PROJECT LIABILITY PROGRAM INSURANCE PROCEDURES MANUAL PROJECT NAME PROJECT NUMBER FOR THE
|
|
|
- Helen Hutchinson
- 10 years ago
- Views:
Transcription
1 PROJECT LIABILITY PROGRAM INSURANCE PROCEDURES MANUAL FOR THE PROJECT NAME PROJECT NUMBER Presented By: Swinerton Builders and Arthur J. Gallagher & Co. Insurance Brokers of California, Inc.
2 Table of Contents Liberty PLP Insurance Manual - GL Program Eligibility... 3 Responsibilities of Subcontractors of Any Tier... 4 PLP Online Enrollment Instructions... 5 Accident Reporting for General Liability Claims... 6 Subcontractor Incident Report Form... 7 Definitions for Purposes of this Manual... 8 Personnel Directory
3 Program Eligibility Liberty PLP Insurance Manual - GL Introduction Swinerton Builders will be providing the general liability and excess liability coverages for this project in a Contractor Controlled Wrap Up Insurance program for all eligible subcontractors of every tier. All qualified subcontractors of any tier whose employees perform actual on-site labor are required to participate in the Project Liability Program (PLP) and follow through with the online enrollment process, if the project contract value is greater than a $100,000 to Swinerton, and other participant responsibilities as noted throughout this Manual. For an outline of the coverages provided by the PLP and other insurance requirements, please refer to Attachment A of your subcontract agreement. Please provide a copy of the Attachment A to all of your sub tier subcontractors for their information. This manual is only for informational purposes regarding the administrative procedures required for this program. You are contractually required to adhere to these procedures in Attachment A of your subcontract agreement. This manual is not a contract document. Coverage Trigger Coverage will commence the day you begin work at the site and is contingent on a properly executed subcontract. You also must complete the online enrollment through the Arthur J. Gallagher (AJG) Wrap-Up Contractor Portal (see page 5 for online enrollment instructions) if the project contract value to Swinerton is greater than $100,000. Once your enrollment is complete you will receive a Certificate of Insurance from Arthur J. Gallagher (AJG) confirming the coverage. Any lower tier subcontractors that you hire will also be required to participate and follow through with responsibilities as noted in this Manual. Enrollment is automatic for any project contract value less than $100,000. Online enrollment is only necessary on those projects should you need a certificate of insurance. Ineligible Parties Subcontractors who present an exceptionally hazardous exposure or risk to the job site may not be eligible to participate, at Swinerton Builders discretion. It is your responsibility to contact Arthur J. Gallagher (AJG) and confirm your eligibility before you begin work on the project. Not everyone will be a participant. For example, the following are ineligible for the program. Subcontractors of any tier that are: Vendors, Suppliers, Material Dealers, Off-site fabricators with no on-site installation included in their subcontract, Transportation or Delivery Companies, Hazardous Material Abatement Contractors, Equipment Rental without operator and without installation (if company is installing equipment such as scaffolding, then they need to be enrolled), Professional services such as consultants, surveyors, testing companies and designers, Owner contracted subcontractors, Parking attendants, or Guard services. If you are uncertain whether your firm will be a participant in this program, or wish confirmation of your eligibility, please contact AJG. Swinerton Builders will coordinate the program at the project site. AJG will be administering the program from their offices. A complete contact list is in the back of this Manual. 3
4 Responsibilities of Subcontractors of Any Tier Liberty PLP Insurance Manual - GL PLP Manual Distribute Attachment A and PLP Manual to prospective bidders or subcontractors, including lower tier subcontractors. Send Attachment A and PLP Manual to your Insurance Agent/Broker so that proper notice can be made to your current insurers. Note your deductible responsibility in Attachment A Claims Report claims immediately to the Swinerton Builders project team noted in the claims section of this Manual. Insurance Requirements The required insurance of every PLP participant is outlined in detail in the Subcontract Attachment A Insurance Requirements. Please refer to that subcontract document for the