1 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFEWORK PRACTICES CAT A-2 SOP #28 Date Issued: October 2011 Revision Date: August 2012 Review Date: August 2015 Revision # PURPOSE This procedure provides Terminal Operator instructions and precautions to properly place internal floating roof tanks into service. With an internal floating roof sitting on its legs and product begins to fill the tank, an explosive vapour space is created in gasoline, diesel and ethanol tanks. Excessive fill rate could generate sufficient static discharge to ignite the explosive mixture. In addition to the risk of explosion, excessive fill rates have the potential for lifting the internal floating roof unevenly and causing the roof to tilt and sink. Normal practice is to gravity feed the tank from an adjacent tank or to fill the tank at a reduced velocity until the roof begins to float at which time the fill rate can be increased to the maximum design velocity of the diffuser. Since the vapors from below the IFR, they will be forced above the IFR. During the initial fill it is recommended that the tank be filled to the maximum safe fill level at this time so that the displaced vapors can escape through the roof vents. Appropriate fill rates for all terminal tankage MUST be outlined to all involved personnel prior to undertaking the task. Flow rates on various sizes of pipe are limited to 3 feet per second velocity through the inlet nozzle until the fill nozzle is submerged and the IFR is afloat. Technical Concerns Floating an Internal Roof Page 1 of 8

2 2.0 SCOPE This Standard Operating Procedure shall apply to all employees and contractors at Suncor Energy Distribution Terminals who may be required to float an internal roof. The scope of this document is to define and communicate the precautions and requirements that involve floating an internal tank roof to Suncor Personnel and applicable Contractors working within Distribution 3.0 REFERENCED DOCUMENTS API RP PRECAUTIONARY STATEMENTS 4.1 Training All Suncor Personnel and Contractors whom in the execution of their normal job function may be required to float an internal tank roof must review and comply in full with this document 4.2 Specific Hazards Typical hazards that may be encountered while working with hoses may include; Identified Hazards o Hazards Identified on the Work Permit Work Environment Hazards o Limited Access / Egress o Exposure to Hydrocarbons Floating an Internal Roof Page 2 of 8

3 Personal Limitations o Distractions in work area o Confusing instructions o First Time Performing the Task 4.3 Personal Protective Equipment Personal protective equipment as outlined in Distribution Standard Operating Procedure, Cat A-1, SOP #10 or as specified on the Safe Work Permit, dependent upon work to be completed as per job scope requirements. 5.0 ROLES & RESPONSIBILITIES Terminal Management; Accountable to ensure full implementation and compliance of this standard operating procedure. Operating Authority / Performing Authority / Transport Drivers; Responsible to ensure full compliance with this procedure. 6.0 SUSTAINMENT AND CONTINUAL IMPROVEMENT Rimouski Terminal Management; Responsible to initiate document review process. Review process to comply with Distribution Standard Operating Procedure Cat A3, SOP #01. To ensure this Standard Operating Procedure document meets all applicable Suncor OEMS and PSM standards, this document is to be reviewed at a frequency not exceeding 3 years, or when conditions change sufficient to warrant a review. Floating an Internal Roof Page 3 of 8

4 7.0 PREREQUISITES Working knowledge of tankage and gauging system Refer to MSDS for information regarding health and environmental concerns for the product Recommended inflow rate to be at 3 ft./sec as per API RP 2003, Section 4.5. (see flow chart and flow calculation example) 2. Excess inflow rates during the refloating of a tank can damage the roof by creating violent surface turbulence. 3. Excess inflow rate can produce abnormally high vapour emission and static charge build-up. 4. Excess inflow rates could create flammable fuel-air mixture both above and below the floating roof. 5. In cold weather, any water residue (i) on the tank bottom could freeze around roof legs, and (ii) on roof seals, may become frozen to the tank shell. This may impede the lifting of the roof and could damage the seal of the floating roof. Floating an Internal Roof Page 4 of 8

