1 Starting Fiscal Year: 2012 Project Class: Program Agency Priority: 3 Project Summary CWU completed a self-funded predesign on the existing vacated Samuelson Union Building (SUB) in June 2010, which was submitted to OFM July 1, CWU received design funding in the biennium and is requesting construction funds to renovate the existing SUB into a 129,260 GSF STEM center. Project Proposed Project: (See Attachments in support to the following Project ). Samuelson Union Building has been mothballed since 2006 when the 1920s-era building was replaced by a new, student-funded Student Union and Recreation Center. CWU proposes to return Samuelson to service as an integrated computer science technology center, the Samuelson Computer science and Technology Center (SCTC). The scope of work includes replacement of the oldest, southern portion of the building and the renovation of the northern portion. The new facility will house the departments of Computer Science; Mathematics; Information technology and Administrative Management (ITAM); and Multi-Modal learning, which requires specialized facilities for online curriculum development. SCTC also will provide safe and secure space for the telecommunications system and the data center that stores and backs up key databases for student and research information. Samuelson is centrally located on the Ellensburg campus and is a critical component of the science neighborhood. This group of buildings houses all of the key CWU science facilities and brings together faculty, staff and students for maximum collaboration and coordination of facilities and personnel. Opportunity/Problem Statement: Problem: The Samuelson Union Building (SUB) was constructed in 1926 as the College Union Building. The structure has been remodeled five times since 1936; the most recent addition was in The facility houses the campus data center, including sensitive research and student data. This critical information is housed in a structure with unreinforced brick and no fire protection. Samuelson also houses the university's 1970s-era phone system, a network of copper twisted pair wire, connected to thousands of phones campus wide. The phone system lacks a backup and the technology is not supported. No updates are available to the system, preventing basic automation of the system. Samuelson housed services and activities for the Associated Students of CWU. In 2006 the Samuelson Union Building was vacated and has since been used for storage. The facility has a flat roof, poor ventilation, inefficient lighting, crumbling infrastructure, and inflexible space. Life-safety issues from asbestos and mold mitigation to earthquake preparedness--call for a major renovation in order to meet any modern building standards. The unreinforced, load-bearing masonry structure throughout the original, southern half of the building would require substantial wall reinforcing and reconstruction to improve seismic resistance. Therefore this portion of the facility is slated for demolition and replacement. Agency and Statewide Support: The construction of the Samuelson Computer science and Technology Center supports all of the priorities of the CWU strategic plan: 1.) Teaching and Learning, by enhancing the quality and opportunities for students and faculty in high-demand STEM fields, particularly opportunity for first-generation students who represent a third of CWU enrollment. 2.) Inclusivity And Diversity, by providing the hands-on experience and individualized learning experience that is preferred by many under-represented and first-generation students, particularly for STEM education. 3.) Scholarship and Creative Expression, by providing new opportunities for collaborative and interdisciplinary research in fields of critical importance to the state and the nation, and by creating a facility that will help to generate external funding for research and scholarship by students and faculty. 1

2 4.) Public Service and Community Engagement, by providing facilities to support CWU community outreach for STEM education. 5.) Resource Development and Stewardship, by enhancing enrollment and external partnerships. The project supports the following state goals: Results Washington Priorities GOAL 1. WORLD CLASS EDUCATION Postsecondary Access (1.3, 1.3.a, b, g) Postsecondary Success (2.3, 2.3 a, e) Project Benefits: In addition to the benefits cited above, the renovation and expansion of the Samuelson Computer science and Technology Center provides the following benefits: Modern education and research facilities for STEM programs: Math, Computer Science, ITAM Specialized digital production facilities for online degree programs Expanded online degree programs; CWU already has more degree programs fully online than any Washington baccalaureate Enhanced distributed degree programs to time- and place-bound students. Integrated facilities that allow for better coordination among faculty, staff and students More efficient use of resources due to consolidation of STEM faculty, staff and students in one location Enhanced quality of education providing up-to-date information technology facilities Enhanced security and integrity for sensitive student and research data files Efficient use of state funding by repurposing an existing building, rather than building an entirely new one Significant improvement in energy utilization efficiency. The new systems will cost less to operate on a square foot basis than the existing Affects on Clients and Services: This project will directly affect the campus community and services in the following ways: Enhances the quality and number of online degree programs and increasing access to total degree programs by providing specialized digital production facilities for online degree programs Improves instructional and research facilities for STEM programs: Math, Computer Science, ITAM Improves coordination among faculty, staff and students by providing appropriate facilities in the Science Neighborhood Makes more efficient use of resources due to consolidation of STEM faculty, staff and students in one location Enhances quality of education providing up-to-date information technology facilities Enhances security and integrity for sensitive student and research data files Increases efficiency of the use of state funding by repurposing an existing building, rather than building an entirely new one Support to State and Community Programs: Enhances the quality and number of online degree programs, increasing access to total degree programs, by providing specialized digital production facilities for online degree programs Improves instructional and research facilities for STEM programs: Math, Computer Science, ITAM Improves coordination among faculty, staff and students by providing appropriate facilities in the Science Neighborhood 2