requirements that pertain to you. Insurance Credit Calculation if you have been instructed to include General Liability insurance costs in your contract/bid Swinerton Contract Value $100,000 or less no credits are assessed Swinerton Contract Value $100,001 to $1,000,000 flat rate of 0.6% subcontract value is used Swinerton Contract Value $1,000,001 and over sub s policy rates used and following applies: Subcontractor s first payment will be reduced by the estimated cost of their General and Excess liability coverages as determined by Arthur J. Gallagher via a credit calculation as a cost of the work. Your Rate and Declarations pages will be required from your General Liability and Excess Liability Policies for Swinerton jobs greater than $1,000,000. A credit calculation will be made at the time of enrollment based on estimated payroll or contract value. When your work is complete, a final adjustment will be made based on your final payroll or contract value. If your umbrella/excess coverage is flat rated (non-auditable premium), we will use 10% of your General Liability rate to calculate your insurance cost for this coverage If you hire any lower tier subcontractors, their insurance costs will be deducted from your subcontract and it is your responsibility to pass along the costs to them. The rates used in a Subcontractor s credit calculations will be the rates in effect at the time of their bid. Subcontractor s credit calculations will not be adjusted upwards or downwards as their insurance renews during the course of their contract unless their bid/contract value adjusts accordingly. Failure to supply all requested insurance documents within 5 days from the date of the request to provide this information, will result in a flat 2% charge against your entire contract amount. Any revisions to an estimated initial calculation will be made at the time of final calculation. If no documents are received by the time final calculation is made and after 5 days of the request for the final information, the 2% charge against contract value will be calculated and considered final with no revisions made afterwards. It is your responsibility to ensure your lower-tiers are in compliance with the requirements of this Manual. 4
5 Liberty PLP Insurance Manual - GL PLP Online Enrollment Instructions PLPs participants must complete the Online Enrollment process through the Arthur J. Gallagher Contractor Portal at for any projects where the contract value to Swinerton exceeds $100,000 (refer to checked box on page 4). Enrollment instructions are attached separately and also available online on Swinerton s website: If you have any questions regarding the completion of the online enrollment, please contact one of the AJG Administrators listed in the Personnel Directory. Please keep in mind the following: Each of your lower-tier subcontractors must complete the online enrollment; The PLP does NOT INCLUDE Workers Compensation coverage; The PLP does NOT INCLUDE automobile coverage (including trucks and licensed equipment) or tools and equipment; The PLP provides General Liability only for operations at the Project. Operations of each subcontractor of any tier at other locations are NOT COVERED by the PLP. If the box on page 4 is checked (Swinerton Contract Value $1,000,001 and over), the following applies. If your firm or your insurance broker does not supply the required documentation of insurance rates, deductibles, aggregate(s), etc., to verify the insurance costs, a 2% rate against contract value will apply. If any of your policies are rated on payroll and you do not provide your final payroll amounts once your work is complete, you will be charged 2% of your final contract value. To avoid this 2% charge, your final information should be submitted on-line in the Close Out section at the AJG Wrap-up Contractor Portal. Please see separate on-line instructions. Your General Liability insurance credit will be based on a $2,000,000 each occurrence limit, so you may need to include a portion of your Excess Liability coverage to meet this requirement. If you are not able to provide a rate for your Excess Liability policy, you will be charged 10% of your General Liability rate. If you do not have Excess Liability policy, please contact Gallagher. If your current insurance program contains a deductible or SIR, you will need to include a deductible premium as it applies to the payroll or revenue on this project. If you do not supply this information, a 2% rate against your contract value will apply. 5
