Sizing Mainframe Workloads for Intel Itanium and Intel Xeon-based Platforms
|
|
|
- Damon Watson
- 10 years ago
- Views:
Transcription
1 Sizing Mainframe Workloads for Intel Itanium and Intel Xeon-based Platforms Table of contents Executive summary... 2 Introduction... 2 Evaluation of different sizing methods... 2 Validating calculated results... 4 Finding the Workload Factor... 4 Using the Workload Factor with engineering estimates... 4 Mainframe to open systems sizing... 5 Capacity sizing and identifying the Workload Factor... 5 Workload classification and using WLF... 6 Using testing results as proof points to validate Itanium and ProLiant server sizing... 7 HP Integrity and ProLiant testing... 7 Sizing scenarios... 8 Sizing methodology... 8 Standards-based and Mainframe system comparative sizing Sizing mainframe migrations Conclusion and next steps Appendix A: z10 versus HP Integrity server sizing tables Workload sizes, z10 EC E64 mainframe versus HP Integrity servers Comparative workload sizes, z10 BC mainframe versus HP Integrity servers For more information HP hardware HP software Intel processors Services Porting guidance... 16
2 Executive summary In today s economy, eliminating fixed costs due to older, inflexible mainframe servers is an excellent way to save costs and meet growing IT requirements. The purpose of this paper is to help organizations understand that that they can size applications for on their standardsbased servers (HP Integrity or ProLiant), rather than being forced to implement them on their existing mainframe environment. The effort in this paper is to create a method of sizing workloads for standards-based servers that can help avoid the costly nature of putting the workloads on mainframe systems. What will be shown is that identifying the type of workload to be sized is very important. For example, mainframe systems have relatively poor performance when running processor-intensive workloads. A business manager deciding to run a new processor-intensive workload on a 1- or 2- processor z10 BC mainframe system could instead place it on a uniprocessor HP Integrity rx2660 or BL860 server at huge cost savings. If the workload was more commercially oriented, or data warehouse oriented, the size of the mainframe resources required would be smaller. This paper discusses how workload type directly impacts sizing of a system. Users can take advantage of this and compare the workload sizing of a standards-based server versus a z10 EC or z10 BC system. This paper helps dispel some of potential fears by showing that it is possible to logically size HP Integrity and ProLiant servers when evaluating a new workload. This paper will examine sizing methods that can be used for standards-based servers, using some of IBM s own methodologies. Introduction Many organizations running mature COBOL, CICS, or DB2 environments would benefit by moving to a standards-based infrastructure running commercial-off-the-shelf (COTS) applications. HP servers with Intel processors combined with HP storage provide a proven, cost-effective, and tightly integrated alternative. There are numerous reasons why migration to standards-based systems makes sense. Increase enterprise agility Modernizing legacy applications and moving them off expensive mainframe environments to more cost effective standards-based servers enables greater infrastructure flexibility to rapidly respond to dynamic business changes. Reduce support and infrastructure costs by as much as 70% Using much more cost effective Intelbased server platform with industry standard applications not only reduces hardware costs, but also dramatically reduces software licensing and support costs. Accelerate delivery of new application features Flexible, open infrastructure with HP Virtual server Environment, workload management, and instant capacity allows for dynamic and rapid provisioning and business model. In today s economy, eliminating the fixed costs and inflexibility associated with older IBM Mainframe servers is an excellent way to make your business more competitive. Evaluation of different sizing methods Several mainframe sizing methods were examined. While this paper uses workload sensitive MIPS (Millions of Instructions Per Second) and MIPS ratios as a measure of sizing, it is important to acknowledge that we agree with IBM s comment Single-number processor capacity tables are 2
3 inherently prone to error because they are not sensitive to the type of work being processed. 1 IBM recommends the use of the relative sizing techniques found in the LSPR (Large System Performance Reference), which sizes mainframe systems using ITR (Internal Throughput Rating). This allows users to do comparative sizing between mainframe systems, but does not address the challenge of choosing standards-based systems for running workloads. IBM states that while MIPS tables are useful for rough processor positioning, this measure should not be used for capacity planning purposes. Their position is that single-number processor capacity numbers, such as MIPS, introduce error into sizing measures not sensitive to the type of workload being run. However, upon examination of the ITR values found in LSPR, and comparing those numbers with MIPS measures for the same systems, it was found that a very high correlation existed between LSPR and MIPS measures for systems. This correlation can be clearly seen in Figure 1. Figure 1: MIPS and ITR (Internal Throughput Rating) comparison for 1 to 64 processor z10 mainframe servers Figure 1 shows that MIPS and the LSPR-based measures track quite closely. The element introduced in the graphic is the comparison of MIPS with the three different workload mixes that IBM uses for general sizing; these workload types are explained in detail later in the paper. It is important to note that the workload mixes are an important part of mainframe to open systems sizing, and are a good introduction to a very important sizing factor the Workload Factor (WLF). WLF is explained in more detail later, but in short, it is the method used to account for sizing differences as a result of differences in workload type. For the work to be done here, one sizing methodology is recommended, based on the technique used by IBM. 1 Large System Performance Reference, pg 13; 3
4 Validating calculated results In an effort to develop relative sizing criteria for HP systems compared to mainframe systems, an HP mainframe migration partner, Micro Focus, tested HP Integrity and HP ProLiant servers with the objective of identifying a MIPS-per-system ratings for several system architectures. 