3 Makes more efficient use of resources due to consolidation of STEM faculty, staff and students in one location Enhances quality of education providing up-to-date information technology facilities Enhances security and integrity for sensitive student and research data files Increases efficiency of the use of state funding by repurposing an existing building, rather than building an entirely new one. Operating Budget Impacts: There are no operation impacts during the current biennium of the project design development and construction. With occupancy of the additional 129,260 gross square feet for the CWU, the project increases total operating costs of the campus: Personnel: 2 FTE for custodial, 2.3 FTE for maintenance and information resources, and.5 FTE for public safety/security for staffing, and repair and maintenance parts, supplies, etc. Utilities Costs: $201,646 (129,290 GSF X $1.56 per GSF). Annual increases are calculated at an inflation rate of 3 percent. (Detail for the operating impacts is in the 'Operating Impacts' section.) Best Alternative: To address the identified need the following alternative solutions were considered: Renovation: CWU determined that the northern portion of Samuelson can be renovated. The north portion of the SUB was constructed of concrete, steel and reinforced masonry. While there have been some structural issues identified, the basic fabric of the structure is sound and suitable for renovation and adaptive reuse. However, the reuse of the southern portion was quickly ruled out as not cost effective or practicable. The low quality of existing construction, and the advanced deterioration of structural, mechanical, and electrical components assure that renovation would be extremely intensive and expensive. Further, code-mandated changes would significantly lower space efficiency and require significant additions. No Action: Taking no action to address the needs of the STEM programs of the university and continuing to leave the SUB vacant is simply not acceptable given the needs and necessity of the programs and the condition of the existing building. If CWU takes no action, the building will stand idle and increasingly generate health and safety problems. This option was rejected as the need to address the operational impacts to the programs was considered essential. If the project does not proceed: Conditions of the existing building will worsen. Educational goals and outcomes of the STEM programs will be more and more difficult to meet. Operation and maintenance costs will continue to increase. Instructional environments will continue to be insufficient. Appropriate instructional technology will not be present. Staff efficiency and morale will continue to suffer. Degree production in Math, ITAM, and Computer Science will slow. 3

4 Selected Alternative: The predesign team has selected a phased renovation and expansion of the existing SUB to create a modern technology-rich academic building as the basis of the proposed project. CWU's Funding Proposal: The university requests 100 percent state appropriation of $64.5 million in the biennium for the construction of a new southern portion of the SCTC and a renovation of the northern portion. Location City: Ellensburg County: Kittitas Legislative District: 013 Project Type Remodel/Renovate/Modernize (Major Projects) Growth Management impacts Central Washington University has addressed growth management impacts as lead agency for the project SEPA public review process. New Facility: No How does this fit in master plan CWU Campus Master Plan, July Funding Acct Code Account Title Estimated Expenditures Prior Biennium Current Biennium Fiscal Period New Reapprops Approps State Bldg Constr-State 69,500,000 2,212,000 2,788,000 64,500,000 69,500,000 2,212,000 2,788, ,500, State Bldg Constr-State Future Fiscal Periods Schedule and Statistics Start Date End Date 4

5 Schedule and Statistics Predesign Design Construction Gross Square Feet: Usable Square Feet: Efficiency: Escalated MACC Cost per Sq. Ft.: Construction Type: Is this a remodel? A/E Fee Class: A/E Fee Percentage: Start Date End Date 10/1/2011 6/1/2015 8/1/2015 6/1/ ,260 73, % 295 College Classroom Facilities Yes B 9.55% Cost Summary Acquisition Costs Consultant Services Pre-Schematic Design Services Construction Documents Extra Services Other Services Design Services Contingency Consultant Services Escalated Cost % of Project 66, % 2,490, % 800, % 1,479, % 411, % 5,244, % Maximum Allowable Construction Cost(MACC) 38,143,196 Site work Related Project Costs Facility Construction GCCM Risk Contingency GCCM or Design Build Costs Construction Contingencies Non Taxable Items Sales Tax Construction Contracts Equipment Equipment Non Taxable Items Sales Tax 3,052, % 35,090, % 3,058, % 3,296, % 44,497, % 11,308, % 904, % 5

6 Cost Summary Equipment Art Work Other Costs Project Management Grand Escalated Costs Escalated Cost % of Project 12,213, % 190, % 1,128, % 1,224, % 64,500,000 Rounded Grand Escalated Costs 64,500,000 Operating Impacts one time start up and ongoing operating costs Acct Code Account Title FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FTE Full Time Employee General Fund-State 566, , , , , , , , , ,813 Narrative The construction of Samuelson Communication and Technology Center provides an additional 129,260 gross sq ft for the CWU, Ellensburg campus. The operational costs less the utilities costs includes 2 FTE for custodial, 2.3 FTE for maintenance and information resources, and.5 FTE for public safety/security for staffing, and repair and maintenance parts, supplies, etc. Utilities Costs Annual increases at inflation rate of 3%. Utilities Costs: $201,646 (129,290 GSF X $1.56 per GSF). 6

7 Parameter Biennium Agency Version Project Classification Capital Project Number Sort Order Include Page Numbers Entered As V3-A Project Priority Y Interpreted As V3-A All Project Classifications Priority Yes For Word or Excel N N User Group Agency Budget Agency Budget User Id All User Ids 7

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington

More information

APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES

APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES The capital project cost estimate is a tool to assist agencies and institutions in creating a project construction budget. It can also

More information

Preservation projects. Programmatic projects. Grant projects.

