1 Flood Damage Report Central Desert Regional Council Controlled Roads Yuendumu to Mt Wedge road 57 Kilometre Yuendumu to Nyirripi road 6 Kilometre Inspected on 29 th,30 th January and 02 nd,03 rd and 04 th February 2015
2 Content Description Page 1. Executive Summary 3 2. Summary of Flood Damage & Costs 4 3. Flood Damage per Road Repair Strategies Appendix A - Rainfall Across Central Desert Regional Council Area Appendix B Council Road Map Appendix C- Photographs Appendix D- CLC Gravel Extraction Royalties 29 Page 2 of 29
3 1. Executive Summary Extent of Damage Heavy rain in mid January 2015 caused major damage to Council s unsealed road network. A year s worth of rain fell in 3 days. See rainfall table Appendix A Only 90km of Council s 500km primary or secondary access roads have proper formation and drainage. All others are flat-bladed tracks, inherited from 1 July These suffered most damage. Sealed roads inside communities suffered only minor damage. Repair cost Total repair cost to Council is $4.98M ex gst to return roads to pre-rain condition. See Summary Table. Council does not have these funds. Council s road budget in 2014/15 is: $449,165 (after admin fees) FAA Roads grant Road maintenance (grading crew) $352,000 Roads to Recovery ($1.76M over 5 yrs) Capital upgrades Council requires NTG Natural Disaster Relief and Recovery Arrangements (NDRRA) funding or similar to achieve road repairs. Council s Road Network Council controls 1,775 km of road network. 1,600 km are access roads between communities. Of these, 220 km are primary access roads the main routes in/out of gazetted communities. 280 km are secondary access roads major routes used by local traffic between communities. Only primary and secondary roads have been audited and costed in this report. Cost calculations Repair costs have been calculated on two rates road contractor rates $12/$8/$4 per m2 for major/moderate/minor and internal Council road crew rates $6.31/$4.05/$1.74 per m2 for same. Council is able to repair the majority of damage using its own local teams and plant, at significantly lower cost than Contractor rates. Only the first 15km of the Yuendumu-Nyirripi Road (borefield access) requires an external contractor due to major gravel and water haulage. If contractors were to undertake all works, the cost would be around $8M. Note the above costs are simply to return roads to their pre-damage condition, i.e. flat blade tracks, not to upgrade to formed, drained roads. Page 3 of 29
4 2. Summary of Flood Damage & Costs Flood Damage Summary Item No Road section Flood damage Estimated cost($) 1 Yuendumu - Nyirripi road (148km) Major scouring and damage at 1.3k to 10.9k,13.2k to 18.2k,56k to 65k and 84k to 87k 2,321, Yuendumu - Yuelumu road (42Km) 3 Yuelumu Access Rd (28Km) Yuelumu - Ten Mile Rd (31Km) Ten Mile - Pulardi- Tanami Rd (18km) Mt Dennison - Willowra backroad (117km) Yuen/Nyir Rd - Mt Wedge - Papunya Rd (65km) Yuendumu sealed section shoulder damage (1.5km) Willowra Primary access(last 20K) Total excluding GST Ti Tree Station (Nturiya) Access Rd (16km) Engawala access creek crossing (1km) Major silting, washouts and floodway damage at 5k to 9k,25k to 28k Minor damages, can be covered from maintenance Major Scouring and floodway damage at 20k to 27k and 28k to 31k Major scouring at 1k to 2k, 6k to 7k and 9k to 10k Major silting at 1K and 113k to 115k. Minor silting elsewhere. Major scouring and sand silting at 50 to 53K and 54k to 58K Washout of shoulder from 0k to 1.5k No flood damage Major damages at 0.7k to 2.7k and 15.05k to 15.15k Damages of floodways at 0.8k,1.1k and 1.15k 497, , , , , , , , ,980, GST 498, Total including GST 5,478, Page 4 of 29
5 3. Flood Damage per Road 3.1. Yuendumu - Nyirripi Road Road Name: Yuendumu - Nyirripi Road Road length:150km Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount from To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst ($) Scouring and washout on carriageway Minor Ext C , Scouring and washout on carriageway Moderate Ext B , Scouring and washout on carriageway Major Ext A , Floodway wash out Major Ext Fld , Floodway wash out Major Ext Fld , Scouring and washout on carriageway Moderate Ext B , Floodway wash out Major Ext Fld , Scouring and washout on carriageway Minor Ext C , Scouring and washout on carriageway Minor Ext C , Scouring and washout on carriageway Major Ext A , Floodway wash out Major Ext Fld , Scouring and washout on carriageway Minor MN , Floodway wash out Major MJ , Scouring and washout on carriageway Minor MN , Scouring and washout on carriageway Moderate MD , Scouring and washout on carriageway Minor MN , Scouring and washout on carriageway Moderate MD , Scouring and washout on carriageway Minor MN , Total road length requiring repairs 52.3 Reinstatement of offlet drains Ongoing costs Mobilisation/demobilisation (incl