1 The HS2 Environmental Minimum Requirements (EMR s) and Code of Construction Practice (CoCP) January 2015 Leila du Toit Sustainable Construction Manager

2 Environmental Minimum Requirements (EMR s) Environmental Minimum Requirements - suite of documents that set out how the Nominated Undertaker will behave and how the scheme will be delivered, committed via an undertaking to Parliament. The EMRs will comprise the following documents: General principles Environmental Memorandum Planning Memorandum Heritage Memorandum CoCP The Register of Undertakings and Assurance 2

3 Environmental Minimum Requirements (EMR s) The Nominated Undertaker (NU) is contractually bound to comply with the EMR s NU will use reasonable endeavours to adopt mitigation measures that will further reduce adverse environmental effects Statutory Undertakers carrying out development in connection with HS2 will be required to comply with the controls set out in the EMR s 3

4 Environmental Minimum Requirements (EMR s) and Project Controls Environmental commitments are addressed within the HS2 EMR s Significant and binding controls Processes described to ensure compliance Demonstrated to have worked on previous projects Engagement on a route-wide level 4

5 Environmental controls imposed on HS2 WORKS AUTHORISED BY THE BILL Protections in the Bill Project specific protections Other statutory controls Protective Provisions Planning Schedule Highways Schedule Environmental Minimum Requirements (EMRs) General Principles Environmental Memorandum Planning Memorandum Code of Construction Practice Heritage Memorandum Undertakings and Assurances Enforced via an undertaking to Parliament Where not disapplied or modified by the HS2 bill existing legislation will apply S61 of the Control of Pollution Act Environmental permitting for discharges into watercourses SS84 AND 85 New Roads and Street Works Act 5

6 Draft CoCP CoCP forms part of the EMR s - final draft submitted to Parliament Builds on direct experience from other major programmes Approach developed with engagement with statutory bodies and local authorities. Implemented through the construction contracts (general and site-specific requirements) and monitoring reported to the Nominated Undertaker Principal Contractor to be BS EN ISO (EMS) Certified 6

7 Purpose of the CoCP Document relates to the route-wide principles governing construction. Contains strategic control measures and the standards that will be implemented as a minimum throughout the project. Local measures will be applied through a range of local underpinning plans- Local Environment Management Plan (LEMP) LEMPs will be produced once the hybrid bill goes through the Parliamentary process. 7

8 Keeping communities informed The CoCP is a key part of community relations during construction, through: A stakeholder liaison approach which seeks to include all parts of local communities; Informing communities in advance of works; HS2 website to provide up to date information; 24 hour helpline / contact. 8

9 General requirements of CoCP To reduce the likelihood of incident or nuisance Typical measures include: Considerate Constructor practice Good site management practice Core working hours Noise and air quality controls Pollution incident control measures Small claims procedure Contractor qualifications and experience 9

10 Local Environmental Management Plans (LEMPs) The LEMPs will build on the general environmental requirements in the CoCP and will set out how the project will adapt and deliver the required environmental and community protection measures within each relevant local authority area. They do not contain new commitments above the ES. Will signpost to additional measures, such as Section 61 consent. 2 draft examples produced; - Urban station Euston - Rural infrastructure Warwick District Council 10

11 Local Environmental Management Plans (LEMPs) Produced in association with local authorities not in agreement. The nominated undertaker and/or its contractors will engage with the local communities, LPAs and other stakeholders in order to develop the LEMPs. 22 LEMPs are being produced Final versions of LEMPs will be produced after Royal Assent 11

12 Summary The EMRs set out how the scheme will be delivered and are committed via an Undertaking to Parliament. The CoCP is an integral part of the EMRs. The CoCP covers the key principles of construction at a route wide level It will be underpinned by Local Environmental Management Plans and agreements with local authorities which will set the requirements for specific construction sites and activities. 12

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014 HS2 Phase One Planning Forum Highways Sub-group Meeting #2 November 2014 Agenda Schedules 4 part 1 Highways Accesses Schedule 16 Road traffic routes Schedule 16 Mud control measures Schedule 24 Lorry ban

More information

South Norfolk Council Business Continuity Policy

South Norfolk Council Business Continuity Policy South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document

