1 ADDENDUM #1 RELEASED SEPTEMBER 5, 2014 GYPSUM TO DOTSERO TRAIL BASE AND PAVING PROJECT Bidders shall acknowledge receipt of this Addendum #1 on the Bid Form. Failure to do so may render the Bidder s bid non-responsive. The following changes, additions, or deletions shall be made to the Bidding Documents and all other items shall remain the same. Question: What is Base and Paving testing frequency and type? See the attached revised Exhibit C Notes and Specifications. Question: Is item 6.31 on Pg. 47 of General Conditions to be deleted? Yes. Question: Is this a unit price contract? This is a combined Unit Price and Lump Sum Contract as specified in Exhibit A. Unit Price Quantities have been estimated with the standard Road and Bridge Department formula for all base and paving work. Quantities are amended by this Addendum to reflect revisions to driveway work and an error regarding shoulder base course quantity. Question: Is there a traffic control CDOT specification? See attached revised Exhibit C Notes and Specifications. Question: Are you going to add a mobilization bid item? No. Question: No permits or fees required by the Contractor? Correct. Eagle County holds the CDOT permit issued for the Gypsum to Dotsero Trail and as stated in the bidding documents, Contractor to review and adhere to the CDOT permit conditions attached to the Bid Documents as Exhibit E. Comment: Certified Weed Free Top Soil is not available locally. Top Soil provided for the work shall either be certified Weed Free or treated with an herbicide after placement and before native seeding. Herbicide treatment shall be performed by a licensed applicator and proposed treatment is subject to review and approval by Eagle County Weed Control department. 1

2 Clarification: Regarding Sterilant Sterilant will be applied to trail subgrade and shoulder area only by Eagle County Weed Control personnel following completion of the trail platform by Eagle County Road and Bridge and prior to the scheduled base and paving date. Revised Exhibit A Bid Form: The form has been revised to reflect quantity revisions as noted above. Revised Exhibit C Notes and Specifications: See following page for strikeouts as removed information and highlights for added or revised information. Driveways: Supplemental driveway exhibits are attached under separate cover and are part of this Addendum #1. 2

3 EXHIBIT A SCOPE OF WORK GYPSUM TO DOTSERO TRAIL BASE AND PAVING PROJECT Revised September 5, 2014 BASE and PAVING BID COMPLETE AND SUBMIT WITH BID FORM: Item Description Unit Quantity Unit Price Total Hot Bituminous Pavement (HBP-SX, PG 58-28), including TN 1,378 trail and all driveways Aggregate Base Course (Class 6), including trail and all driveways TN 2,535 Materials Sampling, testing and inspection LS 1 Construction zone traffic control LS 1 TOTAL BID ALTERNATE BID ITEM 1 - OPTIONAL: Item Description Unit Quantity Unit Price Total Import and Placement of Topsoil (4 ) per Specifications, placed in locations as directed by Owner on trail side slopes within the project limits CY 108 TOTAL ALTERNATE BID 3

4 EXHIBIT C NOTES AND SPECIFICATIONS GYPSUM TO DOTSERO TRAIL BASE AND PAVING PROJECT 1. Project Purpose: Project purpose is to provide a 10 foot wide public trail for recreation and transportation on the south side of Highway 6 between Town of Gypsum and Dotsero as part of the Eagle Valley Trail. 2. Description of Work: a. Contractor will install three inches (3 ) of bituminous asphalt ten feet wide on a 13 foot wide four inch (4 ) deep aggregate base course platform compacted to the specifications cited below. The work will also include a compacted one foot (ABC) Class 6 plus base course shoulder on each side of the asphalt trails. b. The base and paving work will be installed on the trail subgrade currently under construction by the Eagle County Road and Bridge Department. Road and Bridge and ECO Trails will assist Contractor with base and paving layout. c. The compacted subgrade trail platform will be ready for paving as of September 29, Per the Bidding Documents, completion date is November 15. Reasonable extensions for base, paving and topsoil placement are possible subject to approval by Owner, CDOT and acceptable weather conditions. d. The base and paving project ( project ) consists of two parts, separated by approximately one mile, as shown on the attached Exhibit B map. e. Access and staging is available at the Duck Pond Eagle County Open Space property and BLM Horse Pasture river access, subject to review and approval by Owner. 3. Schedule of Work: a. Contractor to schedule pre-base and pave meeting with Owner for one calendar week prior to planned dates for commencement of the work. b. Contractor provide traffic control plan one calendar week prior to planned dates for commencement of the work. b. Contractor to confirm dates of work 48 hours prior to commencement of the work. c. Hours of construction shall be limited to Monday through Friday 7:30 a.m. to 6:00 p.m. No work will be allowed at night, Saturdays, Sundays or legal holidays without prior authorization from the Owner, in compliance with the conditions of project permits. 4

