Short-cut design of small hydroelectric plants

Size: px
Start display at page:

Download "Short-cut design of small hydroelectric plants"

Transcription

1 Renewable Energy 19 (2000) 545±563 Short-cut design of small hydroelectric plants N.G. Voros*, C.T. Kiranoudis, Z.B. Maroulis Department of Chemical Engineering, National Technical University of Athens, Polytechnioupoli, Zografou, Athens, 15780, Greece Received 20 September 1997; accepted 5 May 1999 Abstract The problem of designing small hydroelectric plants has been properly analysed and addressed in terms of maximizing the economic bene ts of the investment. An appropriate empirical model describing hydroturbine e ciency was developed. An overall plant model was introduced by taking into account their construction characteristics and operational performance. The hydrogeographical characteristics for a wide range of sites have been appropriately analyzed and a model that involves signi cant physical parameters has been developed. The design problem was formulated as a mathematical programming problem, and solved using appropriate programming techniques. The optimization covered a wide range of site characteristics and three types of commercially available hydroturbines. The methodology introduced an empirical short-cut design equation for the determination of the optimum nominal owrate of the hydroturbines and the estimation of the expected unit cost of electricity produced, as well as of the potential amount of annually recovered energy. # 1999 Elsevier Science Ltd. All rights reserved. 1. Introduction The term hydropower refers to generation of shaft power from falling water. The power could then be used for direct mechanical purposes or, more frequently, for generating electricity. Hydropower is the most established renewable resource for electricity generation in commercial investments. Although, hydroelectric generation is regarded as a mature technology, there are still possibilities for * Corresponding author /00/$ - see front matter # 1999 Elsevier Science Ltd. All rights reserved. PII: S (99)00083-X

2 546 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Nomenclature a, b, c turbine e ciency model coe cients de ned in Eq. (2) c 0, c 1, c 2 capital cost coe cients de ned in Eq. (15) c E unit cost of electricity produced ($/kwh) c EL conventional unit cost of electricity ($/kwh) c OP operational cost coe cient de ned in Eq. (16) ($/kw) C CP capital cost ($) C OP operational cost ($/h) C T total annual cost ($) e percentage of the capital cost on an annual rate E electrical energy annually recovered (W) g gravity constant (m/s 2 ) H available hydraulic head (m) H 0 available vertical fall of water (m) H r nominal vertical fall of water de ned in Eq. (9) (m) k ow duration curve parameter de ned in Eq. (11) P electrical power (W) PI investment e ciency P r nominal hydroturbine power (W) q 50 owrate duration curve parameter de ned in Eq. (13) q min owrate duration curve parameter de ned in Eq. (12) q max hydroturbine maximum working owrate fraction de ned in Eq. (5) q min hydroturbine minimum working owrate fraction de ned in Eq. (4) Q hydroturbine owrate (m 3 /s) Q available water owrate (m 3 /s) Q 50 mid-year stream owrate (m 3 /s) Q max annual highest stream owrate (m 3 /s) Q min annual lowest stream owrate (m 3 /s) S total annual pro ts expected from the investment ($) t time (s) t OP operating time of the plant (s) time of the calendar year (s) t Y Greek letters g short-cut model parameter de ned in Eq. (21) Z turbine e ciency turbine nominal e ciency Z r

3 N.G. Voros et al. / Renewable Energy 19 (2000) 545± improvement. While some elements of hydropower, such as turbine e ciency and cost, have reached an extreme, the same cannot be said for the system itself. New turbine designs and transmission technology (which is of great importance to hydropower development) with respect to regional characteristics, continue to advance. Moreover, environmental concerns are driving changes in the design, construction, operation and optimization of hydroelectric plants [1,2]. Taking into consideration the aforementioned technological advances, as well as the economic bene ts of this technology, the generation of electricity derived from hydroturbines has now a growing capacity of total world-wide installations of about 5% per year, doubling about every 15 years. More speci cally, hydro installations and plants are long lasting (due to continuous steady-state operation without high temperatures and mechanical stresses), thus producing electricity at low cost with consequent economic bene ts [3]. No consensus has been reached on the de nition of small, mini, and micro hydropower plants. Micro hydropower schemes are usually described as those having capacities below 100 kw, mini hydropower plants as those ranging from 100 kw to 1 MW while small hydroelectric plants as those that produce electric power ranging from 1 to 30 MW. Recent international surveys on small hydropower facilities (with capacities below 10 MW) reveal that small hydropower plants are under construction or have been already constructed in more than 100 countries [4±6]. The design of reliable and cost e ective small hydropower plants capable of large-scale electrical energy production is a prerequisite for the e ective use of hydropower as an alternative resource. In this sense, the design of a small hydroelectric plant or equivalently the determination of type and energy load of the particular hydroturbines, should maximize the energy output together with the life-time of the machines. In all cases, the design objective is closely related to the total annual output of the overall hydroturbine operation in power terms. Obviously, given the power curve of the hydroturbine to be used and regional ow duration statistical data as well as the topology of the site, we can estimate the total annual energy output of a small hydroelectric plant to be installed. In this case, both the type and size of the hydroturbine, expressed in terms of its nominal owrate have to be determined under a certain economic environment. The determination of the optimal plant characteristics must be based on speci c design objectives. In this case, the design problem may be formulated as a mathematical programming problem, involving an objective function representing the investment e ciency which is expressed by the pro ts expected per unit of capital invested. The construction and operation of various types of hydroturbines to be used has been investigated to an extent that several operating experimental data are currently available in the literature. Furthermore, hydrogeographical statistical data and hydropower potential have been thoroughly investigated for a wide range of regions where hydropower seems promising for exploitation. In addition, suitable mathematical models describing the operation of hydroturbines have been developed and used for the simulation of hydroelectric plants. Fasol and Pohl [7]

