1 Installation Guide For PVC Sewer Pipe (ASTM D3034 & F679)
2 TABLE OF CONTENTS: Introduction... 2 Receiving...3 Unloading and Handling Storage... 6 Trenching... 7 De-Watering... 8 Field Cutting... 9 Lowering Pipe into the Trench Cleaning and Inspection Lubrication Joint Assembly Trench Construction Foundation Bedding...15 Haunching Initial Backfill Final Backfill Acceptance Testing Special Considerations Checklist Uni-Bell Literature Standard Warranty Diamond Plastics Corporation 1
3 INTRODUCTION: This document has been developed by the Diamond Plastics Corporation for use as a field installation guide. General information regarding the correct installation of gasketed-joint solid-wall PVC sewer pipe is included. Relevant product standards are: ASTM D3034 Standard Specification for Type PSM Polyvinyl Chloride (PVC) Sewer Pipe and Fittings ASTM F679 Standard Specification for Polyvinyl Chloride (PVC) Large-Diameter Pipe and Fittings Technical data contained in this Installation Guide is furnished without charge and is given and accepted at the recipient s sole risk. Every effort has been made to verify the information contained herein, however, Diamond Plastics Corporation makes no representation about and is not responsible or liable for use of information contained in this Installation Guide, or for which this guide was not intended. In no event shall Diamond Plastics Corporation be liable for incidental or consequential damages. Diamond Plastics Corporation reserves the right to update or change literature and this guide without notice. To assure accurate and current information, contact Diamond Plastics Corporation. Installation of Diamond PVC pipe for sewers or other gravity flow applications should be in accordance with ASTM D2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. This guide is meant as a supplement only ASTM D2321 should be considered the governing document. 2 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
4 RECEIVING: When a load of pipe arrives at the job site, it is your responsibility to check it thoroughly. If possible, inspect each piece for damage. Check quantities against the shipping list. Each pipe shipment should be inspected carefully upon arrival. The carrier is responsible for delivering the pipe. Make certain all material listed on the bill-of- lading has arrived. The receiver must make certain there has been no loss or damage. It is important to note any errors or damage, on both the driver s copy and the delivery receipt. Make claim in accordance with the carrier s instruction. Do not dispose of any damaged material. Carrier will advise you of the procedure to follow for freight damage. Diamond Plastics Corporation 3
5 UNLOADING AND HANDLING: Pipe should be lowered, not dropped, from trucks to the ground or into a trench. Do not cut bands that hold each unit together while the unit is on the truck. The forklift truck, boom and sling, or other material handling equipment should be equipped to avoid excessive swinging. DO NOT USE CHAINS AS A SLING. DO NOT ATTEMPT TO HANDLE PIPE BUNDLES BY PULLING ON STRAPPING OR PACKAGING MATERIAL. Avoid all impact blows, gouging, or abrasions caused by metal surfaces, rocks, material handling equipment, or any other source. Do not roll the pipe off the truck. Cold Weather Handling: Extra care should be used in handling during cold weather. WARNING: Carelessly unloading pipe can be hazardous. Use appropriate equipment and stay clear when removing tie-downs, banding, and dunnage material. Forklift tines must be long enough to support the bottom of all pipe within the bundle. The tines must have a vertical pad. 4 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
6 SEWER PIPE The tables below are provided for use as guides in selection of handling equipment: APPROXIMATE WEIGHT OF PIPE LENGTHS (lbs) The tables below are provided for use as guides in selection of handling equipment: APPROXIMATE WEIGHT OF PIPE LENGTHS (lbs) 20-Foot Lengths 14-Foot Lengths Pipe Size DR35 DR26 DR35 DR26 (in.) Foot Lengths 14-Foot Lengths Pipe Size PS 46 PS 75 PS 115 PS 46 PS 75 PS Diamond Plastics Corporation Corporation Diamond Plastics Corporation 5
7 STORAGE: If you can unload the shipment in unit packages, the pipe will be easier to store. Stack the packages on reasonably level ground. If you unload one piece at a time, place the pipe bevel to bell. Never stack over eight feet in height. Do not stack the pipe next to heat sources or engine exhausts. Gaskets should also be protected from heat, oil, and grease. 6 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