contractor) Soil and Pavement Testing Drilling bore CLC gravel royalties Traffic Mgt cost Environmental cost Total Roadworks Project management 5% Overheads 10% Construction contingency 5% Total cost for flood damage repair to Yuendumu - Nyirripi Road 3.2. Yuendumu-Yuelamu Road Road Name: Yuendumu-Yuelumu Road From Chainage To Repair Strategy Length (Km) Area Rate 170, , , , , , , , ,934, , , , ,321, Amount ($) ex gst (m 2 ) ($/m 2 ) Silting of sand thoughout carriageway Moderate MD , Silting of sand thoughout carriageway Moderate MD , Silting of sand on carriageway Minor MN , Silting of sand thoughout carriageway Moderate MD , scouring of sides of the carriageway Minor MN , Floodway-washout Major MJ , Silting of sand thoughout carriageway Major MJ , Silting of sand thoughout carriageway Major MJ , Silting of sand thoughout carriageway Minor MN , Reinstatement of offlet drains CLC royalties Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% Nature of dmage Severity of damage Road length:42km Flood damage repair 15, , , , , , , , , , Total cost for flood damage repair to Yuendumu - Yuelamu road 497, Page 5 of 29
6 3.3 Yuelamu-Ten Mile Road Road Name: Yuelamu-Ten Mile Rd Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount From To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst ($) Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Minor MN , Floodway washout Minor MN , Scouring on carriageway Moderate MD , Scouring and Silting of sand on carriageway Moderate MD , Scouring on carriageway Major MJ , Scouring on carriageway Minor MN , Scouring and Silting of sand on carriageway Major MJ , Scouring and silting of sand on carriageway Moderate MD , Scouring and silting of sand on carriageway Major MJ , Scouring and silting of sand on carriageway Moderate MD , Reinstate of offlets 29, CLC royalties 43, Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% Total cost for flood damage repair to Yuelamu - Ten Mile road Road length:31km 495, , , , , , , , , Page 6 of 29
7 3.4 Ten Mile-Pulardi-Tanami Road Road Name: Ten Mile-Pulardi-Tanami Rd (Council controlled section) Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount From To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst ($) 0 0 to 0.6 Scouring of carriageway Moderate MD , Scouring of carriageway Major MJ , Roadway Scouring and silting of sand in one side Minor MN , Roadway Scouring and silting of sand in one side Moderate MD , Roadway Scouring and silting of sand in one side Minor MN , Roadway Scouring and silting of sand in one side Major MJ , Roadway Scouring and silting of sand in one side Moderate MD , Roadway Scouring and silting of sand in one side Major MJ , Roadway Scouring and silting of sand in one side Moderate MD , Roadway Scouring and silting of sand in one side Minor MN , Roadway Scouring and silting of sand in one side Moderate MD , Roadway Scouring and silting of sand in one side Minor MN , Reinstate of offlets 13, CLC royalties 36, Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% Total cost for flood damage repairto Ten Mile - Pulardi - Tanami Road Road length:20km 314, , , , , , , , , Mt Dennison Willowra backroad Road Name: Mt Dennison - Willowra backroad From Chainage To Nature of dmage Severity of damage Road length:115km Repair Strategy length (Km) Flood damage repair Area Rate Amount ($) ex gst (m 2 ) ($/m 2 ) Floodway silting Major MJ , Silting on carriageway Minor MN , Silting on carriageway Minor MN , Silting on carriageway Minor MN , Silting on carriageway Minor MN , Floodway silting Minor MN , Floodway silting Minor MN , Silting on carriageway Minor MN , Silting on carriageway Minor MN , Floodway silting Minor MN , Floodway silting Minor MN , Silting on carriageway Minor MN , Silting on carriageway Minor MN , Floodway silting Major MJ , Floodway silting Major MJ , Reinstate of offlets CLC royalties Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% Total cost for flood damage repair to Mt Dennison - Willowra backroad 10, , , , , , , , , , , Page 7 of 29
8 3.6. Yuen/Nyir Road - Mt Wedge Papunya Road (Council controlled section) Road Name: Yuen/Nyir road - Mt Wedge - Papunya Rd (Council controlled section) From Chainage To Nature of dmage Severity of damage Road length :65Km Repair Strategy length (Km) Flood damage repair Area (m 2 ) Rate ($/m 2 ) Amount ($) ex gst Silting and scouring on carriageway Minor MN , Silting and scouring on carriageway Minor MN , Silting and scouring on carriageway Minor MN , Silting and scouring on carriageway Minor MN , Silting and scouring on carriageway Minor MN , Silting on carriageway Minor MN , Major sand silting and scouring on carriageway Major MJ , Floodway washout Major MJ , Major sand silting and scouring on carriageway Major MJ , Floodway washout Minor MN , Floodway washout Minor MN , Scouring on carriageway Major MJ , Scouring