4 548 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 developed suitable mathematical models for the simulation of the operation of a hydroelectric plant and its advanced control schemes. However, design e orts in this eld is limited with respect to the general objectives described previously. Charles et al. [8] used advanced computational uid dynamics for the design of hydroelectric plants and calculated in detail ow quantities, including energy loss and plant e ciency. Short-cut design is a technical procedure for expressing in a straightforward way the optimal results of a detailed design problem through empirical equations involving the corresponding design variables. In this way, all other model variables are directly computed through the model equations. The parameters of the empirical equations are evaluated by tting the short-cut model equations to the corresponding design problem optimal results computed using the full process model. Short-cut design is extremely important for preliminary selection of alternative design scenaria for diversi ed policies of investment at a regional level. In this way, short-cut evaluations of optimal designs for certain sites is an indispensable tool for assessing regional planning strategies at a national or international level. Moreover, it is extremely important for determining the way that alternative energy sources could possibly penetrate the energy market by an appropriate subsidy policy. This work addresses the problem of small hydroelectric plant short-cut design in terms of maximizing the economic bene ts of the investment. The mathematical model of hydroturbines was developed taking into consideration their performance with respect to construction and operation. An empirical model was used for estimating the overall turbine e ciency. The objective function to be maximized was the investment e ciency. The hydrogeographical characteristics of a site have been analyzed in terms of signi cant physical parameters and modeled appropriately. Optimization was carried out for a wide range of site characteristics expressed by the corresponding model parameters and for three di erent types of commercial hydroturbines. An empirical short-cut model equation was introduced for determining the optimum nominal owrate of the hydroturbines. The regions of applicability for all turbines involved, was determined as a function of model parameters. From the engineering point of view, such an analysis will directly serve as an evaluation tool for explicitly determining the pro tability of exploiting hydropower at a certain region. 2. Mathematical modeling of hydroturbines The power obtained by a hydroturbine operated in a small hydroelectric plant is proportional to the potential energy lost by the falling uid and is given by the following equation [9]: P ˆ ZgQH 1 The turbine e ciency, Z, involved in the calculation of water potential converted

5 N.G. Voros et al. / Renewable Energy 19 (2000) 545± energy through expression (1), represents the actual utilization of the available potential energy of the system. Normally, a hydroturbine is designed so that it can be operated for a wide range of working uid owrates around a nominal operating point. The performance of the turbine is characterised by its nominal owrate, Q r, that is an explicit indication of its size. For a speci c type of turbine (con guration of equipment), its size and capacity that are directly analogous to its diameter are proportionally related to its nominal owrate. Therefore, the turbine nominal owrate is a suitable variable for sizing the turbine and all relevant equipment of the plant. The turbine e ciency depends on the working uid owrate and actual turbine characteristics. Experimental data for the turbine e ciency, in the case of three commercial hydroturbines studied in this work (i.e. FRANCIS, PELTON and AXIAL), are given in Fig. 1, as a function of the ratio of working owrate to its corresponding nominal owrate and the turbine e ciency at the nominal owrate, Z r [10]. All curves exhibit a maximum at a owrate representing the nominal performance of the hydroturbine. An empirical expression for representing the turbine e ciency characteristic curve is proposed: Z Q 2 Q ˆ a b c 2 Z r Q r Q r In this expression, the turbine characteristics are the nominal turbine e ciency, Z r, the nominal turbine owrate, Q r, and three parameters expressing the shape of the curves. It must be noted that the nominal power of the turbine is given by the following expression: P r ˆ Z r gq r H 3 Excellent ts to actual experimental data were detected when expression (2) was used as real turbine data. The predictions of the empirical equation proposed for the case of turbine e ciency experimental values are also given in Fig. 1, indicating the excellence of the t and suggesting the practical signi cance of Eq. (2). The estimated turbine parameters of Eq. (2) for all commercial hydroturbines studied, are given in Table 1. The nominal turbine e ciency is independent of the nominal owrate for all turbines examined, and its corresponding values are also given in Table 1. Each hydroturbine is constructed to operate between two extremes, a minimum and a maximum working owrate. We introduce two turbine characteristic parameters q min and q max, representing the fraction of its nominal owrate corresponding the lower and upper extreme working owrates, respectively. These values are also included in Table 1 for each one of the commercial turbines studied. The minimum and maximum working owrates for the turbine are accordingly given by the following equations: Q min ˆ q min Q r 4 Q max ˆ q max Q r 5

6 550 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Fig. 1. Hydroturbine e ciency curves (points are experimental data and lines are model predictions). (a) FRANCIS, (b) PELTON, (c) AXIAL.

7 N.G. Voros et al. / Renewable Energy 19 (2000) 545± Table 1 Hydroturbine e ciency and operational parameters Turbine FRANCIS PELTON AXIAL a b c Z r q min q max The water owrate through the turbine, Q, is determined by the following relationship as a function of the available water owrate, Q [9±11]: 8 < 0, Q < Q min Q ˆ Q, Q : min < Q < Q max 6 Q max, Q max < Q The available hydraulic head involved in Eq. (1) can be estimated by subtracting the friction losses through the penstock from the available vertical fall of water [11]: # Q 2 H ˆ H 0 "1 l 7 Q r The friction coe cient, l, involved in Eq. (7) depends on the penstock size, con guration and topology of the region in the sense that the e ect of piping network and the dam layout is embodied in this parameter. Eqs. (1), (2) and (7) can now be combined to express the actual power converted as a function of turbine working owrate and available vertical fall of water. The nominal power of the plant is given by: P r ˆ Z r gq r H r 8 where: H r ˆ H 0 1 l 9 The potential of a stream is characterized by the available vertical fall (H 0 ) and its owrate that is usually expressed by the owrate duration curve. The ow duration curve provides the time period during which the ow rate of the stream is greater than a speci c value (cumulative distribution of stream owrate on an annual basis). Natural river ow is highly variable, a characteristic that has important implications for the design of hydroelectric plants and their incorporation into the electrical generation system. Most rivers exhibit pronounced seasonal variation in their ow. In some cases, the average three-

8 552 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 month high ow may be more than ten times greater than the average threemonth low ow, while in others, it is less than double. In order to provide a generalized model for predicting a stream owrate duration curve the following expression is suggested: Q ˆ Q max Q min k Q max t 1 k 1 t 10 where: k ˆ Q max Q 50 Q 50 Q min 11 Eq. (10) describes the owrate duration curve of a stream by utilizing only three parameters; the annual highest stream owrate, Q max, the annual lowest stream owrate, Q min, and the stream owrate corresponding to the mid-year point of the ow duration curve, Q 50. All these characteristic parameters of the stream duration curve along with the stream duration curve itself are presented in Fig. 2. The rst two parameters indicate the poles of the ow duration curve, while the third one, its shape (curvature). Obviously this parameter describes the sharpness Fig. 2. Placement of a hydroturbine on a site stream duration curve.