5 d. Per the CDOT permit issued for the project, no work shall be permitted on Highway 6 on Colorado State Holidays Monday, October 13 and Tuesday, November 11. Work can continue on non- CDOT property (County and BLM) if no traffic control impacts to Highway 6. Owner will assist Contractor with request for holiday work authorization if weather delays. 4. Specifications: a. All materials, equipment, installation and construction within the state highway right of way shall be in accordance with the following standard references as applicable: 1. CDOT Field Material Manual 2. CDOT Construction Manual 3. CDOT Standard Specifications for Road and Bridge Construction 4. CDOT M&S Standards 5. FHWA Manual on Uniform Traffic Control Devices 6. AASHTO Roadside Design Guide b. The base and paving trail cross section is as follows: 1. 4 of ABC will be installed as 13 feet wide of asphalt will be installed as 10 feet (10 ) wide 3. An additional 3 depth of ABC will be installed and compacted after asphalt installation as a one foot (1 ) shoulder compacted shoulder flush with the trail asphalt, on each side. c. The Contractor is not responsible for subgrade compaction or repair of soft areas. Contractor will not unduly disturb pre-pave compacted subgrade in preparation for the work. Contractor will participate in observing proof roll of subgrade by Road and Bridge at pre-base and pave meeting. d. Ingress and Egress access is open throughout the project, with exception of between Driveway #1 (Giordano) east to existing block wall is one-way access only. e. Contractor shall match or transition work to existing trail and driveway asphalt grades within project limits. e. Driveway Details and Pavement Scope of Work Quantities: #1 Giordano Residential: a. Currently paved b. Contractor to crackseal driveway surface under planned trail and apron location c. Contractor to overlay trail location and 4 foot x 28 foot wide aprons on north and south side of trail with ½ asphalt and transition as needed to existing driveway grades d. Quantities for new base and asphalt this driveway to serve as trail deleted from project quantities e. Estimated 1 TN of asphalt added to bid quantity 5

6 f. Crackseal quantity is incidental to cost of the work. #2 Duck Pond OS East a. Currently unpaved b. Driveway subgrade and excavation prep by Road and Bridge c. Contractor to add road base and asphalt aprons to each side of trail as follows d. 6 feet on south side of trail, measured from edge of trail x 15 foot width e. 6 feet on south side of side of trail, measured from edge of trail x 15 foot width f. Estimated quantities of 4.5 TN base and 3 TN asphalt added to bid quantity #3 Duck Pond OS West a. Currently paved b. Contractor to crackseal driveway surface under planned trail and apron location c. Contractor to overlay trail location and 4 foot x 16 foot wide aprons on north and south side of trail with ½ asphalt and transition as needed to existing driveway grades d. Quantities for new base and asphalt this driveway to serve as trail deleted from project quantities e. Estimated 1 TN of asphalt added to bid quantity f. Crackseal quantity is incidental to cost of the work. #4 Long s Commercial a. Currently unpaved b. Driveway subgrade and excavation prep by Road and Bridge c. Contractor to add road base and asphalt aprons to each side of trail as follows d. 6 feet on south side of trail, measured from edge of trail x 24 foot width e. 6 feet on south side of side of trail, measured from edge of trail x 24 foot width f. Estimated quantities of 7TN base and 5 TN asphalt added to bid quantity #5 Long s Residential a. Currently paved b. Contractor to crackseal driveway surface under planned trail location plus 20 feet to Hwy 6 connection and 6 feet to south c. Contractor to overlay commensurate area with ½ asphalt and transition as needed to existing driveway grades d. Quantities for new base and asphalt this driveway to serve as trail deleted from project quantities e. Estimated 4.5TN of asphalt added to bid quantity f. Crackseal quantity is incidental to cost of the work. #6 BLM Lava Site a. Currently unpaved b. Driveway subgrade and excavation prep by Road and Bridge c. Contractor to add road base and asphalt aprons to each side of trail as follows d. 10 feet on south side of trail, measured from edge of trail x 15 foot width e. feet north side of trail, measured from edge of trail x 15 foot width f. Include Curve radius to tie into existing Highway 6 asphalt g. Estimated quantities of 9 TN base and 7 TN asphalt added to bid quantity 6