and silting on Carriageway Moderate MD , Major scouring on carriageway Major MJ , Scouring and silting on Carriageway Moderate MD , Scouring and silting on Carriageway Minor MN , Reinstate of offlets 17, CLC royalties Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% 52, , , , , , , , , Total cost for flood damage repair to Yuendumu/Nyirripi road - Mt Wedge - Papunya Rd (CDRC section) 484, Ti Tree Station (Nturiya) Access Road Road Name: Ti Tree Station (Nturiya) Access Rd Road length:15km Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount ($) From To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst Reconstruct floodway Major MJ , Reinstate Offlets Reconstruct floodway Major MJ , Reconstruct floodway Major MJ , Reinstate Catch Drain Reformation Moderate MD , Reinstate Gravel Major MJ , Reformation Minor MN , Reconstruct floodway Major MJ , Reinstate of offlets 19, CLC royalties 15, Total Roadworks 206, Mobilisation demobiliation cost 30, Traffic Mgt cost 2, Environmental cost 1, Sub total 240, Project management 5% 12, Overheads 10% 24, Construction contingency 5% 12, Total cost for flood damage repair to Ti Tree Station (Nturiya) access road 288, Page 8 of 29
9 3.8. Engawala Access Creek Crossing Road Name: Engawala Access Creek Crossing Road length:1.2km Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount From To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst ($) Reconstruct floodway Major MJ , Reconstruct floodway Major Concrete , Reconstruct floodway Major MJ , Reconstruct floodway Major MJ , Reconstruct floodway Major MJ , Reconstruct floodway Major MJ , Reinstate offlets 8 numbers 4, CLC royalties 4, Total Roadworks Mobilisation demobiliation cost Traffic Mgt cost Environmental cost Sub total Project management 5% Overheads 10% Construction contingency 5% Total cost for flood damage repair to Engawala Access Creek Crossing 47, , , , , , , , , Yuendumu internal roads-sealed section Road Name: Yuendumu internal road-sealed section Road length:1.5km Chainage Flood damage repair Severity of Nature of dmage Repair Area Rate Amount from To damage length (Km) Strategy (m 2 ) ($/m 2 ) ex gst ($) Scouring and washout on shoulder Moderate MDS , Ongoing cost ClC royalties 5, , Traffic Management cost Environmental cost Total cost to reinstate flood damage repair on Yuendumu internal road shoulders 1, , Page 9 of 29
10 4. Repair strategies All descriptions based on NT Department of Infrastructure 2014/15 Standard Specification for road maintenance 4.1 Repair of Major Damage-(MJ). By Council Road Crew 57.6k-Mt Wedge road 51.2K Mt Wedge Major damages include scouring or/and siltation over 500mm deep on road surface and floodways. Rectification method as follows: Clearing of unwanted material: Removal of unsuitable material such as silt, rubble, sand, loose material, and debris dumped on flood ways, roadway and drains by flood. Mostly graded over windrows. Refilling and Reformation: This includes hauling, placing, watering and compacting material on all prepared areas including scours and washouts. Refilling includes filling holes and other depressions on roadway and floodway. Spread material in uniform level layers to a maximum thickness of 250mm layers and compact to required degree of compaction. Shape grade and compact road generally with material to reform surface. Compaction: Mix to homogeneous material and compact to required degree using suitable static/vibration roller. Based on distance of 1Km; pavement width 6 m Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x Fuel/water trailer x Caravan x Loader x Water cart x Roller 10T x Excavator x1 (borrow pit) Truck gravel 10T x Work supervisor Cost($/m 2 ) Page 10 of 29
11 4.2 Repair of Moderate Damage-(MD). By Council Road Crew 6.4K-Ten Mile to Pulardi 50.9K Yuen/Nyirripi to Papunya Moderate Damage includes scouring and/or siltation from 150mm to 500mm deep on road surface and floodway. Proposed rectification method as follows: Clearing: Removal of unsuitable material such as silt, rubble, sand and debris dumped on flood ways, roadway and drains by flood. Refilling /cut back and reformation: This includes hauling, placing and compacting material on all prepared areas including scours and washouts, holes and depressions. Depending on the circumstances, either refilling or cut back the existing uneven surface will apply until reach sound dense surface. Compaction: Compact to required degree using suitable static/vibration roller. Based on distance of 1Km; pavement width 6 m Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x Fuel/water trailer x Caravan x Loader x Water cart x Roller 10T x Excavator x1 (borrow pit) Truck gravel 10T x1 Work supervisor Cost($/m 2 ) Page 11 of 29