9 N.G. Voros et al. / Renewable Energy 19 (2000) 545± of seasonal variations in stream owrate. To illustrate the way that a hydroturbine could be placed on the ow duration curve, Fig. 2 also includes the characteristic variables of a hydroturbine placed randomly. In order to describe more e ciently the site characteristic parameters, we introduce the following variables, expressing the corresponding owrate duration curve parameters as a fraction of the maximum annual owrate value of the stream: q min ˆ Q min Q max 12 q 50 ˆ Q 50 Q max 13 The annual energy obtained by the operation of the hydroelectric plant is calculated by integrating Eq. (1) for the entire year: E ˆ top 0 P dt 14 The installation cost of the plant is given by the following equation as a function of the turbine nominal power and the vertical free fall of the site [10]: C CP ˆ c 0 P c 1 r H c The operational cost of the plant is proportional to the installed plant capacity and is given by the following equation [10]: C OP ˆ c OP P r 16 The total annual cost of the plant is therefore calculated by means of the following equation: C T ˆ ec CP t OP C OP 17 As a result the unit cost of energy produced is the ratio of total annual cost and annual energy recovered: c E ˆ CT E 18 The expected pro ts from the operation of the hydroelectric plant is therefore given below: S ˆ E c EL c E 19 The investment e ciency is expressed as the ratio of expected pro ts per invested capital:

10 554 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 PI ˆ S C CP 20 Eqs. (1)±(20) constitute the mathematical model of the entire hydroelectric plant. In this case, the design objective is to maximize the investment e ciency from the operation of such a plant. Given the type of hydroturbine and site hydrogeographical characteristics and topology, there is only one design variable to be computed by means of maximizing the objective function; the nominal owrate of the hydroturbine. The optimization procedure throughout this paper was carried out by means of the successive quadratic programming algorithm implemented in the form of the subroutine E04UCF/NAG. All runs were performed on a SG Indy workstation under Unix. 3. Short-cut design of small hydroelectric plants On the basis of the above, the design strategy for small hydroelectric plants can now be clearly stated. Given the type of hydroturbine and site hydrogeographical characteristics (i.e. stream duration curve parameters) and topology (i.e. available vertical fall of water) the nominal owrate at which the hydroturbine should operate must be determined by means of optimizing appropriate technoeconomical criteria under speci c operational and environmental constraints. As a consequence of the above, the determination of the optimum plant con guration must be based on speci c design objectives. In practice, the representation of the design problem for small hydroelectric plants should focus to corresponding mathematical gures obtained through an adequate mathematical model as previously formulated. In all cases, the design procedure should involve an objective function representing the economic bene ts from the operation of such a plant or its e ciency in terms of energy availability towards regional demand. Certain alternative objective function types may be taken into consideration regarding the bene ts expected: 1. Maximization of the investment e ciency. This case suits to design problems confronted by individual power producing industries (either private or municipal) that have invested or plan to invest in this eld, in countries where legislation permits so. In other words, this objective refers to the direct economical bene ts expected from such an investment under a speci c competitive economic environment, thus determining the feasibility of exploiting this type of renewable energy source. 2. Maximization of the amount of energy annually produced from the available hydro resources. This case suits to design problems usually confronted for regions where no other sources of energy are technically exploitable, and the objective is to exploit the highest possible energy potential of a region in order to cover the local demand, assuming that the use of hydropower is still

11 N.G. Voros et al. / Renewable Energy 19 (2000) 545± pro table compared to the unit cost of electricity available in remote national regions due to increased transportation cost. Throughout this paper we choose the rst possibility for our objective function. Characteristic economical gures concerning capital and operational cost components for a typical economic environment were taken into consideration and are listed in Table 2. Between these two cases, the former evaluates an optimum plant size that is completely di erent (smaller) than the latter. However, it can be shown that the optimal results of the rst objective that is an economically driven function coincide with the ones of the second objective that is a purely technical function (independent of economics) when the unit cost of conventional electricity approaches in nity. In this case the plant operates at the point of maximum energy recovery. In order to illustrate the above mentioned situation we examine the case of a real site (Kourtaliotis, Crete) involving a ow duration curve described by a maximum annual stream owrate of 17,640 m 3 /h, minimum annual stream owrate of 17% of the maximum, mid-year stream owrate of 25% and available vertical water fall of 65 m. The hydroturbine type used for this example was FRANCIS. The e ect of hydroturbine nominal owrate on investment e ciency and total energy recovered is presented in Fig. 3. Obviously, each case results in completely di erent plant size and economic gures. For increasing unit cost of conventional electricity, optimum plant size determined by optimizing the investment e ciency increases to the one determined by maximizing the energy recovery. The power performance curve of the optimal plant size using FRANCIS hydroturbine, determined by the maximization of the annual pro ts for the a typical site involving a linear ow duration curve described by maximum annual stream owrate of 10,000 m 3 /h, zero level of minimum annual stream owrate and available vertical water fall of 100 m, is given in Fig. 4. The power curve is characterised by two di erent regions: a constant power region that lasts for 257 days and a decreasing power region that lasts for the remaining 108 days of the year. The rst region corresponds to days where stream owrate is greater or equal to the maximum hydroturbine owrate. The second region corresponds to Table 2 Design and cost data c 0 (k$) 40 c c c OP 0.01 e 0.1 l 0.1 t Y (h/y) 8760 c EL (c/kwh) 6.7

12 556 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Fig. 3. E ect of hydroturbine nominal owrate on certain process variables. (1) Investment e ciency, (2) energy recovered. (a) c EL =4 c/kwh, (b) c EL =8 c/kwh, (c) c EL =20 c/kwh. days where the stream owrate is less than the maximum hydroturbine owrate. In this case, the turbine operates for only 55 days where the stream owrate is greater or equal to the minimum hydroturbine owrate. Obviously, for the remaining 53 days the plant is out of operation since the stream owrate is less than the minimum hydroturbine owrate. Therefore, the total annual energy

13 N.G. Voros et al. / Renewable Energy 19 (2000) 545± Fig. 4. Power performance curve. recovered corresponds to the area below the hydroturbine power curve that extends up to the 312th day. The optimization procedure for the determination of the optimal turbine size described earlier, was concentrated on the solution of a speci c design problem involving a prede ned turbine type and site hydrogeographical characteristics. This procedure can be extended to include a wide range of turbine types and stream particularities described by di erent values for the parameters of its ow duration curve as well as for di erent vertical water fall values. When the results of the optimization for each turbine and site combination are systematically compiled and presented, an empirical short-cut design equation can be evaluated so that the design engineer can automatically determine the optimal size of each plant and subsequently evaluate its performance in terms of the recovered amount of energy and the unit cost of power produced. A short-cut design empirical equation of the following form is proposed: Q r ˆ " gq 50 1 g 1 q 50 1 q min q min q max q max # Q max 21 It involves only one parameter, g, and expresses the optimal hydroturbine nominal

14 558 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Table 3 Short-cut model parameters Turbine g FRANCIS PELTON AXIAL owrate in terms of investment e ciency maximization. The determination of this short cut model parameter was carried out by tting Eq. (21) to the optimal results of the full design problem for all turbines studied. The values of g for all turbines are given in Table 3. The tting of the short-cut empirical model to the optimal plant nominal owrate for all turbines studied are given in Figs. 5±7. Obviously, all ts were extremely satisfactory and Eq. (21) can be safely used for short-cut design purposes in the case of small hydroelectric plant design. Eq. (21) Fig. 5. Fitting of the short-cut empirical equation (lines) on optimal plant nominal owrate for FRANCIS hydroturbine (points) (1) q 50 =20%, (2) q 50 =40%, (3) q 50 =60%, (4) q 50 =80%. (a) q min =0%, (b) q min =30%, (c) q min =60%.

