Railway Timetabling from an Operations Research Perspective
|
|
|
- Homer Stafford
- 10 years ago
- Views:
Transcription
1 Railway Timetabling from an Operations Research Perspective Leo Kroon 1,3, Dennis Huisman 2,3, Gábor Maróti 1 1 Rotterdam School of Management Erasmus Center for Optimization in Public Transport (ECOPT) Erasmus University Rotterdam, P.O. Box 1738 NL-3000 DR Rotterdam, The Netherlands 2 Econometric Institute Erasmus Center for Optimization in Public Transport (ECOPT) Erasmus University Rotterdam, P.O. Box 1738 NL-3000 DR Rotterdam, The Netherlands 3 Department of Logistics, NS Reizigers, P.O. Box 2025, NL-3500 HA Utrecht, The Netherlands [email protected], [email protected], [email protected] Econometric Institute Report EI Abstract In this paper we describe Operations Research (OR) models and techniques that can be used for determining (cyclic) railway timetables. We discuss the two aspects of railway timetabling: (i) the determination of arrival and departure times of the trains at the stations and other relevant locations such as junctions and bridges, and (ii) the assignment of each train to an appropriate platform and corresponding inbound and outbound routes in every station. Moreover, we discuss robustness aspects of both subproblems. 1 Introduction In this chapter we describe Operations Research (OR) models and techniques that can be used for determining (cyclic) railway timetables. A railway timetable consists of two elements: (i) the arrival and departure times This author is sponsored by the Future and Emerging Technologies Unit of EC (IST priority 6th FP), under contract no. FP (ARRIVAL). 1
2 of the trains at the stations and other relevant locations such as junctions and bridges, and (ii) the assignment of each train to an appropriate platform and corresponding inbound and outbound routes in every station. Preferably, the generation of the arrival and departure times and the selection of the routes through the stations are carried out simultaneously. However, when using a model based approach for generating a timetable, this would lead to models that are too large to be solved by the currently available optimization technology. Therefore, in a model based approach the two steps are commonly split: the timetable is computed first, and then the routings through the stations for this particular timetable are determined. To get an overall feasible timetable, several iterations of this process may be necessary. In this paper, we treat both aspects separately. Of course, timetabling is not the only planning problem faced by a railway operator. One also has to deal with rolling stock and crew (see Figure 1). For a complete overview on the application of OR models in passenger railway transportation, we refer to Huisman et al. (2005). Timetabling Rolling stock scheduling Crew scheduling Figure 1: Planning problems Planning problems within the railway world are traditionally solved based on the experience and the craftsmanship of the involved railway planners. However, in the nineties of the previous century, it was recognized within the railway world that the application of OR models and techniques for supporting the solution process of these problems may be beneficial along various dimensions. On one hand, the application of such models and techniques may lead to better solutions, and on the other hand it may lead to a reduction in the throughput time of the involved planning processes. This transition was stimulated from two directions. First, at least in Europe, railway companies are more and more confronted with competition, due to recent changes in European legislation. Several railway companies have to operate on a commercial or semi-commercial basis, which puts more pressure on efficiency and operational excellence. The application of mathe- 2
3 matical optimization models may help in realizing these objectives. Second, the scientific community has spent a lot of effort to model the railway planning problems in the most appropriate way. Together with new optimization techniques - often from the field of mathematical programming - and increased computing power of the available hardware, those planning problems can nowadays be solved in a reasonable amount of computing time. Twenty years ago this was not possible for many railway planning problems. In this paper, we discuss the most important contributions in the field of model based timetabling, which form the basis for the advanced tools used by several railway operators nowadays. Moreover, we discuss an important research direction in the field of timetabling, namely timetables that are as robust as possible, i.e. timetables that have been constructed in such a way that small disturbances during the operations have only a limited impact. The structure of this paper is as follows. Section 2 describes mathematical optimization models for generating cyclic railway timetables. The most commonly used model is explained in detail with an example. Thereafter, in Section 3, we discuss how the robustness of a cyclic timetable can be improved. Furthermore, results of an experiment in practice with such a robust timetable are reported. Section 4 considers the other aspect of timetabling, namely the routing of trains through railway stations. Robustness issues are discussed here as well. Finally, in Section 5 we conclude this paper with some perspectives on further developments. 2 Cyclic Timetabling In many European countries, the passenger trains are operated according to a cyclic or a periodic timetable. This means that each line of passenger trains is operated in a cyclic pattern, e.g. the trains of the line run every 30, 60 or 120 minutes. Furthermore, if the passenger trains are operated according to a cyclic timetable, then it is usual that the timetable that is planned for the cargo trains is cyclic as well. However, in that case usually not all planned time slots for the cargo trains are actually used in the operations. One advantage of a cyclic timetable is that passengers can easily keep in mind the departure time of their train at their station. Furthermore, it is relatively easy to set up a large number of transfer possibilities for passengers. However, a drawback is the fact that in a cyclic timetable it is difficult to offer a large number of direct connections, since a cyclic timetable is not quite flexible. Another drawback is the fact that a completely cyclic timetable may be rather inefficient: trains may have to be operated even at times with only a small number of passengers. Therefore, in practice there are usually exceptions to the completely cyclic timetable. For example, there may be some additional trains during rush hours, and frequencies may be reduced during late evening hours. Only a few European countries (e.g. 3
4 France and Spain) do not have any cyclicity or regularity in their timetables. In this paper, we do not discuss models and solution approaches for this kind of timetables. We refer the interested reader to Caprara et al. (2002). In this paper, the infrastructure is assumed to be given, both between the stations and within the stations. Although often seen by the general public as part of the timetabling process, a line plan is assumed to be known a priori. We use the following definition of a line: a line is a direct railway connection between two end stations that is operated with a certain frequency and a certain train type, e.g. Intercity or stoptrain. As was indicated earlier, the timetabling step of determining arrival and departure times of the trains at the stations and the step of routing the trains trough the stations are considered separately in this paper. The first step is described in this section and in Section 3, and the latter step is described in Section A mathematical formulation Most cyclic timetabling models are based on the Periodic Event Scheduling Problem (PESP), initially developed by Serafini and Ukovich (1989). The PESP model aims at cyclically scheduling a number of events e = 1,..., E. The cycle time of a timetable is denoted by T. Thus, if an event takes place at time instant v, then a similar event takes place at all time instants {...,v 2T,v T,v,v + T,v + 2T,...}. Note that the PESP model is a pure scheduling model and not a routing model. Thus, if there are several options for routing a train at the tracks between the stations, then it is assumed that a selection for one of these options has been made a priori. For example, if there are 4 parallel tracks between two stations (that is, 2 in each direction), then for each train a selection for one of the possible tracks has been made already. In the case of a railway timetable, the events are the arrivals and departures of the trains at the stations and at the other relevant locations such as junctions: the decision variable v e denotes the time at which event e is scheduled within each cycle. It is common that all event times are integer. Then v e should have an integer value in the interval [0,T 1], and all computations are carried out modulo the cycle time T. The event times are the start and end times of certain processes in the timetable. For example, trains have to run from one station to another, they have to dwell for a certain period of time in a station, there has to be a certain headway time between two consecutive trains crossing the same part of the infrastructure, two trains have to be split or combined, or they have a passenger or a rolling stock connection, etc. Thus there are processes related to single trains and processes related to pairs of trains. The set of processes is denoted by P. If a process starts with event e and ends with event e, then this process is denoted by (e,e ). PESP assumes that for each process (e,e ) a lower bound L e,e and an upper bound U e,e for 4