More information

E18: APPROACH TO SUSTAINABILITY

E18: APPROACH TO SUSTAINABILITY HIGH SPEED TWO INFORMATION PAPER E18: APPROACH TO SUSTAINABILITY This paper outlines HS2 Ltd's approach to sustainability. It will be of particular interest to those potentially affected by the Government

More information

Health, Safety and Environment Management System

Health, Safety and Environment Management System Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental

More information

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)

More information

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL The Budget Responsibility and National Audit Act received Royal Assent in March

More information

NSW Government Digital Information Security Policy

NSW Government Digital Information Security Policy NSW Government Digital Information Security Policy Version: 2.0 Date: April 2015 CONTENTS PART 1 PRELIMINARY... 3 1.1 Scope... 3 1.2 Application... 3 1.3 Objectives... 3 PART 2 POLICY STATEMENT... 4 Core

More information

ANNEX 8 Contract Management Strategy

ANNEX 8 Contract Management Strategy ANNEX 8 Contract Management Strategy Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire Councils working together to improve your local transport Contract Management Strategy

More information

PORT SAFETY PLAN GUIDELINES

PORT SAFETY PLAN GUIDELINES Schedule PORT SAFETY PLAN GUIDELINES 1 July 2015 Version 1.0 1 PREAMBLE... 3 1.1 Title... 3 1.2 Authority... 3 1.3 Application... 3 1.4 Applicable Legislation... 3 1.5 Applicable Standards... 3 1.6 Relevant

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

H2: BIRMINGHAM INTERCHANGE STATION

H2: BIRMINGHAM INTERCHANGE STATION HIGH SPEED TWO INFORMATION PAPER H2: BIRMINGHAM INTERCHANGE STATION This paper outlines the proposals for Birmingham Interchange Station. It will be of particular interest to those potentially affected

More information

F I N A N C I A L R E G U L A T I O N S

F I N A N C I A L R E G U L A T I O N S F I N A N C I A L R E G U L A T I O N S South Downs National Park Authority March 2014 Page 0 of 17 F I N A N C I A L R E G U L A T I O N S Contents Page 1 INTRODUCTION Purpose of Financial Regulations

More information

General Register Office for Scotland information about Scotland s people. Paper NHSCR GB 1/08. NHSCR Scotland Information Governance Standards

General Register Office for Scotland information about Scotland s people. Paper NHSCR GB 1/08. NHSCR Scotland Information Governance Standards General Register Office for Scotland information about Scotland s people Paper NHSCR GB 1/08 NHSCR Scotland Information Governance s This is a draft on which the Board s comments would be welcome. Contents

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

NSW Government Digital Information Security Policy

NSW Government Digital Information Security Policy NSW Government Digital Information Security Policy Version: 1.0 Date: November 2012 CONTENTS PART 1 PRELIMINARY... 3 1.1 Scope... 3 1.2 Application... 3 1.3 Objectives... 3 PART 2 CORE REQUIREMENTS...

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

HOW TO... Be Aware of Your Environmental Legal Responsibilities

HOW TO... Be Aware of Your Environmental Legal Responsibilities HOW TO... Be Aware of Your Environmental Legal Responsibilities How to... Be Aware of Your Environmental Legal Responsibilities You have legal responsibilities for the impact your business has on the environment.

More information

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting Framework Agreement between the Department of Health and the NHS Trust Development Authority Annex C: Finance and Accounting 2014 1. The Framework Agreement sets out the governance and accountability arrangements

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

JOB DESCRIPTION. Position Title and Number: Senior Procurement Officer (100618) Health, Wellbeing & Commissioning

JOB DESCRIPTION. Position Title and Number: Senior Procurement Officer (100618) Health, Wellbeing & Commissioning JOB DESCRIPTION Position Title and Number: Senior Procurement Officer (100618) Grade: Department: Section: Responsible to: Responsible for: SO2 People Directorate Health, Wellbeing & Commissioning Team

More information

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation Page 1 of 11 Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation This work is copyright. It may be reproduced in whole or in part for study or training purposes