2 The objective was to help with sizing efforts. The following are the results of the testing: 1.6 GHz Dual Core Intel Itanium = 295 MIPS per core (16 core system) 3.0 GHz Quad Core x86 = 271 MIPS per core (8 core system) These two measures can be very useful if used properly. Note that the Itanium core measure was performed on a 16-core server, and the x86 measure was performed on an 8-core server. Also note that scaling can play a big part in a MIPS per core measure, as noted in Table 1, excerpts from a mainframe MIPS-per-core table. For example, adding one core processor to go from 63 to 64 core processors is 49% less than a uni-processor mainframe (462 versus 890 MIPS). Z10 EC CPUs MIPS MIPS per CPU Table 1: Excerpts from a mainframe MIPS-per-core table 3 These measures are useful in several ways. These results can be used for validating results found with the method that will be discussed. It should be noted that for systems much different in size, SMP effects will impact the MIPS per core comparison, and should be applied with caution. Finding the Workload Factor IBM has provided a set of thumb rules 4 for sizing workloads from mainframes to standards-based based systems. The basic conversion factor is a transactions per minute (tpm) per MIPS factor, which IBM identifies as being in a range from 30tpm per MIPS (CPU intensive) to 200tpm per MIPS (I/O intensive), with a median value of 120tpm per MIPS for commercial workloads. They call this the Workload Factor (WLF), which is defined by the workload to be sized. Using the Workload Factor with engineering estimates There is a technique recommended by IBM to find the WLF, which will be discussed here. Using the WLF allows you to convert MIPS into tpm, then to apply HP engineering estimates for tpm per server. The advantage of finding an accurate WLF is that it enables you to account for differences in workload type. The lack of consideration for workload type has historically promoted a one-size-fitsall approach to sizing. This is a key criticism of comparisons that only used transactions per minute to establish sizing requirements. The revised approach highlighted in this paper will rely more heavily on 2 Micro Focus study part of HP engineering analysis (HP Performance Study) 3 IBM z10 EC 2097 Mainframe Reference; 4 Putting Linux on IBM System z, 13 November 2008; 4
5 workload profiles to deliver more accurate estimations of the number of servers needed to meet current MIPS processing requirements. Example 1 In this scenario, the new business requirements will mean the purchase of 2000 MIPS of commercial workload capacity on its mainframe. They would like to decide whether to add to their existing mainframe system, or purchase an HP Integrity server. Workload factor (commercial application) = 120tpm per MIPS (this example assumes 100% of workload is converted using 120tpm/MIPS) 2000 MIPS capacity needed 120tpm per MIPS (Commercial workload) Total tpm required = 120 x 2000 = 240,000tpm Recommendation: The IBM mainframe choices are either a z10 EC (3 CPU) model or z10 BC 2098-W05 (5 CPU). The equivalent HP system is a HP Integrity rx8640 6p/12c systems (see Appendix A for comparison methodology and tables) Mainframe to open systems sizing Possibly one of the most challenging areas to work with is sizing a mainframe workload for open systems in our case either HP Integrity or ProLiant servers. With some investigation, one can find that there are rules of thumb and tools available from IBM that can be interpreted to help size HP systems. There are three key steps to a sizing exercise: 1. Identification of the workload type, as defined by IBM s Workload Factor 2. Identification of target workload size/volume in MIPS or tpm 3. Identification of type of standards-based target server and processor type the target workload would run on With the above information, it is possible to properly size the platform to which a mainframe user would need to move to as part of a mainframe migration opportunity. Capacity sizing and identifying the Workload Factor When mainframes were first introduced, processor designs were simpler. Capacity could be expressed as instruction execution rates, and relative system performance would just be a comparison of that rate. MIPS continue to be used as a relatively simple, but easily identifiable method of measure. In the case of sizing the system being targeted for possible migration, MIPS continue to be used as a useful sizing methodology. The formula used by IBM s sizing expert s who analyze workloads and convert tpm measures to MIPS is as follows: MIPS (target system capacity) = %Utilization (source) x Current capacity (source)/wl Target system capacity is the amount of MIPS to be installed, converted from transactions per minute (tpm) using the Workload Factor. WLF depends heavily on the source/target workload and usually falls in the 30 to 200 tpm/mips range (as discussed earlier). It is a conversion factor from transactions per minute to MIPS. Current capacity is the amount of current capacity, measured in transactions per minute %Utilization = Workload utilization level on the source platform. This should not be estimated. 5
6 Example 2 Uses the same characteristics as Example 1, but now assumes a 50% utilization level. Current capacity = 100,000 tpm Workload factor = 120tpm/MIPS % Utilization = 50% MIPS needed = 50% x 100,000/120 = 417 MIPS With this calculation of desired MIPS, one can then estimate the size of target mainframe, as well as convert it number of target cores using a MIPS/target processor conversion factor as the divisor. Workload classification and using WLF As server and computer systems have become more specialized and workload performance has become a primary issue, hardware vendors have tended to divide commercial workloads into two large categories: batch-like and transaction-like. In actuality, every modern application has a mix of batch-like and transaction-like characteristics. In fact, any specific production workloads can be characterized as lying somewhere on the scale between fully batch and fully on-line oriented, as can be seen in Table 2. Batch Job) Metrics (Units of work) Large CPU time per event Small Lower I/O intensity Higher Infrequent Supervisor service requests Frequent Low Event rate High Efficient NWay exploitation Less efficient Not dominant Branching Dominant Predictable Storage reference patterns Random Very high High-speed buffer hit ratio Low Table 2: Characteristics of Batch versus Online workloads Online (Transaction) Identification of the workload type being run is extremely important, as it will have impact in the value of the WLF calculated for the capacity calculations. HP Integrity and ProLiant servers have design features that each accommodates some mix of batch and on-line workloads. For sizing MIPS workloads, the factor that has the greatest influence is the value of the WLF, which can vary from 30 to 200 MIPS per tpm. Table 3 shows a range of values that can be assigned to the WLF, based on IBM definitions. tpm/mips Workload type Typical application types being run on UNIX, Linux, Windows, etc. 30 SPECint Processor intensive workload 75 TPC-C SAP SD 120 Commercial workload SAP ERP; Oracle E-Business Suite; Oracle, DB2 in OLTP 160 Mixed workload SAP BW 200 Business intelligence Oracle, DB2 in Business Intelligence or Data Warehousing Table 3: TPM/MIPS Values assigned to Workload Type While the workload sizing factor can vary by a factor of approximately 6x (from 30 to 200tpm per MIPS) depending upon the nature of the workload, most applications to be moved will typically fall in 6
7 the 75 to 160tpm per MIPS range. Also one can tell by the WLF sizes listed above, mainframe systems tends to handle data processing better than CPU intensive workloads, and will tend to size better for those kinds of workloads. The values in Table 3 can be used for developing tpm per MIPS relationships for specific workloads. For example if workloads to be moved off of a mainframe are a 50% SPECint oriented and 50% commericial workload mix, then the tpm per MIS value could be calculated as 30 x (50%) x (50%) = 75 tpm per MIPS. Using testing results as proof points to validate Itanium and ProLiant server sizing A series of benchmark tests were performed by Micro Focus, a company with a strong mainframe modernization background. The testing of equivalent mainframe workloads was done in an effort to identify sizing factors that could be used for relative sizing comparisons between mainframe and standards-based systems. This effort was extremely helpful in validating HP ProLiant and Integrity servers as alternative target platforms to mainframe systems. The workloads tested were COBOL, CICS, and IMS in a number of different hardware and operating system configurations. HP