Preservation projects. Programmatic projects. Grant projects. A capital project is a project to construct either new facilities or make significant, long-term renewal improvements to existing facilities. A capital project using general obligation bonds usually has

More information

Capital Budget Summary

Capital Budget Summary ZA00JKL Maryland Independent College and University Association Miscellaneous Grant Programs Capital Budget Summary Grant and Loan Capital Improvement Program Program 2014 Approp. 2015 Approp. MICUA $10.500

More information

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5 EXECUTIVE SUMMARY Page 1 of 5 ACTION ITEM: Academic Renovations and Deferred Maintenance Phase I, Revised Revised Project Implementation Approval, (ASU). ISSUE: ASU requests Revised Revised Project Implementation

More information

2011-13 Biennium. Location City: Seattle County: King Legislative District: 043

2011-13 Biennium. Location City: Seattle County: King Legislative District: 043 Report Number: CBS0O2 Date Run: 9/21/2011 3:14PM Project Number: 30000372 Project Title: UW Minor Capital Repairs Description Starting Fiscal Year: 2012 Project Class: Preservation Agency Priority: 1 The

More information

Minnesota State Colleges & Universities St. Cloud Tech College - Allied Health Building Renovation Design

Minnesota State Colleges & Universities St. Cloud Tech College - Allied Health Building Renovation Design 2008 STATE APPROPRIATION REQUEST: $300,000 AGENCY PROJECT PRIORITY: 36 of 37 PROJECT LOCATION: St. Cloud Technical College, St. Cloud ProjectAtAGlance Design for renovation of Allied Health Center building

More information

FY 2016 Capital Outlay Project Request

FY 2016 Capital Outlay Project Request FY 2016 Capital Outlay Project Request October 2014 Fiscal Year 2016 Capital Outlay Project Request Institution Name: Lansing Community College Project Title: 505 N. Capitol Avenue Building Project Focus:

More information

It is the recommendation of the administration and the Finance and Asset Management Committee that the Board of Regents:

It is the recommendation of the administration and the Finance and Asset Management Committee that the Board of Regents: F 2 UW Tacoma Urban Solutions Phase 1 RECOMMENDED ACTIONS (Board of Regents Review & Approval - Stage 2) It is the recommendation of the administration and the Finance and Asset Management Committee that

More information

FORT HAYS STATE UNIVERSITY

FORT HAYS STATE UNIVERSITY FORT HAYS STATE UNIVERSITY Actual FY 2014 Agency Est. FY 2015 FY 2015 Agency Req. Agency Req. FY 2017 FY 2017 Operating Expenditures: State General Fund $ 32,656,997 $ 34,036,691 $ 33,988,112 $ 33,921,728

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Ballot Measures. Bremerton School District No. 100-C. Explanatory Statement (Prepared by the attorney for the district as prescribed by law.

Ballot Measures. Bremerton School District No. 100-C. Explanatory Statement (Prepared by the attorney for the district as prescribed by law. Bremerton School District No. 100-C Capital Projects Levy The Board of Directors of Bremerton School District No. 100- C adopted Resolution No. 2015/2016-08 concerning capital projects and technology.

More information

Core Requirement 2.11.2

Core Requirement 2.11.2 Core Requirement 2.11.2 The institution has adequate physical resources to support the mission of the Institution and the scope of its programs and services. Impact Statement Baton Rouge Community College

More information

Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New

Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New Sullivan County Jail: Cost Analysis of Boarding Out vs. Building New Two options are available to address the issue of the Jail: Boarding out prisoners to neighboring County Jails OR Construction of a

More information

Committee Draft November 27, 2007

Committee Draft November 27, 2007 Coordinating Commission for Postsecondary Education Capital Construction Project Evaluation Form Institution/Campus: Project Name: Date of Governing Board Approval: November 20, 2007 Date Complete Proposal

More information

School Facilities COST CALCULATOR

School Facilities COST CALCULATOR School COST CALCULATOR A Joint-Use Tool for Fair Fees USER GUIDE EXCEL VERSION STEPS 1 Enter Basic District Data 2 Enter - Related Costs 3 Set Joint-Use Policies 4 Apply Fee Structure SPONSORS Active Living

More information

SUPPORTING DATA FOR FISCAL YEAR 2014 ILLINOIS COMMUNITY COLLEGE SYSTEM, ADULT EDUCATION, AND POSTSECONDARY CAREER AND TECHNICAL EDUCATION

SUPPORTING DATA FOR FISCAL YEAR 2014 ILLINOIS COMMUNITY COLLEGE SYSTEM, ADULT EDUCATION, AND POSTSECONDARY CAREER AND TECHNICAL EDUCATION SUPPORTING DATA FOR FISCAL YEAR 2014 ILLINOIS COMMUNITY COLLEGE SYSTEM, ADULT EDUCATION, AND POSTSECONDARY CAREER AND TECHNICAL EDUCATION 1) Copy of the Operating Budget Appropriation and Supporting Technical

