2 Supplier Quality Assurance Mission Statement Our mission is to assure that PG&E has a robust quality program that quantitatively measures supplier performance and drives continuous supplier improvement. We will work with our suppliers to assure delivery of safe, reliable and affordable products that meet or exceed our Customer s expectations.

3 Table of Contents 1.0 SCOPE APPLICABLE DOCUMENTS GENERAL DEFINITIONS QUALITY SYSTEM REQUIREMENTS PG&E PART QUALIFICATION PROCESS (PPQP) ADDITIONAL PG&E REQUIREMENTS Change Management Process Special Process Control Unexpected Visual Conditions Inspections and Product Acceptance Post-Qualification Reporting Requirements APPENDIX A I. QUALIFICATION PROCESS TERMINOLOGY II. QUALIFICATION WORK ELEMENT DEFINITIONS III. QUALIFICATION ELEMENT WORKSHEETS Revision Notes... 44

4 1.0 SCOPE 1.1 This manual establishes qualification requirements for direct material suppliers to PG&E for products and custom tools used in power generation (excluding nuclear) and the transmission and distribution of natural gas and electricity. It includes verification of a supplier s quality management system by audit and describes the process for product qualification to establish supplier capability to meet PG&E contract requirements. This manual applies to conditions identified in section 5.3 below. 2.0 APPLICABLE DOCUMENTS 2.1 The following documents form a part of this specification to the extent specified herein. Additional requirements, applicable item drawings, and specifications will be communicated by PG&E as necessary (examples, ASME, API, AWS, and ASTM). Unless otherwise indicated, the latest document revision shall apply ISO 9001, Quality Management System International Standard ISO 17025, General Requirements for the Competence of Testing and Calibration Laboratories Recommended Practice Number ASNT-TC-1A, Personnel Qualification and Certification for Non-Destructive Testing (or equivalent) 2.2 Hierarchy The Purchase Order (PO) is the formal document transmitting PG&E requirements to a supplier. Changes to a design drawing or specification cannot be made by PO revision alone without the accompanying revised drawing or specification In the event of a conflict between the PO, specifications and the requirements stated therein, the order of precedence (highest to lowest) shall be: Part Drawings (unless they defer to specifications as the overriding documents) Specifications SCM-2105M Purchase Order It is the responsibility of the supplier to review requirements transmitted by PG&E contract or purchase orders and document the results of the review. Any conflict between PO requirements including documents identified in the PO shall be brought to the attention of PG&E Supplier Quality Assurance for resolution prior to initiating work. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 1 of 42

5 3.0 GENERAL DEFINITIONS 3.1 Shall or Must indicate a mandatory requirement. Should or May indicate a recommended or desirable but not mandatory requirement. 3.2 Vendor - The entity to which PG&E issues a purchase order. The vendor is responsible for transmitting PG&E s part requirements to the supplier. 3.3 Supplier - Unless noted otherwise, refers to the corporation, company, partnership, sole proprietorship, or individual that is responsible for manufacturing the part subject to this qualification process. Suppliers of components or services to the manufacturer which enable manufacture of the final product are called sub-suppliers. 3.4 Supplier Quality Engineer (SQE) PG&E representative who communicates qualification and production quality requirements, and is the key contact with the supplier relative to qualifications, process improvements, non-conforming material dispositions, corrective actions, surveillances and auditing. 3.5 Sourcing PG&E representative who negotiates price, delivery, terms and conditions, and places purchase orders for qualification and production. This individual is the official contact between the supplier and PG&E for all commercial issues and conditions. 3.6 Responsible Engineer (RE) PG&E Engineering representative, typically a Standards Engineer, who together with the SQE is responsible for actions and approvals within the qualification process, and/ or reviewing nonconforming issues for engineering approval. This individual also coordinates disposition with the SQE for return response to the Supplier. The RE definition may apply to various functions at PG&E such as the Standards Engineer, Subject Matter Experts or other technical specialist assigned to review a qualification document or nonconformance. Any communication with the RE must be done with prior notification and knowledge of the SQE and Sourcing. 4.0 QUALITY SYSTEM REQUIREMENTS 4.1 The supplier should have a third-party certification to ISO 9001 or a quality management system that complies with ISO 9001 requirements. In cases where the supplier does not meet this requirement, PG&E will document deficiencies of the QMS per ISO guidelines as part of the audit process. The supplier shall submit a corrective action plan to PG&E for approval which addresses all documented deficiencies New suppliers to PG&E shall be audited and conditionally approved by PG&E before being allowed to begin product or process qualification activities. Approval requires the supplier to take corrective action on all audit nonconformance s to PG&E s satisfaction, or to have an approved corrective action plan in place to resolve the QMS deficiencies to PG&E s satisfaction Prior to the audit, suppliers shall submit at the minimum the following to the PG&E SQE for review: PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 2 of 44