15 N.G. Voros et al. / Renewable Energy 19 (2000) 545± Fig. 6. Fitting of the short-cut empirical equation (lines) on optimal plant nominal owrate for PELTON hydroturbine (points) (symbols as in Fig. 5). does not include any dependence of the optimum plant size on the available vertical fall. For the entire range of sites studied, PELTON and AXIAL hydroturbines involve smaller optimum installation than the one evaluated for FRANCIS. All hydrogeographical model parameters (Q max, Q min and Q 50) have positive e ect on the optimum value of the plant nominal owrate (Q r ). Between the site hydrogeographical parameters, the maximum annual stream owrate has the greatest impact on the plant nominal owrate, while the mid-year annual stream owrate has the smallest one. Clearly, for sites with high hydropotential, larger hydroturbines should be utilised to fully exploit hydropower in this case. Figs. 5±7 expressing Eq. (21) are the essence of design of small hydroelectric plants with capacities up to 100 MW. Given the type of hydroturbine used and the regional hydrogeographical and topological characteristics (expressed by appropriate model parameters), the engineer can automatically evaluate the plant optimum nominal size, the corresponding total amount of energy recovered and a reasonable estimation of the total plant cost and pro ts expected at a preliminary design level. At this stage of design, the short-cut design equation for small

16 560 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Fig. 7. Fitting of the short-cut empirical equation (lines) on optimal plant nominal owrate for AXIAL hydroturbine (points) (symbols as in Fig. 5). hydroelectric plants produced is a tool of great signi cance for feasibility studies on such investments. The e ect of variation of selected model parameters on optimal process variables for the case of FRANCIS hydroturbine and the typical site of Fig. 4 is given in Fig. 8. Optimal nominal owrate is greatly a ected by the shape of the stream owrate duration curve, while as indicated above the available vertical fall of water, has no e ect at all. The unit cost of electricity produced is greatly a ected by the available vertical fall of water, while the shape of the stream owrate duration curve has the smallest e ect. Moreover, the available vertical fall of water has the greatest impact on the total energy recovered while the minimum annual stream owrate has the lowest one. The short-cut design model equation parameter, g, is generally a ected by the economic environment assumed. More speci cally, no impact of capital turbine cost was observed on this parameter. On the contrary, the unit cost of conventional electricity had a strong positive e ect on it, indicating that larger hydroturbines are favored as conventional electricity cost increases. This e ect is

17 N.G. Voros et al. / Renewable Energy 19 (2000) 545± Fig. 8. E ect of variations of selected model parameters on optimal process variables for the FRANCIS hydroturbine. (1) Q R, (2) c E (3) E (a) H, (b) q 50, (c) q min. Squares: +25%; triangles: 25%. given in Fig. 9 for the FRANCIS hydroturbine. The results are directly related to the ones obtained from the case study of Fig. 3. In order to determine the range of applicability of each hydroturbine, all hydroturbines were directly compared for a wide range of model parameters expressing topology and hydrogeography. Only two parameters could discern between the various types of hydroturbines. The range of application for all hydroturbines are given in Fig. 10. Clearly FRANCIS hydroturbine is inferior to both others while PELTON is chie y preferred for literally most common practical cases. 4. Conclusions The design of small hydroelectric plants can be properly analysed and addressed by means of optimizing the expected bene ts from such an investment in the eld

18 562 N.G. Voros et al. / Renewable Energy 19 (2000) 545±563 Fig. 9. E ect of conventional unit cost of electricity on short-cut model parameter g. Fig. 10. Regions of applicability of all hydroturbines studied.

19 N.G. Voros et al. / Renewable Energy 19 (2000) 545± of renewable energy exploitation. Optimization can be carried out by developing the mathematical model of the hydroturbines, taking into account their construction characteristics and operational performance. The turbine e ciency can be successfully modeled by means of an empirical equation. The plant model must also involve the regional characteristics in terms of hydrogeographical and topological model parameters. The design problem can be formulated as a mathematical programming one, and can be solved using appropriate programming techniques. An empirical short-cut design equation describes optimal size of the plant for a wide range of site characteristics and all commercially available hydroturbines studied. In this case, the optimum nominal owrate, the amount of energy recovered and a reasonable estimation of the plant cost can be automatically determined. References [1] Donald JJ. Hydro power engineering. New York: Ronald Press, [2] Hammond R. Water power engineering. London: Heywood, [3] Raabe IJ. HydropowerÐthe design, use and function of hydromechanical, hydraulic and electrical equipment. Duesseldorf: VDI-Verlag, [4] Biswas AK. In: El-Hinnawi B, Biswas AK, editors. Hydroelectric energy. Renewable sources of energy and the environment. Dublin: Tycooly International Publishing, [5] Moreira JR, Poole AD. In: Johansson TB, Kelly H, Reddy AKN, Williams RH, editors. Hydropower and its constraints. Renewable energy: sources for fuels and electricity. London: Earthscan Publications, [6] Havery A. Micro-hydro design manual. A guide to small-scale water power schemes. London: Intermediate Technology Publications, [7] Fasol KH, Pohl GM. Simulation, controller design and eld tests for a hydropower plantða case study. Automatica 1990;26:475. [8] Charles S, Xiangying C, Fayi Z. Using computational tools for hydraulic design of hydropower plants. Hydro Review 1995;14:104. [9] Twidell JW, Weir AD. Renewable energy resources. Cambridge University Press, [10] Prefeasibility Study for the Renewable Energy Sources Exploitation in Crete, ALTENER No.1030/93, Final Report, [11] Warnick CC. Hydropower engineering. Englewood Cli s, NJ: Prentice Hall, 1984.

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : sunilfah@iitr.ernet.in

More information

Study of hybrid wind-hydro power plants operation and performance in the autonomous electricity system of Crete Island

Study of hybrid wind-hydro power plants operation and performance in the autonomous electricity system of Crete Island Study of hybrid wind-hydro power plants operation and performance in the autonomous electricity system of Crete Island J. S. ANAGNOSTOPOULOS and D. E. PAPANTONIS School of Mechanical Engineering National

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

Exploring the potential of energy recovery using micro hydropower systems in water supply systems

Exploring the potential of energy recovery using micro hydropower systems in water supply systems Water Utility Journal 7: 25-33, 2014. 2014 E.W. Publications Exploring the potential of energy recovery using micro hydropower systems in water supply systems I. Kougias *, T. Patsialis, A. Zafirakou and

More information

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last

More information

SIMPLIFIED PERFORMANCE MODEL FOR HYBRID WIND DIESEL SYSTEMS. J. F. MANWELL, J. G. McGOWAN and U. ABDULWAHID

SIMPLIFIED PERFORMANCE MODEL FOR HYBRID WIND DIESEL SYSTEMS. J. F. MANWELL, J. G. McGOWAN and U. ABDULWAHID SIMPLIFIED PERFORMANCE MODEL FOR HYBRID WIND DIESEL SYSTEMS J. F. MANWELL, J. G. McGOWAN and U. ABDULWAHID Renewable Energy Laboratory Department of Mechanical and Industrial Engineering University of

More information

Cost management of IT beyond cost of ownership models: a state of the art overview of the Dutch nancial services industry

Cost management of IT beyond cost of ownership models: a state of the art overview of the Dutch nancial services industry Evaluation and Program Planning 25 2002) 167±173 www.elsevier.com/locate/evalprogplan Cost management of IT beyond cost of ownership models: a state of the art overview of the Dutch nancial services industry

More information

What are the Benefits?

