REQUEST FOR ELECTRIC SERVICE Commercial
|
|
|
- Della Hopkins
- 10 years ago
- Views:
Transcription
1 This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a commercial entity. PROJECT CHECKLIST Below is a checklist to assist you with your project: 1. In order to expedite the assignment of your job to our Field Engineer, please complete the following: Complete and sign the Application for Electric Service with accurate Service Address Complete and attach a detailed site sketch, blueprint, survey, plat or similar document Complete the Liability Waiver Form Sign and notarize any necessary easements (TCL&P can notarize these documents if needed all parties must be present when signing) 2. Upon receipt of the above, the Field Engineer will contact you to arrange an appointment to meet at the site to discuss your job. Please make sure property pins are in place or property boundaries are marked prior to this meeting. 3. After the on-site meeting, the Field Engineer will design your job, calculate the construction cost and provide you with an Electric Service Estimate Sheet. Please review the Electric Service Estimate Sheet when you receive it and contact the scheduling department at (231) with any questions or concerns. The Electric Service Estimate Sheet is valid for 120 days and will show the estimated cost to install the electric facilities required to provide service. 4. All new electrical services are REQUIRED BY THE STATE OF MICHIGAN to have an electrical inspection of the meter base before the service can be connected. Please see below for your appropriate electrical inspector: ELECTRICAL INSPECTORS METER BASE PICK-UP LOCATIONS Grand Traverse County DeWeese Hardware Contact: Ed Moody, Phil Nault and/or Mark Russell 1029 Carver Street, Traverse City Office: (231) and (231) (231) Leelanau County Standard Electric Contact: Ted Klumpp 3743 W. Front Street, Traverse City Office: (231) /Fax: (231) (231) Local State Inspector State Inspector Traverse City Light & Power Contact: Dean Reid 1131 Hastings Street, Traverse City Office: (231) (517) (231) In order to secure a place in the construction schedule, you must sign and return the Electric Service Estimate Sheet. Upon receipt of this document and proof of an electrical inspection (provided by the county inspections office), TCL&P will contact you to coordinate scheduling of your job. Revised: July 16, 2015 Page 1 of 6
2 NOTE: Obstacles such as lumber piles or brush located in the proposed path of the electrical facilities (e.g. poles, lines, transformers, etc.) can result in delays and in some cases the rescheduling of the installation of your electric service. NOTE: In accordance with chapter of City of Traverse City, city ordinances, all new installation of utilities shall be placed underground. CONTACT INFORMATION All documentation should be sent to: Traverse City Light & Power, Attn: Scheduling Mail: 1131 Hastings Street, Traverse City, MI Fax: (231) The scheduling department can be reached at (231) CANCELLATION The applicant may cancel the Application for Electric Service at any time. Please notify our scheduling department at (231) as soon as possible. Revised: July 16, 2015 Page 2 of 6
3 APPLICATION TYPE OF SERVICE REQUESTED: Check all the apply New Service Upgrade Relocate Temporary Electric Yard Light Service Address: Customer Information ( Primary contact for ALL project communications) Customer Contact Numbers: Name: Home: ( ) Mailing Address: Work: ( ) Cell: ( ) Address: Fax: ( ) Responsible Party Party responsible for utility installation charges: Customer Contractor Party responsible for service/usage after meter(s) are set: Customer Contractor Contractor/Builder Information ( Primary contact for ALL project communications) Contractor Contact Numbers Company Name: Contact Person: Mailing Address: Business: ( ) Cell: ( ) Address: Fax: ( ) Electrician Information (If Applicable) ( Primary contact for ALL project communications) Electrician: Phone: ( ) Contact Person: Fax: ( ) Site/Structure Information Apartments Subdivision /Industrial Mixed Use M Present Status of Building Project: (Check all that apply) In the planning state? Yes No, When? Property staked? Yes No, When? Site has been excavated? Yes No, When? Foundation poured? Yes No, When? Foundation back-filled? Yes No, When? Desired service route cleared of debris? Yes No, When? Date site will be READY for service: (This date helps with scheduling of service installation. See box to the right.) Note: Before service can be installed Revised: July 16, 2015 Page 3 of 6 Site sketch or survey AND Liability Waiver must be sent to TCL&P. Easements need to be signed and on file at TCL&P. The site and foundation must be back filled within 6 of final grade. The electric meter base must be installed. All electrical inspections are customer s responsibility. An approved inspection is required to energize service.