6 Completed PG&E pre-audit questionnaire Current QMS Certification or evidence of Conformity to the ISO standard or equivalent Copy of the current QMS manual. Recent Organization Chart Accreditation of testing laboratories and the scope of their accreditation List of Special Processes List of key sub- suppliers who may be used to satisfy PG&E requirement and copies of their 3 rd party Certifications, if any. Refer to Appendix II for a definition of a key sub-supplier Pending a successful audit, the supplier will be placed on the PG&E Qualified Suppliers List as conditionally approved pending successful completion of PG&E Part Qualification. 4.2 Record Retention Records required by applicable industry product standards shall be retained for not less than the period of time specified by any applicable industry standards or five years, whichever is longer. Records required to provide evidence of conformity to requirements and of the effective operation of the quality management system shall be retained for a minimum of five years. PG&E must be notified prior to the disposal of any quality records. 4.3 Right of Access PG&E reserves the right to visit suppliers and sub-suppliers for audits or business meetings during the normal course of business or to perform source inspection and surveillance. PG&E will use reasonable efforts to provide at least five (5) days advance notice and work with the suppliers to ensure adequate preparation for audit and business visits. Suppliers will provide advance notice to PG&E for planned surveillance or source inspection activities consistent with manufacturing schedules or as required for key hold points or witness points as defined in section 4.5 below. 4.4 Control of Sub-tier Suppliers If a supplier chooses to outsource a process, product component or final product, the supplier is responsible for qualification and surveillance of the sub-supplier to PG&E requirements and notifying PG&E of this qualification. PG&E reserves the right to (1) Review the supplier s process for selection, qualification and surveillance of its sub-suppliers; (2) To approve or disapprove the sub-supplier s qualification; and (3) Audit and monitor the sub-supplier s processes and facilities when deemed necessary The supplier shall perform routine quality audits and inspection of its key subsuppliers to ensure oversight, knowledge and control of critical or special processes PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 3 of 44

7 as well as changes enacted by the sub-supplier. In addition, the supplier shall have a documented system in place to inspect custom incoming components from subsuppliers for adherence to drawings or specifications The supplier shall conduct requalification to validate any major changes to processes or product provided by the sub-suppliers, including First Article inspections Key sub-suppliers, sub-supplier processes, or sub-supplier manufacturing locations or critical components that affect form, fit, or function that are approved as part of the PG&E qualification are considered frozen and cannot be changed without resubmittal and approval of the required documents by PG&E 4.5 Hold Points and Witness Points Hold Points are mandatory verification points identified by the PG&E SQE beyond which work may not proceed until a PG&E representative performs verification or surveillance and provides notice to proceed. Source inspection prior to product release and PG&E surveillance of a manufacturing step, special process test or inspection are examples of Hold Points. Hold points or witness points, when required, will normally be communicated through purchase order notes Witness Points require the Supplier to notify the SQE in writing prior to completion of those steps. After notification, work may proceed beyond a Witness Point with or without action by the SQE The supplier shall notify the SQE of Hold Points or Witness Points in the manufacturing or qualification process schedule a minimum of ten (10) days in advance (unless otherwise agreed upon with the SQE). 4.6 Design Control The supplier s quality management system shall implement controls to: Ensure that PG&E design, specification, functional and quality requirements are correctly translated into drawings, specifications, procedures, and instructions. Ensure that Supplier designs and specifications, including any revisions, for products being procured by PG&E are reviewed and accepted by PG&E Engineering to confirm that they meet PG&E requirements prior to initiating manufacturing. Assure that design reviews and approvals are documented. 4.7 Preventive Maintenance The supplier shall identify key process equipment and tooling, develop and document a Preventive Maintenance program. PG&E may verify that such programs are documented and effectively implemented during supplier audits. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 4 of 44

8 5.0 PG&E PART QUALIFICATION PROCESS (PPQP) 5.1 General Terminology General terms applicable to the qualification process used by PG&E are listed below. Appendix A contains a glossary of additional terminology related to different work elements of the qualification process Qualification: A specific effort to demonstrate that a supplier s production facility, processes, equipment, tooling, software and/or inspection systems are capable of producing and discriminating acceptable product within the extremes of the defined process, to a defined confidence level as required by drawings, specifications or other documents PG&E Part Qualification Process (PPQP): A structured, approach to conduct supplier qualifications, establish basic manufacturing documentation requirements and assess that products meet PG&E requirements. The process may define effort in 2 Phases and include the following Phase 1 requirements: Part description including drawings and applicable specifications The actual tests and inspections to be performed. Where the tests and/or inspections are to be performed, i.e., at the Supplier or a PG&E facility. Minimum size of a First Article Production run, sampling plans and part test quantities, key characteristics and/or parameters to be evaluated. Acceptance Criteria Required completion of Qualification Process Work Elements. PG&E Hold or Witness Points Phase 2 deals with additional functional and environmental testing which may be required if Phase 1 is successfully completed. The need for such testing will be established by PG&E in conjunction with conversations with the supplier. A completed qualification package prepared by the supplier and submitted to PG&E will consist of a summary cover letter, documented completion of up to 15 different Qualification Work Elements plus an approved Part Warrant. A Work Element Submission Requirements and Status Checklist is also provided to the supplier to facilitate tracking the completion of the various work elements. The Work Elements are listed in Figure and the corresponding work sheets are included in Appendix A Part Qualification Plan (PQP): Documents the qualification and re-submittal requirements that are identified by PG&E for the product that the supplier will be manufacturing. Design drawings and applicable specifications are defined in the PQP Part Warrant (PW): The Part Warrant is the official document prepared by the Supplier and is used to track the status of the PPQP document package. When completed, it will also contain the official PG&E approval and final sign-off of the PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 5 of 44

9 5.2 PPQP Objectives qualification. It must be resubmitted when any approved qualification documents are revised. If the part warrant is rejected, a reason for the rejection will be provided. This process is based on elements of the Automotive Industry Action Groups (AIAG) Production Part Approval Process (PPAP) Standard Revision 4 March, The objectives of this process are: To provide evidence that engineering design and specification requirements are properly understood and fulfilled by the supplier. To demonstrate that the supplier s manufacturing and inspection processes provide products that meet PG&E requirements during an actual production run. An additional benefit includes establishing a baseline of supplier process documentation to facilitate Change Management and Control. 5.3 Applicability This process is required for the following situations: A new product manufactured by a new supplier. A new product manufactured by an existing supplier. A new supplier manufacturing an existing product. After a break of production for at least 2 years After a major factory disturbance such movement of key machines or product lines, a major restructuring of the work force or a factory change of ownership. A new product is defined as one that PG&E has never used or that a supplier may not have ever produced. The design or specification for the new or existing product may be provided by the supplier or PG&E. New product and/or new supplier qualification require submittal of all assigned Work Elements upon completion of Phase 1 by the supplier. This is identified as a Level 1 Qualification in Figure A Level 2 Qualification where most submittal requirements are defined by the SQE, and at PG&E discretion may be used for qualifying long-lead, one-of complex products or limited requalification activities. After an initial qualification, there are situations where some requalification and First Article testing may be required. These situations include but are not limited to: Changes in key sub-suppliers or the manufacturing location of the supplier and critical product sub-suppliers Changes in product design, specifications or processes, or a sub-supplier process, including critical integral software, such that product form, fit or function may be affected Change of a custom component or material PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 6 of 44