5 9.0 TANK - REFILLING PROCEDURE Pre-Refilling: Review and sign off if applicable, PSSR, FRR, MOC or any Work sheet (if applicable). Check electrical bonding between the tank shell and the internal floating roof (if possible). In coordination with contractor personnel, ensure all blinds have been removed, flanges and drains re-connected and all manways installed and secured. Ensure fill valves on tank are open in preparation to receive product. If the refilling of the tank takes place in freezing temperature, visually inspect the tank and remove any water residue near roof legs also between the floating roof seal and the tank shell. Coordinate restricted fill rate if filling via pipeline or marine vessel. Preference is to gravity feed from adjacent tank. Check to ensure tank vents are clear of debris and operable. 9.1 Prior To Re-floating the Roof When re-filling a tank and or re-floating an internal roof, preference is given to the operation via tank gravitation. If required to fill using pump pressure ( ie pipeline, marine ) constant monitoring is required. Manually open the inlet gate valve at tank nozzle. The inlet velocity of the pumping rate is to be 3 ft. /sec. And the liquid level rising rate at the tank is 630 mm/ hour (i.e. 2-1 / hr.). See flow calculation. Begin filling slowly, use gauging system to verify rate. Floating an Internal Roof Page 5 of 8

6 Liquid level shall be checked periodically to make sure that maximum permissible rate not to exceed 3 ft/sec. This can be done by monitoring tank radar gauge to ensure that the tank liquid level rises not to exceed 105 mm/10 minutes. Communicate with the pump operator (by radio) to adjust the pumping rate if needed. Once tank is filled above manways, hold filling procedure and verify manway / nozzle integrity When product level rises to about 1525 mm (5-0 ) from the tank floor (At a point 305mm (12 ) below underside of the roof deck), visual inspection of the roof shall be made at 60 minute intervals, continuing until completion of the refloating operation. Terminal Management directly responsible for the refloating operation shall frequently inspect the floating roof from the cone roof man way (or inspection hatches), and be prepared at all times to stop product flow if any of the following situations occur: (i) (ii) (iii) (iv) It appears the roof is not floating level. The roof shows signs of binding or hanging up on the tank structure (including sign of binding of the IFR mechanical shoe seal). Product is observed on the top surface of the roof. Uneven relaxation of suspension cable(s) (For Suspended Tank Roof only). 9.2 After Re-floating the Roof After the product level rises to 2440 mm (8 ft.) level, checking and finding no visible problems, Terminal Management shall notify the pump operator to resume normal pumping rate. Floating an Internal Roof Page 6 of 8

7 9.3 Other precautions during tank refilling Periodically check tank nozzles and man ways (for leaking) until the tank reached the desired level. Monitor surrounding area and check LEL from time to time. This is a safety measure to ensure that gasoline vapour expelled from the tank will not be trapped in the tank farm. No source of ignition shall be permitted near the tank during refilling. No refilling shall take place when there is a potential chance of lightning. No manual tank gauging is allowed unless approved by the terminal manager. Tank will only be filled to a level allowed by API FILLING RATES Inlet Pipe Size 3ft/sec flow rate GPM 1 m3/hr flow rate m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr 10.0 PROCEDURAL DEVIATION Deviations from this standard operating procedure must be authorized using the Management of Change procedure. Deviations must be documented and documentation must include the relevant facts supporting the deviation decision. Floating an Internal Roof Page 7 of 8

8 DATE AUTHOR DESCRIPTION REVISION October 2011 C. Schinck New document issue. Initial Issue August 2012 R. Rattray Re-Formatted for PSM Floating an Internal Roof Page 8 of 8

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR

BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR BODY OF KNOWLEDGE API TES TANK ENTRY SUPERVISOR CERTIFICATION EXAMINATION November 2015, March 2016, July 2016 and November 2016 (Replaces October 2013) This API Individual Certification Examination is