Integrity tests: Conducted on an HP Integrity rx8640 attached to an HP EVA4000 storage area network with four 4Gb Fibre Channel connections shared between them. The system-under-test operating environment consisted of HP-UX and Oracle 10g. HP ProLiant tests: An HP ProLiant Blade server was tested attached to an EMC Symmetrix SAN storage device through a 4Gb Fibre Channel connection. It was running Microsoft Windows server 2008 with data storage handled by Microsoft SQL server (Note: Tested with existing site Storage equipment.) HP Integrity and ProLiant testing Performance tests on a 16- core HP rx8640 demonstrated a zos MIPS equivalent result of 4714 MIPS (Note: MIPS per Core measures will vary for a system, depending upon the workload type and the benchmark setup). Performance tests of an 8- core x86 has shown in excess of 2150 mainframe MIPS equivalent rating. Both can be seen in Table 4. System x86--based Blade server HP rx8640 CPU 3.0 GHz x86 Quad core processor 1.6 GHz Intel Itanium Dual-Core processor 9100 Series CPU sockets CPU cores OS/DBMS W2K8EE -x64 SQl2KEE-x64 HP-UX Oracle 10g zos MIPS zlinux MIPS Table 4: MIPS per Core: System Testing Results Using the results shown in Table 4 as proxies for x86 and Itanium performance relative to zos MIPS ratings, a rating can be assigned on a per processor basis, as shown in Table 5. 7
8 System CPU x86-based Blade server 3.0 GHz x86 Quad core processor HP rx GHz Intel Itanium Dual- Core Processor 9100 Series Table 5: MIPS per Core Results CPU cores zos MIPS zos MIPS/core CPU Sockets Table 6 shows the results for zlinux sizing. A zlinux environment shares the same System z machine architecture as traditional z/os workloads running on CICS. System CPU CPU cores zos MIPS X86-based Blade server 3.0 GHz Quad core x HP rx GHz Intel Itanium Dual-Core Processor 9100 Series Table 6: MIPS per Core Results, zlinux sizing zos MIPS/core CPU Sockets Sizing scenarios Why is sizing so important? In the mainframe world, support and monthly software licensing charges are driven by system capacity and even a small percentage change even 2% to 5% can have an impact on growth planning and licensing costs. Because of the high costs of the mainframe ecosystem, an error in mainframe sizing can be very costly. A key benefit of migrating to an HP open system ecosystem is that the significantly lower cost infrastructure allows for wider tolerances in sizing. MIPS tables have historically been useful for rough processor positioning, and still can be helpful when discussing approximate system utilization levels. However, Single Table MIPS values should not be used for capacity planning or growth purposes MIPS values are only for rough processor sizing. IBM discourages the use of MIPS tables to assess relative capacity. We agree with this view, which is why we ve chosen the Workload Factor (WLF) focused methodology. Sizing methodology The recommended sizing approach is to identify the Workload Factor, and then convert the workload MIPS to a tpm sizing. The tpm sizing is then converted to core count using a tpm per core factor that you have identified. The alternative method is to use lookup tables, which is done here (Appendix A). Both methods will be highlighted, but the lookup tables will be used here. Use of tables in Appendix A An explanation of how to use the tables can be found at the back of this paper, in the first section of the appendix. The Appendix has six sections, showing three different classes of workloads (processor intensive, commercial application, business intelligence) for two different mainframe system families (z10 EC and z10 BC). The lookup tables will be used for comparison in this paper. The following scenarios are to show how to perform a workload sizing, and how different workload types impact final system sizes. Mainframe capacity to be sized: 1500 zos MIPS. Workload characterization: 8
9 Scenario 1: 20% TPC-C oriented, 50% commercial workload, 30% mixed Scenario 2: 90% Business Intelligence, 10% mixed Target platform (all scenarios): HP Integrity server (Itanium, 1.6GHz Dual core) Scenario 1 20% TPC-C oriented, 50% commercial workload, 30% mixed WLF = (20% x 75) + (50% x 120) + (30% * 160) = 123tpm/MIPS MIPS needed = 1500 zos MIPS Custom workload conversion factor = 123 tpm/mips Total TPM = 1500 x 123 = 184,500 tpm Looking up the engineering analysis, the system requirement for this workload would be z10 EC (2 processors) , or HP rx8640 Itanium N-24M p 8c Scenario 2 90% Business Intelligence, 10% mixed WLF = 0.90*200tpm/MIPS *160tpm/MIPS = 197tpm/MIPS MIPS needed = 1500 zos MIPS Custom Workload Conversion Factor = 197tpm/MIPS Total TPM = 1500 x 197 = 295,500tpm Using engineering analysis, the system requirement for this workload would be z10 EC (2 processors) , or HP rx8640 Itanium N-24M p 12c Table 7 shows the scenario summary. TPC-C (75 tpm/mips) Commercial workload (120tpm/MIPS) Mixed (160 tpm/mips) BI (200tpm/MIPS) Custom Workload tpm Scenario 1 20% 50% 30% 184,500 8 Scenario 2 10% 90% 295, Table 7: Scenario summary Validation using MIPS per core measure MIPS needed = 1500 MIPS Itanium Core = 295 MIPS per core Number of Itanium Cores = 1500/295 = 5.1 cores = 6 Itanium cores (rounded) Itanium Cores Each of the above two scenarios had different answers as a result of the workload types, which was really the purpose of going through this exercise. The following should also be noted: 1. The estimated workload size and type is important factor to identify and should be as accurate as possible. 2. Workload Factor and the associated Workload identifier (commercial application, processor intensive, etc) can have a significant impact on sizing. It is useful to identify the workload type as carefully as possible when performing the sizing exercise. 3. For sizing purposes, it is be best to run multiple likely scenarios to evaluate and analyze the cost impact of any variances. 9
10 Standards-based and Mainframe system comparative sizing Similar to mainframe sizing via LSPR, the sizing exercises done in this paper, assumed that all external resources - storage, I/O, memory, etc. are adequately available to ensure that there are no bottlenecks. This is important to know and understand as some organizations may perform the sizing evaluation without considering any limiting factors. If there is a system that has external constraints, it is important for the evaluator to understand what those limitations or constraints are, as well as factor them into their calculations to assess the potential implications and impact on sizing. For the LSPR tables, IBM identifies workloads with the following classifications. It is important to keep these in mind as the Workload Factor can be impacted by how the workload is categorized, and these descriptions may be used for new workloads OLTP-T - Online Workload: The OLTP-T workload reflects traditional online transactions. These transactions include order entry, stock control, inventory tracking, production specification, hotel reservations, banking, and teller system activities. OLTP-W -Web-enabled Online Workload The OLTP-W workload reflects a production environment that has web-enabled access to a traditional data base. This involves a WebSphere front-end with a CICS/DB2 workload. WASDB - WebSphere Application server and Database This workload reflects an e-business production environment that uses WebSphere applications and a DB2 data base. This workload is designed to emulate an online brokerage firm. CB-L Commercial Batch Long Job The CB-L workload is a commercial batch job stream reflective of large batch jobs with fairly heavy CPU processing. All identified mainframe workload is made up of weighted average mixture of the elements discussed above. Historically, the workloads have been defined as a default mixed workload which is made up of the harmonic/weighted mean of the workload elements just discussed previously. Since mainframes rarely run just one type of workload, to model a more realistic environment, the following hybrid workloads are used. The Mixed workload. This LSPR workload is designed to reflect a majority of database/application workloads found on a mainframe, equally weighted OLTP-T, OLTP-W, WASDB, and CB-L elements (25% each) are combined in a weighted average composite workload. The LoIO workload. This workload mix is frequently used when more batch-like requirements exist. For this workload, the online component is represented by 28% WASDB and 28% OLTP-W, and 44% CB- L. The TI workload. This LSPR workload mix represents a heavy online workload. The weights of this workload are 40% OLTP-T, 40% OLTP-W and 20% CB-L. 10