12 4.3 Repairing of Minor Damage (MN). By Council Road Crew 23.7k Yuendumu-Yuelamu Road 27.7k Pulardi road Minor Damages classified as scouring or/and siltation up to 150mm deep on road surface and floodways. Proposed rectification method as follows: Surface reformation: Removal of unsuitable material such as sand and debris dumped on flood ways and roadway. Shape grade and compact road generally with material cut from higher ground alongside the road if suitable. As necessary cut back existing uneven surface to reach sound dense surface while achieving surface formation. Use suitable static/vibration roller for compaction with sufficient roller passes. Based on distance of 1Km; pavement width 6 m Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x Fuel/water trailer x Water cart x Roller 10T x Caravan x Work supervisor Cost($/m 2 ) 1.74 Page 12 of 29
13 4.4 Repair of Major Damage to Floodways-(MJ). By Council Road Crew 20.0K-Yuel-Tanami Road 51.2k Mt Wedge to Papunya Rd Clearing: Removal of unsuitable material such as silt, rubble, sand and debris dumped on flood way out to levee bank. Reform: Reconstruct floodway with gravel lifts to flow level. Maintain additional 2m width of carriageway on either side of floodway. Compact to required degree of compaction on each layer. Use suitable static/vibration roller for compaction with sufficient roller passes. Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x Fuel/water trailer x Caravan x Loader x Water cart x Roller 10T x Excavator x1 (borrow pit) Truck gravel 10T x Work supervisor Cost($/m 2 ) Page 13 of 29
14 4.5 Reinstatement of offlet drains. By Council Road Crew Clearing: Remove/clear all obstructions including sand silt, trees, fallen branches and rocks, etc. Reconstruction: Trim to shape of trapezoidal drain with batter slope 1:2. Align and grade offlet so that water drains away without scour and damaging the road, and to disperse water as sheet flow or into natural water courses at a gradient not to exceed 1:40(1.5%). Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x1 Cost/offlet($) Reinstatement of shoulders at Yuendumu sealed section. By Council Road Crew Clearing: Removal of unsuitable material such as silt, rubble, sand and debris dumped alongside the shoulders. Scarifying/Refilling: Damaged surface shall scarify to ensure proper bonding of filling material. Suitable shoulder material will be placed on scarified surface to reach the original level. Compaction: Compact with no compaction plane and free of cracking to confirm the required degree of compaction. Use suitable static/vibration roller for compaction with sufficient roller passes. Resources Qty Rate($/hr) hrs Amount($) Grader x Service truck x Fuel/water trailer x Loader x Water cart x Roller 4T x Excavator x1 (borrow pit) Truck gravel 10T x1 Work supervisor Cost/m 2 ($) Page 14 of 29
15 4.7 Road Repairs. By Contractor. Method A Earthworks + Sub grade+ Gravel base Reinststement of formation and gravel pavement from scouring damage 150mm gravel base 150mm subgrade work 150mm earth work` Rate for 1m2 $ 12 Method B Earthworks + Subgrade Earthworks and Sub Grade damaged by severe scouring 150mm sub grade formation 150mm earth work` Rate for 1m2 $ 8 Method C Formation reinstatement Formation damaged by scouring and siltation from runoff 150mm earth work` Rate for 1m2 $ 4 Page 15 of 29
16 APPENDIX A - RAINFALL ACROSS CENTRAL DESERT REGIONAL COUNCIL AREA Rainfall (mm) Dec 2014 Rainfall (mm) Jan 2015 Lajamanu Rabbit Flat Yuendumu Kintore Watarrka Ti-Tree Alice Springs Arltunga Jervois 1 Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan Dec Jan TOTAL TOTAL Average Average Month Month Annual Annual Data from Bureau of Meteorology website Blank cells = no data Kintore = Wulungurru; Ti Tree = Territory Grape Farm; Watarrka = Kings Canyon Papunya and Ali Curung had no observations during December and January Lajamanu Rabbit Flat Yuendumu Kintore Watarrka Ti-Tree Alice Springs Arltunga Jervois Nyirripi Engawala Page 16 of 29
17 APPENDIX B Council Road Map Mt Dennison Willowra backroad Tanami Rd Stuart Hwy Nturiya Access Rd Yuel Access Rd Yuen Nyir Rd Yuen-Papunya backroad Stuart Hwy Council boundary Tanami Rd
18 APPENDIX C- Photographs 1. Yuendumu-Nyirripi road 5.1K 6.5K
19 61.8K 62K Page 19 of 29
20 2. Yuendumu-Yuelamu road 23K 27K Page 20 of 29
21 3. Yuelamu-Ten Mile Road 20K 25K Page 21 of 29
22 26K 30K Page 22 of 29
23 4. Ten Mile - Pulardi Tanami Rd 1K 6K Page 23 of 29
24 5. Yuen/Nyir Road - Mt Wedge Papunya Rd (Council controlled section) 51K 50K Page 24 of 29
25 54K 57K Page 25 of 29
26 6. Mt Dennison Willowra backroad 106K 114K Page 26 of 29
27 7. Yuendumu road-sealed section 8. Ti Tree Station Access road Page 27 of 29
28 9. Engawala Access Creek Crossing Page 28 of 29
