Exhibit SHN-029. Commission Mandatory Hearing SHINE Construction Permit Application Environmental Overview December 15, 2015
|
|
|
- Cora Atkinson
- 10 years ago
- Views:
Transcription
1 Exhibit SHN-029 Commission Mandatory Hearing SHINE Construction Permit Application Environmental Overview December 15, 2015
2 Development of the Environmental Report Began work October 2011 SHINE production facility will be located in Janesville, Rock County Wisconsin County, Environmental Report follows the Final Interim Staff Guidance A Augmenting ti NUREG-1537 NUREG
3 Structure and Content of the Environmental Report Chapter Contents 19.1 Introduction Purpose and need for the proposed action, Regulatory provisions, permits and required consultations 19.2 Proposed Action Site location and layout, Radioisotope facility description, Water consumption and treatment, Cooling and heating dissipation systems, Waste systems, Storage, treatment t t and transportation t ti of radioactive and nonradioactive materials, including LEU, waste, radioisotopes and any other materials 19.3 Description of the Affected Environment 19.4 Impacts of the Proposed Construction, Operations, and Decommissioning Land use and visual resources, Air quality and noise, Geologic environment, Water resources, Ecological resources, Historic and cultural resources, Socioeconomics, Human health Land use and visual resources, Air quality and noise, Geologic environment, Water resources, Ecological resources, Historic and cultural resources, Socioeconomics, Human health, Waste management, Transportation, Postulated accidents, Environmental justice, Cumulative effects 19.5 Alternatives No-action alternative, Reasonable alternatives, Cost-benefit of the alternatives, Comparison of potential environmental impacts 19.6 Conclusions Unavoidable adverse environmental impacts, Relationship between short-term uses and long-term productivity of the environment, Irreversible and irretrievable commitments of resources 3
4 Scope of Field Investigations Phase I Environmental Site Assessment General G l Reconnaissance R i Soil Borings/Geotechnical Investigation Well Installation Phase I Archaeological Investigation Baseline Visual Assessment Wetland W tl d Delineation D li ti Quarterly Ecological Investigations Aquatic Ecology Terrestrial Ecology Monthly Water Resources Water Quality Water Levels 4
5 Context for Data Acquisition Site acre parcel located on the south side of the City of Janesville in Rock County, WI Project Area Circular area with a radius approximately 1 mile from the site center point Region Circular area with a radius of 5 miles from the site center point Larger context as appropriate (e.g., geology, air quality) Region of Influence Rock R kc County t 5
6 Consultations City of Janesville Rock County Wisconsin Department of Natural Resources Wisconsin State Historic Preservation Office (SHPO) Wisconsin i Department t of Transportation ti U.S. Fish and Wildlife Service Federal Aviation Administration Bureau of Indian Affairs Native American Tribes (13): Wisconsin Tribes: Forest County Potawatomi Community, Wisconsin Ho-Chunk Nation of Wisconsin Non-Wisconsin Tribes: 11 Tribal Entities 6
7 Alternative Sites Construction Impacts SHINE (Janesville) Chippewa Falls Stevens Point No-Action MODERATE impacts to Visual Resources, Noise and Transportation MODERATE impacts to Land Use, Visual Resources, Noise, Ground Water, and Transportation Construction Benefits 420 jobs; $635,000 annual 420 jobs; $635,000 annual 420 jobs; $635,000 annual None Operation Impacts Operation Benefits source of fdiagnostic source of fdiagnostic source of fdiagnostic isotopes: Mo-99, isotopes: Mo-99, isotopes: Mo-99, I-131, Xe-133; I-131, Xe-133; I-131, Xe-133; $660,000 annual $660,000 annual $660,000 annual None 7
8 Alternative Technologies SHINE Technology Linear Accelerator Technology Low-Enriched Uranium Aqueous Homogenous Reactor No-Action Construction Impacts Construction Benefits 420 jobs; $635, jobs; $635, jobs; $635,000 annual annual annual None Operation Impacts Operation Benefits source of fdiagnostic isotopes: Mo-99, I-131, Xe-133; $660,000 annual source of fmo-99; $660,000 annual source of fdiagnostic isotopes: Mo-99, I- 131, Xe-133; $660,000 annual None 8
9 NRC Environmental Site Audit July 30 August 1, SHINE presentations on the production process and alternative site selection process Janesville site visit Walk down of proposed site Driving D i i ttour Rock River visit Sampling sites 1 and 2 along the unnamed tributary to the Rock River Tour of the Janesville Wastewater Treatment Facility Alternative site visits: Stevens Point Chippewa Falls Responded to NRC Site Audit Information N d Needs 9
10 SHINE and The Community SHINE believes the relationships between the company, Janesville, and Wisconsin are important SHINE favors a policy of transparency with our community SHINE s actions support these principles Participation in four public meetings per year (two SHINE hosted, two for city council) SHINE management involvement in community activities Regular discussions with city leadership to coordinate plans Regular updates provided to State of Wisconsin These activities have fostered a relationship of trust and enthusiasm for the project 10
11 Conclusions The SHINE environmental review was conducted pursuant to 10 CFR Part 51 and is adequate The requirements of Sections 102(2) (A), (C), and (E) of the National Environmental Policy Act (NEPA) have been satisfied SHINE s weighing g and balancing of the environmental, technical, and other costs and benefits of the SHINE facility supports issuance of the construction permit 11
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents What is the Final Rule implemented by the Forest Service?... 2 Why
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
How To License A Nuclear Plant
Contents Introduction... 1 Two-Step Licensing Process (10 CFR Part 50)... 2 Construction Permit... 2 Operating License... 4 Additional Licensing Processes (10 CFR Part 52)... 4 Early Site Permits... 6
Environmental Impact Assessment
Environmental Impact Assessment E. Beimborn, University of Wisconsin-Milwaukee NEPA: the National Environmental Policy Act Enacted in 1969 Provides a general statement of federal policy towards the environment:
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE
Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act
CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION
Department of the Interior. Departmental Manual
Page 1 of 10 Department of the Interior Departmental Manual Effective Date: 10/23/2015 Series: Public Lands Part 600: Public Land Policy Chapter 6: Implementing Mitigation at the Landscape-scale Originating
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: DOI-BLM-OR-V060-2015-032-CX CE Exemption category: 516 DM 11.9, E.12: Grants of right-of-way wholly within the boundaries
ODOT NEPA Assignment Training Plan Prepared by Ohio Department of Transportation, Office of Environmental Services Last Updated: 12/17/15
ODOT NEPA Assignment Training Plan Prepared by Ohio Department of Transportation, Office of Environmental Services Last Updated: 12/17/15 Pursuant to 23 U.S.C. 327 and a Memorandum of Understanding (MOU)
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.
About Us Edge Engineering & Science, LLC (EDGE) is a privately owned professional services firm headquartered in Houston, Texas. EDGE was established with the primary goal of providing high quality environmental
GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary
GAO United States Government Accountability Office Report to Congressional Committees February 2013 PIPELINE PERMITTING Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps,
1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment
1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that
Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State
Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State Supplemental Draft Environmental Impact Statement for U.S. Department of State Foreign Affairs
FWS Cultural Resource Management Planning
I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
Revision of Land and Resource Management Plan for the Santa Fe National Forest;
This document is scheduled to be published in the Federal Register on 06/30/2016 and available online at http://federalregister.gov/a/2016-15525, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE
How To Decide If A Dam Removal Is Safe For Water Quality
Report Issue Paper: Water Quality Certification Procedures for Klamath River Restoration Project By: Steve Kirk and Debra Sturdevant March 2012 Last Updated: 3/14/12 DEQ 11-WQ-047 This report prepared
Chapter 8. List of Preparers
Chapter 8 List of Preparers This page intentionally left blank. 8 List of Preparers Name and DEIS Responsibility and Qualifications United States Fish and Wildlife Service Megan Seymour Wildlife Biologist,
NASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
Chapter 3 Design of Structures, Systems, and Components CONTENTS
Chapter 3 Design of Structures, Systems, and Components CONTENTS 3.0 Design of Structures, Systems, and Components... 3-1 3.1 Areas of Review...3-1 3.2 Summary of Application...3-2 3.3 Regulatory Basis
2008 Compensatory Mitigation Rule: Overview and Highlights. Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014
2008 Compensatory Mitigation Rule: Overview and Highlights Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014 Outline Background Rule goals Rule structure 8 sections Highlight
5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS
5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS The methods that are used to conduct the environmental impact assessment (EIA) of the Project are described in this section. The EIA uses a methodological framework
List of Preparers AKRF, INC. Robert F. Conway, P.E. EIS Project Manager; Construction Impacts
List of Preparers AKRF, INC. Robert F. Conway, P.E. EIS Project Manager; Construction Impacts Masters, Civil Engineering. More than 30 years of experience in modeling pollutant fate for transportation
33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.
33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.
PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES. Pinal County, Arizona. Scoping Information and Opportunity to Comment
PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES Pinal County, Arizona Scoping Information and Opportunity to Comment U.S. Department of the Interior Bureau of Reclamation Phoenix Area
SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS
SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS This page intentionally left blank. 9.0SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS 9.1 PUBLIC OUTREACH AND PUBLIC INVOLVEMENT Public
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526
A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado
WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD
Estabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014
Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional
DEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
May 9, 2005. Draft Environmental Impact Statement for Power Fire Restoration Project (CEQ# 050111)
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX 75 Hawthorne Street San Francisco, CA 94105 John Berry Forest Supervisor Eldorado National Forest 100 Forni Road Placerville, CA. 95667 May 9, 2005
Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site
Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW Operational Test Period #2 to Evaluate the Feasibility of Changing Runway Configurations at Two Times during the Day at Boston-Logan Airport FAA Order 7400.2 Appendix
Karuk Tribe Integrating Traditional Ecological Knowledge within Natural Resource Management
Karuk Tribe Integrating Traditional Ecological Knowledge within Natural Resource Management Traditional ecological knowledge (TEK) plays a significant role in the Karuk Tribe s approach to natural resource
WYOMING STATE PROTOCOL APPENDIX I GLOSSARY
WYOMING STATE PROTOCOL APPENDIX I GLOSSARY Advisory Council on Historic Preservation (ACHP) Established by the National Historic Preservation Act (1966), the ACHP is an independent executive agency that
SEC. 4001. PURPOSE. SEC. 4002. DEFINITIONS. SEC. 4003. COLLABORATIVE FOREST LANDSCAPE RESTORATION PROGRAM.