5 the corresponding process time are known. For example, the running time of a train between two stations can be determined based on the details of the infrastructure between the stations (including the safety system) and the running time characteristics of the involved rolling stock. The parameters L e,e and U e,e preferably satisfy 0 L e,e U e,e T 1. Note that a process with a process time exceeding the cycle time in principle does not fit within a cyclic timetable. Now the event times v e and v e related to the process (e,e ) are connected by the following constraint. (v e v e ) mod T [L e,e,u e,e ] for all (e,e ) P (1) Here the modulo operator mod T indicates that the timetable is cyclic with cycle time T. For example, time instant 55 is identical to time instant 175 in a cyclic timetable with cycle time T = 60. Moreover, if the departure and the arrival time of a train on a certain trip are 55 and 12, respectively, then the running time of the train on this trip equals (12 55) mod 60 = 17. Since this modulo operator is difficult to handle in optimization models due to its strongly non-linear character, the cyclic character of the timetable is usually modeled by introducing binary decision variables Q e,e that indicate whether the time interval between the events e and e crosses the end of the cycle. That is, Constraint (1) is replaced by the following constraint. L e,e v e v e + T Q e,e U e,e for all (e,e ) P (2) If the time interval between the events e and e crosses the end of the cycle, then Q e,e = 1. If not, then Q e,e = 0. Loosely speaking, the decision variables Q e,e determine the orders of certain pairs of events within each cycle. In the example above, we get that the running time of the trip that starts at 55 and ends at 12 equals = 17. A number of examples of constraints of type (2) is given in Section Example In this section, we illustrate the different aspects of timetabling with a simple example. Moreover, we explain how these aspects can be modeled in the PESP formulation. At the end of this section, we give some results. The example considers the triangle Amersfoort (Amf) - Deventer (Dv) - Zwolle (Zl) in the Netherlands, as depicted in Figure 2. The other relevant stations are Apeldoorn (Apd), Harderwijk (Hd) and Olst (Ost). Consider a line plan with a minimum frequency of one train per half an hour. In Table 2.2, the details of the line plan and the minimum running times are reported. Note that in practice the minimum running times may depend on the applied rolling stock type. Here IC stands for Intercity and stop stands for stoptrain. The columns in the table should be read as follows: the IC Amf - Dv dwells in 5
6 Zl Hd Ost Amf Apd Dv Figure 2: The triangle Amf - Dv - Zl type route relevant stops min. running time freq. train IC Amf - Dv Apd a,1b IC Amf - Zl a,2b,3a,3b IC Zl - Dv Ost a,4b stop Amf - Zl Hd a,5b Table 1: Line plan Apd with minimum running times of 24 minutes (Amf - Apd) and 10 minutes (Apd - Dv), respectively. It runs once every half an hour. In the remainder of this section, we denote this train with number 1a in the direction of Dv and 1b in the opposite direction. Stations that are not mentioned in Table 1 are not relevant. That is why for the stoptrain Amf - Zl only the stop in Hd is listed in the table. The dwell times for the other stops are included in the minimum running times. The IC Amf - Zl does not stop in between Amf and Zl. However, to construct the timetable one should know the time it passes Hd. The minimum running times from Amf and Zl to Hd are 15 and 20 minutes, respectively. In the following, we give a number of examples of Constraints (2) for this instance of PESP. Because the timetable is repeated every 30 minutes, we take the cycle time T equal to 30 minutes in the model. Furthermore, we define arrs t and dept s as the arrival and departure event of train t at station s. For the sake of simplicity, we remove the v from the notation and we denote the arrival and departure time of train t at station s as A t s and Ds. t The first type of constraints, which need to be satisfied, are the so-called running time constraints. Analogous to the general definition, dep 1a Amf is the departure event related to the departure of train 1 (IC Amf-Dv) in Amf, and arr 1a Apd is the arrival event of the same train at the subsequent station Apd. To ensure the required running time of at least 24 minutes on this trip, we get the following constraint. 24 A 1a Apd D 1a Amf + 30 Q dep 1a Amf,arrApd 1a 29 (3) The upper bound of 29 has been included in this constraint since other- 6
7 wise the constraint would be void. The next type of constraints that has to be taken into account, are the so-called headway constraints. This means that between two consecutive departures and arrivals on the same route, there should be a minimum headway. For instance, consider the route Amf - Zl, where the minimum time between the departures of an IC and a stoptrain in Amf is at least 3 minutes. This can be formulated as follows (Note that this constraint holds for both ICs, but we describe it only for train 2a). 3 D 5a Amf D 2a Amf + 30 Q dep 2a Amf,dep 5a 14 (4) Amf The difference in the departure times should be less than 14 minutes, because the stoptrain cannot be overtaken by the IC between Amf and Hd. In other words, to guarantee a time difference of at least 3 minutes in Hd, the difference in running time should be added to obtain the right difference in departure time in Amf (30 - ( ) = = 14). Similarly, other headway constraints can be formulated as well. This also holds for other types of headway constraints, like single track and crossing constraints at stations. An example of the first type is the single track between Dv and Ost. The difference in the departure times of the IC Dv-Zl and the opposite IC Zl-Dv should be at least 2 minutes on both sides of the single track section. The constraint reads as follows. 2 D 4b Dv A4a + 30 Q Dv dep 4b 16 (5) Dv,arr4a Dv The upper bound follows from the fact that the departure of train 4b from Dv cannot be later than the cycle time minus two times the running time on the single track line (6 minutes) plus the minimum headway time in Ost after the arrival of train 4a in Dv. The next type of constraints that we consider involves the dwell times. Suppose that for every stop the minimum dwell time is 1 minute. For the stop in Apd, this can be modeled as follows. 1 D 1a Apd A1a + 30 Q Apd dep 1a 29 (6) Apd,arr1a Apd Finally, if a passenger connection between two trains (e.g. on a trip from Apd to Zl, a transfer time between 2 and 5 minutes is required in Dv) has to be scheduled, then this can be guaranteed as follows. 2 D 4b Dv A 1a Dv + 30 Q dep 4b Dv,arr1a Dv 5 (7) Note that in this section only a subset of the relevant constraints is described. A complete list of all relevant constraints is provided in the appendix of this paper. 7
8 2.3 Objectives Any feasible solution to the PESP system of inequalities provides a timetable satisfying all constraints. This is often an achievement in itself, but one likes to get a good timetable. Here, good can have many meanings. We will give a couple of examples of appropriate objectives, which may be conflicting. For instance, passengers prefer running times that are as short as possible (both on a single train and short transfer times from one train to another). This is often conflicting with a robust timetable, which is the topic of Section 3. The operator prefers short running times as well, since these running times affect the required amounts of rolling stock and crew. Furthermore, they like a timetable where short turn-around times for rolling stock and crew are possible at the end stations of a line. This can conflict with good transfer possibilities for the passengers. 2.4 Solving PESP The decision variables Q e,e that determine the orders of certain pairs of events in each cycle make PESP quite hard to solve by standard branch-andbound methods: due to the relatively large coefficient T in the Constraints (2), the Linear Programming relaxations of models based on this formulation are quite weak. This is a drawback in a branch-and-bound procedure. Therefore Schrijver and Steenbeek (1994) developed a constraint propagation algorithm for solving PESP. Their algorithm, called CADANS, has been implemented in the DONS system. This system has become an indispensable tool in the Dutch long term railway timetabling process in the Netherlands, see Hooghiemstra et al. (1999). Schrijver and Steenbeek (1994) also developed local optimization techniques to improve a feasible solution for fixed values of the variables Q e,e in (2). Instances with up to 250 trains (all trains running in one hour of the Dutch timetable) can be solved usually within reasonable computing times. Nachtigall and Voget (1996) use PESP to generate cyclic timetables with minimal passenger waiting times. Odijk (1996) uses PESP at a strategic level to determine the capacity of the infrastructure around railway stations. Kroon and Peeters (2003) describe a PESP model with variable running times. This results in a higher probability of obtaining a feasible solution. In order to cope with the weak Linear Programming relaxation of models based on Constraints (2), Nachtigall (1999), Lindner (2000), and Peeters (2003) also describe a formulation of PESP based on cycle bases. This formulation does not use the event times as the decision variables, but the process times. Moreover, this formulation uses the fact that the sum of the process times along each directed cycle of the so-called constraint graph is a multiple of the cycle time. This constraint graph contains a node for each event time e, and an arc from node e to node e for each process (e,e ). 8
9 The cycle base formulation is somewhat easier to solve than the standard PESP formulation based on Constraints (2), because of the lower number of integer variables and the somewhat better Linear Programming relaxation. Several classes of cutting planes are described in the mentioned papers, which intend to further tighten the Linear Programming relaxation. Liebchen (2006) gives a complete overview of these results. 2.5 Solution to the example We conclude this section with the optimized timetable of the example described in Section 2.2. To obtain this timetable, the PESP model has been implemented and solved with the commercial modeling tool and solver GAMS. As objective function we have chosen to minimize the total travel time of the passengers, thereby assuming that each Origin/Destination pair has the same number of passengers. Note that in the computations the arrival and departure times in Amf were fixed a priori. Tables 2 and 3 report the resulting timetable. In the intermediate stations Apd, Ost and Hd, we only report the departure times. Recall that all event times are in the interval [0,29] due to the cycle time of 30 minutes. train 2a 3a 5a 2b 3b 5b Amf Hd Zl Table 2: Optimized timetable for Amf - Zl vv. train 1a 1b Amf Apd Dv train 4a 4b Dv Ost Zl Table 3: Optimized timetable for Amf - Dv and Dv - Zl vv. 3 Robust timetabling As was mentioned earlier, one of the objectives when creating a timetable is to create a timetable that is as robust as possible. That means that the timetable can deal as well as possible with relatively small external 9