What are the Benefits? Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro

More information

Pico Power: A Boon for Rural Electrification

Pico Power: A Boon for Rural Electrification Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification

More information

Portfolio selection based on upper and lower exponential possibility distributions

Portfolio selection based on upper and lower exponential possibility distributions European Journal of Operational Research 114 (1999) 115±126 Theory and Methodology Portfolio selection based on upper and lower exponential possibility distributions Hideo Tanaka *, Peijun Guo Department

More information

RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM)

RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM) IMPACT: International Journal of Research in Engineering & Technology (IMPACT: IJRET) Vol., Issue 3, Aug 23, - Impact Journals RECYCLED MICRO HYDROPOWER GENERATION USING HYDRAULIC RAM PUMP (HYDRAM) C.

More information

AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM

AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM Dumitru Dan POP 1, Vasile Simion CRĂCIUN, Liviu Neamţ, Radu Tîrnovan, Teodor VAIDA Technical University of Cluj Napoca, dan.pop@eps.utcluj.ro

More information

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting

More information

Impacts of large-scale solar and wind power production on the balance of the Swedish power system

Impacts of large-scale solar and wind power production on the balance of the Swedish power system Impacts of large-scale solar and wind power production on the balance of the Swedish power system Joakim Widén 1,*, Magnus Åberg 1, Dag Henning 2 1 Department of Engineering Sciences, Uppsala University,

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

Value of storage in providing balancing services for electricity generation systems with high wind penetration

Value of storage in providing balancing services for electricity generation systems with high wind penetration Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1

More information

MICRO HYDRO FOR THE FARM AND HOME

MICRO HYDRO FOR THE FARM AND HOME MICRO HYDRO FOR THE FARM AND HOME How much can I expect to save? This depends entirely on the available flow, available head (fall) and the duration that the flow is available. Some farms struggle to maintain

More information

PICO HYDRO: CLEAN POWER FROM SMALL STREAMS

PICO HYDRO: CLEAN POWER FROM SMALL STREAMS PICO YDRO: CLEAN POWER FROM SMALL STREAMS KAMARUZZAMAN SOPIAN AND JUARI AB. RAZAK Solar Energy Research Institute Universiti Kebangsaan Malaysia 43600 Bangi, Selangor Darul Ehsan MALAYSIA ksopian@vlsi.eng.ukm.my

More information

Optimal portfolio selection in a Value-at-Risk framework

Optimal portfolio selection in a Value-at-Risk framework Journal of Banking & Finance 25 2001) 1789±1804 www.elsevier.com/locate/econbase Optimal portfolio selection in a Value-at-Risk framework Rachel Campbell, Ronald Huisman, Kees Koedijk * Department of Business

More information

Hydroelectric Power (3 Semester Hours)

Hydroelectric Power (3 Semester Hours) ECET 3811 Hydroelectric Power (3 Semester Hours) I. Course Overview: Hydroelectric power is a form of hydropower which exploits the movement of water to generate electricity. Hydroelectricity is a well-established

More information

CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING

CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING 60 CHAPTER 3 SECURITY CONSTRAINED OPTIMAL SHORT-TERM HYDROTHERMAL SCHEDULING 3.1 INTRODUCTION Optimal short-term hydrothermal scheduling of power systems aims at determining optimal hydro and thermal generations

More information

DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME

DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME DESIGN OF SMALL HYDRO ELECTRIC PROJECT USING TAILRACE EXTENSION SCHEME Delson Jose 1, Lini Varghese 2, Renjini G. 3 1,2B.Tech Scholars Engineering College, Cheruthuruthy, Thrissur, 3Assistant Professor,

More information

S.1 Introduction to the Case Study on Micro-Hydro Power Plants

S.1 Introduction to the Case Study on Micro-Hydro Power Plants S.1 Introduction to the Case Study on Micro-Hydro Power Plants Micro-Hydro power is an alternative technology for power generation. This section provides a case study on the design and development of a

More information

TURBINE SELECTION RANGE

TURBINE SELECTION RANGE GILKES GILKESTURGO TURGOIMPULSE IMPULSEHYDRO HYDROTURBINE TURBINE TURBINE SELECTION On 17th August 1856 we received our first order for a water turbine. It produced mechanical power to drive agricultural

More information

Micro-hydropower: status and prospects

Micro-hydropower: status and prospects SPECIAL ISSUE PAPER 31 Micro-hydropower: status and prospects O Paish IT Power Limited, The Manor House, Chineham Court, Luytens Close, Chineham, Hants, UK Abstract: Hydropower on a small scale, or micro-hydro,

More information

OPTIMIZATION OF POWER OUTPUT OF A MICRO-HYDRO POWER STATION USING FUZZY LOGIC ALGORITHM

OPTIMIZATION OF POWER OUTPUT OF A MICRO-HYDRO POWER STATION USING FUZZY LOGIC ALGORITHM International Journal on Technical and Physical Problems of Engineering (IJTPE) Published by International Organization of IOTPE ISSN 2077-3528 IJTPE Journal www.iotpe.com ijtpe@iotpe.com March 2013 Issue

More information

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company e-mail: bashirzadeh@hotmail.com, nssrgifani@gmail.com.