10 Quality issues such that existing qualifications are called into question. The scope of the required requalification effort will be determined by the SQE. Section 6.1 of this procedure entitled Change Management Process provides more guidance on when requalification would be necessary. Change Request requirements are also described. 5.4 General Requirements By successfully completing a qualification (Phase 1 and Phase 2 as required), the supplier demonstrates the ability to provide parts that meet PG&E requirements. The supplier is required to perform the qualification using the documented instructions in the Plan communicated by PG&E. Once the qualification is completed and deemed acceptable by PG&E, PG&E will sign the supplier provided Part Warrant. After approval, the supplier will be considered qualified to supply a specific part or part family The approved process, including those for supplier designed items, will be considered frozen. Any changes to the approved processes, procedures or supplier designed items will require resubmittal and approval by PG&E before they can be implemented. This also includes changes to the Bill of Materials for supplier designed hardware generally for parts defined to be key parts. 5.5 Communication The supplier shall appoint a Project Manager for the Qualification effort. This individual will be responsible for communicating with the SQE (or other identified PG&E Project Lead) on a mutually agreed upon schedule to report project item status, discuss issues (current or unforeseen) that could affect successful completion of the qualification, potential solutions, and SCARs. The Project Manager is responsible for developing schedules and assuring that commitments and milestones are met to satisfy PG&E requirements. 5.6 PG&E Qualification Process Requirements PG&E, with supplier input, will establish the scope of the qualification which is then documented in the Part Qualification Plan (PQP). The qualification process will consist of one or two Phases (depending on various factors that will be addressed by PG&E Supplier Quality Engineering with the Supplier): Phase 1: First Article Tests and Inspections. This Phase is performed by the supplier in compliance with the qualification test plan provided by PG&E. This testing may include dimensional inspection, material testing and/or functional tests to demonstrate that the product is acceptable. The First Articles must be taken from an actual production run in the facility intended to manufacture the product for PG&E using production tooling, PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 7 of 44

11 procedures and equipment. Exceptions may be made with written release by PG&E. The minimum size of the production run and sampling plan for selection of the First Articles to be tested and submitted to PG&E will be established by PG&E. If the Phase 1 results of First Article tests and inspections meet PG&E Acceptance Criteria, the complete PPQP package including a cover letter summary prepared by the supplier, the completed Work Elements, and the signed Part Warrant shall be submitted to PG&E for review and approval. If Phase 1 results do not meet PG&E requirements, Corrective Actions would be required and Phase 1 repeated or amended. Prior to initiating Phase 1, if a product, new to PG&E, has been manufactured by either a new or existing supplier, information on product characteristics and performance will be requested to allow PG&E to perform an initial product assessment. This request will be documented using the Supplemental Requirements Work Sheet of the Qualification Plan and address the following topics: Design Record including Drawings (Minimum), Material and Technical Specifications Electrical Characteristics Utility References Design test results Safety test results Product maintenance & operating procedures and/or requirements Installation instructions Weather proofing characteristics and requirements Samples or Prototypes (if available) for PG&E evaluation Conformance with National Standards Lab test results and certifications Environmental and life testing Production test results Durability (Accelerated life or age test results) Product demonstration results Product In-service experience Material Problem Report History Production history and Capacity For supplier designed products, design records must be provided by the Supplier. Key product and process characteristics should be identified by the supplier in the design record. Key characteristics may be product specification requirements or in-process product characteristics identified by the supplier as being necessary to assure that final product meets requirements. If a product requested by PG&E has never been produced by a supplier, PG&E may take the lead responsibility and/or work with the supplier to populate the Design Record. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 8 of 44

12 If parts requiring qualification are already in production at a new or existing supplier, samples should be submitted to PG&E for evaluation. The results of this evaluation may influence the scope of the later Phase 1 or Phase 2 qualification work. All required Qualification Work Elements shall be submitted to PG&E prior to fabricating First Articles unless specified otherwise by the SQE. Phase 2: Functional and/or Environmental Testing. If deemed necessary by PG&E, this Phase will include additional tests or inspections that may be required to demonstrate functional capability of the product; confirm that installation and maintenance requirements are met; and / or prove that the product will perform in the environment that it is intended to be used. These tests may be performed by the Supplier or PG&E as defined in the PQP. A successful Phase 1 is a pre-requisite for conducting Phase 2 testing. If both Phase 1 and 2 are successfully completed to PG&E s satisfaction, the Part Warrant will be signed by PG&E and returned to the supplier. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 9 of 44