10 disturbances in the real-time operations. Thus robustness of a timetable may lead to a high punctuality in the real-time operations. Robustness of a timetable has one or more of the following effects: (i) external disturbances can be absorbed to some extent so that they do not lead to delays, (ii) there are few secondary delays from one train to another, and (iii) delays disappear quickly, possibly with small measures of traffic control only. Both (i) and (iii) are a consequence of appropriately placed time supplements in the timetable, and (ii) is a consequence of appropriately placed buffer times between consecutive trains at certain locations. Note that, with small traffic control measures only, a timetable can only be robust against small disturbances. If only small traffic control measures are allowed, then it is impossible to create a timetable that is robust against large disturbances, such as a track breakdown. In such cases, large measures of traffic control (e.g. re-routing or canceling trains) are inevitable. This section describes a Stochastic Optimization Model that can be used to improve the robustness of a given cyclic timetable by modifying the time supplements and the buffer times in this timetable. As a consequence, the departure and arrival times of the trains are modified slightly. The model allocates the time supplements and the buffer times to those spots where they are as effective as possible for the robustness of the timetable. The model requires an initial cyclic timetable as input and, based on that, it constructs an improved one with a higher robustness. In this section, we assume that this initial timetable has a cycle time T of one hour. Therefore, we will talk about hours instead of cycles. The model contains a timetabling part for determining the improved timetable, and a simulation part for evaluating the improved timetable. In order to simulate the timetable, R realizations of the trains in the timetable are operated subject to a priori selected primary stochastic disturbances. Here each realization covers H consecutive hours of the timetable. Each realization can be considered as a single day. Whereas the PESP model described in Section 2 includes the problem of determining the cyclic order of the trains on each part of the infrastructure, it is assumed in this section that these orders are given in the initial timetable and cannot be modified by the model. This is not a fundamental assumption, but it helps to keep the computation times within certain limits. Moreover, it is assumed here that also in the realizations of the timetable the order of the trains on each part of the infrastructure is identical to that in the improved timetable (and thus to that in the initial timetable). Finally, all passenger connections between trains that are defined in the timetable are maintained in the realizations. In other words, the simulation part of the model does not include traffic control measures. However, since robustness deals with small disturbances only, traffic control measures are relatively unimportant, as was explained earlier. 10
11 3.1 Notation As was described in Section 2, a timetable consists of a number of processes, such as running from one station to another or dwelling at a station. A process that starts with event e and ends with event e is denoted by (e,e ). In the given cyclic timetable, the planned event time of event e is described by the parameter V e. This parameter denotes the offset of the event time in each hour of the given cyclic timetable. Thus, in the given timetable, process (e,e ) starts and ends at time instants V e and V e, respectively. A process (e,e ) that completely falls within the hour has V e < V e, and a process (e,e ) that crosses the end of the hour has V e > V e. To describe such situations, we introduce for each process (e,e ) a binary parameter K e,e that records whether or not the corresponding process crosses the end of the hour in the initial timetable. In other words, K e,e = 1 if and only if V e < V e. The model is not allowed to modify the given cyclic orders of the events. Note that the role of the parameters K e,e is similar to that of the decision variables Q e,e described in Section 2. In the improved timetable, the planned event time of event e is denoted by the decision variable v e. The decision variable s e,e denotes the planned time supplement for the process time of process (e,e ). In order to make sure that the end of the hour does not lead to undesirable restrictions for the planned event times, the planned event times are not restricted to the time interval [0,T 1]: they may take any (integer) value. As was mentioned before, the timetable is evaluated during its generation by operating R realizations of the timetable subject to a priori selected independent stochastic disturbances. Each realization covers H consecutive hours of the cyclic timetable. Hour h + 1 of realization r takes place after hour h of realization r. The stochastic disturbance of process (e,e ) in hour h of realization r is denoted by the parameter δ e,e,r,h for all (e,e ) P, r = 1,...,R, and h = 1,...,H. The realized event time of event e in hour h of realization r is denoted by the variable ṽ e,r,h. The realized event times of each realization are assumed to occur on a linear time axis. Thus they are not restricted to the time interval [0,T 1]. Mainly the delays of the events corresponding to arrivals of trains are evaluated, but also other delays can be taken into account. Arrival events are, by definition, events whose delays are measured. The set of arrival events is denoted by E a. The delay of arrival event e in hour h of realization r is denoted by the decision variable e,r,h. The average weighted delay of all trains is denoted by. Certain events, such as a departure of a train, should not start before their corresponding planned event times. Such events are called departure events. The set of departure events is denoted by E d. 11
12 3.2 Timetabling part of the model As was explained in Section 2, most of the constraints to be satisfied in a cyclic timetabling model can be expressed in terms of the planned event times and the planned process times. For each process (e,e ) that may include a variable amount of time supplement s e,e, we get the following. M e,e + s e,e = v e v e + T K e,e for all (e,e ) P (8) The left-hand side of this equation describes the planned process time of a process (e,e ) as the sum of the technically minimum process time M e,e and the variable time supplement s e,e. The right-hand side describes it as the time difference between the planned completion time and the planned begin time of process (e,e ), thereby taking into account a possible crossing of the end of the hour by the term T K e,e. 12
13 For certain processes also an upper bound U e,e on the planned process time may be specified. This results in the following constraints. M e,e v e v e + T K e,e U e,e for all (e,e ) P (9) Other relevant constraints specify that, at each part of the infrastructure, the time difference between the last and the first planned event time within each hour should be less than the cycle time T. To that end, let e be the first planned event in an hour on a certain part of the infrastructure, and let e be the last planned event in an hour on the same part of the infrastructure. Then the following constraint must be satisfied. 0 v e v e T 1 (10) Constraints (10) are important since the event times are not restricted to the time interval [0, T 1], as was explained earlier. These constraints guarantee that, after the optimization, all planned event times of the obtained timetable can be transferred back into the time interval [0,T 1]. Next, in order to allocate a certain total amount of time supplement to the process times, Q subsets B 1,...,B Q of processes are selected. Each subset B q of processes is connected with a certain given amount of time supplement S q to be allocated to the processes in the set B q. Then the following constraints are to be satisfied. (e,e ) B q s e,e S q for all q = 1,...,Q (11) For example, such a constraint may indicate that a certain total amount of running time supplement is to be allocated to the consecutive running times along the line of a single train. However, a certain amount of time supplement may also be allocated to a number of lines together. Note that for modeling the processes that involve pairs of trains, the assumption that the orders of the events should remain unchanged is essential. Indeed, if the orders of the events would not be known a priori, then additional binary variables would be required to model these. However, given the orders of the events, all constraints can be described as in (8) (10). Finally, non-negativity constraints have to be imposed on the variables s e,e, and if the timetable has to be expressed in integer minutes, then integrality constraints have to be imposed on the planned event times. 3.3 Simulation part of the model Recall that the simulation part of the model does not include traffic control decisions. The H hours of each realization are operated one after another. A process (e,e ) with K e,e = 0 has V e < V e. Thus it is planned within a single hour. Therefore, we assume that in the realizations a process (e,e ) 13
14 with K e,e = 0 ends in the same hour as the hour it started in. However, a process (e,e ) with K e,e = 1 has V e < V e. Obviously, in the realizations it is impossible that a process ends earlier than it started. Thus in the realizations it is assumed that a process (e,e ) with K e,e = 1 ends in a later hour than the hour it started in. Thus, a process (e,e ) with K e,e = 1 that starts in hour h of realization r at time instant ṽ e,r,h ends in hour h + 1 of realization r at time instant ṽ e,r,h+1. This implies that the following constraints link the event times of the processes to the technically minimum process times and the disturbances. m e,e + δ e,e,r,h ṽ e,r,h+k e,e ṽ e,r,h for all (e,e ) P; r = 1,...,R; h = 1,...,H (12) As a consequence, a delayed train in hour h of realization r may influence the trains in hour h + 1 of realization r. Note that the realized process times do not have an upper bound, in contrast with the planned process times that may have one. Indeed, the realized process times should have the freedom to be extended basically indefinitely, depending on the sizes of the disturbances in (12). Note further that (12) is an inequality and not an equality. Indeed, (12) only deals with process times that are enlarged due to primary disturbances. However, trains may also pick up secondary delays from interactions with other trains. Departure events should not occur too early, and a delay corresponds to a late arrival event. This results in the following constraints. v e + h T ṽ e,r,h for all e E d ; r = 1,...,R; h = 1,...,H (13) ṽ e,r,h (v e + h T) e,r,h for all e E a ; r = 1,...,R; h = 1,...,H (14) Here we use the cyclic character of the timetable, since the planned event time of event e in hour h of realization r equals v e + h T. Import delays of trains that enter the studied area can be modeled by adding a disturbance term to the left-hand side of (13). Finally, all delay variables e,r,h are non-negative. Indeed, positive delays of trains should not be compensated by negative delays of other trains. As was indicated earlier, the objective is to minimize the weighted total (or average) delay of the trains. Thus the objective is to minimize = R e E a r=1 h=1 H w e e,r,h (15) Here the weights w e indicate the weights of the different delays. Delays are weighted, since a delay of one train at a certain location may be more 14