7 f. Driveway Details and Pavement Scope of Work Quantities: 1. Project includes 6 locations where trail will cross driveways. 3 driveways are currently paved, 3 are unpaved. 2. Eagle County Road and Bridge Department (R&B) will prepare all 6 driveways as follows: a. 3 paved driveways will be sawcut 12 x 12 dimension and asphalt removed prepavement. b. At all driveways, road base will be installed and compacted by R&B to required elevation to accommodate 3 of asphalt to be installed by Contractor. Owner to provide road base for this phase. c. R&B will install temporary lightly-compacted road base depth as necessary (+/-3 ) to maintain existing driveway grades to allow safe driveway use pre-paving. d. This work will be performed as close as practically possible to Contractor s start of work date. Driveways to be reviewed at pre-pave meeting. 3. Contractor to remove temporary lightly-compacted road base at all driveways as necessary to accommodate paving. Road base material may be used for shouldering or miscellaneous leveling as needed. 4. Overlay tack is incidental to the cost of the work. 5. Treatment of specific driveways: a. Attached illustrations are intended to generally depict treatment at each of six driveways. Illustrations are not to scale. b. Additional asphalt for extra two feet of trail width at sawcuts, aprons and overlays are included in the bid form quantities. c. Driveway #1 1. Install additional asphalt 1 foot x 26 feet each side of 10 foot trail at 3 deep to pave/fill sawcut area. 2. Install 2 foot x 26 foot apron on south side of trail measured from south side of sawcut, blend and transition to existing driveway grade. 3. Overlay driveway from north edge of trail sawcut area at a depth of 1.5 or less to meet edge of Highway 6 asphalt shoulder. Estimated overlay area is 1,500 feet. 7

8 d. Driveway #2 1. Install asphalt 4 foot x 15 foot x 3 deep apron on each side of trail and transition to existing unpaved driveway grade. e. Driveway #3 1. Install additional asphalt 1 foot x 17 feet each side of 10 foot trail at 3 deep to pave/fill sawcut area. 2. Install 4 foot x 17 foot x 1.5 deep apron on each side of trail and transition to existing paved driveway. f. Driveway #4 1. Install 6 foot x 26 foot x 3 deep aprons each side of trail and transition to existing unpaved driveway grade. g. Driveway #5 1. Install additional asphalt 1 foot x 32 feet each side of 10 foot trail at 3 deep to pave/fill sawcut area. 2. Install 6 foot x 32 foot x 1.5 apron on south side of trail measured from south side of sawcut, to blend and transition to existing driveway grade. 3. Overlay driveway from north edge of trail sawcut area at a depth of 1.5 or less to transition to edge of Highway 6 asphalt shoulder. Estimated overlay area is 1,700 square feet. h. Driveway #6 1. R&B to sawcut clean edge of existing driveway apron from Hwy 6 2. Install 15 feet x 17 x 3 from north edge of trail to meet existing driveway apron. 3. Install 15 feet x 4 feet x 3 apron from south edge of trail and transition to existing unpaved driveway grade. g. Base and asphalt shall maintain subgrade drainage cross slope of 2%. h. Fine grading of topsoil in preparation for seeding (by Owner) is incidental to topsoil placement. i. All staging areas shall be restored to same or better condition prior to the work, following the demobilization of base and paving equipment. j. At or prior to pre-base and pave meeting, Contractor shall submit mix design for Hot Bituminous Pavement and provide certification that Class 6 meets CDOT specifications. 8