More information

E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL

E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL HIGH SPEED TWO INFORMATION PAPER E19: SUSTAINABLE PLACEMENT OF SURPLUS EXCAVATED MATERIAL This paper outlines the approach to sustainable placement of surplus excavated material for Phase One of the HS2

More information

VACANCY NOTICE FOR THE POST Human Resources Manager to the Bio-Based Industries Joint Undertaking (BBI-JU) Reference (to be quoted in all your

VACANCY NOTICE FOR THE POST Human Resources Manager to the Bio-Based Industries Joint Undertaking (BBI-JU) Reference (to be quoted in all your VACANCY NOTICE FOR THE POST Human Resources Manager to the Bio-Based Industries Joint Undertaking (BBI-JU) Reference (to be quoted in all your communication regarding this post): BBI/2014/4/AD-HRM Temporary

More information

Trust Operational Policy. Information Security Department. Third Party Remote Access Policy

Trust Operational Policy. Information Security Department. Third Party Remote Access Policy Trust Operational Policy Information Security Department Policy Reference: 3631 Document Control Document Title Author/Contact Document Reference 3631 Pauline Nordoff-Tate, Information Assurance Manager

More information

STATE RECORDS COMMISSION. SRC Standard 6 OUTSOURCING. A Recordkeeping Standard for State Organizations

STATE RECORDS COMMISSION. SRC Standard 6 OUTSOURCING. A Recordkeeping Standard for State Organizations STATE RECORDS COMMISSION SRC Standard 6 OUTSOURCING A Recordkeeping Standard for State Organizations State Records Commission of WA Perth, Western Australia February 2002 Table of Contents Definitions

More information

Regulation of Insolvency Practitioners and the handling of complaints

Regulation of Insolvency Practitioners and the handling of complaints Regulation of Insolvency Practitioners and the handling of complaints Standard Note: SN/HA/5531 Last updated: 1 June 2010 Author: Section Lorraine Conway, Home Affairs Section Home Affairs Section In the

More information

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011)

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011) NEBOSH National Diploma in Environmental Management Unit ED1 MANAGement of Environmental Risk element 6: Environmental Legislative Framework and Methods of Enforcement Sample material (Material correct

More information

RISK ASSESSMENT POLICY

RISK ASSESSMENT POLICY RISK ASSESSMENT POLICY Post holder responsible for Policy: Directorate / Department responsible for Policy: Contact details: Governance Manager Governance Noy Scott House ext. 3933 Date written: August

More information

EXPLANATORY MEMORANDUM TO THE DEBT RELIEF ORDERS (DESIGNATION OF COMPETENT AUTHORITIES) (AMENDMENT) REGULATIONS 2009. 2009 No.

EXPLANATORY MEMORANDUM TO THE DEBT RELIEF ORDERS (DESIGNATION OF COMPETENT AUTHORITIES) (AMENDMENT) REGULATIONS 2009. 2009 No. EXPLANATORY MEMORANDUM TO THE DEBT RELIEF ORDERS (DESIGNATION OF COMPETENT AUTHORITIES) (AMENDMENT) REGULATIONS 2009 2009 No. 1553 1. This explanatory memorandum has been prepared by the Department for

More information

CONTROLLED DOCUMENT. Traffic Management Policy

CONTROLLED DOCUMENT. Traffic Management Policy CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: PURPOSE Controlled Number: Document Version Number: 1 Controlled Sponsor: Controlled Lead: Approved By: On: Document Document Policy Governance To set out

More information

Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe

Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe 4 Aug 14 Draft v4.4 TBC Resilience Team BCM Policy draft v4.4 1 4 Aug 2014 Statement of

More information

Partial Regulatory Impact Assessment The Planning (Development Management) Regulations (Northern Ireland) 2015

Partial Regulatory Impact Assessment The Planning (Development Management) Regulations (Northern Ireland) 2015 Partial Regulatory Impact Assessment The Planning (Development Management) Regulations (Northern Ireland) 2015 1. Title of Proposal The Planning (Development Management) Regulations (Northern Ireland)

More information

Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version)

Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version) Smart Meters Programme Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Amendment History

More information

BETWEEN[Enter name of other party],and the DIRECTOR-GENERAL OF CONSERVATION ( the Director-General )