8 TRENCHING: Proper installation procedures and trench preparation are essential to successful PVC pipe performance. Trench preparation procedures for PVC pipe do not vary substantially from procedures used with other piping products. No more trench should be prepared than the footage of pipe that can be laid in a day. Do not let the excavated material block sidewalks, drives, or utility outlets. Follow all safety rules and regulations. Protect workers by using sheeting and trench boxes in hazardous areas and by sloping the trench walls in dry soils. When sheeting or a trench box is moved, make sure that the pipe is not moved and that the sidesupport material is not disturbed. Diamond Plastics Corporation 7
9 SEWER PIPE DEWATERING: Do keep the trench as dry as possible until the pipe has been installed and enough backfill placed to prevent the pipe from floating. PVC pipe will float if not filled with water or weighted down. The height of loose backfill material required to prevent flotation of empty pipe is conservatively equal to 1½ times the pipe diameter. 8 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
10 SEWER PIPE FIELD CUTTING: PVC pipe can be easily cut with a power handsaw or power-driven abrasive disc. Be sure you make a square cut. Bevel the end with a beveling tool, wood rasp, or power sander to the same angle and length as provided on the factory-finished pipe. Redraw the insertion line on the spigot using a factory-marked spigot as a guide. Diamond Plastics Corporation 9
11 SEWER PIPE LOWERING PIPE INTO THE TRENCH: Place the pipe and fittings into the trench using ropes and skids, slings on the backhoe bucket, or by hand. Do not throw the pipe or fittings into the trench or allow any part of the pipe to take an unrestrained fall onto the trench bottom. At this point, the pipe and other accessories are in a good position for final inspection. Ensure there are no damaged materials before assembly begins. 10 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
12 SEWER PIPE CLEANING AND INSPECTION: Remove any mud, sand, or other foreign material from the bell interior and spigot exterior that could prevent an effective seal between the bell and spigot. Carefully clean the gasket area. Do not remove the gasket from the bell. Make sure the gasket is seated uniformly in the groove by running your finger around the inner edge of the gasket. Diamond Plastics Corporation 11
13 LUBRICATION: An even, uniform application of gasket lubricant must be applied to the spigot including the bevel and to the insert reference mark as well as the contact surface of the gasket. Gasket lubricant may be applied with a swab, brush, or roller. An adequate amount of gasket lube is furnished with each truckload of pipe. Additional lubricant may be purchased from your distributor. 12 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
14 JOINT ASSEMBLY: Align the spigot to the socket to be assembled so that it is near contact with the gasket. Depending upon the pipe size, Diamond Solid-Wall PVC Sewer pipe may require from 500 to 1000 pounds force to assemble. Keep the pipe lengths in proper alignment. Be careful not to let the lubricated section touch the dirt or backfill as foreign material could adhere to the surface and compromise joint integrity. So that previously completed joints in the line will not be stacked, over belled, or inserted past the reference mark, brace the bell while the spigot end is pushed through the gasket. Push the spigot end in until the reference mark on the spigot end is flush with the end of the bell. If the spigot is inserted beyond the reference mark, laying length will be lost. Loss of laying length can be significant on projects with long footage. Also, joint flexibility is reduced when the spigot is over-inserted. Over-insertion may lead to excessive stress and joint failure. Joints may be assembled using mechanical equipment provided that the pipe is protected, properly lubed, and aligned. The end of the pipe must be protected from damage, and the joint must not be over-belled or inserted beyond the insert reference mark. Use a wood block or sheet of plywood to protect the end of the pipe. A come-a-long may be preferred, but a swinging stab is not