15 harmful to the passengers than a delay of another train at another location. Note that, besides average delays of trains, also several other aspects of the timetable may be incorporated in the objective function. 3.4 Results and timetable experiment in practice Computational results obtained with the Stochastic Optimization Model can be found in Vromans (2005), Kroon et al. (2007a,b). These computational results show that the punctuality of a railway system can often be improved by minor modifications in the timetable. In particular, with the same total amount of time supplements, the optimized timetables showed less knock-on delays in the real-time operations, and once delays of trains did occur, these were absorbed more quickly. In these papers it is also shown that the guideline of U.I.C. (2000) to allocate an amount of running time supplement to each trip in the timetable that is a fixed percentage of the technically minimum running time does not lead to a timetable that is maximally robust against disturbances. Moreover, during the weeks 22 to 29 of 2006 (May 28 until July 23), a timetable generated by the Stochastic Optimization Model was tested in practice on the so-called Zaanlijn in the Netherlands. The Zaanlijn is part of the Kop van Noord-Holland : it is the north-south connection between Den Helder and Amsterdam that is operated by Netherlands Railways. Note that a modified timetable was also operated on the Zaanlijn during the weeks 30 and 31 of 2006, but this period was not representative due to several other changes in the timetable at the same time. The Zaanlijn has been notorious for its relatively low punctuality for several years. That is, the punctuality of the Zaanlijn was always significantly lower than the overall punctuality over all of the Netherlands. For this reason, it was decided by the top management of Netherlands Railways to carry out a number of experiments by temporarily operating slightly different timetables. To that end, the Stochastic Optimization Model was applied to the 2006 timetable of the Zaanlijn. In the optimization, the total amount of running time supplement in the timetable remained the same, and the dwell times were unchanged. As a consequence, the individual travel times of the passengers changed only marginally. Table 4 shows the average punctuality of the trains on the Zaanlijn as well as the average overall punctuality in the Netherlands during the weeks 22 to 29 of This table shows that, during the timetable experiment, the punctuality figures of the Zaanlijn are quite comparable with those of the overall punctuality. Note that weeks 24, 27 and 29 had a relatively large number of major disruptions of the railway infrastructure, which had a negative effect on the punctuality. As a comparison, the average punctuality of the Zaanlijn over the first 13 weeks of 2006 was 79.4%, and the average overall punctuality in the Netherlands over this period was 86.5%. Thus the 15
16 Table 4: Punctuality of the Zaanlijn and the overall punctuality Week Zaanlijn 89.7% 87.5% 80.5% 89.5% Overall 88.6% 87.9% 82.6% 88.8% Week Average Zaanlijn 85.3% 74.8% 90.2% 85.8% 85.4% Overall 86.5% 75.4% 87.3% 81.2% 84.8% figures in Table 4 indicate that the application of the Stochastic Optimization Model had a positive effect on the punctuality of the Zaanlijn. In fact, the effects of the improved timetable were quite similar to what was expected. That is, at moments that there are only small primary disturbances, the improved timetable is better able to deal with these small disturbances. At moments that there are large disturbances, the improved timetable does not give a clear advantage over the original timetable. 4 Routing Trains through Railway Stations Routing trains through railway stations is an integral part of railway timetabling, in particular in dense railway systems. In other words, as long as a detailed routing of the trains through the railway stations has not been determined, one does not have a timetable yet. Railway stations turn out to be the main source of delays in a dense railway system. Therefore, focusing on a robust routing of trains through railway stations is highly relevant for improving the punctuality of a railway system. Note that robustness here again means insensitivity of the railway processes to relatively small disturbances in the real-time operations. A significant number of OR publications have been devoted to the train routing problem in the past decades. Recent developments include Zwaneveld et al. (1996, 2001) who develop a model and solution approaches for finding a feasible routing for a given timetable. Their model is based on the concept of conflict graphs. This model, called STATIONS, was implemented in the timetabling tool DONS, see Hooghiemstra et al. (1999). A similar approach is used by Billionet (2003). In Section 4.4 of this paper this model is extended to take into account robustness issues as well. Fuchsberger (2007) describes an alternative multicommodity-flow type of model for solving the same problem. Caimi et al. (2005) present a heuristic algorithm for finding delay tolerant routings based on an iterative fixed point method. 16
17 4.1 The routing problem The route of a train through a station is represented by the list of all infrastructure elements passed by the train. In particular, it includes the platform tracks assigned to the train. Once one knows the acceleration and deceleration capabilities as well as the planned arrival and departure times of a train, one can determine the exact time intervals when the infrastructure elements are occupied by the train according to the plan. One major goal of routing trains through stations is to ensure that no infrastructure element is occupied by two different trains within a certain headway time. Robustness of the routing can be captured by reducing the number of occasions when the time difference of two trains on an infrastructure element is just higher than the minimum headway time. C C r 1 r 1 A D A D B r 2 B r 2 (a) (b) Figure 3: Crossing and non-crossing routes Figure 3a indicates the lay-out of a station and shows the routes of two trains: train t from C to A and train t from B to D. Note that routes r and r share a piece of the infrastructure. Therefore, they cannot be used both if trains t and t pass through the station at the same time. If, however, train t passes, say, more than 3 minutes earlier than train t does, then the routing is feasible. However, in that case a small delay of train t will hinder train t. Figure 3b indicates an alternative routing for trains t and t. This routing is considered to be more robust than the previous one because routes r and r are disjoint. 4.2 Platform assignment issues The goal of routing trains through stations is, besides specifying the approach routes from and to the platforms, to assign the trains to the platforms themselves. The platform assignment has to satisfy a number of market requirements. For example, trains of the same line are to be assigned to the same platform, while trains departing towards the same destination are preferred to leave from the same platform. Then passengers can easily remember the departure platforms of their trains. Certain pairs of trains have so-called cross-platform connections. These trains have short stops with overlapping time intervals, and are to be as- 17
18 signed to neighboring platforms. Then passengers can easily change from one of these trains to the other in that case. The platforms of large stations may have different preference values when being assigned to trains. For example, trains with many expected passengers are preferred to arrive at platforms that can accommodate long enough trains and that are located closer to the main station facilities. 4.3 Finding a feasible routing Zwaneveld et al. (1996, 2001) describe a model for routing trains through a railway station, given the arrival and departure times of the trains that were determined in an earlier stage. The basic idea is as follows. First the set of all possible routes is identified for each train. Next, one pre-computes which train-route pairs are conflicting, since they lead to a violation of the minimum headway time at one of the infrastructure elements. Then the model makes sure that none of these conflicting train-route pairs appear together in a solution. Note that Zwaneveld et al. (1996, 2001) distinguish inbound routes from outbound routes, but this distinction is neglected here. Let T be the set of trains. For each train t, let R t denote the set of all routes that can be assigned to train t. For train t and route r R t, the parameter p t,r is a penalty for this combination. These penalties may indicate e.g. the train s preference for the platforms. It may also reflect how much of the station s capacity is blocked by route r: real-time operations can be easily disrupted if r has a conflict with many other possible routes. The set C describes the possible conflicts between trains. The elements of C are 4-tuples (t,r,t,r ) with t,t T, r R t, r R t such that choosing routes r and r for trains t and t violates the minimum headway time of one of the infrastructure elements. Also, the market requirements discussed in Section 4.2 are easily expressed by additional elements of C. For example, the 4-tuple (t,r,t,r ) is an element of C if trains t and t should have a crossplatform connection, but routes r and r lead to non-neighboring platforms. Binary decision variables X t,r then describe whether route r is selected for train r. With these notations, the model reads as follows. minimize subject to p t,r X t,r (16) t T r R t X t,r = 1 for all t T (17) r R t X t,r + X t,r 1 for all (t,r,t,r ) C (18) X t,r {0,1} for all t T,r R t (19) Note that this model is similar to a Node Packing Model. Zwaneveld et al. (1996, 2001) solve the model by first looking for dominated routing 18