BETWEEN[Enter name of other party],and the DIRECTOR-GENERAL OF CONSERVATION ( the Director-General ) BETWEEN[Enter name of other party],and the DIRECTOR-GENERAL OF CONSERVATION ( the Director-General ) MEMORANDUM OF UNDERSTANDING Between the [insert name of the party and include the acronym of the other

More information

National Occupational Standards for Health & Safety Stand Alone Units. Unit HSS8: Review health & safety procedures in workplaces

National Occupational Standards for Health & Safety Stand Alone Units. Unit HSS8: Review health & safety procedures in workplaces Unit HSS8: Review health & safety procedures in workplaces This unit is for a person required to review health and safety conditions in workplaces other than their own. This unit is about: Preparing to

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for

More information

Local Government in Scotland Act 2003

Local Government in Scotland Act 2003 Local Government in Scotland Act 2003 (asp 1) i Local Government in Scotland Act 2003 2003 asp 1 CONTENTS Section PART 1 BEST VALUE AND ACCOUNTABILITY Duty to secure best value 1 Local authorities duty

More information

Emergency Management and Business Continuity Policy

Emergency Management and Business Continuity Policy www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy

More information

Securing safe, clean drinking water for all

Securing safe, clean drinking water for all Securing safe, clean drinking water for all Enforcement policy Introduction The Drinking Water Inspectorate (DWI) is the independent regulator of drinking water in England and Wales set up in 1990 by Parliament

More information

Assistant Project Manager Reference (to be quoted in all your communication regarding this post): BBI/2014/2/AST-APM Temporary Agent AST 4 M/F

Assistant Project Manager Reference (to be quoted in all your communication regarding this post): BBI/2014/2/AST-APM Temporary Agent AST 4 M/F VACANCY NOTICE FOR THE POST Assistant Project Manager to the Bio-Based Industries Joint Undertaking (BBI-JU) Reference (to be quoted in all your communication regarding this post): BBI/2014/2/AST-APM Temporary

More information

Cyber Security Consultancy Standard. Version 0.2 Crown Copyright 2015 All Rights Reserved. Page 1 of 13

Cyber Security Consultancy Standard. Version 0.2 Crown Copyright 2015 All Rights Reserved. Page 1 of 13 Cyber Security Consultancy Standard Version 0.2 Crown Copyright 2015 All Rights Reserved Page 1 of 13 Contents 1. Overview... 3 2. Assessment approach... 4 3. Requirements... 5 3.1 Service description...

More information

Non-statutory Off-site Mitigation and Compensation Policy

Non-statutory Off-site Mitigation and Compensation Policy Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Non-statutory Off-site Mitigation and Compensation Policy Update 11 March

More information

Appendix 1. The Existing Regulatory Scheme Comprises:

Appendix 1. The Existing Regulatory Scheme Comprises: The Existing Regulatory Scheme Comprises: A. An Act about management of the radiofrequency spectrum and other matters. The short title is Radiocommunications Act (Cth) No. 174 1992 as amended; B. An Act

More information

General Register Office for Scotland information about Scotland s people. Paper NHSCR GB 5/07. NHSCR s quality assurance procedures

General Register Office for Scotland information about Scotland s people. Paper NHSCR GB 5/07. NHSCR s quality assurance procedures General Register Office for Scotland information about Scotland s people Paper NHSCR GB 5/07 NHSCR s quality assurance procedures November 2007 NHSCR SCOTLAND INFORMATION GOVERNANCE STANDARDS Author: Muriel

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective

More information

Draft Guidance: Non-economic Regulators: Duty to Have Regard to Growth

Draft Guidance: Non-economic Regulators: Duty to Have Regard to Growth Draft Guidance: Non-economic Regulators: Duty to Have Regard to Growth January 2014 Purpose of this document The duty to have regard to the desirability of promoting economic growth (the growth duty )

More information

Policy for the Management of Business Continuity

Policy for the Management of Business Continuity Policy for the Management of Business Continuity VERSION 2.1 Prepared by: Jeremy Cowen 29 January 2014 Page 1 of 7 1.0 Version Control Date Version Amendment Amended by 12 Jan 2011 1.0 Document created