11 Figure 2: Workload Element % amounts in the Tailored Workload Mix Sizing mainframe migrations This paper is targeted at organizations trying to choose between growing their mainframe environment and adding on an HP Integrity or ProLiant system to address capacity growth requirements. The primary target platforms identified in this paper are HP Integrity servers, but the same methodology can be used if HP ProLiant servers are the desired target platform result. For those who would like to migrate their existing mainframe workloads to standards-based servers, the sizing exercise is more complex. When considering the migration of a mainframe workload to standards-based servers, not only is sizing the server environment a requirement, but there are application modernization considerations as well. Tackling a mainframe application modernization effort requires that you intimately understand the applications currently running a mainframe. This includes having information about their origin and construction, their level of customization, linkages to other systems, the amount of duplicate code, whether they can be re-compiled to run on a standards-based application, whether or not they have an open systems equivalent that can be easily transitioned and much more. For companies interested in evaluating their options around reducing their current mainframe workload, software and other operating expenses, HP recommends doing the evaluation as part of an application modernization workshop as a necessary and appropriate first step. A mainframe application modernization assessment will help in the understanding what is possible, how long a partial or complete migration effort would take, the level of associated risk and the required investment, the associated savings, etc. As a leading IT Service provider, HP specializes in partnering with existing and new mainframe clients to facilitate and expedite this process, while enabling them to benefit from our proven methodologies, years of experience and lessons learned. This is an area where HP Application Modernization team and our Modernization partners can be relied upon to provide you with an objective analysis of your mainframe cost saving options. 11
12 Conclusion and next steps After investigation of several mainframe-to-open system sizing methodologies, it was decided that using a Workload Factor approach was more representative of an actual environment than a single MIPS table approach by considering multiple factors and allowing for flexibility in the modeling. Performing the infrastructure sizing between a mainframe and HP servers is an important step in determining a basis for TCO savings, along with associated software, staffing, power, cooling, and migration costs. For a more detailed assessment of your application portfolio and migration options, next steps may include: 1. Perform analysis based on identification of Workload Factors for well known commercially available applications. 2. Consider a modernization workshop or application assessment to determine roadmap forward. 3. Perform a Proof of Concept (POC) to validate sizing and application modernization. 12
13 Appendix A: z10 versus HP Integrity server sizing tables The following tables show mainframe systems sized against HP Integrity rack mount and blade servers. Each table represents sizing of a workload class with either z10 EC or z10 BC mainframe systems. Example of how to use a table: You need to place a processor-intensive workload, sized at 2500 MIPS, on a z10 EC E64 platform, but want to look at your options for putting the workload on a standards-based server. Going to Table A-1, you would choose a 4-processor z10 EC server, since it is the smallest system that could be used to run that size of workload. Alternatively, you would purchase a 1-processor HP Integrity rx6600 server to handle the same workload. Workload sizes, z10 EC E64 mainframe versus HP Integrity servers z-series CPUs Model # MIPS Processor intensive workload Equivalent standardsbased server rx6600 1p 2c (see Note) Business intelligence Commercial workload (BI) workload Equivalent standardsbased Equivalent standards- server based server rx8640 4p 8c rx8640 4p 8c rx6600 1p 2c rx8640 4p 8c rx8640 6p 12c rx6600 1p 2c rx8640 6p 12c rx8640 8p 16c rx6600 1p 2c rx8640 6p 12c rx p 24c rx6600 1p 2c rx8640 8p 16c rx p 32c rx6600 2p 4c rx8640 8p 16c rx p 32c rx6600 2p 4c rx p 24c rx p 32c rx6600 2p 4c rx p 24c rx p 32c rx6600 2p 4c rx p 24c Superdome 24p 48c rx6600 2p 4c rx p 32c Superdome 24p 48c rx6600 2p 4c rx p 32c Superdome 24p 48c rx6600 4p 8c rx p 32c Superdome 32p 64c rx6600 4p 8c rx p 32c Superdome 32p 64c rx6600 4p 8c rx p 32c Superdome 32p 64c rx6600 4p 8c Superdome 24p 48c Superdome 32p 64c rx6600 4p 8c Superdome 24p 48c Superdome 32p 64c rx6600 4p 8c Superdome 24p 48c Superdome 48p 96c rx6600 4p 8c Superdome 24p 48c Superdome 48p 96c rx6600 4p 8c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 48p 96c rx8640 6p 12c Superdome 24p 48c Superdome 64p 128c rx8640 8p 16c Superdome 24p 48c Superdome 64p 128c rx8640 8p 16c Superdome 24p 48c Superdome 64p 128c rx8640 8p 16c Superdome 24p 48c Superdome 64p 128c 13
14 rx8640 8p 16c Superdome 24p 48c Superdome 64p 128c rx8640 8p 16c Superdome 24p 48c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx8640 8p 16c Superdome 48p 96c Superdome 64p 128c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 48p 96c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 24c Superdome 64p 128c rx p 32c Superdome 64p 128c 14
15 rx p 32c Superdome 64p 128c rx p 32c Superdome 64p 128c Table A-1: Workload sizes, z10 EC E64 mainframe versus HP Integrity servers Notes rx6600= HP Integrity rx6600 with Dual core Intel Itanium processor 9150N-24M p 2c. A lower core count rx6600 server can be replaced by an rx3600 or rx2660 server. rx8640= HP Integrity rx8640 with Dual core Intel Itanium processor 9150N-24M p 8c Superdome = HP Integrity Superdome (sx2000) with Intel Itanium processor 9150N-24M p 48c Comparative workload sizes, z10 BC mainframe versus HP Integrity servers z-series CPUs Model # MIPS Processor intensive rack Processor intensive blade Commercial rack Commercial blade BI rack BE blade Z rx6600 1p 2c BL870c 1p 2c rx6600 1p 2c BL870c 1p 2c rx6600 2p 4c BL870c 1p 2c Z rx6600 1p 2c BL870c 1p 2c rx6600 2p 4c BL870c 2p 4c rx6600 4p 8c BL870c 2p 4c Z rx6600 1p 2c BL870c 1p 2c rx6600 4p 8c BL870c 4p 8c rx8640 6p 12c BL870c 4p 8c Z rx6600 1p 2c BL870c 1p 2c rx6600 4p 8c BL870c 4p 8c rx8640 8p 16c BL870c 4p 8c Z rx6600 4p 8c Multi-Blade rx6600 4p 8c Multi-Blade rx8640 8p 16c Multi- Blade Table A-2: Comparative workload sizes, z10 BC mainframe versus HP Integrity servers 15