13 Figure : Qualification Work Elements Work Element Level 1 Level 2 -- Part Qualification Plan (PQP) PG&E PG&E _ Work Element Requirements and Submission Status Checklist* PG&E PG&E -- Supplemental Qualification Requirements PG&E PG&E -- Product Marking, Packaging & Labeling Requirements PG&E PG&E 1 Special Process List 2 Special Process Qualification Documentation Key Sub-supplier List Qualified Laboratory Documentation Process & Inspection Flow Chart (PFO) Software Control Applicable Document List Visual Standards and Part Checking Fixtures Certificate of Conformance (C of C) 10 Dimensional and Visual Inspection Report Supplier Test Report Exceptions Identified During Qualification Part Warrant 14 Change Assessment Questionnaire S S 15 Supplier Change Request (2 pages) 16 Part Warrant Revision History S= Required supplier submittal; the Part Warrant is required upon completion of Phase 1. PG&E = PG&E submittal AR = As Required supplier submittal * = Provided by PG&E to the supplier to track the status of the required Work Elements S S S S S S S S S S S S S AR AR AR AR AR AR S AR S AR S AR AR AR S AR AR PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 10 of 44

14 6.0 ADDITIONAL PG&E REQUIREMENTS 6.1 Change Management Process This process implements a formal PG&E policy requiring approval for all supplier changes. It provides a formal system for assessing, tracking & documenting changes, thereby improving PG&E awareness to prepare and support the change. It also forces pre-approval to avoid the adverse effect of random changes. The supplier is required to implement a Configuration Management System to ensure the control of documentation and the definition of product manufactured and / or designed for PG&E by the supplier or its sub-suppliers When changes are contemplated, a Change Assessment Questionnaire shall be completed by the supplier. Depending on the Yes/No evaluation, the supplier is required to elaborate on the change using the Change Request Form. The Change Assessment Questionnaire along with the Change Request Template for reporting a Change to PG&E are included in Appendix A The Questionnaire and a completed Change Request must be submitted to PG&E for review. They should be submitted at least 6 weeks in advance of when the change is contemplated to be implemented to allow time for PG&E review At a minimum and to facilitate PG&E review or final acceptance of the proposed change, First Articles and first article inspection results may be required for the following: Revisions to drawings and specifications Product manufacturing or equipment changes Manufacturing location changes for the supplier or sub-suppliers Changes in Sub-tier suppliers of product. Changes in the manufacturing environment shown to have no impact on form, fit or function of the product Changes to improve product performance (process yield, scrap, defect rates, customer return rates, etc.) Changes in QC inspection methods or procedures Changes in product packaging or shipping details Qualified product which has had a production lapse of two years or more. Factory change of ownership that affects process or personnel significantly or other major changes in the workforce not related to a change of ownership If the change is to a part designed by the supplier, a Revised Design Record and a revised Bill of Materials for the proposed part should be submitted along with the Change Request The SQE, RE, and others at PG&E will review the Change Request in a timely fashion and determine what actions and PQP resubmittal requirements are PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 11 of 44

15 needed, if any, before the Change can be implemented. The signed form and determination will be returned to the supplier. NOTE: A qualified process or design cannot be changed without first receiving approval from PG&E. 6.2 Special Process Control A Special Process is one in which the results are highly dependent on the control of the process or skill of the operator or both and where the required quality characteristic cannot be readily determined by inspection and test of the product Specific documented and controlled procedures shall be developed and implemented for each special process. The procedures shall include identification and monitoring of critical to process (CTPs) or critical to quality (CTQs) attributes for each special process. The procedures, and related qualification reports, shall be submitted to PG&E for review and approval Only qualified or certified personnel shall be assigned to perform a special process. The supplier shall develop and document specific training plans, check and document the performance of the qualified individual on a regular basis. Personnel performing non-destructive testing shall meet the requirements of Reference Sub-suppliers performing special processes shall meet the same requirements as imposed on suppliers Special processes include but are not limited to: Non-destructive testing and examinations (NDT & NDE) Hydrostatic testing Joining methods such as Welding, Brazing, Soldering Heat treating Melting (raw material production) Pickling, Etching and Chemical Cleaning Passivation Plating Painting or Coating and surface preparation Forging and Hot forming Casting Compositional testing or check methods The following conditions require a qualification or re-qualification of a special process: New special processes or new suppliers performing the special process. Equipment changes that affect Set Points or key parameters of a currently qualified special process PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 12 of 44

16 Non-conservative changes to previously qualified key parameters or Set Points outside of the previously qualified limits New or revised PG&E Specification requirements 6.3 Unexpected Visual Conditions Visual standards often are developed during qualification. Such standards may represent unusual or unexpected conditions observed during qualification of a new product or new process If an unexpected visual condition (UVC) is observed or anticipated on a component, the condition must be clearly identified as such and communicated in writing to the SQE. A UVC will be considered a non-conforming condition unless the SQE is notified in advance early in the manufacturing process, not at final inspection... The notification shall include at a minimum: Photographs of the UVC and description contrasted to a typical or conforming condition. The reason for the UVC Justification for use if the supplier considers the UVC acceptable or as a Minimum Acceptable visual standard. The submittal will be reviewed by PG&E, the result documented and the supplier notified in writing. 6.4 Inspections and Product Acceptance As part of the Qualification Plan, products may be subject to inspection and test by PG&E (source inspection) at the Supplier, PG&E facility or both as determined by PG&E. Acceptance of product at source inspection at the Supplier does not relieve the Supplier of its obligation to provide products that meet drawing, specification and purchase order requirements. Final acceptance (notwithstanding warranty issues discovered during use) shall be based on incoming inspection of Phase 1 parts at PG&E facilities and successful Phase 2 testing results if Phase 2 testing is required. There may be some exceptions, for example transmission and substation class products (including such items as large oil filled electrical products, transmission class pipe, valves and fittings, underground cable and fabricated structures), where final inspection ordinarily occurs at the Supplier s plant or the authorized distributor if there are no Phase 2 tests required. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 13 of 44