More information

Basics of Sustainability. Environmental Management Systems (EMS)

Basics of Sustainability. Environmental Management Systems (EMS) Basics of Sustainability 5 Environmental Management Systems (EMS) 1 Contents Page Aims... 2 Introduction... 3 Environmental Management Standards (EMS)... 3 Environmental Policy... 4 Planning... 4 Implementation,

More information

Government Gazette REPUBLIC OF SOUTH AFRICA. Vol. 438 Cape Town 7 December 2001 No. 22913

Government Gazette REPUBLIC OF SOUTH AFRICA. Vol. 438 Cape Town 7 December 2001 No. 22913 Government Gazette REPUBLIC OF SOUTH AFRICA Vol. 438 Cape Town 7 December 2001 No. 22913 THE PRESIDENCY No. 1314 7 December 2001 It is hereby notified that the President has assented to the following Act,

More information

3 August 2012 Policy updated to reflect name changes and alignment with current Aurora Energy Group Policy standards.

3 August 2012 Policy updated to reflect name changes and alignment with current Aurora Energy Group Policy standards. Aurora Energy Risk Management Policy Version History REV NO. DATE REVISION DESCRIPTION APPROVAL 0 19/11/98 Risk Management Policy Prepared by: Manager Internal Audit 1 March 2007 Risk Management Policy

More information

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES PHARMACEUTICAL INSPECTION CONVENTION PHARMACEUTICAL INSPECTION CO-OPERATION SCHEME PI 002-3 25 September 2007 RECOMMENDATION ON QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES PIC/S September

More information

ARMAGH CITY, BANBRIDGE AND CRAIGAVON BOROUGH COUNCIL GPRC/P4.0/V1.0.

ARMAGH CITY, BANBRIDGE AND CRAIGAVON BOROUGH COUNCIL GPRC/P4.0/V1.0. ARMAGH CITY, BANBRIDGE AND CRAIGAVON BOROUGH COUNCIL Document Number: Reference GPRC/P4.0/V1.0. Title of Policy: Records Management Policy No of Pages 19 (including coversheet and policy screening) (including

More information

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY

More information

Submission in response to the Life Insurance and Advice Working Group Interim Report on Retail Life Insurance

Submission in response to the Life Insurance and Advice Working Group Interim Report on Retail Life Insurance 30 January 2015 Mr John Trowbridge Chairman Life Insurance and Advice Working Group Email: submissions@trowbridge.com.au Dear Mr Trowbridge, Submission in response to the Life Insurance and Advice Working

More information

Information Security Management System (ISMS) Policy

Information Security Management System (ISMS) Policy Information Security Management System (ISMS) Policy April 2015 Version 1.0 Version History Version Date Detail Author 0.1 18/02/2015 First draft Andy Turton 0.2 20/02/2015 Updated following feedback from

More information

Queensland WHISTLEBLOWERS PROTECTION ACT 1994

Queensland WHISTLEBLOWERS PROTECTION ACT 1994 Queensland WHISTLEBLOWERS PROTECTION ACT 1994 Act No. 68 of 1994 Queensland WHISTLEBLOWERS PROTECTION ACT 1994 Section PART 1 PRELIMINARY TABLE OF PROVISIONS Division 1 Title and commencement Page 1 Short

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)

More information

3. OPERATING COMPANY'S ANNUAL ROAD SAFETY REVIEW 1

3. OPERATING COMPANY'S ANNUAL ROAD SAFETY REVIEW 1 SCOTTISH MINISTERS' REQUIREMENTS 1. SCHEDULE 8 PART 3 ROAD SAFETY AND ACCIDENT INVESTIGATION AND PREVENTION CONTENTS Page No. 1. GENERAL 1 1.1 Introduction 1 2. ROUTE SAFETY FILES 1 3. OPERATING COMPANY'S

More information

Issue 1.0. UoG/ILS/IS 001. Information Security and Assurance Policy. Information Security and Compliance Manager

Issue 1.0. UoG/ILS/IS 001. Information Security and Assurance Policy. Information Security and Compliance Manager Document Reference Number Date Title Author Owning Department Version Approval Date Review Date Approving Body UoG/ILS/IS 001 January 2016 Information Security and Assurance Policy Information Security

