A PRODUCTION INVENTORY MODEL WITH SHORTAGES,FUZZY PREPARATION TIME AND VARIABLE PRODUCTION AND DEMAND. 1. Introduction
|
|
|
- Justina Willis
- 10 years ago
- Views:
Transcription
1 A PRODUCTION INVENTORY MODEL WITH SHORTAGES,FUZZY PREPARATION TIME AND VARIABLE PRODUCTION AND DEMAND U. K. BERA 1, N. K. MAHAPATRA 2 AND M. MAITI 3 1 Department of Mathematics, Bengal Institute of Technology & Management, Santiniketan, Birbhum, W.B , India, bera [email protected] 2 Department of Mathematics, Panskura Banamali College, Panskura RS , Purba-Medinipur, W.B., India, nirmal [email protected] 3 Department of Applied Mathematics, Vidyasagar University, Midnapore-72112, WB, India, [email protected] Abstract. A production inventory model is formulated for a single item. Here,demand varies with the on-hand inventory level and production price. Shortages are allowed and fully backlogged. The time gap between the decision and actual commencement of production is termed as preparation time and is assumed to be crisp/imprecise in nature. The set-up cost depends on preparation time. The fuzzy preparation time is reduced to a crisp interval preparation time using nearest interval approximation and following the interval arithmetic, the reduced problem is converted to a multi-objective optimization problem. Mathematical analysis has been made for single objective crisp model (Model-I). Numerical illustration have been made for both crisp (Model-I) and fuzzy (Model-II) models. Model-I is solved by generalized reduced gradient technique and multi-objective model (Model-II) by Global Criteria Method. Sensitivity analyses have been made for some parameters of Model-I. Key words : Fuzzy preparation time, Interval number, Multi-objective, Global criteria method. 1. Introduction After the development of EOQ model by Harris[3] in 1915, a lot of researchers have extended the above model with different types of demands and replenishments. A detailed literature is available in the text book such as Hadley and Whitin[4], Tersine [5], Silver and Peterson [6], etc. In classical inventory models, demand is normally assumed to be constant. But, now-a-days, with the invasion of the multi-nationals under the WTO agreement in the developing countries like India, Bangladesh, etc., there is a strong competition amongst the sellers to capture the market i.e. to allure the customers through different tactics. Common practices in this regard is to have attractive decorative gorgeous display of the items in the show room to create psychological pressure or to motivate the customers to buy more. Furthermore, demand of an item depends on unit production cost, i.e. it varies inversely with the unit production cost. This marketing policy is very useful for fashionable goods / fruits etc. There is some literature on the inventory models with stock-dependent demand. Several authors like Mandal and Phaujdar [7], Urban [8], Bhunia and Maiti [9], and others studied the above-mentioned type of inventory models. Existence of Lead-time (the time gap between placement of order and the actual receipt of it) is a natural phenomenon in the field of business. So far, most of the researchers have dealt with Corresponding Author. 1
2 2 U.K.Bera, N.K.Mahapatra and M.Maiti either constant or stochastic lead-time. Elementary discussion on lead-time analysis are now-adays available in the textbooks like Naddor [1], Magson [11], Foote, Kebriaci and Kumin [12] and others. In practice, it is difficult to predict the lead-time definitely / pricelessly and sometimes, the past records are also not available to form a probability distribution for the lead-time. Hence, the only alternative available to DM is to define the lead-time parameter imprecisely by a fuzzy number. Generally, lead time is associated with EOQ model i.e. instantaneous procurement or purchase of the lot. But, in a production system,the scenario is different. Here the time gap between the decision production and the actual commencement of production matters known as preparation time for the analysis of inventory control models. This preparation time means the time to collect the raw-materials, to arrange skilled/ unskilled labors, to get machine ready for production, etc., and hence influences the set-up cost of the system. For the first time, Mahapatra and Maiti [1][2] formulated and solved production inventory models for a deteriorating/breakable item with imprecise preparation time. Though multiobjective decision making (MODM) problems have been formulated and solved in many other areas like air pollution, structural analysis ( cf. Rao[22]), transportation ( cf. Li and Lai [17]), etc., till now few papers on MODM have been published in the field of inventory control. Padmanabhan and Vrat[21] formulated an inventory problem of deteriorating items with two objectives minimization of total average cost and wastage cost in crisp environment (It is an environment where all input data are assumed to be deterministic, precisely defined and given.) and solved by non-linear goal programming method. Roy and Maiti[23] formulated an inventory problem of deteriorating items with two objectives, namely, maximizing total average profit and minimizing total waste cost in fuzzy environment. Mahapatra et. al. [18][19] formulated multi-objective multi-item inventory problems under some constraints. In this paper, a production inventory control system for a single item is considered. Here demand is dependent on unit production cost and current stock level. Shortages are allowed and backlogged fully. Preparation time in production of the new consignment is allowed and crisp/fuzzy in nature. The setup cost is dependent on preparation time. The crisp problem for minimizing average cost is solved by generalized reduced gradient method. The problem minimizing average total cost with fuzzy preparation time is converted to a multi-objective minimization problem with the help of interval arithmetic and then it is solved by global criteria method to get pareto-optimal solution. Mathematical derivation and analysis also have been made for both single and multi-objective models. Further, the sensitivity analysis is included and two numerical illustration are provided. 2. Interval arithmetic Throughout this section lower and upper case letters denote real numbers and closed intervals respectively. The set of all positive real numbers is denoted by R +. An order pair of brackets defines an interval A = [a L, a R ] = {a : a L a a R, a R + } where a L and a R are respectively left and right limits of A. Definition 1: Let {+,,., /} be a binary operation on the set of positive real numbers. If A and B are closed intervals then A B = {a b : a A, b B} defines a binary operation on the set of closed intervals. In the case of division, it is assumed that / B. The operations on intervals used in this paper may be explicitly calculated from the above definition as A = [a L, a R ] B [b L, b R ] = [a L, a R ] where / B, a L a R and < b L b R b R b L A + B = [a L, a R ] + [b L, b R ] = [a L + b L, a R + b R ] { [kal, ka ka = R ], for k (ka R, ka L ), for k <, where k is a real number.