4 Service Information Service voltages available are (not all voltages are available at all locations): 120/240 V. 1 phase, 3 wire 120/208 V. 3 phase, 4 wire 120/208 V. 1 phase, 3 wire (network) 277/480 V. 3 phase, 4 wire For CT d meters, TCL&P will provide the meter socket and CT s to the electrical contractor. Cold sequencing is required for all commercial services that are direct metered. If CT d metering, the owner must provide and install a 1 conduit from the CT location to the electric meter. Electric: Estimated Load: Voltage Requirement: Temporary Overhead Amperage: Single Phase Permanent Overhead Estimated Demand: Three Phase Temporary Underground Permanent Underground Electric Load Information Main Disconnect Size Amps Volts Phase Square Footage of Building Sq. Ft. Units per Building Average Square Footage Per Unit Sq. Ft. Lighting Load = kw *Motor Load Equipment Load = kw Total 1PH Motor hp X (.746) = kw Total Motor Load* = kw Total 3PH Motor hp X (.746) = kw Other Load = kw Largest Motor hp NEMA Code Single phase motors 10 hp and larger may require assisted start Three phase motors 30 hp and larger may require assisted start Total Connected Load = kw Future Load Total Future Load kw + Total Connected Load kw = kw Revised: July 16, 2015 Page 4 of 6
5 NEW SERVICE SITE SKETCH AND LIABILITY WAIVER FORM Note: The location of all private underground facilities and structures must be identified or exposed. Include the location of all underground facilities or structures on the drawing below. If providing a blueprint, survey, plat or similar document be sure to sign the Construction Authorization/Underground Damage Liability Waiver below. Electrical wiring to outdoor facilities Cable, Satellite TV or internet lines (e.g. yard lights, garages, etc.) Future additions, decks or outbuildings Septic Systems, mound systems or drain fields Driveways and sidewalks Wells, water lines and/or sprinkler systems Preferred location of electric meters LP or natural gas lines Provide distance from the closest corner of Sewer Lines building to the meter Invisible fencing Structure distance from nearest intersection: N Construction Authorization/Underground Damage Liability Waiver: I certify that I own or am the authorized representative of the owner of the property of the service address indicated on this Site Sketch, blueprint, survey, plat or similar document provided and that I have read and understood the above statement regarding marking, exposing or locating all private underground facilities. I furthermore agree to hold Traverse City Light & Power and/or its agents harmless for any damage to private underground facilities that occurs during the installation of electric service, or as a result of failure on my part to ensure that the private underground facilities on this property have been adequately marked, exposed or located. Signature Date Printed Name Revised: July 16, 2015 Page 5 of 6
6 SCHEDULE OF FEES Standard Installation The cost of new underground installations is $5.50 summer, $8.25 winter*, per trench foot length, plus $50.00 for overhead to underground conversion. This is based on a clear and unobstructed path, a minimum of 24" deep for secondary, 36 deep for primary, from the source to the metering location. Where conduits are required under paved areas or other areas deemed necessary by TCL&P, the customer shall either install the conduits in accordance with TCL&P s engineering requirements or pay TCL&P to install these needed conduits. Where the customer installs conduit, the underground charge through that conduit will be reduced by $1.00 per foot. Any subterranean boring required or removal of obstacles such as rocks, old foundations, trees and stumps will be billed to the customer at actual cost. If a new transformer or primary meter is required to serve the customer, an unobstructed location will also be required per TCL&P specifications. *NOTICE: Winter rates help pay for the additional cost of the fuel and special equipment that may be required in order to begin construction during the period of winter when the ground is frozen. However, this is not a guarantee TCL&P will be able to perform the work. All required information for construction to begin must be submitted within two weeks of the winter period (December 1- March 31), or a winter rate will apply. If TCL&P chooses to begin construction during this period, winter rates will not apply. Time and Material Billing Any work that does not classify as a new standard underground installation such as relocation of poles, relocation of lines or temporary electric also will be billed on a time and materials basis at TCL&P rates. Utility billing rates For electric tariff rates please refer to our Small Business Rate (C), Large Business Rate (D), Large /Industrial Primary Rate (I1) and Power Service Cost Recovery for additional information. These are found on our website at Revised: July 16, 2015 Page 6 of 6
Electric Service Conversion Overhead-to-Underground. Minnesota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground
BGE Service Application Guidelines Commercial & Industrial Projects
BGE Service Application Guidelines Commercial & Industrial Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric service and in completing the
How To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
Applying For New or Revised Electric Service
Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service
Electric Service Guide for Commercial Construction
Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32106-E Cancelling Revised Cal. P.U.C. Sheet No. 28314-E Electric Sample Form No. 62-0687 Application for Service
Electric Service Guide for Residential Construction
Electric Service Guide for Residential Construction Table of Contents Contacting KCP&L... 2 Existing Home Remodeling or Additions... 2 Changing your electric service... 2 What you need to know before you
your electric service: from overhead to underground
your electric service: from overhead to underground taking responsibility As an individual, your efficient use of energy brings benefits such as lower bills, improved comfort levels in your home and a
BGE Service Application Guidelines Residential Modification/Relocation Projects
BGE Service Application Guidelines Residential Modification/Relocation Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric modification or
We look forward to serving you!