9 k. Materials test results shall be provided to Owner. Tests and intervals for this project are as follows: Item Test Type Frequency Specification Class 6 Aggregate Base In Place Density 1 per 500 LF 95% Standard Gradation 1 per 2000 TN AASHTO T-99 Atterberg Limits 1 per 2000 TN 92% Theo. Density Hot Bituminous Asphalt Content 1 per 1000 TN Gradation 1 per 1000 TN Density 1 per 500 LF 5. Traffic Control a. Contractor shall be responsible for providing all required traffic control devices necessary to complete the work in accordance with the guidelines set forth within the Manual on Uniform Traffic Control Devices, with latest revisions and the CDOT M&S Standards. b. The Contractor shall not have construction equipment or materials in the lane or shoulders of the highway at any time, unless approved or directed. c. Contractor employee vehicle parking is prohibited where it conflicts with safety, access or flow of traffic. No Contractor employee parking will be allowed within the clear zone unless approved by the Owner or CDOT. d. Proposed lane closures, though unanticipated as part of the work, are subject to review and approval by CDOT. The planned work does not take place on the highway paved travel lanes or shoulders. 1. Two weeks prior to beginning work, Contractor will submit a Traffic Control Plan for review by Owner and Colorado Department of Transportation (CDOT). The TCP will cover all phases of the work. 2. The Traffic Control Plan advanced warning and construction signs, flashers, barricades and flag people must conform to the Manual on Uniform Traffic Control Devices (MUTCD). 3. Any advance warning signs not in use for a particular activity shall be removed, placed outside of the clear zone or laid flat at least 4 from the edge of the shoulder. 4. All flagging personnel must be certified and their certification cards available for inspection at any time. 5. Lane closures must be as short as possible and per the MUTCD. Flaggers are required for each lane closure. 6. The TCP shall insure that closures of access points e.g. driveways is minimized. 9

10 7. Contractor will have a competent person at the work site at all times in responsible charge of the temporary traffic control. As this project is not expected to require beyond the Typical Application shown in the MUTCD and is not located on a roadway with particularly dangerous traffic conditions, a Traffic Control Supervisor is not required. 8. Two-way traffic shall be maintained at all times in the construction area in accordance with the MUTCD. 9. The Contractor shall not have construction equipment or materials in the lanes or the shoulders of the highway at any time, unless approved or directed. 10. Workers, Contractor, Suppliers, etc. shall not access the work area by crossing the roadways unless proper traffic control or other necessary precautions are provided. 11. Employee vehicle parking is prohibited where it conflicts with safety, access or flow of traffic. No employee parking will be allowed within the clear zone. Adequate employee vehicle parking is available in the BLM and County staging areas. 12. Dirt, mud or debris tracked onto the highway by the work activity will be removed daily by Contractor. 13. Activities within the highway must be shut down when pavement is wet and hazardous for the traveling public. 14. To meet conditions encountered in the field, minor changes or additions may be ordered and approved by CDOT. 15. Contractor shall keep a copy on site at all times of the CDOT permit for this work issued to Eagle County and provided in the Bidding Documents. 16. All costs incidental to the foregoing requirements shall be included in the traffic control lump sum contract price for the project. 6. Permits a. The Contractor shall conform to the terms, conditions and stipulations of the CDOT Special Use Permit, attached as Exhibit E. b. Contractor s insurance will include CDOT as an additional insured. 7. Utilities: a. Excavation is not anticipated as part of this work. If excavation occurs, Contractor to notify Utility Notification Center of Colorado (UNCC) at for utility locates. 10