More information

Explosions Involving Nonconductive Flammable Liquids

Explosions Involving Nonconductive Flammable Liquids Explosions Involving Nonconductive Flammable Liquids Almost every firefighter and responder has been introduced to the classic fire triangle. For a fire to occur, all three elements (a fuel, oxygen, and

More information

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or

More information

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3 SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFETY - LIFE SAVING RULES Verify isolations of hazardous energy before any work begins. Date Issued: February

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

LCT 1025 (08/08) Copyright 2008 Harleysville Mutual Insurance Company Page 1 of 5 All rights reserved

LCT 1025 (08/08) Copyright 2008 Harleysville Mutual Insurance Company Page 1 of 5 All rights reserved Bonding and Grounding of Flammable Liquid Containers Provided by Harleysville s Risk Control Department 800-523-6344 ext 8100 www.harleysvillegroup.com/riskcontrol Summary The movement of volatile liquids,

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

OREGON FIRE CODE Interpretations and Technical Advisories

OREGON FIRE CODE Interpretations and Technical Advisories OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application

More information

Standard Hydraulic Piping Flushing Procedure

Standard Hydraulic Piping Flushing Procedure Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,

More information

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) References: Comm 10 2009 EDITION / NFPA 30 2008 EDITION ITEM DESCRIPTION Comm 10 / NFPA General

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS. n OSHA Changes

FLAMMABLE AND COMBUSTIBLE LIQUIDS. n OSHA Changes FLAMMABLE AND COMBUSTIBLE LIQUIDS OSHA Changes Introduction This module covers the two primary hazards associated with flammable and combustible liquids: explosion and fire. In order to prevent these hazards,

More information

Fixed or Semi-Fixed Fire Protection Systems for Storage Tanks

Fixed or Semi-Fixed Fire Protection Systems for Storage Tanks Fixed or Semi-Fixed Fire Protection Systems for Storage Tanks In the early years of the oil industry, fire in a storage tank was a common occurrence. Virtually all products were stored in cone roof tanks

More information

Fire & Explosion Risks in Service Stations

Fire & Explosion Risks in Service Stations Fire & Explosion Risks in Service Stations Petrol Vapour Petrol gives off highly flammable vapour even at very low temperatures. Because of the flammability of petrol vapours, service stations carry a

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

ADMINISTRATIVE SERVICES MANUAL

ADMINISTRATIVE SERVICES MANUAL Purpose Responsibilities Proper Storage and use of flammable liquids can significantly reduce the possibility of accidental fires and injuries. To minimize risk to life and properly, the requirements of

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity? A Health and Safety Guideline for Your Workplace What is static electricity? What causes it? How is it hazardous? And, most importantly, how can it be controlled? All of these questions will be answered

More information

Case Study. Barton Solvents Static Spark Ignites Explosion Inside Flammable Liquid Storage Tank. U.S. Chemical Safety and Hazard Investigation Board

Case Study. Barton Solvents Static Spark Ignites Explosion Inside Flammable Liquid Storage Tank. U.S. Chemical Safety and Hazard Investigation Board Case Study U.S. Chemical Safety and Hazard Investigation Board Barton Solvents Static Spark Ignites Explosion Inside Flammable Liquid Storage Tank No. 2007-06-I-KS Issues Nonconductive flammable liquids

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant

ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS Standards for emissions from furnaces, boilers and Power Plant S. Parameter Limiting concentration in mg/nm 3, unless stated Existing refineries

More information

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)

More information

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change

Process Safety Management of Highly Hazardous & Explosive Chemicals. Management of Change Process Safety Management of Highly Hazardous & Explosive Chemicals Management of Change What if Our PHA s Reveal the Need to Change Something In our System to Minimize the Potential for Release We Must

More information

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Ethanol Vehicle and Infrastructure Codes and Standards Citations Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based

More information

Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation

Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation Static Spark Ignites Flammable Liquid during Portable Tank Filling Operation No. 2008-02-I-IA (September 2008) Key Lessons for Safe Handling and Storage of Flammables Ensure that equipment, such as fill