3 A production inventory model with shortages and fuzzy preparation time 3 Order relations between intervals Here, the order relations which represent the decision-maker s preference between interval costs are defined for minimization problems. Let the uncertain costs for two alternatives be represented by intervals A and B respectively. It is assumed that the cost of each alternative is known only to lie to the corresponding interval. The order relation by the left and right limits of interval is defined in Definition-2. Definition-2 : The order relation LR between A = [a L, a R ] and B = [b L, b R ] is defined as A LR B iff a L b L and a R b R A < LR B iff A LR B and a R b R The order relation LR represents the DM s performance for the alternative with the lower minimum cost, that is, if A LR B, then A is preferred to B. Formulation of the multi-objective problem A general non-linear objective function with some interval valued parameters is as follows: Minimize Z(x) = subject to k i=1 C i k A i x j B j i=1 n j=1 x a ij j (1) x j >, (j = 1, 2,, n.), x = (x 1, x 2,, x n ) where C i = [c Li, c Ri ], A i = [a Li, a Ri ] and B j = [b Lj, b Rj ]. Now, we exhibit the formulation of the original problem (1) as a multi-objective non-linear problem. Since the objective function Z(x) and the constraints contain some parameters represented by intervals, it is natural that the solution set of (1) should be defined by preference relations between intervals. Now from equation (1) the right and left limits z R (x), z L (x) and centre z C (x) of the interval objective function Z(x) respectively may be elicited as z R (x) = z L (x) = k i=1 k i=1 c Li c Li n j=1 n j=1 x a ij j (2) x a ij j (3) z C (x) = 1 2 [z R(x) + z L (x)] (4) Thus the problem (1) is transformed into minimize {z R, z C } (5) k subject to a Li x j b Rj i=1 k a Ri x j b Lj i=1 x j >, (j = 1, 2,., n), x = (x 1, x 2,, x n )
4 4 U.K.Bera, N.K.Mahapatra and M.Maiti Basic fuzzy sets and fuzzy numbers Fuzzy set: A Fuzzy set à in a universe of discourse X is defined as the following set of pairs à = {(x, µã(x)) : x X} Where µã : X [, 1] is a mapping called the membership function of the fuzzy set à and µ à (x) is called the membership value or degree of membership of x X in the fuzzy set Ã. The larger µã(x) is the stronger grade of membership form in Ã. Fuzzy number : A fuzzy number is a fuzzy set in the universe of discourse X that is both convex and normal. Fig.-1 shows a fuzzy number à of the universe of discourse X that is both convex and normal. α - Cut of a fuzzy number : The a α- cut of a fuzzy number à is defined as crisp set A α = {x : µã(x) α, x X} where α [, 1] A α is a non-empty bounded closed interval contained in X and it can be denoted by A α = [A L (α), A R (α)]. A L (α) and A R (α) are the lower and upper bounds of the closed interval respectively. Fig.-1 shows a fuzzy number à with α-cuts A α 1 = [A L (α 1 ), A R (α 1 )], A α2 = [A L (α 2 ), A R (α 2 )]. It is seen that if α 2 α 1 then A L (α 2 ) A L (α 1 ) and A R (α 1 ) A R (α 2 ). Fuzzy numbers are represented by two type of membership functions: (a) Linear membership functions e.g. Triangular fuzzy number (TFN), Trapezoidal fuzzy number, Piecewise Linear fuzzy number etc. (b) Non-linear membership functions e.g. Parabolic fuzzy number (PFN), Parabolic flat fuzzy number, Exponential fuzzy number and other non-linear fuzzy number. Triangular Fuzzy Number (TFN) : TFN is the fuzzy number with the membership function µã(x), a continuous mapping : µã(x) : R [, 1] for < x a 1 b x µã(x) = for a x b b a 1 x b for b x c c b for c x <
5 A production inventory model with shortages and fuzzy preparation time 5 The nearest interval approximation Here we want to approximate a fuzzy number by crisp one. Suppose à and B are two fuzzy numbers with α-cuts are [A L (α), A R (α)] and [B L (α), B R (α)] respectively. Then the distance between à and B is d(ã, B) = (A L (α) B L (α)) 2 dα + (A R (α) B R (α)) 2 dα Given à is a fuzzy number. We have to find a closed interval Cd(Ã) which is nearest to à with respect to metric d. We can do it since each interval is also a fuzzy number with constant α-cut for all α [, 1]. Hence (C d (Ã)) α = [C L, C R ]. Now we have to minimize d(ã, Cd(Ã)) = (A L (α) C L (α)) 2 dα + (A R (α) C R (α)) 2 dα with respect to C L and C R. In order to minimize d(ã, Cd(Ã)), it is sufficient to minimize the 2 function D(C L, C R )(= (d (Ã, Cd(Ã))). The first partial derivatives are and Solving, D(C L, C R ) C L D(C L, C R ) = 2 (A L (α)dα + 2C L = 2 (A R (α)dα + 2C R C R D(C L, C R ) = and D(C L, C R ) = C L C R we get C L = (A L(α)dα and C R = (A R(α)dα. Again since D 2 (C L, C R ) C 2 L = 2 >, D 2 (C L, C R ) C 2 R = 2 > and H(CL, CR) = D2 (CL, C R ). D2 (CL, C R ) CL 2 CR 2 ( D 2 (CL, C R ) ) 2 = 4 > C L. C R
6 6 U.K.Bera, N.K.Mahapatra and M.Maiti So D(C L, C R ) i.e. d(ã, Cd(Ã)) is global minimum. Therefore the interval [ ] C d (Ã) = A L (α)dα, A R (α)dα is nearest interval approximation of fuzzy number à with respect to metric d. Let à = (a 1, a 2, a 3 ) be a fuzzy number. The α-level interval of à is defined as (Ã) α = [A L (α), A R (α)]. When à is a TFN then A L (α) = a 1 + α(a 2 a 1 ) and A R (α) = a 3 + α(a 3 a 2 ). By nearest interval approximation method lower and upper limits of the interval are respectively C L = and C R = A L (α)dα = A R (α)dα = [a 1 + α(a 2 a 1 )](α)dα] = 1 2 (a 2 + a 1 ) [a 3 α(a 3 a 2 )](α)dα] = 1 2 (a 2 + a 3 ) Therefore, interval number considering à as a TFN is [(a 1 + a 2 )/2, (a 2 + a 3 )/2]. 3. Assumptions and notations for the proposed model The following notations and assumptions are used in developing the model. (i) Production system involves only one non-deteriorating item. (ii) Shortages are allowed and fully backlogged. (iii) Time horizon is infinite. (iv) q(t) = inventory level at any time t. (v) Q m (Q s )= the maximum inventory ( shortages) level in an cycle. (vi) L = preparation time for the next production,which is a fuzzy number. (vii) C 3 = Set-up cost which is of the form C 3 = C 3 C 31 Lγ where γ 1 and C 3 and C 31 are two constants so chosen to best fit the set-up cost. (viii) p = production cost per unit item. (ix) D= Rate of demand which depends on production price and stock i.e., D(p, q) = { p ε (a + bq 1 β ) if q > ap ε, if q (6) where a, b are positive real constants. (x) t = cycle length of a cycle. (xi) C 1 = holding cost per unit per unit time. (xii) C 2 = shortage cost per unit per unit time. (xii) t = re-production time, i.e., time when production for next cycle is decided. (xii) K = production rate which is of the form K = µd and µ Mathematical Formulation Production inventory system involves only one item. A cycle starts with shortages at time t = and at time t 1 maximum shortages level is Q s and at that time production process starts to backlog the shortage quantities fully and after time t 2 the shortages reache to zero, inventory accumulates up to time t 3 of amount Q m. At that time production process stopped, accumulated inventory declines due to demand and reaches to zero at time t.
7 A production inventory model with shortages and fuzzy preparation time 7 The differential equations governing the stock status for this model are given by dq dt = dq dt = D if t t 1 K D if t 1 t t 2 K D if t 2 t t 3 D if t 3 t t (7) with the boundary conditions q() = q(t 2 ) = q(t ) =. These equations can be rewritten in the following form. ap ε if t t 1 (µ 1)ap ε if t 1 t t 2 (µ 1)p ε (a + bq 1 β (8) ) if t 2 t t 3 p ε (a + bq 1 β ) if t 3 t t For simplicity we take β =. Solving first and second equations of differential equation (8) in the intervals t t 1 and t 1 t t 2 respectively with the help of boundary conditions q() = = q(t 2 ), we get { ap q(t) = t, from first equation of (8) (µ 1)ap ε (t 2 t), from second equation of (8) { ap with Q s = t 1, from first equation (µ 1)ap ε (t 2 t 1 ), from second equation So at time t = t 1, ap ε t 1 = (µ 1)ap ε (t 2 t 1 ) µt 1 = (µ 1)t 2 (9)
8 8 U.K.Bera, N.K.Mahapatra and M.Maiti Similarly, solving third and fourth differential equations of (8) in the interval t 2 t t 3 and t 3 t t respectively with the help of the boundary conditions q(t 2 ) = = q(t ), we get { a q(t) = b {ex{t t 2} 1} from third equation of (8) a (t t) b {ebp ε 1}, from fourth equation of (8) { a with Q m = b {ex(t 3 t 2 ) 1} a (t t 3 ) b {ebp ε 1} where x = (µ 1)bp ε (1) At time t = t 3, a b {ex(t 3 t 2 ) 1} = a b {ebp ε (t t 3 ) 1} t 3 = t µ + t 1, using the relation (9) (11) Total shortages cost (S C ) is given by S C = C 2 [ t 1 q(t)dt + t 2 t 1 q(t)dt ] (12) = 1 2 C 2ap ε t C 2(µ 1)ap ε (t 2 t 1 ) 2 where t 1 = L + t, t 2 = µ µ 1 t 1 t 3 = t µ + t 1 Now the total holding cost (H C ) during the interval [t 2, t 3 ] and [t 3, t ] is given by H C = C 1 [ t 3 t 2 q(t)dt + t t 3 q(t)dt ] = C 1a b [ 1 x {ex(t 3 t 2 ) 1} + t 2 ] C 1a b [ 1 bp ε {1 ebp ε (t t 3 ) } + t ] (13) Total Production cost (P C ) = p t 2 µap ε dt + p t 3 µp ε (a + bq)dt t 1 t 2 Now the average total cost (AT C) = p 1 ε µa(t 2 t 1 ) + 1 x p1 ε µa{e x(t 3 t 2 ) 1} = 1 t (Holding Cost+Set up Cost+Shortages Cost+Production Cost) = T C t where T C = [ C 1a bx {ex(t 3 t 2 ) 1} + C 1a b t 2 C 1a b 2 p {1 (t t 3 ) ε ebp ε } t C 1 a + C 3 C 31 L γ + 1 b 2 C 2ap ε t C 2(µ 1)ap ε (t 2 t 1 ) 2 + p 1 ε µa(t 2 t 1 ) + 1 x p1 ε µa{e x(t 3 t 2 ) 1}] (14)
9 A production inventory model with shortages and fuzzy preparation time 9 Crisp Model (Model-I) Hence, the proposed model can be stated as Minimize AT C(t, t ) = 1 t [ C 1a bx {ex(t 3 t 2 ) 1} + C 1a b t 2 C 1a b 2 p ε {1 ebp ε (t t 3 ) } t C 1 a b + C 3 C 31 L γ C 2ap ε t C 2(µ 1)ap ε (t 2 t 1 ) 2 + p 1 ε µa(t 2 t 1 ) + 1 x p1 ε µa{e x(t 3 t 2 ) 1}] (15) Fuzzy Model (Model-II) As in this case, preparation time is a fuzzy number L which is replaced by an appropriate interval number L = [L L, L R ]and so, in this case t 1 is replaced by [L L, L R ]+t (for details see Appendix-I) and the crisp problem (15) becomes a fuzzy optimization problem which, using interval arithmetic, becomes a multi-objective non-linear programming problem as follows: Minimize AT C C, AT C R (16) where AT C L = 1 t [H CL + C 3L + S CL + P CL ] AT C R = 1 t [H CR + C 3R + S CR + P CR ] and AT C C = 1 2 (AT C L + AT C R ) 5. Mathematical Analysis Model-I(Crisp Model): The objective function AT C of Model-I is a function of t and t as t 1, t 2 and t 3 are dependent variable (depend on t and t ). To achieve optimal t and t, the partial derivatives of the average total cost AT C with respect to t and t are set to zero. The resulting equation can be solved simultaneously to obtain the optimal t and t. AT C = 1 T C t t t = 1 [ C t 1a µ t b(µ 1) ex[ L µ 1 t µ 1 ] + C 1aµ b(µ 1) C 1a ebp ε µ 1 { µ t (L+t )} b + p1 ε µa µ 1 p1 ε µa t µ µ 1 ex[ L µ 1 t µ 1 ] + C 2 ap ε (L + t ) + C 2 ap ε 1 ( µ 1 t + 1 µ 1 and AT C = 1 T C 1 T C t t t t 2 = 1 [ C t 1a µ t bµ ex[ L µ 1 t L)] = (17) µ 1 ] + C 1a(µ 1) bµ e bp ε { µ 1 µ t (L+t )} C 1a b + p1 ε µa e x[ t µ L µ 1 t µ 1 ] ] 1 T C = (18) µ t 2 i.e. T C = 1 T C (19) t t
10 1 U.K.Bera, N.K.Mahapatra and M.Maiti AT C can be proved as strictly convex since all the principal minors of its Hessian matrix are strictly positive. 2 AT C = 1 T C 2 t 2 t t 2 T C2 C 1 ax t µ where = [ t 2 b(µ 1) 2 ex[ L µ 1 t µ 1 ] + C 1 ap ε e bp ε { µ 1 µ t (L+t )} where 2 AT C t 2 T C2 t 2 + p1 ε µax t µ (µ 1) 2 ex[ L µ 1 t µ 1 ] + C 2 ap ε + C 2ap ε µ 1 ] > = 1 T C 2 t t 2 = 1 T C 2 t t 2 and 2 AT C t 2 2 AT C 2 t 2 T C + 2 T C t t 3 using (18) = [ C t 1ax µ bµ 2 ex[ L µ 1 t µ 1 ] + C 1a(µ 1) 2 p ε e bp ε µ 1 { bµ 2 µ t (L+t )} + p1 ε µax e x[ t µ L µ 2 µ 1 t µ 1 ] ] > { { 2 AT C } T C = t 2 t t t 2 t 2 using (16) = {C 2 ap ε + C 2ap ε µ 1 } 2 AT C > t 2 Hence, the solution of Model-I is global minimum of AT C. 2 T C t 2 { } 2 T C } 2 t t Model-II(Fuzzy Model): In Model-II, the objective functions AT C L and AT C R (and hence AT C C ) are functions of t and t as t 1, t 2 and t 3 are dependent variable (depend on t and t ). As of Model-I, it can be seen that AT C L and AT C R (and hence AT C C ) are strictly convex. Definition: A multi-objective optimization problem is convex if all the objective functions and the feasible region are convex. Definition: [t, t ] is said to be a Pareto optimal solution to the MONLP iff there does not exist another [t, t ] in the feasible region such that AT C i (t, t ) AT C i (t, t ) for all i (i = C, R) and AT C j (t, t ) < AT C j (t, t ) for at least one index j (j = C, R). An objective vector (AT CC, AT C R ) is Pareto-optimal if there does not exist another objective vector (AT C C, AT C R ) such that AT C i AT Ci for all i = C, R and AT C j < AT Cj for at least one index j = C, R. Therefore, (AT CC, AT C R ) is Pareto-optimal if the decision vector corresponding to it is Pareto optimal. Theorem : Let the multi-objective optimization problem be convex. Then every locally Pareto-optimal solution is also globally Pareto-optimum (cf. Miettinen[2])). Therefore the problem given by (16) is a strictly convex multi-objective minimization problem and hence possesses global Pareto-optimal solutions. Hence, the problem (16) is solved by Global Criteria Method. Global Criteria Method: The Multi-Objective Non-linear Programming (MONLP) problems are solved by Global Criteria (2)
11 A production inventory model with shortages and fuzzy preparation time 11 Method converting it to a single objective optimization problem. The solution procedure is as follows. Step-1 : Solve the multi-objective programming problem (16) as a single objective problem using only one objective at a time ignoring. Step-2 : From the above result, formulate a pay-off matrix as follows: ( AT C min C AT C max C AT CR max AT CR min Step-: 3 From the pay-off matrix of Step 2, determine the ideal objective vector, say (AT C min C, AT C min R ) and the corresponding value of (AT C max C, AT C max R ). Here, the ideal objective vector is used as a reference point. The problem is then to solve the following auxiliary problem: {( AT CC (t min ) p (, t ) AT C C AT CR (t min ) p } 1, t ) AT C p R GC = Minimize AT C max min + C AT C C AT C max min, (22) R AT C R where 1 p < and GC is known as global criteria. An usual value of p is 2. ) 6. Numerical Illustration Crisp Model (Model-I) : The equation (15) is non-linear in t and t and difficult to obtain the optimal values of t and t by Calculus method. Hence, we minimize (15) by a gradient based non-linear optimization method. Using the optimal values of t and t, the corresponding values of t 1, t 2, t 3, Q s, Q m and minimum average total cost (ATC) are be obtained. To illustrate the proposed inventory model (Model-I), following input data are considered. L =.6, µ = 1.8, a = 3, b = 2, ɛ =.7, γ =.5, C 1 = 1.5, p = 25, C 3 = 2, C 31 = 3, C 2 = 15 in appropriate units. Solving the Model-I, we get the following optimal values: AT C = , t =.6169, t = , Q s = , Q m = Fuzzy Model (Model-II) : To illustrate the proposed inventory model-ii, following input data are considered. L L =.5, L R =.8, µ = 1.8, a = 3, b = 2, ɛ =.7, γ =.5, C 1 = 1.5, p = 25, C 3 = 2, C 31 = 3, C 2 = 15 in appropriate units. For the above input data, formulate a pay-off matrix as follows: ( AT C C AT C R ) Solving the Model-II using Global Criteria Method, we obtain the following optimal values: AT C C = , AT C R = , AT C L = 18.61, t = , t = , GC = Discussion The Model-I is a single objective optimization problem and is solved using generalized reduced gradient method. The Model-II is a multiobjective problem and is solved by Global Criteria Method. In Model-II, the average cost minimization problem with interval objective function was converted into the multi-objective problem whose objectives are to minimize the centre (ATC C ) and right limit (ATC R ) of the interval objective function. These two objective functions can be considered as the minimization of the average case and the worst case. The solution sets of production inventory problems with interval objective functions are defined as the Pareto optimal (21)
12 12 U.K.Bera, N.K.Mahapatra and M.Maiti solutions of the corresponding multi objective problem. Therefore, the solution set defined in this paper includes the optimal solutions against both the worst and the average cases. Table-1: Sensitivity analysis of Model-I para- % % of t meter changes ATC t Q s Q m a µ 5 no solution L p Sensitivity Analysis A sensitivity analysis of the decision variables t and t for Model-I have been made when each of the parameters a, µ, L, p being changed from 5% to +5%. The relative change of AT C, Q s, Q m are also taken into account and presented in Table-1. From Table-1, it is seen that ATC changes rapidly with the rapid change of the parameter a but these change are too slow in case of parameter µ and p. Again, ATC increases and decreases with decrease and increase in preparation time L respectively, but this change is slow which agrees with the real phenomenon.
13 A production inventory model with shortages and fuzzy preparation time 13 Figure-4 shows the ATC versus b graph. From this graph it is revealed that initially ATC decreases rapidly with the increase in b and after some time it begins to increase slowly. Here, it is interesting to note the effect of shape parameter b of the demand function on ATC. 9. Conclusion The present paper proposes a solution procedure for production inventory model with production cost and on hand inventory dependent demand rate and preparation time. Here, shortages are allowed and backlogged fully. Like lead time, time when the decision is taken for the preparation of next production run i.e. preparation time has been considered for a production inventory model. In real life, setup cost decreases with the increase of preparation time. This consideration is taken into account in Model-I. In Model-II, preparation time is taken as imprecise via a fuzzy number. The fuzzy number is described by linear / non-linear type membership function. Fuzzy number describing preparation time is then approximated to an interval number. Following this, the problem is converted into multi-objective inventory problem where the objective functions are represented by centre and right limit of interval function which are to be minimized. To obtain the solution of the multi-objective inventory problem, Global Criteria Method has been used. The proposed demand has a broad area of applicability. Demand of a commodity decreases with the increase in production cost but increases with the increase of stock of the displayed commodity and vice versa. Here, though the formulation of the model and the solution procedure are quite general, the model is a simple production model with demand dependent production rate. The unit production cost which is assumed here to be constant, in reality, varies with the preparation time and produced quantity. Moreover, time dependent production rate, partially lost sales, inflation, etc., can be incorporated to the model to make it more realistic. Here, demand is stock dependent. The present analysis can be repeated for the dynamic demand also. Though the problem has been presented in crisp and fuzzy environment, it can also be formulated and solved in fuzzy-stochastic environment representing production cost and inventory costs through probability distribution. 1. Acknowledgements This work is supported by University Grants Commission, Govt. of India under the research grand No. F.PSW-96/5-6 (ERO). Appendix-I Since preparation time is a fuzzy number which is replaced by an appropriate interval number L = [L L, L R ], therefore from equations (9) and (11), replacing t 1 by ([L L, L R ] + t ), we have Total shortages cost(s C )is given by t 1 = [L L, L R ] + t = [t 1L, t 1R ] t 2 = µ µ 1 t 1 = [t 2L, t 2R ] t 3 = t µ + t 1 = [t 3L, t 3R ] where t 1i = L i + t µ t 2i = µ 1 t 2i S C = [S CL, S CR ] t 3i = t µ + t 1i, (i = L, R) where S CL = [ 1 2 C 2ap ε t 2 1L C 2yt 2 2L C 2 yt 2R t 1R C 2yt 2 1L]
14 14 U.K.Bera, N.K.Mahapatra and M.Maiti Now the Set-up cost C 3 is given by C 3 = [C 3 C 31 L γ R, C 3 C 31 L γ L ] = [C 3L, C 3R ]. Now the total holding cost (H C )during the interval [t 2, t 3 ] and [t 3, t ] is given by H C = [H CL, H CR ], say where H CL = C 1a bx {ex(t 3L t 2R ) 1} + C 1a b t 2L C 1a b 2 p {1 (t t 3R ) ε ebp ε } t C 1 a b Total Production cost is given by P C = [P CL, P CR ] where P CL = p 1 ε µa(t 2L t 1R ) + p1 ε µa [e x(t 3L t 2R ) 1] x Now the expressions of S CR, H CR and P CR may be obtained from the expressions of S CL, H CL and P CL on replacing the suffices L by R and R by L respectively. Therefore, the total cost becomes AT C = 1 t [H C + C 3 + S C + P C ] = 1 t [(H CL, H CR ) + (C 3L, C 3R ) + (S CL, S CR ) + (P CL, P CR )] = [AT C L, AT C R ] Where AT C L = 1 t [H CL + C 3L + S CL + P CL ] AT C R = 1 t [H CR + C 3R + S CR + P CR ] Now AT C C = 1 2 (AT C L + AT C R ) (23) References [1] Mahapatra, N. K. and Maiti,M., Inventory model for breakable item with uncertain preparation time,tamsui Oxford Journal of Management Science, Vol. 2, No.2,83-12, 24. [2] Mahapatra, N. K. and Maiti, M., Production-inventory model for a deteriorating item with imprecise preparation time for production in finite time horizon,asia Pacific Journal of Operations Research, Vol.23, No.2, ,26. [3] Harris, F., Operations and Cost (Factory Management Series) Chicago, A.W. Shaw Co., 1915 pp [4] Hadley, G and Whitin, T. M., Analysis of Inventory Systems,Prentica Hall,Englewood Cliffs, N J, [5] Tersine,R.J.,Principles of Inventory and Materials Management, Elsivier North Holland Inc., New York,1982. [6] Silver, E. A. and Peterson, R.,Decision system for inventory management and research,john Wiley, New York,1985. [7] Mandal, B. N. and Phaujdar, S., A note on inventory model with stock-dependent consumption rate,opsearch, 26, 43-46,1989a. [8] Urban, T.L, Deterministic inventory models incorporating marketing decisions, Computer and Industrial Engineering, 22,85-93,1992. [9] Bhunia, A.K. and Maiti, M., An inventory model for decaying items with selling price, frequency of advertisement and linearly time dependent demand with shortages, IAPQR Transation, India. Vol. 22,41-49,1997. [1] Naddor, E., Inventory system,john Wiley, New York, [11] Magson, D., Stock control when lead-time can not be considered constant,opl. Res. Soc. 3, ,1979. [12] Foote,B., Kebriaci,N. and Kumin,H. Heuristic policies for inventory ordering problems with long and random varying lead times,j.opns.mgmt.7, [13] Bhunia, A. K. and Maiti, M., ), A Deterministic Inventory Replenishment Problem for Deteriorating Items with Time-Dependent Demand and Shortages for the finite Time Horizon,,OPSEARCH, 34, 51-61,1997a. [14] Mandal,M. and Maiti,M.,(1997),Inventory model for damageable items with stock-dependent demand and shortages, Opsearch 34,
15 A production inventory model with shortages and fuzzy preparation time 15 [15] Ross,S.M.,: Introduction to Probability Models Model,5th Edition,Academic Press, New York, [16] Mondal, S. and Maiti, M.,:Multi-item fuzzy EOQ models using genetic algorithm., Computers and Industrial Engineering, (22) 44, [17] Li, L. and Lai, K. K., A fuzzy approach to the multiobjective transportation problem, Computers & Operations Research, 27, 43-57, 2. [18] Mahapatra, N. K., Roy, T. K. and Maiti,M., Multi-objective multi-item inventory problem,proceedings of the Seminar on Recent Trends and Developments in Applied Mathematics, B.E. College (DU), Howrah, India, March 3, 44-68, 21. [19] Mahapatra, N. K., Das, K., Bhunia, A. K. and Maiti, M., Multiobjective inventory model of deteriorating items with ramp type demand dependent production, setup and unit costs,proceedings of the National Symposium on Recent Advances of Mathematics and its aapplications in Sciecne and Society, University of kalyani, kalyani, India, November, 89-11, 22. [2] Miettinen, K. M., Non-linear Multi-objective Optimization, Kluwer s International Series,1999. [21] Padmanabhan, G. and Vrat, P., EOQ models for perishable items under stock-dependent selling rare, European Journal of Operations Research, 86, , [22] Rao, S. S., Multi Objective Optimization in Structural Design with Uncertain Parameters and Stochastic Process, AIAA Journal, 22, [23] Roy, T. K. and Maiti, M., Multi-objective inventory models of deteriorating items with some constraints in a fuzzy environment, Computers and Operations Research, 25, , 1998.
INVENTORY MODELS WITH STOCK- AND PRICE- DEPENDENT DEMAND FOR DETERIORATING ITEMS BASED ON LIMITED SHELF SPACE
Yugoslav Journal of Operations Research Volume 0 (00), Number, 55-69 0.98/YJOR00055D INVENTORY MODELS WITH STOCK- AND PRICE- DEPENDENT DEMAND FOR DETERIORATING ITEMS BASED ON LIMITED SHELF SPACE Chun-Tao
An Entropic Order Quantity (EnOQ) Model. with Post Deterioration Cash Discounts
Int. J. Contemp. Math. Sciences, Vol. 6,, no. 9, 93-939 An Entropic Order Quantity (EnOQ Model with Post Deterioration Cash Discounts M. Pattnaik Dept. of Business Administration, Utkal University Bhubaneswar-754,
Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time
Tamsui Oxford Journal of Management Sciences, Vol. 0, No. (-6) Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time Chih-Hsun Hsieh (Received September 9, 00; Revised October,
International Journal of Advances in Science and Technology (IJAST)
Determination of Economic Production Quantity with Regard to Machine Failure Mohammadali Pirayesh 1, Mahsa Yavari 2 1,2 Department of Industrial Engineering, Faculty of Engineering, Ferdowsi University
A New Method for Multi-Objective Linear Programming Models with Fuzzy Random Variables
383838383813 Journal of Uncertain Systems Vol.6, No.1, pp.38-50, 2012 Online at: www.jus.org.uk A New Method for Multi-Objective Linear Programming Models with Fuzzy Random Variables Javad Nematian * Department
A Profit-Maximizing Production Lot sizing Decision Model with Stochastic Demand
A Profit-Maximizing Production Lot sizing Decision Model with Stochastic Demand Kizito Paul Mubiru Department of Mechanical and Production Engineering Kyambogo University, Uganda Abstract - Demand uncertainty
Inventory Management - A Teaching Note
Inventory Management - A Teaching Note Sundaravalli Narayanaswami W.P. No.2014-09-01 September 2014 INDIAN INSTITUTE OF MANAGEMENT AHMEDABAD-380 015 INDIA Inventory Management - A Teaching Note Sundaravalli
Economic Production Quantity (EPQ) Model with Time- Dependent Demand and Reduction Delivery Policy
ISSN NO:: 348 537X Economic Production Quantity (EPQ) Model with Time- Dependent Demand and Reduction Delivery Policy Dr. Neeraj Agarwal Professor & Head, Department of Hotel Management, Graphic Era University,
Single item inventory control under periodic review and a minimum order quantity
Single item inventory control under periodic review and a minimum order quantity G. P. Kiesmüller, A.G. de Kok, S. Dabia Faculty of Technology Management, Technische Universiteit Eindhoven, P.O. Box 513,
OPTIMAL CONTROL OF A PRODUCTION INVENTORY SYSTEM WITH GENERALIZED EXPONENTIAL DISTRIBUTED DETERIORATION
Journal of Mathematical Sciences: Advances and Applications Volume 4, Number 2, 2010, Pages 395-411 OPTIMAL CONTROL OF A PRODUCTION INVENTORY SYSTEM WITH GENERALIZED EXPONENTIAL DISTRIBUTED DETERIORATION
1 The EOQ and Extensions
IEOR4000: Production Management Lecture 2 Professor Guillermo Gallego September 9, 2004 Lecture Plan 1. The EOQ and Extensions 2. Multi-Item EOQ Model 1 The EOQ and Extensions This section is devoted to
STRATEGIC CAPACITY PLANNING USING STOCK CONTROL MODEL
Session 6. Applications of Mathematical Methods to Logistics and Business Proceedings of the 9th International Conference Reliability and Statistics in Transportation and Communication (RelStat 09), 21
2.3 Convex Constrained Optimization Problems
42 CHAPTER 2. FUNDAMENTAL CONCEPTS IN CONVEX OPTIMIZATION Theorem 15 Let f : R n R and h : R R. Consider g(x) = h(f(x)) for all x R n. The function g is convex if either of the following two conditions
ISSN: 2277-3754 ISO 9001:2008 Certified International Journal of Engineering and Innovative Technology (IJEIT) Volume 3, Issue 12, June 2014
ISSN: 77-3754 ISO 9001:008 Certified International Journal of Engineering and Innovative echnology (IJEI) Volume 3, Issue 1, June 014 Optimal Preservation echnology Investment, Credit Period and Ordering
Web based Multi Product Inventory Optimization using Genetic Algorithm
Web based Multi Product Inventory Optimization using Genetic Algorithm Priya P Research Scholar, Dept of computer science, Bharathiar University, Coimbatore Dr.K.Iyakutti Senior Professor, Madurai Kamarajar
1 Portfolio mean and variance
Copyright c 2005 by Karl Sigman Portfolio mean and variance Here we study the performance of a one-period investment X 0 > 0 (dollars) shared among several different assets. Our criterion for measuring
EXPONENTIAL DEPENDENT DEMAND RATE ECONOMIC PRODUCTION QUANTITY (EPQ) MODEL WITH FOR REDUCTION DELIVERY POLICY
SRJHSEL/BIMONHLY/ NEERAJ AGARWAL (248-2415) EXPONENIAL DEPENDEN DEMAND RAE ECONOMIC PRODUCION QUANIY (EPQ) MODEL WIH FOR REDUCION DELIVERY POLICY Neeraj Agarwal Department of Hotel Management, Graphic
ECON20310 LECTURE SYNOPSIS REAL BUSINESS CYCLE
ECON20310 LECTURE SYNOPSIS REAL BUSINESS CYCLE YUAN TIAN This synopsis is designed merely for keep a record of the materials covered in lectures. Please refer to your own lecture notes for all proofs.
An integrated Single Vendor-Single Buyer Production Inventory System Incorporating Warehouse Sizing Decisions 창고 크기의사결정을 포함한 단일 공급자구매자 생산재고 통합관리 시스템
Journal of the Korean Institute of Industrial Engineers Vol. 40, No. 1, pp. 108-117, February 2014. ISSN 1225-0988 EISSN 2234-6457 http://dx.doi.org/10.7232/jkiie.2014.40.1.108 2014 KIIE
Stochastic Inventory Control
Chapter 3 Stochastic Inventory Control 1 In this chapter, we consider in much greater details certain dynamic inventory control problems of the type already encountered in section 1.3. In addition to the
A Log-Robust Optimization Approach to Portfolio Management
A Log-Robust Optimization Approach to Portfolio Management Dr. Aurélie Thiele Lehigh University Joint work with Ban Kawas Research partially supported by the National Science Foundation Grant CMMI-0757983
FIXED CHARGE UNBALANCED TRANSPORTATION PROBLEM IN INVENTORY POOLING WITH MULTIPLE RETAILERS
FIXED CHARGE UNBALANCED TRANSPORTATION PROBLEM IN INVENTORY POOLING WITH MULTIPLE RETAILERS Ramidayu Yousuk Faculty of Engineering, Kasetsart University, Bangkok, Thailand [email protected] Huynh Trung
OPTIMAL CONTROL OF A COMMERCIAL LOAN REPAYMENT PLAN. E.V. Grigorieva. E.N. Khailov
DISCRETE AND CONTINUOUS Website: http://aimsciences.org DYNAMICAL SYSTEMS Supplement Volume 2005 pp. 345 354 OPTIMAL CONTROL OF A COMMERCIAL LOAN REPAYMENT PLAN E.V. Grigorieva Department of Mathematics
Proceedings of the World Congress on Engineering and Computer Science 2009 Vol II WCECS 2009, October 20-22, 2009, San Francisco, USA
Inventory and Production Planning in A Supply Chain System with Fixed-Interval Deliveries of Manufactured Products to Multiple Customers with Scenario Based Probabilistic Demand M. Abolhasanpour, A. Ardestani
Offline sorting buffers on Line
Offline sorting buffers on Line Rohit Khandekar 1 and Vinayaka Pandit 2 1 University of Waterloo, ON, Canada. email: [email protected] 2 IBM India Research Lab, New Delhi. email: [email protected]
Discrete Optimization
Discrete Optimization [Chen, Batson, Dang: Applied integer Programming] Chapter 3 and 4.1-4.3 by Johan Högdahl and Victoria Svedberg Seminar 2, 2015-03-31 Todays presentation Chapter 3 Transforms using
Essays in Financial Mathematics
Essays in Financial Mathematics Essays in Financial Mathematics Kristoffer Lindensjö Dissertation for the Degree of Doctor of Philosophy, Ph.D. Stockholm School of Economics, 2013. Dissertation title:
Revenue Management for Transportation Problems
Revenue Management for Transportation Problems Francesca Guerriero Giovanna Miglionico Filomena Olivito Department of Electronic Informatics and Systems, University of Calabria Via P. Bucci, 87036 Rende
A Robust Optimization Approach to Supply Chain Management
A Robust Optimization Approach to Supply Chain Management Dimitris Bertsimas and Aurélie Thiele Massachusetts Institute of Technology, Cambridge MA 0139, [email protected], [email protected] Abstract. We
Coordinated Pricing and Inventory in A System with Minimum and Maximum Production Constraints
The 7th International Symposium on Operations Research and Its Applications (ISORA 08) Lijiang, China, October 31 Novemver 3, 2008 Copyright 2008 ORSC & APORC, pp. 160 165 Coordinated Pricing and Inventory
Optimization under fuzzy if-then rules
Optimization under fuzzy if-then rules Christer Carlsson [email protected] Robert Fullér [email protected] Abstract The aim of this paper is to introduce a novel statement of fuzzy mathematical programming
Supply planning for two-level assembly systems with stochastic component delivery times: trade-off between holding cost and service level
Supply planning for two-level assembly systems with stochastic component delivery times: trade-off between holding cost and service level Faicel Hnaien, Xavier Delorme 2, and Alexandre Dolgui 2 LIMOS,
Inventory Theory. 25.1 Inventory Models. Chapter 25 Page 1
Chapter 25 Page 1 Inventory Theory Inventories are materials stored, waiting for processing, or experiencing processing. They are ubiquitous throughout all sectors of the economy. Observation of almost
Material Requirements Planning MRP
Material Requirements Planning MRP ENM308 Planning and Control I Spring 2013 Haluk Yapıcıoğlu, PhD Hierarchy of Decisions Forecast of Demand Aggregate Planning Master Schedule Inventory Control Operations
Portfolio selection based on upper and lower exponential possibility distributions
European Journal of Operational Research 114 (1999) 115±126 Theory and Methodology Portfolio selection based on upper and lower exponential possibility distributions Hideo Tanaka *, Peijun Guo Department
Lecture 2. Marginal Functions, Average Functions, Elasticity, the Marginal Principle, and Constrained Optimization
Lecture 2. Marginal Functions, Average Functions, Elasticity, the Marginal Principle, and Constrained Optimization 2.1. Introduction Suppose that an economic relationship can be described by a real-valued
2.1 Model Development: Economic Order Quantity (EOQ) Model
_ EOQ Model The first model we will present is called the economic order quantity (EOQ) model. This model is studied first owing to its simplicity. Simplicity and restrictive modeling assumptions usually
Vector and Matrix Norms
Chapter 1 Vector and Matrix Norms 11 Vector Spaces Let F be a field (such as the real numbers, R, or complex numbers, C) with elements called scalars A Vector Space, V, over the field F is a non-empty
CASH FLOW MATCHING PROBLEM WITH CVaR CONSTRAINTS: A CASE STUDY WITH PORTFOLIO SAFEGUARD. Danjue Shang and Stan Uryasev
CASH FLOW MATCHING PROBLEM WITH CVaR CONSTRAINTS: A CASE STUDY WITH PORTFOLIO SAFEGUARD Danjue Shang and Stan Uryasev PROJECT REPORT #2011-1 Risk Management and Financial Engineering Lab Department of
An Integrated Production Inventory System for. Perishable Items with Fixed and Linear Backorders
Int. Journal of Math. Analysis, Vol. 8, 2014, no. 32, 1549-1559 HIKARI Ltd, www.m-hikari.com http://dx.doi.org/10.12988/ijma.2014.46176 An Integrated Production Inventory System for Perishable Items with
Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering, Indian Institute of Technology, Delhi
Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering, Indian Institute of Technology, Delhi Lecture - 27 Product Mix Decisions We had looked at some of the important
A QUEUEING-INVENTORY SYSTEM WITH DEFECTIVE ITEMS AND POISSON DEMAND. [email protected]
A QUEUEING-INVENTORY SYSTEM WITH DEFECTIVE ITEMS AND POISSON DEMAND Rasoul Hai 1, Babak Hai 1 Industrial Engineering Department, Sharif University of Technology, +98-1-66165708, [email protected] Industrial
A Stochastic Inventory Placement Model for a Multi-echelon Seasonal Product Supply Chain with Multiple Retailers
The Sixth International Symposium on Operations Research and Its Applications (ISORA 06) Xinjiang, China, August 8 12, 2006 Copyright 2006 ORSC & APORC pp. 247 257 A Stochastic Inventory Placement Model
The integrating factor method (Sect. 2.1).
The integrating factor method (Sect. 2.1). Overview of differential equations. Linear Ordinary Differential Equations. The integrating factor method. Constant coefficients. The Initial Value Problem. Variable
Introduction to Fuzzy Control
Introduction to Fuzzy Control Marcelo Godoy Simoes Colorado School of Mines Engineering Division 1610 Illinois Street Golden, Colorado 80401-1887 USA Abstract In the last few years the applications of
The Advantages and Disadvantages of Online Linear Optimization
LINEAR PROGRAMMING WITH ONLINE LEARNING TATSIANA LEVINA, YURI LEVIN, JEFF MCGILL, AND MIKHAIL NEDIAK SCHOOL OF BUSINESS, QUEEN S UNIVERSITY, 143 UNION ST., KINGSTON, ON, K7L 3N6, CANADA E-MAIL:{TLEVIN,YLEVIN,JMCGILL,MNEDIAK}@BUSINESS.QUEENSU.CA
Fuzzy Probability Distributions in Bayesian Analysis
Fuzzy Probability Distributions in Bayesian Analysis Reinhard Viertl and Owat Sunanta Department of Statistics and Probability Theory Vienna University of Technology, Vienna, Austria Corresponding author:
COMPLETE MARKETS DO NOT ALLOW FREE CASH FLOW STREAMS
COMPLETE MARKETS DO NOT ALLOW FREE CASH FLOW STREAMS NICOLE BÄUERLE AND STEFANIE GRETHER Abstract. In this short note we prove a conjecture posed in Cui et al. 2012): Dynamic mean-variance problems in
Multi-variable Calculus and Optimization
Multi-variable Calculus and Optimization Dudley Cooke Trinity College Dublin Dudley Cooke (Trinity College Dublin) Multi-variable Calculus and Optimization 1 / 51 EC2040 Topic 3 - Multi-variable Calculus
1 Introduction. Linear Programming. Questions. A general optimization problem is of the form: choose x to. max f(x) subject to x S. where.
Introduction Linear Programming Neil Laws TT 00 A general optimization problem is of the form: choose x to maximise f(x) subject to x S where x = (x,..., x n ) T, f : R n R is the objective function, S
Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling
Abstract number: 015-0551 Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling Karuna Jain and Kanchan Joshi Shailesh J. Mehta School of Management, Indian Institute
Asian Option Pricing Formula for Uncertain Financial Market
Sun and Chen Journal of Uncertainty Analysis and Applications (215) 3:11 DOI 1.1186/s4467-15-35-7 RESEARCH Open Access Asian Option Pricing Formula for Uncertain Financial Market Jiajun Sun 1 and Xiaowei
Analysis of a Production/Inventory System with Multiple Retailers
Analysis of a Production/Inventory System with Multiple Retailers Ann M. Noblesse 1, Robert N. Boute 1,2, Marc R. Lambrecht 1, Benny Van Houdt 3 1 Research Center for Operations Management, University
Supply Chain Planning Considering the Production of Defective Products
Supply Chain Planning Considering the Production of Defective Products Ferrara Miguel, Corsano Gabriela, Montagna Marcelo INGAR Instituto de Desarrollo y Diseño CONICET-UTN Avellaneda 3657, Santa Fe, Argentina
Motivated by a problem faced by a large manufacturer of a consumer product, we
A Coordinated Production Planning Model with Capacity Expansion and Inventory Management Sampath Rajagopalan Jayashankar M. Swaminathan Marshall School of Business, University of Southern California, Los
Summary of specified general model for CHP system
Fakulteta za Elektrotehniko Eva Thorin, Heike Brand, Christoph Weber Summary of specified general model for CHP system OSCOGEN Deliverable D1.4 Contract No. ENK5-CT-2000-00094 Project co-funded by the
Optimization Modeling for Mining Engineers
Optimization Modeling for Mining Engineers Alexandra M. Newman Division of Economics and Business Slide 1 Colorado School of Mines Seminar Outline Linear Programming Integer Linear Programming Slide 2
OPTIMAl PREMIUM CONTROl IN A NON-liFE INSURANCE BUSINESS
ONDERZOEKSRAPPORT NR 8904 OPTIMAl PREMIUM CONTROl IN A NON-liFE INSURANCE BUSINESS BY M. VANDEBROEK & J. DHAENE D/1989/2376/5 1 IN A OPTIMAl PREMIUM CONTROl NON-liFE INSURANCE BUSINESS By Martina Vandebroek
ARBITRAGE-FREE OPTION PRICING MODELS. Denis Bell. University of North Florida
ARBITRAGE-FREE OPTION PRICING MODELS Denis Bell University of North Florida Modelling Stock Prices Example American Express In mathematical finance, it is customary to model a stock price by an (Ito) stochatic
Research Article Two-Period Inventory Control with Manufacturing and Remanufacturing under Return Compensation Policy
Discrete Dynamics in Nature and Society Volume 2013, Article ID 871286, 8 pages http://dx.doi.org/10.1155/2013/871286 Research Article Two-Period Inventory Control with Manufacturing and Remanufacturing
4: SINGLE-PERIOD MARKET MODELS
4: SINGLE-PERIOD MARKET MODELS Ben Goldys and Marek Rutkowski School of Mathematics and Statistics University of Sydney Semester 2, 2015 B. Goldys and M. Rutkowski (USydney) Slides 4: Single-Period Market
A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS
A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS Aya Ishigaki*, [email protected]; Tokyo University of Science, Japan Tetsuo Yamada, [email protected]; The University
INTEGRATED OPTIMIZATION OF SAFETY STOCK
INTEGRATED OPTIMIZATION OF SAFETY STOCK AND TRANSPORTATION CAPACITY Horst Tempelmeier Department of Production Management University of Cologne Albertus-Magnus-Platz D-50932 Koeln, Germany http://www.spw.uni-koeln.de/
Duality in General Programs. Ryan Tibshirani Convex Optimization 10-725/36-725
Duality in General Programs Ryan Tibshirani Convex Optimization 10-725/36-725 1 Last time: duality in linear programs Given c R n, A R m n, b R m, G R r n, h R r : min x R n c T x max u R m, v R r b T
APPLICATION OF GENETIC ALGORITHMS IN INVENTORY MANAGEMENT
DAAAM INTERNATIONAL SCIENTIFIC BOOK 2010 pp. 245-258 CHAPTER 25 APPLICATION OF GENETIC ALGORITHMS IN INVENTORY MANAGEMENT DANIA, W.A.P. Abstract: Inventory cost is a main component of total logistic costs.