17 6.5 Post-Qualification Reporting Requirements A Supplier Scorecard is the basis for rating supplier performance. PG&E will create a Scorecard tailored to the work being performed by the supplier. The Scorecard will allow both parties to track performance and success. It will also provide a basis for both parties to work together on areas that need of improvement. Topics that are typically addressed in PG&E Scorecards include: Product Quality (e.g., Defective Part Rate, DPPM). On-time Delivery. Qualifications and Change Control: adequacy, timeliness and transparency. Quality System audits and SCAR status: are SCAR responses adequate, timely with no repeat issues? Status and timeliness of Improvement Initiatives Communication: proactive notification of quality events and issues. Proactive Contract Support: Cooperation, product design & development support Performance metrics and Key Performance Indicators (KPIs) used in the Scorecard will be established. The Supplier Scorecard will be issued by PG&E on at least a quarterly basis. If the metric objectives are not met, the supplier s product allocation can be reallocated to other suppliers who meet the requirements Reports of process performance capability for qualified products may be requested periodically by PG&E for tracking purposes. Details will be determined with the Supplier after completion of the qualification work A 4-Panel dashboard report format or an equivalent alternative will be employed for suppliers in need of improvement to add performance visibility and track performance. The 4-Panel Report typically contains the following information: Chart trending total inspection rejects over time Pareto trending observed condition leading to the rejects Details of number of parts rejected as a function of time and part type Corrective Action Plans and Status It is expected that the identified supplier(s) will provide frequent performance reports (e.g., bi-weekly) using the 4-Panel Dashboard as agreed upon, or in connection with each delivery to PG&E depending on performance and delivery requirements. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 14 of 44

18 APPENDIX A Elements of the PG&E Part Qualification Process (PPQP) I. Process Qualification Terminology II. Qualification Element Definitions III. Qualification Element Work Sheets PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 15 of 44

19 I. QUALIFICATION PROCESS TERMINOLOGY The following definitions will facilitate understanding of the different elements of the PG&E Part Qualification Process that are presented and described later in this Appendix: Critical to Process (CTP) These may also be referred to as KCC or Key Control Characteristics. They are the critical parameters or set points for controlling a process to ensure that the results of the process meet specifications or a CTQ characteristic. Examples include tool profiles, machine settings, annealing furnace settings, etc. Critical To Quality (CTQ): A characteristic that is identified as critical to the form, fit or function of the final component. This may be a drawing characteristic for a piece or hardware for example or a specification requirement in the case of bulk material. Design Record is the part drawing, specifications, math calculations, and /or electronic CAD data that conveys the information necessary to produce a product. This Record is provided by the supplier for supplier designed products in which case a Design Risk Analysis (FMEA) compliant to PG&E requirements should also be included if available. A single Design FMEA may apply to a family of similar parts or materials. Catalog parts: the design record may only consist of a functional specification or reference to a recognized industry standard. Bulk Materials: the design record may consist of identification of raw materials, formulations, processing steps and parameters, final product specifications and acceptance criteria. Bulk material can also be input to other production processes. Black Box Parts: Are those that may be supplier designed, produced and considered Proprietary. For this type of part, the design record may be limited to an outline drawing or identification of characteristics or items required for customer interface connections and verification of functional requirements. The Design Record, including drawings and specifications, must be revision controlled. There is no specific worksheet requirement for the Design Record format since design files and information may vary from supplier to supplier. First Article (FA) Inspection (FAI): Samples selected for FAI are taken from actual manufacturing and inspection processes being qualified in the supplier facility that will be used for production. The number of FA samples to be sent to PG&E for testing and inspection will be determined based on a sampling plan and specified in the Qualification Plan instructions. Depending on the inspection results, a qualification may have more than one set of first article samples. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 16 of 44

20 Integral Software: (also known as dedicated software) Software, which is dedicated to equipment or a process to the extent, it is inoperable without that software. Integrated System Testing: Integrated System Testing provides increased assurance that new or modified process or inspection equipment has been installed correctly and coordinated to work properly with other facility equipment. This testing is performed in as part of the actual production process. Product or surrogate material may be used to demonstrate the integrated operation of the process equipment and software. Qualification Process (QP): A structured approach to supplier qualifications and manufacturing control. A QP package contains a cover letter prepared by the supplier, up to 15 different elements (depending on PQP requirements) and an approved Part Warrant. Set Points: Settings that control equipment or processes within defined parameters. Significant Production Run: For mass-production type processes: This is sometimes referred to as serial production. The Phase 1 qualification run requires using production equipment, tooling, procedures and production employees operating at normal production rate under normal production conditions. This typically is 300 parts or more. The intent is to assure that all data from the production qualification run reflect the actual production process. For bulk materials: First Article samples for qualification shall be taken in such a manner such that they represent steady-state process operation since it may not be possible to identify a specific number of discrete parts. Production and inspection histories of similar products can be used to estimate initial process capabilities. Supplier Correction Action Report (SCAR): A document that is used to identify, track and correct supplier quality deficiencies as part of a Corrective Action Process. Verification: A work effort to confirm that the range of previously qualified parameters, set points and/or process monitoring produces product that meets specifications or to demonstrate that the process does not adversely affect physical/chemical material properties, quality records, product traceability and inspection sensitivity or reliability. II. QUALIFICATION WORK ELEMENT DEFINITIONS The elements of the Qualification Process are defined below and corresponding templates or worksheet examples follow. Alternate formats to record and present the results of the qualification work requirements may be substituted with prior PG&E SQE agreement. Part Qualification Plan (PQP) Documents the requirements for Phase 1 and/or 2 qualification efforts that will be controlled by the PPQP package and this Manual. Requirements that will be identified will include but are not limited to: item description PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 17 of 44