29 CLC Royalties Appendix D- CLC Gravel Extraction Royalties Expected CLC rate for gravel excavation =$10/m3. Following gravel is required for each road: Road Length (Km) volume (m 3 ) Amount ($) Yuendumu-Yuelamu-300mm , Yuelamu-Ten Mile , Ten Mile - Pulardi-Tanami Rd , Yuen/Nyirripi - Mt Wedge - Papunya (Council section) , Mt Dennison - Willowra , Yuendumu - Nyirripi (150mm) Yuendumu-Nyirripi (300mm) Yuendumu road sealed section shoulder reinstate Ti Tree Station (Nturiya) access (300mm) Engawala Access Creek Crossing (300mm) Total CLC Gravel Extraction Royalties , , , , , , Page 29 of 29
Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL
Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL This document is owned and authorised by the Manager Budget and Program
More informationNATURAL DISASTER ARRANGEMENTS JANUARY 2012 MONTH YEAR
NATURAL DISASTER ARRANGEMENTS JANUARY 2012 MONTH YEAR TABLE OF CONTENTS Page Number 1 Introduction 3 Purpose of these Guidelines What Roads are eligible? What is a Declared Natural Disaster? Funding Responsibility
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationSECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationINDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationCLASS II BASE COURSE - Section 302
CLASS II BASE COURSE - Section 302 Class II Base Courses are similar to Class I Base Courses, with the exception that placement on a subgrade layer built in accordance with Specification Section 305 is
More information4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More information3. QUALITY ASSURANCE REQUIREMENTS
3. QUALITY ASSURANCE REQUIREMENTS 3.1 General This section covers the Kaipara District Council requirements for monitoring and testing of physical asset construction to ensure that the final asset delivered
More informationKAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz
More informationRIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
More informationASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationSOL: Transport Sector Development Project
Transport Sector Development Project (RRP SOL 41171) Scope and Technical Report PART I: Land Transport Infrastructure Subproject (St. Martin Road) Project Number: 41171-02 November 2010 SOL: Transport
More informationStorm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
More informationAsset Management Guide For Project Design Format
NZ Transport Agency Page 1 of 6 Asset Management Guide For Project Design Format 1 Background There has been an increasing awareness of design features, which produce poor wholeof-life costs. These poor
More informationEngineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
More informationTree Pits Operation & Maintenance Guide
Tree Pits Operation & Maintenance Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping
More informationGUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS
GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationRural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate
After fulfilling Module 16, you will be able to: Understand the structure of cost estimating sheets and the steps to establish a cost estimate for rural road maintenance Establish cost estimate Self -
More informationFirst in Service First in Safety
7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationTobique Employment & Training
APPENDICES 3 Tobique Employment & Training Flood Mitigation July 30, 2012 Overview This proposal outlines the work required and budget for flood mitigation measures on Tobique First Nation which is required
More informationPermeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
More informationAUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
More information16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
More informationSE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
More informationTexas Building Pros Foundation Repair Services
Foundation Repair Services Lets get things back on the level Life is not about the work you put into your love, It s about the Love you put into your work. -Mother Theresa Why Choose Texas Building Pros:
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationAPPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
More informationH: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationRoad Construction. Production Study. AccuGrade GPS & ATS Systems. MALAGA Demonstration & Learning Center
AccuGrade GPS & ATS Systems Road Construction Production Study MALAGA Demonstration & Learning Center December 2006 2 TABLE OF CONTENTS ABSTRACT... 4 1 INTRODUCTION... 5 PERSONNEL... 6 EQUIPMENT... 6 2
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationTHE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
More informationPermeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationPapunya Business Directory
Papunya Business Directory Department of Business Phone: 08 8999 5218 http://www.dob.nt.gov.au Table of contents Table of contents... 2 About Papunya... 2 Population... 2 Power and water... 2 ICT information...