TITLE IV--FOREST LANDSCAPE RESTORATION SEC. 4001. PURPOSE. The purpose of this title is to encourage the collaborative, sciencebased ecosystem restoration of priority forest landscapes through a process
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews As discussed in the Unified Federal Review Guidance for EHP
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION United Water Conservation District Project No. 2153-022 ORDER APPROVING SPOIL MANAGEMENT, EROSION, AND SEDIMENT CONTROL PLAN
APPENDIX C LIST OF EA RECIPIENTS
APPENDIX C APPENDIX C LIST OF RECIPIENTS C.1 Federal Agencies Advisory Council on Historic Preservation, Office of Cultural Resources Preservation U.S. Army Corps of Engineers, District Engineer, Regulatory
Chapter 11. List of Preparers/Conflict of Interest and Disclosure Forms
Chapter 11. List of Preparers/Conflict of Interest and Disclosure Forms 11 LIST OF PREPARERS/CONFLICT OF INTEREST AND DISCLOSURE FORMS 11.1 List of Preparers 11.1.1 U.S. Department of Energy, National
ENVIRONMENTAL STUDIES/SCIENCE What can I do with this degree?
ENVIRONMENTAL STUDIES/SCIENCE What can I do with this degree? AREAS EMPLOYERS STRATEGIES SOIL SCIENCE Soil and Water Conservation Land Use Waste Disposal Environmental Reclamation of Contaminated Lands
Developing and Maintaining Your Airport Property Map Lessons from St. Louis
Developing and Maintaining Your Airport Property Map Dana Ryan, St Louis Airport Authority Todd Madison, Central Region, FAA Chuck Reitter, Reitter Consulting, LLC Craig Bowles, St. Louis Airport Authority
121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County
121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Project No. 637-044 Chelan County ORDER MODIFYING AND APPROVING LAKE CHELAN FISHERY PLAN,
National Retardant NEPA USFWS Reasonable and Prudent Alternative (RPA) Tracking Sheet
National Retardant NEPA USFWS Reasonable and Prudent Alternative (RPA) Tracking Sheet RPA Sub-Element Text RPA Due Date Assigned Lead Accomplishments/Progress 1. Coordinate with local Fish and Wildlife
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
THE SECRETARY OF THE INTERIOR WASHINGTON
THE SECRETARY OF THE INTERIOR WASHINGTON ORDER NO. 3336 Subject: Rangeland Fire Prevention, Management and Restoration Sec. 1 Purpose. This Order sets forth enhanced policies and strategies for preventing
MATERIALS LICENSE. Docket or Reference Number 40-9089 Maximum Amount that Licensee May Possess at Any One Time Under This License: Source
PAGE 1 OF 6 PAGES Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974 (Public Law 93-438), and the applicable parts of Title 10, Code of Federal Regulations, Chapter
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
Chapter 9. Selected Watershed Initiatives in the Great Basin Region
Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink
PUBLIC LAW 105 143 DEC. 15, 1997 MICHIGAN INDIAN LAND CLAIMS SETTLEMENT ACT
PUBLIC LAW 105 143 DEC. 15, 1997 MICHIGAN INDIAN LAND CLAIMS SETTLEMENT ACT 111 STAT. 2652 PUBLIC LAW 105 143 DEC. 15, 1997 Dec. 15, 1997 [H.R. 1604] Michigan Indian Land Claims Settlement Act. Public
Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants
OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental
Application No.: 14.074 Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N. 6800 E.
Planning Commission Staff Report Planning and Development Services Croydon Substation Conditional Use Permit Public Meeting August 28, 2014 Application No.: 14.074 Applicant: Steve Rush, representing Rocky
SAWTOOTH NATIONAL RECREATION AREA AND JERRY PEAK WILDERNESS ADDITIONS ACT
PUBLIC LAW 114 46 AUG. 7, 2015 SAWTOOTH NATIONAL RECREATION AREA AND JERRY PEAK WILDERNESS ADDITIONS ACT VerDate Mar 15 2010 13:12 Aug 13, 2015 Jkt 049139 PO 00046 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL046.114
PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project
SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA 94103-1398 PUBLIC NOTICE NUMBER: 2004-28512S PUBLIC
Licensing a Repository at Yucca Mountain
2008 Licensing a Repository at Yucca Mountain DOE PROJECTED SCHEDULE FOR LICENSING A GEOLOGIC REPOSITORY Churchill County Nuclear Waste Oversight Program 85 North Taylor St., Fallon, NV 89406 Licensing
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the
TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 4715.03 November 25, 2013 USD(AT&L) SUBJECT: Integrated Natural Resources Management Plan (INRMP) Implementation Manual References: See Enclosure 1 1. PURPOSE. In accordance