16 For more information HP hardware HP servers: servers Migrate from IBM Mainframes to HP: Linux and HP servers: Why Migrate to HP: Oracle Reference Architectures: HP software HP-UX 11i v3: HP VSE: HP Serviceguard: HP Systems Insight Manager: Intel processors Intel Xeon and Intel Itanium Processors: Services Application Modernization Services: Data center virtualization Application Transition Data and database migration: Porting guidance Selecting The Best Compiler Options: Technology for better business outcomes 2009 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein. 16 4AA2-7670ENW August 2009
HP ProLiant BL460c takes #1 performance on Siebel CRM Release 8.0 Benchmark Industry Applications running Linux, Oracle
HP ProLiant BL460c takes #1 performance on Siebel CRM Release 8.0 Benchmark Industry Applications running Linux, Oracle HP first to run benchmark with Oracle Enterprise Linux HP Leadership» The HP ProLiant
Sizing guide for SAP and VMware ESX Server running on HP ProLiant x86-64 platforms
Sizing guide for SAP and VMware ESX Server running on HP ProLiant x86-64 platforms Executive summary... 2 Server virtualization overview... 2 Solution definition...2 SAP architecture... 2 VMware... 3 Virtual
HP ProLiant BL685c takes #1 Windows performance on Siebel CRM Release 8.0 Benchmark Industry Applications
HP takes #1 Windows performance on Siebel CRM Release 8.0 Benchmark Industry Applications Defeats IBM System x3850 in performance The HP Difference The test system demonstrated that Oracle s Siebel CRM
HP ProLiant BL460c achieves #1 performance spot on Siebel CRM Release 8.0 Benchmark Industry Applications running Microsoft, Oracle
HP ProLiant BL460c achieves #1 performance spot on Siebel CRM Release 8.0 Benchmark Industry Applications running Microsoft, Oracle HP ProLiant BL685c takes #2 spot HP Leadership» The HP ProLiant BL460c
Legal Notices... 2. Introduction... 3
HP Asset Manager Asset Manager 5.10 Sizing Guide Using the Oracle Database Server, or IBM DB2 Database Server, or Microsoft SQL Server Legal Notices... 2 Introduction... 3 Asset Manager Architecture...
HP ProLiant BL660c Gen9 and Microsoft SQL Server 2014 technical brief
Technical white paper HP ProLiant BL660c Gen9 and Microsoft SQL Server 2014 technical brief Scale-up your Microsoft SQL Server environment to new heights Table of contents Executive summary... 2 Introduction...
HP reference configuration for entry-level SAS Grid Manager solutions
HP reference configuration for entry-level SAS Grid Manager solutions Up to 864 simultaneous SAS jobs and more than 3 GB/s I/O throughput Technical white paper Table of contents Executive summary... 2
HP ProLiant DL380 G5 takes #1 2P performance spot on Siebel CRM Release 8.0 Benchmark Industry Applications running Windows
HP ProLiant DL380 G5 takes #1 2P performance spot on Siebel CRM Release 8.0 Benchmark Industry Applications running Windows HP first rack server benchmark on Siebel HP Leadership The HP ProLiant DL380
Performance brief for IBM WebSphere Application Server 7.0 with VMware ESX 4.0 on HP ProLiant DL380 G6 server
Performance brief for IBM WebSphere Application Server.0 with VMware ESX.0 on HP ProLiant DL0 G server Table of contents Executive summary... WebSphere test configuration... Server information... WebSphere
The Advantages of Multi-Port Network Adapters in an SWsoft Virtual Environment
The Advantages of Multi-Port Network Adapters in an SWsoft Virtual Environment Introduction... 2 Virtualization addresses key challenges facing IT today... 2 Introducing Virtuozzo... 2 A virtualized environment
Performance characterization report for Microsoft Hyper-V R2 on HP StorageWorks P4500 SAN storage
Performance characterization report for Microsoft Hyper-V R2 on HP StorageWorks P4500 SAN storage Technical white paper Table of contents Executive summary... 2 Introduction... 2 Test methodology... 3
Identify and control performance and capacity risks. Introduction... 2
Application performance testing in VMware environments Identify and control performance and capacity risks Table of contents Introduction... 2 Performance and capacity planning techniques... 2 Rough sizing
Save up to 85% on Your Oracle Costs
Save up to 85% on Your Oracle Costs With: www.myra.com 1 At MYRA systems, it is about better IT service delivery. Are you finding you are paying increasing costs for your UNIX environments? Advances in
Server Migration from UNIX/RISC to Red Hat Enterprise Linux on Intel Xeon Processors:
Server Migration from UNIX/RISC to Red Hat Enterprise Linux on Intel Xeon Processors: Lowering Total Cost of Ownership A Case Study Published by: Alinean, Inc. 201 S. Orange Ave Suite 1210 Orlando, FL
SAP database backup and restore solutions for HP StorageWorks Enterprise Virtual Array using HP Data Protector 6.1 software
SAP database backup and restore solutions for HP StorageWorks Enterprise Virtual Array using HP Data Protector 6.1 software Table of contents Executive summary... 2 Solution overview... 2 Objectives...
Removing Performance Bottlenecks in Databases with Red Hat Enterprise Linux and Violin Memory Flash Storage Arrays. Red Hat Performance Engineering
Removing Performance Bottlenecks in Databases with Red Hat Enterprise Linux and Violin Memory Flash Storage Arrays Red Hat Performance Engineering Version 1.0 August 2013 1801 Varsity Drive Raleigh NC
Analyzing the Virtualization Deployment Advantages of Two- and Four-Socket Server Platforms
IT@Intel White Paper Intel IT IT Best Practices: Data Center Solutions Server Virtualization August 2010 Analyzing the Virtualization Deployment Advantages of Two- and Four-Socket Server Platforms Executive
Summary. Key results at a glance:
An evaluation of blade server power efficiency for the, Dell PowerEdge M600, and IBM BladeCenter HS21 using the SPECjbb2005 Benchmark The HP Difference The ProLiant BL260c G5 is a new class of server blade
Windows Server 2008 R2 for Itanium-Based Systems offers the following high-end features and capabilities:
Overview NOTE: HP no longer sells Microsoft Windows Server 2008/2008 R2 on Integrity servers. HP will continue to support Microsoft Windows Server 2008/2008 R2 until Microsoft's end of mainstream support
How To Write An Article On An Hp Appsystem For Spera Hana
Technical white paper HP AppSystem for SAP HANA Distributed architecture with 3PAR StoreServ 7400 storage Table of contents Executive summary... 2 Introduction... 2 Appliance components... 3 3PAR StoreServ
Mission-critical HP-UX 11i v2 WebSphere Reference Architecture White Paper
Mission-critical HP-UX 11i v2 WebSphere Reference Architecture White Paper Designed for WebSphere Application Server 5.1, Oracle 9i and 10g for HP 9000 Servers Table of Contents Executive Summary... 2
Performance Comparison of Fujitsu PRIMERGY and PRIMEPOWER Servers
WHITE PAPER FUJITSU PRIMERGY AND PRIMEPOWER SERVERS Performance Comparison of Fujitsu PRIMERGY and PRIMEPOWER Servers CHALLENGE Replace a Fujitsu PRIMEPOWER 2500 partition with a lower cost solution that
Red Hat Enterprise Linux solutions from HP and Oracle
Red Hat Enterprise Linux solutions from HP and Oracle Driven by innovation to improve interoperability and scalability, HP, Red Hat, and Oracle deliver a broad and deep range of Linux offerings to enhance
Maximum performance, minimal risk for data warehousing
SYSTEM X SERVERS SOLUTION BRIEF Maximum performance, minimal risk for data warehousing Microsoft Data Warehouse Fast Track for SQL Server 2014 on System x3850 X6 (95TB) The rapid growth of technology has
Introducing logical servers: Making data center infrastructures more adaptive
Introducing logical servers: Making data center infrastructures more adaptive technology brief, 2 nd edition Abstract... 2 Introduction... 2 Overview of logical servers... 3 Why use logical servers?...