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company e-mail: bashirzadeh@hotmail.com, nssrgifani@gmail.com. International Renewable Energy Congress November 5-7, 2010 Sousse, Tunisia Economical and Environmental Effects of Pressure Reducer Valve Substituting by Small Hydro Power-Plants in Gravity Water Transmission

More information

A case study of evolution in object oriented and heterogeneous architectures

A case study of evolution in object oriented and heterogeneous architectures The Journal of Systems and Software 43 (1998) 85±91 A case study of evolution in object oriented and heterogeneous architectures Vaclav Rajlich *, Shivkumar Ragunathan Department of Computer Science, Wayne

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Application of sensitivity analysis in investment project evaluation under uncertainty and risk

Application of sensitivity analysis in investment project evaluation under uncertainty and risk International Journal of Project Management Vol. 17, No. 4, pp. 217±222, 1999 # 1999 Elsevier Science Ltd and IPMA. All rights reserved Printed in Great Britain 0263-7863/99 $ - see front matter PII: S0263-7863(98)00035-0

More information

University of Saskatchewan Department of Economics Economics 414.3 Homework #1

University of Saskatchewan Department of Economics Economics 414.3 Homework #1 Homework #1 1. In 1900 GDP per capita in Japan (measured in 2000 dollars) was $1,433. In 2000 it was $26,375. (a) Calculate the growth rate of income per capita in Japan over this century. (b) Now suppose

More information

Enhancing the SNR of the Fiber Optic Rotation Sensor using the LMS Algorithm

Enhancing the SNR of the Fiber Optic Rotation Sensor using the LMS Algorithm 1 Enhancing the SNR of the Fiber Optic Rotation Sensor using the LMS Algorithm Hani Mehrpouyan, Student Member, IEEE, Department of Electrical and Computer Engineering Queen s University, Kingston, Ontario,

More information

Energy transformations

Energy transformations Energy transformations Objectives Describe examples of energy transformations. Demonstrate and apply the law of conservation of energy to a system involving a vertical spring and mass. Design and implement

More information

Project management applications of the theory of constraints beyond critical chain scheduling

Project management applications of the theory of constraints beyond critical chain scheduling International Journal of Project Management 20 2002) 75±80 www.elsevier.com/locate/ijproman Project management applications of the theory of constraints beyond critical chain scheduling H. Steyn * Department

More information

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: Carsten.Agert@next-energy.de

More information

Advance Electronic Load Controller for Micro Hydro Power Plant

Advance Electronic Load Controller for Micro Hydro Power Plant Journal of Energy and Power Engineering 8 (2014) 1802-1810 D DAVID PUBLISHING Advance Electronic Load Controller for Micro Hydro Power Plant Dipesh Shrestha, Ankit Babu Rajbanshi, Kushal Shrestha and Indraman

More information

MODELLING AND SIMULATION OF MICRO HYDRO POWER PLANT USING MATLAB SIMULINK

MODELLING AND SIMULATION OF MICRO HYDRO POWER PLANT USING MATLAB SIMULINK MODELLING AND SIMULATION OF MICRO HYDRO POWER PLANT USING MATLAB SIMULINK Auwal Abubakar Usman 1, Rabiu Aliyu Abdulkadir 2 1 M.Tech (Power System Engineering), 2 M.Tech (Instrumentation and Control) Sharda

More information

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

Assessment of hydropower resources

Assessment of hydropower resources Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key

More information

The Stock Market, Monetary Policy, and Economic Development

The Stock Market, Monetary Policy, and Economic Development The Stock Market, Monetary Policy, and Economic Development Edgar A. Ghossoub University of Texas at San Antonio Robert R. Reed University of Alabama July, 20 Abstract In this paper, we examine the impact

More information

Critical Illness Insurance to Alleviate Catastrophic Health Expenditures: New Evidence from China

Critical Illness Insurance to Alleviate Catastrophic Health Expenditures: New Evidence from China Critical Illness Insurance to Alleviate Catastrophic Health Expenditures: New Evidence from China February 16, 2015 Abstract Currently, a high percentage of China s households face nancial catastrophe

More information

1 Volatility Trading Strategies

1 Volatility Trading Strategies Brunel University Msc., EC5504, Financial Engineering Prof Menelaos Karanasos Lecture Notes: Volatility Trading Strategies 1 Volatility Trading Strategies As previously explained, volatility is essentially

More information

Manufacturing exibility: Measures and relationships

Manufacturing exibility: Measures and relationships European Journal of Operational Research 118 (1999) 49±449 www.elsevier.com/locate/orms Theory and Methodology Manufacturing exibility: Measures and relationships Rodney P. Parker a, *, Andrew Wirth b

More information

Generation Expansion Planning under Wide-Scale RES Energy Penetration

Generation Expansion Planning under Wide-Scale RES Energy Penetration CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING Generation Expansion Planning under Wide-Scale RES Energy Penetration K. Tigas, J. Mantzaris, G. Giannakidis, C. Nakos, N. Sakellaridis Energy Systems Analysis

More information

Fuzzy Logic based user friendly Pico-Hydro Power generation for decentralized rural electrification

Fuzzy Logic based user friendly Pico-Hydro Power generation for decentralized rural electrification Fuzzy Logic based user friendly Pico-Hydro Power generation for decentralized rural electrification Priyabrata Adhikary #1, Susmita Kundu $2, Pankaj Kr Roy *3, Asis Mazumdar *4 # Mechanical Engineering

More information

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational

More information

Testosterone levels as modi ers of psychometric g

Testosterone levels as modi ers of psychometric g Personality and Individual Di erences 28 (2000) 601±607 www.elsevier.com/locate/paid Testosterone levels as modi ers of psychometric g Helmuth Nyborg a, *, Arthur R. Jensen b a Institute of Psychology,

More information

Adıgüzel Hydroelectric Power Plant Modeling and Load-Frequency Control

Adıgüzel Hydroelectric Power Plant Modeling and Load-Frequency Control Adıgüzel Hydroelectric Power Plant Modeling and Load-Frequency Control 1 Yüksel Oğuz * 1 Ahmet Kaysal and 1 Kübra Kaysal * 1 Faculty of Engineering, Department of Electric & Electronic Engineering, Afyon

More information

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan Mini & Micro Hydro Power Generation EBARA Hatakeyama Memorial Fund Tokyo, Japan Definitions Large Scale hydro power generation : Capacity 100(MW) Most of them involve major construction of dams. Small

More information

Waste, Just Another Resource: A Case for Waste Water

Waste, Just Another Resource: A Case for Waste Water Energy Engineering ISSN: 0199-8595 (Print) 1546-0118 (Online) Journal homepage: http://www.tandfonline.com/loi/uene20 Waste, Just Another Resource: A Case for Waste Water David Goodman, Arash Edalatnoor

More information

Direct Conversion of Wind Energy into Heat Using Joule Machine

Direct Conversion of Wind Energy into Heat Using Joule Machine International Conference on Environmental and Computer Science ICBEE vol.9() () IACSI ress, Singapore Direct Conversion of Wind Energy into Heat Using Joule Machine Roustiam Chakirov, and Yuriy Vagapov

More information

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy

More information

CAPM, Arbitrage, and Linear Factor Models

CAPM, Arbitrage, and Linear Factor Models CAPM, Arbitrage, and Linear Factor Models CAPM, Arbitrage, Linear Factor Models 1/ 41 Introduction We now assume all investors actually choose mean-variance e cient portfolios. By equating these investors