6 Liberty PLP Insurance Manual - GL Accident Reporting for General Liability Claims 1. If an injury is involved, the Subcontractor's superintendent must immediately arrange for first aid or other required medical treatment for the injured party. 2. All Incidents, regardless of severity, shall be reported immediately to the Job Site Contact and Onsite Safety Coordinator and reported to Swinerton Risk Management. 3. The Subcontractor's superintendent must complete a General Liability Loss Notice for each accident and file with the Swinerton Job Site Office. 4. Swinerton team will immediately forward to Swinerton Risk Management for handling. 5. Any Court Summons, legal documents or other correspondence must be immediately referred to Swinerton Risk Management Department and Swinerton Legal Department by registered mail. Additional questions concerning suit papers should be referred to Swinerton Risk Management Department. 6
7 Liberty PLP Insurance Manual - GL PROJECT NAME Subcontractor Incident Report Form Today s : Incident Type: Injury to Third Party Property Damage Subcontractor Claim Contact Name: Title: Phone: E Mail: Incident Narrative: of Incident: Time of Incident: Photos Available? YES NO Photos Retained By: Title: Phone: E Mail: Police Report Taken? YES NO Officer s Name: Police Report Number: Badge Number: Jurisdiction: Names of Potentially Involved Subcontractors: Were there Witnesses? Witness #1: Phone: E Mail: Witness #2: Phone: E Mail: Witness #3: Phone: E Mail: Injured Person: Phone: Nature of Injury: Address: Owner of Damaged Property: Phone: Description of Damaged Property: Address: Signature of Person Completing Form: Company: 7
8 Definitions for Purposes of This Manual Liberty PLP Insurance Manual - GL General Contractor: Project: Project: Site: Off-Site Exposures: Subcontract: Subcontractor of Any Tier: Work: Insured: Swinerton Builders Project Address The areas designated in writing by Swinerton Builders in a contract document for performance of the Work and such additional areas as may be designated in writing by Swinerton Builders for Subontractor s use in performance of the Work. The Project Site shall also include (1) field offices, (2) property used for bonded storage of material for the Project approved by Swinerton Builders, (3) staging areas dedicated to the Project. Items 1 through 3 must be approved by the CCIP Insurer and listed in the CCIP Policy. Offices, shops, warehouses, factories, or similar locations away from the designated project site that have not been approved by the CCIP Insurer and listed on the CCIP Policy ARE NOT COVERED. The agreement between Swinerton Builders and the Subcontractor. The terms "Subcontract" and "Agreement" are used interchangeably. The person, firm or corporation with whom Swinerton Builders has entered into Agreement to perform the Work; or the Person or entity who has a contract with a Swinerton Builders Subcontractor to perform any of the Work at the Site. Operations, as fully described in the Contract, performed at or emanating directly from the Project. Subcontractors of any tier who have an executed subcontract agreement. The following are not Insureds under this WRAP-UP- Vendors, suppliers, material dealers, off-site fabricators and others who merely transport, pick up, deliver or carry materials, personnel, parts or equipment or any other items or persons to or from the Project Site, et al. 8
9 Liberty PLP Insurance Manual - GL Personnel Directory PROJECT MANAGER: PROJECT ADMINISTRATOR: PLP SAFETY DIRECTOR: NAME address NAME address Wade Obermann Swinerton Incorporated 2300 Clayton Road, Suite 800 Concord CA (925) (925) /fax RISK MANAGEMENT: John Capener Susan Thorne Swinerton Incorporated Swinerton Incorporated 2300 Clayton Road, Suite Clayton Road, Suite 800 Concord, CA Concord, CA (925) (925) INSURANCE BROKER & CONTACT: ADMINISTRATION: Arthur J. Gallagher & Co. Insurance Brokers of California, Inc Battery Street, Suite 450 San Francisco, CA For General Inquiry: (877) toll free [email protected] Loretta Martinez (415) Timothy Council (415) Cecilia Kahara (415) Mariamawit Wondimu (415) Stanford Faigin (415) GENERAL LIABILITY CLAIMS: Louise Sakotani Swinerton Incorporated 2300 Clayton Road, Suite 800 Concord, CA (925) [email protected] 9
LAYTON RISK MANAGEMENT CONTRACTOR CONTROLLED INSURANCE PROGRAM MANUAL FOR THE PROJECT NAME. Layton Construction and Gallagher Construction Services
LAYTON RISK MANAGEMENT CONTRACTOR CONTROLLED INSURANCE PROGRAM MANUAL FOR THE PROJECT NAME Presented By: Layton Construction and Gallagher Construction Services 1 Table of Contents Insurance Coverages...