HP Intelligent Management Center Standard Software Platform
Data sheet HP Intelligent Management Center Standard Software Platform Key features Highly flexible and scalable deployment Powerful administration control Rich resource management Detailed performance
Using HP StoreOnce Backup systems for Oracle database backups
Technical white paper Using HP StoreOnce Backup systems for Oracle database backups Table of contents Introduction 2 Technology overview 2 HP StoreOnce Backup systems key features and benefits 2 HP StoreOnce
HP ProLiant DL585 G5 earns #1 virtualization performance record on VMmark Benchmark
HP ProLiant DL585 G5 earns #1 virtualization performance record on VMmark Benchmark HP Leadership»The HP ProLiant DL585 G5 is a highly manageable, rack optimized, four-socket server designed for maximum
QuickSpecs. HP Integrity Virtual Machines (Integrity VM) Overview. Currently shipping versions:
Currently shipping versions: HP Integrity VM (HP-UX 11i v2 VM Host) v3.5 HP Integrity VM (HP-UX 11i v3 VM Host) v4.1 Integrity Virtual Machines (Integrity VM) is a soft partitioning and virtualization
Red Hat Enterprise Linux: The Clear Leader for Enterprise Web Applications
Red Hat Enterprise Linux: The Clear Leader for Enterprise Web Applications Industry standard benchmarks illustrate that when you need performance, scalability, and reliability for your web applications,
Implementing the HP Cloud Map for SAS Enterprise BI on Linux
Technical white paper Implementing the HP Cloud Map for SAS Enterprise BI on Linux Table of contents Executive summary... 2 How to utilize this HP CloudSystem Matrix template... 2 Download the template...
Vertical Scaling of Oracle 10g Performance on Red Hat Enterprise Linux 5 on Intel Xeon Based Servers. Version 1.0
Vertical Scaling of Oracle 10g Performance on Red Hat Enterprise Linux 5 on Intel Xeon Based Servers Version 1.0 March 2009 Vertical Scaling of Oracle 10g Performance on Red Hat Enterprise Linux 5 on Inel
Enabling VMware Enhanced VMotion Compatibility on HP ProLiant servers
Enabling VMware Enhanced VMotion Compatibility on HP ProLiant servers Technical white paper Table of contents Executive summary... 2 VMware VMotion overview... 2 VMotion CPU compatibility... 2 Enhanced
Mainframe alternative Solution Brief. MFA Sizing Study for a z/os mainframe workload running on a Microsoft and HP Mainframe Alternative (MFA)
Mainframe alternative Solution Brief MFA Sizing Study for a z/os mainframe workload running on a Microsoft and HP Mainframe Alternative (MFA) Mainframe alternative Solution Brief MFA Sizing Study for a
SRNWP Workshop. HP Solutions and Activities in Climate & Weather Research. Michael Riedmann European Performance Center
SRNWP Workshop HP Solutions and Activities in Climate & Weather Research Michael Riedmann European Performance Center Agenda A bit of marketing: HP Solutions for HPC A few words about recent Met deals
HP ProLiant Gen8 vs Gen9 Server Blades on Data Warehouse Workloads
HP ProLiant Gen8 vs Gen9 Server Blades on Data Warehouse Workloads Gen9 Servers give more performance per dollar for your investment. Executive Summary Information Technology (IT) organizations face increasing
HP Intelligent Management Center Standard Software Platform
Data sheet HP Intelligent Management Center Standard Software Platform Key features Highly flexible and scalable deployment Powerful administration control Rich resource management Detailed performance
Performance and Recommended Use of AB545A 4-Port Gigabit Ethernet Cards
Performance and Recommended Use of AB545A 4-Port Gigabit Ethernet Cards From Results on an HP rx4640 Server Table of Contents June 2005 Introduction... 3 Recommended Use Based on Performance and Design...
How To Test For Performance And Scalability On A Server With A Multi-Core Computer (For A Large Server)
Scalability Results Select the right hardware configuration for your organization to optimize performance Table of Contents Introduction... 1 Scalability... 2 Definition... 2 CPU and Memory Usage... 2
EMC Unified Storage for Microsoft SQL Server 2008
EMC Unified Storage for Microsoft SQL Server 2008 Enabled by EMC CLARiiON and EMC FAST Cache Reference Copyright 2010 EMC Corporation. All rights reserved. Published October, 2010 EMC believes the information
HP Insight Capacity Advisor Virtualization Services
HP Insight Capacity Advisor Virtualization Services HP Services Service overview HP Insight Capacity Advisor Virtualization Services (icavs) can assist you in understanding and developing a consolidated
White Paper. SAP NetWeaver Landscape Virtualization Management on VCE Vblock System 300 Family
White Paper SAP NetWeaver Landscape Virtualization Management on VCE Vblock System 300 Family Table of Contents 2 Introduction 3 A Best-of-Breed Integrated Operations Architecture 3 SAP NetWeaver Landscape
Desktop virtualization: Implementing Virtual Desktop Infrastructure (VDI) with HP. What is HP Virtual Desktop Infrastructure?