More information

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS by Kevin Rafferty Geo-Heat Center January 2000 REALITY CHECK Owners of low-temperature geothermal resources are often interested

More information

Scientific and Technological References. Energy Technology Indicators

Scientific and Technological References. Energy Technology Indicators 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Scientific and Technological References Energy Technology

More information

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION Dr. S. K. Dave 1, Ashokkumar A. Parmar 2, Nikhil M. Vyas 3, P. S.Chadhari 4 Lecturer & I/C Head Civil Eng, Applied Mechanics.,

More information

Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010

Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010 Institut für Energietechnik Department of Energy Systems Hydroelectric power Elias Bartos 2/7 2010 1 Contents Different types of power plants Potential Economics Conclusion 2 Impoundment A dam is built

More information

Multi-zone dispatching in truckload trucking

Multi-zone dispatching in truckload trucking Transportation Research Part E 37 2001) 375±390 www.elsevier.com/locate/tre Multi-zone dispatching in truckload trucking G. Don Taylor a, *, Gary L. Whicker b, John S. Usher a a Department of Industrial

More information

Capacity planning for fossil fuel and renewable energy resources power plants

Capacity planning for fossil fuel and renewable energy resources power plants Capacity planning for fossil fuel and renewable energy resources power plants S. F. Ghaderi *,Reza Tanha ** Ahmad Karimi *** *,** Research Institute of Energy Management and Planning and Department of

More information

MICRO-HYDRO POWER. Technical

MICRO-HYDRO POWER. Technical MICRO-HYDRO POWER Introduction Water power can be harnessed in many ways; tidal flows can be utilised to produce power by building a barrage across an estuary and releasing water in a controlled manner

More information

Managing project risks: a case study from the utilities sector

Managing project risks: a case study from the utilities sector International Journal of Project Management 20 2002) 49±57 www.elsevier.com/locate/ijproman Managing project risks: a case study from the utilities sector Paul Elkington, Clive Smallman * University of

More information

Micro-hydro applications in rural areas

Micro-hydro applications in rural areas OASYS South Asia: Dundee Workshop 20 Micro-hydro applications in rural areas Dr Arthur Williams Dept. of Electrical & Electronic Engineering University of Nottingham, UK Types of hydropower Conventional

More information

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid Cronfa Amaethyddol Ewrop ar gyfer Datblygu Gwledig: Ewrop yn Buddsoddi mewn Ardaloedd Gwledig The European Agricultural Fund for Rural Development: Europe Investing in Rural Areas Micro-hydro Power Introduction

More information

Linear Programming. Solving LP Models Using MS Excel, 18

Linear Programming. Solving LP Models Using MS Excel, 18 SUPPLEMENT TO CHAPTER SIX Linear Programming SUPPLEMENT OUTLINE Introduction, 2 Linear Programming Models, 2 Model Formulation, 4 Graphical Linear Programming, 5 Outline of Graphical Procedure, 5 Plotting

More information

Wind Turbine Power Calculations

Wind Turbine Power Calculations Wind Turbine Power Calculations RWE npower renewables Mechanical and Electrical Engineering Power Industry INTRODUCTION RWE npower is a leading integrated UK energy company and is part of the RWE Group,

More information

On time series data and optimal parameters

On time series data and optimal parameters Available online at www.sciencedirect.com Omega 32 (2004) 111 120 www.elsevier.com/locate/dsw On time series data and optimal parameters Rasmus Rasmussen Institute of Economics, Molde University College,

More information

Asian Journal on Energy and Environment

Asian Journal on Energy and Environment As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable

More information

Renewable energy education for sustainable development

Renewable energy education for sustainable development Renewable Energy 22 (2001) 113±118 www.elsevier.com/locate/renene Renewable energy education for sustainable development Philip Jennings*, Chris Lund Australian Cooperative Research Centre for Renewable

More information

OFF-GRID ELECTRICITY GENERATION WITH HYBRID RENEWABLE ENERGY TECHNOLOGIES IN IRAQ: AN APPLICATION OF HOMER

OFF-GRID ELECTRICITY GENERATION WITH HYBRID RENEWABLE ENERGY TECHNOLOGIES IN IRAQ: AN APPLICATION OF HOMER Diyala Journal of Engineering Sciences ISSN 1999-8716 Printed in Iraq Second Engineering Scientific Conference College of Engineering University of Diyala 16-17 December. 2015, pp. 277-286 OFF-GRID ELECTRICITY

More information

Solar and Hydroelectric Power. Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert

Solar and Hydroelectric Power. Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert Solar and Hydroelectric Power Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert Photovoltaic Cell vs Solar Heating Panel Photovoltaic cells power things such as calculators and satellites.

More information

Hybrid Renewable Energy Systems for North-Eastern Poland

Hybrid Renewable Energy Systems for North-Eastern Poland Hybrid Renewable Energy Systems for North-Eastern Poland * Janusz PIECHOCKI, Piotr SOLOWIEJ, Maciej NEUGEBAUER Department of Electrical, Power, Electronic and Control Engineering, University of Warmia

More information

CHAPTER 3 RESEARCH DESIGN

CHAPTER 3 RESEARCH DESIGN CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.

More information

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

Small-Micro Hydro Facilitation & Innovative Technologies in Japan 1 HYDROVISION2006 Oregon Convention Center, Portland, Oregon USA July 31 August 5, 2006 Innovative Small and Medium Hydro Technologies Workshop By IEA Small Hydro Annex-2 2 & NRCan - CETC Small-Micro Hydro

More information

SMALL HYDRO PROJECT ANALYSIS

SMALL HYDRO PROJECT ANALYSIS Training Module SPEAKER S NOTES SMALL HYDRO PROJECT ANALYSIS CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides) for this training module

More information

Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist

Hydropower: A closer look at Archimedes Screws. Dr Peter Walker APEM Senior Aquatic Scientist Hydropower: A closer look at Archimedes Screws Dr Peter Walker APEM Senior Aquatic Scientist Why am I here? To talk about Archimedes screw hydropower Topics covered: A brief, general overview of hydropower

More information

SELECTION AND PERFORMANCE GENERATOR COUPLING TO VERTICAL AXIS WIND TURBINES TO URBAN APPLICATIONS

SELECTION AND PERFORMANCE GENERATOR COUPLING TO VERTICAL AXIS WIND TURBINES TO URBAN APPLICATIONS EWEA 11 - Europe s Premier Wind Energy Event 14-17 March 11, Brussels, Belgium SELECTION AND PERFORMANCE GENERATOR COUPLING TO VERTICAL AXIS WIND TURBINES TO URBAN APPLICATIONS Jorge A. Villar Alé, Damien