19 possibilities. For example, if routes r and r have the same start and end point, but route r is a detour in comparison with route r, then all routing possibilities involving route r are dominated by the routing possibilities involving route r. Moreover, the authors aggregate constraints (18) into genuine clique-constraints, which usually provide a stronger Linear Programming relaxation. The aggregated model is solved then by CPLEX, usually within a couple of minutes, even for larger sized stations. 4.4 Robust routing The model described in Section 4.3 does not deal with any robustness aspects. Therefore, the model is extended here by maximizing the time between crossing movements of trains. In this way, the probability of knock-on delays is minimized. This fits with the robustness idea that consecutive utilizations of a single resource by different users should be spread in time. Let q t,r,t,r be a non-negative penalty value for each pair of trains t,t and for all routes r R t and r R t. These penalty values express the impact of the assignment of routes r and r to trains t and t, respectively, on the robustness of the timetable. The penalty is zero if the simultaneous choice of routes r and r for trains t and t, respectively, does not jeopardize the robustness. This happens if the routes are disjoint or if the time difference between trains t and t is sufficiently large. Then the robustness aspects are incorporated in the model (16) (19) by replacing (16) by the following quadratic objective function. minimize p t,r X t,r + q t,r,t,r X t,rx t,r (20) t T r R t t T r R t t T r R t In this extended model, all penalties q t,r,t,r for selected pairs (t,r) and (t,r ) are accumulated in the objective function. Indeed, X t,r X t,r = 1 if and only if X t,r = 1 and X t,r = 1. The optimal solution is a feasible routing which minimizes the sum of the involved penalties, thereby also taking into account the robustness aspect Linearization of the robust routing model The quadratic integer programming model described in the previous section is too difficult to treat computationally. For example, the non-convex objective function rules out efficient convex optimization methods. However, with an appropriate linearization of the model, one may use sophisticated mixed integer linear programming algorithms. An easy linearization method is to introduce non-negative continuous decision variables Y t,r,t,r, to replace the product X t,rx t,r by Y t,r,t,r in the objective function (20), and to impose the following additional constraints. X t,r + X t,r 1 + Y t,r,t,r (21) 19
20 This is indeed a sound method, since in any optimal solution the value Y t,r,t,r equals the product of X t,r and X t,r, as one easily checks. A drawback of this method is, however, that it leads to a weak Linear Programming relaxation. Therefore, other linearization methods will have to be used for solving practical instances. However, a discussion of other linearization methods falls out of the scope of this paper Aggregated routes It turns out that the number of possible routes through a reasonably big station is quite large, limiting the possibility of applying the routing model for real-life problems. One way to deal with this is to work with a restricted set of allowed routes. This way is followed by Zwaneveld et al. (1996, 2001). However, here we suggest another possibility. Instead of using the fully detailed routes through the station, we use the notion of aggregated routes, as indicated in Figure 4. The bold lines in Figure 4a indicate the detailed routes of two trains. An aggregated route arises by keeping the platform and the destination (A, B or C in the figure) of a route fixed, and by neglecting all intermediate infrastructure elements. The aggregated routes are represented by the bold arrows in Figure 4b. Conflicts between aggregated routes are defined as follows. Let the platforms and the destinations be indexed from top to bottom. Then two aggregated routes are conflicting if the route from a lower indexed platform departs to a higher indexed destination, i.e. if the arrows in Figure 4b cross each other. A A B B (a) C (b) C Figure 4: Detailed and aggregated routes Subsequently, we solve the robust routing problem with these aggregated routes. The solution gives an indication of the detailed routing, which can be found afterwards by existing non-robust routing algorithms by fixing the platform assignment and looking for just a feasible routing. Whenever the aggregated routes cross one another, the corresponding routes in any feasible detailed routing cross one another, too. However, it is not difficult to find examples where the opposite implication does not hold. Therefore, the robust routing model with the aggregated routes yields a lower bound on the penalty of any feasible detailed routing. 20
21 Having split the robust detailed routing problem into two parts (namely into robust aggregated routing and feasible detailed routing), there is a risk that a robust aggregated routing does not give rise to any feasible detailed routing. In such cases, it is vital to define more complex aggregated routes by taking key infrastructure elements (such as fly-overs, long parallel tracks without switches, etc.) into account. This enhances the probability of indeed finding a feasible detailed routing Computational experience and conclusions A linearized formulation of the robust routing model (17) (20) was implemented for the major Dutch railway node Utrecht Central Station in the Netherlands. Since the cycle time of the periodic timetable of Netherlands Railways is one hour, it suffices to compute the routes for a single hour only. In order to reduce the computation times, the aggregated routes that were described in Section were used. Utrecht Central Station is a busy station with about 55 trains passing every hour, bound to 5 destinations. The passenger trains can arrive at 14 platforms; freight trains may use three additional dedicated tracks to pass through the station. The aggregated routes regard the complex system of fly-overs at the northern side of the station. The mixed integer program was solved by CPLEX 9.0 to optimality within an hour on a standard PC. The Linear Programming bounds of the first few nodes in the Branch-and-Bound tree are very weak. Therefore it is advantageous to instruct CPLEX to start the solution process with intensive branching, and to look for feasible solutions later. The test implementation computed the aggregated routes only. A further manual step indicated that the model captured the key elements of the infrastructure conflicts in an adequate way, since the aggregated routes could be extended to a feasible detailed routing through the station. The results showed that a manually planned routing usually can be improved slightly. But more importantly, the model allows a direct and quick evaluation of the effect of certain market requirements, such as crossplatform connections, on the robustness of the routing. Cross-platform connections have a negative effect on the robustness of the routing. Indeed, whereas the robustness objective tries to separate trains from each other in space and time, cross-platform connections do the opposite. The model can also show the usefulness of minor changes of the arrival and departure times. In fact, shifting the arrival time of a single cargo train at Utrecht Central Station by one minute allows to decrease the optimal objective value by about 50%. In further research, detailed simulations of the processes inside the stations are to be carried out to investigate how well the objective function (20) reflects the robustness of the obtained routings. 21
22 5 Final remarks An advantage of the application of optimization models is that it may lead to better solutions in a shorter throughput time. Better solutions may be the result of the fact that the application of optimization models enables one to study several solutions instead of just a single one. For example, one may compare the most cost-efficient solution with the solution that provides a maximum service to the passengers. In this way, one may explicitly study the trade-off between costs and service. Moreover, in several practical cases, the application of optimization models lead to improvements in several criteria at the same time. The latter results from the fact that manual planning methods are usually heuristic approaches. Optimization models play an increasing role in the planning processes of railway systems. For example, the timetable of the Berlin metro that has been in operation since December 2005 was created completely with the help of optimization techniques based on the PESP model that was described in Section 2. Further details on this case can be found in Liebchen (2006). Similarly, within Netherlands Railways the models described in this paper have developed into indispensable tools in the railway planning process. As was mentioned earlier, these models have been implemented in the automatic timetabling system DONS (=Designer Of Network Schedules). This system has been used extensively in the development of the Dutch railway timetable that has been in operation since December Also the simulation model SIMONE (SImulation MOdel for NEtworks) was used in this development process, see Middelkoop and Bouwman (2000). Whereas in earlier years new timetables were usually created in an incremental way by modifying an existing timetable, the current Dutch timetable was generated completely from scratch with the help of the described models. Also the available models for rolling stock circulation and crew scheduling played an indispensable role in this planning process. More details on these models can be found in Fioole et al. (2006) and Abbink et al. (2005). One of the main objectives in the development of the current Dutch timetable was to improve its robustness, which should translate into increased punctuality figures in the operations. This was aimed at by allocating time supplements and buffer times in a different way, and by reducing the number of crossing train movements in station areas as much as possible. Although at the moment of writing (May 2007) the time that the current timetable has been in operation is still too short for definitive conclusions, a certain upward trend in the punctuality figures can be discovered. A major challenge for further research is to find a better integration between the models developed for solving the timetabling step described in Sections 2 and 3 and the models developed for routing trains through railway stations described in Section 4. A better integration between these models will allow one to take into account more details of the routes through 22