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion Annex 17, page 1 ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16 Part B Prevention of fire and explosion Regulation 4 Probability of ignition 1 The existing paragraph 5.5 is replaced

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

OSHA Office of Training and Education 1

OSHA Office of Training and Education 1 Flammable and Combustible Liquids OSHA Office of Training and Education 1 Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE Page 1 of 9 PURPOSE Steam is the most commonly used heating medium for maintaining process temperatures. Compared to other heating media, steam contains a significant amount of heat energy, and this heat

More information

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS September 2007 Replaces the July 2004 edition 1. Purpose Purpose of present Guideline is to specify conditions for the safe handling of flammable

More information

STORAGE TANK SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE)

STORAGE TANK SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE) Page : 1 of 87 Rev: 02 Practical Engineering Guidelines for Processing Plant Solutions www.klmtechgroup.com Rev 01 Rev 02 June 2012 KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

WORK IN CONFINED SPACES

WORK IN CONFINED SPACES WORK IN CONFINED SPACES STFC Safety Code No 11 Rev. 1.4, Issued April, 2015 Note - This document may have been superseded by a more recent version. Revisions 1 Initial Launch November 2007 1.1 Minor changes

More information

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must

More information

Pressure Testing Procedures for Pipelines

Pressure Testing Procedures for Pipelines Pressure Testing Procedures for Pipelines Document Number Revision 2 Approved By Ric Morris McMurdo, Palmer, and South Pole November 11, 2004 Active Divisions/Departments FEMC Raytheon Polar Services Company

More information

Alabama Air and Waste Regulatory Update

Alabama Air and Waste Regulatory Update Alabama Air and Waste Regulatory Update September 24, 2015 RSA Activity Center Montgomery, AL New Federal UST Regulations (Effective Date October 13, 2015) What Does This Mean To Me? The Current ADEM Regulations

More information

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined

CHAPTER. Standpipes and Hose Systems OVERVIEW. Standpipe and Hose Systems Defined Standpipes and Hose Systems CHAPTER 3 This chapter, which opens with an overview of standpipe and hose systems, is intended to assist the registered design professional (RDP), commissioning agent, authority

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 36 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

NITROUS TRANSFER PUMP INSTRUCTIONS

NITROUS TRANSFER PUMP INSTRUCTIONS NITROUS TRANSFER PUMP INSTRUCTIONS SAFETY TIPS Never directly inhale nitrous oxide. When inhaled in large quantities, nitrous oxide can cause respiratory ailments or in extreme cases, death by suffocation.

More information

HS-901(A) BASIC STEAM HEATING SYSTEMS

HS-901(A) BASIC STEAM HEATING SYSTEMS HS-901(A) BASIC HEATING SYSTEMS One-Pipe Two-Pipe Basic Steam Heating Systems One-pipe steam heating system EQUALIZER SAFETY FACTOR STATIC HEAD PRESSURE DROP 2" HEATING UNIT 15" DRIP CONNECTION In a one-pipe,

More information

Compressed Gas Cylinder Program

Compressed Gas Cylinder Program Department of Environmental Health & Safety Procedures Compressed Gas Cylinder Program March 2010 Compressed Gas Cylinder Program Page 1 of 8 Table of Contents I. Introduction II. III. IV. Policy Scope

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute

Grounding and Bonding Against Static Electricity. Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Grounding and Bonding Against Static Electricity Jon Koppari, CSP, MS Occupational Safety and Health Instructor OSHA Training Institute Objectives Identify Sources of Ignition. Identify Hazards associated

More information

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Fiberstars Lighted Laminar Flow Fountain Installation Manual Fiberstars Lighted Laminar Flow Fountain Installation Manual 79-15037-00 REV Xx http://www.fiberstars.com Page 1 of 8 SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation

More information

MOTOR FUEL DISPENSING SAFETY

MOTOR FUEL DISPENSING SAFETY STRATEGIC OUTCOMES PRACTICE TECHNICAL ADVISORY BULLETIN January 2010 MOTOR FUEL DISPENSING SAFETY Fire! Not an alarm anyone wants to hear, especially not when the fire is burning at a major fuel source.