More information

Introduction to Logistic Regression

Introduction to Logistic Regression OpenStax-CNX module: m42090 1 Introduction to Logistic Regression Dan Calderon This work is produced by OpenStax-CNX and licensed under the Creative Commons Attribution License 3.0 Abstract Gives introduction

More information

How To Solve A Minimum Set Covering Problem (Mcp)

How To Solve A Minimum Set Covering Problem (Mcp) Measuring Rationality with the Minimum Cost of Revealed Preference Violations Mark Dean and Daniel Martin Online Appendices - Not for Publication 1 1 Algorithm for Solving the MASP In this online appendix

More information

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW Resit Unal Edwin B. Dean INTRODUCTION Calibrations to existing cost of doing business in space indicate that to establish human

More information

Covert Networks and the Antitrust Policy

Covert Networks and the Antitrust Policy Covert Networks and the Antitrust Policy Flavia Roldán Universidad ORT Uruguay and Public-Private Sector Research Center, IESE Business School June, 2011 Abstract This article studies the e ectiveness

More information

Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing

Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing IIE Transactions (2000) 32, 989±998 Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing WENNY H.M. RAAYMAKERS, J. WILL

More information

Clean Development Mechanism Project Opportunities in Indonesia

Clean Development Mechanism Project Opportunities in Indonesia Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002

More information

Secondary Loop Chilled Water In Super High-Rise

Secondary Loop Chilled Water In Super High-Rise The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

The function of a power station is to deliver

The function of a power station is to deliver CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum

More information

Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge

Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge Long-Term Debt Pricing and Monetary Policy Transmission under Imperfect Knowledge Stefano Eusepi, Marc Giannoni and Bruce Preston The views expressed are those of the authors and are not necessarily re

More information

Advanced Development Economics: Business Environment and Firm Performance. 20 October 2009

Advanced Development Economics: Business Environment and Firm Performance. 20 October 2009 Advanced Development Economics: Business Environment and Firm Performance Måns Söderbom 20 October 2009 1 Introduction Over the last two decades there have been radical changes in economic policy in many

More information

Improving the supply chain performance: use of forecasting models versus early order commitments

Improving the supply chain performance: use of forecasting models versus early order commitments int. j. prod. res., 2001, vol. 39, no. 17, 3923±3939 Improving the supply chain performance: use of forecasting models versus early order commitments XIANDE ZHAOy*, JINXING XIEz and R. S. M. LAU This paper

More information

Measurement with Ratios

Measurement with Ratios Grade 6 Mathematics, Quarter 2, Unit 2.1 Measurement with Ratios Overview Number of instructional days: 15 (1 day = 45 minutes) Content to be learned Use ratio reasoning to solve real-world and mathematical

More information

Sensitivity Analysis for Small Hydropower Plant (SHP)

Sensitivity Analysis for Small Hydropower Plant (SHP) Sensitivity Analysis for Small Hydropower Plant (SHP) Adriana Catanase, William Phang 1 Agenda SBI/SCG Present and future of Small Hydro Power Plants valuating a small hydro project Small Hydro project

More information

Half the cost Half the carbon

Half the cost Half the carbon Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within

More information

Optimal insurance contracts with adverse selection and comonotonic background risk

Optimal insurance contracts with adverse selection and comonotonic background risk Optimal insurance contracts with adverse selection and comonotonic background risk Alary D. Bien F. TSE (LERNA) University Paris Dauphine Abstract In this note, we consider an adverse selection problem

More information

Expense preference behavior in public transit systems

Expense preference behavior in public transit systems Transportation Research Part E 36 (2000) 249±265 www.elsevier.com/locate/tre Expense preference behavior in public transit systems K. Obeng * Department of Economics, Transportation/Logistics, North Carolina

More information

Hybrid Micro-Power Energy Station; Design and Optimization by Using HOMER Modeling Software

Hybrid Micro-Power Energy Station; Design and Optimization by Using HOMER Modeling Software Hybrid Micro-Power Energy Station; Design and Optimization by Using HOMER Modeling Software Iyad. M. Muslih 1, Yehya Abdellatif 2 1 Department of Mechanical and Industrial Engineering, Applied Science

More information

Introduction. Chapter 1. 1.1 The Motivation

Introduction. Chapter 1. 1.1 The Motivation Chapter 1 Introduction 1.1 The Motivation Hydroelectric power plants, like real systems, have nonlinear behaviour. In order to design turbine controllers, it was normal practice in the past, when computer

More information

Normalization and Mixed Degrees of Integration in Cointegrated Time Series Systems

Normalization and Mixed Degrees of Integration in Cointegrated Time Series Systems Normalization and Mixed Degrees of Integration in Cointegrated Time Series Systems Robert J. Rossana Department of Economics, 04 F/AB, Wayne State University, Detroit MI 480 E-Mail: r.j.rossana@wayne.edu

More information

Capital markets, nancial intermediaries, and liquidity supply

Capital markets, nancial intermediaries, and liquidity supply Journal of Banking & Finance 22 (1998) 1157±1179 Capital markets, nancial intermediaries, and liquidity supply Paolo Fulghieri a,b, Riccardo Rovelli c, * a Finance Area, INSEAD, Boulevard de Constance,

More information

System Modelling and Online Optimal Management of MicroGrid with Battery Storage

System Modelling and Online Optimal Management of MicroGrid with Battery Storage 1 System Modelling and Online Optimal Management of MicroGrid with Battery Storage Faisal A. Mohamed, Heikki N. Koivo Control Engineering Lab, Helsinki University of Technology, P.O. Box 5500, FIN-0015

More information

WHITEPAPER CABLE CONDUCTOR SIZING

WHITEPAPER CABLE CONDUCTOR SIZING WHITEPAPER CABLE CONDUCTOR SIZING FOR MINIMUM LIFE CYCLE COST Bruno De Wachter, Walter Hulshorst, Rodolfo di Stefano July 2011 ECI Available from www.leonardo-energy.org/node/156451 Document Issue Control

More information

First Power Production figures from the Wave Star Roshage Wave Energy Converter

First Power Production figures from the Wave Star Roshage Wave Energy Converter First Power Production figures from the Wave Star Roshage Wave Energy Converter L. Marquis 1, M. Kramer 1 and P. Frigaard 1 Wave Star A/S, Gammel Vartov Vej 0, 900 Hellerup, Denmark E-mail: info@wavestarenergy.com

More information

CLEAN ENERGY PROJECT ANALYSIS WITH RETSCREEN SOFTWARE

CLEAN ENERGY PROJECT ANALYSIS WITH RETSCREEN SOFTWARE Training Module SPEAKER S NOTES CLEAN ENERGY PROJECT ANALYSIS WITH RETSCREEN SOFTWARE CLEAN ENERGY PROJECT ANALYSIS COURSE This document provides a transcription of the oral presentation (Voice & Slides)

More information