23 the stations already in the timetabling step. This may be beneficial for the quality of the finally obtained timetable, in particular for its robustness. Moreover, until now, the planning process of a railway system has been the traditional application area for optimization models. Here one may apply large optimization models that can be solved to near optimality without caring too much about the computation time. However, decision support for re-scheduling in case of a disruption in the real-time operations may be even more relevant for increasing the quality of a railway system. In particular, after a disruption of the railway system has occurred, decision support is needed on which trains to cancel or to re-route in order to uphold as much as possible of the service for the passengers, or on how to adjust the rolling stock circulations and the crew schedules. Disruption management is a re-active way of dealing with disruptions. It requires a fundamentally different focus of the involved optimization models: now a short computation time is essential, and near optimality of the obtained solutions is less relevant, but not at any price. This different focus requires still a lot of research, which poses an enormous challenge for the research community. Acknowledgements The authors like to thank Twan Dollevoet, Willem van Jaarsveld and Evelien van der Hurk for calculating the timetable as presented in the example of Section 2. References E. Abbink, M. Fischetti, L. Kroon, G. Timmer, and M. Vromans. Reinventing crew scheduling at Netherlands Railways. Interfaces, 35(5): , A. Billionet. Using integer programming to solve the train-platforming problem. Transportation Science, 37: , G. Caimi, D. Burkolter, and T. Herrmann. Finding delay-tolerant train routings through stations. In H. Fleuren, editor, Operations Research Proceedings 2004, pages Springer, A. Caprara, M. Fischetti, and P. Toth. Modeling and solving the train timetabling problem. Operations Research, 50: , P. Fioole, L. Kroon, G. Maróti, and A. Schrijver. A rolling stock circulation model for combining and splitting of passenger trains. European Journal of Operational Research, 174(2): , M. Fuchsberger. Solving the train scheduling problem in a main station area via a resource constrained space-time integer multicommodity flow. Master s thesis, Institute for Operations Research, ETH Zürich, Switzerland, J. Hooghiemstra, L. Kroon, M. Odijk, M. Salomon, and P. Zwaneveld. Decision Support Systems support the search for win-win solutions in railway network design. Interfaces, 29(2):15 32,
24 D. Huisman, L. Kroon, R. Lentink, and M. Vromans. Operations Research in passenger railway transportation. Statistica Neerlandica, 59: , L. Kroon and L. Peeters. A variable trip time model for cyclic railway timetabling. Transportation Science, 37: , L. Kroon, R. Dekker, G. Maróti, M. Retel Helmrich, and M. Vromans. Stochastic improvement of cyclic railway timetables. ERIM Research Report ERS LIS, Erasmus University Rotterdam, The Netherlands, 2007a. L. Kroon, R. Dekker, and M. Vromans. Cyclic railway timetabling: a Stochastic Optimization approach. In F. Geraets, L. Kroon, A. Schoebel, D. Wagner, and C. Zaroliagis, editors, Algorithmic Methods for Railway Optimization, Lecture Notes in Computer Science, Berlin, 2007b. Springer. C. Liebchen. Periodic Timetable Optimization in Public Transport. PhD thesis, TU Berlin, Germany, T. Lindner. Train schedule optimization in public rail transport. PhD thesis, Technical University Braunschweig, Braunschweig, D. Middelkoop and M. Bouwman. Train network simulator for support of network wide planning of infrastructure and timetables. In J. Allan, C. Brebbia, R. Hill, and G. Sciutto, editors, Computers in Railways VII, pages , Ashurst, UK, WIT Press. K. Nachtigall. Periodic network optimization and fixed interval timetables. Habilitation thesis, Deutsches Zentrum für Luft- und Raumfahrt, Braunschweig, K. Nachtigall and S. Voget. A genetic algorithm approach to periodic railway synchronization. Computers and Operations Research, 23: , M. Odijk. A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research, 30: , L. Peeters. Cyclic Railway Timetable Optimization. PhD thesis, Erasmus University Rotterdam, Rotterdam School of Management, The Netherlands, A. Schrijver and A. Steenbeek. Dienstregelingontwikkeling voor Railned (Timetable construction for Railned). Technical report, Center for Mathematics and Computer Science, Amsterdam, In Dutch. P. Serafini and W. Ukovich. A mathematical model for Periodic Event Scheduling Problems. SIAM Journal of Discrete Mathematics, 2: , U.I.C. Timetable recovery margins to guarantee timekeeping - recovery margins. Leaflet of U.I.C., Paris, France, M. Vromans. Reliability of Railway Systems. PhD thesis, Erasmus University Rotterdam, Rotterdam School of Management, The Netherlands,
25 P. Zwaneveld, L. Kroon, H. Romeijn, M. Salomon, S. Dauzère-Pérès, C. Van Hoesel, and H. Ambergen. Routing trains through railway stations: Model formulation and algorithms. Transportation Science, 30(3): , P. Zwaneveld, L. Kroon, and S. van Hoesel. Routing trains through a railway staion based on a node packing model. European Journal of Operational Research, 128: 14 33,
Operations Research in Passenger Railway Transportation
Operations Research in Passenger Railway Transportation Dennis Huisman 1,2, Leo G. Kroon 1,2, Ramon M. Lentink 1,3 and Michiel J.C.M. Vromans 1,4 1 Erasmus Center for Optimization in Public Transport (ECOPT),
Railway rolling stock is one of the most significant cost components for operators of passenger trains. The
TRANSPORTATION SCIENCE Vol. 0, No., August 2006, pp. 78 91 issn 001-1655 eissn 1526-57 06 00 078 informs doi 10.1287/trsc.1060.0155 2006 INFORMS Efficient Circulation of Railway Rolling Stock Arianna Alfieri
The Rolling Stock Recovery Problem. Literature review. Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ
The Rolling Stock Recovery Problem Julie Jespersen Groth *α, Jesper Larsen β and Jens Clausen *γ DTU Management Engineering, The Technical University of Denmark, Produktionstorvet, DTU Building 424, 2800
Minimizing costs for transport buyers using integer programming and column generation. Eser Esirgen
MASTER STHESIS Minimizing costs for transport buyers using integer programming and column generation Eser Esirgen DepartmentofMathematicalSciences CHALMERS UNIVERSITY OF TECHNOLOGY UNIVERSITY OF GOTHENBURG
24. The Branch and Bound Method
24. The Branch and Bound Method It has serious practical consequences if it is known that a combinatorial problem is NP-complete. Then one can conclude according to the present state of science that no
An optimisation framework for determination of capacity in railway networks
CASPT 2015 An optimisation framework for determination of capacity in railway networks Lars Wittrup Jensen Abstract Within the railway industry, high quality estimates on railway capacity is crucial information,
Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows
TECHNISCHE UNIVERSITEIT EINDHOVEN Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows Lloyd A. Fasting May 2014 Supervisors: dr. M. Firat dr.ir. M.A.A. Boon J. van Twist MSc. Contents
Appendix: Simple Methods for Shift Scheduling in Multi-Skill Call Centers
MSOM.1070.0172 Appendix: Simple Methods for Shift Scheduling in Multi-Skill Call Centers In Bhulai et al. (2006) we presented a method for computing optimal schedules, separately, after the optimal staffing
The Trip Scheduling Problem
The Trip Scheduling Problem Claudia Archetti Department of Quantitative Methods, University of Brescia Contrada Santa Chiara 50, 25122 Brescia, Italy Martin Savelsbergh School of Industrial and Systems
INTEGER PROGRAMMING. Integer Programming. Prototype example. BIP model. BIP models
Integer Programming INTEGER PROGRAMMING In many problems the decision variables must have integer values. Example: assign people, machines, and vehicles to activities in integer quantities. If this is
This paper introduces a new method for shift scheduling in multiskill call centers. The method consists of
MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 10, No. 3, Summer 2008, pp. 411 420 issn 1523-4614 eissn 1526-5498 08 1003 0411 informs doi 10.1287/msom.1070.0172 2008 INFORMS Simple Methods for Shift
An Interactive Train Scheduling Tool for Solving and Plotting Running Maps
An Interactive Train Scheduling Tool for Solving and Plotting Running Maps F. Barber 1, M.A. Salido 2, L. Ingolotti 1, M. Abril 1, A. Lova 3, P. Tormos 3 1 DSIC, 3 DEIOAC, Universidad Politécnica de Valencia,
OPRE 6201 : 2. Simplex Method
OPRE 6201 : 2. Simplex Method 1 The Graphical Method: An Example Consider the following linear program: Max 4x 1 +3x 2 Subject to: 2x 1 +3x 2 6 (1) 3x 1 +2x 2 3 (2) 2x 2 5 (3) 2x 1 +x 2 4 (4) x 1, x 2
Title: Integrating Management of Truck and Rail Systems in LA. INTERIM REPORT August 2015
Title: Integrating Management of Truck and Rail Systems in LA Project Number: 3.1a Year: 2013-2017 INTERIM REPORT August 2015 Principal Investigator Maged Dessouky Researcher Lunce Fu MetroFreight Center
Routing in Line Planning for Public Transport
Konrad-Zuse-Zentrum für Informationstechnik Berlin Takustraße 7 D-14195 Berlin-Dahlem Germany MARC E. PFETSCH RALF BORNDÖRFER Routing in Line Planning for Public Transport Supported by the DFG Research
A Quantitative Decision Support Framework for Optimal Railway Capacity Planning
A Quantitative Decision Support Framework for Optimal Railway Capacity Planning Y.C. Lai, C.P.L. Barkan University of Illinois at Urbana-Champaign, Urbana, USA Abstract Railways around the world are facing
Re-optimization of Rolling Stock Rotations
Konrad-Zuse-Zentrum für Informationstechnik Berlin Takustraße 7 D-14195 Berlin-Dahlem Germany RALF BORNDÖRFER 1, JULIKA MEHRGARDT 1, MARKUS REUTHER 1, THOMAS SCHLECHTE 1, KERSTIN WAAS 2 Re-optimization
Lecture 10 Scheduling 1
Lecture 10 Scheduling 1 Transportation Models -1- large variety of models due to the many modes of transportation roads railroad shipping airlines as a consequence different type of equipment and resources
Railway traffic optimization by advanced scheduling and rerouting algorithms
Railway traffic optimization by advanced scheduling and rerouting algorithms 1 A. D Ariano, 1 F. Corman, 1 I.A. Hansen Department of Transport & Planning, Delft University of Technology, Delft, The Netherlands
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 36 Location Problems In this lecture, we continue the discussion
Multi-layer MPLS Network Design: the Impact of Statistical Multiplexing
Multi-layer MPLS Network Design: the Impact of Statistical Multiplexing Pietro Belotti, Antonio Capone, Giuliana Carello, Federico Malucelli Tepper School of Business, Carnegie Mellon University, Pittsburgh
Models in Transportation. Tim Nieberg
Models in Transportation Tim Nieberg Transportation Models large variety of models due to the many modes of transportation roads railroad shipping airlines as a consequence different type of equipment
A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM:
A MODEL TO SOLVE EN ROUTE AIR TRAFFIC FLOW MANAGEMENT PROBLEM: A TEMPORAL AND SPATIAL CASE V. Tosic, O. Babic, M. Cangalovic and Dj. Hohlacov Faculty of Transport and Traffic Engineering, University of
Approximation Algorithms
Approximation Algorithms or: How I Learned to Stop Worrying and Deal with NP-Completeness Ong Jit Sheng, Jonathan (A0073924B) March, 2012 Overview Key Results (I) General techniques: Greedy algorithms
Some Polynomial Theorems. John Kennedy Mathematics Department Santa Monica College 1900 Pico Blvd. Santa Monica, CA 90405 [email protected].