Bid/Contract Insurance Requirements (Insurance Manual)
The Regents of the University of California University Controlled Insurance Program (UCIP) Bid/Contract Insurance Requirements (Insurance Manual) for the [CAMPUS] [PROJECT] Construction Project Need a
Schedule Q (Revised 1/5/15)
Schedule Q (Revised 1/5/15) CONSTRUCTION CONTRACTOR INSURANCE REQUIREMENTS Section 0.0 Introduction of the Owner-Controlled Insurance Program The City of Oakland (City) has implemented an Owner-Controlled
OCIP III Insurance Procedures and Enrollment Manual
Owner Controlled Insurance Program OCIP III Insurance Procedures and Enrollment Manual This Manual is a Contract Document 1 TABLE OF CONTENTS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Z-25 Plus Program Manual 10/1/12 to 10/1/15 PROGRAM
Sundt Layton, a Joint Venture Z-25 Plus Program Manual 10/1/12 to 10/1/15 PROGRAM For the San Mateo, CA Presented by: Scott R. Whiteside, EVP John Shearman, Senior VP Gallagher Construction Services Lovitt-Touche,
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE
USING OCIPs AND CCIPS TO BRING ORDER TO PROJECT INSURANCE CMAA Southern California Chapter October 30, 2014 8:00 a.m. The Grand Conference Center 4101 E. Willow Street Long Beach, CA Panel Greg Kildare
Taking the Stress Out of Controlled Insurance Programs: Guidance for Subcontractors
Taking the Stress Out of Controlled Insurance Programs: Guidance for Subcontractors December 2012 Lockton Companies Before you bid on a construction contract, knowing your insurance obligations will help
CCIP Insurance Manual. Turner Construction Company
Turner Construction Company Contractor Controlled Insurance Program (CCIP) Learned Hall, Engineering Expansion Phase Two (LEEP2) 1520 E 15 th Street, Lawrence, KS 66045 CCIP Insurance Manual This Manual
That s A Wrap What Every Claims And Construction Professional Needs To Know About Wrap-up Insurance Programs
2015 CLM Atlanta Conference November 5-6, 2015 in Atlanta, GA That s A Wrap What Every Claims And Construction Professional Needs To Know About Wrap-up Insurance Programs In the construction industry,
Wrap Up Insurance Manual
Los Angeles Department of Water and Power Silver Lake Complex Storage Replacement Project (Silver Lake Reservoir) Wrap Up Insurance Manual Date: 11/5/2012 (Revised: 01/24/2013) This Manual is part of the
Christus Health Spohn Medical Center. Owner Controlled Insurance Program Contractors Insurance Procedures Manual. June 25, 2015 DRAFT
Christus Health Spohn Medical Center Owner Controlled Insurance Program Contractors Insurance Procedures Manual DRAFT Table of Contents 1.0 INTRODUCTION... 4 1.1 Overview... 4 1.2 About this Manual...
OCWIP Insurance Manual
Metropolitan Washington Airports Authority Owner Controlled Wrap-Up Insurance Program (OCWIP) OCWIP Insurance Manual NOVEMBER 2010 EDITION (Reporting Forms Revised 08/2011) This manual is a contract document
OWNER-CONTROLLED INSURANCE PROGRAM
PART 1 GENERAL OWNER-CONTROLLED INSURANCE PROGRAM 1.01 INTRODUCTION A. The Water Authority has implemented an Owner-Controlled Insurance Program for its Emergency Storage Project. In an OCIP, the construction
AVIATION OWNER CONTROLLED INSURANCE PROGRAM MANUAL
AVIATION OWNER CONTROLLED INSURANCE PROGRAM MANUAL June 2013 EDITION RISK MANAGEMENT DEPARTMENT This manual is a contract document Changes to the AVIATION OCIP Insurance Manual Change Number Date of Change
Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern:
Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern: Norsouth Construction Company of Georgia, Inc. is dedicated to the highest standards of integrity
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
A. Applicability of the MCIP
CONTRACT REQUIRMENTS The School District of Palm Beach County has elected to implement the Florida Municipal Construction Insurance Trust ( FMCIT ) Master Controlled Insurance Program ( MCIP ) that will
ADDENDUM TO SUBCONTRACT [Contractor s Consolidated Insurance Program]
ADDENDUM TO SUBCONTRACT [Contractor s Consolidated Insurance Program] The Subcontract Agreement between LAYTON CONSTRUCTION COMPANY, INC., a Utah corporation ( Contractor ) and, a ( Subcontractor ) dated
Note: It is suggested that you examine your current Policies and contact your Insurance Broker before answering the following questions.