More informationThere is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
More information2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27
2014 ANNUAL REPORT Department: Highway Department Head: David Hartman Departmental Employees: 27 Department Mission: The Yates County Highway Department is responsible for the construction, maintenance
More informationNDRRA Flood Restoration Guideline for Queensland Local Governments
NDRRA Flood Restoration Guideline for Queensland Local Governments Prepared by: IPWEAQ Page 1 of 34 Revision No.2.0 Quality Information Document Ref NDRRA Flood Restoration Guideline for Queensland Local
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationT2: Reduce overall transport cost by cost effective road rehabilitation and maintenance
PROJECT REPORT PR/INT/277/04 Dynamic Cone Penetrometer tests and analysis Technical Information Note By Colin Jones Sector: Theme: Project Title: Project Reference: Transport T2: Reduce overall transport
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
More informationPRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationFinal Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationNJ650.1404 Interception Drainage
NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements
More informationStorm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
More informationPICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
More informationLand claims are now being settled in Canterbury.
Land claims are now being settled in Canterbury. HERE S A SUMMARY OF THE PROCESS Any damage to the house s foundations is covered by the building claim (not the land claim) Trees and gardens are not covered
More informationTITLE: DCP analysis and design of low volume roads by new TRL software UK DCP AUTHORS: Piouslin Samuel and Simon Done, TRL
SEMINAR: SUSTAINABLE ACCESS AND LOCAL RESOURCE SOLUTIONS Date : 28 30 November 2005 TITLE: DCP analysis and design of low volume roads by new TRL software UK DCP AUTHORS: Piouslin Samuel and Simon Done,
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationSmall Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
More informationWATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
More informationHelen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationSERVICES AND HIGHWAY PROBLEMS AND THEIR LOCATIONS DRAINS & OVERHANGS TO PATHWAYS
SERVICES AND HIGHWAY PROBLEMS AND THEIR LOCATIONS DRAINS & OVERHANGS TO PATHWAYS Following Parish Council meeting of 21st May 2014 various problems regarding drains, overhanging branches on walkways and
More informationScheduling Maintenance for Infiltration Basins and Trenches
Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections
More informationSection 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
More informationAquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationSabino Canyon History
History During the Great Depression of the 1930 s, the CCC (Civilian Conservation Corporation) and the WPA (Works Progress Administration) built the nine bridges that crossed Sabino Creek. They originally
More informationRoad Maintenance Techniques
COLD CHON (GALWAY) LTD Cold Chon Road Maintenance Techniques Jim Campbell, Chief Engineer, Cold Chon www.coldchon.ie INTRODUCTION The maintenance of roads involves the co-ordination of a wide range of
More informationGuidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationAdvancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
More informationDIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY
DIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY 201.01 Description This work shall consist of clear cutting, selective clearing and thinning, tree trimming, removing single trees, including
More informationTrack Drainage Inspection and Maintenance
Track Drainage Inspection and Maintenance 1 Scope Civil Engineering RTS 3432, March 2006 The purpose of this drainage guide is to enable engineering and maintenance staff to inspect and maintain effective
More informationGovernment of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL
Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationBlock and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
More informationDRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationROAD AND DRAINAGE MAINTENANCE
ROAD AND DRAINAGE MAINTENANCE Service Delivery Training Module 3 of 4 MINISTRY OF LOCAL GOVERNMENT AND PROVINCIAL COUNCILS ROAD AND DRAINAGE MAINTENANCE Service Delivery Training Module 3 of 4 2008 MINISTRY
More information