Desktop virtualization: Implementing Virtual Desktop Infrastructure (VDI) with HP What is HP Virtual Desktop Infrastructure? Virtual Desktop Infrastructure from HP is a desktop replacement solution designed
HP Serviceguard Cluster Configuration for Partitioned Systems
HP Serviceguard Cluster Configuration for Partitioned Systems July 2005 Abstract...2 Partition configurations...3 Serviceguard design assumptions...4 Hardware redundancy...4 Cluster membership protocol...4
International Journal of Advancements in Research & Technology, Volume 1, Issue6, November-2012 1 ISSN 2278-7763
International Journal of Advancements in Research & Technology, Volume 1, Issue6, November-2012 1 VIRTUALIZATION Vikas Garg Abstract: The main aim of the research was to get the knowledge of present trends
HP Intelligent Management Center Enterprise Software Platform
Data sheet HP Intelligent Management Center Enterprise Software Platform Key features Highly flexible, scalable deployment models Powerful administration control Rich resource management Detailed performance
System Requirements Table of contents
Table of contents 1 Introduction... 2 2 Knoa Agent... 2 2.1 System Requirements...2 2.2 Environment Requirements...4 3 Knoa Server Architecture...4 3.1 Knoa Server Components... 4 3.2 Server Hardware Setup...5
HP VMware ESXi 5.0 and Updates Getting Started Guide
HP VMware ESXi 5.0 and Updates Getting Started Guide Abstract This guide is intended to provide setup information for HP VMware ESXi. HP Part Number: 616896-002 Published: August 2011 Edition: 1 Copyright
HP StorageWorks Data Protection Strategy brief
HP StorageWorks Data Protection Strategy brief Your business depends on IT more than ever before. The availability of key application services and information is critical to maintain business processes,
Performance Characteristics of VMFS and RDM VMware ESX Server 3.0.1
Performance Study Performance Characteristics of and RDM VMware ESX Server 3.0.1 VMware ESX Server offers three choices for managing disk access in a virtual machine VMware Virtual Machine File System
Colgate-Palmolive selects SAP HANA to improve the speed of business analytics with IBM and SAP
selects SAP HANA to improve the speed of business analytics with IBM and SAP Founded in 1806, is a global consumer products company which sells nearly $17 billion annually in personal care, home care,
HP CLOUDSYSTEM. A single platform for private, public, and hybrid clouds. Simply the most complete cloud system for enterprises and service providers
HP CLOUDSYSTEM A single platform for private, public, and hybrid clouds Simply the most complete cloud system for enterprises and service providers Solution brief It s a fact of life: cloud computing is
HP StorageWorks MPX200 Simplified Cost-Effective Virtualization Deployment
HP StorageWorks MPX200 Simplified Cost-Effective Virtualization Deployment Executive Summary... 2 HP StorageWorks MPX200 Architecture... 2 Server Virtualization and SAN based Storage... 3 VMware Architecture...
Managing HP Integrity Servers with HP Server Automation and HP Virtual Server Environment
Managing HP Integrity Servers with HP Server Automation and HP Virtual Server Environment Managing HP Integrity Servers with HP Server Automation and HP Virtual Server Environment... 1 Introduction...
Best practices for fully automated disaster recovery of Microsoft SQL Server 2008 using HP Continuous Access EVA with Cluster Extension EVA
Best practices for fully automated disaster recovery of Microsoft SQL Server 2008 using HP Continuous Access EVA with Cluster Extension EVA Subtitle Table of contents Overview... 2 Key findings... 3 Solution
HP SiteScope. HP Vertica Solution Template Best Practices. For the Windows, Solaris, and Linux operating systems. Software Version: 11.
HP SiteScope For the Windows, Solaris, and Linux operating systems Software Version: 11.23 HP Vertica Solution Template Best Practices Document Release Date: December 2013 Software Release Date: December
Server Consolidation for SAP Business Solutions on Lenovo X6 Systems with X ARCHITECTURE technology and Intel Xeon E7 v2 Processors
Server Consolidation for SAP Business Solutions on Lenovo X6 Systems with X ARCHITECTURE technology and Intel Xeon E7 v2 Processors Lowering Total Cost of Ownership An Alinean White Paper Lenovo Document
Performance and scalability of a large OLTP workload
Performance and scalability of a large OLTP workload ii Performance and scalability of a large OLTP workload Contents Performance and scalability of a large OLTP workload with DB2 9 for System z on Linux..............
High Performance SQL Server with Storage Center 6.4 All Flash Array
High Performance SQL Server with Storage Center 6.4 All Flash Array Dell Storage November 2013 A Dell Compellent Technical White Paper Revisions Date November 2013 Description Initial release THIS WHITE
Protect Microsoft Exchange databases, achieve long-term data retention
Technical white paper Protect Microsoft Exchange databases, achieve long-term data retention HP StoreOnce Backup systems, HP StoreOnce Catalyst, and Symantec NetBackup OpenStorage Table of contents Introduction...
HP Cloud Map for TIBCO ActiveMatrix BusinessWorks: Importing the template
HP Cloud Map for TIBCO ActiveMatrix BusinessWorks: Importing the template An HP Reference Architecture for TIBCO Technical white paper Table of contents Executive summary... 2 Solution environment... 2
HP ConvergedSystem 900 for SAP HANA Scale-up solution architecture
Technical white paper HP ConvergedSystem 900 for SAP HANA Scale-up solution architecture Table of contents Executive summary... 2 Solution overview... 3 Solution components... 4 Storage... 5 Compute...
VBLOCK SOLUTION FOR SAP: SAP APPLICATION AND DATABASE PERFORMANCE IN PHYSICAL AND VIRTUAL ENVIRONMENTS
Vblock Solution for SAP: SAP Application and Database Performance in Physical and Virtual Environments Table of Contents www.vce.com V VBLOCK SOLUTION FOR SAP: SAP APPLICATION AND DATABASE PERFORMANCE
RAID 5 rebuild performance in ProLiant
RAID 5 rebuild performance in ProLiant technology brief Abstract... 2 Overview of the RAID 5 rebuild process... 2 Estimating the mean-time-to-failure (MTTF)... 3 Factors affecting RAID 5 array rebuild
Near-line Storage with CBW NLS
Near-line Storage with CBW NLS High Speed Query Access for Nearline Data Ideal Enhancement Supporting SAP BW on HANA Dr. Klaus Zimmer, PBS Software GmbH Agenda Motivation Why would you need Nearline Storage
Express5800 Scalable Enterprise Server Reference Architecture. For NEC PCIe SSD Appliance for Microsoft SQL Server
Express5800 Scalable Enterprise Server Reference Architecture For NEC PCIe SSD Appliance for Microsoft SQL Server An appliance that significantly improves performance of enterprise systems and large-scale
HP recommended configuration for Microsoft Exchange Server 2010: HP LeftHand P4000 SAN
HP recommended configuration for Microsoft Exchange Server 2010: HP LeftHand P4000 SAN Table of contents Executive summary... 2 Introduction... 2 Solution criteria... 3 Hyper-V guest machine configurations...