FORM 1 Page 1 of 2 INSURANCE COST INFORMATION WORKSHEET All Contractors, Subcontractors, and Sub subcontractors of every tier, are required to complete this worksheet and submit as part of your bid. Note:
Gordon L. Mountjoy & Associates, Inc.
INSURANCE REQUIREMENTS CHECKLIST Submit an Acord 25 form and the endorsements as required below. Your insurance must be in compliance immediately after you sign your subcontract and before you start work.
California Department of Transportation. Owner Controlled Insurance Program (OCIP) OCIP Manual. SFOBB Seismic Safety Projects Oakland Touchdown
California Department of Transportation Owner Controlled Insurance Program (OCIP) OCIP Manual SFOBB Seismic Safety Projects Oakland Touchdown Contract # 04-0120L4 California Department of Transportation
CERTIFICATE OF INSURANCE TO CITY OF NEWARK CALIFORNIA ( the City ) A Municipal Corporation
CERTIFICATE OF INSURANCE TO CALIFORNIA ( the City ) A Municipal Corporation Page 1 of 2 Only this Certificate of Insurance form will be accepted This certifies to the City of Newark that the following
INSURANCE REQUIREMENTS FOR MASTER AGREEMENT CONTRACTORS
INSURANCE REQUIREMENTS FOR MASTER AGREEMENT CONTRACTORS Without limiting CONTRACTOR's indemnification of COUNTY, and in the performance of this Contract and until all of its obligations pursuant to this
Owner Controlled Insurance Program (OCIP) Overview
Owner Controlled Insurance Program (OCIP) Overview An Owner Controlled Insurance Program (OCIP) is a consolidated insurance program that includes coverage for the owner (MTA), enrolled contractors and
H. The Contractor shall not begin work under the contract until the required insurance has been obtained and approved by the Contracting Agency.
Insurance Requirements (1) General Requirements A. The Contractor shall obtain the insurance described in this section from insurers approved by the State Insurance Commissioner pursuant to RCW Title 48.
Items 1-7 above shall not be subject to any of the following limiting or exclusionary endorsements:
Page 1 of 5 Supplier's Insurance. Before commencing the Work, and as a condition of any payment due under this Subcontract, Supplier shall, at its own expense, procure and maintain insurance on all of
The New Jersey Turnpike Authority
INSURANCE MANUAL FOR: The New Jersey Turnpike Authority Owner Controlled Insurance Program (OCIP) OCIP Insurance Manual This OCIP Manual is a Contract Document as defined in the Authority s 2004 Standard
EXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP)
EXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP) 1.0 Definitions Certificate of Insurance: Contract: Contractor: Contractor insurance cost City (Sponsor): Owner Controlled Insurance Program
SECTION 00 73 16 INSURANCE REQUIREMENTS
SECTION 00 73 16 INSURANCE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES 1.02 Insurance Requirements 1.02 INSURANCE REQUIREMENTS A. The successful Contractor shall procure and maintain for the duration
How To Insure Construction Contracts In Northern California Schools Insurance Group
NORTHERN CALIFORNIA SCHOOLS INSURANCE GROUP Cover Note to NCSIG Members & Their Architects/Engineers Insurance Recommendations for Construction Contracts Applicable to New Construction & Modernization/Remodeling
Insurance Requirements for Contractors (Without Construction Risks)
Insurance Requirements for Contractors (Without Construction Risks) Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to
INSURANCE AND SURETY INFORMATION SHEET
INSURANCE AND SURETY INFORMATION SHEET In order for your company to comply with the bonding and insurance requirements per your contract with the City of Elk Grove there are several things that we require.