21 including reference to design drawings and applicable Specifications, Phase 1 testing requirements, identifying applicable PQP sections, number of pieces required for qualification, inspection frequency for qualification components and acceptance criteria. Work Element Requirements and Submission Status Checklist - This form is intended to be a useful tool for both the supplier and PG&E. It summarizes Work Element Submission Requirements identified by PG&E and the Completion Status of each. The planned completion dates for Work Elements originating from the Supplier are established by the Qualification Project Schedule as agreed upon by the Supplier and the SQE. Supplemental Qualification Requirements Additional requirements as part of the Phase 1 qualification effort are listed in this section. This could also contain special qualification requirements such as barcoding process methods as well as specifying witness or hold points or one-of performance test requirements. Marking, Packaging and Labeling Identifies the requirements for part marking, packaging and labeling for shipping to PG&E. These requirements may include industry standards and cover such details as: part marking / barcoding, final documentation package content, part and lot identification requirements, maximum packaging limitations (quantity, weight, number of lots), packing list and box label contents. Special Process List A list of the special processes used to manufacture the component. The specific qualification files or reports for these processes are to be listed in the Special Process Qualification Work Sheet. Qualified Laboratory Documentation This is a list of laboratories along with their accreditations and qualified test methods that will or may be used for inspecting or testing product samples for certification purposes. This does not preclude qualification of specific laboratory processes used for product testing, in which case an additional qualification plan and report for the particular process will be required to be submitted by the Supplier. Process and Inspection Flow Chart (PFO) Identifies the process flow for the component covering all manufacturing and inspection steps (on-line or off-line) from receipt of raw material to shipment of the final product. Any work outsourced to a subsupplier must be shown including the name and address of the sub-supplier and any receipt inspections performed by the supplier upon return of the subject parts. Flow of nonconforming parts or material, including rework or scrap loops must also be shown. Rework operations must be approved by PG&E before being used. PG&E Hold Points, Witness Points and Source Inspection points must also be identified in the Process Flow. There is a general format in the attached worksheets but any specific format used by the supplier may also be acceptable. The PFO shall be revision controlled. Special Process Qualifications Special processes will either be previously qualified or an additional special process qualification activity must be included with the part qualification. In each case the key parameters and qualified ranges will be documented PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 18 of 44

22 in this section. All non-destructive testing must be qualified and performed by qualified and certified non-destructive evaluation personnel. Key Sub-Suppliers A sub-supplier is one who performs special processes, inspections, or operations that affect form, fit, or function of the product. Software Control All software that will be used in the manufacture or inspection of the component (examples: OGP, CMM, etc.) must be under revision control and documented. Any changes that are made to the software must be updated and approved in this section. Applicable Document List Identifies all supplier documentation for the manufacture of the component (example: Procedures, supplier drawings, etc.). This list is to be revised and resubmitted along with any revised documents requiring PG&E approval. Visual Standards and Part Checking Fixtures A list of the supplier's visual standards and part checking fixtures, the identification number, a description of each, the PG&E requirement for the condition, the date submitted and approval status. For checking fixtures, a controlled copy of the drawing should be supplied. If the fixture is used to check part dimensions in final form, then evidence that the fixture conforms to its design drawing is required. This may be a gage study showing repeatability in assessing the required characteristics.. Supplier Test Report This report should identify inspection methods, related drawing dimensional characteristics and tolerance, inspection results for that characteristic, and frequency of inspection. Required visual characteristics should also be identified on this form along with the method, results and inspection frequency. This form is an example; alternates may be submitted to PG&E for approval prior to use. Supplier Testing (Material & Performance Test Results) Identifies any testing (and summarizes results) required for the supplier to complete in order to certify the component other than dimensional and visual inspection results which are recorded elsewhere. This section can also summarize any performance tests and results obtained by the supplier during the qualification process. Copies of the original test reports shall also be provided. Material composition / test results should be reported on a Certificate of Analysis (or testing) from an accredited laboratory. Confirmation by the supplier that the material meets all requirements is required for the qualification as well as for continued production. Certificate of Conformance (C of C) This is an example of a Certification that the supplier completes and submits with the components to certify the product. All individual test reports must be attached to this C of C. An alternate can be proposed by the Supplier. At a minimum, a C of C should include: Summary of results and Acceptability Product description and requirements such as applicable Drawings and Specifications PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 19 of 44

23 PG&E Purchase Order and Material Code information Mfg. history by reference to the applicable approved Part Warrant Material condition and Material Certification Reference Statement that products were manufactured, inspected, and tested to approved procedures and meet PO, specification, and design requirements Signature of approval by Supplier authority All test reports must be attached Exceptions Identified During Qualification - Exceptions encountered during qualification should be documented and explained on this Work Sheet. Examples to be documented include departures from the original qualification plan; unplanned or unforeseen processing issues; part outages or deviations noted during production or inspection of the First Article production run; part rework or scrap conditions. Corrective actions for the exceptions must be listed and actual completion dates identified. Corrective actions must be completed before Phase 1 can be considered complete. PG&E Part Warrant This is the official governing document to track the status and approval of the PPQP package. Change Assessment Questionnaire and Supplier Change Request Form - This process implements a formal policy requiring PG&E approval of supplier changes that may impact product quality. It provides a formal system for assessing, tracking & documenting changes: improves PG&E ability to be aware, prepare and support the change; forces pre-approval to avoid the adverse effect of random changes. The Change Assessment Questionnaire is to identify if any action is required to validate or verify potential changes to the existing PPQP. This questionnaire, along with the Change Request Form is to be filled out by the supplier and then submitted to the SQE for evaluation by PG&E to define requalification requirements, if any. In the case of changes to Supplier designed products, a revised Design Record must be submitted along with the Change Request. Part Warrant Revision History This is to documents all revisions and changes to a completed PPQP package. PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 20 of 44