recommended. Assembly will require greater effort during cold weather. The bar-and-block method of joint assembly is recommended, as the installer is able to feel the amount of force being used and whether the joint goes together smoothly. Larger pipe may require mechanical assistance to apply sufficient force to assemble the joint. When mechanical devices are used, care must be taken to ensure that the spigot is inserted to the proper depth and that previously assembled pipe joints are not disturbed. This is accomplished by inserting only to the insertion line on the spigot end. If the spigot is over-inserted, back the pipe out until the insertion line is visible. In all cases, straight alignment of the pipe is essential for proper assembly. If the pipe is misaligned, over- inserted, or assembled with excessive force, the following are possible consequences: rolled gaskets failure to pass acceptance testing (e.g., low-pressure air testing and deflection-mandrel testing) over-insertion of previously assembled joints Manual Bar-and-Block Method Diamond Plastics Corporation 13
15 TRENCH CONTRUCTION: Terms used in pipe installation are illustrated in the trench cross-section below. The use of proper embedment materials is very important to trouble-free operation of pipe systems. The particle size of material in contact with the pipe shall not exceed 1½ inches. FOUNDATION: A foundation is required when the trench bottom is unstable. The bottom of the trench is over-excavated and brought back up to grade with suitable material. Where over-excavation occurs, ensure that the elevation under the entire length of the pipe is brought up (rather than only at the bells). Proper placement of new foundation materials will support the pipe and prevent sagging between joints. 14 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
16 BEDDING: Bedding may be used to bring the trench bottom up to grade before the pipe is installed. Its purpose is to provide continuous and uniform support. Where bedding is required, a maximum compacted depth of 4 to 6 inches is typical. Holes for pipe bells should be provided at each joint to ensure uniform support for the pipe. Bell holes should be no larger than necessary for pipe assembly. Maximum particle size for embedment, which includes bedding, haunching, and initial backfill, is limited to material passing a 1½ inch sieve. (Limiting particle size to 3/4 inch or less enhances placement of embedment material for nominal pipe sizes 8 inch through 15 inch. For smaller pipe, a particle size of about 10% of the nominal pipe diameter is recommended.) Unstable trench bottoms shall be stabilized by methods and with materials, required by the specifying engineer, to provide adequate and permanent support for the conditions encountered. HAUNCHING: Haunching should be completed as the pipe is laid. The haunching material should consist of an evenly graded, free flowing, granular material which is free of large stones, frozen clods or other hard particles. If imported material is required, haunching material should be the same as the bedding. Placement and compaction of the haunching material are the most important factors affecting pipe performance and deflection. Proper placement and compaction of material in the haunch reduce voids and increase pipe support. Granular materials may be properly placed using techniques such as shovel slicing. Place material under the haunches and at least halfway up the pipe to provide side support. Make sure material is properly compacted. DO NOT DISTURB SIDE SUP- PORT WHEN MOVING SHEEETING OR TRENCH BOX. Diamond Plastics Corporation 15
17 INITIAL BACKFILL: Keep the initial backfill free from rocks which could damage the pipe during final backfill. Depth of the initial backfill should be at least 6 inches over the top of the pipe. Initial backfill protects the pipe from damage during final backfill. Machine compaction of initial backfill directly over the pipe is not desirable unless adequate cover has been provided to protect the pipe. Adequate cover will depend on the type of compaction equipment. For adequate cover to prevent pipe damage or deflection, consult the project engineer. 16 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