More information

HOW TO EVALUATE BUILDINGS AND DETERMINE RETROFIT COSTS

HOW TO EVALUATE BUILDINGS AND DETERMINE RETROFIT COSTS David Bell PJHM Architects, Inc. Young Nam Daniel Traub Thornton Tomasetti how to evaluate buildings and determine retrofit costs HOW TO EVALUATE BUILDINGS AND DETERMINE RETROFIT COSTS Presented by: David

More information

INDIANA STATE BUDGET AGENCY. Capital Budget Development Process for FY 2014 and FY 2015

INDIANA STATE BUDGET AGENCY. Capital Budget Development Process for FY 2014 and FY 2015 INDIANA STATE BUDGET AGENCY Capital Budget Development Process for FY 2014 and FY 2015 Successful capital planning and budgeting requires long-term planning, looking well beyond the current biennium to

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

RESOLUTION NO. 2003-04-13

RESOLUTION NO. 2003-04-13 RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of

More information

Article 5: Building Regulations

Article 5: Building Regulations Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 56 of 24 A.C.A. 6-5-9 et seq. History and Organization History- Northwest Vocational Technical School (NTI) was established in 975 and became Northwest Technical

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 6 of 22 A.C.A. 6-5-9 et seq. History and Organization History - Northwest Vocational Technical School (NTI) was established in 975 and became Northwest Technical

More information

MARSHALL COMMUNITY AND TECHNICAL COLLEGE

MARSHALL COMMUNITY AND TECHNICAL COLLEGE MARSHALL COMMUNITY AND TECHNICAL COLLEGE POLICY # 4.00 - Program Approval SECTION 4.1. GENERAL 4.1.a. This policy defines the process for obtaining approval of new academic programs and discontinuance

More information

College Success Foundation, AX

College Success Foundation, AX Agency: 350 Office of Superintendent of Public Instruction Budget Period: 2009-11 Recommendation Summary Text (Short Description): The College Success Foundation focuses on recruiting low-income middle

More information

School District - Understanding the Capital Project and General Fund Types

School District - Understanding the Capital Project and General Fund Types SIGNIFICANT BUDGET AND ACCOUNTING REQUIREMENTS BASIS OF PRESENTATION FUND ACCOUNTING The District uses funds to report on its financial position and the result of its operations. A fund is defined as a

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: November 2 4, 2 01 4 CAO File No. 0640-01386-0022 To: The Honorable Members of the City Council From: Sharon M. Tso, Chief Legislative

More information

FLORIDA COLLEGE SYSTEM CURRENT STATUS OF FUNDED PROJECTS THROUGH FY 2012-2013 August 1, 2012

FLORIDA COLLEGE SYSTEM CURRENT STATUS OF FUNDED PROJECTS THROUGH FY 2012-2013 August 1, 2012 CURRENT STATUS OF FUNDED PROJECTS THROUGH FY 212-213 August 1, 212 COLLEGE: GROSS SQUARE FEET (GSF) ADDITIOL FUNDS REQUIRED TOTAL PROJECT COSTS EST. COMPLETION DATE PROJECT TITLE Funding Source(s) YEAR(S)

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

Description of Project Statewide Student Data Warehouse

Description of Project Statewide Student Data Warehouse Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data

More information

Board of Regents Meeting August 14-15, 2008 Item # 20 EXECUTIVE SUMMARY Page 1 of 7

Board of Regents Meeting August 14-15, 2008 Item # 20 EXECUTIVE SUMMARY Page 1 of 7 EXECUTIVE SUMMARY Page 1 of 7 ACTION ITEM: Project and Budget Increase for Residence Life Building Renewal, Phase 3 and Phase 4 (UA) ISSUE: The University of Arizona seeks Project and Budget Increase for

More information

Bachelor of Applied Science in Food Service Management Central Washington University

Bachelor of Applied Science in Food Service Management Central Washington University December 2005 Bachelor of Applied Science in Food Service Management Central Washington University Introduction Central Washington University (CWU) is seeking Higher Education Coordinating Board approval

More information

Clarksville Campus. Workforce Investment Area 8

Clarksville Campus. Workforce Investment Area 8 Clarksville Campus The Clarksville Campus of the Tennessee College of Applied Technology Dickson is located off U.S. Highway 79 across from the Hemlock Semiconductor plan, just east of Interstate 24, approximately

More information

2008-2010 Biennium Date: June 8, 2007

2008-2010 Biennium Date: June 8, 2007 DPB Form CNJ March 2007 Virginia Department of Planning and Budget Project Request Justification 2008-2010 Biennium Date: June 8, 2007 A. General Information 1. Agency Name: Longwood University 2. Agency

More information

Fund 30020 Infrastructure Replacement and Upgrades

Fund 30020 Infrastructure Replacement and Upgrades Focus Fund 30020 supports the long term needs of the County s capital assets to maximize the life of County facilities, avoid their obsolescence, and provide for planned repairs, improvements and restorations