24 III. QUALIFICATION ELEMENT WORKSHEETS Examples of the different Qualification Element Worksheets for each PPQP Element and page number locations follow below. Functional electronic worksheets for each element can be obtained from the PG&E Supplier Quality Engineer assigned to your qualification. The worksheets must be completed and returned to the PG&E Supplier Quality Engineer on a pre-agreed upon schedule. The method of transmission of the completed worksheets to PG&E is to be agreed upon with the Supplier Quality Engineer. Transmission via is preferred. Section III. Table of Contents Work Sheet Page Number Part Qualification Plan (PQP) 22 Work Element Requirements and Submission Status Checklist 23 Supplemental Qualification Requirements 24 Marking, Packaging & Labeling Requirements 25 Special Process List 26 Key Sub-supplier List 27 Special Process Qualification Documentation 28 Qualified Laboratory Documentation 29 Process & Inspection Flow Chart (PFO) 30 Software Control 31 Applicable Document List 32 Visual Standards and Part Checking Fixtures 33 Certificate of Conformance (C of C) 34 Dimensional and Visual Inspection Report 35 Supplier Test Report 36 Exceptions Identified During Qualification 37 Part Warrant 38 Change Assessment Questionnaire (2 pages) 39 Supplier Change Request (2 pages) 41 Part Warrant Revision History 43 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 21 of 44

25 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 22 of 44

26 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 23 of 44

27 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 24 of 44

28 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 25 of 44

29 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 26 of 44

30 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 27 of 44

31 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 28 of 44

32 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 29 of 44

33 PROCESS / INSPECTION FLOW CHART (PFO) Part/Drawing Number (Include Item #; MCN): Drawing Revision: Part Name: Legend: Manual Operation Decision Process Operation Any work outsourced to a sub-supplier must be shown including the name and address of the sub-supplier and any receipt inspection upon return of the subject parts. Flow of nonconforming parts or material, including rework or scrap loops must also be shown. Rework operations must be approved by PG&E before being used. PG&E Hold Points, Witness Points and Source Inspection points must also be identified in the Process Flow. The PFO shall be revision controlled. RE Approval: Date: SQE Approval: Date: PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 30 of 44

34 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 31 of 44

35 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 32 of 44

36 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 33 of 44

37 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 34 of 44

38 DIMENSIONAL & VISUAL INSPECTION REPORT Drawing No. Item Rev. Material Code: Part Name and Serial Number(s) QC Procedure No. Rev. Specification Rev. Heat No. P.O. No. Rev. P.O. Item No. Material Supplier Lot Size Sample Size No. Pcs. Accepted No. Pcs Rejected Inspector Date Dim QC Ref. Drawing Acceptance No. Char Dimension LSL USL Accept Reject Results/Comments Remarks Frequency Verification Supplier QA/QC Manager: Approved Date SQE Approval: Date: Other PG&E Approval: Date: PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 35 of 44

39 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 36 of 44

40 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 37 of 44

41 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 38 of 44

42 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 39 of 44

43 PG&E 2014 Pacific Gas and Electric Company. All rights reserved. Page 40 of 44

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

GE Power Electronics Business Total Quality Management for Suppliers

GE Power Electronics Business Total Quality Management for Suppliers GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

Purchase Order Clauses and Conditions

Purchase Order Clauses and Conditions Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:

More information

SUPPLIER QUALITY PROGRAM, V (U)

SUPPLIER QUALITY PROGRAM, V (U) FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED

More information

Quality Systems Manual

Quality Systems Manual Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management

More information

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page 7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

QP-740. Supplier Management Handbook

QP-740. Supplier Management Handbook QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,

More information

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded

More information

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Supplier Requirements for Beckwith Electric Co., Inc. Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality

More information

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11

Introduction. Cooper Standard Global Supplier Quality Manual Page 2 of 11 Global Supplier Quality Manual Revision 3 Introduction 1. Purpose: This manual has been created for Cooper Standard s (CS) Production, Prototype and Service Suppliers. The manual includes all CS locations

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY GE Oil & Gas Quality at GE Oil & Gas GE imagination at work QUALITY 2 - Quality at GE Oil & Gas TABLE OF CONTENTS GE Oil & Gas and Quality Visions Our Customer Commitments The Quality Organization and

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing

More information

Bogue Machine Company, Inc. Business Instruction

Bogue Machine Company, Inc. Business Instruction Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,

More information

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

GE Oil & Gas Quality Management System Sourcing Supplier Quality Requirements ARSB-O&G-001 Rev: 2.0

GE Oil & Gas Quality Management System Sourcing Supplier Quality Requirements ARSB-O&G-001 Rev: 2.0 Approved By: Type name or written signature Arun Tv Global Quality Leader Livio Loschiavo Global QMS Leader Luca Palatiello Global Quality Operations & Process Leader Orlando Dean Supplier Quality Manager

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

Management System Procedure. 4.06 30 004 N 4/01/2012 2 of 14

Management System Procedure. 4.06 30 004 N 4/01/2012 2 of 14 4.06 30 004 N 4/01/2012 2 of 14 TABLE OF CONTENTS 1. Introduction 1.1 Policy and Vision 1.2 Purpose 1.3 Scope 1.4 Responsibility 2. Quality System Requirements 2.1 ISO/TS 16949: 2009 and Alternatives 2.2

More information

How To Ensure Quality Assurance

How To Ensure Quality Assurance 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

Quality at GE Energy

Quality at GE Energy Quality at GE Energy Table of Contents GE Energy and Quality Visions 2 Our Customer Commitments 3-5 The Quality Organization and Policy 6-8 Quality Management System 9-11 Key Business Processes 12-16

More information

Supplier Handbook Terms and Conditions

Supplier Handbook Terms and Conditions * 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary Page 1 / 9 ABSTRACT This document is the Section F to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions

More information

Valued Supplier: This Manual represents STRATTEC s commitment to quality and supplier partnerships.

