SECTION 5 - STREET CONSTRUCTION AND DESIGN
|
|
- Brice Sparks
- 8 years ago
- Views:
Transcription
1 SECTION 5 - STREET CONSTRUCTION AND DESIGN 1. SPECIFICATIONS FOR STREET CONSTRUCTION AND DESIGN All residential subdivision streets built within the unincorporated area of Riley County shall be built so as to comply with the Riley County specifications for crushed stone subgrade and surfacing as stated herein. Equivalent road sections using flyash, geofabrics or lime subgrade treatment based on soil tests and designed by a professional engineer licensed in Kansas may be approved. This specification shall constitute a minimum standard. Higher construction standards may be required by resolution for designated areas as conditions may warrant. All paved streets in residential subdivisions shall be built so as to comply with the "Riley County Kansas Standard Specifications for the Construction of Paving, Storm Sewers, Curb and Gutter, and Sidewalks". Streets in commercial or industrial subdivisions shall be so designed to carry the anticipated loads for each unique situation. 2. INSPECTION AND APPROVAL FOR MAINTENANCE Street projects are constructed at the expense of the subdivision's developer. The Riley County Public Works Department is responsible for inspection of the construction. A final inspection of the project is made and is attended by the developer, County Public Works and township personnel. If the condition of the project is satisfactory, the County Engineer recommends to the County Commission that the streets be accepted and be turned over to the township in which they are located for maintenance. 3. GUARANTEE OF SATSIFACTORY PERFORMANCE a. A developer may construct the streets in a subdivision with or without having posted a performance bond with the County. If the developer elects to post the bond, the final plat of the subdivision may be filed and building permits issued prior to the acceptance of the streets. If the developer elects not to post bond, the subdivision plat may not be filed nor building permits issued until the roads are accepted. The performance bond shall be in the amount of the contract cost of the road improvements. b. In the case where a developer starts a street project without a performance bond and encounters interest from parties interested in obtaining building permits, the developer will be allowed to post a performance bond in the amount of the estimated cost of the remaining work. In no case will a street project be accepted without the developer having posted a maintenance bond for the project. The maintenance bond is in the amount of fifteen percent of the construction cost of the project and is to remain in force for one year after the streets are accepted. Performance and maintenance bonds must be issued by a bonding company registered to do business in the State of Kansas. Letters of credit or cashiers checks will be accepted in lieu of bonds. Personal checks or collateral assignments will not be accepted.
2 4. CRUSHED STONE SUBGRADE Crushed stone subgrade shall be supplied and installed in accordance with sections through of the K.D.O.T. Standard Specifications for State Road and Bridge Construction (1990 edition) with the following exceptions: 1. Compaction shall be Type B (MR-90) 2. The Road Mix Method may be used. 3. The gradation requirements for "Crushed Stone for Backfill" shall be as noted below: 5. SURFACING Sieve Size % Retained 3" " No a. DESCRIPTION This work shall consist of the placing of aggregate for surfacing in a windrow, and the uniform spreading and compaction of the windrowed material in reasonable close conformity with the details displayed in Exhibit I (on display in Riley County Planning & Development Office). The use of a mechanical spreader may be substituted for the windrow-uniform spreading method. b. CONSTRUCTION REQUIREMENTS The aggregate materials to be utilized shall be combined material (AB-3) as described in the K.D.O.T. Specifications for State Road and Bridge Construction. The aggregate material to be utilized shall be approved by the County Engineer. The approved material shall be hauled in suitable vehicles having dump beds suitable for dumping the materials. No hauling of materials will be permitted when in the judgement of the County Engineer, the weather or road conditions are such that hauling operations cause excessive cutting or rutting of the road surface. The materials approved for delivery to the road shall be uniformly distributed through out the length of the road to be improved. The rate of application shall be as shown herein for the various materials provided. Section 5 Street Construction and Design
3 6. MINIMUM DESIGN STANDARDS Right-of-way... 60' for Service Street ' for Minor Trafficways ' for Major Trafficways Horizontal Curvature ' Rad. for Trafficways ' Rad. for Service Streets Sight Distance...150' Roadbed Width...24' Ditch Depth...2' Ditch Width...4' Should Slope... 3:1 Back Slope... 2:1 Bridge Design Loading... AASHTO A-20 Bridge Roadway Width...24' Maximum Roadway Grade...12% These standards may be recommended for waiver by the County Engineer if terrain features and/or safety considerations justify such a waiver. 7. EXTRAORDINARY CONDITIONS Where, in the opinion of the County Engineer, extraordinary pedological conditions are encountered in a subdivision, a special street design may be required. California Bearing Ratio and modified Proctor density curves shall be provided to assist the County Engineer in determining if extraordinary conditions exist. Section 5 Street Construction and Design
4
5
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationCHAPTER 1181 Improvements
139 CHAPTER 1181 Improvements 1181.01 Performance bond; 1181.07 Street name signs. construction plans; 1181.08 Street lighting. improvements. 1181.09 Improvements bond. 1181.02 Monuments. 1181.10 Maintenance
More informationINDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationSECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationBethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
More informationJEFFERSON COUNTY ROAD DEPARTMENT HIGHWAY PERMIT USE OF ROADS FOR HAUL ROUTE / EVENT ROUTE. Hereinafter referred to as County/Owner and Name
JEFFERSON COUNTY ROAD DEPARTMENT HIGHWAY PERMIT USE OF ROADS FOR HAUL ROUTE / EVENT ROUTE WHEREAS ROAD DEPARTMENT, JEFFERSON COUNTY, PO BOX 322 14991 94TH ST., OSKALOOSA, KS 66066 Hereinafter referred
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationSUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationDeveloper s/consultants Field Services Guidelines
Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION
More informationSTANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationDivision 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
More informationMDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More information8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationPorous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
More informationSECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationChapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
More informationCHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS
I "i,, I, 1 " CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS CHAPTER 10 PERMIT PROCEDURES A N D BONDING REQUIREMENTS FOR CONTRACTORS, Section I -, INDEX :, - % I I,,J Topic b 101
More informationSIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationElectric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationEXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
More informationRIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
More informationThe checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
More informationRoad Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationCITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationCHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements
More informationChapter 9 Sanitary Sewers
Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationStructures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More informationSECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
More informationBuilding Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
More informationTOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
More informationSECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
More information1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationPERMEABLE INTERLOCKING CONCRETE PAVEMENT
[NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded
More informationAGREEMENT FOR SOILS CONSULTANT. (City of Camarillo) This Agreement is made and entered into by and between
AGREEMENT FOR SOILS CONSULTANT (City of Camarillo) PROJECT NUMBER: This Agreement is made and entered into by and between (hereafter DEVELOPER) and (hereafter CONSULTANT). W I T N E S S E T H: The parties
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationG.S. 47-30 Mapping Requirements for Recordable Maps
G.S. 47-30 Mapping Requirements for Recordable Maps 47-30. Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the registry
More informationMEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction
More informationSECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
More informationTown of Beaumont. Lot Grading Guidelines
Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...