Attachment D. Insurance
Insurance Contractor/Vendor: The City and County of San Francisco would like to direct your attention to the City's insurance requirements, which have proved confusing to some bidders in the past. We have
PREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
INSURANCE GUIDE I - MINOR CONTRACTS FOR SERVICE
INSURANCE GUIDE I - MINOR CONTRACTS FOR MEETING GUIDE I SPECIFICATIONS DURATION: Project will not exceed 30 calendar days COST: Project cost will not exceed $50,000 RISK: Low, No unusual or high hazards
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015
Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS October 19, 2015 The Morgan Hill Unified School District ( District ) has determined that contractors on future
SAMPLE CONSTRUCTION INSURANCE REQUIREMENTS
SAMPLE CONSTRUCTION INSURANCE REQUIREMENTS A. In General The shall purchase and continuously maintain in full force and effect for the policy periods specified below the insurance policies specified in
Owner Controlled Insurance Program (OCIP) BROWARD COUNTY. OCIP Insurance Manual
Owner Controlled Insurance Program (OCIP) BROWARD COUNTY OCIP Insurance Manual Broward County, Florida OCIP Manual 11/01/2014 Rev. 0010 11/01/2014 O W N E R C O N T R O L L E D I N S U R A N C E P R O
SAMPLE VERBIAGE OF SUBCONTRACT AGREEMENT INSURANCE REQUIREMENTS (PLEASE REFER TO YOUR STRUCTURE HOME SUBCONTRACT AGREEMENT)
SAMPLE VERBIAGE OF SUBCONTRACT AGREEMENT INSURANCE REQUIREMENTS (PLEASE REFER TO YOUR STRUCTURE HOME SUBCONTRACT AGREEMENT) INSURANCE REQUIREMENTS A. COVERAGE: Subcontractor and its subcontractors and
STANFORD UNIVERSITY SUPPLIER INSURANCE GUIDELINES
Contractor/Consultant shall not commence Services until it has obtained all of the required insurance, set forth below, and such insurance has been approved by University/Owner. Contractor/Consultant shall
Request for Proposals ARCHITECTURAL/ENGINEERING SERVICES FOR. New Fire Station Facility
Request for Proposals ARCHITECTURAL/ENGINEERING SERVICES FOR New Fire Station Facility Snohomish County Fire District 7 is accepting proposals from qualified architectural / engineering firms to provide
INSURANCE REQUIREMENTS FOR VENDORS
INSURANCE REQUIREMENTS FOR VENDORS The Contractor/Vendor shall purchase and maintain for the duration of the contract/work insurance against claims for injuries to persons or damages to property which
D3 Bus Wash Rehabilitation AC Transit Contract #2016-1372 SECTION 007316 INSURANCE REQUIREMENTS
SECTION 007316 INSURANCE REQUIREMENTS PART 1 - INSURANCE REQUIREMENTS 1.01 GENERAL A. Any person, firm or corporation Contractor authorizes to work upon the Property, including any subcontractor, shall
ADDENDUM A1. Subcontractor Insurance Requirements
ADDENDUM A1 Subcontractor Insurance Requirements Certificates and endorsements must be received and approved prior to the start of any work. No payments will be released until all insurance documents are
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS THIS QUESTIONNAIRE MUST BE PRINTED ON BLUE PAPER OAKLAND UNIFIED SCHOOL DISTRICT
Bonding and Insurance Workshop. Presented by Ingrid Merriwether, President & CEO
Bonding and Insurance Workshop Presented by Ingrid Merriwether, President & CEO 1 What is to Be Gained? Practical Knowledge of insurance and bonding How insurance and bonding protects you and others How
W.E. O NEIL CONSTRUCTION CO. OF COLORADO INSURANCE REQUIREMENTS. Project Name Project Address City, State Zip
W.E. O NEIL CONSTRUCTION CO. OF COLORADO INSURANCE REQUIREMENTS Project Name Project Address Subcontractor SHALL NOT COMMENCE WORK at the site until it has obtained and provided all insurance required
INSURANCE MANUAL FOR: The New Jersey Turnpike Authority. Rolling Owner Controlled Insurance Program (OCIP)
INSURANCE MANUAL FOR: The New Jersey Turnpike Authority (OCIP) OCIP Insurance Manual This OCIP Manual is a Contract Document as defined in the Authority s 2004 Standard Specifications, and is fully incorporated
FULTONCOUNTY GOVERNMENT