More information

Bachelor of Science Degrees in Engineering at WWU

Bachelor of Science Degrees in Engineering at WWU Bachelor of Science Degrees in Engineering at WWU Until recently, the training of engineers by public institutions in the state of Washington was legislatively mandated to the University of Washington

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 For Meeting of July 21, 2015 DISCUSSION ITEM PRELIMINARY PLANS FUNDING, MISSION BAY EAST CAMPUS PHASE 1 (BLOCK 33) BUILDING,

More information

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management

More information

Agencies should use the following categories when requesting capital projects:

Agencies should use the following categories when requesting capital projects: Capital Improvements State agencies maintain buildings of various agencies all over the state. Given the financial commitment the state s facilities demand, expenditure requests for capital projects are

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:

More information

Department of Corrections

Department of Corrections Agency 310 Department of Corrections Recommendation Summary Dollars in Thousands 2015-17 Expenditure Authority Annual FTEs General Fund State Other Funds Total Funds 8,269.2 1,857,764 13,653 1,871,417

More information

2015 CAMPUS STATEMENT

2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK CONTRACT COLLEGES AT CORNELL UNIVERSITY 2015 CAMPUS STATEMENT Cornell University is a private corporation, founded in 1865, as New York State s land grant university. Cornell

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

BUDGET TOWN HALL MEETING. March 25, 2015

BUDGET TOWN HALL MEETING. March 25, 2015 BUDGET TOWN HALL MEETING March 25, 2015 Sales and Services 19% FY 2015 Revenue Budget Investment Income 1% State Appropriations 28% Contributions 3% Contracts and Grants 16% Total Revenue Budget: $136,030,000

More information

Higher Education. Proposed Adjustments as Introduced. ($ in millions)

Higher Education. Proposed Adjustments as Introduced. ($ in millions) Higher Education Proposed Adjustments as Introduced ($ in millions) FY 2017 Proposed FY 2018 Proposed GF NGF GF NGF 2016-18 Base Budget, Ch. 665 $1,797.6 $8,345.5 $1,797.6 $8,345.5 Proposed Increases 173.5

More information

Superintendent s Proposed FY2015 Budget. February 18, 2014

Superintendent s Proposed FY2015 Budget. February 18, 2014 Superintendent s Proposed FY2015 Budget February 18, 2014 FY2015 Budget Process School Board established Budget Calendar Cost Center operating and CIP requests Governor s Proposed Budget School Board established

More information

Enterprise Technology, Office of. Projects Summary ($ in Thousands) 2010 Agency Priority

Enterprise Technology, Office of. Projects Summary ($ in Thousands) 2010 Agency Priority Projects Summary ($ in Thousands) Project Title 2010 Agency Priority Agency Project Request for State Funds ($ by Session) Governor s Recommendations Governor s Planning Estimate Ranking 2010 2012 2014

More information

TITLE 135 PROCEDURAL RULE WEST VIRGINIA COUNCIL FOR COMMUNITY AND TECHNICAL COLLEGE EDUCATION

TITLE 135 PROCEDURAL RULE WEST VIRGINIA COUNCIL FOR COMMUNITY AND TECHNICAL COLLEGE EDUCATION TITLE 135 PROCEDURAL RULE WEST VIRGINIA COUNCIL FOR COMMUNITY AND TECHNICAL COLLEGE EDUCATION SERIES 11 DEGREE DESIGNATION, GENERAL EDUCATION REQUIREMENTS, NEW PROGRAM APPROVAL, AND DISCONTINUANCE OF EXISTING

More information

2015 CAMPUS STATEMENT

2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK UNIVERSITY AT STONY BROOK 2015 CAMPUS STATEMENT The University at Stony Brook got its start in 1957 at a temporary location on the Planting Fields estate in Oyster Bay, Long

More information

POSITION SPECIFICATION. President. Northern Virginia Community College. Preamble

POSITION SPECIFICATION. President. Northern Virginia Community College. Preamble POSITION SPECIFICATION President Northern Virginia Community College Preamble The Virginia Community College System provides programs and courses of instruction, through the associate degree level, encompassing

More information

The Board of Governors of the California Community Colleges

The Board of Governors of the California Community Colleges The Board of Governors of the California Community Colleges PRESENTED TO THE BOARD OF GOVERNORS DATE: May 18-19, 2015 SUBJECT: 2016-17 Capital Outlay Projects Item Number: 2.3 Attachment: Yes CATEGORY:

More information

2015-17 Biennial Request Executive Summary

2015-17 Biennial Request Executive Summary 2015-17 Biennial Request Executive Summary Operating Request Components of Operating Appropriations Submission In accordance with the instructions of the Indiana Commission for Higher Education (ICHE)

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT

STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT STATE UNIVERSITY OF NEW YORK COLLEGE OF ENVIRONMENTAL SCIENCE AND FORESTRY 2015 CAMPUS STATEMENT Established in 1911 by an act of the New York State Legislature as the State s institution for educational

More information

GLOSSARY OF TERMS. BUILDING MANAGER Non-certified persons hired by the school district to manage and oversee the operation of a school.

GLOSSARY OF TERMS. BUILDING MANAGER Non-certified persons hired by the school district to manage and oversee the operation of a school. GLOSSARY OF TERMS ACCUMULATIVE ENROLLMENT - The total number of students enrolled in a school year (beginning of the year enrollment plus any students added after that date), this count is used to determine

More information

FY09 PERFORMANCE PLAN Office of Property Management

FY09 PERFORMANCE PLAN Office of Property Management FY09 PERFORMANCE PLAN MISSION Support the District Government and residents through strategic real estate management, construction and facilities management. SUMMARY OF SERVICES The (OPM) has primary responsibility

More information

Strategic Vision 2015: Gateway to the American Dream

Strategic Vision 2015: Gateway to the American Dream Strategic Vision 2015: Gateway to the American Dream Office of Institutional Research, Planning, and Assessment Northern Virginia Community College November 2010 College Mission With commitment to the

More information

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret Capital Budget Testimony to the Maryland General Assembly Presented by Dr. Robert L. Caret President, Towson University March 2009 Capital Budget Testimony to the Maryland General Assembly Presented by

More information

COVER PAGE Colorado Mesa University

COVER PAGE Colorado Mesa University COVER PAGE FY 2015-16 CAPITAL CONSTRUCTION REQUESTS (3) (listed in OSPB priority order) Not recommended for funding: Health Sciences, Phase I, Nurse Practitioner (new) Kinesiology and Performing Arts Center

More information

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) August 2014 These procedures are available for download at: http://www.pscp.state.md.us Applications for this program must be submitted

More information

PROSPECTUS - ALTERATION Prospectus for Design

PROSPECTUS - ALTERATION Prospectus for Design Description fhe General Services Administration (GSA) is seeking authorization for design projects during liscal year 2011 that we will schedule for construction in future years. Project descriptions are

More information

Project Requests for State Funds. Gov's Planning Estimates Project Title Rank Fund 2016 2018 2020 2016 2018 2020

Project Requests for State Funds. Gov's Planning Estimates Project Title Rank Fund 2016 2018 2020 2016 2018 2020 Projects Summary ($ in thousands) Project Requests for State Funds Gov's Rec Gov's Planning Estimates Project Title Rank Fund 2016 2018 2020 2016 2018 2020 Asset Preservation 1 GO 30,000 30,000 30,000

More information

Program Description. [Program, e.g. B.S. in Nursing] To Be Offered by [Campus] at [Location]

Program Description. [Program, e.g. B.S. in Nursing] To Be Offered by [Campus] at [Location] Program Description [Program, e.g. B.S. in Nursing] To Be Offered by [Campus] at [Location] 1. Characteristics of the Program a. Campus(es) Offering Program: b. Scope of Delivery (Specific Sites or Statewide):

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County Honorable Board of Supervisors February 26, 2007 County of

More information

PROJECT REQUEST REPORT CENTER FOR ADVANCED MANUFACTURING TECHNOLOGIES (REPLACEMENT OF BUILDING 22) 2015/2017 CAPITAL BUDGET REQUEST

PROJECT REQUEST REPORT CENTER FOR ADVANCED MANUFACTURING TECHNOLOGIES (REPLACEMENT OF BUILDING 22) 2015/2017 CAPITAL BUDGET REQUEST PROJECT REQUEST REPORT CENTER FOR ADVANCED MANUFACTURING TECHNOLOGIES (REPLACEMENT OF BUILDING 22) 2015/2017 CAPITAL BUDGET REQUEST CPTC Center for Advanced Manufacturing Technologies (Replacement of Building

More information

TEXAS HIGHER EDUCATION COORDINATING BOARD P.O. Box 12788 Austin, Texas 78711

TEXAS HIGHER EDUCATION COORDINATING BOARD P.O. Box 12788 Austin, Texas 78711 TEXAS HIGHER EDUCATION COORDINATING BOARD P.O. Box 12788 Austin, Texas 78711 Fred W. Heldenfels IV CHAIR Harold W. Hahn VICE CHAIR Dennis D. Golden, O.D. SECRETARY OF THE BOARD Ryan T. Bridges STUDENT

More information

Analysis of compliance with the 50 Percent Law (ECS 84362)

Analysis of compliance with the 50 Percent Law (ECS 84362) SUPPLEMENTAL DATA Analysis of compliance with the 50 Percent Law (ECS 84362) The Current Expense of Education S11 GENERAL FUND - UNRESTRICTED SUBFUND For Actual Year: 2014-2015 Budget Year: 2015-2016 District

More information

VOICE OVER INTERNET PROTOCOL BUSINESS CASE SOFTWARE AND HARDWARE <VOIP>

VOICE OVER INTERNET PROTOCOL BUSINESS CASE SOFTWARE AND HARDWARE <VOIP> VOICE OVER INTERNET PROTOCOL BUSINESS CASE SOFTWARE AND HARDWARE TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 1. Problem Definition... 3 2. Addressing Problem with CWU existing tools and products (i.e.