Dear Construction Customer: Enclosed you will find your DP&L Electric Construction Packet. This packet provides you with the information needed to obtain your new electric service or electric service change
Application for. Commercial New Service
Application for Commercial New Service Welcome to Lake Country Power! In order to make your new service installation easy, we provide individualized help to process and install a new service. In order
New Commercial Service Application
Please submit with this form an application fee of $500.00 and an Electronic CAD file of your preliminary plat. CAD file can be emailed to [email protected]. Member Information Work Order Number:
NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST
NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST SUBDIVISIONS, MULTI-FAMILY, LARGE COMMERCIAL AND 3-PHASE PROJECTS NEED TO USE OUR DEVELOPER S APPLICATION ITEMS NEEDED BEFORE PROJECT IS ENGINEERED:
New Electric Connection Application Packet Commercial and Industrial. City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641
New Electric Connection Application Packet Commercial and Industrial General Information: Maps: City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641 Please type or print plainly in ink. Applications
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
Contents. Section 1 General Information 2. 1.A Introduction 3 1.B Overview 3 1.C Pricing, Billing, and Payment Policies 6
Contents Section 1 General Information 2 1.A Introduction 3 1.B Overview 3 1.C Pricing, Billing, and Payment Policies 6 Section 2 Engineering Design 7 2.A Introduction 8 2.B Pepco s Commercial Service
Step 1: Application Instructions
Step 1: Application Instructions CONTENTS Introduction Customer and Electrician Instructions Completing Section 1 or Section 2 Definitions INTRODUCTION Every effort has been made to provide clear instruction
Temporary Electric Service
Temporary - Electric Construction Packet Temporary Electric Service This packet explains what is required to construct your Single new Phase electric Service temporary service and will guide you through
2015 Service Guide XCEL ENERGY. Minnesota North Dakota South Dakota Natural Gas and Electric Installation Information for Residential Contractors
XCEL ENERGY 2015 Service Guide Revised 5/15 Minnesota North Dakota South Dakota Natural Gas and Electric Installation Information for Residential Contractors CONTENTS DEVELOPERS Welcome, Developers!...
Electric Service Guide for Residential Construction
Electric Service Guide for Residential Construction TABLE OF CONTENTS Contacting KCP&L... 2 Existing Home Remodeling or Additions... 2 Building a New Home... 3 KCP&L Services at a Glance... 4 Current Transformers...
New Residential Service Requiring Construction
New Residential Service Requiring Construction What you should know about having service connected to your new home visit us at www.flintenergies.com FEMC 593 R2/12 All references from NEC 2011 New Residential
Considering UNDERGROUND. tampaelectric.com
Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
ELECTRIC SERVICE GUIDELINES (For Indiana)
ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE:
SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE
AN INFORMATION GUIDE SCOPE PROJECT MANAGER Joint Provisioning Guidelines for Shallow Utility Services in Residential Areas where the Electric, Gas, Telephone & Cable TV facilities are Buried in the same
PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME
PERMIT # TOWN OF ASHLAND, NEW HAMPSHIRE 20 HIGHLAND STREET PO BOX 517 ASHLAND, NH 03217 603-968-4432 FAX 603-968-3776 www.ashland.nh.gov PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY
Moving a House in Pasadena
Moving a House in Pasadena To assist homeowners and contractors wishing to relocate a home in Pasadena, this handout summarizes the steps in the permitting process. Please keep in mind that the sequence
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
[email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
Builder/developer gas service application
Builder/developer gas service application All gas service applications will be processed within three business days of receipt. Apply for gas service by: Phone: 1-888-224-2710 option 2 Fax: 1-877-413-1152
NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps
NEW SERVICE INSTALLATION STEPS Here is the step-by-step process required to fulfill your service installation request. Please take a few minutes to review the steps, become familiar with key milestones
ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL
January 2, 2014 ATTENTION: SUBJECT: ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL Electrical Service Manual (ESR) Several revisions have been made to the
Ferry County Out Building Application
Ferry County Out Building Application 1. Will the building be larger than 1000 square feet? Yes No 2. Will the building have eave projections greater than 2 feet? Yes No 3. Will the building be greater
ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering
ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering Requirements Clearance Requirements August 2015 A current version
Commercial Construction Permit Application
THIS IS NOT A CONSTRUCTION PERMIT DO NOT START CONSTRUCTION UNTIL PERMIT IS ISSUED City of Lincoln Commercial Construction Permit Application Rev. 4-14 Page 1 Commercial Permit Application THIS IS NOT
TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3
UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...