More information

SUNCORP INSURANCE AND FINANCE AMENDMENT BILL 1996

SUNCORP INSURANCE AND FINANCE AMENDMENT BILL 1996 1 SUNCORP INSURANCE AND FINANCE AMENDMENT BILL 1996 EXPLANATORY NOTES GENERAL OUTLINE Objectives of the Legislation The Bill seeks to amend the Suncorp Insurance and Finance Act 1985 (the Suncorp Act ),

More information

The New Zealand Human Services Quality Framework - ISO9002:2008 to 2012

The New Zealand Human Services Quality Framework - ISO9002:2008 to 2012 HUMAN SERVICES QUALITY FRAMEWORK STANDARDS - POLICIES DOCUMENT Q:/1 DATE REVEIWED: REFERENCE: GOVERNANCE AND August 2014 MANAGEMENT POLICY AUTHORISATION: STANDARD REFERENCE: NEXT REVIEW DATE: Management

More information

FOOD LAW ENFORCEMENT IN SCOTLAND

FOOD LAW ENFORCEMENT IN SCOTLAND FOOD LAW ENFORCEMENT IN SCOTLAND A Report on the Administrative and Enforcement Arrangements Prepared by: The Society of Chief Officers of Environmental Health in Scotland The Royal Environmental Health

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

LEEDS BECKETT UNIVERSITY. Information Security Policy. 1.0 Introduction

LEEDS BECKETT UNIVERSITY. Information Security Policy. 1.0 Introduction LEEDS BECKETT UNIVERSITY Information Security Policy 1.0 Introduction 1.1 Information in all of its forms is crucial to the effective functioning and good governance of our University. We are committed

More information

IMPLEMENTING ISO 14001:2004. www.aecos.co.uk

IMPLEMENTING ISO 14001:2004. www.aecos.co.uk IMPLEMENTING ISO 14001:2004 www.aecos.co.uk What is an Environmental Management System? A systematic framework to manage the immediate and long term environmental impacts of an organisation s products,

More information

Graduate Project Engineer

Graduate Project Engineer Position Information Package Graduate Project Engineer POSITION NUMBER: R15/16.15 APPLICATIONS CLOSE: 5:00pm Friday 2 nd October 2015 POSITION INFORMATION Salary: $52 344 - $60 501 (Band 5) Hours: Location:

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

JOB DESCRIPTION. Corporate Governance Manager. 45 hours per week. Director of Compliance & Governance. London with national responsibilities

JOB DESCRIPTION. Corporate Governance Manager. 45 hours per week. Director of Compliance & Governance. London with national responsibilities JOB DESCRIPTION POST: SALARY: HOURS: REPORTS TO: LOCATION: Corporate Governance Manager 40,000 per annum 45 hours per week Director of Compliance & Governance London with national responsibilities JOB

More information

LINCOLNSHIRE COUNTY COUNCIL. JEM Number:1776

LINCOLNSHIRE COUNTY COUNCIL. JEM Number:1776 LINCOLNSHIRE COUNTY COUNCIL JOB DESCRIPTION DIRECTORATE: Development Service/Sub-Division: Technical Services Partnership JOB TITLE: Senior Engineer (AIP) Division/Section/Branch: Highways and Traffic

More information

Information Governance Strategy & Policy

Information Governance Strategy & Policy Information Governance Strategy & Policy March 2014 CONTENT Page 1 Introduction 1 2 Strategic Aims 1 3 Policy 2 4 Responsibilities 3 5 Information Governance Reporting Structure 4 6 Managing Information

More information

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

EXECUTIVE NOTE THE BANKRUPTCY (CERTIFICATE FOR SEQUESTRATION) (SCOTLAND) REGULATIONS 2010 SSI 2010/397

EXECUTIVE NOTE THE BANKRUPTCY (CERTIFICATE FOR SEQUESTRATION) (SCOTLAND) REGULATIONS 2010 SSI 2010/397 EXECUTIVE NOTE THE BANKRUPTCY (CERTIFICATE FOR SEQUESTRATION) (SCOTLAND) REGULATIONS 2010 SSI 2010/397 The above instrument was made in exercise of the powers conferred by sections 5(2B)(c)(ib) and 5B(5)(a),

More information

OVERVIEW. stakeholder engagement mechanisms and WP29 consultation mechanisms respectively.