More information

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81

Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81 Program: Program Based Budget 2016-2018 Page 81 Program: Vision: To develop and maintain town buildings which are safe, comfortable and welcoming to all. Mission Statement: To provide technical expertise

More information

Operating Budget Data

Operating Budget Data D25E03 Interagency Committee on School Construction Operating Budget Data ($ in Thousands) FY 15 FY 16 FY 17 FY 16-17 % Change Actual Working Allowance Change Prior Year General Fund $1,879 $1,986 $1,934

More information

Chapter 12. Introduction to Value Determination

Chapter 12. Introduction to Value Determination Chapter 12 Value Theory, Highest and Best Use Analysis, and the Cost Approach 11/17/2005 FIN4777 - Special Topics in Real Estate - Professor Rui Yao 1 Introduction to Value Determination Price is usually

More information

Public Works Program Area Summary

Public Works Program Area Summary Overview The agencies in the Public Works program area have both an external and internal focus. They are responsible for designing and building County infrastructure, such as administrative buildings,

More information

Each year, millions of Californians pursue degrees and certificates or enroll in courses

Each year, millions of Californians pursue degrees and certificates or enroll in courses Higher Education Each year, millions of Californians pursue degrees and certificates or enroll in courses to improve their knowledge and skills at the state s higher education institutions. More are connected

More information

NORTHWEST TECHNICAL INSTITUTE

NORTHWEST TECHNICAL INSTITUTE NORTHWEST TECHNICAL INSTITUTE Enabling Laws Act 139 of 25 A.C.A. 6-51-91 et seq. History and Organization History - Northwest Vocational Technical School was established in 1975 and became Northwest Technical

More information

BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03

BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03 BACCALAUREATE ACCOUNTABILITY REPORT Form No. BAAC-03 Section 1007.33(5)(h), Florida Statutes, requires a Florida College System institution to annually report its status on specified performance and compliance

More information

Mississippi s Community & Junior Colleges. Fiscal Year 2017. Legislative Budget Request

Mississippi s Community & Junior Colleges. Fiscal Year 2017. Legislative Budget Request Mississippi s Community & Junior Colleges Fiscal Year 2017 Legislative Budget Request Nationally Recognized In August, Mississippi s community college system was ranked the number one community college

More information

Facilities Central Operational Rates and Charging Methodology FY13 & Base for FY14 Planning

Facilities Central Operational Rates and Charging Methodology FY13 & Base for FY14 Planning Facilities Central Operational Rates and Charging Methodology FY13 & Base for FY14 Planning Questions please contact John Kaufhold, Director of Finance & Administration Facilities Rates: Physical Plant

More information

Expenditures by Category Local Assistance 1,181,965 1,290,105 1,339,723 1,363,110 2,702,833

Expenditures by Category Local Assistance 1,181,965 1,290,105 1,339,723 1,363,110 2,702,833 Governor s Recommendations STATE COLLEGES & UNIVERSITIES Agency Overview Dollars in Thousands Current Governor Recomm. Biennium FY2004 FY2005 FY2006 FY2007 2006-07 Direct Appropriations by Fund Environment

More information

University of Houston System

University of Houston System UNIVERSITY of HOUSTON SYSTEM University of Houston System FY2016 Annual Budget August 20, 2015 1 UNIVERSITY of HOUSTON SYSTEM Legislative Session Results FY2016 Budget Development o Increase in General

More information

Meeting Date 04/05/11

Meeting Date 04/05/11 Form Revision Date: 09/27/10 Meeting Date 04/05/11 City of Largo Agenda Item 18 Department: PW Public Works Presenter: Glenn Harwood, Facilities Manager TITLE: AWARD OF BID NO. 11 B 350, DEMOLITION OF

More information

PREDESIGN STUDY EWU SCIENCE II

PREDESIGN STUDY EWU SCIENCE II JULY 2014 PREDESIGN STUDY EWU SCIENCE II EASTERN WASHINGTON UNIVERSITY BIOLOGY PROJECT NUMBER 30000466 PREPARED FOR: STATE OF WASHINGTON OFFICE OF FINANCIAL MANAGEMENT BY: EASTERN WASHINGTON UNIVERSITY

More information

TOPIC: The Universities at Shady Grove: Facilities Master Plan Update. DATE OF COMMITTEE MEETING: October 17, 2013 (presentation and information)

TOPIC: The Universities at Shady Grove: Facilities Master Plan Update. DATE OF COMMITTEE MEETING: October 17, 2013 (presentation and information) BOARD OF REGENTS SUMMARY OF ITEM FOR ACTION, INFORMATION OR DISCUSSION TOPIC: The Universities at Shady Grove: Facilities Master Plan Update COMMITTEE: Finance DATE OF COMMITTEE MEETING: October 17, 2013

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

STATE OF INDIANA SCHOOL CONSTRUCTION ANNUAL REPORT 2003-2004

STATE OF INDIANA SCHOOL CONSTRUCTION ANNUAL REPORT 2003-2004 STATE OF INDIANA SCHOOL CONSTRUCTION ANNUAL REPORT 2003-2004 The Department of Local Government Finance (DLGF) is responsible for reviewing projects utilizing short term and long term debt for school improvements