Tucson Electric Power Company Rules and Regulations
Original Sheet No.: 907 Introduction The Company will construct, own, operate and maintain lines along public streets, roads and highways which the Company has the legal right to occupy, and on public
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
The City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
Residential Electric Service Handbook
Residential Electric Service Handbook INTRODUCTION This booklet was developed to help you acquire electrical power to your property. It presents information and general specification about the supply and
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
Electric Service Requirement Handbook
INLAND POWER 10110 W. HALLETT RD. SPOKANE, WA 99224-7435 inlandpower.com Electric Service Requirement Handbook Table of Contents Contact Information... 1 1. Introduction... 2 2. Line Extension Policy...
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
Building Code Inspections and Fees
St. Mary s County Department of Land Use & Growth Management Customer Assistance Guide 22 Building Code Inspections and Fees May 10, 2014 This guide is intended to assist in the proper construction sequence
APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas 78602 Intake Date
For all Residential Construction, Commercial Construction, Fences, Accessory Buildings, and any other structural addition, remodel or new construction within the City Limits of Bastrop. No partial submittals
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
City of Douglas Commercial Building Permit Site Application
City of Douglas Commercial Building Permit Site Application *Complete the following information including a complete site plan and floor plan. *Incomplete information may result in delay and/or rejection
STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number
STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number -- ----- ------- --- - ---- - - --- PART II - SITEPLAN ------- -- ---------------- - - S cae: I E ac
Policy and Guidelines for Electric Service
Policy and Guidelines for Electric Service FRANKLIN MUNICIPAL POWER & LIGHT 1050 Pretlow Street Franklin, VA 23851 757-562-8568 757-562-7883 Fax January 2008 Franklin Power & Light HELPFUL TELEPHONE NUMBERS
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
Botetourt County, Virginia. Frequently Asked Questions
Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME
WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through
C I T Y O F P E A R S A L L
The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
Residential Plan Routing Information
Residential Plan Routing Information BUILDING INSPECTIONS 800 4th AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The building Inspection s Department receives and issues all applications for building
Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1
Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1 2 Service address City 3 (Inside city: Yes No) State 4 Complex
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4
New Construction Permit Application Village of Shorewood Building Division One Towne Center Blvd Shorewood, IL 60404 (815)553-2310 Fax (815)744-6766 SUBMISSION CHECKLIST - Complete this application and
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone
Residential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
new construction departments...
New Service GUIDE NEW SERVICE GUIDE new construction departments... If you re building a new home or performing any construction that requires a change to your existing electric or gas service, it s important
TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812
TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property
Borough of Matawan 201 Broad Street, Matawan, New Jersey 07747
Borough of Matawan 201 Broad Street, Matawan, New Jersey 07747 (732) 566-3898 Fax (732) 290-7585 DEPARTMENT OF PUBLIC WORKS APPLICATION FOR PERMIT TO CUT SURFACE OF PUBLIC PLACE PERMIT NO: DATE: Application
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH DOCUMENTS YOU WILL NEED 1. Building Permit Residential Basement Finish Package 2. Contractors copy of state and business license ADDITIONAL FORMS YOU MAY NEED
COMMERCIAL CONDUIT RULES AND REGULATION
Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret
Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret Accessing Application Materials Email [email protected] The Building Permit Application
Wellesley Municipal Light Plant. Standard Requirements for Electric Service
Wellesley Municipal Light Plant Standard Requirements for Electric Service Index Section 1... General Information Section 2..General Requirements for Service Section 3. Types of Available Service Section
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals
Close-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
New Water/Sewer Connection Application Packet Residential. City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641
New Water/Sewer Connection Application Packet Residential City of Plummer P.O. Box B, Plummer, ID 83851 (208) 686-1641 Please type or print plainly in ink. General Information: Applications will not be
Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.
Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs. REA Energy Services Sells and Installs: Heating and Air Conditioning Electrical Contracting Geothermal Heat Pumps Back-Up
RETAIL ELECTRIC SERVICE TARIFF P.S.C. Md. No. 3 R Sheet 61
R Sheet 61 SCHEDULE R RESIDENTIAL SERVICE AVAILABILITY Available throughout the area served by the Cooperative to individual residences and individually metered dwelling units in multiple-occupancy buildings
CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS
CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS 10.1 APPLICATION REQUIREMENTS AND PROCEDURES 10.1.1 A permit shall be required for any construction or installation within the public right-of-way
Natural gas and electric service guide
Natural gas and electric service guide For commercial, industrial and residential customers BGE.COM Before you dig, every dig. It s the law. MISS UTILITY 811 or 1.800.257.7777 One call to Miss Utility
NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS
NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS These guidelines are intended to familiarize Developers regarding some issues that are important to get electric
PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-71 PERMIT
SAME JETC May 22-25, 2012. St. Louis, Missouri IMPORTANT
18a Electrical Terms and Conditions IMPORTANT Please read the list of work below. If you require any of this work to be performed in your booth space, it must be performed by a show electrician. This work