OVERVIEW. stakeholder engagement mechanisms and WP29 consultation mechanisms respectively. Joint work between experts from the Article 29 Working Party and from APEC Economies, on a referential for requirements for Binding Corporate Rules submitted to national Data Protection Authorities in

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

REPORT 4 FOR DECISION. This report will be considered in public

REPORT 4 FOR DECISION. This report will be considered in public REPORT 4 Subject: Safety Readiness for the Summer 2013 Events Programme Agenda item: Public Item 7 Report No: 4 Meeting date: 28 May 2013 Report to: Board Report of: Mark Camley, Interim Executive Director

More information

iso20000templates.com

iso20000templates.com iso20000templates.com Public IT Limited 2011 IT Service Policy Document Ref. ITSM01001 Version: 1.0 Draft 1 Document Author: Document Owner: V 1.0 Draft 1 Page 1 of 11 Revision History Version Date RFC

More information

Asset and Development Coordinator

Asset and Development Coordinator Department: Section: Location: Works and Services Technical Services City Offices Position Overview The is a critical role within Council s Technical Services section of the Works and Services Department

More information

REMUNERATION COMMITTEE

REMUNERATION COMMITTEE 8 December 2015 REMUNERATION COMMITTEE References to the Committee shall mean the Remuneration Committee. References to the Board shall mean the Board of Directors. Reference to the Code shall mean The

More information

Compliance Audit Handbook

Compliance Audit Handbook Compliance Audit Handbook This Compliance Audit Handbook has been produced by the Compliance and Assurance Section of the Department of Environment and Conservation NSW (DEC). For technical information

More information

Online Infringement of Copyright and the Digital Economy Act 2010 Draft Initial Obligations Code

Online Infringement of Copyright and the Digital Economy Act 2010 Draft Initial Obligations Code Online Infringement of Copyright and the Digital Economy Act 2010 Draft Initial Obligations Code Consultation Publication date: 28 May 2010 Closing Date for Responses: 30 July 2010 Contents Section Page

More information

Proposed guidance for firms outsourcing to the cloud and other third-party IT services

Proposed guidance for firms outsourcing to the cloud and other third-party IT services Guidance consultation 15/6 Proposed guidance for firms outsourcing to the cloud and other third-party IT services November 2015 1. Introduction and consultation 1.1 The purpose of this draft guidance is

More information

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Additional Submission to WorkCover Western Australia

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Additional Submission to WorkCover Western Australia NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Additional Submission to WorkCover Western Australia Review of the Workers Compensation and Injury Management Act 1981: Final Report 31 July 2014

More information

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland

More information

WEST LOTHIAN COUNCIL RECORDS MANAGEMENT POLICY. Data Label: Public

WEST LOTHIAN COUNCIL RECORDS MANAGEMENT POLICY. Data Label: Public WEST LOTHIAN COUNCIL RECORDS MANAGEMENT POLICY RECORDS MANAGEMENT POLICY CONTENTS 1. POLICY STATEMENT... 3 2. PRINCIPLES... 3 DEFINITIONS... 4 3. OBJECTIVES... 4 4. SCOPE... 4 5. OWNERSHIP & RESPONSIBILITIES...

More information

Regulators Code July 2013

Regulators Code July 2013 July 2013 Foreword In the Autumn Statement 2012 Government announced that it would introduce a package of measures to improve the way regulation is delivered at the frontline such as the Focus on Enforcement

More information

Quality Assurance and Safeguards Working Arrangements for the Launch of the NDIS in Victoria

Quality Assurance and Safeguards Working Arrangements for the Launch of the NDIS in Victoria Quality Assurance and Safeguards Working Arrangements for the Launch of the NDIS in Victoria As agreed between the Commonwealth of Australia and Victoria As at 6 May 2013 1 Contents 1. Background... 3

More information

PARLIAMENTARY AND HEALTH SERVICE OMBUDSMAN. Records Management Policy. Version 4.0. Page 1 of 11 Policy PHSO Records Management Policy v4.