18 FINAL BACKFILL: Final backfill is often specified by the project engineer based on site design. Material selection, placement, and compaction should meet the project requirements. After placement and compaction of pipe embedment materials, the balance of backfill materials may be returned to the trench. The material should not contain large stones or rocks, frozen materials, or debris. Compaction procedures of the remainder of the backfill should be in accordance with the contract specification. ACCEPTANCE TESTING: After the installed PVC pipeline is thoroughly cleaned, one or more of the following tests may be performed: Visual inspection Deflection test Leakage test Visual Inspection: Sewer pipelines can be inspected visually to verify accuracy of alignment and freedom from debris and obstructions. The test is typically performed by closed-circuit TV. Deflection Testing: Deflection testing is usually performed with a properly sized go/no-go mandrel. Mandrel sizes for 7½% deflection of the base inside diameter are found in the ASTM product standards (D3034 and F679) and are also given in the Handbook of PVC Pipe: Design and Construction. The following table provides base inside diameters for the pipe and the subsequent mandrel dimensions, which are derived from them. Size and Mandrel Dimensions Pipe size Average Base I.D.* 7.5% Mandrel Size 5% Mandrel Size (in.) (mm) O.D. (in.) (in.) (mm) (in.) (mm) (in.) (mm) * Base I.D. is a minimum pipe inside diameter derived by subtracting a statistical tolerance package from the pipe s average inside diameter. Diamond Plastics Corporation 17
19 Leakage Testing: Low-pressure air testing is an acceptable method of insuring integrity of the installed sewer system. ASTM F1417 Standard Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low- Pressure Air provides procedures for leakage testing of plastic sewer lines. Water-infiltration testing is an alternative method which is accurate only when the pipe is completely under water. Water-exfiltration testing is a rarely used method that can be complicated by entrapped air. The recommended duration of the test time for a 1.0 or 0.5 air pressure drop is provided in the following tables. These recommendations are taken out of the Uni- Bell PVC Pipe Association document Uni-B-6, Recommended Practice for Low- Pressure Air Testing of Installed Sewer Pipe. These recommendations are for all products not just PVC. Specific information on conducting this test can be found in Uni- B-6. With large diameter pipe the duration of the test can become excessively long. It is the industry recommendation that if there is no loss of pressure after one hour of testing that the test section shall be accepted and the test ended. If there is any loss of pressure during the first hour the test should run its full duration. If any test section loses more air pressure than that specified the contractor shall, at his own expense, locate and repair the defective section. If a failure is noted the first things to check are the hoses, gauges, and valves and plugs associated with the test equipment. After these are ruled out as the problem any laterals on the system should be checked. After this is ruled out individual pipe joints should be checked. Isolating the individual section, which is leaking is the key to resolving the problem. MINIMUM SPECIFIED TIME REQUIRED FOR A 1.0 PSIG PRESSURE DROP FOR SIZE AND LENGTH OF PIPE INDICATED FOR Q = Pipe Min. Lgth. Size Time Min. Time for m:s Time Longer line 100 ft. 150 ft. 200 ft. 250 ft. 300 ft. 350 ft. 400 ft. 450 ft. 4 3: L 3:46 3:46 3:46 3:46 3:46 3:46 3:46 3:46 6 5: L 5:40 5:40 5:40 5:40 5:40 5:40 5:42 6:24 8 7: L 7:34 7:34 7:34 7:34 7:36 8:52 10:08 11: : L 9:26 9:26 9:26 9:53 11:52 13:51 15:49 17: : L 11:20 11:20 11:24 14:15 17:05 19:56 22:47 25: : L 14:10 14:10 17:48 22:15 26:42 31:09 35:36 40: : L 17:00 19:13 25:38 32:03 38:27 44:52 51:16 57: : L 19:50 26:10 34:54 43:37 52:21 61:00 69:48 78: : L 22:47 34:11 45:34 56:58 68:22 79:46 91:10 102: : L 28:51 43:16 57:41 72:07 86:32 100:57 115:22 129: : L 35:37 53:25 71:13 89:02 106:50 124:38 142:26 160: : L 51:17 76:55 102:34 128:12 153:50 179:29 205:07 230: : L 69:48 104:42 139:37 174:30 209:24 244:19 279:13 314: : L 91:10 136:45 182:21 227:55 273:31 319:06 364:42 410:17 Note: If there has been no leakage (zero psig drop) after one hour of testing, the test section shall be accepted and the test complete. 18 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