More information

: Floating Roof sinking Failure report of Condensate Tank 5E-220-TB002A..

: Floating Roof sinking Failure report of Condensate Tank 5E-220-TB002A.. INTEROFFICE MEMORANDUM To Cc : Complex Manager : Operation division manager : Production manager : Deputy Complex Manager : Production SPT : Maintenance SPT : HSE coordinator From : Acting Production Eng.

More information

TECHNICAL ADVISORY BULLETIN

TECHNICAL ADVISORY BULLETIN RISK CONTROL AND CLAIM ADVOCACY PRACTICE TECHNICAL ADVISORY BULLETIN November 2014 www.willis.com FIRE PUMP TESTING Fire pumps are a critical part of a fire protection system, especially when they are

More information

26.3.3 The Ship/Shore Safety Check-List

26.3.3 The Ship/Shore Safety Check-List International Safety Guide for Oil Tankers and Terminal Fifth Edition 2006-12-05 26.3.3 The Ship/Shore Safety Check-List Ship's Name Berth Date of Arrival Port Time of Arrival Part `A' - Bulk Liquid General

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING Chapter 24 PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING This Chapter provides guidance on precautions to be observed by both tanker and shore when cargo handling, ballasting, bunkering, tank

More information

BP WIND ENERGY POLICIES AND PROCEDURES

BP WIND ENERGY POLICIES AND PROCEDURES BP WIND ENERGY POLICIES AND PROCEDURES Document Control Details 1.0 Purpose/Scope 1.1 This procedure provides the minimum requirements to be followed for the storage of flammable or combustible materials

More information

TANKER - SHORE SAFETY CHECK-LIST

TANKER - SHORE SAFETY CHECK-LIST TANKE - SHOE SAFETY CHECK-LIST Part A - Bulk Liquid General - Physical Checks Bulk Liquid - General Tanker Terminal Code emarks 1 There is safe access between the tanker and shore. L1 The fendering arrangements

More information

LIQUEFIED PETROLEUM GASES

LIQUEFIED PETROLEUM GASES CHAPTER 38 LIQUEFIED PETROLEUM GASES SECTION 3801 GENERAL 3801.1 Scope. Storage, handling and transportation of liquefied petroleum gas (LP-gas) and the installation of LP-gas equipment pertinent to systems

More information

ETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10

ETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10 Color Light Streams Large Laminar Installation Manual (CLSLL) Input Power: Total Power: 12V AC 5W 4008814 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15152-00 Rev E2 9.14

More information

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation

FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation FIRE SAFETY GUIDANCE NOTE Risk Assessments for Petrol Filling Stations Required Under Fire Safety Legislation Number: GN75 This Guidance Note provides information on the legislation relating to risk assessments

More information

Nitrogen Blanketing for Methanol Storage and Transportation

Nitrogen Blanketing for Methanol Storage and Transportation Nitrogen Blanketing for Methanol Storage and Transportation Overview Air is the enemy of many materials. Not only can oxygen cause safety concerns and product degradation, but moisture, dirt, hydrocarbons

More information

Liquid level measurement using hydrostatic pressure and buoyancy

Liquid level measurement using hydrostatic pressure and buoyancy iquid level measurement using hydrostatic pressure and buoyancy This worksheet and all related files are licensed under the Creative Commons Attribution icense, version 1.0. To view a copy of this license,

More information

LNG Fuel Tank System LNG Tank overview

LNG Fuel Tank System LNG Tank overview Index 1. LNG Tank Overview 2. 3. Gas Flow Diagram 4. Tank Operation 5. 6. Maintenance Boil off line Slave tank Master tank manual gas line vacuum control manual liquid line Check nonreturn filling line

More information

CHECKLIST FOR INSTALLING OR CONVERTING EQUIPMENT TO DISPENSE E15, E30 E85 AND OTHER BLENDS OF ETHANOL General Information:

CHECKLIST FOR INSTALLING OR CONVERTING EQUIPMENT TO DISPENSE E15, E30 E85 AND OTHER BLENDS OF ETHANOL General Information: CHECKLIST FOR INSTALLING OR CONVERTING EQUIPMENT TO DISPENSE E15, E30 E85 AND OTHER BLENDS OF ETHANOL General Information: Is your project an equipment conversion, station remodel or new construction?