PARLIAMENTARY AND HEALTH SERVICE OMBUDSMAN. Records Management Policy. Version 4.0. Page 1 of 11 Policy PHSO Records Management Policy v4. PARLIAMENTARY AND HEALTH SERVICE OMBUDSMAN Records Management Policy Version 4.0 Page 1 of 11 Document Control Title: Original Author(s): Owner: Reviewed by: Quality Assured by: File Location: Approval

More information

Section 69 Order: modification of the Solicitors Regulation Authority Compensation Fund

Section 69 Order: modification of the Solicitors Regulation Authority Compensation Fund Section 69 Order: modification of the Solicitors Regulation Authority Compensation Fund A consultation paper under section 70 of the Legal Services Act 2007 on proposals to modify the Solicitors Act 1974

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John

More information

Tree Management Policy

Tree Management Policy Tree Management Policy This policy is designed to be a policy framework for the management of trees owned and managed by the Connect HA. It sets out the guiding principles for managing our stock, to assist

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)

More information

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE:

JE PANEL/BENCHMARKING REF NO: 867/4 EVALUATION DATE: 1. JOB TITLE Job Title: Project Manager (Transport Infrastructure) Reports to: Design Programme Manager Service: Highways and Transport Environment & Infrastructure Date: November 2014 2. JOB PURPOSE To

More information

Disposal Schedule for Functional records of Retirement Benefits Fund. Disposal Authorisation No. 2416

Disposal Schedule for Functional records of Retirement Benefits Fund. Disposal Authorisation No. 2416 Disposal Schedule for Functional records of Retirement Benefits Fund Disposal Authorisation No. 2416 TABLE OF CONTENTS INTRODUCTION Page 4 Archives legislation Page 4 Schedule elements and arrangement

More information

Standards and accreditation. Tools for delivering better regulation

Standards and accreditation. Tools for delivering better regulation Standards and accreditation Tools for delivering better regulation Introduction Standards and accreditation are marketbased tools that can be used by Government policy makers to deliver better regulation.

More information

Get in on the Act. The Care Act 2014. Corporate

Get in on the Act. The Care Act 2014. Corporate Get in on the Act The Care Act 2014 Corporate Get in on the Act The Care Act 2014 Background The Care Act was first published as a Bill in the House of Lords on 9 May 2013, following prelegislative scrutiny.

More information

Customer Service Charter Guidelines

Customer Service Charter Guidelines Customer Service Charter Guidelines August 2006 Customer Service Charter Guidelines August 2006 1 Contents 1 What are the Customer Service Charter Guidelines? 2 2 What is a Customer Service Charter? 2

More information

Information security controls. Briefing for clients on Experian information security controls

Information security controls. Briefing for clients on Experian information security controls Information security controls Briefing for clients on Experian information security controls Introduction Security sits at the core of Experian s operations. The vast majority of modern organisations face

More information

DRAFT REVISED MoU 15.10.15

DRAFT REVISED MoU 15.10.15 DRAFT REVISED MoU 15.10.15 Memorandum of Understanding on resolution planning and financial crisis management 1. This memorandum has been prepared and published in line with the provisions of Section 65

More information

MEDICAL PRACTITIONERS SEEKING APPROVAL AS INDEPENDENT MEDICAL EXAMINERS - GENERAL PRACTITIONERS

MEDICAL PRACTITIONERS SEEKING APPROVAL AS INDEPENDENT MEDICAL EXAMINERS - GENERAL PRACTITIONERS MEDICAL PRACTITIONERS SEEKING APPROVAL AS INDEPENDENT MEDICAL EXAMINERS - GENERAL PRACTITIONERS 1. Personal Details What is your medical specialty (if any)? Title: Dr Mr Mrs Ms Other (please specify) Family

More information

Council Policy. Records & Information Management

Council Policy. Records & Information Management Council Policy Records & Information Management COUNCIL POLICY RECORDS AND INFORMATION MANAGEMENT Policy Number: GOV-13 Responsible Department(s): Information Systems Relevant Delegations: None Other Relevant

More information