20 MINIMUM SPECIFIED TIME REQUIRED FOR A 0.5 PSIG PRESSURE DROP FOR SIZE AND LENGTH OF PIPE INDICATED FOR Q = Pipe Min. Lgth. Time Size Time Min. for m:s Time Longer line 100 ft. 150 ft. 200 ft. 250 ft. 300 ft. 350 ft. 400 ft. 450 ft. 4 1: L 1:53 1:53 1:53 1:53 1:53 1:53 1:53 1:53 6 2: L :12 8 3: L 3:47 3:47 3:47 3:47 3:48 4:26 5:04 5: : L 4:43 4:43 4:43 4:57 5:56 6:55 7:54 8: : L 5:40 5:40 5:42 7:08 8:33 9:58 11:24 12: : L 7:05 7:05 8:54 11:08 13:21 15:35 17:48 20: : L 8:30 9:37 12:49 16:01 19:14 22:26 25:38 28: : L 9:55 13:05 17:27 21:49 26:11 30:32 34:54 39: : :837L 11:24 17:57 22:48 28:30 34:11 39:53 45:35 51: : L 14:25 21:38 28:51 36:04 43:16 50:30 57:42 64: : L 17:48 26:43 35:37 44:31 53:25 62:19 71:13 80: : L 25:39 38:28 51:17 64:06 76:55 89:44 102:34 115: : L 34:54 52:21 69:49 87:15 104:42 122:10 139:37 157: : L 45:35 68:23 91:11 113:58 136:46 159:33 182:21 205:09 Note: If there has been no leakage (zero psig drop) after one hour of testing, the test section shall be accepted and the test complete. Diamond Plastics Corporation 19
21 SPECIAL CONSIDERATIONS: Changes in Direction: 1. Pipe bending Some changes in direction may be accomplished without the use of bends, sweeps, or other fittings. Controlled bending within acceptable limits can be accommodated by PVC pipe. A general rule of thumb for the minimum bending radius (Rb) calculation is Rb = 200 OD. Tighter bending radii may be achieved for certain products. Consult the manufacturer for specific product information. In most cases, bending should be accomplished manually. It is not recommended to attempt bending pipes greater than 12 inches in diameter due to the forces required. 2. Joint deflection During construction, it may become necessary to make very slight changes of direction. Changes in direction may also be accomplished through joint deflection. Allowable joint deflection is dependent on pipe size and joint design. Neither the pipe nor the joint should be axially deflected in any manner to cause stress at the joint. Diamond Solid-Wall PVC Sewer Pipe will accommodate a 1 change in direction per joint. With 20 joints this is a 4 offset, and with 14 joints this is approximately 2 ¾ offset. 3. Combined pipe bending and joint deflection Either joint deflection or longitudinal bending may be used for changes in direction, BUT NOT BOTH on the same length of pipe. Manhole Connections: Proper manhole connections are essential to good system performance. The following precautions are recommended: Insure stable foundation and bedding for the manhole and connecting pipe to prevent shifting which could damage the connection. Use a water-stop gasket produced from elastomeric material which prevents leakage while allowing longitudinal pipe movement. Use a non-shrinking or expansive type grout for making connections of pipe and water-stop to manhole walls. Manhole construction techniques may vary from one region to another. However, the smooth surface of Diamond Solid-Wall PVC Sewer Pipe facilitates an easy connection. A watertight system requires a flexible seal or waterstop between the PVC pipe and the manhole structure. With precast or poured in place concrete manholes, use an elastomeric seal, or flexible boot to facilitate a seal as concrete will not bond directly to PVC. Fiberglass or polyethylene manholes may be connected to Diamond PVC Sewer Pipe by using a properly sized rubber coupling. The manhole foundation and bedding material should be compacted to 95% Proctor Density. Compaction of the bedding and haunch material at the manhole connection is critical in controlling settlements. Settlements can cause shear failures and/or excessive deflection. Cold Weather Installation: Extremely cold temperatures result in increases in pipe stiffness and tensile strength and decreases in impact strength. The decrease in impact strength requires care in handling during installation in cold temperatures. 20 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