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V TITAN pt. no.: 02 0000 0143 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended

More information

Flammable and Combustible Liquids. Slide 1 (of 23)

Flammable and Combustible Liquids. Slide 1 (of 23) Flammable and Combustible Liquids Slide 1 (of 23) Introduction The two primary hazards associated with flammable and combustible liquids are explosion and fire Safe handling and storage of flammable liquids

More information

ABOVEGROUND STORAGE TANK GUIDANCE DOCUMENT

ABOVEGROUND STORAGE TANK GUIDANCE DOCUMENT ABOVEGROUND STORAGE TANK GUIDANCE DOCUMENT Revised 2010 Developed By: Department of Environmental Protection Division of Water and Waste Management SECTION 1.0 APPLICABILITY These instructions are applicable

More information

PETROLEUM STORAGE TANK FIRE PROTECTION SECTION INDEX

PETROLEUM STORAGE TANK FIRE PROTECTION SECTION INDEX PETROLEUM SECTION INDEX Foam Application Method: Fixed Surface Systems (Design Reference NFPA 11)... K2 Fixed, Full Surface Foam Application...K3-K4 BFC Series Custom Fitted Foam Chambers...K5-K6 BFC-HC

More information

Tankless Water Heater

Tankless Water Heater Tankless Water Heater USER S INFORMATION MANUAL Models WGRTNG199 / WGRTLP199 WGRTCNG199 / WGRTCLP199 NOTICE: Westinghouse reserves the right to make product changes or updates without notice and will not

More information

Flammable liquid classes: Combustible Liquid Classes. Class IC. Class II. Class IB F.P. below 22.8 C (73 F), boiling point at or above 37.

Flammable liquid classes: Combustible Liquid Classes. Class IC. Class II. Class IB F.P. below 22.8 C (73 F), boiling point at or above 37. BCFC Part 4 Flammable and Combustible Liquids Application: BCFC Part 4 Part 4 provides for the storage, handling, use and processing of flammable liquids and combustible liquids in buildings,, structures

More information

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

Ergo-Pro Single Line Solar Station Installation and Operating Instructions Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating

More information

I. Introduction. 10 minutes

I. Introduction. 10 minutes I. Introduction 10 minutes Introduction (1 of 2) An uninterrupted water supply is: The primary weapon for extinguishment Essential for fire fighter safety Ensuring a dependable water supply is a critical

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

Protection of unoccupied or void properties

Protection of unoccupied or void properties Real Estate Issue one Protection of unoccupied or void properties Introduction The current economic downturn has lead to a greatly increased number of vacant properties. In some countries rates of unoccupancy

More information

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4 Model TSP2, TSP3 and TSP4 Owner s Manual July 2010 Table of Contents 1 Introduction...................................................... 1 1.1 Read before using..............................................

More information

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;

More information

THE UNIVERSITY OF MAINE COMPRESSED GAS CYLINDERS FOR SCUBA DIVING

THE UNIVERSITY OF MAINE COMPRESSED GAS CYLINDERS FOR SCUBA DIVING THE UNIVERSITY OF MAINE COMPRESSED GAS CYLINDERS FOR SCUBA DIVING Department: The University of Maine Safety and Environmental Management Department Page i TABLE OF CONTENTS Section Title Page 1.0 Purpose

More information

CARING FOR YOUR WATER HEATER

CARING FOR YOUR WATER HEATER http://waterheatertimer.org/troubleshoot-rheem-tankless-water-heater.html Water Heater Inspections CARING FOR YOUR WATER HEATER Venting System (Direct Vent Only) The venting system should be inspected