Some Polynomial Theorems by John Kennedy Mathematics Department Santa Monica College 1900 Pico Blvd. Santa Monica, CA 90405 [email protected] This paper contains a collection of 31 theorems, lemmas,
JUST-IN-TIME SCHEDULING WITH PERIODIC TIME SLOTS. Received December May 12, 2003; revised February 5, 2004
Scientiae Mathematicae Japonicae Online, Vol. 10, (2004), 431 437 431 JUST-IN-TIME SCHEDULING WITH PERIODIC TIME SLOTS Ondřej Čepeka and Shao Chin Sung b Received December May 12, 2003; revised February
A Service Design Problem for a Railway Network
A Service Design Problem for a Railway Network Alberto Caprara Enrico Malaguti Paolo Toth Dipartimento di Elettronica, Informatica e Sistemistica, University of Bologna Viale Risorgimento, 2-40136 - Bologna
A Decision Support System for Crew Planning in Passenger Transportation using a Flexible Branch-and-Price Algorithm
A Decision Support System for Crew Planning in Passenger Transportation using a Flexible Branch-and-Price Algorithm RICHARD FRELING 1, 2*, RAMON M. LENTINK 1, 2 AND ALBERT P.M. WAGELMANS 1 1 Erasmus Center
Optimization of Supply Chain Networks
Optimization of Supply Chain Networks M. Herty TU Kaiserslautern September 2006 (2006) 1 / 41 Contents 1 Supply Chain Modeling 2 Networks 3 Optimization Continuous optimal control problem Discrete optimal
Special Situations in the Simplex Algorithm
Special Situations in the Simplex Algorithm Degeneracy Consider the linear program: Maximize 2x 1 +x 2 Subject to: 4x 1 +3x 2 12 (1) 4x 1 +x 2 8 (2) 4x 1 +2x 2 8 (3) x 1, x 2 0. We will first apply the
Two objective functions for a real life Split Delivery Vehicle Routing Problem
International Conference on Industrial Engineering and Systems Management IESM 2011 May 25 - May 27 METZ - FRANCE Two objective functions for a real life Split Delivery Vehicle Routing Problem Marc Uldry
Efficient and Robust Allocation Algorithms in Clouds under Memory Constraints
Efficient and Robust Allocation Algorithms in Clouds under Memory Constraints Olivier Beaumont,, Paul Renaud-Goud Inria & University of Bordeaux Bordeaux, France 9th Scheduling for Large Scale Systems
Single item inventory control under periodic review and a minimum order quantity
Single item inventory control under periodic review and a minimum order quantity G. P. Kiesmüller, A.G. de Kok, S. Dabia Faculty of Technology Management, Technische Universiteit Eindhoven, P.O. Box 513,
A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem
A Branch and Bound Algorithm for Solving the Binary Bi-level Linear Programming Problem John Karlof and Peter Hocking Mathematics and Statistics Department University of North Carolina Wilmington Wilmington,
A Case Study of Joint Online Truck Scheduling and Inventory Management for Multiple Warehouses
Technische Universität Chemnitz Fakultät für Mathematik D-09107 Chemnitz, Germany A Case Study of Joint Online Truck Scheduling and Inventory Management for Multiple Warehouses C. Helmberg, S. Röhl Preprint
NEW applications of wireless multi-hop networks, such
870 IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 17, NO. 3, JUNE 2009 Delay Aware Link Scheduling for Multi-Hop TDMA Wireless Networks Petar Djukic, Member, IEEE, and Shahrokh Valaee, Senior Member, IEEE
Factoring Trinomials: The ac Method
6.7 Factoring Trinomials: The ac Method 6.7 OBJECTIVES 1. Use the ac test to determine whether a trinomial is factorable over the integers 2. Use the results of the ac test to factor a trinomial 3. For
A MULTI-PERIOD INVESTMENT SELECTION MODEL FOR STRATEGIC RAILWAY CAPACITY PLANNING
A MULTI-PERIOD INVESTMENT SELECTION MODEL FOR STRATEGIC RAILWAY Yung-Cheng (Rex) Lai, Assistant Professor, Department of Civil Engineering, National Taiwan University, Rm 313, Civil Engineering Building,
Cash $331 $9,095. Receivables 4,019 2,342. Prepaid expenses 2,729 456. Prepaid catalog costs 2,794 1,375. Deferred catalog costs 7,020 3,347
Coldwater Creek Coldwater Creek, located in Idaho, operates a direct-mail catalog business. Items marketed through these catalogs include women's and men's apparel, jewelry, and household items. The beginning
Stochastic Inventory Control
Chapter 3 Stochastic Inventory Control 1 In this chapter, we consider in much greater details certain dynamic inventory control problems of the type already encountered in section 1.3. In addition to the
Discrete Optimization
Discrete Optimization [Chen, Batson, Dang: Applied integer Programming] Chapter 3 and 4.1-4.3 by Johan Högdahl and Victoria Svedberg Seminar 2, 2015-03-31 Todays presentation Chapter 3 Transforms using
A Constraint Programming based Column Generation Approach to Nurse Rostering Problems
Abstract A Constraint Programming based Column Generation Approach to Nurse Rostering Problems Fang He and Rong Qu The Automated Scheduling, Optimisation and Planning (ASAP) Group School of Computer Science,
Chapter 13: Binary and Mixed-Integer Programming
Chapter 3: Binary and Mixed-Integer Programming The general branch and bound approach described in the previous chapter can be customized for special situations. This chapter addresses two special situations:
RailML use in the project
French institute of science and technology for transport, spatial planning, development and networks RailML use in the project Grégory Marlière Optimal Networks for Train Integration Management across
Airline Schedule Development
Airline Schedule Development 16.75J/1.234J Airline Management Dr. Peter Belobaba February 22, 2006 Airline Schedule Development 1. Schedule Development Process Airline supply terminology Sequential approach
PANDA: A Software Tool for Improved Train Dispatching with Focus on Passenger Flows
CASPT 2015 PANDA: A Software Tool for Improved Train Dispatching with Focus on Passenger Flows Ralf Rückert Martin Lemnian Christoph Blendinger Steffen Rechner Matthias Müller-Hannemann Abstract Delay
INTEGRATED OPTIMIZATION OF SAFETY STOCK
INTEGRATED OPTIMIZATION OF SAFETY STOCK AND TRANSPORTATION CAPACITY Horst Tempelmeier Department of Production Management University of Cologne Albertus-Magnus-Platz D-50932 Koeln, Germany http://www.spw.uni-koeln.de/
Strategic planning in LTL logistics increasing the capacity utilization of trucks
Strategic planning in LTL logistics increasing the capacity utilization of trucks J. Fabian Meier 1,2 Institute of Transport Logistics TU Dortmund, Germany Uwe Clausen 3 Fraunhofer Institute for Material
NETWORK EFFECTS IN RAILWAY SYSTEMS
NETWORK EFFECTS IN RAILWAY SYSTEMS Alex Landex Technical University of Denmark, Centre for Traffic and Transport Otto Anker Nielsen Technical University of Denmark, Centre for Traffic and Transport 1 ABSTRACT
Charles Fleurent Director - Optimization algorithms
Software Tools for Transit Scheduling and Routing at GIRO Charles Fleurent Director - Optimization algorithms Objectives Provide an overview of software tools and optimization algorithms offered by GIRO
Load Balancing and Switch Scheduling
EE384Y Project Final Report Load Balancing and Switch Scheduling Xiangheng Liu Department of Electrical Engineering Stanford University, Stanford CA 94305 Email: [email protected] Abstract Load
Linear Programming. March 14, 2014
Linear Programming March 1, 01 Parts of this introduction to linear programming were adapted from Chapter 9 of Introduction to Algorithms, Second Edition, by Cormen, Leiserson, Rivest and Stein [1]. 1
Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies
Strategic evolution of railway corridor infrastructure: dual approach for assessing capacity investments and M&R strategies Y. Putallaz & R. Rivier EPFL Swiss Federal Institute of Technology, Lausanne
1 Solving LPs: The Simplex Algorithm of George Dantzig
Solving LPs: The Simplex Algorithm of George Dantzig. Simplex Pivoting: Dictionary Format We illustrate a general solution procedure, called the simplex algorithm, by implementing it on a very simple example.
Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets
Unraveling versus Unraveling: A Memo on Competitive Equilibriums and Trade in Insurance Markets Nathaniel Hendren January, 2014 Abstract Both Akerlof (1970) and Rothschild and Stiglitz (1976) show that
An example of a computable
An example of a computable absolutely normal number Verónica Becher Santiago Figueira Abstract The first example of an absolutely normal number was given by Sierpinski in 96, twenty years before the concept
A Survey on Problem Models and Solution Approaches to Rescheduling in Railway Networks
JOURNAL OF L A TEX CLASS FILES, VOL. -, NO. -, JANUARY 2015 1 A Survey on Problem Models and Solution Approaches to Rescheduling in Railway Networks Wei Fang, Member, IEEE, Shengxiang Yang, Senior Member,
(Refer Slide Time: 01.26)
Discrete Mathematical Structures Dr. Kamala Krithivasan Department of Computer Science and Engineering Indian Institute of Technology, Madras Lecture # 27 Pigeonhole Principle In the next few lectures
Fairness in Routing and Load Balancing
Fairness in Routing and Load Balancing Jon Kleinberg Yuval Rabani Éva Tardos Abstract We consider the issue of network routing subject to explicit fairness conditions. The optimization of fairness criteria
Clustering and scheduling maintenance tasks over time
Clustering and scheduling maintenance tasks over time Per Kreuger 2008-04-29 SICS Technical Report T2008:09 Abstract We report results on a maintenance scheduling problem. The problem consists of allocating
What is Linear Programming?