Valued Supplier: This Manual represents STRATTEC s commitment to quality and supplier partnerships. Valued Supplier: Enclosed is the, which has been developed to assist you in understanding our Corporate Materials Management and Supplier Quality Assurance requirements. This Manual represents STRATTEC

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

Supplier Quality Requirements (SQR) for External Process and/or Product Providers

Supplier Quality Requirements (SQR) for External Process and/or Product Providers Supplier Quality Requirements (SQR) for External Process and/or Product Providers Document Revision History Revision No Revision Date Revision Description Approved By Apr 2, 2 Initial Release Joel Sodowsky

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

GE Power & Water. Supplier Handbook

GE Power & Water. Supplier Handbook GE Power & Water Handbook 1 DISCLAIMER The information in this handbook is provided for convenience of our suppliers and may be subjected to change from time to time without prior intimation. This document

More information

Supplier Quality Management Production Part Approval Process (PPAP) Manual

Supplier Quality Management Production Part Approval Process (PPAP) Manual Supplier Quality Management Production Part Approval Process (PPAP) Manual February, 2009 Rev 6 Release Cooper Industries 600 Travis Suite 5600 Houston, TX 77002 Table of Contents TABLE OF CONTENTS...2

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

Supply Quality Assurance

Supply Quality Assurance Supply Quality Assurance Electric / Gas T&D, Hydro, Solar and Fossil Fuel Power Generation 2014 Supplier Conference Jim Adamson Director, Supplier Quality Assurance Engaging With Suppliers How Supplier

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the

More information

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

Ege Fren Ege Fren San. ve Tic. A.Ş.

Ege Fren Ege Fren San. ve Tic. A.Ş. Page : 1 / 8 1. Purpose: This manual is formed in order to create a business environment based on a partnership understanding with our suppliers, determine and develop our relationships in this context

More information

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010 Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power

More information

Quality Assurance Manual. QAM-2013-Rev2

Quality Assurance Manual. QAM-2013-Rev2 QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality

More information

Quality Management System and Procedures

Quality Management System and Procedures Commercial HVAC/R Coils & Protective Coatings Quality Management System and Procedures Rahn Industries, Inc. Quality Assurance Manual Version 3.0 www.rahnindustries.com 1-800-421-7070 Commitment to Quality

More information

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian

More information

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System 1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech

More information

Integrated Supplier Quality Requirements

Integrated Supplier Quality Requirements Integrated Supplier Quality Requirements ISQ-001-QM November 1, 2013 Revision C The controlled and current version of this document, and all referenced documents, are available on www.navistarsupplier.com.

More information

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers. Supplier Quality Standard 1.0 Purpose The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers. These expectations

More information

Q2A First Article Inspection (FAI) AS9102

Q2A First Article Inspection (FAI) AS9102 Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.

More information

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13

SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13 SQM-H Supplier Quality Management Handbook MAHLE Behr - global This Handbook is a summary of the processes and documents of the supplier quality management 1/13 Scope of Application The Supplier Quality

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

PERFORMANCE EXCELLENCE Procurement Standards

PERFORMANCE EXCELLENCE Procurement Standards PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through

More information

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material

More information

Supplier Quality Agreement EK 25

Supplier Quality Agreement EK 25 1. Purpose and Scope of Agreement Supplier Quality Agreement EK 25 1.1. In order to exceed the expectations and ensure the satisfaction of its customers, Benteler is committed to achieving a level of quality

More information

Quality Agreement Template

Quality Agreement Template Quality Agreement Template Prepared by Dan O Leary Ombu Enterprises, LLC 3 Forest Ave. Swanzey, NH 03446 603-209-0600 This document is intended to form the basis for a Supplier Agreement. The document

More information

Welcome! Frank Teleso. Quality Manager

Welcome! Frank Teleso. Quality Manager Welcome! We appreciate your interest in Excelsior s Quality Management System. The objective of this document is to provide a quick method for you to do a preliminary quality qualification of Excelsior

More information

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS) Donaldson Supplier Business Operating System Standard () Supplier Business Operating System Standard () INTRODUCTION DCI is a multi-plant manufacturing company serving several different markets. These

More information

Gulfstream Production Certificate Operations

Gulfstream Production Certificate Operations SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.

More information

Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100

Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100 Page 1 / 11 ABSTRACT Qualification of Auditor and Lead Auditor to CONTENTS 0. GENERAL... 2 0.1. Purpose... 2 0.2. Scope of application... 2 0.3. References... 2 0.4. Terminology... 2 1. SECTIONS... 2 1.1.

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

Alstom Thermal Power Supplier Quality Manual POWER-Q-MSM-002 - Revision B - December 2014

Alstom Thermal Power Supplier Quality Manual POWER-Q-MSM-002 - Revision B - December 2014 Alstom Thermal Power Supplier Quality Manual POWER-Q-MSM-002 - Revision B - December 2014 INTRODUCTION Under the Alstom Thermal Power Dedicated to Excellence (d2e) program, we are deploying our Quality

More information

CUSTOMER SPECIFIC REQUIREMENTS

CUSTOMER SPECIFIC REQUIREMENTS CUSTOMER SPECIFIC REQUIREMENTS For Use With ISO 9001:2008 & ISO/TS 16949:2009 Page 1 SYSTEMS POLICY MANUAL CONTENTS Revision History Approval Document Distribution and Control General Application Background

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg mom_oshd@mom.gov.sg Application for Approved (Overseas/Local) Third Party Inspection Agency

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information