FULTONCOUNTY GOVERNMENT LIBRARY CAPITAL IMPROVEMENT PROGRAM Wolf Creek Branch Library Hogan Construction GENERAL LIABILITY WRAP-UP MANUAL Version 2 November 20, 2012 Resurgens Risk Management (RRM)/ Willis
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT
SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE 1 PRE-QUALIFICATION QUESTIONNAIRE 000 CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears
SECTION 3 AWARD AND EXECUTION OF CONTRACT
SECTION 3 AWARD AND EXECUTION OF CONTRACT 3.01 CONSIDERATION OF BIDS: After the Proposals are opened and read, the approximate estimated quantity of each item multiplied by the unit price bid for that
SCHEDULE 17. Insurance Requirements. Part 1 Insurance Requirements applicable to the Phase 2 Work
SCHEDULE 17 Insurance Requirements Part 1 Insurance Requirements applicable to the Phase 2 Work Capitalized terms used in this Schedule which are not otherwise defined shall have the meanings given to
[ controlled insurance programs - Controlled Insurance Programs Act - codification - effective date - emergency ]
ENGROSSED SENATE BILL NO. By: Coates of the Senate and Quinn of the House [ controlled insurance programs - Controlled Insurance Programs Act - codification - effective date - emergency ] BE IT ENACTED
UNDERSTANDING OCIPS. FCA CONTRACTINSIGHT Vol. 1, Issue 2 JUNE 2007 I. WHAT IS AN OCIP? Owner Controlled Insurance Program
FCA CONTRACTINSIGHT Vol. 1, Issue 2 JUNE 2007 UNDERSTANDING OCIPS I. WHAT IS AN OCIP? Owner Controlled Insurance Program Contractors and subcontractors are normally required to provide insurance for work
BUILDERS & CONTRACTORS INSURANCE COMPANY, RRG, A RISK RETENTION GROUP CONTRACTORS APPLICATION NATIONAL BUILDERS INSURANCE SERVICES, INC.
1. PRODUCER NAME: 2. PRODUCER ADDRESS: 3. PRODUCER TELEPHONE: 5. PRODUCER FAX 7. APPLICANT NAME Gaslamp Insurance Services 739 4 th Avenue, suite 206, San Diego, CA 92101 619-238-4367 4. PRODUCER CONTACT
Menlo Park City School District 181 Encinal Avenue Atherton, CA 94027
181 Encinal Avenue Atherton, CA 94027 The offers this information to any individual or firm wishing to be added to the District s general construction informal bid list for all trades pursuant to Public
Risk Management Department NOTICE TO CONTRACTORS / VENDORS / FACILITY USERS
Risk Management Department NOTICE TO CONTRACTORS / VENDORS / FACILITY USERS Chapman University requires Certificates of Insurance from (1) Contractors, (2) Vendors, (3) Other Parties that provide services
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR
FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR A New High School Competition Gym RFP No. 052015-036 PROPOSALS ARE DUE 10:00
CHECKLIST FOR INSURANCE REVIEWS
CHECKLIST FOR INSURANCE REVIEWS FOR DIRECT PURCHASE ORDERS FOR PROFESSIONAL SERVICES CONSULTANTS 1. Determine the applicable insurance requirements as set forth in Exhibit A. If the P.O. involves a Special
SCHEDULE D TAX COMPLIANCE DECLARATION FORM
SCHEDULE D TAX COMPLIANCE DECLARATION FORM The Ontario Government expects all proponents to pay their Provincial taxes on a timely basis. In this regard, proponents are advised that any contract with the
How To Write A Certificate Of Insurance For A Car With A Safety Insurance Policy
1. DATE (MM/DD/YYYY) this is the date the Certificate is generated; 2. PRODUCER insert the complete name and address of the insurance agency or broker issuing this Certificate; Contact person s office
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE
CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE The following are excerpts from Caltrans 2010Standard Specifications. Specifications are subject to change so refer to the project
-1- -2- -3- -4- -5- INSURANCE REQUIREMENTS FOR DEVELOPER EXTENSION AGREEMENTS 1.1 The developer shall obtain and keep in force during the term of the contract, Commercial General Liability insurance policies
MAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS
MAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 CONTRACTOR PROVIDED INSURANCE COVERAGE... 1 3 BC HYDRO PROVIDED INSURANCE COVERAGE... 2 4
REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES
REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES 1. STATEMENTS OF QUALIFICATIONS REQUESTED The San Bernardino Community College District (District) Facilities
MINNESOTA STATE COLLEGES AND UNIVERSITIES General Insurance Requirements for Contractors & Vendors
Certificate of Liability Insurance, Form ACORD25: Following are the insurance requirements of the State of Minnesota acting through its Board of Trustees of the Minnesota State Colleges and Universities,
CERTIFICATE OF LIABILITY INSURANCE
Exhibit A SAMPLE CERTIFICATE OF INSURANCE TO ALL CONTRACTS/PURCHASE ORDER AGREEMENTS ACORD TM CERTIFICATE OF LIABILITY INSURANCE Date (MM/DD/YY) PRODUCER SUBCONTRACTOR S AGENT / BROKER ADDRESS CITY, STATE,
Exhibit B (Incorporated into Construction Purchase Order Terms and Conditions) CONSTRUCTION CONTRACT INSURANCE REQUIREMENTS
Exhibit B (Incorporated into Construction Purchase Order Terms and Conditions) CONSTRUCTION CONTRACT INSURANCE REQUIREMENTS 1.1. Contractor shall maintain insurance underwritten by solvent insurance companies
Owner Controlled Insurance Program (OCIP) Overview
Owner Controlled Insurance Program (OCIP) Overview Prepared for Caltrans Oakland Touchdown Outreach Presented by: Willis One Bush Street, Suite 900 San Francisco CA 94104 (415) 981-1141 WHAT IS AN OCIP
Contract Review: Key Terms That May Put Your Company At Risk
Contract Review: Key Terms That May Put Your Company At Risk Grady Dotson, CPCU, Vice-President of CSDZ, Utah Will Kieffer, AFSB, Surety Account Executive, CSDZ, Utah Surety Bond Review Three Party Agreement:
INDEPENDENT CONTRACTOR AGREEMENT (On Call Real Estate Broker Services)
INDEPENDENT CONTRACTOR AGREEMENT (On Call Real Estate Broker Services) THIS AGREEMENT (Contract") is made this 14th day of December, 2010, between the Board of County Commissioners of Sumter County, Florida
PITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
Thank you for your interest in doing business with Greystar!
Thank you for your interest in doing business with Greystar! As a National Company, Greystar requires that all of our vendors enroll with Compliance Depot prior to doing business with our communities.
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS 1. GENERAL PROVISIONS A. Indemnification. The Contractor shall indemnify and save harmless the City of Lincoln, Nebraska from and against all losses, claims,
The Good, The Bad & The Ugly
The Good, The Bad & The Ugly OCIP/CCIP from a Subcontractor s Perspective Presented By: Richard. B Usher and Donald W. Gregory, Esq. 1 INSURANCE IS: The business of accepting/financing Risk Transfer for
2 nd Notice AHCCCS Insurance Requirements ACTION REQUIRED September 29, 2014 Page 1 of 5
Dear Providers and Staff: 2 nd Notice ACTION REQUIRED September 29, 2014 Page 1 of 5 We distributed a blast fax communication to you on July 16 explaining that effective October 1, 2013 AHCCCS updated
INDEMNIFICATION AND INSURANCE REQUIREMENTS FOR LOS ANGELES COUNTY SERVICE AGREEMENTS
INDEMNIFICATION AND INSURANCE REQUIREMENTS FOR LOS ANGELES COUNTY SERVICE AGREEMENTS Include Section I and Section II.(A. - F.) in all County service agreements. I. Indemnification: Contractor shall indemnify,
IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!
` SUBCONTRACTOR: PHONE PROJECT: LOCATION: Page 1 of 6 SUBCONTRACT (SHORT FORM) JOB NO.: COST CODE: PRICE: This agreement is made and effective, by and between SUN CONSTRUCTION & FACILITY SERVICES, INC.
"Wrap Ups" For Schools: IT S ABOUT TIME
Owner Controlled Programs Presented By: Bill Poland, Keenan & Associates Owner Controlled Programs (OCIPs) "Wrap Ups" For Schools: IT S ABOUT TIME Legislative History Schools & Risk Management Pre 1999
RISK ENGINEERING TECHNICAL GUIDE
Introduction To meet the needs of many of our Producers or Agents who have developed a clientele of well performing general contractors, Crum & Forster s Claims, Risk Engineering and Underwriting Departments