22 Risers: Sewer risers or vertical stacks may be required in deep sanitary sewers to minimize excavation for services lines. Risers are generally permitted where the main sewer line is deeper than 7 feet. The vertical riser pipe creates a load scenario not common in other sewer installations. Any settlement of material alongside the riser produces a drag-down load due to the frictional forces at the pipe/soil interface. Additionally, settlement of the lateral fitting assembly produces a similar drag-down load. These loads must be mitigated or transferred harmlessly off the stack to prevent problems such as over-insertion, fitting fracture, main sewer line deflection/misalignment, etc. The following practices are considered appropriate for all riser installations: Transitions from horizontal to vertical should be smooth and well supported. This may be accomplished withfitting combinations, gradual bends and/or trench geometry. Service laterals from the main sewer should exit at an angle no greater than 45 degrees from the horizontal. A single length of lateral pipe should be used for the riser section whenever possible. To minimize or eliminate settlement and the resulting loading, compaction is critical beneath the main line sewer and lateral connections. Soil Migration: Where running or standing water occurs in the trench or substantial seasonal water table changes are expected, consideration must be given to preventing soil migration. Migration could cause loss of soil support for installed pipe. Materials used for underdrains, bedding, and haunching should be of proper gradation and thickness to prevent migration of material from fine-grained native soils. Diamond Plastics Corporation 21
23 CHECKLIST: Take all precautions necessary to protect workers and materials. Plan ahead for fittings. Use trench boxes or shoring in unstable conditions. Do not disturb installed pipe when moving trench boxes or shoring materials. Properly assemble pipe joints by inserting the spigot end until the insertion line is even with the bell lip. Insure watertight seals at manhole connections. Keep the trench bottom as dry as possible. For detailed installation recommendations, see ASTM D2321 Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. Consult the pipe manufacturer for specifics regarding gaskets and lubricants. Check with the project engineer regarding specifications and procedures. 22 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
24 Recommended Standards UNI-B-1 Recommended Specifications for Thermoplastic Pipe Joints, Pressure and Non-Pressure Applications UNI-B-6 Recommended Practice for Low-Pressure Air Testing of Installed Sewer Pipe Technical Reports UNI-TR-1 Deflection: The Pipe/Soil Mechanism UNI-TR-3 Maintenance of PVC Sewer Pipe UNI-TR-5 The Effects of Ultraviolet Radiation on PVC Pipe Diamond Plastics Corporation 23
25 LIMITED WARRANTY AND LIABILITY SEWER PIPE Diamond Plastics Corporation, 1212 Johnstown Road, P. O. Box 1608, Grand Island, NE 68802, does hereby warrant subject to the limitations hereinafter stated, its PVC Pipe INTRODUCTION: to be free from defects in material and workmanship under normal use and service for a period of twelve (12) months from the date of invoice. This limited warranty extends only to the original purchase for use, and will be void if the product is used under conditions other than those for which it was designed or if it is not used in compliance with all instructions contained in any operating manual or specification sheets provided for such product. The sole obligation of Diamond Plastics Corporation, under this limited warranty, and the exclusive remedy of the purchaser under this limited warranty is the repair or replacement, without charge, F.O.B. shipping point, of such products or parts of products only, specifically excluding any labor or installation thereof, which Diamond Plastics Corporation, after inspection, determines to be defective. Purchase must notify Diamond Plastics Corporation, in writing at its address shown above within ten (10) days from the date of discovery of any claimed defect specifically stating the details of such defect, and, if requested by Diamond Plastics Corporation, return the defective product, freight prepaid, to Diamond Plastics Corporation, F.O.B. shipping point as shown on Diamond Plastics Corporation s order acknowledgement. Diamond Plastics Corporation shall not be liable for any other damages, whether direct or consequential. Specifically, but without limitation, Diamond Plastics Corporation shall not be liable for any crop damage or any other incidental or consequential damages resulting from any breach of warranty, express or implied, or from any defects in its products. No statement, remark, agreement, representation, promise or understanding, oral or written, made by Diamond Plastics Corporation, or any agent, representative or employee thereof, which is not contained herein, will be recognized by, or be enforceable