Fuzzy regression model with fuzzy input and output data for manpower forecasting
Fuzzy Sets and Systems 9 (200) 205 23 www.elsevier.com/locate/fss Fuzzy regression model with fuzzy input and output data for manpower forecasting Hong Tau Lee, Sheu Hua Chen Department of Industrial Engineering
Project procurement and disposal decisions: An inventory management model
Int. J. Production Economics 71 (2001) 467}472 Project procurement and disposal decisions: An inventory management model Keith A. Willoughby* Department of Management, Bucknell University, Lewisburg, PA
Numerical methods for American options
Lecture 9 Numerical methods for American options Lecture Notes by Andrzej Palczewski Computational Finance p. 1 American options The holder of an American option has the right to exercise it at any moment
A FUZZY LOGIC APPROACH FOR SALES FORECASTING
A FUZZY LOGIC APPROACH FOR SALES FORECASTING ABSTRACT Sales forecasting proved to be very important in marketing where managers need to learn from historical data. Many methods have become available for
Nonparametric adaptive age replacement with a one-cycle criterion
Nonparametric adaptive age replacement with a one-cycle criterion P. Coolen-Schrijner, F.P.A. Coolen Department of Mathematical Sciences University of Durham, Durham, DH1 3LE, UK e-mail: [email protected]
FACTORING POLYNOMIALS IN THE RING OF FORMAL POWER SERIES OVER Z
FACTORING POLYNOMIALS IN THE RING OF FORMAL POWER SERIES OVER Z DANIEL BIRMAJER, JUAN B GIL, AND MICHAEL WEINER Abstract We consider polynomials with integer coefficients and discuss their factorization
Keywords: Single-vendor Inventory Control System, Potential Demand, Machine Failure, Participation in the Chain, Heuristic Algorithm
Indian Journal of Fundamental and Applied Life Sciences ISSN: 31 63 (Online) An Open Access, Online International Journal Available at www.cibtech.org/sp.ed/jls/01/03/jls.htm 01 Vol. (S3), pp. 1781-1790/Valiporian
Applications to Data Smoothing and Image Processing I
Applications to Data Smoothing and Image Processing I MA 348 Kurt Bryan Signals and Images Let t denote time and consider a signal a(t) on some time interval, say t. We ll assume that the signal a(t) is
Notes V General Equilibrium: Positive Theory. 1 Walrasian Equilibrium and Excess Demand
Notes V General Equilibrium: Positive Theory In this lecture we go on considering a general equilibrium model of a private ownership economy. In contrast to the Notes IV, we focus on positive issues such
Review of Basic Options Concepts and Terminology
Review of Basic Options Concepts and Terminology March 24, 2005 1 Introduction The purchase of an options contract gives the buyer the right to buy call options contract or sell put options contract some
International Journal of Software and Web Sciences (IJSWS) www.iasir.net
International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) ISSN (Print): 2279-0063 ISSN (Online): 2279-0071 International
a 11 x 1 + a 12 x 2 + + a 1n x n = b 1 a 21 x 1 + a 22 x 2 + + a 2n x n = b 2.
Chapter 1 LINEAR EQUATIONS 1.1 Introduction to linear equations A linear equation in n unknowns x 1, x,, x n is an equation of the form a 1 x 1 + a x + + a n x n = b, where a 1, a,..., a n, b are given
Integer Programming Model for Inventory Optimization for a Multi Echelon System
Journal of Advanced Management Science Vol, No, January 06 Integer Programming Model for Inventory Optimization for a Multi Echelon System Bassem H Roushdy Basic and Applied Science, Arab Academy for Science
Christfried Webers. Canberra February June 2015
c Statistical Group and College of Engineering and Computer Science Canberra February June (Many figures from C. M. Bishop, "Pattern Recognition and ") 1of 829 c Part VIII Linear Classification 2 Logistic
Principles of Inventory and Materials Management
Principles of Inventory and Materials Management Second Edition Richard J. Tersine The University of Oklahoma m North Holland New York Amsterdam Oxford TECHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesamthiblio-thek
Reliability Guarantees in Automata Based Scheduling for Embedded Control Software
1 Reliability Guarantees in Automata Based Scheduling for Embedded Control Software Santhosh Prabhu, Aritra Hazra, Pallab Dasgupta Department of CSE, IIT Kharagpur West Bengal, India - 721302. Email: {santhosh.prabhu,
Module1. x 1000. y 800.
Module1 1 Welcome to the first module of the course. It is indeed an exciting event to share with you the subject that has lot to offer both from theoretical side and practical aspects. To begin with,
A Direct Numerical Method for Observability Analysis
IEEE TRANSACTIONS ON POWER SYSTEMS, VOL 15, NO 2, MAY 2000 625 A Direct Numerical Method for Observability Analysis Bei Gou and Ali Abur, Senior Member, IEEE Abstract This paper presents an algebraic method
2 Applications to Business and Economics
2 Applications to Business and Economics APPLYING THE DEFINITE INTEGRAL 442 Chapter 6 Further Topics in Integration In Section 6.1, you saw that area can be expressed as the limit of a sum, then evaluated
A simulation study on supply chain performance with uncertainty using contract. Creative Commons: Attribution 3.0 Hong Kong License
Title A simulation study on supply chain performance with uncertainty using contract Author(s) Chan, FTS; Chan, HK Citation IEEE International Symposium on Intelligent Control Proceedings, the 13th Mediterrean
Information Theory and Stock Market
Information Theory and Stock Market Pongsit Twichpongtorn University of Illinois at Chicago E-mail: [email protected] 1 Abstract This is a short survey paper that talks about the development of important
Linear Programming I
Linear Programming I November 30, 2003 1 Introduction In the VCR/guns/nuclear bombs/napkins/star wars/professors/butter/mice problem, the benevolent dictator, Bigus Piguinus, of south Antarctica penguins
Some Research Problems in Uncertainty Theory
Journal of Uncertain Systems Vol.3, No.1, pp.3-10, 2009 Online at: www.jus.org.uk Some Research Problems in Uncertainty Theory aoding Liu Uncertainty Theory Laboratory, Department of Mathematical Sciences
THE SCHEDULING OF MAINTENANCE SERVICE
THE SCHEDULING OF MAINTENANCE SERVICE Shoshana Anily Celia A. Glass Refael Hassin Abstract We study a discrete problem of scheduling activities of several types under the constraint that at most a single
Joint Location-Two-Echelon-Inventory Supply chain Model with Stochastic Demand
Joint Location-Two-Echelon-Inventory Supply chain Model with Stochastic Demand Malek Abu Alhaj, Ali Diabat Department of Engineering Systems and Management, Masdar Institute, Abu Dhabi, UAE P.O. Box: 54224.
24. The Branch and Bound Method
24. The Branch and Bound Method It has serious practical consequences if it is known that a combinatorial problem is NP-complete. Then one can conclude according to the present state of science that no
Cost-Per-Impression and Cost-Per-Action Pricing in Display Advertising with Risk Preferences
MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 00, No. 0, Xxxxx 0000, pp. 000 000 issn 1523-4614 eissn 1526-5498 00 0000 0001 INFORMS doi 10.1287/xxxx.0000.0000 c 0000 INFORMS Cost-Per-Impression and
Practical Guide to the Simplex Method of Linear Programming
Practical Guide to the Simplex Method of Linear Programming Marcel Oliver Revised: April, 0 The basic steps of the simplex algorithm Step : Write the linear programming problem in standard form Linear