Case Studies Using EMC Legato NetWorker for OpenVMS Backups
OpenVMS Technical Journal V6 Case Studies Using EMC Legato NetWorker for OpenVMS Backups Case Studies Using EMC Legato NetWorker for OpenVMS Backups... 2 Overview... 2 Introduction... 2 Case Study 1: Backup
HP and Business Objects Transforming information into intelligence
HP and Business Objects Transforming information into intelligence 1 Empowering your organization Intelligence: the ability to acquire and apply knowledge. For businesses today, gaining intelligence means
How to register. Who should attend Services, both internal HP and external
mm Servicing HP Rack and Tower Server Solutions - Rev 12.31 Course data sheet Certification: Exam(s): The Learning Center: Format: Recommended Duration: How to register HP ATP - Rack and Tower Server Solutions
IT@Intel. Comparing Multi-Core Processors for Server Virtualization
White Paper Intel Information Technology Computer Manufacturing Server Virtualization Comparing Multi-Core Processors for Server Virtualization Intel IT tested servers based on select Intel multi-core
Virtuoso and Database Scalability
Virtuoso and Database Scalability By Orri Erling Table of Contents Abstract Metrics Results Transaction Throughput Initializing 40 warehouses Serial Read Test Conditions Analysis Working Set Effect of
7 Real Benefits of a Virtual Infrastructure
7 Real Benefits of a Virtual Infrastructure Dell September 2007 Even the best run IT shops face challenges. Many IT organizations find themselves with under-utilized servers and storage, yet they need
Re-Hosting Mainframe Applications on Intel Xeon Processor-Based Servers
WHITE PAPER Intel Xeon Processor-based Servers Data Center Modernization Re-Hosting Mainframe Applications on Intel Xeon Processor-Based Servers A technical discussion of methodology, design, and benefits
Infrastructure Matters: POWER8 vs. Xeon x86
Advisory Infrastructure Matters: POWER8 vs. Xeon x86 Executive Summary This report compares IBM s new POWER8-based scale-out Power System to Intel E5 v2 x86- based scale-out systems. A follow-on report
Performance brief for Oracle Enterprise Financial Management 8.9 (Order-to-Cash Counter Sales) on HP Integrity BL870c server blades
Performance brief for Oracle Enterprise Financial Management 8.9 (Order-to-Cash Counter Sales) on HP Integrity BL870c server blades Executive summary... 2 Test methodology... 3 Inventory... 4 Billing...
Brochure. Update your Windows. HP Technology Services for Microsoft Windows 2003 End of Support (EOS) and Microsoft Migrations
Brochure Update your Windows HP Technology Services for Microsoft End of Support (EOS) and Microsoft Migrations Stabilize and secure your infrastructure Microsoft will end support for Windows Server 2003/R2
Re-Hosting Mainframe Applications on Intel Xeon Processor-based Servers
SOLUTION BRIEF Intel Xeon Processor-based Servers Mainframe Migration Re-Hosting Mainframe Applications on Intel Xeon Processor-based Servers A Proven Methodology for Mainframe Migration The mainframe
Leveraging EMC Fully Automated Storage Tiering (FAST) and FAST Cache for SQL Server Enterprise Deployments
Leveraging EMC Fully Automated Storage Tiering (FAST) and FAST Cache for SQL Server Enterprise Deployments Applied Technology Abstract This white paper introduces EMC s latest groundbreaking technologies,
Microsoft SQL Server 2014 Fast Track
Microsoft SQL Server 2014 Fast Track 34-TB Certified Data Warehouse 103-TB Maximum User Data Tegile Systems Solution Review 2U Design: Featuring Tegile T3800 All-Flash Storage Array http:// www.tegile.com/solutiuons/sql
HP Storage Essentials Storage Resource Management Software end-to-end SAN Performance monitoring and analysis
HP Storage Essentials Storage Resource Management Software end-to-end SAN Performance monitoring and analysis Table of contents HP Storage Essentials SRM software SAN performance monitoring and analysis...
EMC Backup and Recovery for Microsoft SQL Server
EMC Backup and Recovery for Microsoft SQL Server Enabled by EMC NetWorker Module for Microsoft SQL Server Copyright 2010 EMC Corporation. All rights reserved. Published February, 2010 EMC believes the
CA Workload Automation Agents for Mainframe-Hosted Implementations
PRODUCT SHEET CA Workload Automation Agents CA Workload Automation Agents for Mainframe-Hosted Operating Systems, ERP, Database, Application Services and Web Services CA Workload Automation Agents are
Solution guide. HP Just Right IT. Technology made easy for your growing business
Solution guide HP Just Right IT Technology made easy for your growing business Build your business with Just Right IT Small businesses like yours are driving economic growth. You create the jobs. You create
The Consolidation Process
The Consolidation Process an overview Washington System Center IBM US Gaithersburg SIG User Group April 2009 Trademarks The following are trademarks of the International Business Machines Corporation in
QuickSpecs. What's New. Models. HP ProLiant Essentials Performance Management Pack version 4.4. Overview
Overview ProLiant Essentials Performance Management Pack (PMP) is a software solution that detects, analyzes, and explains hardware bottlenecks on HP ProLiant servers. HP Integrity servers and HP Storage
HP OpenView Service Desk Process Insight 2.10 software
HP OpenView Service Desk Process Insight 2.10 software Data sheet HP OpenView Service Desk Process Insight software provides real-time visibility into the ITIL processes managed by your HP OpenView Service
Boost Database Performance with the Cisco UCS Storage Accelerator
Boost Database Performance with the Cisco UCS Storage Accelerator Performance Brief February 213 Highlights Industry-leading Performance and Scalability Offloading full or partial database structures to
White Paper. Better Performance, Lower Costs. The Advantages of IBM PowerLinux 7R2 with PowerVM versus HP DL380p G8 with vsphere 5.
89 Fifth Avenue, 7th Floor New York, NY 10003 www.theedison.com 212.367.7400 White Paper Better Performance, Lower Costs The Advantages of IBM PowerLinux 7R2 with PowerVM versus HP DL380p G8 with vsphere
The Benefits of POWER7+ and PowerVM over Intel and an x86 Hypervisor
The Benefits of POWER7+ and PowerVM over Intel and an x86 Hypervisor Howard Anglin [email protected] IBM Competitive Project Office May 2013 Abstract...3 Virtualization and Why It Is Important...3 Resiliency
White Paper. Recording Server Virtualization
White Paper Recording Server Virtualization Prepared by: Mike Sherwood, Senior Solutions Engineer Milestone Systems 23 March 2011 Table of Contents Introduction... 3 Target audience and white paper purpose...
EMC VFCACHE ACCELERATES ORACLE
White Paper EMC VFCACHE ACCELERATES ORACLE VFCache extends Flash to the server FAST Suite automates storage placement in the array VNX protects data EMC Solutions Group Abstract This white paper describes