Chapter 1 What is Linear Programming? An optimization problem usually has three essential ingredients: a variable vector x consisting of a set of unknowns to be determined, an objective function of x to
R u t c o r Research R e p o r t. A Method to Schedule Both Transportation and Production at the Same Time in a Special FMS.
R u t c o r Research R e p o r t A Method to Schedule Both Transportation and Production at the Same Time in a Special FMS Navid Hashemian a Béla Vizvári b RRR 3-2011, February 21, 2011 RUTCOR Rutgers
Information Theory and Coding Prof. S. N. Merchant Department of Electrical Engineering Indian Institute of Technology, Bombay
Information Theory and Coding Prof. S. N. Merchant Department of Electrical Engineering Indian Institute of Technology, Bombay Lecture - 17 Shannon-Fano-Elias Coding and Introduction to Arithmetic Coding
Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital
Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital Johan M. M. van Rooij Guest Lecture Utrecht University, 31-03-2015 from x to u The speaker 2 Johan van Rooij - 2011 current:
Research Article Scheduling IT Staff at a Bank: A Mathematical Programming Approach
e Scientific World Journal, Article ID 768374, 10 pages http://dx.doi.org/10.1155/2014/768374 Research Article Scheduling IT Staff at a Bank: A Mathematical Programming Approach M.Labidi,M.Mrad,A.Gharbi,andM.A.Louly
Moral Hazard. Itay Goldstein. Wharton School, University of Pennsylvania
Moral Hazard Itay Goldstein Wharton School, University of Pennsylvania 1 Principal-Agent Problem Basic problem in corporate finance: separation of ownership and control: o The owners of the firm are typically
A Branch-Cut-and-Price Approach to the Bus Evacuation Problem with Integrated Collection Point and Shelter Decisions
A Branch-Cut-and-Price Approach to the Bus Evacuation Problem with Integrated Collection Point and Shelter Decisions Marc Goerigk, Bob Grün, and Philipp Heßler Fachbereich Mathematik, Technische Universität
MEI Structured Mathematics. Practice Comprehension Task - 2. Do trains run late?
MEI Structured Mathematics Practice Comprehension Task - 2 Do trains run late? There is a popular myth that trains always run late. Actually this is far from the case. All train companies want their trains
Appendix A. About RailSys 3.0. A.1 Introduction
Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research
A hierarchical multicriteria routing model with traffic splitting for MPLS networks
A hierarchical multicriteria routing model with traffic splitting for MPLS networks João Clímaco, José Craveirinha, Marta Pascoal jclimaco@inesccpt, jcrav@deecucpt, marta@matucpt University of Coimbra
A multilevel integrative approach to hospital case mix and capacity planning DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT (KBI)
Faculty of Business and Economics A multilevel integrative approach to hospital case mix and capacity planning Guoxuan Ma & Erik Demeulemeester DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT
Revenue Management for Transportation Problems
Revenue Management for Transportation Problems Francesca Guerriero Giovanna Miglionico Filomena Olivito Department of Electronic Informatics and Systems, University of Calabria Via P. Bucci, 87036 Rende
Nan Kong, Andrew J. Schaefer. Department of Industrial Engineering, Univeristy of Pittsburgh, PA 15261, USA
A Factor 1 2 Approximation Algorithm for Two-Stage Stochastic Matching Problems Nan Kong, Andrew J. Schaefer Department of Industrial Engineering, Univeristy of Pittsburgh, PA 15261, USA Abstract We introduce
An Overview of Routing and Staffing Algorithms in Multi-Skill Customer Contact Centers. Submitted version
An Overview of Routing and Staffing Algorithms in Multi-Skill Customer Contact Centers Ger Koole & Auke Pot Department of Mathematics, Vrije Universiteit Amsterdam, The Netherlands Submitted version 6th
A Tool for Generating Partition Schedules of Multiprocessor Systems
A Tool for Generating Partition Schedules of Multiprocessor Systems Hans-Joachim Goltz and Norbert Pieth Fraunhofer FIRST, Berlin, Germany {hans-joachim.goltz,nobert.pieth}@first.fraunhofer.de Abstract.
This article has been accepted for inclusion in a future issue of this journal. Content is final as presented, with the exception of pagination.
IEEE/ACM TRANSACTIONS ON NETWORKING 1 A Greedy Link Scheduler for Wireless Networks With Gaussian Multiple-Access and Broadcast Channels Arun Sridharan, Student Member, IEEE, C Emre Koksal, Member, IEEE,
FIN-40008 FINANCIAL INSTRUMENTS SPRING 2008
FIN-40008 FINANCIAL INSTRUMENTS SPRING 2008 Options These notes consider the way put and call options and the underlying can be combined to create hedges, spreads and combinations. We will consider the
Change Management in Enterprise IT Systems: Process Modeling and Capacity-optimal Scheduling
Change Management in Enterprise IT Systems: Process Modeling and Capacity-optimal Scheduling Praveen K. Muthusamy, Koushik Kar, Sambit Sahu, Prashant Pradhan and Saswati Sarkar Rensselaer Polytechnic Institute
LECTURE - 3 RESOURCE AND WORKFORCE SCHEDULING IN SERVICES
LECTURE - 3 RESOURCE AND WORKFORCE SCHEDULING IN SERVICES Learning objective To explain various work shift scheduling methods for service sector. 8.9 Workforce Management Workforce management deals in
The Goldberg Rao Algorithm for the Maximum Flow Problem
The Goldberg Rao Algorithm for the Maximum Flow Problem COS 528 class notes October 18, 2006 Scribe: Dávid Papp Main idea: use of the blocking flow paradigm to achieve essentially O(min{m 2/3, n 1/2 }
Chapter 2. Estimated Timetable. 2.1 Introduction. 2.2 Selected Timetable: Spoorboekje 1999-2000
Chapter 2 Estimated Timetable 2.1 Introduction A suitable starting point from where to do capacity evaluation and further cogitate upon alternative upgraded scenarios ought to be defined. This chapter
1 Portfolio mean and variance
Copyright c 2005 by Karl Sigman Portfolio mean and variance Here we study the performance of a one-period investment X 0 > 0 (dollars) shared among several different assets. Our criterion for measuring
Sensitivity Analysis 3.1 AN EXAMPLE FOR ANALYSIS
Sensitivity Analysis 3 We have already been introduced to sensitivity analysis in Chapter via the geometry of a simple example. We saw that the values of the decision variables and those of the slack and
Math Review. for the Quantitative Reasoning Measure of the GRE revised General Test
Math Review for the Quantitative Reasoning Measure of the GRE revised General Test www.ets.org Overview This Math Review will familiarize you with the mathematical skills and concepts that are important
Simulation of modified timetables for high speed trains Stockholm Göteborg
17 18 May 2010, Opatija, Croatia First International Conference on Road and Rail Infrastructure Simulation of modified timetables for high speed trains Stockholm Göteborg H. Sipilä Division of Traffic
Prescriptive Analytics. A business guide
Prescriptive Analytics A business guide May 2014 Contents 3 The Business Value of Prescriptive Analytics 4 What is Prescriptive Analytics? 6 Prescriptive Analytics Methods 7 Integration 8 Business Applications
6.231 Dynamic Programming and Stochastic Control Fall 2008
MIT OpenCourseWare http://ocw.mit.edu 6.231 Dynamic Programming and Stochastic Control Fall 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. 6.231
The truck scheduling problem at cross-docking terminals
The truck scheduling problem at cross-docking terminals Lotte Berghman,, Roel Leus, Pierre Lopez To cite this version: Lotte Berghman,, Roel Leus, Pierre Lopez. The truck scheduling problem at cross-docking
TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE
TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE Johnny C. Ho, Turner College of Business, Columbus State University, Columbus, GA 31907 David Ang, School of Business, Auburn University Montgomery,
Scheduling Home Health Care with Separating Benders Cuts in Decision Diagrams
Scheduling Home Health Care with Separating Benders Cuts in Decision Diagrams André Ciré University of Toronto John Hooker Carnegie Mellon University INFORMS 2014 Home Health Care Home health care delivery
Optimal shift scheduling with a global service level constraint
Optimal shift scheduling with a global service level constraint Ger Koole & Erik van der Sluis Vrije Universiteit Division of Mathematics and Computer Science De Boelelaan 1081a, 1081 HV Amsterdam The
School Timetabling in Theory and Practice
School Timetabling in Theory and Practice Irving van Heuven van Staereling VU University, Amsterdam Faculty of Sciences December 24, 2012 Preface At almost every secondary school and university, some
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company
The Problem of Scheduling Technicians and Interventions in a Telecommunications Company Sérgio Garcia Panzo Dongala November 2008 Abstract In 2007 the challenge organized by the French Society of Operational