11 b. Overhead power lines are present within work area and should be accommodated during the work. 8. General: a. Contractor selection shall be based on Base and Paving Bid and per qualifications and other criteria described in the Bid Documents; and not on the combined total of the Base and Paving Bid and Alternate Bid. b. Material quantities may be adjusted by Owner depending on bid results. END OF ADDENDUM NUMBER #1 11

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA 2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

SCOPE OF WORK. COLORADO DEPARTMENT OF TRANSPORTATION Statewide

SCOPE OF WORK. COLORADO DEPARTMENT OF TRANSPORTATION Statewide SCOPE OF WORK Construction Management Construction Inspection & Materials Testing Services For the Calendar Year 2016 Program COLORADO DEPARTMENT OF TRANSPORTATION Statewide SCOPE OF WORK FOR: I. Construction

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction

More information

Summary Statement of Work

Summary Statement of Work Exhibit A PennDOT District 2-0 Tree Work Specifications for a Specialized / Expandable Arboriculture Complement Summary Statement of Work I. DESCRIPTION A. This statement of work is in addition to the

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL 1.0 Description. 1.1 This specification allows bidders the opportunity to include in their overall bid proposal, pricing for

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation. Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

SECTION 5 - STREET CONSTRUCTION AND DESIGN

SECTION 5 - STREET CONSTRUCTION AND DESIGN SECTION 5 - STREET CONSTRUCTION AND DESIGN 1. SPECIFICATIONS FOR STREET CONSTRUCTION AND DESIGN All residential subdivision streets built within the unincorporated area of Riley County shall be built so

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

Section 801 Driveway Access Onto Public Right-of-Ways

Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00 Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00. Definitions. The following words and terms, when used in this Article, shall have the following meanings, unless the

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

How To Get A Street Opening Permit In Belham

How To Get A Street Opening Permit In Belham TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Developer s/consultants Field Services Guidelines

Developer s/consultants Field Services Guidelines Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

County Wide Chip Seal

County Wide Chip Seal LORNE HAASE, CHAIRMAN JOHN OKOREN, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALAN, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX

More information

Bituminous Paving and Construction

Bituminous Paving and Construction JOHN OKOREN, CHAIRMAN LORNE HAASE, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALON, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

PC 23-11 Nate Lundgren-Auto Repair Business Conditional Use Permit 9/7/11 Applicants

PC 23-11 Nate Lundgren-Auto Repair Business Conditional Use Permit 9/7/11 Applicants PC 23-11 Nate Lundgren-Auto Repair Business Conditional Use Permit 9/7/11 Applicants Nate Lundgren Triple K Partnership Mankato 105 LeSueur Ave 320 Mallard Lane Eagle Lake, MN 56024 Mankato MN 560001 Request

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131 SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK City of Des Peres, Missouri 12325 Manchester Road Des Peres, Missouri 63131 Prepared by City Engineer March 2011 INVITATION TO BID SANITARY

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT

Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT Welcome to the Inland Wetlands Commission Town of Barkhamsted, CT Introduction Purpose Barkhamsted is a residential community located in Litchfield County, 15 miles northwest of Hartford. Our population

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT APPLICATION FOR A FILL, ECAVATION AND SITE GRADING PERMIT 1. The first step to obtain a Fill, Excavation and Site Grading permit is to obtain a Broward County Environmental Review Approval. Through the

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing

4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Guidelines. Work Zone Access and Egress

Guidelines. Work Zone Access and Egress Guidelines on Work Zone Access and Egress This document describes concerns associated with work zone access and egress. The document offers recommended practices and describes effective strategies and

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR PH 231.946.5874 FAX 231.946.3703 WWW.gourdiefraser.com CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR Little Traverse Bay Bands of Odawa Indians Nine Mile Point Boat Launch Hayes Township, Charlevoix

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

Right-of Way Use Permit Application

Right-of Way Use Permit Application Right-of Way Use Permit Application 400 SW 152 nd Street, Suite 300 Burien, WA 98166 Phone: (206) 439-3161 Inspection: Line 206-439-3162 Email address: rowpermits@burienwa.gov For City Use Only Reviewed

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Construction Management Program

Construction Management Program Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information