More informationCity of West Linn Public Works Design Standards 2010. Table of Contents
City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2
More informationSMART GROWTH POLICY REVIEW COMMITTEE MEETING WEDNESDAY, DECEMBER 11, 2013
1 1 1 1 1 0 1 0 1 0 1 SMART GROWTH POLICY REVIEW COMMITTEE MEETING WEDNESDAY, DECEMBER, 0 In Attendance Clay Ervin, Member Stephen Kintner, Member Dianne Cade, Member Pete Glover, Member Rob Merrell, Member
More informationSECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)
SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation
More information2011 HYDRAULICS MANUAL
STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following
More informationFIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
More informationSECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationORDINANCE NO. 89-04-09 AN ORDINANCE TO ESTABLISH REGULATIONS AND STANDARDS FOR STORM DRAINAGE FACILITIES
Bill No. 86-13 ORDINANCE NO. 89-04-09 AN ORDINANCE TO ESTABLISH REGULATIONS AND STANDARDS FOR STORM DRAINAGE FACILITIES The Berkeley County Council hereby adopts the following provisions: 1) Definitions
More information104 INTERPRETATION OF TEXT
100 PURPOSE The Purpose of these rules, guidelines and standards as adopted by the Delaware County Board of Commissioners, hereinafter referred to as the County Commissioners, is to provide engineering
More informationDesign and Construction Standards
Design and Construction Standards Volume 2 Construction Specifications 2015 Edition Public Works Planning and Development Services ADOPTION OF CONSTRUCTION SPECIFICATIONS CITY OF OVERLAND PARK A. Authority
More informationSECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
More informationAsphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
More informationArchitectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
More informationQUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park
QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationINSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER
INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER Applicable to all AquaPerm TM Permeable Unit Paver Systems FOREWORD These outline specifications have been prepared for the general guidance of architects,
More informationCHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS
CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS 10.1 APPLICATION REQUIREMENTS AND PROCEDURES 10.1.1 A permit shall be required for any construction or installation within the public right-of-way
More informationTECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
More informationSECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
More informationBeacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
More informationSECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationCLASS II BASE COURSE - Section 302
CLASS II BASE COURSE - Section 302 Class II Base Courses are similar to Class I Base Courses, with the exception that placement on a subgrade layer built in accordance with Specification Section 305 is
More informationSection 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
More informationDIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
More informationCity of Los Angeles. Mayor Antonio R. Villaraigosa GUIDELINE
City of Los Angeles Mayor Antonio R. Villaraigosa R E S I D E N T I A L P A R K W A Y L A N D S C A P I N G GUIDELINE RESIDENTIAL PARKWAY LANDSCAPING GUIDELINE This document is intended to provide constituents
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
More informationSummary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
More informationTITLE VIII ST. ROBERT CODE OF ORDINANCES INFRASTRUCTURE DEVELOPMENT REGULATIONS OF THE CITY OF ST. ROBERT, MISSOURI
TITLE VIII ST. ROBERT CODE OF ORDINANCES INFRASTRUCTURE DEVELOPMENT REGULATIONS OF THE CITY OF ST. ROBERT, MISSOURI A UNIFIED REGULATION GOVERNING THE DEVELOPMENT OF STREET, WATER, SANITARY SEWER INFRASTRUCTURE
More information40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement
More informationSTORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
More informationARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
More informationHempfield Township LOGGING/HARVESTING PERMIT APPLICATION. Per Section 87-73 of the Code of the Township of Hempfield
1132 Woodward Drive, Suite A, Greensburg, PA 15601-9310 Phone: 724-834-7232 724-864-7378 Fax: 724-834-5510 Website: www.hempfieldtwp.us LOGGING/HARVESTING PERMIT APPLICATION Per Section 87-73 of the Code
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationSUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
More informationRight-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)
Flood Control District of Maricopa County (District) 2801 W. Durango Street Phoenix, AZ 85009 Telephone: 602-506-4583 or 602-506-5476 Fax: 602-506-1663 Right-of-Way Permit Application Process (Plans that
More informationGreening our Roads. Approach
Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads
More information