or binding upon Diamond Plastics Corporation. There are no understandings or undertakings of any kind with respect to the products or any part thereof which are not expressly set forth and contained herein, and all sales are made without any representation or warranty by Diamond Plastics Corporation that the goods are suitable for any particular purpose. In the event any provision of this LIMITED WARRANTY AND LIMITATION OF LIABILITY is held to be illegal or unenforceable by any court of competent jurisdiction, the remaining provisions shall remain in full force and effect. STATUTE OF LIMITATION: Any action for breach of this LIMITED WARRANTY AND LIMITATION OF LIABILITY must be commenced within one (1) year after the cause of action has accrued. THERE ARE NO EXPRESS OR IMPLIED WARRANTIES BY DIAMOND PLASTICS CORPORATION, OTHER THAN THOSE SPECIFICALLY SET OUT ABOVE. THERE ARE NO IMPLIED WARRANTIES OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE IN CONNECTION WITH ANY SALE EXCEPT ASSET FORTH ABOVE. 24 INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE
26 Sales Office DIAMOND PLASTICS CORPORATION P.O. Box 1608 Grand Island, NE MANUFACTURING PLANTS: Grand Island, Nebraska Golconda, Nevada Lubbock, Texas Macon, Georgia Muncie, Indiana Plaquemine, Louisiana Casa Grande, Arizona 10/2013
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Installation Guide. Recommendations for Installation of IPS & PIP Pressure Pipe
Installation Guide Recommendations for Installation of IPS & PIP Pressure Pipe INDEX Index......... 1 Diamond Plastic Pipe....... 2 PVC Installation Guide...... 2 Handling & Storage....... 2 Receiving
Installation Guide. Recommendations For Installation of AWWA C900 And AWWA C905
Installation Guide Recommendations For Installation of AWWA C900 And AWWA C905 INDEX Index........... 1 Diamond Plastic Pipe......... 2 PVC Installation Guide........ 2 Receiving Handling & Storage Inspection.........
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
Gasketed Sewer Pipe and Fittings Installation Guide. Suitable for Gasketed Sewer Applications
Gasketed Sewer Pipe and Fittings Installation Guide Suitable for Gasketed Sewer Applications Royal Muincipal Solutions Gasketed Sewer Pipe and Fittings Installation Guide TABLE OF CONTENTS Introduction...2
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.
SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
Ultra-Rib PVC Storm Sewer Pipe 8" - 30"
Ultra-Rib PVC Storm Sewer Pipe 8" - 30" Ultra-Rib is a PVC Storm Sewer Pipe That Provides Superior Structural Capabilities Waterworks Products PW Eagle s Ultra-Rib is an open profile PVC gravity-flow storm
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
Diamond LOK-21 Assembly Information
Diamond LOK-21 Assembly Information Proper assembly of a Diamond LOK-21 is much like that of conventional bell-and-spigot PVC pressure pipe. Proper assembly of the joint requires: A clean bell and spigot,
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
SANITARY GRAVITY SEWER LINE TESTING. B. Section 02732 CCTV Inspection of Gravity Sewer Lines
PART 1 GENERAL 1.1 SECTION INCLUDES A. Low Pressure Air Test B. Deflection Test 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02732 CCTV Inspection of Gravity Sewer Lines
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
GASKETED JOINT PVC PRESSURE PIPE
INSTALLATION GUIDE FOR GASKETED JOINT PVC PRESSURE PIPE TABLE OF CONTENTS Introduc on 3 Receiving 3 Unloading and Handling 4-5 Storage 6 Trenching 7 De-Watering 8 Field Cu ng 8 Lowering Pipe into the Trench
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer.
SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. All materials and workmanship
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for
SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
OAR52 A-1 (September, 1981)
APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos
TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL. 23 21 13.19 Pre-Insulated Piping 4-8-13
TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL 23 21 13.19 Pre-Insulated Piping 4-8-13 MATERIAL SUBMITTAL JOB NAME: TEXAS A&M SAN ANTONIO CENTRAL ACADEMIC BUILDING & PATRIOTS CASA CONTRACTOR:
900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE
900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limit as to Width of Trench 901.05 Unauthorized Excavation
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding