japan
1 HYDROVISION2006 Oregon Convention Center, Portland, Oregon USA July 31 August 5, 2006 Innovative Small and Medium Hydro Technologies Workshop By IEA Small Hydro Annex-2 2 & NRCan - CETC Small-Micro Hydro
Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).
Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ
3. Buying non-accredited green power from electricity retailer
ATTACHMENT 1 Understanding Australia s Renewable Energy Market In Australia electricity customers have four options for neutralising the greenhouse emissions associated with their electricity use. These
Howsham fish passage Consultation document
Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing
Carbon Path to 2020. Alan Aldridge Executive Director Energy Services and Technology Association
Carbon Path to 2020 Alan Aldridge Executive Director Energy Services and Technology Association ESTA PO Box 77 Benfleet Essex SS7 5EX T: 01268 569010 F: 01268 569737 E: [email protected] W: www.esta.org.uk
FEED-IN TARIFF (FiT) IN MALAYSIA www.seda.gov.my
IN MALAYSIA www.seda.gov.my 1 Introduction to Feed-in Tariff Mechanism Feed-in Tariff mechanism oblige energy utilities to buy renewable energy from producers, at a mandated price. By guaranteeing access
China s Small Hydropower in Rural Energy Development
China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one
The Energy Saving Trust s community solar programme How your community can benefit from discounted solar panels and Feed-in Tariffs
The Energy Saving Trust s community solar programme How your community can benefit from discounted solar panels and Feed-in Tariffs 1 Introduction Feed-in Tariffs have arrived, which means there has never
Generating your own ENERGY. A planning guide for householders, communities and businesses
Generating your own ENERGY 1 1 A planning guide for householders, communities and businesses Climate change is happening now Climate change is one of the biggest challenges facing the world and one that
Clean Development Mechanism Project Opportunities in Indonesia
Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002
GENERATING YOUR OWN ENERGY. A planning guide for householders, communities and businesses
GENERATING YOUR OWN ENERGY 1 1 A planning guide for householders, communities and businesses Climate change is happening now We know that innovations such as the internet and mobile phones have transformed
D 4.4 Report on the feasibility analysis for most technically acceptable locations
SMART Strategies to Promote Small Scale Hydro Electricity Production in Europe D 4.4 Report on the feasibility analysis for most technically acceptable locations 1 technically acceptable locations Page
Energy usage in households with Solar PV installations
Energy usage in households with Solar PV installations Background The National Energy Efficiency Data-Framework (NEED) is produced and published by DECC to provide detailed information on annual electricity
TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: MICRO-HYDRO Steven Jones, M.S., P.E. September 4, 2013 Outline Micro Hydro Power Basics Hydro Power Equipment
Hydro Power. Chapter 4. Mohammed Taih Gatte and Rasim Azeez Kadhim. 1. Introduction
Chapter 4 Hydro Power Mohammed Taih Gatte and Rasim Azeez Kadhim Additional information is available at the end of the chapter http://dx.doi.org/10.5772/52269 1. Introduction Humans have used the power
S.1 Introduction to the Case Study on Micro-Hydro Power Plants
S.1 Introduction to the Case Study on Micro-Hydro Power Plants Micro-Hydro power is an alternative technology for power generation. This section provides a case study on the design and development of a
Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010
Institut für Energietechnik Department of Energy Systems Hydroelectric power Elias Bartos 2/7 2010 1 Contents Different types of power plants Potential Economics Conclusion 2 Impoundment A dam is built
Case Study 5 Use of Wind Turbine Technology
Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity
12 ENERGY. 12.1 Introduction
12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh
Contract for Difference for non-uk Renewable Electricity Projects
Contract for Difference for non-uk Renewable Electricity Projects August 2014 Crown copyright 2014 URN 14D/291 You may re-use this information (not including logos) free of charge in any format or medium,
Half the cost Half the carbon
Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within
ENA Submission to the Parliamentary Renewable and Sustainable Energy Group Inquiry into the access and management of renewables and the Grid
1 ENA Submission to the Parliamentary Renewable and Sustainable Energy Group Inquiry into the access and management of renewables and the Grid 1.0 Introduction 1.1 Energy Networks Association (ENA) is
REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES)
PAGE: 1 REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 SUBJECT: BY: RENEWABLE ENERGY ACTION PLAN ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES) 1. REASON FOR REPORT 1.1 To inform
Reforming the business energy efficiency tax landscape
Reforming the business energy efficiency tax landscape September 2015 Reforming the business energy efficiency tax landscape September 2015 Crown copyright 2015 This publication is licensed under the
red zone management white paper Making the most of Distribution Use of System (DUoS) Charges
red zone management white paper Making the most of Distribution Use of System (DUoS) Charges 1. Distribution charges 2. Measuring usage 3. Component parts 4. Time is of the essence 5. Solution provider
Wind Turbine Power Calculations
Wind Turbine Power Calculations RWE npower renewables Mechanical and Electrical Engineering Power Industry INTRODUCTION RWE npower is a leading integrated UK energy company and is part of the RWE Group,
DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME
DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME Delson Jose 1, Lini Varghese 2, Renjini G. 3 1,2B.Tech Scholars Engineering College, Cheruthuruthy, Thrissur, 3Assistant Professor,
THE TRADABLE VALUE OF DISTRIBUTED GENERATION
THE TRADABLE VALUE OF DISTRIBUTED GENERATION CONTRACT NUMBER: DG/DTI/00047 URN NUMBER: 05/1228 1 The DTI drives our ambition of prosperity for all by working to create the best environment for business
Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)
Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential
Energy Act 2011 CHAPTER 1 CONTENTS PART 1 ENERGY EFFICIENCY GREEN DEAL
Energy Act 2011 CHAPTER 16 CONTENTS PART 1 ENERGY EFFICIENCY CHAPTER 1 GREEN DEAL Introductory 1 Green deal plans 2 Green deal plans: supplementary 3 Framework regulations Green deal plan 4 Assessment
Reforming the business energy efficiency tax landscape
Reforming the business energy efficiency tax landscape Consultation response from: Emission Trading Group (ETG) Contact details: John Craven, [email protected] ETG welcomes this review of the business
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Heat Networks Delivery Unit
Heat Networks Delivery Unit HNDU Round 6: Overview April 2016 Crown copyright 2016 URN 16D/056 You may re-use this information (not including logos) free of charge in any format or medium, under the terms
Performance of Gangrel Hydroelectric Power Plant A Case Study
Performance of Gangrel Hydroelectric Power Plant A Case Study Bhoumika Sahu 1, Sanjiv Kumar 2, Dhananjay Kumar Sahu 3,Brijesh patel 4,Kalpit P. Kaurase 5 1 M.Tech scholar (TurboMachinary) & Mats University,
Investing in renewable technologies CfD contract terms and strike prices
Investing in renewable technologies CfD contract terms and strike prices December 2013 Crown copyright 2013 You may re-use this information (not including logos) free of charge in any format or medium,
Non Domestic energy consumption 2013 Kent Local Authorities (Previously Industrial & Commercial energy use)
[Business Intelligence Statistical Bulletin June 2015 Non Domestic energy consumption 2013 Kent Local Authorities (Previously Industrial & Commercial energy use) Related documents Domestic energy consumption
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE
The Solar Power Specialists GB: 0845 64 39 772 NI: 0845 50 40 444 Email: [email protected] Visit: www.metartecsolar.com Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House,
Micro-hydro applications in rural areas
OASYS South Asia: Dundee Workshop 20 Micro-hydro applications in rural areas Dr Arthur Williams Dept. of Electrical & Electronic Engineering University of Nottingham, UK Types of hydropower Conventional
Community Solar Roof Guide
Community Solar Roof Guide Installing a community owned solar roof has become a reality in the UK since the introduction of the Feed-in-Tariff in April 2010, which pays renewable energy generators a premium
PHOTOVOLTAIC SYSTEM DESIGN AND INSTALLATION From the pre-feasibility study to the commissioning
FEBRUARY, 2011 PHOTOVOLTAIC SYSTEM DESIGN AND INSTALLATION From the pre-feasibility study to the commissioning [email protected] www.a-sunenergy.com FEBRUARY, 2011 TABLE OF CONTENT PROJECT OVERVIEW
Using the sun to generate electricity
Using the sun to generate electricity Image source: http://www.globalsolarcenter.com/files/2009/04/commercial-solar.jpg Solar panels information sheet What are the benefits? How does it work? What is the
RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION
RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION Dr. S. K. Dave 1, Ashokkumar A. Parmar 2, Nikhil M. Vyas 3, P. S.Chadhari 4 Lecturer & I/C Head Civil Eng, Applied Mechanics.,
Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011
Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly
Exploring the potential of energy recovery using micro hydropower systems in water supply systems
Water Utility Journal 7: 25-33, 2014. 2014 E.W. Publications Exploring the potential of energy recovery using micro hydropower systems in water supply systems I. Kougias *, T. Patsialis, A. Zafirakou and
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
Domestic energy bills and costs of implementing environmental measures
Domestic energy bills and costs of implementing environmental measures The Sustainable Development Commission has analysed household electricity and gas bills to show the contribution of the additional
HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL
HYDROPOWER SYSTEMS BY APPOINTMENT TO H.M. THE QUEEN WATER TURBINE ENGINEERS, GILBERT GILKES & GORDON LTD, KENDAL 1 WWW.GILKES.COM CONTENTS THE COMPANY 3 GILKES HYDROPOWER 5 GILKES PACKAGE 7 TURBINE SELECTION
NERA Analysis of Energy Supplier Margins
7 December 2009 NERA Analysis of Energy Supplier Margins By Graham Shuttleworth Even though wholesale energy prices have fallen recently, gas and electricity suppliers are earning very little margin on
HydroHelp 1 AN EXCEL PROGRAM DEVELOPED FOR TURBINE-GENERATOR SELECTION FOR HYDROELECTRIC SITES
HydroHelp 1 AN EXCEL PROGRAM DEVELOPED FOR TURBINE-GENERATOR SELECTION FOR HYDROELECTRIC SITES Selecting the correct turbine for a hydro site is difficult, particularly for small low-head sites. Manufacturers
Design and manufacturing of Crossflow, Pelton, Kaplan and Francis turbines
Design and manufacturing of Crossflow, Pelton, Kaplan and Francis turbines Founded in 1990 as a manufacturer of hydro power plant equipment In 2005, the company underwent complete modernization and extended
Renewable Energy Certificates
EPA s Green Power Partnership Renewable Energy Certificates Last updated: July 2008 U.S. Environmental Protection Agency 1200 Pennsylvania Ave, NW (Mail Code 6202J) Washington, DC 20460 www.epa.gov/greenpower
Delivering the UK s renewable heat objectives through wood fuel
Delivering the UK s renewable heat objectives through wood fuel Sustainability Position Paper March 2014 Executive Summary Renewable energy from wood fuel has major potential as a sustainable and efficient