More information

New York University. NYU Core Project Financial Planning Information. Martin S. Dorph Executive Vice President, Finance and Information Technology

New York University. NYU Core Project Financial Planning Information. Martin S. Dorph Executive Vice President, Finance and Information Technology New York University NYU Core Project Financial Planning Information Martin S. Dorph Executive Vice President, Finance and Information Technology November, 2012 Contents Background 3 Description of Analysis

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

February 9, 2009. Achieve Scholarship Spending on Expanding Access to Rigorous High School Courses

February 9, 2009. Achieve Scholarship Spending on Expanding Access to Rigorous High School Courses February 9, 2009 Achieve Scholarship Spending on Expanding Access to Rigorous High School Courses Authors The Minnesota Office of Higher Education compiled this information from the Minnesota State Colleges

More information

Structural Engineering Services

Structural Engineering Services DRH Engineers, PLC (DRH) is a small veteran owned civil/structural engineering firm located in Warrenton, VA. DRH has a distinguished record of providing quality structural engineering and project management

More information

Master of Science in Computational Science Central Washington University

Master of Science in Computational Science Central Washington University June 2011 Master of Science in Computational Science Central Washington University Introduction Central Washington University (CWU) proposes to offer a self-supporting Master of Science in Computational

More information

Office/Workstation Space Guidelines for Academic, Research and Academic Support Functions Effective July 1, 2011

Office/Workstation Space Guidelines for Academic, Research and Academic Support Functions Effective July 1, 2011 Office/ Space Guidelines for Academic, Research and Academic Support Functions Effective July 1, 2011 Overview These space guidelines for office and workstation spaces are intended to enable academic,

More information

University of Arizona Strategic Business Plan Arizona Board of Regents Presentation April 8, 2011. Board of Regents Meeting April 7-8, 2011 Item #25

University of Arizona Strategic Business Plan Arizona Board of Regents Presentation April 8, 2011. Board of Regents Meeting April 7-8, 2011 Item #25 University of Arizona Strategic Business Plan Arizona Board of Regents Presentation April 8, 2011 Board of Regents Meeting April 7-8, 2011 Item #25 Overview What are we doing Aligning our business plan

More information

2016-2017 EDUCATION APPROPRIATIONS HIGHLIGHTS

2016-2017 EDUCATION APPROPRIATIONS HIGHLIGHTS 2016-2017 EDUCATION S HIGHLIGHTS LINE EDUCATION ENHANCEMENT LOTTERY TRUST FUND 1 Classrooms First & 1997 Bond Programs 2 Class Size Capital Outlay Debt Service $155,820,162 $155,786,420 $151,262,548 $151,265,624

More information

MINNESOTA STATE COLLEGES AND UNIVERSITIES BOARD OF TRUSTEES Agenda Item Summary Sheet

MINNESOTA STATE COLLEGES AND UNIVERSITIES BOARD OF TRUSTEES Agenda Item Summary Sheet MINNESOTA STATE COLLEGES AND UNIVERSITIES BOARD OF TRUSTEES Agenda Item Summary Sheet Name: Finance and Facilities Committee Date: June 17, 2015 Title: FY2016 Operating Budget (Second Reading) Purpose

More information

CENTER FOR DESIGN LAKE WASHINGTON INSTITUTE OF TECHNOLOGY 2017-2019 PROJECT REQUEST REPORT

CENTER FOR DESIGN LAKE WASHINGTON INSTITUTE OF TECHNOLOGY 2017-2019 PROJECT REQUEST REPORT CENTER FOR DESIGN LAKE WASHINGTON INSTITUTE OF TECHNOLOGY 2017-2019 PROJECT REQUEST REPORT December 17, 2015 TABLE OF CONTENTS CENTER FOR DESIGN 2017-19 PROJECT REQUEST REPORT PROJECT REQUEST REPORT 1.0

More information

THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT. Conference Call Meeting Wednesday, October 14, 2015

THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT. Conference Call Meeting Wednesday, October 14, 2015 THE UNIVERSITY OF WYOMING BOARD OF TRUSTEES REPORT Conference Call Meeting Wednesday, October 14, 2015 The final report can be found on the University of Wyoming Board of Trustees website at http://www.uwyo.edu/trustees/

More information

Southside Virginia Higher Education

Southside Virginia Higher Education Senate Finance Committee Meeting Education Subcommittee December 6, 2007 Southside Virginia Higher Education Daniel J. LaVista Executive Director State Council of Higher Education for Virginia New College

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.) APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of

More information

Klamath Community College Student Success Center/Career Tech Expansion

Klamath Community College Student Success Center/Career Tech Expansion Klamath Community College Student Success Center/Career Tech Expansion Learning Resource Center Will Be Complimentary Design and will include: 34,500 Square Feet Learning Resource Center to include Library

More information

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement

Guideline for Construction Reimbursement Rates. 160-5-4-.16 (a) 7. Educational Facility Site, Construction, and Reimbursement Guideline for Construction Reimbursement Rates 160-5-4-.16 (a) 7 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 NEW CONSTRUCTION REIMBURSEMENT

More information