More information

NFPA 30-2008: Basic Requirements for Storage Tanks

NFPA 30-2008: Basic Requirements for Storage Tanks NFPA 30-2008: Basic Requirements for Storage Tanks New York City Metro Chapter Society of Fire Protection Engineers New York, NY February 22, 2011 NFPA 30, Flammable and Combustible Liquids Code Storage

More information

Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001

Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001 Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001 Specifically designed pumps for heavy duty applications Handles solids with eas and simple to open and clean Standard roll

More information

Fiberstars Mini Lighted Laminar Flow Fountains

Fiberstars Mini Lighted Laminar Flow Fountains Fiberstars Mini Lighted Laminar Flow Fountains SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation and operation of Fiberstars Mini Lighted Laminar Flow Fountain. The

More information

Pressure Testing Procedures for Building Services Piping

Pressure Testing Procedures for Building Services Piping Pressure Testing Procedures for Building Services Piping Document Number Revision 0 Approved By Ric Morris McMurdo, Palmer, and South Pole February 25, 2005 Active Divisions/Departments FEMC Raytheon Polar

More information

International Safety Guide Chapter 3 for Inland Navigation Tank-barges and Terminals. Chapter 3 STATIC ELECTRICITY

International Safety Guide Chapter 3 for Inland Navigation Tank-barges and Terminals. Chapter 3 STATIC ELECTRICITY Chapter 3 STATIC ELECTRICITY This Chapter describes hazards associated with the generation of static electricity during the loading and discharging of cargo and during tank cleaning, dipping, ullaging

More information

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed

More information

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the

More information

Source Sampling Manual Volume II

Source Sampling Manual Volume II Source Sampling Manual Volume II December, 1980 Revisions: May, 1981 January, 1992 April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

Underground Storage Tanks

Underground Storage Tanks Underground Storage Tanks An Informational and Guidance Document for the University Community. Please contact Yale Environmental Health and Safety for latest Regulatory Requirements. A typical UST installation

More information

Model Safety Program

Model Safety Program Model Safety Program DATE: SUBJECT: Flammable and Combustible Liquids Safety Program REGULATORY STATUTE: OSHA 29 CFR 1910.106 OVERALL RESPONSIBILITY: The (YOUR COMPANY) Safety Officer is. He/she is solely

More information

FUELING AND FUEL STORAGE

FUELING AND FUEL STORAGE FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007 TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES 301.010 ANNUAL SERVICE TEST FOR FIRE HOSE EFFECTIVE: OCTOBER 2007 The Department will test all fire hose annually. The testing of fire hose determines its serviceability.

More information

In-Line Air Separators

In-Line Air Separators Air Elimination & Control In-Line Air Separators The AC models of air separators deliver all the quality and performance you expect from Taco products. They are built to last with shell, heads and ANSI

More information

OSHA Tank Venting DEFINITIONS

OSHA Tank Venting DEFINITIONS OSHA Tank Venting DEFINITIONS 1910.106 - Flammable and combustible liquids. 1910.106(a)(2) (a) Definitions. As used in this section: (2) Atmospheric tank shall mean a storage tank which has been designed

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60

More information

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service BP Lower 48 Onshore Operations Safety Manual Page 4.19 1 Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service I. General Requirements A. After motor vehicle accidents and underground excavation

More information

Ethanol-Water Phase Separation White Paper

Ethanol-Water Phase Separation White Paper Ethanol-Water Phase Separation White Paper Samir Jain Background The use of ethanol as a fuel in the United States has significantly increased over the past decade. Today, greater than 80% of all retail

More information

Petrol Storage Information Note

Petrol Storage Information Note Petrol Storage Information Note The storage of petrol is governed by specific legislation. These regulations are entitled; Dangerous Substances (Retail and Private Petroleum Stores) Regulations, S.I. 311

More information